    Modeling and Monitoring of the Operational Risk in

    Wind Farms South American Experience

    Bernardo Reyes

    Vestas Mediterranean

  • 8/13/2019 Risco operacional - elica

    2/17

    1.About Vestas Service in South America and Brazil

    2.Modeling of the Risk in ind farms in o!eration

    ".Monitoring of the Risk in ind farms in o!eration

    #.$he Benefit for the %ustomer& Reduction of the Risk and

    Savings

    '.$he South America and Brazil ()!erience

    *.Structure to Su!!ort the +ynamic Risk Modeling and

    Monitoring

    ,.-A

    /.Summary

    Agenda

  • 8/13/2019 Risco operacional - elica

    3/17

    "

    About Vestas Service in South America and Brazil

    ARGENTNA ,,0# M

    !R!G!A" " M

    #$%E 11#0, M

    N#ARAG!A # M

    &ra'il1# M

  • 8/13/2019 Risco operacional - elica

    4/17

    #

    About Vestas Service in South America and Brazil

    %a!acity already$3R

    ()* MW

    %a!acity undere)ecution

    (++ MW

    ()ecution about toStart

    ,-. MW

    / 0 -*1 MW

    Signed 211

    12* MW

    Main office

    4ortaleza 4acility

  • 8/13/2019 Risco operacional - elica

    5/17

    '

    Modeling the Risk in ind 4arms in 3!eration

    4ailures Rates !er every 4ailure Mode

    Ambient $em!erature and 5umidity

    6evel of !roduction

    S!in78! of the ind

    Seasonality. 9n South America that kind of !henom is named :$he Boy;$he !g

    hen the ind farms start the o!eration0 the risk is modeling change the focus. ?o is not only

    the variable 6A% @load and charges or turbulence and the modeling includes&

  • 8/13/2019 Risco operacional - elica

    6/17

    *

    Modeling the Risk in ind 4arms in 3!eration

    ind and Site RiskModeling

    Service RiskModeling

    6oad and %harges at +rive $rain

    Site %heck for $urbulences ind Sector Management $heoretical 6ifetime for Main %om!onents

    Risk of every failure mode

    %BM for critical failures modes 3!timal ins!ection at minimum cost Real 6ifetime for Main %om!onents and Monitoring

    Focus on 3ind farm4stechnical feasi5ilit6

    Site Selection +evelo!ment ermits (ngineering %onstruction 3!eration

    C2 years172 yearsD 71D years 171D years172 years17" years

    Focus on minimi'ingoperati7e costs

  • 8/13/2019 Risco operacional - elica

    7/17,

    Modeling the Risk in ind 4arms in 3!eration

    4or that modeling the stages are&

    R%M Stage@

  • 8/13/2019 Risco operacional - elica

    8/17/

    Modeling the Risk in ind 4arms in 3!eration

    8sing an on suite for the modeling the risk of every failure mode e considerer&

    Severity of every failure mode @not only the drive train failures 4reEuency0 historic data and im!rovements of $< %a!ability of detection (nvironment0 Safety0 %ost0 8navailability Behavior @Mortal 9nfantry0 ?ormal0 ear0 %orrosion Survival 4unction and theoretical R86

    %BM @condition base monitoring only for the critical failures modes @in red reventive Maintenance for standard failures modes @in green Run to failure strategy for lo im!act failures modes @in cyan

    And define by risk the task needed to avoid;mitigate the effects by&

  • 8/13/2019 Risco operacional - elica

    9/17F

    Modeling the Risk in ind 4arms in 3!eration

    ith the !riorization of the failures modes based on risk the ne)t ste! is model thesurvival function for every failures mode. +e!ending of the criticality %MB changes into!reventive maintenance or Euantity of s!are7!arts.

  • 8/13/2019 Risco operacional - elica

    10/171

    Monitoring the Risk in ind 4arms in 3!eration

    4or that modeling the stages are&

    3!timal 9ns!ection4reEuency Stage@6ocal0 for ind 4arm

    S!are artsModeling Stage

    @6ocal0 for ind 4arm

    R86Monitoring Stage@6ocal0 for ind 4arm

    3!timal 4reEuency define the number of interventions de!ending of the cost0 M$B4and M$$R and also0 if reEuired !ortable or online eEui!ment.

