2015 2020 Transportation I mprovement Program (TI P) SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) 2015-2020 PROJECTS For the WASATCH FRONT REGIONAL COUNCIL (WFRC) AREA The Urban Surface Transportation Program (STP), the Congestion Mitigation/ Air Quality Program (CMAQ), and the Transportation Alternatives Program (TAP) Other Federal-Aid Funds Transit Funds State Funds National Highway Performance Interstate Maintenance (IM) National Highway System (NHS Bridge On State System Any Area Statewide Bridge Replacement Off System – Local Off System – Optional Minimum Guarantee Highway Safety Improvement Safety Any Area Railroad Crossings Hazard Elimination Transportation Alternatives Recreational Trails Safe Routes to School Other Federal Funds Sec. 5307 – Urbanized Area Formula Sec. 5309 – Capital Investment Program – New Starts Sec. 5309 – Capital Investment Program – Bus Sec. 5309 – Capital Investment Program – Fixed Guide-way Modernization Sect. 5310 – Elderly Persons and Persons with Disabilities Sec. 5316 – Job Access Reverse Commute Sec. 5317 – New Freedom State Construction Centennial Highway Funds Critical Highway Need Funds Highway Construction Program State General Funds State Traffic Corridor Preservation Transportation Investment Fund Section includes; Glossary of Federal Funding Types Projects included in the 2015-2020 Transportation Improvement Program (TIP) o Urban Surface Transportation Program (STP) Projects o Congestion Mitigation/ Air Quality Program (CMAQ) Projects o Transportation Alternatives Program (TAP) Projects o Other Federal-Aid Funded and State Funded Projects o Transit Funded Projects Wasatch Front Regional Council | Approved by the WFRC on August 28, 2014

Upload: others

Post on 10-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

2015 – 2020 Transportation Improvement Program (TIP)

SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

2015-2020 PROJECTS

For the WASATCH FRONT REGIONAL COUNCIL (WFRC) AREA

The Urban Surface Transportation Program (STP), the

Congestion Mitigation/ Air Quality Program (CMAQ), and the

Transportation Alternatives Program (TAP)

Other Federal-Aid Funds Transit Funds State Funds

National Highway Performance

Interstate Maintenance (IM)

National Highway System (NHS

Bridge On State System

Any Area Statewide

Bridge Replacement

Off System – Local

Off System – Optional

Minimum Guarantee Highway

Safety Improvement Safety

Any Area

Railroad Crossings Hazard

Elimination Transportation

Alternatives Recreational

Trails

Safe Routes to School

Other Federal Funds

Sec. 5307 – Urbanized Area Formula

Sec. 5309 – Capital Investment Program –

New Starts

Sec. 5309 – Capital Investment Program –

Bus

Sec. 5309 – Capital Investment Program –

Fixed Guide-way Modernization

Sect. 5310 – Elderly Persons and Persons

with Disabilities

Sec. 5316 – Job Access Reverse Commute

Sec. 5317 – New Freedom

State Construction Centennial

Highway Funds Critical

Highway Need Funds

Highway Construction

Program

State General Funds

State Traffic Corridor

Preservation

Transportation Investment

Fund

Section includes;

• Glossary of Federal Funding Types

• Projects included in the 2015-2020 Transportation Improvement

Program (TIP)

o Urban Surface Transportation Program (STP) Projects

o Congestion Mitigation/ Air Quality Program (CMAQ) Projects

o Transportation Alternatives Program (TAP) Projects

o Other Federal-Aid Funded and State Funded Projects

o Transit Funded Projects

Wasatch Front Regional Council | Approved by the WFRC on August 28, 2014

Page 2: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

2015 – 2020 Transportation Improvement Program (TIP)

Approved by the WFRC on August 28, 2014 | Wasatch Front Regional Council

Page 3: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

STIP Planning Fund TableUDOT electronic Program Management

Page 1

Report run on: October 28, 2014 5:01 PMepm381_plan_fund (v 1.0)

BRIDGE RESEARCH & DEPLOY PRGBRIDGE RESEARCH & DEPLOYBRIDGE PROGRAM - 2008 ADDL OBLIGATIONBRIDGE REHAB/REPLACEMENT (OFF SYSTEM)BRIDGE REHAB/REPLACEMENT (ON/OFF)SCENIC BYWAYSCONGESTION MITGATION / AIR (BOX ELDER)CONGESTION MITIGATION/AIR QUALITY (CACHECONGESTION MITIGATION/AIR QUALITY (MAG)CMAQ REDUCE PM 2.5 EMISSIONSCONGESTION MITIGATION/AIR QUALITY (TOOELCONGESTION MITIGATION/AIR QUALITY (WFRC)EARMARK-SECTION 115 (2004)EARMARK - ITS (2004)EARMARK-SECTION 117 (2005)EARMARK - IM DISCRETIONARY (2005)EARMARK - PUBLIC LANDS HWYS (2005)EARMARK - SECTION 112 (2006)EARMARK - PUBLIC LANDS HWYS (2006)EARMARK - TCSP (2006)EARMARK - SECTION 129EARMARK - PUBLIC LANDS HIGHWAY (2009)EARMARK - TCSP (2009)EARMARK - FERRY BOAT DISCRETIONARYEARMARK - HWY FOR LIFE (2010)EARMARK - INNOV BRIDGE RES & DES (2010)EARMARK - IM DISCRETIONARY ( 2010)EARMARK - PUBLIC LANDS HIGHWAY ( 2010)EARMARK - HWY FOR LIFE (2011)EARMARK - INNOV BRIDGE RES & DEP (2011)EARMARK - IM DISCRETIONARY (2011)EARMARK - PUBLIC LANDS HWY DISCRETIONARYEARMARK - TCSP (2011)EARMARK - TRUCK PARKING FAC PROG (2011)EARMARK - FERRY BOAT DISCR. (2012)EARMARK - HWY FOR LIFE ( 2012)EARMARK - INNOVATIVE BRIDGE RESEARCHEARMARK - PUBLIC LANDS HWY DISC. (2012)EARMARK - TCSP PROGRAM (2012)FERRY BOAT DISC FUNDS - 2014EARMARK - HIGH PRIOR PROJ - SECTION 1702EARMARK - 2010 SURFACE TRANS PRIORTIESEARMARK - HIGH PRIOR PROJ - TEA 21EARMARK - TRANS IMPROV PROJ - SEC 1934STP ENHANCEMENT FUNDS @ 100%

Description

BRD_FBRD_F_100%BR_2008_+OABR_OFFBR_ON/OFFBYWAYSCMAQ_BOX_ELDCMAQ_CACHECMAQ_MAGCMAQ_PM2.5CMAQ_TOOELECMAQ_WFRCEM_2004_115EM_2004_ITSEM_2005_117EM_2005_IMDEM_2005_PLHEM_2006_112EM_2006_PLHEM_2006_TCSPEM_2008_129EM_2009_PLHDEM_2009_TCSPEM_2010_FBDEM_2010_HFLEM_2010_IBRDEM_2010_IMDEM_2010_PLHDEM_2011_HFLEM_2011_IBRDEM_2011_IMDEM_2011_PLHDEM_2011_TCSPEM_2011_TPFPEM_2012_FBDEM_2012_HFLEM_2012_IBRDEM_2012_PLHDEM_2012_TCSPEM_2014_FBDEM_HPP_1702EM_HPP_2010EM_HPP_T21EM_TI_1934ENH_EAC_100%

Plan Fund

MISCBRIDGEBRIDGEBRIDGEBRIDGEFLHCMAQCMAQCMAQCMAQCMAQCMAQEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKEARMARKSTP

Category

50.00 100.00 80.00 80.00 80.00 80.00 93.23 93.23 93.23 93.23 93.23 93.23 100.00 50.00 100.00 94.18 100.00 100.00 100.00 80.00 100.00 100.00 80.00 80.00 100.00 100.00 90.00 100.00 100.00 100.00 90.00 100.00 80.00 100.00 80.00 80.00 100.00 100.00 80.00 80.00 80.00 100.00 80.00 93.23 100.00

Fed Aid

YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY

Reg

FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF

Fed/St

Page 4: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

STIP Planning Fund TableUDOT electronic Program Management

Page 2

Report run on: October 28, 2014 5:01 PMepm381_plan_fund (v 1.0)

EQUITY BONUS / MINIMUM GUARANTYEMERGENCY RELIEF - 2005 EVENTS (93.23 %)EMERGENCY RELIEF - 2009 EVENTS (93.23%)EMERGENCY RELIEF- 2009 EVENTS (100%)EMERGENCY RELIEF - 2010 EVENTS (93.23%)EMERGENCY RELIEF - OTHER EVENTSLOCAL TRANSPORTATION ASSISTANCE PRGMFEDERAL AID MISCELLANEOUSMISC. FEDERAL AID WITH 100% PRO RATAFEDERAL AID WITH 50% PRO-RATAPUBLIC LANDS HIGHWAYSSHRP2 IMPLEMENTATION ASSISTANCEECONOMIC RECOVERY - SM URBAN - CACHEECONOMIC RECOVERY - SM URBAN - DIXIEECONOMIC RECOVERY - ENHANCEMENT PROJECTSECONOMIC RECOVERY - JHC PROJECTSECONOMIC RECOVERY - SM URBAN- MAGECONOMIC RECOVERY - URBAN - OGDEN/LAYTONECONOMIC RECOVERY - URBAN- PROVO/OREMARRA ECONOMIC RECOVERY - NON URBANECONOMIC RECOVERY - URBAN- SALT LAKEECONOMIC RECOVERY - STATE PROJECTSECONOMIC RECOVERY - TRANSIT PROJECTSFED TRANSIT ADMINISTRATIONFED TRANSIT ADMINISTRATION SEC. 5307FED TRANSIT ADMINISTRATION SEC 5309FED TRANSIT ADMINISTRATION SEC 5310TRANSIT IN THE PARK FUNDINGSECTION 5337 STATE OF GOOD REPAIR FUNDSFED TRANSIT ADMINSTRATION SEC 5339FTA-MPO (CPG) FUNDS @ 93.23 % PRORATAFTA SEC_5304 GRANT @ 80%FTA SECTION 5307 GRANT 50% MATCHFTA SECTION 5310 @50 % SM RURALFTA SECTION 5310 @ 80% SM RURALFTA-5311 60%@ 50%, 40% @ 20% MATCHFTA SECTION 5311 GRANT AT 0% MATCHFTA SECTION 5311 GRANT 50 % MATCHFTA SECTION 5311 @ 80%FTA- 5316 JOB ACCESS & REVERSE COMMUTETRANSIT - NEW FREEDOM PROGRAMFTA-5317 NEW FREEDOM PROGRAMFTA SECTION 5329 @ 80 %FTA SECTION 5339 @ 80 %FED TRANSIT ADMINISTRATION ILLUSTRATIVE

Description

EQ_BONUS(MG)ER_2005ER_2009ER_2009_100ER_2010ER_OTHERFA_LTAPFA_MISCFA_MISC_100%FA_MISC_50%FA_PUB_LANDSFA_SHRP2FS_STP_CMPOFS_STP_DMPOFS_STP_ENHFS_STP_JHCFS_STP_MAGFS_STP_O/LFS_STP_P/OFS_STP_RURALFS_STP_SLFS_STP_STFS_STP_TRANSFTASEC_5303FTASEC_5307FTASEC_5309FTASEC_5310FTASEC_5320FTASEC_5337FTASEC_5339FTA_5303FTA_5304_80%FTA_5307_50%FTA_5310_50FTA_5310_80FTA_5311_10FTA_5311_100FTA_5311_50%FTA_5311_80FTA_5316_10FTA_5317FTA_5317_10FTA_5329_80FTA_5339_80FTA_ILL

Plan Fund

EB / MGERERERERERMISCMISCMISCMISCFLHMISCSTPSTPSTPSTPSTPSTPSTPSTPSTPSTPSTPPLSTATESTATESTATELOCALLOCALSTATEPLLOCALLOCALLOCALLOCALSTATELOCALLOCALLOCALSTATESTATESTATELOCALLOCALSTATE

Category

93.23 93.23 93.23 100.00 93.23 100.00 50.00 80.00 100.00 50.00 100.00 100.00 100.00 100.00 100.00 93.23 100.00 93.23 100.00 93.23 93.23 100.00 100.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00 93.23 80.00 50.00 50.00 80.00 58.80 100.00 50.00 80.00 58.80 50.00 58.80 80.00 80.00 80.00

Fed Aid

YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY

Reg

FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF

Fed/St

Page 5: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

STIP Planning Fund TableUDOT electronic Program Management

Page 3

Report run on: October 28, 2014 5:01 PMepm381_plan_fund (v 1.0)

EARMARK - HPP - SEC 1702 @ 100 %HIGHWAY SAFETY IMPROVEMENT PROGAMHIGHWAY SAFETY PROGRAM @ 100 % FAHIGH RISK RURAL ROADSHSIP HIGH RISK RUAL ROADS @100%INTERSTATE MAINTENANCEINDIAN RESERVATION ROADSITS RESEARCH ALLOCATION OF FUNDSHIGHWAY INFRASTRUCTURELOCAL GOVERNMENT FUNDSLOCAL IN KIND (SOFTMATCH)LOCAL GOVT - BETTERMENT CO-OPCORRIDOR PRESERVATION - WEBER COCORRIDOR PRESERVATION - DAVIS COCORRIDOR PRESERVATION - STATE MATCHCORRIDOR PRESERVATION - UTAH COCORRIDOR PRESERVATION - WASHINGTON COLOCAL PASS THUR MATCHNAT'L HIGHWAY PERFORM PROG. BRIDGE ONNAT'L HIGHWAY PERFORM PROGRAM - IMNAT'L HIGHWAY PERFORM PROG. NHS ROUTESNATIONAL HIGHWAY SYSTEMNATIONAL RECREATION TRAILSNATIONAL SUMMER TRANSPORTATION INSTITUTEPRIVATE FUNDSPLANNING MPO (CACHE)PLANNING MPO (DIXIE)PLANNING MPO (MAG)PLANNING MPO (WFRC)RAIL / HWY - PROTECTIVE DEVICESRAIL / HWYS - CROSSINGS HAZARD ELIMSAFETY INITIATIVES SECTION 406 PROGRAMSECTION 164 PENALTIES-FOR HSIPPLANNING & RESEARCH @ 100%STATEWIDE PLANNING & RESEARCH (PLANNING)SPR PLANNING FUNDS @ 100%STATEWIDE PLANNING & RESEARCH (RESEARCH)SPR POOLED FUND 100%SAFE ROUTES TO SCHOOLS - INFRASTRUCTURESAFE ROUTES TO SCHOOLS - EITHERSAFE ROUTES TO SCHOOLS - PROGRAM ADMINSTP - JHC BRIDGE FUNDS UNDER MAPP-21STP - BRIDGE FUNDS FOR STATE PROJECTSSTP - ENHANCEMENT - ADVISORY COMMSTP - ENHANCEMENT - STATE

Description

HPP_1702@100HSIPHSIP_100%HSIP_HRRRHSIP_HRRR@1IMIRRITS_RESEARCHLHIPLOCAL_GOVTLOCAL_INKINDL_BETTERMENTL_CORR-WEBERL_CORR_DAVISL_CORR_MATCHL_CORR_UTCOL_CORR_WASHL_PASS_MATCHNHPP_BRNHPP_IMNHPP_NHSNHSNRTNSTIOTHERPL_CMPOPL_DMPOPL_MAGPL_WFRCR/H_DEVICESR/H_HAZ_ELIMSAFETY_406SEC164_HSIPSPP_R _100%SPR_PSPR_P_100%SPR_RSPR_R_100%SR2S_INFRSR2S_OPTSR2S_PRGMSTP_BRSTP_BRIDGESTP_ENH_EACSTP_ENH_ST

Plan Fund

EARMARKSAFETYSAFETYSAFETYSAFETYIMINDIANMISCMISCLOCALLOCALLOCALLOCALLOCALLOCALLOCALLOCALLOCALNHPPNHPPNHPPNHREC TRAILSMISCMISCSTPSTPSTPSTPRAIL/HWYRAIL/HWYSAFETYHSIPSPRSPRSPRSPRSPRSAFETYSAFETYSTATESTPSTPSTPSTP

Category

100.00 93.23 100.00 93.23 100.00 94.18 100.00 50.00 80.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

93.23 94.18 93.23 93.23 50.00 100.00 0.00

93.23 93.23 93.23 93.23 93.23 93.23 100.00 93.23 100.00 80.00 100.00 80.00 100.00 100.00 100.00 100.00 93.23 93.23 80.00 80.00

Fed Aid

YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY

Reg

FFFFFFFFFLOOOOOOLLFFFFFFOFFFFFFFFFFFFFFFFFFFF

Fed/St

Page 6: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

STIP Planning Fund TableUDOT electronic Program Management

Page 4

Report run on: October 28, 2014 5:01 PMepm381_plan_fund (v 1.0)

STP_ FLEXABLE @ 100 FEDERAL FUNDINGSTP - FLEXIBLE CACHE (CMPO)STP - FLEXIBLE DIXIE (DMPO)STP - FLEXIBLE (JHC)STP - FLEXIBLE SOUTH UTAH CO (MAG)STP - FLEXIBLE (ANY AREA) STATEWIDESTP - FLEXIBLE (WFRC)STP-RURAL (NON URBAN)STP - SMALL URBAN (CACHE)STP - SMALL URBAN (DIXIE)STP - SMALL URBAN (JHC)STP- SMALL URBAN (JHC) @ 100 %STP - SMALL URBAN SOUTH UTAH CO (MAG)CONVERTED TAP FUNDS TO STPSTP - URBAN AREA OGDEN / LAYTON (WFRC)STP - URBAN AREA PROVO/OREM (MAG)STP - URBAN AREA SALT LAKE (WFRC)STP SALT LAKE URBAN FUNDS @ 100 %STP - O/L URBAN AREA @ 100%STP-URBAN STEA 03 FUNDSSTATE CONST-ADA RAMP PLACEMENTSSTATE APPROPRIATED BUDGETSTATE CONST - ATMS STATEWIDESTATE CONST - BARRIER TREATMENTSMTN VIEW CORRIDOR - LEG APPROVED BONDINGSTATE CONST - BRIDGE PROGRAMCENTENNIAL HIGHWAY FUNDCENTENNIAL HWY FUND - DEPOSITS TO TIFREGION CONCEPT DEVELOPMENTREGION ONE CONCEPT FUNDSREGION TWO CONCEPT FUNDSREGION THREE CONCEPT FUNDSREGION FOUR CONCEPT FUNDSSTATE CONSTRUCTIONSTATE CONST - PROGRAMMING CONTINGENCYSTATE CONST - REGION 1 CONTIGENCYSTATE CONST - REGION 2 CONTINGENCYSTATE CONST - REGION 3 CONTINGENCYSTATE CONST - REGION 4 CONTINGENCYSTATE CONST - CORRIDOR STUDIES & CEVPOTHER CORRIDOR PRESERVATION FUNDSSTATE CONST - FUNDS EXCHANGE PROGRAMEXPRESS LANES REVENUE - CAPITAL PRGMGENERAL FUND - BRIDGE PROGRAMGENERAL FUND - CRITICAL HIGHWAY NEEDS

Description

STP_FLX_100%STP_FLX_CMPOSTP_FLX_DMPOSTP_FLX_JHCSTP_FLX_MAGSTP_FLX_STSTP_FLX_WFRCSTP_RURALSTP_SU_CMPOSTP_SU_DMPOSTP_SU_JHCSTP_SU_JHC@1STP_SU_MAGSTP_TAP_STSTP_URB_O/LSTP_URB_P/OSTP_URB_SLSTP_URB_SL@1STP_UR_O/L@1STP_UR_P/O@1ST_ADA_RAMPSST_APPROPST_ATMSST_BARRIERST_BONDS_MVCST_BRIDGEST_CHFST_CHF_TIFST_CONCEPT_DST_CONCPT_D1ST_CONCPT_D2ST_CONCPT_D3ST_CONCPT_D4ST_CONSTST_CONT_PGST_CONT_R1ST_CONT_R2ST_CONT_R3ST_CONT_R4ST_CORR_CEVPST_CORR_PRESST_EXCHANGEST_EXPRESSST_GF_BRIDGEST_GF_CHN

