run 11 rhic machine/experiments meeting

29
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 17 May 2011 Agenda: √s = 200 GeV AuAu progress

Upload: uyen

Post on 06-Feb-2016

38 views

Category:

Documents


0 download

DESCRIPTION

17 May 2011 Agenda: √s = 200 GeV AuAu progress. Run 11 RHIC Machine/Experiments Meeting. Run 11 Plan based on PAC recommendation/ALD Guidance and available funds 5/17/10 update. only 2 days!. 3 Jan, Begin cool-down to 4.5K - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Run 11 RHIC Machine/Experiments Meeting

RUN 11 RHIC MACHINE/EXPERIMENTS MEETING

17 May 2011

Agenda:

• √s = 200 GeV AuAu progress

Page 2: Run 11 RHIC Machine/Experiments Meeting

Run 11 Plan based on PAC recommendation/ALD Guidance and available funds 5/17/10 update

• 3 Jan, Begin cool-down to 4.5K • 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins• 24 Jan, 1 week Ramp-up with 8 hr/night beam to experiments• 11 Feb (machine and ~experiments), begin ~10 week physics run (√s = 500 GeV pp)• 7 Mar, cryo troubles, extended maintenance, 0900 hrs till 2000 hrs 14 Mar – lost 7.5 days• 17 Mar, power distribution problem, extended maintenance, 1930 hrs till 0315 hrs 20 Mar –

lost 2.3 days• 18 Apr, end 9.4 week physics run at √s = 500 GeV• 18 Apr jet target polarization measurement at injection (<5%) • 19 Apr, short maintenance followed by setup for √s = 18 GeV AuAu• 23 Apr, begin ~1 week physics run (√s = 19.6 AuAu)• 2 May 08:00, end 1.3 week physics run at √s = 19.6 GeV• 2 May, begin setup for √s = 200 AuAu• 5 May, begin 2 day Ramp-up with 8 hr/night beam to experiments• 6 May 11:37, begin ~8 week physics run at (√s = 200 GeV/n AuAu)

• 17 May- TODAY• 29 June, end 7.7 week AuAu physics run at √s = 200 GeV/n , begin warm-up• 30 June, cryo warm-up ~ complete, end 25.4 weeks cryo operation

What’s missing :• Run into July?• Uranium test/physics run• Low energy test run only 2 days!

Page 3: Run 11 RHIC Machine/Experiments Meeting

√S = 200 GeV/n AuAu luminosity goals (to be updated)

STAR

2000 mb-1 sampled / 60% = 3300 mb-1 delivered

PHENIX

700 mb-1 sampled / ?% = ? mb-1 delivered

Estimate from PHENIX Beam Use Proposal• Live Time = 97%• Uptime = 65%• +/- 10 cm vertex = 25%

Page 4: Run 11 RHIC Machine/Experiments Meeting

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5-M

ay

12

-Ma

y

19

-Ma

y

26

-Ma

y

2-J

un

9-J

un

16

-Ju

n

23

-Ju

n

Inte

gra

ted

Lu

min

os

ity

[m

b^

-1]

Run11 RHIC AuAu Integrated Luminosity for Physics(√s = 200 GeV/n)

STAR PHENIX Lmax Lmin Phenix Run10

thru store 15877Tuesday 17 May

STAR Goal

(with corrected STAR singles correction)

Page 5: Run 11 RHIC Machine/Experiments Meeting

(with corrected STAR singles correction)

0

200

400

600

800

1000

1200

1400

5-M

ay

12

-Ma

y

19

-Ma

y

26

-Ma

y

Inte

gra

ted

Lu

min

os

ity

[m

b^

-1]

Run11 RHIC AuAu Integrated Luminosity for Physics(√s = 200 GeV/n)

STAR PHENIX Lmax Lmin Phenix Run10

thru store 15877Tuesday 17 May

Page 6: Run 11 RHIC Machine/Experiments Meeting

“Typical” Store 15865, 111/111 bunches, 0.75 (goal 0.65) m b*, Longitudal cooling only

1.1 x 109/bunch (goal = 1.1 x 109)

42 x 1026 s-1cm-2 (Goal = 45 x 1026)

PHENIX Lstore avg = 15 x 1026 s-1cm-2 (Goal = 25 x 1026 s-1cm-2)

Assumes 9.6 barn ZDC xsection

(singles corrected)

Ratio=1.18

Ratio=1.75

STAR SINGLES CORRECTION IS NOT RIGHT

Page 7: Run 11 RHIC Machine/Experiments Meeting

(not singles corrected)

