run 11 rhic machine/experiments meeting

35
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 19 Apr 2011 Agenda: Wrap-up of 250 GeV pp run Goals for √s = 18 GeV/n Au-Au run

Upload: kaethe

Post on 17-Jan-2016

26 views

Category:

Documents


0 download

DESCRIPTION

19 Apr 2011 Agenda: Wrap-up of 250 GeV pp run Goals for √s = 18 GeV/n Au-Au run. Run 11 RHIC Machine/Experiments Meeting. 11/23/2010, APEX: Agreed to new APEX schedule, 12 hour sessions (0800-2400) every other week away from maintenance days. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Run 11 RHIC Machine/Experiments Meeting

RUN 11 RHIC MACHINE/EXPERIMENTS MEETING

19 Apr 2011

Agenda: • Wrap-up of 250 GeV pp run• Goals for √s = 18 GeV/n Au-Au run

Page 2: Run 11 RHIC Machine/Experiments Meeting

RUN 11 RHIC MACHINE/EXPERIMENTS MEETING

DECISIONS• 11/23/2010, APEX: Agreed to new APEX schedule, 12 hour sessions (0800-2400) every other week away from maintenance days.

• 2/25/2011, CNI Polarimeters Normalization: Beginning with physics store 15239, changed CNI Polarimeter analyzing power to agree with jet target polarization measurements …18% lower polarization than before.

• 4/11-15/2011, End 250 GeV pp on18 April, switch to 18 GeV AuAu on after jet target polarization measurement at injection is completed

Page 3: Run 11 RHIC Machine/Experiments Meeting

Decisions (cont’)

3/25/2011: AnDY Collisions (W. Fischer, L. Bland, E. Aschenauer, S. Vigdor):

(1) A. Drees will test the sequence developed to address both orbit and tune effects of AnDY at the end of a store (or multiple stores if needed). (2) When the proper functioning of the sequence is demonstrated we will go back to a 1.05e11/bunch threshold, and increase every store by another 0.05e11/bunch until we reach a 10-20% luminosity impact on STAR and PHENIX. In the event the prescribed bunch intensity is not reached during the store then AnDY should be steered into collision during the last 30 minutes of the store. (3) When the tune scan on the ramp finishes (~2 more tune to test), we will increase the store length to 10h or more, (with PHENIX/STAR concurrence), with this AnDY will have more time available after turning on.

Page 4: Run 11 RHIC Machine/Experiments Meeting

Run 11 Plan based on PAC recommendation/ALD Guidance and 28.3 weeks cryo operation4/19/10 update

• 3 Jan, Begin cool-down to 4.5K • 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins• ~11 Jan, 2 ⅟2 weeks beam setup for √s = 500 GeV pp in RHIC begins.• 15 Jan, power supply work/DX training complete• 17 Jan, first successful ramp• 19 Jan, 1st maint day• 24 Jan, 1 week Ramp-up with 8 hr/night beam to experiments• 11 Feb (machine and ~experiments), begin ~10 week physics run (√s = 500 GeV pp)• 16 Feb, AGS Jump Quads in routine operation for RHIC injection• 24 Feb, 9 MHz cavity in routine operation • 7 Mar, cryo troubles, extended maintenance, 0900 hrs till 2000 hrs 14 Mar – lost 7.5 days• 17 Mar, power distribution problem, extended maintenance, 1930 hrs till 0315 hrs 20 Mar – lost 2.3 days• 28 March – 1 April, PAC 2011• 15 April Continuing Resolution Ends, guidance to follow• 18 Apr, end 9.4 week physics run at √s = 500 GeV pp run• 18 Apr jet target polarization measurement at injection (<5%) – STILL NO BUDGET GUIDANCE

• 19 Apr, short maintenance followed by setup for √s = 18 GeV AuAu• 25 Apr, begin ~1 week physics run (√s = 18 AuAu)• 2 May, end 1 week physics run at √s = 18 GeV• 2 May, begin 1 week setup for √s = 200 AuAu• 9 May, begin 1 week Ramp-up with 8 hr/night beam to experiments• 16 May, begin ?? week physics run at (√s = 200 GeV/n AuAu)• 4 Jul, completed 26 weeks cryo operations (7 weeks 200 GeV AuAu to this point)

What’s missing :• Uranium test/physics run• Low energy test run• cryo warm-up

Page 5: Run 11 RHIC Machine/Experiments Meeting

0

20

40

60

80

100

120

140

160

180

200

220

240

11-Feb 18-Feb 25-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr

De

live

red

Lu

min

os

ity

(pb

-1)