Plan Fund

STPSTPSTPSTPSTPSTPSTPSTPSTPSTPSTPSTPSTPTAPSTPSTPSTPSTPSTPSTPSTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATE

Category

100.00 93.23 93.23 93.23 93.23 93.23 93.23 93.23 93.23 93.23 93.23 100.00 93.23 93.23 93.23 93.23 93.23 100.00 100.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Fed Aid

YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY

Reg

FFFFFFFFFFFFFFFFFFFFSSSSSSSSSSSSSSSSSSSSSSSSS

Fed/St

Page 7: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

STIP Planning Fund TableUDOT electronic Program Management

Page 5

Report run on: October 28, 2014 5:01 PMepm381_plan_fund (v 1.0)

STATE CONSTRUCTION PER HB 173GENERAL FUND - HB 185 (2010)GENERAL FUND - HB 242 (2009)GENERAL FUND - HB 3 (2012) ITEM 49GENERAL FUND - HWY CONSTRUCTION PRGMGENERAL FUND - OTHERSTATEWIDE E/W CORRIDOR PLANNING STUDYGENERAL FUND - TRANSP INVESTMENT FUNDTRANSPORTATION FUNDING FROM HB377STATE CONST - JURISDICTIONAL TRANSFERSTATE INELIGIBLE FUNDS USED TO CLOSE OUTFUNDS RECOVERED FOR DAMAGE REPAIRKNOW WHERE KNOW WHY CAMPAINSTATE CONST - LIGHTINGSTATE MATCHING FUNDS - F.A. PROGRAMSTATE MOTOR CARRIER FUNDSSTATE PARK ACCESS ROADS (JHC)STATE - PUBLIC RELATIONSSTATE CONST - PAVEMENT PRESERVATIONQUARTER OF QUARTERSTATE FUNDS RETAINED FROM RIGHT OF WAYSAFE SIDEWALK PROGRAM FUNDSSALT LAKE COUNTY BOND PROJECTS SIB FUNDS FOR LOCAL GOVERNMENTSTATE CONSTRUCTION - SIGNAL PROGRAMSTATE CONST - SIGNINGSIGNALS MAINTENANCE & OPERATIONSSTATE CONST - MAINT SPOT IMPROVEMENTSSTATE CONST - SAFETY SPOT IMPROVEMENTSSTATE SETTLEMENT FUNDSSTATE TIF FUNDSTIF FUNDS EXCHANGED FOR FEDERAL FUNDSGENERAL FUND - HB 377 (2013)TIF FUNDS - SB229 (2012)TRANSPORTATION ALTERNITIVE PROGRAMTRANS ALT PROGRAM - NON URBAN JHCTRANS ALT PROGRAM - CMPOTRANS ALT PROGRAM - DMPOTRANS ALT PROGRA - JHCTRANS ALT PROGRAM - MAGTRANSPORTATION ALT PROGRAM - WFRCTRANSIT -GAS/ ENERGY REDUCTION GRANTUTA FUNDSUTAH COUNTY TRANSPORTATION BOND

Description

ST_GF_HB173ST_GF_HB185ST_GF_HB242ST_GF_HB3ST_GF_HCPST_GF_OTHERST_GF_STUDYST_GF_TIFST_HB377/TFST_HWY_TRNSFST_INELIGIBLST_INS-RECOVST_KW_KW_CST_LIGHTINGST_MATCHST_MOTOR_CARST_PK_ACCESSST_PRST_PVMTST_QTR_QTRST_RET_ROWST_SAFE_SIDEST_SB215ST_SIB_LGST_SIGNALSST_SIGNINGST_SIGNL_M&OST_SPOT_MNTST_SPOT_SFTYST_STLMNTST_TIFST_TIF_EXCHST_TIF_HB377ST_TIF_SB229TAP_FLEXTAP_NU_JHCTAP_SU_CMPOTAP_SU_DMPOTAP_SU_JHCTAP_URB_MAGTAP_URB_WFRCTIGGERUTA_FUNDSUTCO_BOND

Plan Fund

STATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATESTATETAPTAPTAPTAPTAPTAPTAPSTPLOCALLOCAL

Category

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

93.23 93.23 93.23 93.23 93.23 93.23 93.23 100.00 0.00 0.00

Fed Aid

YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY

Reg

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSFFFFFFFFOO

Fed/St

Page 8: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Surface Transportation Program (STP) 2014-2019 Transportation Improvement Program (TIP)

Print Date: 28-Oct-14

Project Information

Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

SALT LAKE/ WEST VALLEY URBAN AREA

Salt Lake West Jordan 48 F-0048(22)8 6587 7800 South & Airport RoadIntersection & Roadway Capacity

Improvements2007 $ 1,177,732 1,098,000$ $ 1,098,000 -$ -$ -$ -$ -$ -$ -$

Salt Lake West Jordan 68 F-0068(54)48 7204 Redwood Road & 8200 South Intersection Improvements 2008 $ 1,194,000 1,309,000$ $ 503,443 805,557$ -$ -$ -$ -$ -$ -$

Salt Lake UDOT/ Midvale 89 S-0089(173)316 7001State Street (US-89); 6400 South to 8000

South

Road - Asphalt Pavement

Reconstruction/Widen 2010 $ 24,000,000 5,000,000$ $ 5,000,000 -$ -$ -$ -$ -$ -$ -$

Salt Lake UTA/SLC 186 F-0186(11) 7648 Bus ReplacementNT Fund - Exchange; To Replacement

Buses2007 $ 65,000,000 5,780,604$ $ 5,780,604 -$ -$ -$ -$ -$ -$ -$

Salt Lake Sandy LC35 STP-LC35(154) 5282 10600 South; 1200 East to 1750 EastRoad - Asphalt Pavement

Reconstruction/Widen2005 $ 9,161,000 7,753,000$ $ 5,468,279 2,284,721$ -$ -$ -$ -$ -$ -$

Salt Lake SL City LC35 F-LC35(184) 6621 1300 South; 500 West to 700 West Bridge - Rehabilitation $ 11,041,296 10,293,800$ $ 1,445,997 8,847,803$ -$ -$ -$ -$ -$ -$

Salt Lake W. Valley LC35 STP-LC35(155) 52841200 West Connector Road; 3100 South

to 3300 SouthRoad - New Construction 2005 $ 2,300,000 2,979,000$ $ 2,978,999 -$ -$ -$ -$ -$ -$ -$

Salt Lake Herriman LC35 F-LC35(181) 7635

5600 West; 13100 South to 11800 South

(was Herriman Parkway - approx. 12600

South)

New Construction 2007 $ 9,325,000 4,500,000$ $ 4,500,000 -$ -$ -$ -$ -$ -$ -$

Salt Lake Riverton LC35 F-LC35(199) 8104 13400 South; 4000 West to 4570 WestReconstruct and Widen/ Intersection

Relocation & Signal Improvements2009 $ 8,486,000 7,319,000$ $ 7,319,000 41,954$ -$ -$ -$ -$ -$ -$

Salt Lake Murray 2102 F-LC35(201) 8108 5900 South; State Street to 700 WestReconstruction with minor improvements

to Drainage, Curb, Gutter and Sidewalk2009 $ 5,100,000 4,639,000$ $ 577,501 946,999$ 2,064,500$ 1,000,000$ -$ -$ -$ -$

Salt Lake Cottonwood Heights 2116 F-LC35(202) 8110Fort Union Boulevard and Highland

Drive IntersectionIntersection Improvements 2009 $ 4,798,000 4,232,000$ $ 1,305,219 565,781$ 1,361,000$ 1,000,000$ -$ -$ -$ -$

Salt Lake South Salt Lake 2284 F-LC35(203) 8112 300 East; 3300 South to 3900 South

Reconstruct with Drainage

Improvements, Curb, Gutter and

Sidewalk Improvements

2009 $ 5,326,000 8,325,000$ $ 976,771 1,233,229$ 1,770,000$ 3,345,000$ 1,000,000$ -$ -$ -$

Salt Lake Salt Lake County 195 F-0195(5) 81142300 East (SR-195) Phase I; I-80 to 3900

South

Reconstruct & Widen including Safety

Improvements2009 $ 9,826,077 8,225,043$ $ 2,030,549 1,856,551$ 3,245,000$ 1,092,943$ -$ -$ -$ -$

Salt Lake West Jordan 172 F-0172(20) 81005600 West (SR-172); 6300 South to 7000

SouthReconstruct & Widen 2009 $ 7,413,000 5,750,000$ $ 1,262,664 2,708,485$ 1,778,850$ -$ -$ -$ -$ -$

Salt Lake UTA 11984Salt Lake Central Bus Maintenance

Facility

Relocate, Replace, and Expand the Bus

Maintnenance Facility2013 $ 56,400,000 3,000,000$ $ - -$ -$ -$ -$ -$ 3,000,000$ -$

Salt Lake UTA Newproject-0027( ) 8599Transit Oriented Development (TOD) @

10000 South TRAX Station

Replace 11 acres of surface parking with

two parking structures2010 $ 13,500,000 2,000,000$ $ - -$ -$ -$ -$ 1,000,000$ 1,000,000$ -$

Salt Lake Cottonwood Heights Newproject-0008( ) 8565Highland Drive & I-215 ; I-215

Westbound On-Ramp to La Cresta

Provide a right turn only lane for

southbound Highland Dr west onto La

Cresta and on-ramp for WB I-215

2010 $ 1,828,000 1,661,000$ $ - 510,000$ 1,151,000$ -$ -$ -$ -$ -$

Salt Lake West Valley City Newproject-

004( )8557 6200 South; 6100 West to SR-111 New Construction 2010 $ 6,655,000 5,463,000$ $ 10,000 -$ 990,000$ 1,005,000$ 2,000,000$ 1,458,000$ -$ -$

Salt Lake Taylorsville Newproject-

002( )8553

4700 South I-215 Area; 2200 West to

2700 WestFeasibility Study 2010 $ 137,262 124,265$ $ 124,265 -$ -$ -$ -$ -$ -$ -$

Salt Lake WFRC Var F-R299(50) 7223Project Planning Support - Salt Lake

CountyPlanning - Urban Transportation 2003 $ 2,018,867 2,680,816$ $ 1,048,000 260,000$ 260,000$ 260,000$ 260,000$ 260,000$ 260,000$ 260,000$

County Route Project Number

Estimated Funding and Phasing (Fiscal Year) Concept Development

Year Added

to TIP

Estimated Total

Project Cost

Original Funds

ProgrammedSponsor PIN

Total Amount

Obligated as of

Dec '13

E:\_Data\BWUTH\TIP\TIP 2015\Program\Approved Status - October 15-20 STP, CMAQ, & TAP (Autosaved).xls STP 2015-2020 Aug 10/28/2014

Page 9: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Surface Transportation Program (STP) 2014-2019 Transportation Improvement Program (TIP)

Print Date: 28-Oct-14

Project Information

Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

County Route Project Number

Estimated Funding and Phasing (Fiscal Year) Concept Development

Year Added

to TIP

Estimated Total

Project Cost

Original Funds

ProgrammedSponsor PIN

Total Amount

Obligated as of

Dec '13

Salt Lake WFRC Var F-R299(50) 11985Project Planning Support - Salt Lake

CountyPlanning Assistance Program 2003 $ 429,046 260,000$ $ - 260,000$ -$ -$ -$ -$ -$ -$

Salt LakeSalt Lake County & Salt

Lake CityVar F-R299(83) 7208 ATMS/ ITS

Upgrade 330 intersections to IP Format

and Install new Signal Controllers2008 $ 1,643,000 1,085,000$ $ 1,025,530 60,486$ -$ -$ -$ -$ -$ -$

Salt Lake Sandy 209 F-0209(25)7 10004 9000 South & 700 WestIntersection Improvements and

additional lanes of traffic2011 $ 4,760,000 4,123,000$ $ 2,739,470 13$ -$ -$ -$ -$ -$ -$

Salt Lake South Jordan City LC35 F-R299(137) 100054800 West; Skye Drive (9800 South) to

10200 South

Construction of New Roadway, Curb &

Gutter, Sidewalk, Park Strip, &

Roadway Improvements

2011 $ 6,568,000 6,058,000$ $ 3,637,356 2,420,643$ -$ -$ -$ -$ -$ -$

Salt Lake UDOT 154 F-0154(67)6 10006 SR-154 (Bangerter Hwy) & 13400 SouthIntersection Improvements - Construct

Continuous Flow Intersection (CFI)2011 $ 7,276,000 3,780,000$ $ 3,780,000 -$ -$ -$ -$ -$ -$ -$

Salt Lake Draper F-R299(138) 100071300 East; Pioneer Road (12400 South)

to 13200 SouthReconstruct & Widen 2011 $ 3,641,000 3,179,000$ $ 539,690 1,010,310$ -$ 710,000$ 1,419,000$ -$ -$ -$

Salt Lake UDOT 172 F-0172(22)6 10008 SR-172 at SR-201

Intersection Improvements - Convert

existing Structure over SR-201 into a

Diverging Diamond Interchange (DDI)

2011 $ 4,422,000 4,006,000$ $ - 10,000$ 500,000$ 1,496,000$ 2,000,000$ -$ -$ -$

Salt Lake West Jordan F-R299(139) 10009 5600 West; 7800 South to 8600 South New Construction and Widening 2011 $ 5,378,000 4,666,000$ $ - 10,000$ 500,000$ 1,250,000$ 1,906,000$ 1,000,000$ -$ -$

Salt Lake South Salt Lake F-R299(140) 10010 300 East (Phase II); Helm Ave to 3900 So

Reconstruct with Drainage

Improvements, Curb, Gutter and

Sidewalk Improvements

2011 $ - -$ $ - -$ -$ -$ -$ -$ -$ -$

Salt Lake Draper F-R299(141) 10011 13800 South; Bangerter Hwy to 300 EastWiden Intersection to Accommodate two

through lanes and dual left turn lanes2011 $ 3,370,000 2,926,000$ $ 10,000 250,000$ -$ 1,000,000$ 1,666,000$ -$ -$ -$

Salt Lake Bluffdale F-LC35(241) 11986Porter Rockwell Blvd (Fifth Segment);

Redwood Road to 0.46 miles eastNew Construction 2013 $ 5,234,000 4,770,000$ $ - -$ 10,000$ -$ 2,000,000$ 1,760,000$ 1,000,000$ -$

Salt Lake Draper F-LC35(215) 11086 Highland Drive & Minutemand Drive Intersection Improvements 2012 $ 1,975,000 1,725,000$ $ - 10,000$ -$ 500,000$ 500,000$ 715,000$ -$ -$

Salt Lake Murray F-LC35(242) 11987 Vine Street; 900 East to 1300 East

Reconstruct with minor widening,

improvements to Drainage, Curb, Gutter

and Sidewalk

2013 $ 5,081,000 4,000,000$ $ - -$ 10,000$ -$ 250,000$ 1,740,000$ 2,000,000$ -$

Salt Lake Salt Lake City F-2076(1 ) 11083 1300 East; 1300 South to 2100 SouthReconstruction with minor improvements

to Drainage, Curb, Gutter and Sidewalk2012 $ 11,099,000 4,067,700$ $ - 10,000$ -$ -$ 401,834$ 3,990,000$ -$ -$

Salt Lake Salt Lake County F-2240(2 )0 11085 4700 South; 4000 West to 5600 West

Reconstruct with minor widening,

improvements to Drainage, Curb, Gutter

and Sidewalk

2012 $ 7,930,150 7,375,040$ $ - 10,000$ -$ 365,040$ 2,365,040$ 5,000,000$ -$ -$

Salt Lake Taylorsville F-0068 (73 )52 11082Redwood Road; Bruin Blvd (4445 So.) to

4700 South

Access Management and Safety

Improvements2012 $ 3,091,000 2,778,000$ $ - 10,000$ -$ -$ 1,000,000$ 1,768,000$ -$ -$

Salt Lake UDOT F-0154 (72 )1 11087 Bangerter Hwy (SR-154) & 200 West Intersection Improvements 2012 $ 988,000 884,000$ $ - -$ -$ 884,000$ -$ -$ -$ -$

Salt Lake UDOT/ Taylorsville F-LC35 (243) 119884700 South Seperated Right Turn Lane

to Southbound I-215

Widen Current Roadway to include

freeflow Right-turn Lane2013 $ 2,774,000 2,470,000$ $ - -$ -$ 1,250,000$ 1,220,000$ -$ -$ -$

Salt Lake UTA/ U of U F-LC35 (220) 11098University of Utah Central Campus

Electrified Shuttle RouteNew Construction 2012 $ 838,000 665,000$ $ 10,000 355,000$ 300,000$ -$ -$ -$ -$ -$

Salt Lake West Jordan F-R299(142) 100127000 South - SR-154 (Bangerter Hwy) to

SR-68 (Redwood Road)Feasibility Study 2011 $ 199,000 183,000$ $ - 183,000$ -$ -$ -$ -$ -$ -$

E:\_Data\BWUTH\TIP\TIP 2015\Program\Approved Status - October 15-20 STP, CMAQ, & TAP (Autosaved).xls STP 2015-2020 Aug 10/28/2014

Page 10: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Surface Transportation Program (STP) 2014-2019 Transportation Improvement Program (TIP)

Print Date: 28-Oct-14

Project Information

Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

County Route Project Number

Estimated Funding and Phasing (Fiscal Year) Concept Development

Year Added

to TIP

Estimated Total

Project Cost

Original Funds

ProgrammedSponsor PIN

Total Amount

Obligated as of

Dec '13

Salt Lake West Jordan New 11989 9000 South; 4800 West to 5300 WestReconstruction with minor improvements

to Drainage, Curb, Gutter and Sidewalk2013 $ 4,047,000 3,175,000$ $ - -$ -$ 1,260,000$ 1,915,000$ -$ -$ -$

Salt Lake Bluffdale Var NEWPROJ(13112) 13112

Porter Rockwell Blvd (Forth Segment);

East Jordan Canal and 15800 South to

0.5 miles east

New Construction 2014 $ 6,474,700 6,036,363$ $ - -$ -$ -$ -$ 500,000$ 2,500,000$ 3,036,363$

Salt Lake Herriman Var NEWPROJ(13113) 1311311800 South; Mountain View Corridor to

5600 WestNew Construction 2014 $ 3,051,200 2,000,000$ $ - -$ -$ -$ -$ 250,000$ 1,000,000$ 750,000$

Salt Lake Sandy Var NEWPROJ(13114) 131149270 South & State Street; 150 East to

State Street

Intersection Improvements and Signal

Installation2014 $ 3,453,000 3,203,756$ $ - -$ -$ 10,000$ -$ 400,000$ 1,500,000$ 1,293,756$

Salt Lake Taylorsville 68 NEWPROJ(13115) 13115Redwood Road; 4100 South to Bruin

Blvd (4445 So.)

