section d: erosion and sediment control plans...

21
DAKOTA SOUTH STATE OF PROJECT SHEET SHEETS TOTAL NH-PH 0018(198)173 10 10 32 33 34 35 36 31 32 33 1 2 3 4 5 6 8 9 11 12 13 14 15 4 5 6 7 8 V ET A L HA RR I NG T ON 18 288 S T 289 S T 290 S T 291 S T 292 S T 31 10 BEGIN NH-PH 0018(198)173 END NH-PH 0018(198)173 BE NNETT COUNT Y T ODD COUNT Y R33W T 37 N T 37 N R33W 16 9 R34W R34W 16 17 242 AVE T 38 N T 38 N Station 745+66.14 Station 612+00.00 SECTION D: EROSION AND SEDIMENT CONTROL PLANS INDEX OF SHEETS Standard Plates SDDOT Stabilized Construction Entrance Details Options for Dewatering and Sediment Collection Erosion and Sediment Control Plan Sheets Erosion and Sediment Control Legend Stormwater Pollution Prevention Plan Checklist Estimate with General Notes and Tables General Layout with Index D17 to D21 D16 D15 D10 to D14 D9 D5 to D8 D2 to D4 D1 U:\ r d \ p r j\ b e nn04 XH\ T itl e D. dgn F il e - Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS Pl o t Sca l e - 1 200 Pl o tt e d F r o m - t r p r 13525 D1 D21

Upload: others

Post on 28-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

NH-PH 0018(198)173

1010

32 33 34 35 3631 32 33

123456

8 911 12

131415

456

7 8

VETAL

HARRINGTON

18

288 ST

289 ST

290 ST

291 ST

292 ST

31

10

BEGIN NH-PH 0018(198)173

END NH-PH 0018(198)173

BE

NN

ET

T C

OU

NT

Y

TO

DD C

OU

NT

Y

R33W

T37

N

T37

N

R33W

16

9

R34W

R34W

1617

242

AV

E

T38

N

T38

N

Station 745+66.14

Station 612+00.00

SECTION D: EROSION AND SEDIMENT CONTROL PLANS

INDEX OF SHEETS

Standard Plates

SDDOT Stabilized Construction Entrance Details

Options for Dewatering and Sediment Collection

Erosion and Sediment Control Plan Sheets

Erosion and Sediment Control Legend

Stormwater Pollution Prevention Plan Checklist

Estimate with General Notes and Tables

General Layout with Index

D17 to D21

D16

D15

D10 to D14

D9

D5 to D8

D2 to D4

D1

U:\rd\prj\b

enn04

XH\Title

D.d

gn

File -

Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

3525

D1 D21

Page 2: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D2 D21SECTION D ESTIMATE OF QUANTITIES TABLE OF LOW FLOW SILT FENCE Quantity

Station L/R Location (Ft) BID ITEM

ITEM QUANTITY UNIT 612+00 L ACROSS DITCH 65 NUMBER 612+00 R ACROSS DITCH 65

110E1690 Remove Sediment 2.0 CuYd XR621 8+70 TO 12+20 L SLOW RUN-ON 380 0 110E1700 Remove Silt Fence 2,850 Ft XR621 0+00 L ACROSS DITCH 16 0 <:'!

XR621 0+00 R ACROSS DITCH 16 230E0010 Placing Topsoil 32,524 CuYd

730E0251 Special Permanent Seed Mixture 1 1,820 Lb 622+30 TO 624+50 L PERIMETER CONTROL 270 643+00 TO 646+20 L SLOW RUN-ON 330

731E0200 Fertilizing 70.00 Ton 653+14 TO 655+93 L SLOW RUN-ON 370 732E0100 Mulching 140.0 Ton 659+33 TO 661 +52 L SLOW RUN-ON 520 734E0044 Soil Stabilizer 46.9 Acre 660+00 TO 661 +32 R SLOW RUN-ON 280

734E0103 Type 3 Erosion Control Blanket 41,170 SqYd 661 +52 TO 663+05 L PERIMETER CONTROL 160 670+06 TO 670+46 R PERIMETER CONTROL 55

734E0154 12" Diameter Erosion Control Wattle 850 Ft 677+60 TO 678+90 L SLOW RUN-ON 275 734E0165 Remove and Reset Erosion Control Wattle 213 Ft 690+54 TO 691 +25 L SLOW RUN-ON 200

734E0325 Surface Roughening 46.9 Acre 709+00 TO 710+60 L SLOW RUN-ON 160

734E0510 Shaping ror Erosion Control Blanket 15,000 Ft 717+25 TO 718+33 724+50 TO 725+50

L SLOW RUN-ON 120 L PERIMETER CONTROL 100

734E0602 Low Flow Silt Fenc,e 5,300 Ft 728+00 TO 734+00 L SLOW RUN-ON 620 734E0604 High Flow Silt Fence 6,100 Ft 734+00 TO 735+80 L PERIMETER CONTROL 220

734E0610 Mucking Silt Fence 792 CuYd Additional Quantity: 1 078

734E0620 Repair Sift Fence 2,850 Ft Total : 5,300

900E1320 Construction Entrance 2 Each TABLE OF HIGH FLOW SILT FENCE

Station L/R Location

LOW FLOW SILT FENCE XR621 7+00 TO 9+25 R PERIMETER CONTROL XR621 9+22 L INLET OF PIPE

The low flow silt fence fabric provided shall be from the approved product list. 621+00 L INLET OF PIPE

The approved product list for low flow silt fence may be viewed at the 625+19 L INLET OF PIPE 625+50 TO 630+20 R PERIMETER CONTROL following internet site: 631+50 TO 634+20 R PERIMETER CONTROL

http://sddot.com/business/certification/products/Default.aspx 632+55 L INLET OF PIPE 638+13 to 639+20 R PERIMETER CONTROL 638+50 L INLET OF PIPE

Low flow silt fence shall be placed at the locations noted in the table and at 640+85 to 643+00 R PERIMETER CONTROL locations that will minimize siltation of adjacent streams, lakes, dams, or 642+00 L INLET OF PIPE drainage areas as determined by the Engineer during construction. Refer to 650+20 L INLET OF PIPE Standard Plate 734.04 for details. 659+58-90' L INLET OF PIPE

659+79 R INLET OF PIPE An additional quantity of Low Flow Silt Fence has been added to the Estimate 664+37 R INLET OF PIPE of Quantities for temporary sediment control. 679+20 TO 680+ 75 R PERIMETER CONTROL

684+51 TO 687+13 R PERIMETER CONTROL 669+91 L INLET OF PIPE

HIGH FLOW SILT FENCE 680+00 L INLET OF PIPE 686+37 L INLET OF PIPE

The high flow silt fence fabric provided shall be from the approved product 693+51 L INLET OF PIPE 693+ 77 TO 694+55 R PERIMETER CONTROL list. The approved product list for high flow silt fence may be viewed at the 706+50 R INLET OF PIPE

following internet site : 710+35 TO 712+60 R PERIMETER CONTROL 710+42 L INLET OF PIPE

http://sddot.com/business/certification/products/Default.aspx 718+26 R INLET OF PIPE 718+25 TO 720+00 R PERIMETER CONTROL

High flow silt fence shall be placed at the locations noted in the table and at 725+25 R INLET OF PIPE locations that will minimize siltation of adjacent streams, lakes, dams, or 729+85 TO 730+61 R PERIMETER CONTROL drainage areas as determined by the Engineer during construction . Refer to 736+00 R INLET OF PIPE Standard Plate 734.05 for details. 742+10 TO 743+60 L PERIMETER CONTROL

742+78 R INLET OF PIPE

E An additional quantity of high flow silt fence has been added to the Estimate Additional Quantity: e of Quantities for temporary sediment control. Total : u. 'C Q)

"' £

Quantity (Ft)

335 18 18 18

940 540

30 185

18 215

30 30 18 18 18

275 475

18 18 18 18

190 18

410 100 60

375 18

145 18

260 18

1,235

6,100

I I TOTAL SHEET SHEETS I STATE OF I PROJECT

SOUTH I DAKOTA NH-PH 0018(198)173 I I

Plotting Date: 08/06/2019

EROSION CONTROL WATTLE

Erosion control wattles for restraining the flow of runoff and sediment shall be installed at locations noted in the table and at locations determined by the Engineer during construction . Refer to Standard Plate 734 .06 for details. The Contractor shall provide certification that the erosion control wattles do not contain noxious weed seeds.

Erosion control wattles shall remain on the project to decompose.

An additional quantity of 12" Diameter Erosion Control Wattles has been added to the Estimate of Quantities for temporary erosion and sediment control in highway ditch channels and as an alternative to low flow or high flow silt fence at wetland areas adjacent to the highway.

The erosion control wattle provided shall be from the approved product list. The approved product list for erosion control wattle may be viewed at the following internet site:

http://sddot.com/business/certification/products/Default.aspx

TABLE OF 12" DIAMETER EROSION CONTROL WATTLE

Quantity Station L/R Location {Ft) 613+00 L DITCH CHANNEL 30 613+00 R DITCH CHANNEL 30 615+00 L DITCH CHANNEL 30 615+00 R DITCH CHANNEL 30 654+00 L DITCH CHANNEL 30 726+50 to 732+ 75 R PERIMETER CONTROL 500

Additional Quantity: 200

Total: 850

PLACING TOPSOIL

The thickness will be approximately 4 inches or less within the right-of-way and on temporary easements.

The estimated amount of topsoil to be placed is as follows :

Station XR 621 612+00 635+00 665+00 695+00 725+00

to Station

635+00 665+00 695+00 725+00 745+66.14

Topsoil (CuYd) 837

4,763 6,822 8,524 8,211 3,367

Total : 32,524

C C) 'C

c:i C 0

1l CD en "' ~ ~ g C C CD :9 "' C. -:

Page 3: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D3 D21

0 0 <:'!

E e u. "C Q)

"' £

SURFACE ROUGHENING

Surface roughening shall be done after topsoil placement and before permanent seeding, fertilizing, and mulching applications. Refer to Standard Plate 734.25 for details.

