sayyed tausif alam.doc 2 (1)

23
3 SAYYED TAUSIF ALAM Address: Village Khar Batkhela Malakand Agency NWFP. E-mail: [email protected]

Upload: sayyed-tauseef-alam

Post on 24-Jan-2018

116 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: SAYYED TAUSIF ALAM.doc 2 (1)

3

SAYYED TAUSIF ALAM

Address: Village Khar Batkhela Malakand Agency NWFP. E-mail: [email protected]

Page 2: SAYYED TAUSIF ALAM.doc 2 (1)

3

Contact No. 0932- 450222Cell No: 0344-9777477

OBJECTIVES

Acquiring the skills in the field of management sciences and developing managerial potential for future. Looking for a job in a prestigious organization to achieve my goal.

PERSONAL

Page 3: SAYYED TAUSIF ALAM.doc 2 (1)

3

Father’s Name SAYYED FAKHRUDDIN GILLANI

Date of Birth Feb. 03,1984

N.I.C. No. 15402-6549185-1

ACADEMIC QUALIFICATION

BE MECHANICAL ENGINEERING (Agg 852/1310 65.03%) 1st Division

University of Engineering and Technology

Peshawar NWFP Pakistan.

2007

Page 4: SAYYED TAUSIF ALAM.doc 2 (1)

3

F.Sc. (Pre-Engg), 828, 75.27% 1st Division

Islamia college Peshawar

Board of Intermediate and Secondary Education

Peshawar, N.W.F.P, Pakistan.

2002

S.S.C. (Science Group), 657 77.64% 1st Division

Oxford Education Academy Batkhela Distt Malakand

Board of Intermediate and Secondary Education

1999

Page 5: SAYYED TAUSIF ALAM.doc 2 (1)

3

Saidu Sharif Swat, N.W.F.P, Pakistan.

PROFFESIONAL EXPERIANCE (1)

Designation: Assistant Manager (Maintenance).Company: Ittehad Chemical Limited Kala Sha Kako (Lahore)Period: 23th August 2007 to 1st April 2008.

Page 6: SAYYED TAUSIF ALAM.doc 2 (1)

3

Responsibi l i t ies : • Operation, Supervision & Maintenance of 15 Bar Screw Compressor and

Rotary Compressor.• Operation and maintenance of 32MW Gas Power Plant (5 No’s Gas Engine of

Wartsila Company).• Operation and Maintenance of Pumps and valves in Sodium Hypo Chlorite

and shfaf Plant.

Page 7: SAYYED TAUSIF ALAM.doc 2 (1)

3

Designation: Operation Engineer. (BPS-17)Posting: Khan Khwar Power Station (72 MW)Company: Water and Power Development Authority, Pakistan. Period: 15th April 2008 15th May 2012.

Responsibi l i t ies:• Operation, Supervision & Synchronization of 72MW generators through

Page 8: SAYYED TAUSIF ALAM.doc 2 (1)

3

SCADA/POWER GENERATION PORTAL.• Operation, Supervision and Maintenance of Francis and Turgo Turbine.• Operation and control of 11KV Switch Gears.• Switching and synchronizing of 132KV Transmission Lines through SF6

Circuit Breakers.• Tap Changing of power and auto transformers.• Managing Load and Voltage as per system requirements• Operation and Supervision of Allied auxiliary system. • Operation and supervision of Station DC system.

Page 9: SAYYED TAUSIF ALAM.doc 2 (1)

3

• Operation of different Compressors and Pumps. • In case of any fault, investigate and preparation of trouble report.• Issuance of Permits & Tags to Maintenance Section after arranging safety

measurements and preparing Energy and log sheets. • Preparation of Monthly Generation Reports, Synopsis Reports of the

plants. • Supervision and management of Technical Staff involved in operation and

trouble shooting.

Page 10: SAYYED TAUSIF ALAM.doc 2 (1)

3

Designation: Shift Engineer. (BPS-17)Posting: Dargai Hydel Power Station (20 MW)Company: Water and Power Development Authority, Pakistan. Period: 16th May 2012 25th July 2013.

Page 11: SAYYED TAUSIF ALAM.doc 2 (1)

3

Responsibi l i t ies:• Operation, Supervision & Synchronization of 20MW generators and

further disbursement to national grid.• Operational Supervision of Francis Turbine.• Operation and control of 11KV Switch Gears.• Switching and synchronizing of 132KV Transmission Lines through SF6

Circuit Breakers.• Tap Changing of power and auto transformers.• Managing Load and Voltage as per system requirements

Page 12: SAYYED TAUSIF ALAM.doc 2 (1)

3

• Operation and Supervision of Allied auxiliary system. • Operation and supervision of Station DC system.• Operation of different Compressors and Pumps. • In case of any fault, investigate and preparation of trouble report.