Access Management and Safety

Improvements2014 $ 4,837,000 4,427,493$ $ - -$ -$ -$ -$ 250,000$ 2,000,000$ 2,177,493$

Salt Lake South Jordan Var NEWPROJ(13116) 13116 3200 West; 10431 South to 10600 South

Reconstruct with minor widening,

improvements to Drainage, Curb, Gutter

and Sidewalk

2014 $ 1,396,200 1,000,000$ $ - -$ -$ 10,000$ -$ 250,000$ 740,000$ -$

Salt Lake West Valley City Var NEWPROJ(13117) 131174100 South; Bangerter Highway to 4400

West

Reconstruction with minor improvements

to Drainage, Curb, Gutter and Sidewalk2014 $ 4,346,900 3,994,346$ $ - -$ -$ 10,000$ -$ 484,346$ 1,000,000$ 2,500,000$

$15,730,000 $15,730,000 $15,730,000 $15,730,000 $15,730,000 $15,730,000 $15,730,000

Table was updated on New Project $22,893,327 $15,905,469 $21,695,119 $20,977,136 $20,310,693 $15,215,347 $14,945,347

21-Nov-13 Project Completed Amount Oblig

Fiscal Year $ 11,846,711 22,717,858$ 13,940,350$ 16,447,983$ 19,902,874$ 20,825,346$ 16,000,000$ 10,017,612$

Total Obligated $ 60,541,243 $175,469 $1,965,119 $5,247,136 $4,580,693 ($514,653) ($784,653) $4,927,735Balance

Funds Apportioned

Funds Available

Funds Scheduled

E:\_Data\BWUTH\TIP\TIP 2015\Program\Approved Status - October 15-20 STP, CMAQ, & TAP (Autosaved).xls STP 2015-2020 Aug 10/28/2014

Page 11: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Surface Transportation Program (STP) 2014-2019 Transportation Improvement Program (TIP)

Print Date: 28-Oct-14

Project Information

Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

County Route Project Number

Estimated Funding and Phasing (Fiscal Year) Concept Development

Year Added

to TIP

Estimated Total

Project Cost

Original Funds

ProgrammedSponsor PIN

Total Amount

Obligated as of

Dec '13

OGDEN/ LAYTON URBAN AREA

Davis UDOT 37 F-0037(4)0 65521800 North (SR-37); I-15 to 2000 West

(SR-108)

1800 North Environmental Impact

Statement (EIS)2007 $ 31,148,000 2,236,308$ $ 1,652,611 583,697$ -$ -$ -$ -$ -$ -$

Weber UDOT 39 CM-0039(12)4 4400 Wall Ave 12th Street, Ogden Intersection - Improvements 2005 $ 8,700,000 2,000,000$ $ 2,000,000 -$ -$ -$ -$ -$ -$ -$

Davis UDOT 68 STP-0068(16)68 4178 500 South; 1100 West to I-15 Road - Widen to Five Lanes 2000 $ 12,953,985 12,076,998$ $ 12,076,998 -$ -$ -$ -$ -$ -$ -$

WeberPleasant View/ North

OgdenLC57 F-LC57(18) 6568 Skyline Drive in Pleasant View

Preliminary Engineering & ROW

Acquisition2007 $ 7,542,000 3,433,500$ $ 9,323 -$ -$ -$ -$ -$ 3,424,177$ -$

Davis Clinton LC11 F-LC57(20) 7196 800 North; 1000 West to 2000 WestIntersection Improvements & Roadway

Reconstruction and Widening2008 $ 9,060,000 7,162,000$ $ 3,511,865 -$ -$ -$ -$ -$ -$ -$

Davis West Bountiful LC11 F-R199(68) 8137 400 North; 800 West to 1100 West Reconstruct 2009 $ 2,427,350 2,390,744$ $ 2,572,542 -$ -$ -$ -$ -$ -$ -$

Weber South Ogden 3354 F-R199(70) 814140th Street; Washington Blvd. to

Gramercy AvenueReconstruct and Widen 2009 $ 7,562,000 7,500,000$ $ - 510,000$ -$ 3,490,000$ 3,500,000$ -$ -$ -$

Davis Woods Cross 1410 F-R199(71) 81431500 South & Redwood Road

Intersection

Intersection Improvements & Signal

Installation2009 $ 1,039,000 944,000$ $ 1,119,000 -$ -$ -$ -$ -$ -$ -$

Weber Washington Terrace LC57 Newproject-006( ) 8559 Adams Avenue; City Limits to US-89 Reconstruct 2010 $ 5,290,000 4,964,287$ $ 400,889 4,563,398$ -$ -$ -$ -$ -$ -$

Davis Kaysville LC11 Newproject-001( ) 8551 200 North; 900 West to Flint Street Reconstruct 2010 $ 2,925,000 2,727,000$ $ 2,680,334 46,666$ -$ -$ -$ -$ -$ -$

Davis Farmington 225 Newproject-001( ) 8591Park Lane (SR-225) at Clark Lane and

1100 WestReconstruct 2010 $ 3,064,000 2,719,145$ $ 2,719,145 2,639$ -$ -$ -$ -$ -$ -$

Var WFRC Var STP-LC57(10) 11049Project Planning Support - Weber/ Davis

County, 7223Planning - Urban Transportation 2003 $ 1,991,988 1,857,130$ $ 1,017,130 140,000$ 140,000$ 140,000$ 140,000$ 140,000$ 140,000$ 140,000$

Davis Woods Cross 1410 F-LC11(46) 100151500 South Phase II; Redwood Road (SR-

68) to 1450 WestReconstruct/ Widen 2011 $ 3,131,000 2,794,000$ $ 2,264,557 13,202$ -$ -$ -$ -$ -$ -$

Weber West Haven 37 F-LC57(22) 100164000 South (SR-37); 3500 West to 3900

WestReconstruct/ Widen 2011 $ 3,870,000 3,551,000$ $ - -$ -$ -$ 1,801,000$ 1,750,000$ -$ -$

Box Elder Brigham City F-LC03(18 ) 11991 1100 West & SR-91 New Signalized Intersection Construction 2013 $ 3,631,000 1,500,000$ $ - 10,000$ -$ 290,000$ 1,200,000$ -$ -$ -$

Davis West Point/ Clearfield F-LC11(54 ) 11997 300 North; 1000 West to 2000 WestReconstruction with minor improvements

to Drainage, Curb, Gutter and Sidewalk2013 $ 2,971,000 2,500,000$ $ - 10,000$ -$ -$ -$ 1,000,000$ 1,490,000$ -$

Weber Harrisville F-R199(133) 11091 Washington Blvd & Larsen Lane Intersection Improvements 2012 $ 669,000 534,000$ $ - -$ -$ -$ -$ 534,000$ -$ -$

Davis UDOT I-15 F-I15-7(301)313 10944I-15; I-215 (No Salt Lake) to US-89

(Farmington)I-15; South Davis Operational Upgrades 2013 $ 121,000,000 22,830,999$ $ 510,000 14,881,999$ 7,439,000$ -$ -$ -$ -$ -$

Davis UTA F-R199(131) 11099D&RGW Rail Trail; Centerville to

FarmingtonNew Construction 2012 $ 1,020,000 500,000$ $ 413,975 86,025$ -$ -$ -$ -$ -$ -$

Var WFRC Var F-LC11 (50 ) 11990Project Planning Support -Weber &

Davis CountyPlanning Assistance Program 2003 $ 429,046 140,000$ $ - 140,000$ -$ -$ -$ -$ -$ -$

E:\_Data\BWUTH\TIP\TIP 2015\Program\Approved Status - October 15-20 STP, CMAQ, & TAP (Autosaved).xls STP 2015-2020 Aug 10/28/2014

Page 12: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Surface Transportation Program (STP) 2014-2019 Transportation Improvement Program (TIP)

Print Date: 28-Oct-14

Project Information

Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

County Route Project Number

Estimated Funding and Phasing (Fiscal Year) Concept Development

Year Added

to TIP

Estimated Total

Project Cost

Original Funds

ProgrammedSponsor PIN

Total Amount

Obligated as of

Dec '13

Weber Harrisville F-LC57 (26 ) 11993Larsen Lane; North Harrisville Road to

Washington Blvd

Reconstruct with minor widening,

improvements to Drainage, Curb, Gutter

and Sidewalk

2013 $ 3,748,000 3,000,000$ $ - -$ 10,000$ -$ -$ 750,000$ 2,240,000$ -$

Davis Sunset F-LC11 (53 ) 11996 800 North; Main St (SR-126) to 450 WestReconstruction with minor improvements

to Drainage, Curb, Gutter and Sidewalk2013 $ 2,547,000 2,258,000$ $ - -$ 10,000$ -$ -$ 1,250,000$ 998,000$ -$

Davis Fruit Heights Var New 13120 Nicholls Road/ US-89 Grade SearationPreliminary Engineering & ROW

Acquisition2014 $ 1,081,100 1,007,910$ $ - -$ -$ -$ -$ -$ -$ 1,007,910$

Davis Kaysville Var New 13121 200 North & Angel Street Intersection Intersection - Improvements 2014 $ 3,271,900 3,050,392$ $ - -$ -$ 10,000$ -$ 240,000$ 500,000$ 2,300,392$

Davis North Salt Lake Var New 13122Center Street; Legacy Parkway to

Redwood Road

Reconstruct with minor widening,

improvements to Drainage, Curb, Gutter

and Sidewalk

2014 $ 1,938,300 1,778,176$ $ - -$ -$ 1,778,176$ -$ -$ -$ -$

WeberUDOT/

West Haven & Roy108 New 13123

Midland Drive (SR-108); 4800 South to

4275 SouthRoad - Widen to Five Lanes 2014 $ 20,588,000 3,200,000$ $ - -$ -$ -$ -$ -$ 700,000$ 2,500,000$

Weber West Haven Var New 13124 4700 West; 4200 South to 4800 South

Reconstruct with minor widening,

improvements to Drainage, Curb, Gutter

and Sidewalk and an area of New

Construction

2014 $ 3,870,700 2,500,000$ $ - -$ -$ -$ -$ -$ 500,000$ 2,000,000$

$8,470,000 $8,470,000 $8,470,000 $8,470,000 $8,470,000 $8,470,000 $8,470,000

Table was updated on New Project Funding Removed $22,896,056 $10,378,430 $11,249,430 $10,011,254 $8,333,824 $11,139,824 $9,617,647

21-Nov-13 Project Completed Amount Oblig

Fiscal Year $ 3,262,146 20,987,626$ 7,599,000$ 5,708,176$ 6,641,000$ 5,664,000$ 9,992,177$ 7,948,302$

48683475.11 Total Obligated $ 44,393,807 $1,908,430 $2,779,430 $1,541,254 ($136,176) $2,669,824 $1,147,647 $1,669,345

Balance

Funds Scheduled

Funds Apportioned

Funds Available

E:\_Data\BWUTH\TIP\TIP 2015\Program\Approved Status - October 15-20 STP, CMAQ, & TAP (Autosaved).xls STP 2015-2020 Aug 10/28/2014

Page 13: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Surface Transportation Program (STP) 2014-2019 Transportation Improvement Program (TIP)

Print Date: 28-Oct-14

Project Information

Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

County Route Project Number

Estimated Funding and Phasing (Fiscal Year) Concept Development

Year Added

to TIP

Estimated Total

Project Cost

Original Funds

ProgrammedSponsor PIN

Total Amount

Obligated as of

Dec '13

Davis North Salt Lake LC11 F-LC11(45) 100131100 North Street; Redwood Road to 110

EastReconstruct/ Widen 2011 $ 5,512,000 2,512,000$ $ - 2,135,200$

Weber Ogden City LC57 F-LC57(21) 10014Harrison Blvd. (South); 7th Street to 2nd

StreetReconstruct/ Widen 2011 $ 6,446,000 4,500,000$ $ - 3,825,000$

Weber Ogden New 11995Harrison Blvd./ 2nd Street/ Sheridan

DriveIntersection Realignment/ Improvements 2013 $ 3,118,000 2,500,000$ $ - 2,125,000$

Davis West Point LC11 F-LC11(47) 10017 3000 West; 300 North to 1300 NorthReconstruct with minor widening,

shoulders, Curb, Gutter and Sidewalk2011 $ 3,709,000 3,341,000$ $ - 2,839,850$

Davis Syracuse New 11090 3000 West; 700 South to Bluff RoadReconstruct with minor widening,

shoulders, Curb, Gutter and Sidewalk2012 $ 4,079,000 3,699,000$ $ - 3,144,150$

Weber Hooper New 110894300 West; 6000 South (Hooper) to 2300

North (Clinton)New Construction 2012 $ 3,860,000 3,495,000$ $ - 2,970,750$

Davis Clinton New 11992 3000 West; 1400 North to 2300 NorthReconstruct with minor widening,

shoulders, Curb, Gutter and Sidewalk2013 $ 3,492,000 2,784,000$ $ - 2,366,400$

$ 22,831,000 19,406,350$

Table was updated on New Project 19,406,350$ ($0)

21-Nov-13 Project Completed Total 19,406,350$ -$

48683475.11 ($0) ($0)

Funds Scheduled

Balance

OGDEN/ LAYTON LOCAL PROJECT'S EXCHANGED

Funds Apportioned

Funds Available

E:\_Data\BWUTH\TIP\TIP 2015\Program\Approved Status - October 15-20 STP, CMAQ, & TAP (Autosaved).xls STP 2015-2020 Aug 10/28/2014

Page 14: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Congestion Mitigation/ Air Quality Program (CMAQ) 2014-2019 Transportation Improvement Program (TIP)

PIN Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

Salt Lake Bluffdale 140 New 1313014600 South (SR-140); Pony Express

Road to UPRR Bridge over SR-140Construct Bicycle & Pedestrian Facility 2014 $ 669,700 $ 624,361 $ 45,339 $ - $ - $ - $ 10,000 $ - $ 614,361 $ - $ -

Salt LakeCottonwood

Heights Newproject-0028( ) 8601 Wasatch Boulevard & 7650 South Park-n-Ride Lot 2010 $ 1,600,000 $ 1,486,000 $ 107,908 $ - $ 10,000 $ 150,000 $ 326,000 $ 1,000,000 $ - $ - $ -

Salt LakeCottonwood

Heights New 12000 Bengal Blvd & 2300 East Round-About Intersection Improvements 2013 $ 2,655,000 $ 2,655,000 $ 192,796 $ - $ 10,000 $ - $ - $ - $ 1,000,000 $ 1,645,000 $ -

Salt LakeCottonwood

HeightsVar New 13128 Park and Ride Smart Boards

Construct "Live Parking Availability"

Signs for Select Canyon Park-n-Ride

Lots

2014 $ 706,900 $ 659,043 $ 47,857 $ - $ 10,000 $ 349,043 $ 300,000

Salt Lake Holladay Newproject-003( ) 8555 6200 South & Holladay Boulevard Intersection Improvements 2010 $ 1,500,000 $ 1,300,000 $ 94,401 $ 10,000 $ - $ 250,000 $ 1,040,000 $ - $ - $ - $ -

Salt Lake Holladay LC35 F-R299(144) 10020 6200 South & 2300 East Intersection Intersection Improvements 2011 $ 938,000 $ 874,000 $ 63,466 $ - $ 10,000 $ 150,000 $ 214,000 $ 500,000 $ - $ - $ -

Salt LakeSalt Lake City &

UTAVar New 13125

Sugar House Streetcar Double Track;

500 East to 600 EastConstruct a Double Track 2014 $ 3,016,100 $ 900,000 $ 65,354 $ - $ - $ - $ - $ - $ - $ - $ 900,000

Salt LakeSalt Lake City/

UTA New 11999

Black Line TRAX Service; SL Central

Station to University of UtahLight Rail Service & Operations 2013 $ 7,240,000 $ 2,000,000 $ 145,232 $ - -$ -$ -$ -$ -$ -$ 2,000,000$

Salt LakeSalt Lake County

& UTAVar New 13126

Hillsborough Pond Park & Ride

Expansion; Wasatch Blvd & Creek RdExpand and Improve Parking Facility 2014 $ 1,784,700 $ 1,663,876 $ 120,824 $ - $ - $ - $ - $ - $ - $ 500,000 $ 1,163,876

Salt Lake Sandy New 12001 1300 East Buttercup Pedestrian BridgePedestrian Bridge New Construction/

Intersection Improvements2013 $ 3,116,000 $ 2,000,000 $ 145,232 $ - $ 10,000 $ - $ 1,000,000 $ 990,000 $ - $ - $ -

Salt Lake UDOT 68 CM-0068(38)52 5262SR-68; Redwood Road 4700 South,

TaylorsvilleIntersection - Improvements 2005 $ 2,130,537 $ 2,263,727 $ 164,383 $ 2,263,728 $ - $ - $ - $ - $ - $ - $ -

Salt Lake UDOT 68 CM-0068(39)51 5264SR-68; Redwood Road 5400 South,

TaylorsvilleIntersection - Improvements 2005 $ 2,660,817 $ 2,758,107 $ 200,283 $ 2,758,108 $ - $ - $ - $ - $ - $ - $ -

Salt Lake UDOT Var CM-R299(9) 5996 Region 2 Commuter Link ITS/ATMS - Commuter Link 1999 $ 30,684,350 $ 7,741,000 $ 671,045 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,341,000 $ 400,000 $ -

Salt Lake UDOT Var F-ST99(162) 10018 TravelWise

Comprehensive Travel Demand

Management Program. (For Private &

Public Partnership)

2011 $ 2,400,000 $ 746,077 $ 54,177 $ 202,077 $ - $ 136,000 $ 136,000 $ 136,000 $ 136,000 $ - $ -

Salt Lake UDOT New 11096I-215 Ramp Meters - I-215 between 6200

South and State StreetConstruct & Implement Ramp Meters 2012 $ 3,813,000 $ 924,000 $ 67,097 $ - $ 10,000 $ - $ - $ 914,000 $ - $ - $ -

Salt Lake UDOT New 11998Little Cottonwood Canyon Intersection -

Snowbird Entry 1Intersection Improvements 2013 $ 953,000 $ 350,000 $ 25,416 $ - $ 10,000 $ - $ - $ 340,000 $ - $ - $ -

Salt Lake UDOT Var 12008 Salt Lake Green Bike Share ExpansionConstructs additional Bike Docking

Stations/ Purchases additional Bikes2013 $ 75,000 $ 69,923 $ 46,759 $ 69,923 $ - $ - $ - $ - $ - $ 250,000 $ 324,000

Salt Lake UDOT 154 New 1312910400 South & Bangerter Hwy VMS;

Northbound & SouthboundInstall Variable Message Signs (VMS) 2014 $ 915,200 $ 863,124 $ 62,677 $ - $ - $ - $ - $ - $ - $ 863,124 $ -

Salt Lake UDOT New 13131 Foothill VMS; Southbound Install Variable Message Sign (VMS) 2014 $ 462,900 $ 431,562 $ 31,338 $ - $ - $ - $ - $ - $ - $ 431,562 $ -

Salt Lake UTA Var F-0070(17) 8597 Tooele - Stansbury Park and Ride Lot Park-n-Ride Lot 2010 $ 2,219,000 $ 1,025,500 $ 74,468 $ 1,025,500 $ - $ - $ - $ - $ - $ - $ -

Salt Lake UTA F-R299(143) 10019Key North Temple Project 500 West;

from North Temple to 300 North

Multimodal connections to FrontRunner,

TRAX, Bus, Bicycle, and Pedestrian2011 $ 3,064,000 $ 1,400,000 $ 101,663 $ 130,000 $ - $ 270,000 $ 1,000,000 $ - $ - $ - $ -

Total Amount

Obligated as of

Dec '13

County Sponsor Route Project Number

Estimated CMAQ Funds and Phasing (Fiscal Year) Concept Development Estimated Total

Project Cost

Original Funds

Programmed

Local Matching

Funds Due

SALT LAKE/ WEST VALLEY URBAN AREA

Project Information Year

Added to

TIP

E:\_Data\BWUTH\TIP\TIP 2015\Program\Approved Status - October 15-20 STP, CMAQ, & TAP (Autosaved).xls Tab 10/28/2014]

Page 15: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Congestion Mitigation/ Air Quality Program (CMAQ) 2014-2019 Transportation Improvement Program (TIP)

PIN Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

Total Amount

Obligated as of

Dec '13

County Sponsor Route Project Number

Estimated CMAQ Funds and Phasing (Fiscal Year) Concept Development Estimated Total

