rfq cooler and buncher project for isolde present status and off-line test results hanna frånberg,...

15
RFQ cooler and buncher project for ISOLDE Present status and off- line test results Hanna Frånberg, ISOLDE

Upload: dinah-garrett

Post on 13-Jan-2016

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

RFQ cooler and buncher project for ISOLDE

Present status and off-line test results

Hanna Frånberg, ISOLDE

Page 2: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

Why an RFQ CB for ISOLDE

• Reduced transverse emittance

• Reduced energy spread

• Beam bunching capability

For a wide range of masses

Relatively fast cooling (< ms)

Page 3: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

Examples for applications

• Injection into mass spectrometerse.g. ISOLTRAP, MISTRAL, JYFLTRAP

• Laser spectroscopy– COLLAPS, JYFL

• Injection into mass separators– HRS of ISOLDE, EURISOL

Page 4: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

Installation of RFQToday:

October 2007:

2nd step:

future:

EURISOL HIE Isolde:

Tim Giles

Page 5: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

Where at ISOLDE

Page 6: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

Cartoon of the RFQ installation

RIB from

HRS

Page 7: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

RFQ Cooler technique

• RF for radial confinement• DC Segments for axial trapping• Gas for cooling

Page 8: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

Aims of the off-line tests• Transmission efficiency

– As a function of the mass• Alkali ions Li,Na, K, Cs• Ar / noble gases from a FEBIAD source

– CW and pulsed mode

• Beam quality improvements– Emittance measurements– Time and energy spread of the bunches

• Specific issues– Space charge limit with bunched beams– Recombination of noble gases with impurities

Page 9: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

ISCOOL off-line tests

• RFQ• RF Oscillator• Test ion source• 2 FCs for diagnostics• Quadrupole Triplet

Page 10: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

0%

20%

40%

60%

80%

100%

0 20 40 60 80 100 120 140

Mass

Tra

nsm

issi

on

6Li

23Na

39K

133Cs

Optimized transmissions

Element Transmission

Li 17 %

Na 28 %

K 68 %

Cs 79 %CW mode

Page 11: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

Ion cooling

When optimizing the buffer gas pressure or the RF voltage the emittance decreases as transmission efficiency increases

Element Emittance

Ion source >35 π•mm•mrad

Without cooling

>35 π•mm•mrad

With cooling

Cs

ε95= 2.2 π•mm•mrad

60% transmission

Na ε95=2.95 π•mm•mrad

23 % transmission

CW mode

Page 12: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

Example of emittance plots• Without cooling • With cooling

~35·mm·mrad 95% emittance

~2.2·mm·mrad 95% emittance

Page 13: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

Bunched beams

• Preliminary tests with Na ions– Transmission close to CW operation (>20%)– Space charge limits in transmission efficiency not

seen up to 106-107 ions/bunch – BUT: long bunches >50s

• may be due to the (too) simple extraction scheme adopted up to now – pulsing of the extraction plate only

Page 14: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

Next steps• Off-line commissioning

– Tests with a FEBIAD ion source (Ar)• ISOLDE-like ion source• Charge recombination in the buffer gas?

– Tests of the bunching mode with a better extraction scheme

• Pulsing the extraction plate and the last segments of the buncher

• Installation– HV platform - next June– Installation of the RFQ - October

Page 15: RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE

H. Frånberg, INTAG workshop GSI May 24-25 2007

In collaboration with:P. Delahaye, R. Catherall, M. Lindroos, T. Giles, I. Podadera

E. Mané, J. Billowes, F. Duval

A. Jokinen1 Schuster Laboratory , University of Manchester, United

KingdomCERN, CH-1211 Geneva 23, Switzerland3 ISMRA, Caen, France4 Department of Physics, University of Jyväskylä, Finland

Thank you for your attention!