    S!are arts Modelling give a number of s!are !arts reEuired in ind farm0 main are7

    house to control the Risk at Minimum %ost

    R86 give an ear Status of the devicesto !lanning a re!lacement hen fails

  • 8/13/2019 Risco operacional - elica

    11/1711

    Monitoring the Risk in ind 4arms in 3!eration

    9nsulate ear Monitoring @3ffline

    artial +ischarges Monitoring @3fflineear Monitoring in slo s!eed devices @3ffline

    3il Analysis @3ffline or 3nline

    Vibrations Monitoring@3ffline or 3nline

    9tGs !ossible monitoring allfailures modes and

    eliminate all risk0 but thechallenge is make at

    minimum cost of o!eration

  • 8/13/2019 Risco operacional - elica

    12/1712

    Monitoring the Risk in ind 4arms in 3!eration

    ,,8 of failures modes based on senseGsins!ections and non7com!le) ins!ections@leakage0 noise0 tem!erature

    128 of failures modes needs conditionmonitoring @vibrations0 ultrasonic0 electrical test

    28 of failures modes fi)ed and !reventivemaintenance0 to eliminate the e)ternal factors

    ,,8 no need maintenance0 only s!are7!arts

    *8 of failures modes needs redesign andcontinuous im!rovement

    9n the industry the normal ratios for the different ty!es of maintenance to control the

    o!erational risk at minimum cost.

  • 8/13/2019 Risco operacional - elica

    13/171"

    South America and Brazil ()!erience

  • 8/13/2019 Risco operacional - elica

    14/171#

    South America and Brazil ()!erience

    9n South America the reliability strategy to monitoring and controlling the o!erational risk0starting at A!ril of 211 give the ne)t results&

    1 MH in direct savings for the customers by re!airs I9$ @Iust in$ime ith loest level of lost !roduction0 in one year ofa!!lications of the risk monitoring

    6o level of 640 under control by sym!toms monitoring for Brazil0minor than the target of 1.'J

    6o level of 640 under control by sym!toms monitoring for %hile0Argentina and 8ruguay0 minor than the target of 1.'J

    9m!rovement the commissioning and end of arranty !rocess itha lo im!act in 64

    ith the models0 in a middle indo of time @and de!ending of thety!e of contract the time of sto!!ed turbine by maintenance ill bereduce in a #J

  • 8/13/2019 Risco operacional - elica

    15/171'

    Structure to Su!!ort the +ynamic Risk Modeling and Monitoring

    A3M ' is a !erformance guarantee centred around measuring energy

    based availability

    Fi7e steps to esta5lishing lost production per WTG in the 3ind farm

    9rimar6

    neigh5ouringtur5ine

    (

    Secondar6

    neigh5ouringtur5ine

    1

    WTG nacelleanemometer

    ,

    $u5 heightanemometer

    located at themeteorolog6mast nearestto the WTG

    *

    A7erageproduction fortur5ines of the

    same modeland 3ith the

    sameconfiguration

    2

    1WTG2

    #

    "

    '

    $he risk that gets

    eliminated ith

    (nergy based Availability

    + 19%

  • 8/13/2019 Risco operacional - elica

    16/17

    -A

    1*

  • 8/13/2019 Risco operacional - elica

    17/17

    #op6right Notice

    $he documents are created by Vestas ind Systems A;S and contain co!yrighted material0 trademarks0 and other !ro!rietary information. All rights reserved. ?o !art of the documents may be re!roduced or co!ied in any form or by any

    means 7 such as gra!hic0 electronic0 or mechanical0 including !hotoco!ying0 ta!ing0 or information storage and retrieval systems ithout the !rior ritten !ermission of Vestas ind Systems A;S. $he use of these documents by you0 or

    anyone else authorized by you0 i s !rohibited unless s!ecifically !ermitted by Vestas ind Systems A;S. Kou may not alter or remove any trademark0 co!yright or other notice from the documents. $he documents are !rovided :as is= and

    Vestas ind Systems A;S shall not have any res!onsibility or liability hatsoever for the results of use of the documents by you.

    $hank you for your attention

    4or %ontact&Bernardo Reyes %ruz0 Vestas MediterraneanbereyLvestas.com'*72/22'F22

    mailto:[email protected]:[email protected]