Project Cost

Original Funds

Programmed

Local Matching

Funds Due

Project Information Year

Added to

TIP

Salt Lake UTA Var CM-9999( ) 2351 WFRC AreaAir Quality - Rideshare & Vanpool

Management1993 $ 2,488,870 $ 2,231,132 $ 257,739 $ 1,318,199 $ 318,733 $ 318,733 $ 318,733 $ 318,733 $ 318,733 $ 318,733 $ 318,733

Salt Lake UTA Var CM-9999( )Tran

SEC.ITS/APTS Deployment in S L Air Quality - FTA Fund Transfer 1999 $ 12,000,000 $ 500,000 $ 60,998 $ 340,000 $ - $ - $ - $ 250,000 $ 250,000 $ - $ -

Salt Lake UTA Var CM-9999( )Tran

SEC.Lease Vans in S L Air Quality - FTA Fund Transfer 1994 $ 1,855,411 $ 1,453,400 $ 188,439 $ 1,141,600 $ 276,200 $ 276,200 $ 325,000 $ 300,000 $ - $ 276,000 $ -

Salt Lake UTA Var New 13127Depot District Service Center (DDSC);

669 West 200 South

Construct the CNG Facilities of the

DDSC2014 $ 57,000,000 $ 950,000 $ 68,985 $ - $ - $ - $ - $ - $ - $ 450,000 $ 500,000

Salt Lake UTA\ UDOT 172 F-0172(18) 76505600 West Bus Rapid Transit (BRT)

Phase I; 2700 South to 6200 South

ROW & Construction of Bus Rapid

Transit (BRT) (Not to be used for Bus

Purchase)

2010 $ 5,000,000 $ 2,000,000 $ 145,232 $ - $ - $ - $ - $ - $ 2,000,000 $ - $ -

Salt LakeUTAH/ Local

GovernmentsVar 7947 Traffic Adaptive Control System Traffic Signal Adaptive Control 2009 $ 5,485,000 $ 5,110,000 $ 371,068 $ 4,148,735 $ 961,265 $ - $ - $ - $ - $ - $ -

Salt Lake W. Valley LC35 CM-LC35(158) 5296 Cross Town Trail, West Valley City Air Quality - Bike Ped Facility 2003 $ 1,038,000 $ 730,000 $ 53,010 $ 730,000 $ - $ - $ - $ - $ - $ - $ -

Salt Lake West Jordan New 11094 7800 South & 1300 West Intersection Improvements 2012 $ 847,000 $ 450,000 $ 32,677 $ - $ 10,000 $ - $ 240,000 $ 200,000 $ - $ - $ -

Salt Lake West Jordan New 11095 9000 South & 4000 West Intersection Improvements 2012 $ 1,000,000 $ 750,000 $ 54,462 $ - $ 10,000 $ - $ 240,000 $ 250,000 $ 250,000 $ - $ -

Salt Lake West Jordan LC35 New 11097Jordan River Trail (Gardner Village

TRAX Station)Pedestrian/ Bike Trail 2012 $ 321,785 $ 300,000 $ 21,785 $ - $ 10,000 $ - $ 290,000 $ - $ - $ - $ -

$ 15,637,870 5,263,241$ 5,263,241$ 5,263,241$ 5,263,241$ 5,263,241$ 5,263,241$ 5,263,241$

Table was updated on New Project $ 4,148,735 4,519,379$ 6,636,422$ 8,848,729$ 7,472,237$ 6,026,745$ 6,026,745$ 5,379,892$

26 Mar 2014 Project Completed Amount Oblig

FY2013 $1,889,070 3,146,198$ 3,050,933$ 6,639,733$ 6,708,733$ 5,910,094$ 5,483,462$ 5,506,609$

#REF! $31,089 Total Obligated $ 29,382,966 1,373,181$ 3,585,488$ 2,208,996$ 763,504$ 116,651$ 543,283$ (126,717)$

$ (7,588,530)

Running Balance

Funds Available

Funds Scheduled

Funds Apportioned

E:\_Data\BWUTH\TIP\TIP 2015\Program\Approved Status - October 15-20 STP, CMAQ, & TAP (Autosaved).xls Tab 10/28/2014]

Page 16: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Congestion Mitigation/ Air Quality Program (CMAQ) 2014-2019 Transportation Improvement Program (TIP)

PIN Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

Total Amount

Obligated as of

Dec '13

County Sponsor Route Project Number

Estimated CMAQ Funds and Phasing (Fiscal Year) Concept Development Estimated Total

Project Cost

Original Funds

Programmed

Local Matching

Funds Due

Project Information Year

Added to

TIP

Davis Bountiful New 12002 400 North & 500 South Intersection400 North 500 West Dedicated Right

Turn Lane Construction2013 $ 1,300,000 $ 1,200,000 $ 133,614 $ - $ 1,200,000 $ - $ - $ - $ - $ - $ -

Davis Centerville 106 F-0106(11)3 7194 Main Street (SR-106) & Parrish Lane Intersection Improvements 2008 $ 660,000 1,207,876$ $ 86,985 $ 1,197,876 -$ -$ -$ -$ -$ -$ -$

Davis Centerville New 12003Frontage Road Bike Lanes; 638 North to

2200 North (Lund Lane)

Construct Bike Lanes along Westside of

Frontage Road2013 $ 1,215,000 $ 970,000 $ 133,614 $ - $ 10,000 $ - $ - $ 250,000 $ 710,000 $ - $ -

Weber UDOT Var CM-9999( ) 5981 Region 1 Commuter Link ITS/ATMS - Commuter Link 2000 $ 6,650,220 $ 6,200,000 $ 450,220 $ 1,100,000 1,100,000$ 600,000$ $ 600,000 $ 600,000 $ 1,100,000 $ 1,100,000 $ 1,100,000

Davis UDOT 68 8593 500 South; I-15 to 200 West Intersection Improvements 2010 $ 5,363,081 $ 5,000,000 $ - $ - $ 3,300,000 $ 1,700,000 $ - $ - $ - $ - $ -

Weber UDOT Var 10018 TravelWise

Comprehensive Travel Demand

Management Program. (For Private &

Public Partnership)

2011 $ 2,400,000 $ 320,000 $ 14,523 $ 64,000 $ 64,000 $ 64,000 $ 64,000 $ 64,000 $ 64,000 $ - $ -

Davis UDOT New 11092650 North & I-15 Interchange/

IntersectionsIntersection Improvements 2012 $ 4,636,000 $ 2,840,000 $ 133,614 $ - $ 10,000 $ - $ 2,200,000 $ 630,000 $ - $ - $ -

Davis UDOT New 12004I-15 - 200 North Kaysville NB

On-Ramp Ramp Meters

Install Ramp Meters on NB

On-Ramp2013 $ 250,000 $ 224,000 $ 133,614 $ - $ 10,000 $ - $ 214,000 $ - $ - $ - $ -

Weber UDOT 39 CM-0039(12)6 4400 Wall Ave 12th Street, Ogden Intersection - Improvements P.E. 2003 $ 8,700,000 4,125,000$ $ 299,456 $ 4,123,826 1,177$ -$ -$ -$ -$ -$ -$

Weber UDOT 97 New 13132SR-97 (5600 South); Hill Field Air Force

Base to 2050 WestIntersection/ Operational Improvements 2014 $ 3,037,700 $ 750,000 $ - $ - $ - $ - $ - $ - $ - $ - $ 750,000

Davis UDOT New 13133 US-89 VMS; Just North of Shepard Lane Install Variable Message Sign (VMS) 2014 $ 462,900 $ 431,562 $ 31,338 $ - $ - $ - $ - $ - $ - $ - $ 431,562

Davis UTA 89 10021Fruit Heights/ Kaysville 400/200 North

Park n Ride LotExpand Park n Ride Lot 2011 $ 1,498,000 $ 1,233,000 $ 89,536 $ - $ - $ - $ - $ - $ - $ - $ 1,233,000

Weber UTA Var CM-9999( )Tran

SEC.ITS/APTS Deployment in Weber Co Air Quality - FTA Fund Transfer 1999 $ 923,522 $ 861,000 $ 62,522 $ 240,000 $ - -$ -$ 430,500$ 430,500$ -$ -$

Weber UTA Var CM-9999( )Tran

SEC.Lease Vans in Weber Co Air Quality - FTA Fund Transfer 1994 $ 708,356 $ 660,400 $ 47,956 $ 504,400 118,800$ $ 118,800 $ 118,800 $ 118,800 $ 66,400 $ 118,800 $ -

Weber UTA Var CM-9999( )Tran

SEC.WFRC Area

Air Quality - Rideshare & Vanpool

Management1993 $ 1,179,781 $ 1,099,910 $ 79,871 $ 585,390 157,130$ $ 157,130 $ 157,130 $ 157,130 $ 157,130 $ 157,130 $ 157,130

Weber UTA NewTran.

SEC.

Bus Service from Downtown Ogden to

Ogden ValleyPurchase Canyon Service Buses 2013 $ 1,027,000 $ 950,000 $ 89,536 $ - $ - $ - $ - $ 450,000 $ 500,000 $ - $ 958,000

Weber West Haven LC11 STP-LC11(25) 5143River Parkway Trail; D&RGW Rail to

1800 So, WeberAir Quality - Bike Ped Facility 2003 $ 8,000,000 2,250,000$ $ 153,510 $ 2,113,991 136,009$ -$ -$ -$ -$ -$ -$

$ (419,399) $ 10,348,881 2,851,022$ 2,851,022$ 2,851,022$ 2,851,022$ 2,851,022$ 2,851,022$ 2,851,022$

Table was updated on New Project $ 9,929,482 6,538,174$ 3,282,080$ 3,493,172$ 2,990,264$ 3,140,856$ 2,963,848$ 4,438,940$

26 Mar 2014 Project Completed Amount Oblig

FY2013 $1,439,930 6,107,116$ 2,639,930$ 3,353,930$ 2,700,430$ 3,028,030$ 1,375,930$ 4,629,692$

Total Obligated $ 13,348,881 431,058$ 642,150$ 139,242$ 289,834$ 112,826$ 1,587,918$ (190,752)$

OGDEN/ LAYTON URBAN AREA

Funds Apportioned

Funds Available

Funds Scheduled

Running Balance

E:\_Data\BWUTH\TIP\TIP 2015\Program\Approved Status - October 15-20 STP, CMAQ, & TAP (Autosaved).xls Tab 10/28/2014]

Page 17: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Transportation Alternatives Program (TAP) 2014-2019 Transportation Improvement Program (TIP)

Print Date: 28-Oct-14

Project Information Finializing of Year

Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

SALT LAKE/ WEST VALLEY URBAN AREA

Salt Lake Salt Lake City 12006200 West - Enhanced/ Separated Bikeway; North

Temple to 900 SouthConstruct a Separated-On-Street Bike Path 2013 $ 212,000 85,000$ $ - 85,000$ -$ -$ -$ -$ -$ -$

Salt Lake Holladay City 12007 City-wide Bicycle Trails Improvement Project

1) Improve Bicycle Routes (Emphasis at

Intersections), 2) Enhance Bicycle Commuting by

providing Route Info, 3) Innovative Signage

2013 $ 145,000 108,000$ $ - 108,000$ -$ -$ -$ -$ -$ -$

Salt Lake Salt Lake City 12008 Bike Share ExpansionConstructs additional Bike Docking Stations/

Purchases additional Bikes2013 $ 14,160,000 233,075$ $ 233,075 -$ -$ -$ -$ -$ -$ -$

Salt Lake Midvale City 12009 700 West; 7200 South to 7800 South Construct Non-Motorized Infrastructure 2013 $ 332,000 309,000$ $ - 309,000$ -$ -$ -$ -$ -$ -$

Salt Lake South Jordan City 12011Welby Jacob and Bingham Creek; North City Limit

to South City Limit

Trail Design to Plan for a City-wide Multi use Trail

System2013 $ 40,000 37,292$ $ - 37,292$ -$ -$ -$ -$ -$ -$

Salt Lake Sandy City New 13134 Dry Cree Trail; 10200 South to 10000 South (544 feet) Constructs a Bicycle/ Pedestrian Facility 2014 $ 77,300 72,067$ $ - -$ 72,067$ -$ -$ -$ -$ -$

Salt Lake Salt Lake City New 13135 Bike Share ExpansionConstructs additional Bike Docking Stations/

Purchases additional Bikes2014 $ 2,001,200 176,111$ $ - -$ 176,111$ -$ -$ -$ -$ -$

Salt Lake Salt Lake County New 13136Parley's Trail - 2300 East Tunnel Crossing; I-80/ 2300

East Off-ramp

Construct a Grade Seperated Crossing for Bicycle

and Ped2014 $ 1,224,600 250,000$ $ - -$ 250,000$ -$ -$ -$ -$ -$

Salt LakeCottonwood

Heights New 13137 HAWK Pedestrian Crossing on Fort Install a High Intensity Activated Crosswalk 2014 $ 206,800 192,800$ $ - -$ 192,800$ -$ -$ -$ -$ -$

Salt Lake Salt Lake City New 13138Salt Lake City; North Temple Complete Street &

Bike Connection - Plan/ Study

Develop a corridor plan for a complete street and

seperated family friendly bikeway on North Temple

through the heart of downtown Salt Lake

2014 $ 50,000 37,500$ $ - -$ 37,500$ -$ -$ -$ -$ -$

$900,000 $700,000 $0 $0 $0 $0 $0

Table was updated on New Project 666,925$ $827,633 $99,155 $99,155 $99,155 $99,155 $99,155

5 June 2013 Project Completed Total 539,292$ 728,478$ -$ -$ -$ -$ -$

$40,272,486 $ 233,075 127,633$ $99,155 $99,155 $99,155 $99,155 $99,155 $99,155

Estimated TAP Funds and Phasing (Fiscal Year)

County Sponsor Route Project Number PINYear Added

to TIP

Estimated Total

Project Cost

Original Funds

Programmed

Total Amount

Obligated

Concept Development

Funds Apportioned

Funds Available

Funds Scheduled

Balance

Page 18: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Transportation Alternatives Program (TAP) 2014-2019 Transportation Improvement Program (TIP)

Print Date: 28-Oct-14

Project Information Finializing of Year

Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

Estimated TAP Funds and Phasing (Fiscal Year)

County Sponsor Route Project Number PINYear Added

to TIP

Estimated Total

Project Cost

Original Funds

Programmed

Total Amount

Obligated

Concept Development

30,927,831$ Print Date: 28-Oct-14

Project Information

Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2018 2018

Project Information Finializing of Year

Location/ Limits Concept/ Type of Improvement 2014 2015 2016 2017 2018 2019 2020

OGDEN/ LAYTON URBAN AREA

Davis West Point 12012 200 South Trail; 2000 West to 4000 WestNew Construction of Trail from Emigrant Trail to the

D&RGW Rail/ Trail2013 $ 431,000 367,000$ $ - 367,000$ -$ -$ -$ -$ -$ -$

Davis North Salt Lake 12013Center Street Trail; Redwood Road to Legacy

Parkway

New Construction of Trail from Foothills east to the

Legacy Parkway Trail2013 $ 236,000 192,000$ $ - 192,000$ -$ -$ -$ -$ -$ -$

Weber Ogden 12014Ogden City Bicycle Study;

Municipal Boundaries of Ogden City

Produce a Comprehensive Bicycle Facilities Master

Plan2013 $ 100,000 93,000$ $ - 93,000$ -$ -$ -$ -$ -$ -$

Weber West Haven New 13139 River Parkway Trail; 1800 South to City Cemetery New Construction of Bike/ Ped Trail 2014 $ 459,000 150,000$ $ - -$ 150,000$ -$ -$ -$ -$ -$

Davis West Point New 13140 Emigrant Trail; 1300 North to 2425 North

New Construction of Bike/ Ped Trail to complete a

gap in the Emigrant Trail between West Point and

Hooper

2014 $ 347,800 250,000$ $ - -$ 250,000$ -$ -$ -$ -$ -$

$700,000 $350,000 $0 $0 $0 $0 $0

Table was updated on New Project $700,000 $398,000 ($2,000) ($2,000) ($2,000) ($2,000) ($2,000)

5 June 2013 Project Completed Total 652,000$ 400,000$ -$ -$ -$ -$ -$

48683475.11 $49,484,840 $ - $48,000 ($2,000) ($2,000) ($2,000) ($2,000) ($2,000) ($2,000)

County Sponsor Route Project Number

Funds Scheduled

Balance

Concept Development

Funds Apportioned

Funds Available

PINYear Added

to TIP

Original Funds

Programmed

County Sponsor Route Project Number

Estimated Total

Project Cost

Total Amount

Obligated as of May

'12

Estimated TAP Funds and Phasing (Fiscal Year) Concept Development

PINYear Added

to TIP

Estimated Total

Project Cost

Original Funds

Programmed

Total Amount

Obligated as of May

'12

Page 19: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

2015 – 2020 Transportation Improvement Program (TIP)

Wasatch Front Regional Council | Approved by the WFRC on August 28, 2014 VII - 3

2015 2016 2017 2018 2019 2020

UT APreventive Maintenance of Buses, Rail

Vehicles and Facilit ies 202,861,752 40,572,350 19,898,497 22,332,332 23,188,834 23,593,339 24,004,721 24,423,096 24,848,584

UT AADA Operating Assistance for

Paratransit Service 23,654,619 4,730,924 2,330,010 2,606,582 2,703,912 2,749,878 2,796,626 2,844,169 2,892,520

UT A

Transit Enhancements (Street

Furniture, Stop / Stat ion Amenities,

Signage, Bike Racks, Transit Access

Improvements)

2,365,462 473,092 233,001 260,658 270,391 274,988 279,663 284,417 289,252

UT A Security Equipment 2,365,462 473,092 233,001 260,658 270,391 274,988 279,663 284,417 289,252

UT A Planning 5,298,899 1,059,780 605,588 605,588 605,588 605,588 605,588 605,588 605,588

236,546,195 47,309,239 23,300,097 26,065,819 27,039,116 27,498,781 27,966,260 28,441,687 28,925,196

UT APreventive Maintenance of Buses, Rail

Vehicles and Facilit ies 91,795,639 18,359,128 9,810,477 9,981,202 10,362,569 10,542,680 10,725,852 10,912,139 11,101,592

UT AADA Operating Assistance for

Paratransit Services 10,662,179 2,132,436 1,141,211 1,160,611 1,203,948 1,224,415 1,245,230 1,266,399 1,287,928

UT A

Transit Enhancements (Street

Furniture, Stop Amenities, Signage,

Bike Racks, Transit Access

Improvements)

1,066,218 213,244 114,121 116,061 120,395 122,442 124,523 126,640 128,793

UT A Security Equipment 1,066,218 213,244 114,121 116,061 120,395 122,442 124,523 126,640 128,793

UT A Planning 2,031,538 406,308 232,176 232,176 232,176 232,176 232,176 232,176 232,176

106,621,792 21,324,358 11,412,105 11,606,111 12,039,483 12,244,154 12,452,305 12,663,994 12,879,282

(Fiscal Year)5307 Funds

Obligated in FY

2014

Local Share of

Project

SALT LAKE/WEST VALLEY – O GDEN/ LAYTO N TRANSPO RTATIO N IMPRO VEMENT PRO GRAM

PUBLIC TRANSIT PRO GRAM

Grantee

SALT LAKE/WEST VALLEY URBANIZED AREA FORMULA - SECTION 5307

SUBTO TAL: SALT LAKE/WEST VALLEY

URBANIZED AREA FORMULA - SECTION 5307

OGDEN/ LAYTON URBANIZED AREA FORMULA - SECTION 5307

SUBTO TAL: OGDEN/ LAYTON URBANIZED

AREA FORMULA - SECTION 5307

Estimated Federal Share and Phasing

Estimated Total

Project CostProject Description

Page 20: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

2015 – 2020 Transportation Improvement Program (TIP)

VII - 4 Approved by the WFRC on August 28, 2014 | Wasatch Front Regional Council

2015 2016 2017 2018 2019 2020

Sugar House StreetcarSection 5309

TIGER II 37,180,000 11,180,000 1,031,468

37,180,000 11,180,000 1,031,468

SALT LAKE/WEST VALLEY – OGDEN/ LAYTON TRANSPORTATIO N IMPROVEMENT PRO GRAM

PUBLIC TRANSIT PRO GRAM

5309 Funds

Obligated Through

FY 2014

TO TAL: SALT LAKE/WEST VALLEY and O GDEN/ LAYTO N URBANIZED

AREAS CAPITAL INVESTMENT PROGRAM - SECTIO N 5309 NEW STARTS

Estimated Federal Funding and Phasing

(Fiscal Year)

CAPITAL INVESTMENT PROGRAM - SECTION 5309 NEW STARTS

Sponsor

Year Added to

TIP Project Description

Fund Source

(FTA Section)

Estimated Total

Project Cost

Local Share of

Project

2015 2016 2017 2018 2019 2020

UTA 2002

High Intensity Fixed Guideway

State of Good Repair &

Preventive Maintenance

5337 State of

Good Repair 136,870,252 27,374,050 7,645,233 7,942,136 8,352,011 19,476,132 19,748,798 20,025,281 26,306,609

136,870,252 27,374,050 7,645,233 7,942,136 8,352,011 19,476,132 19,748,798 20,025,281 26,306,609

SponsorEstimated Federal Share and PhasingYear Added to

TIPProject Description

Fund Source

(FTA Section)

Estimated Total

Project Cost

Local Share of

Project

TOTAL: SALT LAKE/WEST VALLEY and O GDEN/ LAYTON URBANIZED

AREAS CAPITAL INVESTMENT PRO GRAM - SECTION 5337 STATE O F

GO OD REPAIR

SALT LAKE/WEST VALLEY – O GDEN/ LAYTON TRANSPO RTATIO N IMPROVEMENT PROGRAM

PUBLIC TRANSIT PRO GRAM

CAPITAL INVESTMENT PROGRAM - SECTION 5337 STATE OF GOOD REPAIR

*Section 5337 State of Good Repair money can be used on fixed guideway systems but UTA has seen more succuess with those that have been in operation at least 7 years. As fixed guideways

become at least 7 years old, the National Transit Database (NTD) will show that increase in fixed guideway miles. The Federal allocation formula will use those new numbers to increase allocations

as UTA’s rail systems meet this requirement. There is a two year lag for eligible systems to receive funds; one year for it to be reported to NTD Data and one year for it to be used as part of the

federal formula.