Date

STAR PHENIX ANDY X10

STAR Goal (50% Pol)

PHENIX Goal (50% Pol)

max

min

thru final fill 15472, 18 Apr

Page 6: Run 11 RHIC Machine/Experiments Meeting

0.50

0.75

1.00

1.25

1.50

1.75

2.00

15160 15210 15260 15310 15360 15410 15460

Rati

o PH

ENIX

/STA

R ZD

C (s

ingl

es co

rrec

ted)

fill number

Phenix/STAR Lumi Ratio, 250 GeV pp Run 11

Final Lumi should change as it appears there’s an issue with the singles correction

Page 7: Run 11 RHIC Machine/Experiments Meeting

0

1

1

2

2

3

3

4

0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00

PHEN

IX p

b-1/

stor

e (s

ingl

es c

orre

cted

)

blue beam intensity at physics start (1E11/bunch)

Phenix Lumi vs beam intensity, 250 GeV pp Run 11

Page 8: Run 11 RHIC Machine/Experiments Meeting

0

5

10

15

20

25

30

35

0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00

PHEN

IX p

b-1/

wee

k (s

ingl

es co

rrec

ted)

blue beam intensity at physics start (1E11/bunch)

PHENIX projected lumi per week

projected pb-1 per week based on 100 hrs at storefor stores > 6 hours

Run 11 projected maximum

Store 15443 (12 Apr)

Page 9: Run 11 RHIC Machine/Experiments Meeting

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

15160 15210 15260 15310 15360 15410 15460

Infe

rred

em

ittan

ce (p

imm

mr,

norm

aliz

ed)

fill number

inferred beam emittance vs beam intensity, 250 GeV pp Run 11

Page 10: Run 11 RHIC Machine/Experiments Meeting

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00

Infe

rred

em

ittan

ce (p

imm

mr,

norm

aliz

ed)

blue beam intensity at physics start (1E11/bunch)

inferred beam emittance vs beam intensity, 250 GeV pp Run 11

Page 11: Run 11 RHIC Machine/Experiments Meeting

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00

ZDC

fast

com

pone

nt li

feti

me

(hrs

))

blue beam intensity at physics start (1E11/bunch)

ZDC fast component lifetime vs beam intensity, 250 GeV pp Run 11

Page 12: Run 11 RHIC Machine/Experiments Meeting

0.20

0.25

0.30

0.35

0.40

0.45

0.50

0.55

0.60

0.65

0.70

0.75

0.80

15150 15200 15250 15300 15350 15400 15450 15500

Pola

riza

tion

Fill Number

Run 11 Yellow beam polarization as measured with the jet target

jump quads operational for RHIC fills

4/17/2011fill 15470

0.20

0.25

0.30

0.35

0.40

0.45

0.50

0.55

0.60

0.65

0.70

0.75

0.80

15150 15200 15250 15300 15350 15400 15450 15500

Pola

riza

tion

Fill Number

Run 11 Blue beam polarization as measured with the jet target

jump quads operational for RHIC fills

4/17/2011fill 15470

Page 13: Run 11 RHIC Machine/Experiments Meeting

0.200.250.300.350.400.450.500.550.600.650.700.750.80

15150 15200 15250 15300 15350 15400 15450 15500

Pola

riza

tion

Fill Number

Run 11 polarization as measured with jet target (4 fill average)

B_Po (w/jump quads) B_Po (w/o jump quads)

4/17/2011fill 15470

0.200.250.30

0.350.400.450.50

0.550.600.65

0.700.75

0.80

15150 15200 15250 15300 15350 15400 15450 15500

Pola

riza

tion

Fill Number

Run 11 polarization as measured with jet target (4 fill average)

Y_Po (w/jump quads) Y_Po (w/o jump quads)

4/17/2011fill 15470

Blue average = 45.3 +/- 0.6%

Yellow Average = 45.8 +/- 0.6%

one store

Page 14: Run 11 RHIC Machine/Experiments Meeting

0.25

0.30

0.35

0.40

0.45

0.50

0.55

0.60

0.65

0.70

0.75

0.80

0.85

15150 15200 15250 15300 15350 15400 15450 15500

Pola

riza

tion

Fill Number

Run 11 Source, AGS polarization (CNI), 250 GeV RHIC (jet target) (4 fill average when available)