Goal 17-20

Page 8: Run 11 RHIC Machine/Experiments Meeting

Latest Stores

goals

initial

average

Page 9: Run 11 RHIC Machine/Experiments Meeting

Through 16 May 2011

0

5

10

15

20

25

30

35

40

45

501-

Jul-

081-

Aug

-08

1-S

ep-0

81-

Oct

-08

1-N

ov-0

81-

Dec

-08

1-Ja

n-09

1-F

eb-0

91-

Mar

-09

1-A

pr-0

91-

May

-09

1-Ju

n-09

1-Ju

l-09

1-A

ug-0

91-

Sep

-09

1-O

ct-0

91-

Nov

-09

1-D

ec-0

91-

Jan-

101-

Feb

-10

1-M

ar-1

01-

Apr

-10

1-M

ay-1

01-

Jun-

101-

Jul-

101-

Aug

-10

1-S

ep-1

01-

Oct

-10

1-N

ov-1

01-

Dec

-10

1-Ja

n-11

1-F

eb-1

11-

Mar

-11

1-A

pr-1

11-

May

-11

Dai

ly A

vera

ge

Po

wer

(M

W)

Date

BNL Energy Use FY 2009-11RHIC Cryo RHIC other

AGS-Exp Booster

AGS-Mach Tandem

CAD Bldg less SMD NSRL

Site Base BNL Peak-Av

Site total not recorded 30 Nov 09through Oct 2010

Page 10: Run 11 RHIC Machine/Experiments Meeting

Through 16 May 2011

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

-30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140

MW

Days since beginning of Run

RHIC Operations FY09-11CAD Power 09

CAD Power 10

CAD Power 11

Page 11: Run 11 RHIC Machine/Experiments Meeting

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

-5 5 15 25 35 45 55 65 75 85 95 105 115 125 135

MW

Days since beginning of Run

RHIC Cryo Operations FY09-11RHIC Cryo 09

RHIC Cryo 10

RHIC Cryo 11

Through 16 May 2011

Possible oil contamination in one of the heat exchangers

Page 12: Run 11 RHIC Machine/Experiments Meeting

Through 16 May 2011

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

-30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140

MW

Days since beginning of Run

RHIC Cryo Operations FY09-11RHIC Cryo 09

RHIC Cryo 10

RHIC Cryo 11

Page 13: Run 11 RHIC Machine/Experiments Meeting

Old information

Page 14: Run 11 RHIC Machine/Experiments Meeting

0

20

40

60

80

100

120

140

160

180

200

220

240

11-Feb 18-Feb 25-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr

De

live

red

Lu

min

os

ity

(pb

-1)

Date

STAR PHENIX ANDY X10

STAR Goal (50% Pol)

PHENIX Goal (50% Pol)

max

min

thru final fill 15472, 18 Apr

Page 15: Run 11 RHIC Machine/Experiments Meeting

0.50

0.75

1.00

1.25

1.50

1.75

2.00

15160 15210 15260 15310 15360 15410 15460

Rati

o PH

ENIX

/STA

R ZD

C (s

ingl

es co

rrec

ted)

fill number

Phenix/STAR Lumi Ratio, 250 GeV pp Run 11

Final Lumi should change as it appears there’s an issue with the singles correction

Page 16: Run 11 RHIC Machine/Experiments Meeting

0

1

1

2

2

3

3

4

0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00

PHEN

IX p

b-1/

stor

e (s

ingl

es c

orre

cted

)

blue beam intensity at physics start (1E11/bunch)

Phenix Lumi vs beam intensity, 250 GeV pp Run 11

Page 17: Run 11 RHIC Machine/Experiments Meeting

Run 11 Plan based on PAC recommendation/ALD Guidance and available funds 4/26/10 update (1/2)

• 3 Jan, Begin cool-down to 4.5K • 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins• ~11 Jan, 2 ⅟2 weeks beam setup for √s = 500 GeV pp in RHIC begins.• 15 Jan, power supply work/DX training complete• 17 Jan, first successful ramp• 19 Jan, 1st maint day• 24 Jan, 1 week Ramp-up with 8 hr/night beam to experiments• 11 Feb (machine and ~experiments), begin ~10 week physics run (√s = 500 GeV pp)• 16 Feb, AGS Jump Quads in routine operation for RHIC injection• 24 Feb, 9 MHz cavity in routine operation • 7 Mar, cryo troubles, extended maintenance, 0900 hrs till 2000 hrs 14 Mar – lost 7.5 days• 17 Mar, power distribution problem, extended maintenance, 1930 hrs till 0315 hrs 20 Mar – lost 2.3 days• 28 March – 1 April, PAC 2011• 15 April Continuing Resolution Ends, guidance to follow• 18 Apr, end 9.4 week pp physics run at √s = 500 GeV • 18 Apr jet target polarization measurement at injection (<5%) • 19 Apr, short maintenance followed by setup for √s = 18 GeV AuAu• 23 Apr, begin ~1 week physics run (√s = 19.6 AuAu)

• 2 May, end 1.3 week physics run at √s = 19.6 GeV

Page 18: Run 11 RHIC Machine/Experiments Meeting

30.00

35.00

40.00

45.00

50.00

55.00

60.00

65.00

0 50 100 150 200 250 300

Pola

riza

tion

(%

)

energy (GeV)

