saic-b-2006 rev 0
TRANSCRIPT
-
7/28/2019 SAIC-B-2006 Rev 0
1/2
B Weather, Preparation & Cleaning (API Pub. 2218)
B1
Weatheris dry, temperature (metal, ambient) is moderate, humidity is
low to medium, & winds are not strong. Proper conditions exist.
(API Pub. 2218)
SAES-B-006
Section 3.2
ACTUAL INSPECTION DATE & TIME
EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER
SAUDI ARAMCO USE ONLYSAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER
CONTRACTOR INSPECTION LEVELSAUDI ARAMCO INSPECTION LEVEL
ITEM
No.ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DA
MH's SPENT TRAVEL TIMQUANTITY INSP.
WORK PERMIT REQUI
SCHEDULED INSPECTION DATE & TIME
LAYOUT DRAWING NUMBER
PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Pre-Application Inspection of Intumescent Fireproofing
MaterialsSAIC-B-2006 25-May-05 MECH-
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER
A10Equipment for spray applications is available and acceptable.Air
movers in place to allow proper ventillation as required.
SAES-H-102,
Section 4
A General Requi remen ts:
A1Material Application guidelines from manufacturer are available at the
work site along with the Material Safety Data Sheet.
SAES-B-006
Section 8
A2
Separate containers are labelled (Arabic & English) with name of
Manufacturer, date of manufacture, expiry date, Batch Number, productID number & SAMS stock number (09-SAMSS-060, Sect. 5).
SAES-H-100,
Para. 6.4
A3Shelf life has been determined & maintained. Materials to be used have
not passed expiration.
SAES-H-100,
Para. 6.4
Covering of wo rk areas is properly done to prevent foreign matter
(dust/sand) embedment & fouling of intumescent coatings.
(API Pub. 2218)
SAES-B-006
Section 3.2
A4
Materials are stored upright & covered on site (canvas or tarp) per
manufacturers instructions with temporary storage periods at site not
exceeding 14-day storage rule per SAES-H-100, Para. 6.2.
SAES-H-100,
Para. 6.6
A11APCS 1B surfaces are acceptable (touch up & repairs complete).
Surfaces are clean & free of sand, dust, oil and other contaminants.
SAES-B-006
Section 8.4
SAES-H-100,
Para. 6.5
As required, total encapsulation & use of dehumidifying equipment
provides environmental conditions to meet manufacturer guidelines.
(API Pub. 2218)
SAES-B-006
Section 3.2
A5Fireproofing materials are used from a container showing no sign
of leakage.
A6
Opened containers are examined for skinning, gelling, sludge & leakage.
Containers & materials not in good condition are not used. Leaking
containers are set aside & not used. (SAES-H-100, Sect 6).
SAES-H-100,
Para. 7.2
A8Mesh reinforcement material is available. Mesh available is adequate
for the application & meets manufacturer's specifications.
B2
A7 Mixing operations, follow material specific data sheet instruction(volumes, ratios, etc) in accordance with manufacturer guidelines.
SAES-B-006Para. 8.2.3
B3
A9Equipment for special h and applications is available such as small
areas of tie-ins and repairs (rollers, brushes, trowels, etc).
SAES-B-006
Section 3.2
SAES-B-006
Section 8
Page 1 of 2
-
7/28/2019 SAIC-B-2006 Rev 0
2/2
C Qual ity Cont ro l & SAES-H-100, A tt achm en ts A , B , C, D
B4 Overspray protection covering of work areas (plastic sheets, tarps,masking tape, etc) is completed. (API Pub. 2218) SAES-B-006Section 3.2
C1
Drawings are checked & areas to be treated are easily identifiable &
supported by drawings. Application limits are clearly identified.
(API Pub. 2218)
SAES-B-006
Section 3.2
QC Superviso r
REFERENCE DOCUMENTS:
Pre-Application Inspection of Intumescent Fireproofing
MaterialsSAIC-B-2006 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER
CONTRACTOR / SUBCONTRACTOR
ITEM
No.ACCEPTANCE CRITERIA REFERENCE
REMARKS:
PASS FAIL N/A RE-INSP DA
Proponent and Others
Name, Initials and Date:
Contractor / Third-Party Saudi AramcoConstruction Representative* PMT Representative
Work is Complete and Ready for Inspection:
Name, Initials and Date:
T&I Witnessed QC Record Reviewed Work Verified
1. API Publication 2218 -- Fireproofing Practices in Petroleum & Petrochemical Processing Plants, 2nd EDITION, AUG 1999
2. SAES-B-006, Fireproofing for Plants, (30 June 2003)3. SAES-H-100, Coating Materials & Application Requirements for Industrial Facilities, (31 July 2004)
QC Inspector PID Representative
Name, Initials and Date:
Performed Inspection Work / Rework May Proceed
Name, Initials and Date:
T&I Witnessed QC Record Reviewed Work Verified
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FA
Name, Organization,
Initials and Date:
T&I Witnessed QC Record Reviewed Work Verified
Name, Sign and Date:
Quality Record Approved:
C6 QC Inspection Form SATR-B-2001 is completed. SATIP-B-006-02
C4In-process Inspection Sheet (Att. C) is completed/signed daily by
contractor. SA initials each asterisk item & work is controlled.
Refer to
Manufacturer's
Procedure
B5Substrate temperature is above 10C & within the temperature limits
listed by the manufacturer on the applicable Data Sheet.
SAES-H-100,
Section 8
B6The substrate temperature is less than 3C above the dew point & within
limits listed by the manufacturer on the applicable data sheet.
SAES-H-100,
Section 8
B7
Adverse weather conditions do not exist (such as the following):
A) Wind is strong enough to blow sand, salt spray, or other foreign
matter onto the surface being painted.
SAES-B-006,
Section 3.2
Page 2 of 2