• Issuance of Permits & Tags to Maintenance Section after arranging safety measurements and preparing Energy reports and log sheets.

• Preparation of Monthly Generation Reports, Synopsis Reports of the plants.

Page 13: SAYYED TAUSIF ALAM.doc 2 (1)

3

• Supervision and management of Technical Staff involved in operation and trouble shooting.

Designation: Assistant Resident Engineer. (BPS-17)Posting: Jabban Hydel Power Station (22 MW)Company: Water and Power Development Authority, Pakistan. Period: 26th July 2013 25th May 2015.

Page 14: SAYYED TAUSIF ALAM.doc 2 (1)

3

Responsibi l i t ies:• Operation, Supervision and maintenance of 22MW new hydel power

station.• Operational, maintenance and Supervision of Francis Turbines.• Operation and Maintenance of Supervisory Control and data acquisition

system (SCADA) for Power generation and its distribution to the local Grids.

• Supervision of Operation and control of 11KV Switch Gears.• Supervision of Switching and synchronizing of 132KV Transmission

Page 15: SAYYED TAUSIF ALAM.doc 2 (1)

3

Lines through SF6 Circuit Breakers.• Supervision of Managing Load and Voltage as per system requirements• Supervision of Operation and Supervision of Allied auxiliary system. • Supervision of Operation and supervision of Station DC system.• Supervision of Operation of different Compressors and Pumps. • Management of fault identification, investigation and rectification of

trouble.• Management of Permits & Tags issued to Maintenance Section after

arranging safety measurements and compiling Energy reports and log

Page 16: SAYYED TAUSIF ALAM.doc 2 (1)

3

sheets for the head office. • Preparation of Monthly Generation Reports, Synopsis Reports of the

plants. • Supervision and management of Technical Staff involved in operation and

trouble shooting.• Local meeting with local contractor for remaining punch list item and

issues.• Management of clearance of all local security issues and social issues.

Page 17: SAYYED TAUSIF ALAM.doc 2 (1)

3

Designation: Resident Engineer. (BPS-18)Posting: Jabban Hydel Power Station (22 MW)Company: Water and Power Development Authority, Pakistan. Period: 26th May 2015 up to Now.

Responsibi l i t ies:• Overall Supervision of Operation and maintenance of 22MW new hydel

power station.

Page 18: SAYYED TAUSIF ALAM.doc 2 (1)

3

• Coordination of different section of Power House i.e. Electrical Section, Mechanical section and Operation Section.

• Performing duty as Drawing and Disbursing officer of the Plant.• Preparing of Annual Budget for Operation of Power House by attending

meetings with Head office.• Arrangements of Funds for Power house from government for Purchase of

different spare parts and tools on time.• Arrangement of various technical and social training to enhance capability

of technical staff.

Page 19: SAYYED TAUSIF ALAM.doc 2 (1)

3

• Attending meetings with local irrigation department for smooth supply of water for generation.

• Attending meetings with local administration for security of staff and plant.

• Overall supervision of stocks available for smooth operation of plant.• Hiring and training of new technical and non-technical staff.• Co-ordination with head office and finance office.• Overall supervision of civil works and creating new works for

maintenance of the staff.

Page 20: SAYYED TAUSIF ALAM.doc 2 (1)

3

• Overall supervision of allocated budget and its timely expenditure and dealing with audit section.

FINAL YEAR PROJECT

Design and fabrication of single seated four wheel independent suspensions system All Terrain Vehicle.

COURSES ATTEND

Four days course on the topic of PRESENTATION SKILLS FOR MANAGER from Pakistan institute of management Lahore.

Page 21: SAYYED TAUSIF ALAM.doc 2 (1)

3

Two months JUNIOR INDUCTION COURSE FOR HYDEL ENGINEERS in WAPDA hydel training center Mangla.

Two weeks training Course on the topic of BEST PRACTICE IN HYDRO OPERATION AND MAINTENANCE organized by USAID.

Five Weeks SECTOR SPECFIC COURSE (PRE-PROMOTION) in WAPDA hydel Training Center Mangla.

Two months JUNIOR MANAGEMENT COURSE at WAPDA Administrative Staff College.

Page 22: SAYYED TAUSIF ALAM.doc 2 (1)

3

Three weeks Training Course on the Topic of HYDRO FINANCING at Asian Institute of Technology Bangkok and ENTURA Hydro Tasmania Hobart Australia from 11th July 2016 to 28th July 2016.

EXPERIENCE

Internship in Amin Mechanical Industries. Internship in Khyber Teaching Hospital Refrigeration Plant Peshawar.

COMPUTER SKILLS

Office Automation,.Autocad,ProE,Ansys etc

Page 23: SAYYED TAUSIF ALAM.doc 2 (1)

3