TABLE OF SURFACE ROUGHENING

Area Station to Station L/R (Acre) 612+00 620+75 L 1.5 612+00 620+75 R 1.3 XR621 0+00 5+00 L 0.2 XR621 0+00 5+00 R 0.2 XR621 6+50 9+00 L 0.2 XR621 6+50 8+75 R 0.2 XR621 10+00 13+80 L 0.1 XR621 10+00 11+50 R 0.1 XR621 12+50 13+80 R 0.1 622+00 625+00 L 0.5 622+00 625+00 R 0.3 626+00 632+00 L 0.6 626+00 632+00 R 0.6 633+00 638+00 L 0.9 633+00 638+00 R 0.8 639+00 641+50 L 0.7 639+00 641+50 R 0.2 642+50 649+50 L 0.7 642+50 649+50 R 0.5 650+50 659+50 R 1.9 651+00 659+00 L 1.6 660+00 664+00 L 0.3 660+50 664+00 R 0.8 664+00 664+75 R 4.0 644+50 669+50 L 1.3 664+75 669+50 R 1.5 670+00 679+50 L 2.6 670+25 679+50 R 1.0 680+50 686+00 R 0.7 681+00 686+00 L 2 .1 686+00 687+00 L 0.3 686+75 693+50 R 1.1 687+00 692+75 L 1.3 694+00 706+00 L 2 .0 694+50 706+00 R 2.5 707+00 710+00 L 0.4 707+00 710+00 R 0.4 711+00 717+50 L 2 .1 711+00 718+00 R 1.4 719+00 725+00 L 1.8 719+00 730+00 R 2.0 726+00 730+00 L 0.7 730+75 735+75 R 0.5 731+00 735+75 L 0.9 736+25 742+50 L 0.9 736+25 742+50 R 0.8 743+00 745+66 L 0.1 743+00 745+66 R 0.2

Total : 46.9

FERTILIZING

The Contractor shall apply an all-natural slow release fertilizer prior to seeding or placing sod. The all-natural fertilizer shall have a minimum guaranteed analysis of 4-4-4 and be USDA Certified BioBased. It should provide a minimum of 4% (N) nitrogen with a minimum water insoluble nitrogen (WIN) fraction of 2 .07%, a minimum of 4% (P205) available phosphate, a minimum of 4% (K20) soluble potash, and a maximum carbon to nitrogen ratio (C:N ratio) of 5:1. The all-natural fertilizer shall be free of weed-seed and pathogens accomplished through thermophilic composting, and not mechanical or chemical sterilization, to assure presence of beneficial soil microbiology. The fertilizer shall have a near neutral pH, a low salt index, a low biological oxygen demand, contain organic humic and fulvic acids, and have high aerobic organism counts . The fertilizer shall also be stable , free of bad odors, and be unattractive as a food source for animals. It should also be in a granular form that is easily spread.

The fertilizer shall be applied at a rate of 2,000 pounds per acre in accordance with the manufacturer's recommended method of application.

The all-natural slow release fertilizer shall be as shown below or an approved equal:

Product

Sustane

Perfect Blend

MYCORRHIZAL INOCULUM

Manufacturer

Sustane Corporate Headquarters Cannon Falls, Minnesota Phone: 1-800-352-9245 www.sustane.com

Perfect Blend, LLC Bellevue, WA Phone: 1-866-456-8890 www.perfect-blend.com

Mycorrhizal inoculum shall consist of mycorrhizal fungi spores and mycorrhizal fungi-infected root fragments in a solid carrier. The carrier may include organic materials, calcinated clay, or other materials consistent with application and good plant growth . The supplier shall provide certification of the fungal species claimed and the live propagule count. The inoculum shall include the following fungal species: 25% Glomus intraradices 25% Glomus aggregatum or desertico/a 25% Glomus mosseae 25% Glomus etunicatum

All seed will be inoculated by the seed supplier with a minimum of 100,000 live propagules of mycorrhizal fungi per acre. All costs of inoculating the seed will be incidental to the contract unit price per pound for the corresponding permanent seed mixture .

The mycorrhizal inoculum will be as shown below or an approved equal :

Product

MycoApply

Manufacturer

Mycorrhizal Applications , Inc. Grants Pass, OR Phone : 1-866-4 76-7800 www.mycorrhizae.com

I SHEET I TOTAL SHEETS I STATE OF I PROJECT

SOUTH I DAKOTA NH-PH 0018(198)173 I I

Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS

AM 120 Multi Species Blend Reforestation Technologies Int. Gilroy, CA Phone: 1-800-784-4769 www.reforest.com

PERMANENT SEEDING

The areas to be seeded consist of all newly graded areas within the project limits except for the top of roadways and temporary easements under cultivation .

Special Permanent Seed Mixture 1 shall consist of the following:

Grass Species

Switchgrass

Little Bluestem

Sideoats Grama

Green Needleqrass

lndiangrass

Big Bluestem

Sand Bluestem

Variety

Dacotah, Forestburg,

Nebraska 28, Pathfinder, Summer, Sunburst, Trailblazer

Badlands, Itasca, Blaze, Camper

Butte, Pierre

Lodorm, AC Mallard Ecovar

Holt, Tomahawk, Chief, Nebraska 54 Bison, Bonilla, Champ, Sunnvview, Rountree, Bonanza Cherry, Goldstrike, Garden

Purple prairieclover Bismarck

Reqreen or Quickquard Sterile Cover Crop

Total:

EROSION CONTROL BLANKET

Pure Live Seed (PLS)

(Pounds/Acre)

2

2

2

2

2

2

2

2

10

26

Erosion control blanket shall be installed 24 feet wide at the locations noted in the table and at locations determined by the Engineer during construction .

Erosion control blanket shall be trenched in as shown on Standard Plate 734.01 as well as along the longitudinal edges.

The erosion control blanket provided shall be from the approved product list. The approved product list for erosion control blanket may be viewed at the following internet site :

http://sddot.com/business/certification/products/Default.aspx

An additional quantity of Type 3 Erosion Control Blanket has been added to the Estimate of Quantities for temporary erosion control.

SHAPING FOR EROSION CONTROL BLANKET

The ditches shall be shaped for the erosion control blanket as specified on Standard Plate 734.01 .

C C) "C

c:i C 0

1l CD en <I)

~ ~ g C C CD :9 "' C. -:

Page 4: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D4 D21TABLE OF TYPE 3 EROSION CONTROL BLANKET IN DITCH BOTTOMS

Shaping Quantity Station to Station L/R (Ft) (SqYd)

XR621 0+00 2+00 L 200 535

XR621 0+00 2+00 R 200 535 0 0

870 <:'! XR621 6+26 9+50 L 325 622+00 626+00 R 400 1,070

627+00 636+00 R 900 2,400

628+25 632+50 L 430 1,150

650+00 653+60 L 360 960

650+00 659+53 R 955 2,550

656+00 659+23 L 320 855

660+00 668+00 R 800 2,135

663+00 669+00 L 600 1,600

677+00 682+00 R 520 670

687+00 689+50 L 250 2,550

692+85 695+25 L 240 640

696+00 706+75 L 1,080 2,880

696+00 706+50 R 1,060 2,830

707+50 712+00 R 450 1,200

715+00 718+00 L 300 800

717+00 718+75 R 180 480

724+00 725+25 R 125 335

732+80 745+00 R 1,245 3,295

735+90 742+50 L 670 1,790

Additional Quantity: 3,390 9,040

Total: 15,000 41,170

DEWATERING AND SEDIMENT COLLECTING

The Contactor has the option to treat sediment laden water trapped within the project limits or the Contractor may elect to transport sediment laden water off the project. Refer to the OPTIONS FOR DEWATERING AND SEDIMENT COLLECTING detail sheet for more information.

Water transported off the project limits will not be disposed of in an area where it can enter a waterway. The disposal site must be approved by the Engineer.

CONSTRUCTION ENTRANCE

The Contractor will install a Construction Entrance at locations where there is a potential for mud tracking and sediment flow from the construction site and work area onto a paved public roadway.

It is the Contractor's option to use the SDDOT Construction Entrance (See SDDOT Construction Entrance notes and details), a product from the list provided in these notes, or other products or processes as approved by the Engineer during construction .

If the Contractor elects to use one of the products listed in the table, then the Contractor will install the construction entrance product in accordance with the manufacturer's installation instructions or as directed by the Engineer.

The Contractor will maintain the construction entrance such that mud tracking and sediment flow will not enter the roadway or adjacent drainage areas. The construction entrance will be routinely inspected, and the Contractor will repair or replace material as deemed necessary by the Engineer.

All costs for furnishing, installing, maintaining, and removal of the construction entrance including equipment, labor, materials, and incidentals will be included in the contract unit price per each for "Construction Entrance".

The following table is a list of known construction entrance products available for use:

Product

Grizzly Rumble Grate (1 O' width and 24' length required)

Rumble Grid (12' width and 24' length including

combination of grids and ramps required)

Tracking Pad (12' width and 24' length

(2 - 12'x12' pads) and 2 - 4'x4' turning flares)

FOOS Trackout Control Mat ( 12' width and 10 mats

To get a 70' length)

DuraDeck and MegaDeck HD An adequate quantity is needed to

prevent tires from becoming muddy (does not remove mud)

Manufacturer

Trackout Control, LLC Tempe, AZ Phone: 1-800-761-0056 www.trackoutcontrol.com

Pro-Tee Equipment, Inc. Charlotte, Ml Phone: 1-800-292-1225 www.pro-tecequipment.com

Tracking Pads LLC Denver, CO Phone: 1-719-371-3791 www.trackingpads .com

FOOS, LLC Denver, CO Phone: 1-844-200-3637 getfods.com

Signature Systems Group, LLC Flower Mound , TX Phone: 1-800-709-8151 www.duradeckmats.com

I I TOTAL SHEET SHEETS I STATE OF I PROJECT

SOUTH I DAKOTA NH-PH 0018(198)173 I I

Plotting Date: 08/06/2019

SDDOT CONSTRUCTION ENTRANCE

If the SDDOT Construction Entrance is utilized, then the Contractor will install the SDDOT Construction Entrance in accordance with these notes and the detail drawings.

Pit run material will be obtained from a granular source and will conform to the following gradation:

Sieve Size 6" #4

#200

Percent Passing 100% 0-60% 0-20%

The pit run material will be compacted to the satisfaction of the Engineer.

The aggregate for the granular material will conform to the following gradation requirements:

Sieve Size Percent Passing 3" 100%

2%" 90-100% 1 %" 25-60% %" 0-10% %" 0-5%

The granular material will be placed in 6" maximum lifts.