Y_Po (w/jump quads)

B_Po (w/jump quads)

Y_Po (w/o jump quads)

B_Po (w/o jump quads)

AGS(CNI)

Source

4/17/2011fill 15470

Page 15: Run 11 RHIC Machine/Experiments Meeting

~ Best Store (scaling to 100 hrs at store), 12 April8.2 hour store, 2.64 pb-1, peak lumi 143 x 1030 cm-2s-1

Bunched intensity at beginning of physics 1.64/1.63 x 10 11

Run 11 Projected maximum

Page 16: Run 11 RHIC Machine/Experiments Meeting

PHENIX with singles correction

no singles correction

-16%

-8%-17%

Run 11 Projected maximum (170 x 1030 cm-2s-1)

Page 17: Run 11 RHIC Machine/Experiments Meeting

Inferred emittance = 20.7 pmmmr

Page 18: Run 11 RHIC Machine/Experiments Meeting

y = 0.1112x2 - 1.0246x + 2.3583

0

20

40

60

80

100

120

140

0 5 10 15 20 25 30 35 40

mill

ion

even

ts/w

eek

root s (GeV/n)

Low energy AuAu, million events/week

Estimate for 18 GeV/n

Page 19: Run 11 RHIC Machine/Experiments Meeting

Through 14 Apr 2011

0

5

10

15

20

25

30

35

40

45

50

1-Ju

l-08

1-A

ug-0

81-

Sep

-08

1-O

ct-0

81-

Nov

-08

1-D

ec-0

81-

Jan-

091-

Feb

-09

1-M

ar-0

91-

Apr

-09

1-M

ay-0

91-

Jun-

091-

Jul-

091-

Aug

-09

1-S

ep-0

91-

Oct

-09

1-N

ov-0

91-

Dec

-09

1-Ja

n-10

1-F

eb-1

01-

Mar

-10

1-A

pr-1

01-

May

-10

1-Ju

n-10

1-Ju

l-10

1-A

ug-1

01-

Sep

-10

1-O

ct-1

01-

Nov

-10

1-D

ec-1

01-

Jan-

111-

Feb

-11

1-M

ar-1

11-

Apr

-11

Dai

ly A

vera

ge

Po

wer

(M

W)

Date

BNL Energy Use FY 2009-11RHIC Cryo RHIC other AGS-Exp

Booster AGS-Mach Tandem

CAD Bldg less SMD NSRL Site Base

BNL Peak-Av

Site total not recorded 30 Nov 09through Oct 2010

Page 20: Run 11 RHIC Machine/Experiments Meeting

Through 14 Apr 2011

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

-30 -10 10 30 50 70 90 110 130 150 170 190 210

MW

Days since beginning of Run

RHIC Operations FY09-11CAD Power 09

CAD Power 10

CAD Power 11

Page 21: Run 11 RHIC Machine/Experiments Meeting

Through 14 Apr 2011

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

-30 -10 10 30 50 70 90 110 130 150 170 190 210

MW

Days since beginning of Run

RHIC Cryo Operations FY09-11RHIC Cryo 09

RHIC Cryo 10

RHIC Cryo 11

Page 22: Run 11 RHIC Machine/Experiments Meeting

Through 14 Apr 2011

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105110

MW

Days since beginning of Run

RHIC Cryo Operations FY09-11RHIC Cryo 09

RHIC Cryo 10

RHIC Cryo 11

Page 23: Run 11 RHIC Machine/Experiments Meeting

Old information

Page 24: Run 11 RHIC Machine/Experiments Meeting

30.00

35.00

40.00

45.00

50.00

55.00

60.00

65.00

0 50 100 150 200 250 300

Pola

riza

tion

(%

)

energy (GeV)

Up down ramp, Blue Beampolarization with current analyzing powers

Up

Down

+11.0 %

-28.5 %

+6.8%

0.30

0.40

0.50

0.60

0.70

0.80

0.90

0 50 100 150 200 250 300

Asy

mm

etry

(x10

2 )

energy (GeV)

Up down ramp, Blue BeamAsymmetry

Up

Down

-15.0%

-11.3%

-5.0%

7 April Up-Down Ramp measurementBlue Beam

Current CNI average analyzing powers are:Energy AN

24 0.0144100 0.0122250 0.0147

Page 25: Run 11 RHIC Machine/Experiments Meeting

30.00

35.00

40.00

45.00

50.00

55.00

60.00

65.00

0 50 100 150 200 250 300

Pola

riza

tion

(%

)

energy (GeV)