5337 Funds

Obligated in FY

2014

Page 21: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

2015 – 2020 Transportation Improvement Program (TIP)

Wasatch Front Regional Council | Approved by the WFRC on August 28, 2014 VII - 5

2015 2016 2017 2018 2019 2020

UT A 2013

Replace, Rehabilitate and Purchase

Buses and Related Equipment and to

Construct Bus-Related Facilities

5339 Bus & Bus

Facilities 29,261,881 5,852,376 3,066,157 3,118,282 3,329,857 3,386,465 3,444,035 3,502,583 3,562,127

UT A 2001

Purchase 234 Replacement Clean Fuel

Buses and Related Equipment: Approx.

33 Buses Per Year

Local Funds 171,414,846 34,282,969 9,297,566 12,651,490 26,065,354 18,778,776 27,726,127 20,238,440 22,374,124

UT A 2001

Replace 202 Paratransit Vehicles and

Related Equipment: Approx. 29

Vehicles Per Year

Local Funds 46,073,728 9,214,746 3,489,216 4,648,254 5,292,112 5,474,040 5,902,130 6,115,850 5,937,380

29,261,881 5,852,376 3,066,157 3,118,282 3,329,857 3,386,465 3,444,035 3,502,583 3,562,127

SALT LAKE/WEST VALLEY – O GDEN/ LAYTO N TRANSPO RTATIO N IMPRO VEMENT PRO GRAM

PUBLIC TRANSIT PRO GRAM

SponsorEstimated Total

Project Cost

Local Share of

Project

5339 Funds

Obligated in FY

2014

Estimated Federal Share and Phasing

CAPITAL INVESTMENT PROGRAM - SECTION 5339 BUS & BUS FACILITIES

TO TAL: SALT LAKE/WEST VALLEY and O GDEN/ LAYTO N URBANIZED

AREAS CAPITAL INVESTMENT PRO GRAM - SECTIO N 5339 BUS & BUS

FACILITIES

Year Added to

TIPProject Descript ion

Fund Source

(FTA Section)

2015 2016 2017 2018 2019 2020

4,475,327 895,065 481,588 491,220 501,044 511,065 521,286 531,712 542,346

2,195,307 439,061 236,236 240,961 245,780 250,696 255,709 260,824 266,040

5,867,304 1,173,461 631,378 644,006 656,886 670,023 683,424 697,092 711,034

3,246,626 649,325 349,368 356,355 363,482 370,752 378,167 385,731 393,445

4,475,327 895,065 481,588 491,220 501,044 511,065 521,286 531,712 542,346

TO TAL: SALT LAKE/WEST VALLEY and O GDEN/ LAYTON URBANIZED

AREAS CAPITAL INVESTMENT PRO GRAM - SECTIO N 5339 BUS & BUS

FACILITIES

Statewide or Non-UZA

Non-WFRC UZA's

Salt Lake City / West Valley City UZA

Ogden / Layton UZA

Purchase Buses,

Vans, and

Related Equip.

For Seniors and

Persons with

Disabilities; and

other eligible

operating /

mobility mgmt..

Expenses

SALT LAKE/WEST VALLEY – O GDEN/ LAYTO N TRANSPO RTATIO N IMPRO VEMENT PRO GRAM

ENHANCED MOBILITY OF SENIORS AND INDIVIDUALS WITH DISABILITIES - SECTION 5310

PUBLIC TRANSIT PRO GRAM

SponsorYear Added to

T IPProject Description

Fund Source

(FT A Section)

Estimated T otal

Project Cost

Local Share of

Project

5310` Funds

Obligated in FY

2014

Estimated Federal Share and Phasing

Page 22: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

2015 – 2020 Transportation Improvement Program (TIP)

VII - 6 Approved by the WFRC on August 28, 2014 | Wasatch Front Regional Council

2015 2016 2017 2018 2019 2020

UTA NAPark and Ride Lots: Property

Acquisit ion, Design and Construct ion5309 Bus 6,380,000 1,740,000 2,320,000 2,320,000

UTA 2004 ITS/ APTS Deployment 5309 Bus 5,000,000 1,000,000 2,000,000 2,000,000

UTA 2010Transit Oriented Development

Projects

5309 Livability

and Local 12,000,000 6,000,000 2,000,000 2,000,000 2,000,000

5309 SGR 4,448,000

TIGER VI 7,500,000 7,500,000

STP 3,000,000

CMAQ 950,000

160,940,028 35,787,970 19,935,472 13,375,000 - - 2,000,000 6,320,000 6,320,000

(Fiscal Year)SponsorYear Added to

TIPProject Description

Fund Source

(FTA Sec)

Estimated Total

Project Cost

Local Share of

ProjectPast Federal Funds

TO TAL: SALT LAKE/WEST VALLEY and OGDEN/ LAYTON URBANIZED

AREAS CAPITAL INVESTMENT PROGRAM - DISCRETIONARY GRANTS

SALT LAKE/WEST VALLEY – O GDEN/ LAYTO N TRANSPO RTATIO N IMPROVEMENT PRO GRAM

PUBLIC TRANSIT PRO GRAM

CAPITAL INVESTMENT PROGRAM - DISCRETIONARY GRANTS

Estimated Federal Funding and Phasing

51,879,986 UTA 2011

Central Garage: Design and

Construction (Including CNG Fueling

Facility)

75,277,986

Page 23: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

2015 – 2020 Transportation Improvement Program (TIP)

Wasatch Front Regional Council | Approved by the WFRC on August 28, 2014 VII - 7

2015 2016 2017 2018 2019 2020

UT AOgden Intermodal Terminal to Weber

State University Corridor 150,000,000 75,000,000 40,000,000 35,000,000

UT ADraper to Utah County Light Rail

(12400 So. to 14600 So.: Phase II) 470,500,000 94,100,000 376,400,000

UT APleasant View to Brigham City Transit

Improvement 100,000,000 20,000,000 80,000,000

UT APleasant View to Brigham City

Corridor Preservation 14.7 miles 17,500,000 3,500,000 14,000,000

UT AMountain View Corridor Transit

Improvement (5600 West BRT) 167,000,000 33,400,000 20,000,000 6,000,000 60,000,000 35,000,000 12,600,000

UT A9400 South East-West Transit

Improvements 2,000,000 400,000 1,600,000

UT A3500 South Bus Rapid Transit (BRT)

Phase III 12,000,000 2,400,000 3,200,000 3,200,000 3,200,000

UT A

Clean Fuels Bus Program (Hybrid

Electric) or CNG Replacement Buses

and Related Equipment

30,386,904 6,077,381 7,787,520 8,099,021 8,422,982

UT ATaylorsville / Murray Transit

Improvements 52,000,000 26,000,000 26,000,000

UT ATransit Oriented Development

Implementation 31,250,000 6,250,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000

UT A Intelligent Transportation Systems 30,000,000 6,000,000 8,000,000 8,000,000 8,000,000

UTA/CountyMountain Transportation

Improvements 750,000,000 150,000,000 200,000,000 200,000,000 200,000,000

Sponsor

SALT LAKE/WEST VALLEY – O GDEN/ LAYTO N TRANSPO RTATIO N IMPRO VEMENT PRO GRAM

- ILLUSTRATIVE PRO JECTS - PUBLIC TRANSIT PRO GRAM

Estimated Federal Funding and Phasing

(Fiscal Year)Estimated Total

Project Cost

Local Share of

ProjectProject Description

Page 24: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

2015 – 2020 Transportation Improvement Program (TIP)

VII - 8 Approved by the WFRC on August 28, 2014 | Wasatch Front Regional Council

2015 2016 2017 2018 2019 2020

UTA Foothill Drive BRT Study 250,000 50,000 200,000

UTA/Cities Sugar House Streetcar Extension Study 500,000 100,000 400,000

UTA/CitySalt Lake City Downtown Circulator

Study 500,000 100,000 400,000

UTACapacitors on LRT lines to store/use

energy from regenerative braking 2,000,000 400,000 1,600,000

UTAElectric Charging Stations at two Park

and Ride Lots 312,500 62,500 50,000 100,000 100,000

UTA Sandy/South Jordan Circulator 70,000,000 14,000,000 6,000,000 25,000,000 25,000,000

UTA Clearfield Circulators 3,000,000 600,000 2,400,000

UTA South Davis Transit Implementation 80,000,000 16,000,000 4,000,000 30,000,000 30,000,000

Sponsor Project DescriptionEstimated Total

Project Cost

Local Share of

Project

Estimated Federal Funding and Phasing

(Fiscal Year)

SALT LAKE/WEST VALLEY – O GDEN/ LAYTO N TRANSPO RTATIO N IMPROVEMENT PRO GRAM

- ILLUSTRATIVE PRO JECTS - PUBLIC TRANSIT PROGRAM

Page 25: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 3 of 217

10491

10811

10941

12389

11476

12623

8131

8618

PIN

S-I15-8(151)349

F-I15-8(152)374

S-I15-8(148)362

S-0102(10)8

F-0240(2)0

F-1104(1)4

F-R199(65)

F-LC03(15)

Project No.

I-15, 2700 N (Farr West) to 1100 S (Brigham City)

I-15 OVER BEAR RIVER; STRUCTURE F-2 MP 374

I-15; SR-91 (1100 South) Interchange

SR-102; Bridge over West Canal, D-820

I-15; Honeyville Interchange, F-24

Corinne Canal Bridge, Box Elder Co., 003025D

Iowa String Road (6800 W.); Jct. SR-83 to 6800 N.

MALAD RIVER BRIDGE

PIN Description / Project Location

New Construction

Structure Rehabilitation

Reconstruct widening

New Bridge/Bridge Replacement

Replacement and Rehabilitation - Structure

New Bridge/Bridge Replacement

ASPHALT OVERLAY

Bridge Rehabilitation

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

15

15

102

240

1104

MULT

MULT

350

374

362

8

4

Beg Len

12

1

Prior

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

$668,966

$3,344,959

$8,359,614

$1,375,000

Total

Total

Total

Total

$3,387,475

$155,974

$1,911,742

$7,256

$64,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$68,056,441

$3,500,933

$10,271,356

$1,382,256

$0

$3,028,110

$0

$1,100,000

$68,056,441

$472,823

$10,271,356

$0

$0

$0

$0

$282,256

Box Elder County Projects

ST_TIFST_TIF_SB229ST_CONCPT_D1

NHPP_BRST_BRIDGE

ST_TIF_HB377ST_GF_HB173

ST_BRIDGE

NHPP_BR

STP_BR

STP_RURAL

BR_OFFL_BETTERMENT

$3,387,475 $0 $0

$155,974 $0

$0 $1,911,742

$0

$0

$0

$490,913

$0 $7,256

$64,000,000 $0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0 $0

$0 $0 $0

$0 $0

$0 $0

$310,000

$4,500,000

$410,000

$0

$0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0 $0

$68,000,000 $0

$56,441

$3,248,000 $252,933

$1,271,356 $9,000,000

$310,000

$4,500,000

$410,000

$2,145,232

$1,375,000 $7,256

$0 $0 $0

$3,028,110 $0

$0 $0

$0

$4,195,350

$382,243

$2,000,000

$1,100,000 $0

$68,000,000 $0

$56,441

$219,890 $252,933

$1,271,356 $9,000,000

$310,000

$304,650

$27,757

$0

$0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0

$145,232

$275,000 $7,256

$612,525 $0

$56,441

$3,092,026 $252,933

$1,271,356 $7,088,258

$0

$0

$0

$1,654,319

$1,375,000 $0

Region

Active

Subst Comp

Subst Comp

STIP

Scoping

STIP

Cntrl Rev

Contr Clsd

04/20/13

08/17/13

05/25/13

04/20/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

I-15; MP 349.74 - 362.02

I-15; MP 374.01 - 374.01 & I-15 over Bear River, structure F-2

I-15; MP 361.50 - 362.50

SR-102; MP 8.08 - 8.19

SR-240; MP .04 - .17

Cnty:FA-1104; MP 4.49 - 4.63

IOWA STRING ROAD (6800 W.); From Jct. SR-83 TO 6800 NORTH

MALAD RIVER BRIDGE

Page 26: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 4 of 217

9984

7146

11991

5599

10031

5599

8073

8074

PIN

F-LC03(16)

F-LC03(17)

F-LC03(18)

S-0013(40)8

F-0013(39)5

S-I15-8(149)388

F-I15-8(128)352

F-I15-8(140)385

Project No.

1000 North: 2300 West to I-15

STONE ROAD, SNOWVILLE

1100 West & SR-91

SR-13; UPRR Property Purchase

SR-13; I-15 to Bear River

I-15 Detention Pond Restoration, Riverside

I-15; SR-126 TO SR-91

I-15; SR-30 to Idaho State Line

PIN Description / Project Location

Small Urban

Non-Urban

Intersection Modification

ROW

Minor Rehabilitation - Roadway

Contingency Funds

CONCRETE REHABILITATION

Minor Rehabilitation - Roadway

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

OTHER

13

13

15

15

15

8

5

388

352

385

Beg Len

2

10

16

Prior

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

$305,500

$1,466,100

$1,085,698

$11,490,465

Total

Total

Total

Total

$767,116

$142,824

$614,302

$3,009,535

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,072,616

$1,608,924

$1,700,000

$14,500,000

$1,000,000

$1,500,000

$1,584,910

$13,585,200

$0

$0

$115,090

$914,800

$72,616

$108,924

$0

$0

Box Elder County Projects

STP_SU_JHCLOCAL_GOVT

LOCAL_INKINDLOCAL_GOVTSTP_RURAL

STP_URB_O/L

ST_CONT_R1

EQ_BONUS(MG)STP_FLX_ST

ST_CONT_R1

IM

NHPP_IMSTP_ENH_STIM

$767,116 $0

$62,807 $46,117 $33,900

$10,726

$0

$113,082 $501,220

$35

$0

$3,009,535 $0 $0

$0 $0

$0 $0 $0

$311,059

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0

$0 $0 $0

$1,287,139

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$1,072,616 $0

$62,807 $46,117

$1,500,000

$1,608,924

$37,000

$1,152,450 $547,550

$7,000

$14,103,455

$13,900,000 $500,000 $100,000

$1,000,000 $0

$0 $0

$1,500,000

$1,500,000

$0

$1,074,429 $510,481

$0

$13,282,634

$13,091,020 $400,000

$94,180

$0 $0

$0 $0 $0

$0

$37,000

$78,021 $37,069

$7,000

$820,821

$808,980 $100,000

$5,820

$72,616 $0

$62,807 $46,117

$0

$108,924

$0

$0 $0

$0

$0

$0 $0 $0

$305,500 $0

$0 $0

$1,466,100

$0

$37,000

$1,039,368 $46,330

$6,965

$14,103,455

$10,890,465 $500,000 $100,000

Region

Active

Closeout

STIP

Active

Undr Const

Closeout

Closeout

Closeout

05/18/13

03/15/14

10/14/10

02/16/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11668

10701

11247

8502

9567

Other: 1000 NORTH TREMONTON to: 1.82 for: 1.82

STONE ROAD, SNOWVILLE

1100 West & SR-91

SR-13; MP 8.35 - 8.38

SR-13; MP 5.45 - 7.03

I-15; MP 388.25 - 388.50

I-15; SR-126 TO SR-91

State Route: I-15 from: 384.88 to: 400.59 for: 15.71

Page 27: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 5 of 217

5599

5775

5930

5775

8072

5599

5599

10032

6064

PIN

S-0030(56)93

S-0030(58)92

S-0030(55)6

S-0038(4)8

F-R199(135)

S-R199(112)

S-0091(49)3

F-0091(58)2

F-0102(6)16

Project No.

SR-30; Saferty Improvements at Bear Hollow Dev.

SR-30; MP 91.9, Intersection Improvements

SR-30; Safety Improvements at MP 6

SR-38; Turn Lanes (MP 8.29)

SR-90; Microsurface, Box Elder County

Intersection Modeling, 1100 South Brigham City

US-91, Gravel Pit Traffic Study, Brigham City

SR-91; SR-13 to SR-90

SR-102, MAIN STREET RR CROSSING IMPROVEMENT

PIN Description / Project Location

Contingency Funds

Intersection Improvements

Spot improvement

Spot Safety

Preservation - Roadway

Study

Roadside Improvements

Preservation - Roadway

Railway-Highway Grade Crossing

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

30

30

30

38

90

91

91

91

102

93

92

6

8

1

3

2

16

Beg Len

1

1

1

2

4

2

Prior

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

$436,311

$827,670

Total

Total

$0

$38,314

$0

$0

$0

$0

$0

$0

$0

$0

$436,311

$865,984

$406,773

$704,804

$29,538

$161,180

$0

$0

Box Elder County Projects

ST_CONT_R1

ST_SPOT_SFTY

ST_SPOT_MNT

ST_SPOT_SFTY

STP_FLX_STEQ_BONUS(MG)

ST_CONT_R1

ST_CONT_R1

NHPP_NHS

R/H_DEVICESST_SPOT_SFTY

$0

$125,000

$66,000

$69,022

$0 $0

$20,500

$0

$888,000

$32,895 $5,419

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$90,000

$125,000

$66,000

$366,299

$431,311 $5,000

$25,000

$30,000

$900,000

$755,984 $110,000

$0

$0

$0

$0

$402,111 $4,662

$0

$0

$839,070

$704,804 $0

$90,000

$125,000

$66,000

$366,299

$29,200 $339

$25,000

$30,000

$60,930

$51,180 $110,000

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$90,000

$0

$0

$297,277

$431,311 $5,000

$4,500

$30,000

$12,000

$723,089 $104,581

Region

Scoping

Scoping

Scoping

Phys Compl

Closeout

Active

Active

Scoping

Closeout

05/31/14

06/22/13

01/28/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12737

12178

12843

11387

11297

10541

11259

12258

8527

SR-30; MP 93.10 - 93.80

SR-30; MP 91.90 - 91.90

SR-30; MP 6.00 - 6.15

SR-38; MP 8.04 - 8.54

SR-90; MP .00 - 1.18

US-91, I-15 to US-89

US-91; MP 3.00 - 7.00

US-91; MP 1.97 - 3.68

SR-102, MAIN STREET RAILROAD CROSSING IMPROVEMENT, TREMONTON

Page 28: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 6 of 217

5599

6019

8072

10032

11903

12132

12132

5599

PIN

S-I84-5(48)20

F-I15-8(153)379

F-R199(136)

F-0038(3)0

F-0083(4)23

F-I84-6(122)8

F-R199(181)

S-R199(178)

Project No.