It is anticipated that the granular material will need to be periodically removed and replaced as it becomes inundated with mud and sediment.

The Reinforcement Fabric (MSE) will be in conformance with Section 831 of the Specifications. The Reinforcement Fabric (MSE) will be on the Approved Products List for this material or will be certified by the supplier to meet this specification prior to installation.

The Reinforcement Fabric (MSE) should be kept as taut as possible prior to placing .

Equipment will not be allowed on the Reinforcement Fabric (MSE) until the first lift of granular material is in place.

All seams in the Reinforcement Fabric (MSE) will be overlapped at least 2' and shingled .

C C) 'O

c:i C 0

1l CD en <I)

~ ~ g C C CD :9 "' C. -:

Page 5: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D5 D21STORMWATER POLLUTION PREVENTION PLAN CHECKLIST (The numbers left of the title headings are reference numbers to the GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOC/A TED WITH CONSTRUCT/ON ACTIVITIES (Stormwater Permit))

5.3 (2): STAFF TRAINING/SWPPP IMPLEMENTATION To promote stormwater management awareness specific for this project, the Contractor's Erosion Control Supervisor should provide correspondence of how the SWPPP will be implemented . The Contractor's Erosion Control Supervisor is responsible for providing this information at the preconstruction meeting, and subsequently completing an attendance log, which should identify site-specific implementation of the SWPPP and the names of the personnel who attended the preconstruction meeting . Documentation of the preconstruction meeting will be filed with the SWPPP documents.

5.3 (3): DESCRIPTION OF CONSTRUCTION ACTIVITIES ~ 5.3 (3a): Project Limits (See Title Sheet) ~ 5.3 (3a): Project Description (See Title Sheet) ~ 5.3 (4): Site Map(s) (See Title Sheet and Plans) ~ Major Soil Disturbing Activities (check all that apply)

• 0Clearing and grubbing • 0Excavation/borrow • [8]Grading and shaping • 0Filling • 00ther (describe):

~ 5.3 (3b): Total Project Area 85 Acres ~ 5.3 (3b): Total Area to be Disturbed 70 Acres ~ 5.3 (3c): Maximum Area Disturbed at One Time ~ 5.3 (3d): Existing Vegetative Cover (%) 70 ~ 5.3 (3d): Description of Vegetative Cover Typical Western South

Dakota native and introduced vegetation ~ 5.3 (3e): Soil Properties: Fine Sandy Loams ~ 5.3 (3f): Name of Receiving Water Body/Bodies Little White River ~ 5.3 (3g): Location of Construction Support Activity Areas

5.3 (3h): ORDER OF CONSTRUCTION ACTIVITIES ~ Special sequencing requirements (see Section C). The Contractor will enter the Estimated Start Date.

Description

Install stabilized construction entrance(s) .

Install perimeter protection where runoff may exit site or run-on may enter the site .

Clearing and grubbing.

Remove and store topsoil.

Clearing and grubbing.

Install inlet and culvert protection after completing storm drainage and other utility installations

Complete final grading and replace topsoil.

Stabilize disturbed areas using surface roughening and soil stabilizer until seedinq can be completed . Complete final paving and sealing of concrete .

Complete traffic control installation and protection devices.

Fertilize, reseed, and mulch or blanket areas disturbed by removal activities .

Estimated Start Date

5.3 (5): DESCRIPTION AND MAINTENANCE OF CONTROL MEASURES All controls will be maintained in good working order. Necessary repairs will be initiated within 24 hours of the site inspection report. Include the technical reasoning for selecting each control. (check all that apply)

Perimeter Controls (See Detail Plan Sheets)

Description

D Natural Buffers (within 50 ft of Waters of State)

[8l Silt Fence

[8l Erosion Control Wattles

D Temporary Berm / Windrow

D Floating Silt Curtain

[8l Stabilized Construction Entrances

D Entrance/Exit Equipment Tire Wash

D Other:

Structural Erosion and Sediment Controls

Description

[8l Silt Fence

D Temporary Berm/Windrow

[8l Erosion Control Wattles

D Temporary Sediment Barriers

D Erosion Bales

D Temporary Slope Drain

D Turf Reinforcement Mat

[8l Riprap

[8l Gabions

D Rock Check Dams

D Sediment Traps/Basins

[8l Culvert Inlet Protection

D Transition Mats

D Median/Area Drain Inlet Protection

D Curb Inlet Protection

D Interceptor Ditch

D Concrete Washout Facility

D Work Platform

D Temporary Water Barrier

D Temporary Water Crossing

D Permanent Stormwater Ponds

D Permanent Open Vegetated Swales

D Natural Depressions to allow for Infiltration

D Sequential Systems that combine several practices

D Other:

Estimated Start Date

Estimated Start Date

t----------i....::=-,l.....:S!!:!!HE~ET~S--1 I STATE OF I PROJECT I SHEET I TOTAL

SOUTH 1· 1 DAKOTA NH-PH 0018(198)173 I

Plotting Date:

Dust Controls

Description

D Tarps & Wind impervious fabrics

D Watering

D Stockpile location/orientation

D Dust Control Chlorides

OOther

Dewatering BMPs

Description

D Sediment Basins

D Dewatering bags

D Weir tanks

D Temporary Diversion Channel

D Other:

Stabilization Practices (See Detail Plan Sheets)

08/06/2019 Revision Date: 08-06-2019 WS

Estimated Start Date

Estimated Start Date

(Stabilization measures shall begin the following work day whenever earth disturbing activity on any portion of the site has temporarily or permanently ceased. Temporary stabilization shall be completed as soon as practicable but no later than 14 days after initiating soil stabilization activities (3.18))

Description

0Vegetation Buffer Strips

D Temporary Seeding (Cover Crop Seeding)

[8l Permanent Seeding with nurse crop

D Sodding

D Planting (Woody Vegetation for Soil Stabilization)

[8l Mulching (Grass Hay or Straw)

D Fiber Mulching (Wood Fiber Mulch)

[8l Soil Stabilizer

D Bonded Fiber Matrix

D Fiber Reinforced Matrix

[8l Erosion Control Blankets

[8l Surface Roughening (e .g. tracking)

D Other:

Wetland Avoidance

Estimated Start Date

Will construction and/or erosion and sediment controls impinge on regulated wetlands? Yes D No [8l If yes, the structural and erosion and sediment controls have been included in the total project wetland impacts and have been included in the 404 permit process with the USACE.

C C) 'O

c:i C 0

1l CD en <I)

~ ~ g C C CD :9 "' C. -:

Page 6: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D6 D215.3 (6): PROCEDURES FOR INSPECTIONS

• Inspections will be conducted at least once every 7 days. • All controls will be maintained in good working order. Necessary

repairs will be initiated within 24 hours of the site inspection report .

• Silt fence will be inspected for depth of sediment and for tears to ensure the fabric is securely attached to the posts and that the posts are well anchored . Sediment buildup will be removed from the silt fence when it reaches 1/ 3 of the height of the silt fence .

• Sediment basins and traps will be checked . Sediment will be removed when depth reaches approximately 50 percent of the structure's capacity, and at the conclusion of the construction .

• Check dams will be inspected for stability. Sediment will be removed when depth reaches % the height of the dam.

• All seeded areas will be checked for bare spots, washouts, and vigorous growth free of significant weed infestations.

• Inspection and maintenance reports will be prepared on form DOT 298 for each site inspection, this form will also be used to document changes to the SWPPP. A copy of the completed inspection form will be filed with the SWPPP documents.

• The SDDOT Project Engineer and Contractor's Erosion Control Supervisor are responsible for inspections. Maintenance and repair activities are the responsibility of the Contractor. The SDDOT Project Engineer will complete the inspection and maintenance reports and distribute copies per the distribution instructions on DOT 298.

5.3 (7): POST CONSTRUCTION STORMWATER MANAGEMENT Stormwater management will be handled by temporary controls outlined in "DESCRIPTION AND MAINTENANCE OF CONTROL MEASURES" above, and any permanent controls needed to meet permanent stormwater management needs in the post construction period will be shown in the plans and noted as permanent.

5.3 (8): POLLUTION PREVENTION PROCEDURES

5.3 (Sa): Spill Prevention and Response Procedures ~ Material Management

• Housekeeping • Only needed products will be stored on-site by the Contractor. • Except for bulk materials the contractor will store all materials

under cover and/or in appropriate containers. • Products must be stored in original containers and labeled . • Material mixing will be conducted in accordance with the

manufacturer's recommendations . • When possible, all products will be completely used before

properly disposing of the container off-site . • The manufacturer's directions for disposal of materials and

containers will be followed . • The Contractor's site superintendent will inspect materials

storage areas regularly to ensure proper use and disposal. • Dust generated will be controlled in an environmentally safe

manner.

• Hazardous Materials • Products will be kept in original containers unless the container

is not resealable and provide secondary containment as applicable.

• Original labels and material safety data sheets will be retained in a safe place to relay important product information.

• If surplus product must be disposed of, manufacturer's label directions for disposal will be followed.

• Maintenance and repair of all equipment and vehicles involving oil changes, hydraulic system drain down, de-greasing operations, fuel tank drain down and removal, and other activities which may result in the accidental release of contaminants will be conducted on an impervious surface and under cover during wet weather to prevent the release of contaminants onto the ground .

• Wheel wash water will be collected and allowed to settle out suspended solids prior to discharge. Wheel wash water will not be discharged directly into any stormwater system or stormwater treatment system.

• Potential pH-modifying materials such as: bulk cement, cement kiln dust, fly ash, new concrete washings, concrete pumping, residuals from concrete saw cutting (either wet or dry), and mixer washout waters will be collected on site and managed to prevent contamination of stormwater runoff.

~ Spill Control Practices In addition to the previous housekeeping and management practices, the following practices will be followed for spill prevention and cleanup if needed. • For all hazardous materials stored on site, the manufacturer's

recommended methods for spill cleanup will be clearly posted. Site personnel will be made aware of the procedures and the locations of the information and cleanup supplies.

• Appropriate cleanup materials and equipment will be maintained by the Contractor in the materials storage area on-site. As appropriate, equipment and materials may include items such as brooms, dust pans, mops, rags, gloves, goggles, kitty litter, sand, sawdust, and plastic and metal trash containers specifically for cleanup purposes.