Up down ramp, Yellow Beampolarization (#1 only) with current analyzing powers

Up

Down

+24.4 % -23.1 %

-0.4 %

0.30

0.40

0.50

0.60

0.70

0.80

0.90

0 50 100 150 200 250 300

Asy

mm

etry

(X10

2 )

energy (GeV)

Up down ramp, Yellow Beamasymmetry (CNI #1 only)

Up

Down

-13.3%

-15.9%

-1.9%

7 April Up-Down Ramp measurementYellow Beam (only Yellow 1 was used as Yellow 2 was acting up)

Current CNI average analyzing powers are:Energy AN

24 0.0144100 0.0122250 0.0147

Page 26: Run 11 RHIC Machine/Experiments Meeting
Page 27: Run 11 RHIC Machine/Experiments Meeting
Page 28: Run 11 RHIC Machine/Experiments Meeting

$(20)

$-

$20

$40

$60

$80

$100

$120 O

ct-0

0

Oct

-01

Oct

-02

Oct

-03

Oct

-04

Oct

-05

Oct

-06

Oct

-07

Oct

-08

Oct

-09

Oct

-10

Oct

-11

$/M

Wh

rBNL Energy Cost

Billed Cost/MWhr

Without Balanced Billing

Balanced Billing Projection

RHIC ON

AGS SEB/FEB

NSRL

through Feb 2011

Page 29: Run 11 RHIC Machine/Experiments Meeting

A good store with 9 MHzSat 2/26

Page 30: Run 11 RHIC Machine/Experiments Meeting

Run 11, First overnight store, Mon Jan 24 00:12Fill number 14919,, s=500 GeV21 days since start of cool-down

20K

20 x 1011

• 28 x 27 bunches• b*=0.65 meters

For peak store lumi = 170 x 1030 cm-2s-1 (projected MAXIMUM)ZDC Rate ~ 400K (assuming 2.4 mb n-pair xsection)

Page 31: Run 11 RHIC Machine/Experiments Meeting

Run 9, First overnight store at s=500 GeV22 days after start of cool-down

• 56 x 56 bunches• b*=0.7 meters

40K

40 x 1011

Page 32: Run 11 RHIC Machine/Experiments Meeting

AGS pp log, 23 Feb 09, 00:26

Page 33: Run 11 RHIC Machine/Experiments Meeting

26 weeks

http://www.bnl.gov/cad/esfd

AGS-Booster-Tandem/Linac/EBIS Startup

RHIC Cryo Cooldown to 45 deg K

RHIC Cryo Cooldown/Warm-up

RHIC Cryo Operation

RHIC Cryo off

RHIC STAR & PHENIX

RHIC Research with s = 500 GeV pp

RHIC Research with s = 200 GeV /n AuAu

RHIC Research with s = 192 GeV /n UU

RHIC Research with s = 18 GeV /n AuAu

RHIC Drell-Yan Test (2:00 IR)

Low Energy Au test(?)

Particle Accelerator Conference

NSRL (NASA Radiobiology)

BLIP (Isotopes)

BLIP (other)

Shutdown (RHIC)

C-A Operations-FY11

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2011

26 Jan 11

setup with beams

Sep

concurrent with RHIC

ramp up luminosity

5 Oct

28.3 weeks

3Jan

24 Nov

setup as required

10 weeks physics

10 weeks

8 weeks

.4 weeks

planned (budget permitting)

NSRL 111B actual schedule to be determined

11A 11B10C

20 Jul

RHIC Schedule subject to change

10 Jun

1.5

15 Mar 20 May

Page 34: Run 11 RHIC Machine/Experiments Meeting

PHENIX Goal (50% pol)

STAR Goal (50% pol)

Goals to be updated/corrected

Page 35: Run 11 RHIC Machine/Experiments Meeting

Run-11 Au-Au luminosity projections 100 GeV/nucleon

Wolfram Fischer 35

Assume 6 weeks to ramp-up for min, and 8 weeks for max (stoch. cooling re-commissioning).Expect Lavg up to 25x1026cm-2s-1 (+25%).

[from Run-10 to max: b* = 0.75 0.65 m, Nb = 1.1 1.1x109, more cooling]

PHENIX Goal (0.7 recorded)

?? (complicated)

STAR Goal (TBD)

Goals to be updated/corrected