I-84;Delineation and Shoulder Improvements

I-15; Median Cable Barrier (MP 378.9-400.6) FFY14

I-15, I-84; Crack Sealing, Box Elder County

SR-38; SR-13 to SR-30

SR-83; Culvert MP 19.37 and 23.25

I-84; E. Snowville to Hansel Valley

SR-83, SR-102; Various Locations Box Elder County

Box Elder County Speed Trailer

PIN Description / Project Location

Contingency Funds

Barrier - T/S

Preservation - Roadway

Preservation - Roadway

Drainage - Maint

Preservation - Roadway

Preservation - Roadway

Reimbursement/Settlement

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

MULT

MULT

MULT

Beg Len

Prior

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

BOX EL

$1,018,865

$614,406

$1,691,820

$0

Total

Total

Total

Total

$35,000

$0

$648,180

$2,125,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,053,865

$614,406

$2,340,000

$2,125,000

$949,888

$578,648

$2,181,582

$1,543,162

$103,977

$35,758

$158,418

$581,838

$0

$0

$0

$0

Box Elder County Projects

ST_CONT_R1

ST_SPOT_MNTSEC164_HSIPHSIP

IMNHPP_IM

EQ_BONUS(MG)STP_FLX_ST

STP_FLX_ST

NHPP_IM

ST_PVMTSTP_FLX_ST

ST_CONT_R1

$1,068

$35,000 $0 $0

$0 $0

$0 $648,180

$480,000

$3,500,000

$469,780 $1,655,220

$5,100

$0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0

$10,000

$35,000 $948,484

$70,381

$610,406 $4,000

$1,504,589 $835,411

$500,000

$3,500,000

$469,780 $1,655,220

$5,100

$0

$0 $884,272

$65,616

$574,880 $3,767

$1,402,728 $778,854

$466,150

$3,296,300

$0 $1,543,162

$0

$10,000

$35,000 $64,212 $4,765

$35,526 $233

$101,861 $56,557

$33,850

$203,700

$469,780 $112,058

$5,100

$0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0

$8,932

$0 $948,484

$70,381

$610,406 $4,000

$1,504,589 $187,231

$20,000

$0

$0 $0

$0

Region

Closeout

Subst Comp

Closeout

Phys Compl

Scoping

STIP

STIP

Scoping

04/19/14

04/06/13

05/31/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11621

11381

11291

11783

12322

12259

12262

13054

I-84; MP 24.00 - 32.00 & I-84; MP 24.00 - 32.00 & I-84; MP 20.00 - 42.00 & I-84; MP 20.00 - 42.00

I-15; MP 378.90 - 400.59 & I-15; MP 378.90 - 400.59

I-84; MP 40.82 - 41.70 & I-84; MP 7.13 - 18.27 & I-15; MP 365.50 - 380.00

SR-38; MP .00 - 18.95 & SR-102; MP 17.52 - 20.07

SR-83; MP 23.20 - 23.30 & SR-83; MP 19.36 - 19.39

I-84; MP 8.01 - 15.83 & I-84; MP 8.01 - 15.83

SR-83; MP .00 - 14.03 & SR-102; MP 9.44 - 14.00

Equipment to by Used in Box Elder County

Page 29: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 16 of 217

6465

8836

10942

10944

11092

11275

PIN

S-0105(5)0

F-I15-8(134)336

S-I15-7(299)331

F-I15-7(301)313

F-I15-7(309)318

F-I15-7(320)329

Project No.

PARRISH LANE RAILROAD BRIDGE CROSSING

SR-103 TO SR-97 - *ROW*

I-15; Interchange Modifications (Layton Area)

I-15; South Davis Operational Upgrades

650 North & I-15 Interchange/Intersection

I-15; SR-273 to Layton Pkwy (NB)

PIN Description / Project Location

Bridge Rehabilitation

ADD AUXILIARY LANE

Reconstruct widening

New Construction

Intersection Improvements

Choke Point

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

15

15

15

15

15

319

336

331

313

318

329

Beg Len

3

3

28

1

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$0

$36,794,479

Total

Total

$21,032,000

$90,604,277

$0

$0

$0

$0

$0

$0

$0

$0

$21,032,000

$127,398,756

$0

$61,825,346

$21,032,000

$64,215,451

$0

$1,357,959

Davis County Projects

ST_GF_HCP

EM_2008_129

ST_GF_CHNST_GF_TIFST_GF_HB173ST_CHF_TIFST_TIFST_TIF_HB377

STP_FLX_STST_TIF_SB229ST_BRIDGEST_GF_HB173ST_RET_ROWST_SIGNALSCMAQ_WFRCNHPP_BRNHPP_NHSSTP_URB_O/LL_BETTERMENTNHPP_IM

CMAQ_WFRC

NHPP_IM

$705,980

$0

$0 $0 $0 $0

$21,032,000 $0

$0 $48,765,831

$909,000 $0 $0

$90,000 $3,334,506

$11,291,000 $1,465,000

$18,705,352 $1,343,588 $4,700,000

$10,726

$100,000

$0

$0

$0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$2,359,755

$6,000,000

$0

$0

$0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$675,748

$0

$0

$0

$0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0

$0

$0

$0

$0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0

$0

$8,000,000

$463,424

$0 $0 $0 $0

$21,032,000 $0

$243,981 $51,231,018

$909,000 $6,996,246

$567,132 $90,000

$6,563,080 $19,091,000 $9,240,000

$24,488,897 $1,357,959 $6,620,443

$3,046,229

$6,100,000

$0

$463,424

$0 $0 $0 $0 $0 $0

$227,464 $0 $0 $0 $0 $0

$6,118,759 $17,798,539 $8,614,452

$22,830,999 $0

$6,235,133

$2,839,999

$5,744,980

$8,000,000

$0

$0 $0 $0 $0

$21,032,000 $0

$16,518 $51,231,018

$909,000 $6,996,246

$567,132 $90,000

$444,321 $1,292,461

$625,548 $1,657,898

$0 $385,310

$206,230

$355,020

$0

$0

$0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$1,357,959 $0

$0

$0

$7,294,020

$463,424

$0 $0 $0 $0 $0 $0

$243,981 $2,465,187

$0 $6,996,246

$567,132 $0

$3,228,574 $7,800,000 $7,775,000 $5,783,545

$14,371 $1,920,443

$0

$0

Region

Undr Const

Closeout

Active

Undr Const

STIP

STIP

05/12/08

09/12/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv.Const

PARRISH LANE RAILROAD BRIDGE CROSSING

SR-103 TO SR-97

I-15; MP 331.00 - 333.50

I-15; MP 313.00 - 340.50

I-15; MP 317.55 - 317.55

I-15; MP 328.68 - 329.96

Page 30: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 17 of 217

12064

12656

6552

1793

4178

8143

4278

PIN

S-I15-7(318)323

F-I15-7(325)327

F-0037(4)0

SP-0067(1)0

STP-0068(16)68

F-LC11(43)

SP-0089(98)334

Project No.

I-15; Farmington Choke Point Environmental

I-15; NB Aux Lane Rest Area to 200 N., Kaysville

1800 NO. (SR-37) 2000 W, to I-15 Enviro. Study

Legacy Parkway Project - *ROW*

500 S; 1100 West to I-15, South side

1500 SOUTH & REDWOOD RD INTERSECTION

US-89 Corridor Preservation

PIN Description / Project Location

Adding a lane/shoulder

Adding a lane/shoulder

ENVIRONMENTAL DOCUMENT

MIS, EIS, GEO TECH & CONSTRUCTION

Road Widen to Five Lanes

INTERSECTION IMPROVEMENTS & SIGNAL INSTALLATION

Purchace Parcels in advance of project activity

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

15

37

67

68

68

89

323

327

68

67

398

Beg Len

1

2

2

14

1

11

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$1,789,200

$14,355,042

$1,312,278

$5,757,916

Total

Total

Total

Total

$587,138

$498,602

$2,064

$3,760,247

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,376,338

$14,853,643

$1,314,342

$9,518,163

$2,200,000

$8,766,402

$1,118,999

$0

$176,338

$5,542,582

$114,086

$9,518,163

$0

$544,660

$81,257

$0

Davis County Projects

ST_CONT_R1

NHPP_IM

STP_URB_O/LST_CONCPT_D1

ST_CHF

ST_GF_CHNL_BETTERMENTST_SIGNALSSTP_URB_O/LEQ_BONUS(MG)

STP_URB_O/LST_SIGNALSST_INELIGIBL

ST_CONT_R1ST_CORR_PRES

$10,000

$0

$587,138 $0

$0

$493,634 $4,968

$0 $0 $0

$0 $1,968

$97

$1,000 $3,759,247

$0

$0

$0 $0

$0

$0 $0 $0 $0 $0

$0 $0 $0

$0 $0

$0

$5,000,000

$0 $0

$0

$0 $0 $0 $0 $0

$0 $0 $0

$0 $0

$0

$0

$0 $0

$0

$0 $0 $0 $0 $0

$0 $0 $0

$0 $0

$0

$0

$0 $0

$0

$0 $0 $0 $0 $0

$0 $0 $0

$0 $0

$10,000

$5,000,000

$2,359,755 $16,583

$391,965,504

$4,706,000 $544,660 $200,000

$7,828,983 $1,574,001

$1,200,257 $113,217

$869

$1,000 $9,517,163

$0

$4,709,000

$2,200,000 $0

$0

$0 $0 $0

$7,298,961 $1,467,441

$1,118,999 $0 $0

$0 $0

$10,000

$291,000

$159,755 $16,583

$391,965,504

$4,706,000 $0

$200,000 $530,022 $106,560

$0 $113,217

$869

$1,000 $9,517,163

$0

$0

$0 $0

$0

$0 $544,660

$0 $0 $0

$81,257 $0 $0

$0 $0

$0

$0

$1,772,617 $16,583

$391,965,504

$4,212,366 $539,692 $200,000

$7,828,983 $1,574,001

$1,200,257 $111,249

$772

$0 $5,757,916

Region

Scoping

STIP

Active

Phys Compl

Closeout

Closeout

Active

05/10/03

03/09/10

07/07/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

I-15; MP 322.60 - 323.80

I-15; MP 326.61 - 328.35

SR-37; MP .00 - 2.00

LEGACY PARKWAY

500 S; 1100 West to I-15, West Bountiful

1500 SOUTH & REDWOOD RD INTERSECTION

US-89; MP 397.55 - 408.38

Page 31: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 18 of 217

9990

10021

11777

13120

10706

7194

12666

PIN

F-0089(280)404

F-LC11(48)

S-0089(340)402

F-LC11(59)

F-0103(2)0

F-0106(11)3

F-0107(11)4

Project No.

US-89; SR-193 to Cornia Drive (NB)

Fruit Heights / Kaysville 400/200 North

US-89; Antelope Dr. Intersection Improvements

Nicholls Road / US-89 Grade Searation

SR-103; SR-126 to I-15

SR-106; MAIN STREET & PARRISH LANE

SR-107; Bridge Rehab (0F-330), Clearfield

PIN Description / Project Location

Choke Point

UTA/Transit

New Construction

PE

Intersection Modification

INTERSECTION IMPROVEMENT

Minor Rehabilitation - Structure

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

89

89

89

89

103

106

107

404

340

403

399

3

4

Beg Len

1

1

1

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$4,719,590

$9,130,000

$1,716,166

$200,000

Total

Total

Total

Total

$1,780,410

$6,650,000

$166,503

$1,100,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$6,500,000

$15,780,000

$1,882,669

$1,300,000

$6,059,950

$0

$1,197,876

$745,840

$440,050

$15,780,000

$576,116

$554,160

$0

$0

$108,677

$0

Davis County Projects

NHSNHPP_NHS

CMAQ_WFRC

ST_SPOT_SFTYST_TIF_HB377ST_GF_TIF

STP_URB_O/L

STP_FLX_ST

ST_SIGNALSL_BETTERMENTST_CONT_R1CMAQ_WFRCST_CONCPT_D1

EQ_BONUS(MG)STP_FLX_STST_HWY_TRNSF

$0 $1,780,410

$10,726

$0 $6,650,000

$0

$0

$0

$166,503 $0 $0 $0 $0

$10,000 $590,000 $500,000

$0 $0

$0

$0 $0 $0

$0

$0

$0 $0 $0 $0 $0

$0 $0 $0

$0 $0

$789,982

$0 $0 $0

$0

$4,300,000

$0 $0 $0 $0 $0

$0 $0 $0

$0 $0

$0

$0 $0 $0

$0

$0

$0 $0 $0 $0 $0

$0 $0 $0

$0 $0

$521,828

$0 $0 $0

$1,081,100

$0

$0 $0 $0 $0 $0

$0 $0 $0

$400,000 $6,100,000

$1,322,536

$30,000 $14,750,000 $1,000,000

$1,081,100

$4,300,000

$350,000 $21,692

$150,000 $1,284,861

$76,116

$210,000 $590,000 $500,000

$372,920 $5,687,030

$1,233,000

$0 $0 $0

$1,007,910

$4,008,890

$0 $0 $0

$1,197,876 $0

$195,783 $550,057

$0

$27,080 $412,970

$0

$30,000 $14,750,000 $1,000,000

$0

$291,110

$350,000 $0

$150,000 $0

$76,116

$14,217 $39,943

$500,000

$0 $0

$89,536

$0 $0 $0

$73,190

$0

$0 $21,692

$0 $86,985

$0

$0 $0 $0

$400,000 $4,319,590

$0

$30,000 $8,100,000 $1,000,000

$0

$0

$183,497 $21,692

$150,000 $1,284,861

$76,116

$200,000 $0 $0

Region

Phys Compl

Scoping

Undr Const

STIP

STIP

Undr Const

Scoping

04/05/14

04/19/14

03/22/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

State Route: US-89 from: 404.30 to: 405.70 for: 1.40

State Route: US-89 from: 340.00 to: 340.10 for: .10

US-89; MP 402.70 - 403.90

US-89; MP 398.50 - 398.90

SR-103; MP .00 to MP .17

SR-106: MAIN STREET & PARRISH LANE

SR-107; MP 4.00 - 4.40

Page 32: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 19 of 217

4745

11477

11945

11158

8021

11946

PIN

STP-0108(13)4E

S-0108(33)4

S-0108(31)0

F-0126(24)0

S-0193(6)0

S-0232(8)0

Project No.

SR-108; from SR-127 to SR-126 on the North

SR-108; SR-127 to SR-107

SR-108; Antelope Inter. Modification Construction

SR-126; Historic Train Station Parking, Layton

SR-193 EXTENSION, 2000 WEST TO 1-15, DAVIS COUNTY

SR-232; Hill Field Rd. Inter. Mod. Construction

PIN Description / Project Location

Preliminary Engineering

Reconstruct widening

Intersection Modification

Other - Enhancement Project

ROADWAY CONSTRUCTION

Intersection Modification

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

108

108

108

126

193

232

4

4

Beg Len

10

2

1

3

1

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$2,677,513

$10,103

$1,085,760

$408,087

$55,375,911

$807,731

Total

Total

Total

Total

Total

Total

$609,449

$0

$6,830,158

$55,785

$3,173,850

$2,192,269

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$50,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$3,286,962

$50,010,103

$7,915,918

$463,872

$58,549,762

$3,000,000

$3,181,725

$0

$0

$260,000

$0

$0

$105,237

$50,010,103

$7,750,000

$203,872

$56,475,938

$3,000,000

$0

$0

$165,918

$0

$2,073,823

$0

Davis County Projects

STP_URB_O/LEM_2006_112STP_FLX_ST

ST_TIFST_TIF_SB229ST_CONCPT_D1

ST_GF_HB173L_BETTERMENTST_TIFST_TIF_HB377ST_BRIDGE

ST_GF_CHNSTP_ENH_ST

L_CORR_DAVISST_CONSTL_CORR_MATCHST_GF_CHNL_BETTERMENT

ST_TIF_HB377ST_GF_HB173

$609,449 $0 $0

$0 $0 $0

$2,500,000 $0

$400,000 $3,930,158

$0

$48,285 $7,500

$626,059 $1,200,000

$0 $1,244,749

$103,043

$0 $2,192,269

$0 $0 $0

$0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0

$50,000,000 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0

$0 $0

$804,462 $1,732,500

$750,000

$50,000,000 $0

$10,103

$2,500,000 $165,918 $400,000

$4,600,000 $250,000

$138,872 $325,000

$1,300,000 $1,200,000

$670,781 $55,275,938

$103,043

$400,000 $2,600,000

$750,000 $1,732,500

$699,225

$0 $0 $0

$0 $0 $0 $0 $0

$0 $260,000

$0 $0 $0 $0 $0

$0 $0

$54,462 $0

$50,775

$50,000,000 $0

$10,103

$2,500,000 $0

$400,000 $4,600,000

$250,000

$138,872 $65,000

$0 $1,200,000

$0 $55,275,938

$0

$400,000 $2,600,000

$0 $0 $0

$0 $0 $0

$0 $165,918

$0 $0 $0

$0 $0

$1,300,000 $0

$670,781 $0

$103,043

$0 $0

$195,013 $1,732,500

$750,000

$0 $0

$10,103

$0 $165,918

$0 $669,842 $250,000

$90,587 $317,500

$673,941 $0

$670,781 $54,031,189

$0

$400,000 $407,731

Region

Subst Comp

STIP

Advertised

Reg Rev

Subst Comp

Scoping

05/24/14

06/08/13

02/26/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

SR-108; from SR-127 to SR-126 on the North

SR-108; MP 4.01 - 6.00

SR-108; MP .00 - .80

SR-126; MP .33 - .58

SR-193 EXTENSION, 2000 WEST TO I-15, DAVIS COUNTY

SR-232; MP .00 - .75

Page 33: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 20 of 217

10013

10015

8551

4184

7196

10017

11225

PIN

S-1386(1)0

F-1410(2)0

F-LC11(42)

S-15-8(211)332

F-LC57(20)

S-LC11(47)

S-I15-7(312)312

Project No.