• All spills will be cleaned immediately after discovery and the materials disposed of properly.

• The spill area will be kept well ventilated and personnel will wear appropriate protective clothing to prevent injury from contact with a hazardous substance.

• After a spill a report will be prepared describing the spill, what caused it, and the cleanup measures taken. The spill prevention plan will be adjusted to include measures to prevent this type of spill from reoccurring, as well as clean up instructions in the event of reoccurrences .

• The Contractor's site superintendent, responsible for day-to-day operations, will be the spill prevention and cleanup coord inator.

~ Spill Response The primary objective in responding to a spill is to quickly contain the material(s) and prevent or minimize migration into stormwater runoff and conveyance systems. If the release has impacted on-site stormwater, it is critical to contain the released materials on-site and prevent their release into receiving waters . If a spill of pollutants threatens stormwater or surface water at the site, the spill response procedures outlined below must be implemented in a timely manner to prevent the release of pollutants. • The Contractor's site superintendent will be notified immediately

when a spill or the threat of a spill is observed . The superintendent will assess the situation and determine the appropriate response .

• If spills represent an imminent threat of escaping erosion and sediment controls and entering receiving waters, personnel will be directed to respond immediately to contain the release and notify the superintendent after the situation has been stabilized .

I STATE OF I PROJECT

SOUTH I I SHEET I TOTAL SHEETS

DAKOTA NH-PH 0018(198)173 I I Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS

• Spill kits containing appropriate materials and equipment for spill response and cleanup will be maintained by the Contractor at the site .

• If oil sheen is observed on surface water (e .g. settling ponds, detention ponds, swales), action will be taken immediately to remove the material causing the sheen. The Contractor will use appropriate materials to contain and absorb the spill . The source of the oil sheen will also be identified and removed or repaired as necessary to prevent further releases .

• If a spill occurs the superintendent or the superintendent's designee will be responsible for completing the spill reporting form and for reporting the spill to SDDENR.

• Personnel with primary responsibility for spill response and cleanup will receive training by the Contractor's site superintendent or designee. The training must include identifying the location of the spill kits and other spill response equipment and the use of spill response materials.

• Spill response equipment will be inspected and maintained as necessary to replace any materials used in spill response activities.

5.3 (Sb): WASTE MANAGEMENT PROCEDURES ~ Waste Disposal

• All liquid waste materials will be collected and stored in approved sealed containers. All trash and construction debris from the site will be deposited in the approved containers. Containers will be serviced as necessary, and the trash will be hauled to an approved disposal site or licensed landfill. All onsite personnel will be instructed in the proper procedures for waste disposal and notices stating proper practices will be posted. The Contractor is responsible for ensuring waste disposal procedures are followed.

~ Hazardous Waste • All hazardous waste materials will be disposed of in a manner

specified by local or state regulations or by the manufacturer. Site personnel will be instructed in these practices, and the Contractor will be responsible for seeing that these practices are followed.

~ Sanitary Waste • Portable sanitary facilities will be provided on all construction sites.

Sanitary waste will be collected from the portable units which must be secured to prevent tipping and serviced in a timely manner by a licensed waste management Contractor or as required by any local regu I ations.

C C) "O

c:i C 0

1l CD en "' ~ ~ g C C CD :9 "' C. -:

Page 7: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D7 D215.3 (9): CONSTRUCTION SITE POLLUTANTS The following materials or substances are expected to be present on the site during the construction period. These materials will be handled as noted under the heading "POLLUTION PREVENTION PROCEDURES" (check all that apply) .

~ C8l Concrete and Portland Cement ~ D Detergents ~ C8l Paints ~ C8l Metals ~ C8J Bituminous Materials ~ C8J Petroleum Based Products ~ C8J Diesel Exhaust Fluid ~ D Cleaning Solvents ~ 0Wood ~ D Cure ~ D Texture ~ D Chemical Fertilizers ~ D Other:

Product Specific Practices

• Petroleum Products All on-site vehicles will be monitored for leaks and receive regular preventive maintenance to reduce the chance of leakage. Petroleum products will be stored in tightly sealed containers which are clearly labeled.

• Fertilizers Fertilizers will be applied only in the amounts specified by the SDDOT. Once applied, fertilizers will be worked into the soil to limit the exposure to stormwater. Fertilizers will be stored in an enclosed area. The contents of partially used fertilizer bags will be transferred to sealable containers to avoid spills.

• Paints All containers will be tightly sealed and stored when not required for use. The excess will be disposed of according to the manufacturer's instructions and any applicable state and local regulations.

• Concrete Trucks Contractors will provide designated truck washout facilities on the site . These areas must be self-contained and not connected to any stormwater outlet of the site . Upon completion of construction, the area at the washout facility will be properly stabilized .

5.3 (10): NON-STORMWATER DISCHARGES The following non-stormwater discharges are anticipated during the course of this project (check all that apply) .

~ D Discharges from water line flushing . ~ D Pavement wash-water, where no spills or leaks of toxic or

hazardous materials have occurred . ~ C8J Uncontaminated ground water associated with dewatering activities.

5.3 (11): INFEASIBILITY DOCUMENTATION If it is determined to be infeasible to comply with any of the requirements of the Stormwater Permit, the infeasibility determination must be thoroughly documented in the SWPPP.

7.0: SPILL NOTIFICATION In the event of a spill, the Contractor's site superintendent will make the appropriate notification(s), consistent with the following procedures:

~ A release or spill of a regulated substance (includes petroleum and petroleum products) must be reported to SDDENR immediately if any one of the following conditions exists:

• The release or spill threatens or is able to threaten waters of the state (surface water or ground water)

• The release or spill causes an immediate danger to human health or safety

• The release or spill exceeds 25 gallons • The release or spill causes a sheen on surface water • The release or spill of any substance that exceeds the ground

water quality standards of ARSD Chapter 74:54:01 • The release or spill of any substance that exceeds the surface

water quality standards of ARSD Chapter 74:51 :01 • The release or spill of any substance that harms or threatens to

harm wildlife or aquatic life • The release or spill is required to be reported according to

Superfund Amendments and Reauthorization Act (SARA) Title Ill List of Lists, Consolidated List of Chemicals Subject to Reporting Under the Emergency Planning and Community Right to Know Act, US Environmental Protection Agency.

~ To report a release or spill, call SDDENR at 605-773-3296 during regular office hours (8 a.m. to 5 p.m. Central Standard Time). To report the release after hours, on weekends or holidays, call South Dakota Emergency Management at 605-773-3231. Reporting the release to SDDENR does not meet any obligation for reporting to other state, local, or federal agencies. Therefore, you must also contact local authorities to determine the local reporting requirements for releases. A written report of the unauthorized release of any regulated substance, including quantity discharged, and the location of the discharge shall be sent to SDDENR within 14 days of the discharge.

I STATE OF I PROJECT I SHEET I TOTAL

SOUTH 11---:--:-:--:::-:--:-::-:-------t-:=~....:S~HE~ET~S_j DAKOTA NH-PH 0018(198)173 I I

Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS

C C) "O

c:i C 0

1l CD en <I)

~ ~ g C C CD :9 "' C. -:

Page 8: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D8 D215.4: SWPPP CERTIFICATIONS ~ Certification of Compliance with Federal, State, and Local

Regulations The Storm Water Pollution Prevention Plan (SWPPP) for this project reflects the requirements of all local municipal jurisdictions for storm water management and sediment and erosion control as established by ordinance, as well as other state and federal requirements for sediment and erosion control plans, permits, notices or documentation as appropriate.

~ South Dakota Department of Transportation

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Authorized Signature (See the General Permit, Section 7.4 (1 ))

~ Prime Contractor This section is to be executed by the General Contractor after the award of the contract. This section may be executed any time there is a change in the Prime Contractor of the project.

I certify under penalty of law that this document and all attachments will be revised or maintained under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted . Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete . I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations .

Authorized Signature

CONTACT INFORMATION The following personnel are duly authorized representatives and have signatory authority for modifications made to the SWPPP:

~ Contractor Information:

• Prime Contractor Name:

• Contractor Contact Name:

• Address :

• City: State: Zip:

• Office Phone: Field:

• Cell Phone: Fax:

~ Erosion Control Supervisor

• Name:

• Address:

• City:

• Office Phone:

• Cell Phone: _______ Fax: ________ _

~ SDDOT Project Engineer

• Name:

• Business Address:

• Job Office Location :

• City: _________ State: ---~Zip: ___ _

• Office Phone: -------~Field:-------~

• Cell Phone: _________ Fax:---------

~ SDDENR Contact Spill Reporting • Business Hours Monday-Friday (605) 773-3296 • Nights and Weekends (605) 773-3231

~ SDDENR Contact for Hazardous Materials. • (605) 773-3153

~ National Response Center Hotline • (800)424-8802.

~ SDDENR Stormwater Contact Information • SDDENR Stormwater (800) 737-8676 • Surface Water Quality Program (605) 773-3351

I SHEET I TOTAL SHEETS I STATE OF I PROJECT

SOUTH I DAKOTA NH-PH 0018(198)173 I I

Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS

5.5: REQUIRED SWPPP MODIFICATIONS

~ 5.5 (1): Conditions Requiring SWPPP Modification The SWPPP must be modified , including the site map(s) , in response to any of the following conditions:

• When a new operator responsible for implementation of any part the SWPPP begins work on the site .

• When changes to the construction plans, sediment and erosion control measures, or any best management practices on site that are no longer accurately reflected in the SWPPP. This includes changes made in response to corrective actions triggered by inspections.

• To reflect areas on the site map where operational control has been transferred (including the date of the transfer) or has been covered under a new permit since initiating coverage under this general permit.

• If inspections by site staff, local officials, SDDENR, or U.S. EPA determine that SWPPP modifications are necessary for compliance with the Stormwater Permit.

• To reflect any revisions to applicable federal, state, or local requirements that affect the control measures implemented at the site.

• If approved by the Secretary, to reflect any changes in chemical water treatment systems or controls, including the use of a different water treatment chemical, age rates, different areas, or methods of application .

~ 5.5 (2): Deadlines for SWPPP Modification Any required revisions to the SWPPP must be completed within 7 calendar days following any of the items listed above.