Up down ramp, Blue Beampolarization with current analyzing powers

Up

Down

+11.0 %

-28.5 %

+6.8%

0.30

0.40

0.50

0.60

0.70

0.80

0.90

0 50 100 150 200 250 300

Asy

mm

etry

(x10

2 )

energy (GeV)

Up down ramp, Blue BeamAsymmetry

Up

Down

-15.0%

-11.3%

-5.0%

7 April Up-Down Ramp measurementBlue Beam

Current CNI average analyzing powers are:Energy AN

24 0.0144100 0.0122250 0.0147

Page 19: Run 11 RHIC Machine/Experiments Meeting

30.00

35.00

40.00

45.00

50.00

55.00

60.00

65.00

0 50 100 150 200 250 300

Pola

riza

tion

(%

)

energy (GeV)

Up down ramp, Yellow Beampolarization (#1 only) with current analyzing powers

Up

Down

+24.4 % -23.1 %

-0.4 %

0.30

0.40

0.50

0.60

0.70

0.80

0.90

0 50 100 150 200 250 300

Asy

mm

etry

(X10

2 )

energy (GeV)

Up down ramp, Yellow Beamasymmetry (CNI #1 only)

Up

Down

-13.3%

-15.9%

-1.9%

7 April Up-Down Ramp measurementYellow Beam (only Yellow 1 was used as Yellow 2 was acting up)

Current CNI average analyzing powers are:Energy AN

24 0.0144100 0.0122250 0.0147

Page 20: Run 11 RHIC Machine/Experiments Meeting
Page 21: Run 11 RHIC Machine/Experiments Meeting
Page 22: Run 11 RHIC Machine/Experiments Meeting

$(20)

$-

$20

$40

$60

$80

$100

$120 O

ct-0

0

Oct

-01

Oct

-02

Oct

-03

Oct

-04

Oct

-05

Oct

-06

Oct

-07

Oct

-08

Oct

-09

Oct

-10

Oct

-11

$/M

Wh

rBNL Energy Cost

Billed Cost/MWhr

Without Balanced Billing

Balanced Billing Projection

RHIC ON

AGS SEB/FEB

NSRL

through Feb 2011

Page 23: Run 11 RHIC Machine/Experiments Meeting

A good store with 9 MHzSat 2/26

Page 24: Run 11 RHIC Machine/Experiments Meeting

Run 11, First overnight store, Mon Jan 24 00:12Fill number 14919,, s=500 GeV21 days since start of cool-down

20K

20 x 1011

• 28 x 27 bunches• b*=0.65 meters

For peak store lumi = 170 x 1030 cm-2s-1 (projected MAXIMUM)ZDC Rate ~ 400K (assuming 2.4 mb n-pair xsection)

Page 25: Run 11 RHIC Machine/Experiments Meeting

Run 9, First overnight store at s=500 GeV22 days after start of cool-down

• 56 x 56 bunches• b*=0.7 meters

40K

40 x 1011

Page 26: Run 11 RHIC Machine/Experiments Meeting

AGS pp log, 23 Feb 09, 00:26

Page 27: Run 11 RHIC Machine/Experiments Meeting

26 weeks

http://www.bnl.gov/cad/esfd

AGS-Booster-Tandem/Linac/EBIS Startup

RHIC Cryo Cooldown to 45 deg K

RHIC Cryo Cooldown/Warm-up

RHIC Cryo Operation

RHIC Cryo off

RHIC STAR & PHENIX

RHIC Research with s = 500 GeV pp

RHIC Research with s = 200 GeV /n AuAu

RHIC Research with s = 192 GeV /n UU

RHIC Research with s = 18 GeV /n AuAu

RHIC Drell-Yan Test (2:00 IR)

Low Energy Au test(?)

Particle Accelerator Conference

NSRL (NASA Radiobiology)

BLIP (Isotopes)

BLIP (other)

Shutdown (RHIC)

C-A Operations-FY11

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2011

26 Jan 11

setup with beams

Sep

concurrent with RHIC

ramp up luminosity

5 Oct

28.3 weeks

3Jan

24 Nov

setup as required

10 weeks physics

10 weeks

8 weeks

.4 weeks

planned (budget permitting)

NSRL 111B actual schedule to be determined

11A 11B10C

20 Jul

RHIC Schedule subject to change

10 Jun

1.5

15 Mar 20 May

Page 28: Run 11 RHIC Machine/Experiments Meeting

PHENIX Goal (50% pol)

STAR Goal (50% pol)

Goals to be updated/corrected

Page 29: Run 11 RHIC Machine/Experiments Meeting

Run-11 Au-Au luminosity projections 100 GeV/nucleon

Wolfram Fischer 29

Assume 6 weeks to ramp-up for min, and 8 weeks for max (stoch. cooling re-commissioning).Expect Lavg up to 25x1026cm-2s-1 (+25%).

[from Run-10 to max: b* = 0.75 0.65 m, Nb = 1.1 1.1x109, more cooling]

PHENIX Goal (0.7 recorded)

?? (complicated)

STAR Goal (TBD)

Goals to be updated/corrected