1100 North Street: Redwood Road to 110 East

1500 South Ph II; Redwood Rd (SR-68) to 1450 West

200 NORTH; 900 WEST TO FLINT STREET

I-15; South Layton Interchange

800 NORTH; 1000 WEST TO 2000 WEST

3000 West; 300 North to 1300 North

I-15; Program Management, S. Davis Co. OP Upgrades

PIN Description / Project Location

Reconstruct widening

Reconstruct widening

RECONSTRUCT

Interchange - New Construction

INTERSECTION IMPROVEMENTS & ROADWAY RECONSTRUCTION

Reconstruct widening

PE

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

1386

1410

1512

MULT

MULT

MULT

MULT

Beg Len

1

1

1

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$319,444

$92,046,095

$5,260,119

$1,704

$4,012,411

Total

Total

Total

Total

Total

$4,815,756

$3,116,588

$959,579

$3,122,131

$1,462,589

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$5,135,200

$95,162,683

$6,219,698

$3,123,835

$5,475,000

$0

$0

$5,662,000

$0

$0

$2,135,200

$93,999,755

$37,622

$2,839,850

$5,475,000

$3,000,000

$1,162,928

$520,076

$283,985

$0

Davis County Projects

ST_TIF_EXCHLOCAL_GOVT

STP_URB_O/L

STP_URB_O/L

L_BETTERMENTST_GF_CHN

STP_URB_O/LLOCAL_INKINDST_CONCPT_D1ST_CONT_PGLOCAL_GOVT

ST_EXCHANGESTP_URB_O/LLOCAL_GOVT

ST_TIF_SB229ST_CONT_R1

$1,827,458 $2,988,299

$0

$50,055

$0 $3,116,588

$650,135 $70,854

$0 $0

$238,589

$2,839,850 $0

$282,281

$1,462,589 $0

$0 $0

$0

$0

$0 $0

$0 $0 $0 $0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0 $0 $0 $0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0 $0 $0 $0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0 $0 $0 $0 $0

$0 $0 $0

$0 $0

$2,135,200 $3,000,000

$2,429,000

$2,925,024

$1,162,928 $93,999,755

$5,662,000 $70,854 $2,622

$35,000 $449,222

$2,839,850 $0

$283,985

$5,450,000 $25,000

$0 $0

$2,264,557

$2,727,000

$0 $0

$5,662,000 $0 $0 $0 $0

$0 $0 $0

$0 $0

$2,135,200 $0

$0

$0

$0 $93,999,755

$0 $0

$2,622 $35,000

$0

$2,839,850 $0 $0

$5,450,000 $25,000

$0 $3,000,000

$164,443

$198,024

$1,162,928 $0

$0 $70,854

$0 $0

$449,222

$0 $0

$283,985

$0 $0

$307,742 $11,701

$2,429,000

$2,874,969

$1,162,928 $90,883,167

$5,011,865 $0

$2,622 $35,000

$210,633

$0 $0

$1,704

$3,987,411 $25,000

Region

Active

Cntrl Rev

Undr Const

Closeout

Closeout

Scoping

Active

04/27/13

05/03/14

03/28/09

03/17/11

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Other: 1100 NORTH IN NO. SALT LAKE to: 1.00 for: 1.00

Other: 1500 SO. SR-68 TO 1450 WEST to: .50 for: .50

200 NORTH; 900 WEST TO FLINT STREET

I-15; South Layton Interchange

800 NORTH; 1000 WEST TO 2000 WEST

Other: 3000 WEST; 300 NO. TO 1300 NO. to: 1.20 for: 1.20

I-15; MP 312.32 - 340.94 & I-15; MP 312.32 - 340.94

Page 34: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 21 of 217

11383

11623

11771

12056

7176

7318

8137

8591

PIN

F-I215(167)28

S-R199(144)

S-R199(151)

F-I215(173)28

S-0067(14)0

S-R199(50)

F-R199(68)

F-LC11(49)

Project No.

I-215; Barrier Upgrades at C514, F125, F126

I-15; Layton Interchanges Public Involvement

I-15; Layton Interchanges Environmental and Design

I-215; I-15 Int. Bridge Rehab C-514, F-125, F-126

West Davis Corridor EIS

West Davis Corridor Preservation

400 North; 800 West to 1100 West

PARK LANE AT CLARK LANE AND 1100 WEST

PIN Description / Project Location

Barrier - T/S

Document EA/EIS

Intersection Modification

Minor Rehabilitation - Structure

Environmental Impact Study

CORRIDOR PRESERVATION

RECONSTRUCT

RECONSTRUCT

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

OTHER

OTHER

OTHER

OTHER

Beg Len

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$1,200,000

$1,580,595

$1,130,158

$11,306,042

$11,515,416

$2,912,777

Total

Total

Total

Total

Total

Total

$0

$1,719,405

$276,342

$3,193,958

$2,735,198

$3,821

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,200,000

$3,300,000

$1,406,500

$14,500,000

$14,250,614

$2,916,598

$1,118,760

$0

$1,305,220

$0

$0

$2,719,144

$81,240

$3,300,000

$101,280

$14,500,000

$0

$0

$0

$0

$0

$0

$14,250,614

$197,454

Davis County Projects

NHPP_BRHSIP

ST_GF_HB173

ST_TIF_HB377ST_GF_HB173ST_GF_TIF

ST_CONT_R1NHPP_BR

ST_TIF_SB229ST_GF_CHN

L_CORR_MATCHL_CORR_DAVIS

STP_URB_O/L

STP_URB_O/LLOCAL_INKINDSTP_UR_O/L@1

$0 $0

$679,939

$1,220,139 $0

$499,266

$6,500 $269,842

$3,193,958 $0

$0 $2,735,198

$0

$0 $3,821

$0

$0 $0

$0

$0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0 $0 $0

$0 $0

$0

$0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0 $0 $0

$0 $0

$0

$0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0 $0 $0

$0 $0

$0

$0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0 $0 $0

$400,000 $800,000

$1,100,000

$1,500,000 $1,300,000

$500,000

$6,500 $1,400,000

$5,000,000 $9,500,000

$2,844,501 $11,406,113

$2,759,350

$2,860,164 $3,821

$52,613

$372,920 $745,840

$0

$0 $0 $0

$0 $1,305,220

$0 $0

$0 $0

$2,572,542

$2,666,531 $0

$52,613

$27,080 $54,160

$1,100,000

$1,500,000 $1,300,000

$500,000

$6,500 $94,780

$5,000,000 $9,500,000

$0 $0

$0

$0 $0 $0

$0 $0

$0

$0 $0 $0

$0 $0

$0 $0

$2,844,501 $11,406,113

$186,808

$193,633 $3,821

$0

$400,000 $800,000

$420,061

$279,861 $1,300,000

$734

$0 $1,130,158

$1,806,042 $9,500,000

$2,844,501 $8,670,915

$2,759,350

$2,860,164 $0

$52,613

Region

Closeout

Active

Active

Advertised

Active

Active

Closeout

Undr Const

07/13/13

10/04/14

04/28/12

03/22/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

I-215; MP 28.10 - 28.50 & I-215; MP 28.10 - 28.70 & I-215; MP 28.33-28.5

SR-232; MP .00 - .75 & SR-108; MP .00 - .80

SR-108; MP .00 - .80 & SR-232; MP .00 - .75

I-215; MP 28.25 - 28.63 & I-215; MP 28.25 - 28.49

West Davis Corridor

West Davis Corridor

400 NORTH; 800 WEST TO 1100 WEST

SR-225; PARK LANE AT CLARK LANE AND 1100 WEST

Page 35: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 22 of 217

11090

13121

4955

11099

11990

11992

11994

11996

PIN

S-LC11(46)

F-LC11(60)

SP-9999(807)

F-R199(131)

F-LC11(50)

S-LC11(51)

F-LC11(52)

F-LC11(53)

Project No.

3000 West; 700 South to Bluff Road

200 North & Angel Street Intersection

West Davis Corridor; Corridor Preservation

D&RGW Rail Trail; Centerville to Farmington

Project Planning Support -Weber & Davis County

3000 West/ 4300 West; 1400 North to 6000 South

I-15; 200 North to Layton Parkway

800 North; Main St (SR-126) to 450 West

PIN Description / Project Location

Reconstruct widening

Intersection Modification

Corridro Preservation

Trails

Local/MPO/Other Agency Pass-Through

Reconstruct widening

New Construction

Reconstruct no widening

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

Beg Len

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$111

$719,286

$0

Total

Total

Total

$3,458,454

$92,272

$5,870,865

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$3,458,565

$811,558

$5,870,865

$0

$720,200

$0

$3,144,150

$0

$5,337,150

$314,415

$91,358

$533,715

Davis County Projects

STP_URB_O/LST_EXCHANGELOCAL_GOVT

STP_URB_O/L

ST_CORR_PRES

STP_ENH_EACSTP_URB_O/L

STP_URB_O/L

LOCAL_GOVTST_EXCHANGESTP_URB_O/L

STP_URB_O/L

STP_URB_O/L

$0 $3,144,150

$314,304

$0

$271,337

$0 $92,272

$150,166

$533,715 $5,337,150

$0

$0

$10,726

$0 $0 $0

$0

$0

$0 $0

$150,166

$0 $0 $0

$0

$0

$0 $0 $0

$0

$0

$0 $0

$150,166

$0 $0 $0

$0

$0

$0 $0 $0

$0

$0

$0 $0

$150,166

$0 $0 $0

$0

$1,340,770

$0 $0 $0

$3,271,900

$0

$0 $0

$300,332

$0 $0 $0

$0

$1,070,471

$0 $3,144,150

$314,415

$3,271,900

$4,380,114

$275,250 $536,308

$1,051,162

$533,715 $5,337,150

$0

$0

$2,421,967

$0 $0 $0

$3,050,392

$0

$220,200 $500,000

$979,998

$0 $0 $0

$0

$2,258,000

$0 $3,144,150

$0

$0

$4,380,114

$0 $0

$0

$0 $5,337,150

$0

$0

$0

$0 $0

$314,415

$221,508

$0

$55,050 $36,308

$71,164

$533,715 $0 $0

$0

$163,967

$0 $0

$111

$0

$4,108,777

$275,250 $444,036

$150,166

$0 $0 $0

$0

$0

Region

Scoping

STIP

Active

Closeout

Active

Scoping

STIP

STIP

07/06/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

3000 West; 700 South to Bluff Road

200 North and Angel Street, Kaysville

North Legacy Corridor; N Ext. of Legacy Parkway

D&RGW Rail Trail; Centerville to Farmington

Project Planning Support -Weber & Davis County

3000 West/4300 West; 1400 North to 6000 South

I-15 NB Auxilliary Lane; 200 North to Layton Parkway

800 North; Main St (SR-126) to 450 West

Page 36: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 23 of 217

11997

12004

12012

12013

13122

5599

5599

8071

5599

PIN

F-LC11(54)

F-R199(160)

F-LC11(57)

F-LC11(58)

F-LC11(61)

S-I15-8(139)331

S-0037(11)0

F-0037(9)2

S-0067(21)7

Project No.

300 North; 1000 West to 2000 West

I-15 - 200 North Kaysville NB

200 South Trail; 2000 West to 4000 West

Center Street Trail; Redwood Rd to Legacy Pkwy

Center Street; Legacy Parkway to Redwood Road

Layton Interchanges Landscaping

SR-37; Sunset City Sidewalk Project

SR-37, SR-108 to SR-97

SR-67; Roadway Improvements Near SR-105

PIN Description / Project Location

Reconstruct no widening

Ramp Meters

Trails

Trails

Reconstruct widening

Landscaping

Contingency Funds

Preservation - Roadway

Contingency Funds

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

37

37

67

331

2

7

Beg Len

1

5

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$132,915

$37,292

Total

Total

$260,735

$168,650

$0

$0

$0

$0

$0

$0

$0

$0

$393,650

$205,942

$367,000

$192,000

$0

$0

$26,650

$13,942

Davis County Projects

STP_URB_O/L

CMAQ_WFRC

LOCAL_GOVTTAP_URB_WFRC

LOCAL_GOVTTAP_URB_WFRC

STP_URB_O/L

ST_CONT_R1

ST_CONT_R1

STP_FLX_ST

ST_CONT_R1

$10,726

$10,726

$26,650 $234,085

$13,942 $154,708

$0

$0

$2,234

$7,502

$1,348

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$229,540

$0 $0

$0 $0

$0

$0

$0

$0

$0

$1,072,616

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$1,598,198

$0

$0 $0

$0 $0

$1,907,300

$0

$0

$0

$0

$2,681,540

$240,266

$26,650 $367,000

$13,942 $192,000

$1,907,300

$13,919

$2,500

$20,000

$30,000

$2,500,000

$224,000

$0 $367,000

$0 $192,000

$1,778,176

$0

$0

$18,646

$0

$0

$16,266

$0 $0

$0 $0

$0

$13,919

$2,500

$1,354

$30,000

$181,540

$0

$26,650 $0

$13,942 $0

$129,124

$0

$0

$0

$0

$0

$0

$0 $132,915

$0 $37,292

$0

$13,919

$266

$12,498

$28,652

Region

STIP

STIP

Advertised

Scoping

STIP

Active

Active

Closeout

Active

07/19/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

9973

12853

10310

11585

300 North; 1000 West to 2000 West

I-15 - 200 North Kaysville NB On-Ramp Ramp Meters

200 South Trail; 2000 West to 4000 West, West Point

Center Street Trail; Redwood Road to Legacy Parkway

Center Street; Legacy Parkway to Redwood Road

State Route: I-15 from: 331.00 to: 332.00 for: 1.00

SR-37; MP .24 - .30

SR-37; MP 2.00 to MP 6.69

SR-67; MP 6.90 - 7.30

Page 37: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 24 of 217

5952

8072

5599

5775

5599

5952

5952

6019

5599

PIN

S-0067(23)

F-0067(19)0

S-0068(88)69

S-0068(87)64

S-0089(346)401

S-0089(367)0

S-0089(368)0

F-0089(370)403

S-0105(6)0

Project No.

SR-67; Signal at 500 S & SB Legacy Ramp

SR-67; Legacy Bridge Approaches

SR-68; UTA Pedestrian Ramp Upgrade, 500 South

SR-68; Two-Way Left-Turn Ln (MP 63.98-64.36) FY13

SR-89 Safety Improvements, Layton

US-89 (Washington Blvd) & 28th Street, Ogden

US-89 (Washington Blvd) & 26th Street, Ogden

US-89; MP 402.54-403.70, Median Barrier

SR-105; Safety Drainage Repair

PIN Description / Project Location

Traffic Signal - New

Minor Rehabilitation - Roadway

Contingency Funds

Highway Safety Improvement

Contingency Funds

Traffic Signal - Upgrade

Traffic Signal - Upgrade

Barrier - T/S

Contingency Funds

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

67

67

68

68

89

89

89

89

105

4

69

64

401

413

414

403

Beg Len

3

1

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$434,699Total $2 $0 $0 $0 $0 $434,701 $405,272 $29,429 $0

Davis County Projects

ST_SIGNALS

EQ_BONUS(MG)STP_FLX_ST

ST_CONT_R1

ST_SPOT_SFTY

ST_CONT_R1

ST_SIGNALS

ST_SIGNALS

HSIP

ST_CONT_R1

$184,407

$2 $0

$294

$82,984

$0

$146,885

$149,973

$360,000

$10,860

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$200,000

$429,701 $5,000

$16,967

$536,000

$14,000

$150,000

$150,000

$400,000

$15,000

$0

$400,610 $4,662

$0

$0

$0

$0

$0

$372,920

$0

$200,000

$29,091 $339

$16,967

$536,000

$14,000

$150,000

$150,000

$27,080

$15,000

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$15,593

$429,699 $5,000

$16,673

$453,016

$14,000

$3,115

$27

$40,000

$4,140

Region

Scoping

Phys Compl

Contr Clsd

Subst Comp

Closeout

Scoping

Scoping

Active

Active

10/27/12

04/05/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12490

11065

12032

11386

11973

12816

12817

12884

11579

SR-67; MP 4.04 - 4.04

SR-67; MP .24 - .48

SR-68; MP 68.70 - 68.75

SR-68; MP 63.98 - 64.36

US-89; MP 401.13 - 404.30

US-89; MP 413.34 - 413.34

US-89; MP 413.63 - 413.63

US-89; MP 402.54 - 403.70

SR-105; MP .25 - .25

Page 38: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 25 of 217

5599

5952

5599

11214

11731

5952

5952

11731

5952

PIN

S-0106(15)0

S-R199(150)

S-0107(12)0

S-0107(10)4

F-0108(32)0

S-0126(28)7

S-0126(30)0

F-0126(27)2

S-0127(4)1

Project No.

SR-106 Pipe Replacement and Island Removal

2 Locations on SR-106

SR-107; Roadside Drainage Improvements, West Point

SR-107; 300 N. over UPRR Bridge Repair, F-330

SR-108; I-15 to SR-126

SR-126 (Main Street) & 1300 North, Sunset (MP 6.7)

SR-126 (Main St) & SR-108 (Antelope Dr) Clearfield

SR-126; SR-107 to SR-97

New Signal at SR-127 & 3000 West in Syracuse

PIN Description / Project Location

Grade & Drainage

Traffic Signal - Upgrade

Contingency Funds

Minor Rehabilitation - Structure

Minor Rehabilitation - Roadway

Traffic Signal - New

Traffic Signal - New

Minor Rehabilitation - Roadway

Traffic Signal - New

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

106

106

107

107

108

126

126

126

127

1

4

7

3

6

1

Beg Len

1

1

3

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

Davis County Projects

ST_CONT_R1

ST_SIGNALS

ST_CONT_R1

ST_BRIDGE

STP_FLX_ST

ST_SIGNALS

ST_SIGNALS

STP_FLX_ST

ST_SIGNALS

$0

$275,274

$40,000

$51,456

$1,425,000

$380,421

$293,770

$6,940,000

$117,504

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$40,542

$410,000

$40,000

$200,000

$1,425,000

$400,000

$300,000

$7,320,000

$150,000

$0

$0

$0

$0

$1,328,528

$0

$0

$6,824,436

$0

$40,542

$410,000

$40,000

$200,000

$96,473

$400,000

$300,000

$495,564

$150,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$40,542

$134,726

$0

$148,544

$0

$19,579

$6,230

$380,000

$32,496

Region

Closeout

Active

Active

Closeout

STIP

Scoping

Scoping

Scoping

Scoping

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

10143

11766

13155

11888

11676

12616

12767

11679

12039

SR-106; MP .30 to MP .50

SR-106; MP 1.00 - 1.18

SR-107; MP .00 - .50

SR-107; MP 4.12 - 4.29

SR-108; MP .00 - .69

SR-126; MP 6.74 - 6.74

SR-126; MP 3.32 - 3.32

SR-126; MP 5.74 - 8.74

SR-127; MP 1.46 - 1.56

Page 39: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 26 of 217

5599

5952

5952

10031

6632

6019

5952

10031

PIN

S-0134(12)10

S-0193(9)5

S-0193(11)4

F-0193(10)1

S-I215(154)26

F-0225(5)0

S-0227(4)0

F-0232(7)0

Project No.

Crack Sealing on SR-134, MP 10 to 11

Traffic Signal at SR-193 & 2400 East Layton

SR-193 (3000 No) & Greyhawk Drive, Layton (MP 4.3)

SR-193, SR-126 to SR-232

Bridge Approach Repairs I-215 / Legacy Parkway

SR-225; Interchange Signing Improvements

New Signal at SR-227 & 200 West, Farmington

SR-232; SR-126 to SR-193

PIN Description / Project Location

Preservation - Roadway

Traffic Signal - New

Traffic Signal - New

Minor Rehabilitation - Roadway

Other structure item repair

Signing - T/S

Traffic Signal - New

Minor Rehabilitation - Roadway

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

134

193

193

193

215

225

227

232

10

5

7

3

26

Beg Len

1

2

2

1

2

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$3,863,970

$1,200,000

Total

Total

$136,030

$500,000

$0

$0

$0

$0

$0

$0

$0

$0

$4,000,000

$1,700,000

$3,729,200

$1,398,450

$270,800

$301,550

$0

$0

Davis County Projects

ST_CONT_R1

ST_SIGNALS

ST_SIGNALS

EQ_BONUS(MG)NHSSTP_FLX_STNHPP_NHS

ST_BRIDGE

HSIPST_SIGNALSSEC164_HSIP

ST_SIGNALS

STP_FLX_ST

$0

$127,140

$226,286

$0 $0

$136,030 $0

$82,791

$300,000 $200,000

$0

$58,732

$0

$0

$0

$0

$0 $0 $0 $0

$0

$0 $0 $0

$0

$0

$0

$0

$0

$0 $0 $0 $0

$0

$0 $0 $0

$0

$0

$0

$0

$0

$0 $0 $0 $0

$0

$0 $0 $0

$0

$0

$0

$0

$0

$0 $0 $0 $0

$0

$0 $0 $0

$0

$0

$37

$267,000

$250,000

$284,250 $245,750 $715,750

$2,754,250

$100,000

$1,375,000 $200,000 $125,000

$225,000

$80,000

$0

$0

$0

$265,006 $229,113 $667,294

$2,567,787

$0

$1,281,913 $0

$116,538

$0

$74,584

$37

$267,000

$250,000

$19,244 $16,637 $48,456

$186,463

$100,000

$93,088 $200,000

$8,463

$225,000

$5,416

$0

$0

$0

$0 $0 $0 $0

$0

$0 $0 $0

$0

$0

$37

$139,860

$23,714

$284,250 $245,750 $579,720

$2,754,250

$17,209

$1,075,000 $0

$125,000

$166,268

$80,000

Region

Closeout

Active

Scoping

Advertised

Active

Awarded

Active

Closeout

10/18/14

08/23/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

10596

11706

12599

11547

10158

12175

12036

11548

SR-134, M.P. 10 to M.P. 11

SR-193; MP 5.10 - 5.20

SR-193; MP 7.10 - 7.10

SR-193; MP 2.79 - 5.17

I-215; MP 26.00 to MP 28.00

SR-225; MP .00 - .75

SR-227; MP .44 - .54

SR-232; MP .00 - 2.40

Page 40: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 27 of 217

5599

6019

5599

5928

5952

6019

6019

8072

PIN

S-0273(21)0

F-0273(9)2

S-R199(167)

F-R199(40)

S-R199(158)

F-0067(22)3

F-R199(170)

F-I15-7(304)332

Project No.