~ 5.5 (3): Documentation of Modifications to the Plan All SWPPP modification records are required to be maintained showing the dates of when the modification occurred. The records must include the name of the person authorizing each change and a brief summary of all changes.

~ 5.5 (4): Certification Requirements All modifications made to the SWPPP must be signed and certified as required in Section 7.4.

~ 5.5 (5): Required Notice to Other Operators If there are multiple operators at the site, the Contractor's Erosion Control Supervisor must notify each operator that may be impacted by the change to the SWPPP within 24 hours.

When modifications as described above occur, the SWPPP will be modified to provide appropriate protection to disturbed areas, all storm water structures, and adjacent waters . The SDDOT Project Engineer will modify the SWPPP using the DOT 298 form and drawings on the plan will be modified to reflect the needed changes. Copies of the DOT 298 forms and the SWPPP will be retained on site in a designated place for review throughout the course of the project. A copy of the DOT 298 form will be given to the Contractor Erosion Control Supervisor and a copy will be emailed to the SDDOT Environmental Section in accordance with the DOT 298 Form.

C C) 'O

c:i C 0

1l CD en <I)

~ ~ g C C CD :9 "' C. -:

Page 9: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

NH-PH 0018(198)173

Low Flow Silt Fence

High Flow Silt Fence

High Flow Silt Fence at Pipe

Temporary Sediment Barrier

Temporary Water Barrier

Floating Silt Curtain

Sediment Filter Bags

Triangular Silt Barriers

Erosion Control Wattles on Slopes

Erosion Control Wattles at Inlets

Erosion Control Wattles in Ditches

Erosion Bales

Surfacing Roughening

Type 2 Erosion Control Blanket

Type 3 Erosion Control Blanket

Type 4 Erosion Control Blanket

Type 1 Turf Reinforcement Mat

Type 2 Turf Reinforcement Mat

Type 3 Turf Reinforcement Mat

Transition Mat

Rock Check Dam

Temporary Slope Drain

Topsoil Stockpile

Borrow Area

Stabilized Construction Entrance

Vegetated Buffer Strip

Concrete Washout

Asphalt Plant Site

Concrete Plant Site

Vehicle and Equipment Parking, Fueling, and Maintenance Areas

Dumpster or other Trash and Debris Containers

On-Site Construction Material Storage Area

Spill Kit

Work Platform

Cut Interceptor Ditch

If these items are applicable they are to be shown in the updated SWPPP using the Symbols given.

Best Management Practices (BMPs) are split into three categories and are to be used throughout construction.

Bonded Fiber Matrix/ Fiber Reinforced Matrix

Temporary Grass Hay or Straw Mulch/ Soil Stabilizer

Type 1 Erosion Control Blanket

BEST MANAGEMENT PRACTICES

and in the Final Phase to achieve final stabilization.

in the Initial Phase prior to earth disturbing activitIes and remain in place for the Intermediate Phase for temporary stabilization

BMPs from the Legend shown as Orange Symbols on the Erosion and Sediment Control Plan Sheets are to be installed

INITIAL PHASE

Intermediate Phase for temporary stabilization and remain in place in the Final Phase to achieve final stabilization.

BMPs from the Legend shown as Blue Symbols on the Erosion and Sediment Control Plan Sheets are to be installed in the

INTERMEDIATE PHASE

Final Phase to achieve final stabilization.

BMPs from the Legend shown as Green Symbols on the Erosion and Sediment Control Plan Sheets are to be installed in the

FINAL PHASE

Sediment Control at Inlet After Placement of Surfacing

Sediment Control at Inlet Before Placement of Surfacing

Silt Trap (See Standard Plate 734.04)

...\rd\prj\b

enn04

XH\E

&S

CLegend.d

gn

File -

Plotting Date: 08/06/2019

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

3525

TS

B

CE

VB

M

SK

WP

CW

AP

CP

V

D

EROSION AND SEDIMENT CONTROL LEGEND D9 D21

Page 10: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

0+00

5+00

10+00

13+80

13+80

607+98607+98 610+00615+00

620+00625+00 630+00

635+00607+98 610+00

615+00620+00

625+00 630+00

635+00

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

NH-PH 0018(198)173

75'

75'

Present US Hwy 18

Wayne Johnson

Landowners of Allotment 4853

Jeff Johnson & Lonna Johnson

Wayne JohnsonParcel 5

Parcel 2

75'

75'

75'

75'

Parcel 1

Parcel 3 & 3A

BEGIN NH-PH 0018(198)173

Section Line

1/1

6 Line

Sec. 36 - T38N - R34W

Sec. 1 - T37N - R34W

Government Lot 1Government Lot 4

Government Lot 4

Sec. 31 - T38N - R33W

Sec. 6 - T37N - R33W

U:\rd\prj\b

enn04

XH\6

07ec.d

gn

File -

Plotting Date: 08/06/2019

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

3525

100'

100'

33'

33'

33'

SE1/4

E1/2 SW1/4

100'

Government Lot 2

634+34.5

4

615+00 R 30 Ft

615+00 L 30 Ft

613+00 R 30 Ft

613+00 L 30 Ft

at the following locations:

across the highway ditch channel bottom

Install 12" Diameter Erosion Control Wattles

628+25 to 632+50 L 430' Shaping 1,150 SqYd

627+00 to 636+00 R 900' Shaping 2,400 SqYd

622+00 to 626+00 R 400' Shaping 1,070 SqYd

XR621 6+26 to 9+50 L 325' Shaping 870 SqYd

XR621 0+00 to 2+00 R 200' Shaping 535 SqYd

XR621 0+00 to 2+00 L 200' Shaping 535 SqYd

bottom at the following locations:

24' wide in the highway ditch channel

Install Type 3 Erosion Control Blanket

270 FtPERIMETER CONTROL622+30 to 624+50 L

16 FtACROSS DITCHXR621 0+00 R

16 FtACROSS DITCHXR621 0+00 L

380 FtSLOW RUN-ONXR621 8+70 to 12+20 L

65 FtACROSS DITCH612+00 R

65 FtACROSS DITCH612+00 L

Install Low Flow Silt Fence at the following locations:

Around topsoil stockpiles--quantity and location to be determined

540 Ft631+50 to 634+20 R PERIMETER CONTROL

940 Ft625+50 to 630+20 R PERIMETER CONTROL

335 FtXR621 7+00 to 9+25 R PERIMETER CONTROL

Install High Flow Silt Fence at the following locations:

30 Ft632+55 L INLET OF PIPE

18 Ft625+19 L INLET OF PIPE

18 Ft621+00 L INLET OF PIPE

XR621 9+22 L INLET OF PIPE 18 Ft

Install High Flow Silt Fence at the following locations:

626+00 to 632+00 R 0.6 Acres

626+00 to 632+00 L 0.6 Acres

622+00 to 625+00 R 0.3 Acres

622+00 to 625+00 L 0.5 Acres

XR621 12+50 to 13+80 R 0.1 Acres

XR621 10+00 to 11+50 R 0.1 Acres

XR621 10+00 to 13+80 L 0.1 Acres

XR621 6+50 to 8+75 R 0.2 Acres

XR621 6+50 to 9+00 L 0.2 Acres

XR621 0+00 to 5+00 R 0.2 Acres

XR621 0+00 to 5+00 L 0.2 Acres

612+00 to 620+75 R 1.3 Acres

612+00 to 620+75 L 1.5 Acres

with an application of Soil Stabilizer at the following locations:

Utilize Surface Roughening inside the work limits and follow

Station 612+00

XR

621

XR

621

D10 D21

Page 11: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

635+00

640+00 645+00 650+00 655+00 660+00665+00635+00

640+00 645+00 650+00 655+00 660+00665+00

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

NH-PH 0018(198)173

1/4 Line

Jeff Johnson & Lonna Johnson

Jimmie H. O'Neill & Martha T. O'Neill

Jeff Johnson & Lonna Johnson 1/16 Line

Sec. 6 - T37N - R33W

Government Lot 2

Government Lot 3

Government Lot 1

U:\rd\prj\b

enn04

XH\6

35ec.d

gn

File -

Plotting Date: 08/06/2019

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

3525

75'100' 100'

648+00.1

4

634+34.5

5

661+80.5

3Sec. 31 - T38N - R33W

E1/2 SW1/4

Landowners of Allotment 4853

Jimmie H. O'Neill & Martha T. O'Neill

Parcel 3

Parcel 4

Parcel 6

Parcel 5

Parcel 7

75'

75'

75'

654+00 L 30 Ft

at the following locations:

across the highway ditch channel bottom

Install 12" Diameter Erosion Control Wattles

660+00 to 668+00 R 800' shaping 2,135 SqYd

656+00 to 659+23 L 320' shaping 855 SqYd

650+00 to 659+53 R 955' shaping 2,550 SqYd

650+00 to 653+60 L 360' shaping 960 SqYd

24' wide at the following locations:

in the highway ditch channel bottom

Install Type 3 Erosion Control Blanket

664+00 to 664+75 R 4.0 Acres

660+50 to 664+00 R 0.8 Acres

660+00 to 664+00 L 0.3 Acres

651+00 to 659+00 L 1.6 Acres

650+50 to 659+50 R 1.9 Acres

642+50 to 649+50 R 0.5 Acres

642+50 to 649+50 L 0.7 Acres

639+00 to 641+50 R 0.2 Acres

639+00 to 641+50 L 0.7 Acres

633+00 to 638+00 R 0.8 Acres

633+00 to 638+00 L 0.9 Acres

with an application of Soil Stabilizer at the following locations:

Utilize Surface Roughening within the work limits and follow 160 Ft661+52 to 663+05 L PERIMETER CONTROL

280 Ft660+00 to 661+32 R SLOW RUN-ON

520 Ft659+33 to 661+52 L SLOW RUN-ON

370 Ft653+14 to 655+93 L SLOW RUN-ON

330 Ft643+00 to 646+20 L SLOW RUN-ON

Install Low Flow Silt Fence at the following locations:

18 FtINLET OF PIPE664+37 R

18 FtINLET OF PIPE659+79 R

18 FtINLET OF PIPE659+58-90'L

30 FtINLET OF PIPE650+20 L

30 FtINLET OF PIPE642+00 L

18 FtINLET OF PIPE638+50 L

Install High Flow Silt Fence at the following locations:

215 Ft640+85 to 643+00 R PERIMETER CONTROL

185 Ft638+13 to 639+20 R PERIMETER CONTROL

Install High Flow Silt Fence at the following locations:

Present US Hwy 18

Section Lin

e

D11 D21

Page 12: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

665+00

670+00

675+00

680+00

685+00

690+00

695+

00665+00

670+00

675+00

680+00

685+00

690+00

695+

00

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

NH-PH 0018(198)173

Sectio

n Line

Government Lot 1

Sec. 5 - T37N - R33W

Government Lot 3

Sec. 6 - T37N - R33W

Government Lot 4

U:\rd\prj\b

enn04

XH\6

65ec.d

gn

File -

Plotting Date: 08/06/2019

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

3525

75'

100'

100'

S1/2 NW1/4S1/2 NE1/4

675+94.5

9

Jimmie H. O'Neill & Martha T. O'Neill

Jimmie H. O'Neill & Martha T. O'Neill

Jeff Johnson & Lonna Johnson

75'

Parcel 7

Parcel 6

Parcel 8

1/16 Lin

e

675+09.3

4

1/16 Line

692+85 to 695+25 L 240' Shaping 640 SqYd

687+00 to 689+50 L 250' Shaping 2,550 SqYd

677+00 to 682+00 R 520' Shaping 670 SqYd

663+00 to 669+00 L 600' Shaping 1,600 SqYd

bottom at the following locations:

24' wide in the highway ditch channel

Install Type 3 Erosion Control Blanket

18 Ft693+51 L INLET OF PIPE

18 Ft686+37 L INLET OF PIPE

18 Ft680+00 L INLET OF PIPE

18 Ft669+91 L INLET OF PIPE

Install High Flow Silt Fence at the following locations:

200 Ft690+54 to 691+25 L SLOW RUN-ON

275 Ft677+60 to 678+90 L SLOW RUN-ON

55 Ft670+06 to 670+46 R PERIMETER CONTROL

Install Low Flow Silt Fence at the following locations:

190 Ft693+77 to 694+55 R PERIMETER CONTROL

475 Ft684+51 to 687+13 R PERIMETER CONTROL

275 Ft679+20 to 680+75 R PERIMETER CONTROL

Install High Flow Silt Fence at the following locations:

687+00 to 692+75 L 1.3 Acres

686+75 to 693+50 R 1.1 Acres

686+00 to 687+00 L 0.3 Acres

681+00 to 686+00 L 2.1 Acres

680+50 to 686+00 R 0.7 Acres

670+25 to 679+50 R 1.0 Acres

670+00 to 679+50 L 2.6 Acres

664+75 to 669+50 R 1.5 Acres

644+50 to 669+50 L 1.3 Acres

with an application of Soil Stabilizer at the following locations:

Utilize Surface Roughening inside the work limits and follow

Present US Hwy 18

D12 D21

Page 13: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

0+00

695+00 700+00705+00

710+00715+00

720+00

725+00695+00 700+00705+00

710+00715+00

720+00

725+00

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

NH-PH 0018(198)173

704+20.1

1 301.3

4'

100'

1/4 Line

100'

Sec. 5 - T37N - R33W

Government Lot 3

Government Lot 2

Government Lot 1 U:\rd\prj\b

enn04

XH\6

95ec.d

gn

File -

Plotting Date: 08/06/2019

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

3525

75'

75'

S1/2 NE1/4

S1/2 NW1/4

702+64.66

703+51.0

9

717+68.8

9

Jimmie H. O'Neill & Martha T. O'Neill

Jimmie H. O'Neill & Martha T. O'Neill

1/16 Line

Parcel 8

Parcel 9

75'

75'

717+00 to 718+75 R 180' Shaping 480 SqYd

715+00 to 718+00 L 300' Shaping 800 SqYd

707+50 to 712+00 R 450' Shaping 1,200 SqYd

696+00 to 706+50 R 1060' Shaping 2,830 SqYd

696+00 to 706+75 L 1080' Shaping 2,880 SqYd

24' wide at the following locations:

in the highway ditch channel bottom

Install Type 3 Erosion Control Blanket

719+00 to 730+00 R 2.0 Acres

719+00 to 725+00 L 1.8 Acres

711+00 to 718+00 R 1.4 Acres

711+00 to 717+50 L 2.1 Acres

707+00 to 710+00 R 0.4 Acres

707+00 to 710+00 L 0.4 Acres

694+50 to 706+00 R 2.5 Acres

694+00 to 706+00 L 2.0 Acres

with an application of Soil Stabilizer at the following locations:

Utilize Surface Roughening inside the work limits and follow

100 Ft724+50 to 725+50 L PERIMETER CONTROL

120 Ft717+25 to 718+33 L SLOW RUN-ON

160 Ft709+00 to 710+60 L SLOW RUN-ON

Install Low Flow Silt Fence at the following locations:

60 FtINLET OF PIPE718+26 R

100 FtINLET OF PIPE710+42 L

18 FtINLET OF PIPE706+50 R

Install High Flow Silt Fence at the following locations:

375 Ft718+25 to 720+00 R PERIMETER CONTROL

410 Ft 710+35 to 712+60 R PERIMETER CONTROL

Install High Flow Silt Fence at the following locations:

Present US Hwy 18

D13 D21

Page 14: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

750+000+00

5+00

9+99725+00730+00 735+00 740+00 745+00 750+00750+43

725+50 (Mainline)0+00 (Div730)=

725+00730+00 735+00 740+00 745+00 750+00

750+43

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

NH-PH 0018(198)173

100' 100'

BE

NN

ET

T C

OU

NT

Y

150'

Jimmie H. O'Neill & Martha T. O'Neill

Parcel 9

Parcel 10James W. O'Neill & Abby O'Neill

END NH-PH 0018(198)173

Section Line

33'

Government Lot 1Government Lot 4

Sec. 4 - T37N - R33W

Government Lot 3

33'

33'

U:\rd\prj\b

enn04

XH\7

25ec.d

gn

File -

Plotting Date: 08/06/2019

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

3525

75'

75'

75'

1729532.610

322162.514

POE 750+42.91

731+14.8

7

744+37.3

8

33'

33'

1/4 Line

Section Line

R 400.00'

L 139.30'

T 70.36'

E 1727144.10

N 322024.98

PI 1+00.00

Div 730

R 400.00'

L 165.69'

T 84.05'

E 1727891.67

N 322082.01

PI 9+01.46

Div 730

R 400.00'

L 347.76'

T 185.73'

E 1727511.14

N 322227.51

PI 5+17.76

Div 730

Sec. 5 - T37N - R33W

735+90 to 742+50 L 670' Shaping 1,790 SqYd

732+80 to 745+00 R 1245' Shaping 3,295 SqYd

724+00 to 725+25 R 125' Shaping 335 SqYd

24' wide at the following locations:

in the highway ditch channel bottom

Install Type 3 Erosion Control Blanket

726+50 to 732+75 R 500 Ft

at the following locations:

for perimeter control prior to earth-moving

Install 12" Diameter Erosion Control Wattles

PERIMETER CONTROL 220 Ft734+00 to 735+80 L

620 Ft SLOW RUN-ON728+00 to 734+00 L

Install Low Flow Silt Fence at the following locations:

260 Ft 742+10 to 743+60 L PERIMETER CONTROL

145 Ft729+85 to 730+61 R PERIMETER CONTROL

Install High Flow Silt Fence at the following locations:

743+00 to 745+66 R 0.2 Acres

743+00 to 745+66 L 0.1 Acres

736+25 to 742+50 R 0.8 Acres

736+25 to 742+50 L 0.9 Acres

731+00 to 735+75 L 0.9 Acres

730+75 to 735+75 R 0.5 Acres

726+00 to 730+00 L 0.7 Acres

with an application of Soil Stabilizer at the following locations:

Utilize Surface Roughening inside the work limits and follow

18 Ft725+25 R INLET OF PIPE

18 Ft742+78 R INLET OF PIPE

18 Ft736+00 R INLET OF PIPE

Install High Flow Silt Fence at the following locations:

TO

DD C

OU

NT

Y

Present US Hwy 18

Station 745+66.14

D14 D21

Page 15: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

NH-PH 0018(198)173

http://www.soilmoist.com

Phone: 1.216.475.8488

Cleveland, OH

JRM Chemical, Inc.

FI-3500 Tablets

http://www.innovativeturfsolutions.com

Phone: 1.513.317.8311

Cincinnati, OH

Innovative Turf Solutions Products

Floc, Floc Soc, Floc Bag

www.terratubes.com

Phone: 1.800.366.1180

Buffalo Grove, IL

ACF Environmental

Terra-Tubes

http://www.siltstop.com

Phone: 1.866.200.9868

Woodstock, GA

Applied Polymer Systems, Inc.

APS 700 Series Floc Logs

FLOCCULENTS listed below are considered to be safe for the environment, if used as directed:

www.acfenvironmental.com

Phone: 1.800.223.9021

Richmond, VA

ACF Environmental

Heavy Duty Dirtbag 55

www.iviindustries.com

Phone: 1.800.659.5111

Johnson City, NY

Indian Valley Industries, Inc.

Non-woven Sediment Filter Bags

www.flo-water.net

Phone: 1.515.577.6763

West Des Moines, IA

Flo-Water, LLC

Pump-It Tube

www.solhutec.com

Phone: 1.888.703.9889

Sebastian, FL

SolHuTec Group, Inc.

Taurus Dewatering Bags/Socks

www.flocsystems.com

Phone: 1.604.343.2046

Surrey, British Columbia

Floc Systems Inc.

Tigerfloc

www.biostar-ch.com

Phone: 1.715.426.5131

Stillwater, MN

Hild & Associates, Inc.

Biostar CH

The treatment flocculent bag may be from the list or an approved equal.

consist of a storage bin lined with plastic, the bed of a dump truck lined with plastic, a sediment basin, or other Engineer approved unit.

sediment storage units are project site specific and shall be the Contractor's responsibility. A water and sediment storage unit may

incorporate the use of 2 flocculent housing units and 2 water and sediment storage units. Design and construction of the water and

The cascade system is shown below and to the right for conceptual purposes only; however, the cascade system shall at a minimum

THE CASCADE SYSTEM

...\rd\prj\b

enn04

XH\D

ewatering.d

gn

File -

Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS

Plot Scale -

1:3

00

Plotted Fro

m -

trpr1

3525

www.spillcontainment.com

Phone: 1.800.764.9563

Jacksonville, FL

UltraTech International, Inc

Ultra-Dewatering Bag

www.dandyproducts.com

Phone: 1.800.591.2284

Powell, OH

Dandy Products, Inc.

