Sample of Public bid BIM EX Plan
• Specification format
• More quantifiable
• Can be applied to any project
• Not project specific based
![Page 2: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is](https://reader034.vdocument.in/reader034/viewer/2022051808/600a1412216f5b668708a025/html5/thumbnails/2.jpg)
![Page 3: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is](https://reader034.vdocument.in/reader034/viewer/2022051808/600a1412216f5b668708a025/html5/thumbnails/3.jpg)
![Page 4: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is](https://reader034.vdocument.in/reader034/viewer/2022051808/600a1412216f5b668708a025/html5/thumbnails/4.jpg)
![Page 5: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is](https://reader034.vdocument.in/reader034/viewer/2022051808/600a1412216f5b668708a025/html5/thumbnails/5.jpg)
Sample of Privately bid BIM Ex Plan• Team based
• Explains project goals / objectives
• Distribute information based on Design Model LOD
• Project specific priorities associated with schedule
![Page 6: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is](https://reader034.vdocument.in/reader034/viewer/2022051808/600a1412216f5b668708a025/html5/thumbnails/6.jpg)
![Page 7: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is](https://reader034.vdocument.in/reader034/viewer/2022051808/600a1412216f5b668708a025/html5/thumbnails/7.jpg)
![Page 8: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is](https://reader034.vdocument.in/reader034/viewer/2022051808/600a1412216f5b668708a025/html5/thumbnails/8.jpg)
Project specific questions to ask:• How is BIM being used• Who will be using it• Is there a chance that the BIM investment will not be carried over to owner• Produce menu of options for use and needs for O&M
Coordination OverlayBased on BIM turnover
Master equipment ListBased on Menu of Options