Dandy Dewatering Bag

DEWATERING BAGS AND SOCKS capture sediment and should be placed on pavement, vegetated areas, or gravel.

http://www.neptunewash.comhttp://aqualeteindustries.comwww.ecopondrescue.com

Phone: 1.501.525.8484Phone: 1.732.695.6336Phone: 1.727.412.4323

Hot Springs, ArkansasOcean, New JerseySeminole, Florida

Innovative Equipment SolutionsAqualete Industries, LLCEco Pond Rescue LLC

Dry Flocculent Mixing SystemWTS2000 Portable Sediment TankEco Pond Rescue Water Wagon

PORTABLE FLOCCULENT SYSTEMS

No additional payment will be made for Dewatering and Sediment Collecting. Dewatering and Sediment Collecting shall be incidental to other items on the project.

PAYMENT

sediment collection system to capture and treat stormwater at multiple outfalls and/or locations simultaneously during each phase of the project.

will have to intercept and treat the stormwater before storm sewer outfalls into "Waters of the US" or "Waters of the State". The Contractor may need more than one dewatering and

Suggestions for dewatering and sediment collection may be shown on the plan sheets. It is the Contractor's responsibility to dewater and collect sediment. The Contractor

Permit from the South Dakota Department of Environment & Natural Resources (DENR) on all projects outside of Indian Reservation boundaries.

or "Waters of the State" instead of disposing of the water off-site, using it for irrigation, or using it for hydroseeding. The Contractor will also need to obtain a Temporary Discharge

The Contractor will need to create a Pollution Prevention Plan (PPP) for dewatering and sediment collection if the Contractor choses to discharge the water into "Waters of the US"

for each body of water on this project.

falls out of suspension before the water is discharged into “Waters of the US” or “Waters of the State”. Refer to the Environmental Commitments for the specific requirements The purpose of a dewatering and sediment collection system is to collect turbid storm water on the project, treat it with flocculents as needed, and capture the sediment that

PURPOSE

Contractor may pump dirty water into a hydroseeder and mix it with a flocculent, and spray the mixture back onto a sediment pond.

a lined dumpster until sediment to falls out of suspension before discharging the water. Drop inlet protection devices could also be used as part of a treatment train. The

The Contractor may elect to block a portion of storm sewer near the outfall with sand bags and pump the water out to be treated with a flocculent or allow the water to set in

are available and can be used with approval from the Engineer.

Various systems, devices, and products are shown on this sheet to give the Contractor ideas of what may be used for water treatment. Other systems, devices, and products

PERMIT FOR CONSTRUCTION ACTIVITIES.

NO MATTER THE SYSTEM OR METHOD USED, THE CONTRACTOR MUST MEET THE TERMS OF THE TEMPORARY DISCHARGE PERMIT AND THE STORMWATER

OPTIONS ARE NOT LIMITED TO WHAT IS SHOWN ON THIS SHEET

Flow Flow

Flow

Flow

NO.

1

2

3

4

5

6

7

8

9

DESCRIPTION QUANTITY UNIT

1

2

1

1

1

1

10

1

1

Each

Each

Each

Each

Each

Each

Ft.

Each

Each

2"

3" Gas

4" Diesel

6" Diesel

(gpm)

Flow Rate

50-250

250-350

500-750

750-1000

Flocculent Housing Unit

Flow

A A

Flocculent Housing Unit

Stage 1 Stage 2

Flow

Submersible 1-5 HP Pump

Trash Pump Floating

Handle to Attach Rope

Storage Unit

Water and Sediment

Flow

Flow

Flo

w

Flocculent Housing Unit

Stage 3

Optional

Storage Unit

Water and Sediment

Storage Unit

Water and Sediment

Coupler Connect on Hose

Secure Flocculent Bag to

6"

1"

CASCADE SYSTEM

ELEVATION VIEW

VIEW A-A

FLOCCULENT HOUSING UNIT

FLOCCULENT BAG

1

2

3

4

6

8 5 7

29

Discharge H

ose

From Trash P

ump

FLOCCULENT HOUSING UNIT

4" or 6" Dia. Sch. 40 Gate Valve

4" X 6" or 6" X 8" Sch. 40 PVC Bushing

6" or 8" Dia. Sch. 40 PVC "Y"

6" or 8" Dia. Sch. 40 PVC Female Threaded Cap

1" Dia. Sch. 80 PVC Drain Valve

1/2" Eye Bolt with Wing Nut and Rubber Gromets

6" or 8" Dia. Sch. 40 PVC Pipe

6" or 8" Dia. Sch. 40 PVC Male Adapter

4" or 6" Dia. Sch. 40 PVC Swing Check Valve

Type

Pump

5'- 0"

(estimated quantities for information only)

or to

Storm S

ewer w

ith Dro

p Inlet P

rote

ctio

n.

Return to N

atural W

ater B

ody

(Gallons each bag will treat varies by site)

FLOW RATE ESTIMATE

OPTIONS FOR DEWATERING AND SEDIMENT COLLECTINGD15 D21

Page 16: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

NH-PH 0018(198)173

A

11

A

Existing Roa

d

6" to 8" Berm

(If Necessary)

Drainage Pipe

(If Necessary)

Embankment12" of Granular Material

Reinforcement Fabric (MSE)

12" of Pit Run Material

(Min.)

12"

(Min.)

12"

(Min.)15'

B

B

6" to 8"

33

15'

Roadway

SECTION A-A

(Min.)

15'

12" of Granular Material

12" Pit Run Material

SECTION B-B

Reinforcement Fabric (MSE)

GENERAL NOTES:

See SECTION A-A.

shall be used to prevent sediment or mud from being deposited on the roadway.

If the grade of the entrance slopes down to the roadway, a berm of extra rock

If embankment is necessary it shall be pit run material.

TRANSVERSE TO ROADWAY PARALLEL TO ROADWAY

10'

(Min.)

50'

Work Area

12" of Granular material

12" Pit Run MaterialSECTION A-A

Reinforcement Fabric (MSE)

Existing Surface

Existing Surface(Min.)

15'

Reinforcement Fabric (MSE)12" of Granular Material

12" Pit Run Material

SECTION B-B

Traffic Dire

ctio

n

Traffic Direction

PLAN VIEW

(Min.)

15'

Work Area

A

10'

B B

(Min.)

50'

Granular Material

12" of

Surface

Existing Channelizing Device

Legend

A

(Min.)

50'

SDDOT CONSTRUCTION ENTRANCE

to meet field conditions. All cost shall be incidental to the various contract items.

If a drainage pipe is necessary the size and type shall be determined by the Contractor

...\benn04

XH\Sta

bilizedconent.dgn

File -

Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

3525

D16 D21

Page 17: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D17 D21

STATE OF SOUTH

DAKOTA

PROJECT

NH-PH 0018(198)173

SHEET TOTAL

SHEETS

Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS

20' CMin.>

IO' 10'

20:1 20:1

Erosion Control Blanket

STANDARD DITCH SECTION

12' (Min.>

[,Sloped Ditch Section

o< ·o'O,e ":,\)_.-­

-.JO<'. o\\j,..-­\~\.c_,--

------ -1 --.-c ,-,,"""""==------=-'-" ~T

Erosion Control Blanket

This ditch section shall be constructed when installing erosion control blanket,

SLOPED DITCH SECTION

Bury upslope end of erosion control blanket in o trench

Median

Erosion Control Blanket

The median shall be shaped to the limits shown in this detail where the erosion control blanket will be placed,

MEDIAN SECTION

Flow

* Use o 4" (Min.> overlap wherever two widths of erosion control blanket ore applied side by side.

* Use o 6" CMin.> overlap wherever one roll of erosion control blanket ends and another begins.

OVERLAP DETAIL

6" deep by 6" wide. The trench shall be backfilled and compacted to the appropriate elevation.

Bury upslope end of erosion control blanket in o trench 6" deep by 6" wide. The trench shall be backfilled and compacted to the appropriate elevation,

i\f.T-Pin or Staple

4-H ui[~t©@UttJtU

~

T-Pin or Staple

TRENCH DETAIL PIPE END DETAIL

GENERAL NOTES1

Prior to placement of the erosion control blanket, the areas shall be properly prepared, shaped, seeded, and fertilized,

Erosion control blanket shall be unrolled in the direction of the flow of water when placed in ditches and on slopes. The upslope end of the erosion control blanket shall be buried in o trench 6" wide by 6" deep. There shall be at least o 6" overlap wherever one roll of erosion control blanket ends and another begins, with the upslope erosion control blanket placed on top of the downslope erosion control blanket.

The erosion control blanket shall be pinned to the ground according to the manufacturer's installation recommendations.

After the placement of the erosion control blanket, the Contractor shall fine grade along all edges of the blanket to maintain o uniform slope adjacent to the blanket and level any low spots which might prevent uniform and unrestricted flow of side drainage directly onto the erosion control blanket.

All ditch sections shall be shaped when installing the erosion control blanket. All costs for shaping the ditches shall be incidental to the contract unit price per foot for "Shaping for Erosion Control Blanket",

Published Date: 3rd Otr. 2019

s 0 0 0 T

EROSION CONTROL BLANKET

December 23, 2004

PLAT£ NUMBER

734.01

Sheet I of I

Page 18: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D18 D21

MANUAL LOW FLOW SILT FENCE INSTALLATION

~ EXCAVATE TRENCH ~ DRIVE STEEL T FENCE POSTS

(] ATTACH 26" WOVEN WIRE FENCE TO POSTS

Fabric far silt fence shall be 36" minimum width. Fabric that overlaps

the top of fence shal I be placed between the posts and the

Attach the silt fence fabric with plastic ties, wire ties, or hog rings at 12" max. horizontal spacing an the tap and bottom wires of the woven wire fence and with plastic or wire ties at 12" max. vertical spacing on the posts.

Steel T Fence Posts

woven wire fence.---- 26" Woven Wire Fence

0 ATTACH SILT FENCE FABRIC

Silt Fence Fabric

8" staples shall-----­be placed at each post to secure the silt fence fabric ta the bottom of the trench.

SECTION A-A

Published Date: 3rd Otr. 2019

s 0 0 0 T

® BACKFILL TRENCH AND WHEEL COMPACT SOIL

The elevation at these locations shall be, at a minimum, higher than the tap of the silt fence fabric at i ts lowest elevation.

LOW FLOW SILT FENCE AND SILT TRAP

December 23, 2003

PLATE NUMBER

734.04

Sheet I of 2

STATE OF SOUTH

DAKOTA

PROJECT

NH-PH 0018(198)173

SHEET TOTAL

SHEETS

Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS

MACHINE SLICED LOW FLOW SILT FENCE INSTALLATION

-Operation Roll of Silt

/f/!t~='----F..:.e-,nce Fabric

Slicing Blade .c (7'4" width) , C "t_ ll:lll:lll:111:111:111:111 I 11:11 - ~- Q>

:lll:111:lll:111:111:111:11 Ill: -o o ll:lll:111:111:111:lll:lll:I 11:11 O Q> u :111:111:111:111:lll:III:' :Ill: +- U ·-

~m\Mm\Mm\Mm\Mm\Mmi. !:::m~m~m~m~m~m~m~m~mi - 00 ~ ii ll:lll:lll:111:111:lll:III: :lll:lll:111:111:111:111:lll:lll:II ~

Horizontal Chisel Point (3" width)

Q) INSTALL SILT FENCE FABRIC BY MACHINE SLICING METHOD.

Silt fence fabric shall be overlapped a minimum of 2" at tap of woven wire fence.

Silt Fence Fabric

26" Woven Wire Fence Bend at base as necessary to provide for a minimum of 2" of silt fence fabric overlap.

Silt Fence Fabric

DRIVE STEEL T FENCE POSTS

0 WHEEL COMPACT SOIL ABOVE SLICED IN PORTION OF FABRIC AND THEN DRIVE STEEL T FENCE POSTS.

Attach the silt fence fabric with plastic ties, wire ties, or hog rings at 12" max. horizontal spacing an the tap and bottom wires of the woven wire fence and with plastic or wire ties at 12" max. vertical spacing on the posts.

~

--:;:; ..... - ---- .........--::::::::--..... .... _ ....... ---............... --- -

5' Steel T Fence Pasts

--------:--::-:-~ ..... ~ - -------0 ATTACH 26" WOVEN WIRE FENCE TO POSTS -;;:"~--

AND ATTACH SILT FENCE FABRIC.

GENERAL NOTES:

The elevation at these locations shall be, at a minimum, higher than the top of the silt fence fabric at its lowest elevation.

The radius of the silt fence shall be the minimum capable by the sl icing machine. The post spacing shall be 3' for these types of applications of silt fence. All the other components of the silt fence shall be the same as shown above.

A silt trap shall be provided when specified by a pion note. All costs for constructing the silt trap shall be incidental to the contract unit price per cubic yard for "Silt Trap",

If a trench con not be dug or the silt fence fabric con not be sliced in due to the type of earthen material (such as rock), then a row of 30 to 40 pound sandbags butted end to end shall be provided on top of the e x tra length of silt fence fabric to prevent underflow.

Published Date: 3rd Otr. 2019

s 0 0 0 T

LOW FLOW SILT FENCE AND SILT TRAP

December 23, 2003

PLATE NUMBER

734.04

Sheet 2 of 2

Page 19: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D19 D21

MANUAL HIGH FLOW SILT FENCE INSTALLATION

CI) EXCAVATE TRENCH 0 DRIVE STEEL T FENCE POSTS

Attach the silt fence fabric with a

Fabric far silt fence shall be 36" minimum width.

total of 4 plastic or wire ties per post. Three ties shall be used at the top and I tie shall be approximately at mid-point of the post.

0 ATTACH SILT FENCE FABRIC © BACKFILL TRENCH AND WHEEL COMPACT SOIL

Silt Fence Fabric\

8" staples shall

Steel T Fence Post

be placed at each post to secure the silt fence fabric to the bottom of the trench.

'---->- Plastic or / Wire Ties

SECTION A-A

Published Date: 3rd Otr. 2019

s D D 0 T

The elevation at these locations shall be, at a minimum, higher than the top of the silt fence fabric at its lowest elevation.

HIGH FLOW SILT FENCE

December 23. 2003

PLAT£ NUMBER

734.05

Sheet I of 2

STATE OF SOUTH

DAKOTA

PROJECT

NH-PH 0018(198)173

SHEET TOTAL

SHEETS

Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS

MACHINE SLICED HIGH FLOW SILT FENCE INSTALLATION

-Operation Rall of silt

///!t~='----f..:.e-,nce f obr i c Silt Fence Fabric

Fabric for silt fence shall be 36" minimum width.

DRIVE STEEL T FENCE POSTS

0 WHEEL COMPACT SOIL ABOVE SLICED IN PORTION OF FABRIC AND THEN DRIVE STEEL T FENCE POSTS.

Attach the silt fence fabric with a total of 4 plastic or wire ties per post. Three ties shall be used at the top and I tie shall be approximately at mid-point of the post.

Silt Fence Fabric

Flow

Steel T Fence Post

Wheel Compacted Areas

G) ATTACH SILT FENCE FABRIC SECTION A-A

~ ! The silt fence length and width may be adjusted due to a larger pipe, multiple pipe. or other circumstances during construction as determined by the Engineer.

GENERAL NOTE:

The radius of the silt fence shall be the minimum capable by the slicing machine. The post spacing shall be 3' for these types of applications of silt fence. All the other components of the silt fence shall be the some as shown above,

If a trench con not be dug or the silt fence fabric con not be sliced in due to the type of earthen material <such as rock), then a row of 30 to 40 pound sandbags butted end to end shall be provided on top of the e x tra length of slit fence fabric to prevent underflow.

Published Date: 3rd Otr. 2019

s D D 0 T

HIGH FLOW SILT FENCE

December 23. 2003

PLAT£ NUMBER

734.05

Sheet 2 of 2

Page 20: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D20 D21

ELEVATION VIEW CUT OR FILL SLOPE INSTALLATION

Excavated Material from Trench

Wood Stake

DETAIL B (TYPICAL OF ALL INSTALLATIONS>

Point A

ISOMETRIC VIEW DITCH INSTALLATION

DITCH INSTALLATION

Grade Spacing (Ft>

2% 150 3% 100 4% 75 5% 50

CUT OR FILL SLOPE INSTALLATION

Slope Spacing

1:1 2:1 3:1 4:1

Ends of Erosion Control Wattles

Wood

(Ftl

10 20 30 40

DETAIL C

PLAN VIEW DITCH INSTALLATION

SECTION A-A

December 23. 2004

s 0 0 0 T

EROSION CONTROL WATTLE PLATE NUMBER

734.06

Published Date: 3rd Otr. 2019 Sheet I of 2

STATE OF SOUTH

DAKOTA

PROJECT

NH-PH 0018(198)173

SHEET TOTAL

SHEETS

Plotting Date: 08/06/2019 Revision Date: 08-06-2019 WS

GENERAL NOTES1

At cut or fill slope installations, wattles shall be installed along the contour and perpendicular to the water flow.

At ditch installations, point A must be higher than point B to ensure that water flows over the wattle and not around the ends.

The Contractor shall dig a 3" to 5" trench, install the wattle tightly in the trench so that daylight can not be seen under the wattle, and then compact the soil excavated from the trench against the wattle on the uphill side. See Detail B.

The stakes shall be l"x2" or 2"x2" wood stakes, however, other types of stakes such as rebar may be used only if approved by the Engineer. The stakes shall be placed 6" from the ends of the wattles and the spacing of the stakes along the wattles shall be 3' to 4',

Where installing running lengths of wattles. the Contractor shall butt the second wattle tightly against the first and shall not overlap the ends. See Detail C.

The Contractor and Engineer shal I inspect the erosion control wattles once every week and within 24 hours after every rainfal I event greater than 112". The Contractor shal I remove, dispose, or reshape the accumulated sediment when necessary as determined by the Engineer.

Sediment removal, disposal, or necessary shaping shal I be as directed by the Engineer. All costs for removing accumulated sediment, disposal of sediment, and necessary shaping shal I be incidental to the contract unit price per cubic yard for "Remove Sediment",

All costs for furnishing and installing the erosion control wattles including labor, equipment, and materials shall be incidental to the contract unit price per foot for the corresponding erosion control wattle bid item.

All costs for removing the erosion control wattle from the project including labor, equipment, and materials shall be incidental to the contract unit price per foot for "Remove Erosion Control Wattle".

Published Date: 3rd Otr. 2019

s 0 0 0 T

EROSION CONTROL WATTLE

December 23. 2004

PLATE NUMBER

734.06

Sheet 2 of 2

Page 21: SECTION D: EROSION AND SEDIMENT CONTROL PLANS DAKOTAapps.sd.gov/HC65C2C/EBS/lettings/electronicplans/04XH_SectionD.p… · section d estimate of quantities table of low flow silt

D21 D21

. . . . ·.· .. · .. . · · .. M• ,: 0 •

· ...... :. :: (-:. < ·: . . . . . . . ~ . . .

· . . · . . ' ._· ·.:

.. : . . . · . . · ...

.. '• . . . . : . ~

.. .. .. : . . . . . . • . .

GENERAL NOTES1

Where practical, surface roughening shal I be done on slopes 3:1 and steeper and on slopes deemed necessary by the Engineer.

The equipment used for surface roughening shal I be equipped with tracks that are capable of creating ridges in the soil that are perpendicular to the slope, The final condition of the surface roughening shall be approved by the Engineer.

Measurement for surface roughening shall be to the nearest tenth of an acre.

All costs assoc iated with surface roughening including labor, equipment, and materials shal I be incidental to the contract unit price per acre for "Surface Roughening",

.... .

June 26, 2009

Published Date: 3rd Otr. 2019

s 0 0 0 T

SURFACE ROUGHENING PLATE NUMBER

734.25

Sheet I of I

STATE OF SOUTH

DAKOTA

Plotting Date:

PROJECT

NH-PH 0018(198)173

SHEET TOTAL

SHEETS

08/06/2019 Revision Date: 08-06-2019 WS