SR-273; Hidden Valley Dr. Intersection Realignment

SR-273; MP 2.0-2.2, Intersection Realign & Signal

West Center Street Traffic Study, North Salt Lake

SR-93, SR-105 & SR-106; VARIOUS ROUTES

New Traffic Signals Along SR-273 in Kaysville

SR-67; Median Cable Barrier (MP 3-10.84) FFY14

US-89; Two Segments, Median Barrier

I-15; Various Bridge Approaches & Shoulder Sealing

PIN Description / Project Location

Contingency Funds

Intersection Improvements

Traffic

BONDED WEARING COURSE (BWC) TYPE A

Traffic Signal - New

Barrier - T/S

Barrier - T/S

Preservation - Roadway

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

273

273

MULT

MULT

MULT

MULT

MULT

MULT

2

Beg Len

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$110,000

$82

$1,751,885

$1,089,677

$898,834

Total

Total

Total

Total

Total

$690,000

$199,918

$0

$220,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$800,000

$200,000

$1,751,885

$1,309,677

$898,834

$559,380

$0

$233,075

$1,221,012

$846,522

$240,620

$100,000

$1,474,910

$88,665

$52,312

$0

$100,000

$43,900

$0

$0

Davis County Projects

ST_CONT_R1

ST_SIGNALSHSIP

LOCAL_GOVTST_CONT_R1

STP_FLX_STL_BETTERMENTST_BRIDGEST_PVMT

ST_SIGNALS

HSIPSEC164_HSIP

HSIP

IMNHPP_IM

$0

$200,000 $490,000

$99,918 $100,000

$0 $0 $0 $0

$131,579

$220,000 $0

$1,530,000

$0 $0

$0

$0 $0

$0 $0

$0 $0 $0 $0

$0

$0 $0

$0

$0 $0

$0

$0 $0

$0 $0

$0 $0 $0 $0

$0

$0 $0

$0

$0 $0

$0

$0 $0

$0 $0

$0 $0 $0 $0

$0

$0 $0

$0

$0 $0

$0

$0 $0

$0 $0

$0 $0 $0 $0

$0

$0 $0

$0

$0 $0

$31,000

$200,000 $600,000

$100,000 $100,000

$250,000 $43,900

$500,000 $957,985

$350,000

$828,316 $481,360

$1,700,000

$430,502 $468,332

$0

$0 $559,380

$0 $0

$233,075 $0 $0 $0

$0

$772,239 $448,772

$1,584,910

$405,447 $441,075

$31,000

$200,000 $40,620

$0 $100,000

$16,925 $0

$500,000 $957,985

$350,000

$56,077 $32,588

$115,090

$25,055 $27,257

$0

$0 $0

$100,000 $0

$0 $43,900

$0 $0

$0

$0 $0

$0

$0 $0

$31,000

$0 $110,000

$82 $0

$250,000 $43,900

$500,000 $957,985

$218,421

$608,316 $481,360

$170,000

$430,502 $468,332

Region

Closeout

Scoping

Scoping

Closeout

Active

Undr Const

Scoping

Phys Compl

01/24/09

06/28/14

12/01/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11729

13023

12822

7113

12037

11384

12892

11056

SR-273; MP .35 - .45

SR-273; MP 2.00 - 2.20

SR-67; MP .00 - 1.30 & SR-67; MP .00 - 1.30 & I-215; MP 26.70 - 27.80 & I-215; MP 26.70 - 27.80 & SR-68; MP 63.30 - 64.70

I-15, SR-93, SR-105, & SR-106; VARIOUS LOCATIONS

SR-273; MP 2.16 - 2.26 & SR-273; MP 2.08 - 2.18 & SR-273; MP 2.68 - 2.78

SR-67; MP 3.00 - 10.84 & SR-67; MP 3.00 - 10.84

US-89; MP 405.97 - 407.15 & US-89; MP 398.19 - 402.25

I-15; MP 331.53 - 334.73 & I-15; MP 342.24 - 344.57

Page 41: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 28 of 217

8072

10031

10031

12132

12132

5599

5599

5599

PIN

F-0089(315)405

F-I15-7(298)332

F-0273(7)0

F-R199(176)

S-R199(182)

S-R199(148)

S-R199(169)

S-0067(24)0

Project No.

US-89; Deer Run to Weber River & SR-203 to 40th

I-15; SR-232 to 200 South

SR-273; US-89 to 200 S.

SR-273; 200 S. to I-15 & SR-106; 1700 S. to US-89

SR-68, SR-108; Microsurface Davis County

Clearfield Circulator Study

1200 North to SR-67 Drainage, West Bountiful

SR-67; Legacy Trail Head Restroom, Woods Cross

PIN Description / Project Location

Preservation - Roadway

Minor Rehabilitation - Roadway

Minor Rehabilitation - Roadway

Preservation - Roadway

Preservation - Roadway

Traffic

Contingency Funds

Contingency Funds

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

MULT

OTHER

Beg Len

Prior

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

DAVIS

$2,000,000

$2,659,938

Total

Total

$0

$115,062

$0

$0

$0

$0

$0

$0

$0

$0

$2,000,000

$2,775,000

$1,864,600

$2,587,133

$135,400

$187,868

$0

$0

Davis County Projects

NHS

EQ_BONUS(MG)NHSNHPP_NHS

NHPP_NHSNHS

STP_FLX_ST

ST_PVMT

ST_CONT_R1

ST_CONT_R1

ST_CONT_R1

$0

$0 $0 $0

$115,062 $0

$1,013,000

$550,000

$0

$125,000

$5,000

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0

$0

$1,116,246

$74,256 $53,000

$1,872,744

$2,625,000 $150,000

$1,025,000

$550,000

$5,000

$125,000

$5,000

$1,040,676

$69,229 $49,412

$1,745,959

$2,447,288 $139,845

$955,608

$0

$0

$0

$0

$75,570

$5,027 $3,588

$126,785

$177,713 $10,155

$69,393

$550,000

$5,000

$125,000

$5,000

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0

$0

$1,116,246

$74,256 $53,000

$1,872,744

$2,509,938 $150,000

$12,000

$0

$5,000

$0

$0

Region

Closeout

Subst Comp

Advertised

Advertised

STIP

Active

Scoping

Scoping

01/26/13

03/22/14

10/11/14

10/25/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11063

10698

12594

12254

12267

11730

12826

12835

US-89; MP 405.34 - 406.21 & US-89; MP 408.38 - 411.69

I-15; MP 331.53 - 334.73 & I-15; MP 331.53 - 334.73

SR-273; MP .00 - 2.07 & SR-273; MP .00 - 2.07

SR-273; MP 1.93 - 3.08 & SR-106; MP 5.19 - 9.43

SR-68; MP 68.99 - 70.62 & SR-108; MP 6.89 - 8.02

Area Near Clearfield Frontrunner Station

1200 North to SR-67 in West Bountiful

Legacy Trail Head, SR-67 at 500 South, Woods Cross City

Page 42: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 49 of 217

9565

13096

4950

4954

8129

6019

10032

5599

PIN

F-I84-6(107)92

F-R199(180)

BRO-LC29(7)

STP-LC29(9)

F-1978(1)0

F-0065(3)8

S-0066(8)9

S-I84-6(112)103

Project No.

I-84; Mountain Green to Morgan

Devils Slide Bridge Feasibility Study

Stoddard Lane over Weber River

Morgan Valley Drive Improvements

700 EAST; 300 NORTH TO 650 NORTH, MORGAN CITY

SR-65; Guardrail and rumble strips (MP 8.44-13.94)

SR-66; Porterville to Morgan

I-84; MP 103 to MP 111

PIN Description / Project Location

Minor Rehabilitation - Roadway

Other structure item repair

Off-System Bridge

Non-Urban

Non-Urban

Barrier - T/S

Preservation - Roadway

Study

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

84

1980

MULT

MULT

OTHER

65

66

84

92

8

9

103

Beg Len

11

1

6

6

8

Prior

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

$32,931,514

$0

$167,397

$394,579

Total

Total

Total

Total

$338,541

$50,000

$1,552,603

$46,228

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$33,270,055

$50,000

$1,720,000

$440,807

$25,887,831

$46,615

$1,581,409

$410,964

$7,382,224

$0

$0

$29,843

$0

$3,385

$138,591

$0

Morgan County Projects

HSIPIMEQ_BONUS(MG)STP_FLX_STST_RET_ROWST_GF_BRIDGE

STP_FLX_STLOCAL_GOVT

STP_BRBR_OFF

STP_RURAL

STP_RURAL

SEC164_HSIPHSIP

ST_PVMT

ST_CONT_R1

$0 $8,985

$1 $329,555

$0 $0

$46,615 $3,385

$1,552,603 $0

$0

$39,766

$0 $46,228

$124,246

$6,259

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$1,200,000 $24,814,845 $1,170,445

$329,555 $5,105,210

$650,000

$46,615 $3,385

$1,552,603 $167,397

$2,273,946

$2,145,232

$0 $440,807

$585,015

$20,000

$1,118,760 $23,370,621 $1,091,206

$307,244 $0 $0

$46,615 $0

$1,447,492 $133,918

$2,120,000

$2,000,000

$0 $410,964

$0

$0

$81,240 $1,444,224

$79,239 $22,311

$5,105,210 $650,000

$0 $0

$0 $0

$0

$0

$0 $29,843

$585,015

$20,000

$0 $0 $0 $0 $0 $0

$0 $3,385

$105,111 $33,479

$153,946

$145,232

$0 $0

$0

$0

$1,200,000 $24,805,859 $1,170,444

$0 $5,105,210

$650,000

$0 $0

$0 $167,397

$2,273,946

$2,105,467

$0 $394,579

$460,769

$13,741

Region

Subst Comp

STIP

Scoping

Cntr Comp

Advertised

Closeout

Undr Const

Active

06/25/11

05/25/13

10/04/14

08/24/13

12/07/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11356

11785

10452

State Route: I-84 from: 92.00 to: 103.00 for: 11.00

Cnty:FA-1980; MP .00 - .08

Stoddard Lane over Weber River

Morgan Valley Drive and Old Highway 30

700 EAST; 300 NORTH TO 650 NORTH, MORGAN CITY

SR-65; MP 8.44 - 13.94

SR-66; MP 8.74 - 14.35

I-84; MP 103.00 to MP 111.00

Page 43: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 50 of 217

5599

5599

5599

PIN

S-I84-6(114)92

S-I84-6(121)103

S-I84-6(124)0

Project No.

I-84; Deicing Bridge System, Mt. Green

I-84; Mixed Use Trail, Morgan to Croydon

I-84; Morgan to Croydon Right of Way Search

PIN Description / Project Location

Contingency Funds

Trails

Concept Development

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

84

84

MULT

92

103

Beg Len

9

Prior

MORGAN

MORGAN

MORGAN

Morgan County Projects

ST_CONT_R1

ST_CONT_R1

ST_CONT_R1

$12,368

$30,655

$20,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$155,000

$150,000

$20,000

$0

$0

$0

$155,000

$150,000

$20,000

$0

$0

$0

$142,632

$119,345

$0

Region

Closeout

Scoping

Scoping

Status

Adv Dt:

Adv Dt:

Adv Dt:

11004

12128

13092

I-84; MP 92.25 - 92.50

I-84; MP 103.00 - 111.65

I-84; MP 103.10 - 111.60 & I-84; MP 103.10 - 111.60

Page 44: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 52 of 217

5591

6632

6632

6632

6632

8073

PIN

S-R499(127)

OB-REG(001)

OB-REG(002)

OB-REG(003)

OB-REG(004)

REGION-ONE(FN)ND

Project No.

Regionwide; Wetland & Cultural Clearances Contract

REGION ONE FY2011 ORANGE BOOK EFFICIENCY FUND

REGION TWO FY2011 ORANGE BOOK EFFICIENCY FUND

REGION THREE FY2011 ORANGE BOOK EFFICIENCY FUND

REGION FOUR FY2011 ORANGE BOOK EFFICIENCY FUND

REGION ONE PURPLE BOOK EFFICIENCY FUNDS

PIN Description / Project Location

Enviro. Mitigation/Storm Water Pollution/ etc

REGION ONE FY2011 ORANGE BOOK FUND

Planning

REGION THREE FY2011 ORANGE BOOK FUND

REGION FOUR FY2011 ORANGE BOOK FUND

REGION ONE PURPLE BOOK EFFICIENCY FUNDS

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

1

1

1

1

Prior

REGION

REGION

REGION

REGION

REGION

REGION

$0

$0

$0

Total

Total

Total

$167,949

$246,154

$161,839

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$167,949

$246,154

$161,839

$44,703

$229,489

$152,372

$123,246

$16,665

$9,467

$0

$0

$0

Region County Projects

ST_CONT_R4

IMSTP_FLX_STNHSST_PVMT

ST_PVMTIMST_BRIDGENHSSTP_FLX_ST

NHSSTP_FLX_ST

NHSIMST_PVMTSTP_FLX_ST

STP_FLX_STNHSNHPP_IMIM

$44,584

$0 $0 $0 $0

$0 $0

$120,000 $0

$47,949

$0 $246,154

$0 $0 $0 $0

$5,000 $0

$156,839 $0

$0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$100,000

$0 $0 $0 $0

$0 $0

$120,000 $0

$47,949

$0 $246,154

$0 $0 $0 $0

$5,000 $0

$156,839 $0

$0

$0 $0 $0 $0

$0 $0 $0 $0

$44,703

$0 $229,489

$0 $0 $0 $0

$4,662 $0

$147,711 $0

$100,000

$0 $0 $0 $0

$0 $0

$120,000 $0

$3,246

$0 $16,665

$0 $0 $0 $0

$339 $0

$9,128 $0

$0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$55,416

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

Region

Active

Active

Active

Active

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

9760

8891

8892

8893

8894

8850

Other: REGIONWIDE ENVIRON. CONTRACT to: .10 for: .10

REGION ONE FY2011 ORANGE BOOK FUND

REGION TWO FY2011 ORANGE BOOK FUND

REGION THREE FY2011 ORANGE BOOK FUND

REGION FOUR FY2011 ORANGE BOOK FUND

REGION ONE PURPLE BOOK EFFICIENCY FUNDS

Page 45: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 53 of 217

8073

8073

8073

8419

PIN

REGION-TWO(FU)ND

REGION-THREE(FU)ND

REGION-FOUR(FU)ND

EFFICIENCY-FUND(R2)

Project No.

REGION TWO PURPLE BOOK EFFICIENCY FUNDS

REGION THREE PURPLE BOOK EFFICIENCY FUNDS

REGION FOUR PURPLE BOOK EFFICIENCY FUNDS

REGION TWO PROGRAM DE-OBLIGATION FUND

PIN Description / Project Location

Staffing Support

REGION THREE PURPLE BOOK EFFICIENCY FUNDS

REGION FOUR PURPLE BOOK EFFICIENCY FUNDS

REGION TWO PROGRAM EFFICIENCY FUND

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

OTHER

Beg Len

1

1

1

Prior

REGION

REGION

REGION

REGION

$0

$0

$0

$0

Total

Total

Total

Total

$623,640

$140,825

$37,100

$3,594,020

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$623,640

$140,825

$37,100

$3,594,020

$581,420

$70,143

$34,617

$3,177,679

$42,220

$70,683

$2,483

$416,341

$0

$0

$0

$0

Region County Projects

STP_FLX_STNHSIMNHPP_IM

ST_PVMTSTP_FLX_STIMNHPP_IMNHS

IMNHSSTP_FLX_STSTP_RURALNHPP_IM

STP_FLX_STNHPP_NHSST_QTR_QTRIMNHSNHPP_IMEQ_BONUS(MG)BR_ON/OFF

$623,640 $0 $0 $0

$65,711 $63,114

$0 $12,000

$0

$0 $0

$34,100 $0

$3,000

$938,550 $2,187,614

$188,438 $0 $0

$279,418 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0

$623,640 $0 $0 $0

$65,711 $63,114

$0 $12,000

$0

$0 $0

$34,100 $0

$3,000

$938,550 $2,187,614

$188,438 $0 $0

$279,418 $0 $0

$581,420 $0 $0 $0

$0 $58,841

$0 $11,302

$0

$0 $0

$31,791 $0

$2,825

$875,011 $2,039,513

$0 $0 $0

$263,156 $0 $0

$42,220 $0 $0 $0

$65,711 $4,273

$0 $698

$0

$0 $0

$2,309 $0

$175

$63,540 $148,101 $188,438

$0 $0

$16,262 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0

Region

Active

Active

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

8852

8851

8849

8459

REGION TWO PURPLE BOOK EFFICIENCY FUNDS

REGION THREE PURPLE BOOK EFFICIENCY FUNDS

REGION FOUR PURPLE BOOK EFFICIENCY FUNDS

REGION TWO PROGRAM DE-OBLIGATION FUND

Page 46: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 54 of 217

8420

8421

8549

PIN

EFFICIENCY-FUND(R3)

EFFICIENCY-FUND(R4)

F-R199(103)

Project No.

REGION THREE PROGRAM DE-OBLIGATION FUND

REGION FOUR PROGRAM DE-OBLIGATION FUND

Deer Fencing (Regionwide)

PIN Description / Project Location

REGION THREE PROGRAM EFFICIENCY FUND

REGION FOUR PROGRAM EFFICIENCY FUND

Wildlife

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

Beg Len

1

Prior

REGION

REGION

REGION

$0

$0

$1,001,418

Total

Total

Total

$1,233,522

$3,671,720

$7,895

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,233,522

$3,671,720

$1,009,314

$1,150,013

$3,454,706

$806,795

$83,509

$217,014

$202,519

$0

$0

$0

Region County Projects

IMNHPP_IMNHSFS_STP_STEQ_BONUS(MG)NHPP_NHSSTP_FLX_ST

STP_FLX_STNHPP_NHSNHSNHPP_IMIMEQ_BONUS(MG)

ST_INELIGIBLSTP_ENH_ST

$0 $0 $1 $0 $0

$1,219,982 $13,539

$349,505 $0 $0

$3,322,215 $0 $0

$820 $7,076

$0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0 $1 $0 $0

$1,219,982 $13,539

$349,505 $0 $0

$3,322,215 $0 $0

$820 $1,008,494

$0 $0 $1 $0 $0

$1,137,389 $12,623

$325,843 $0 $0

$3,128,862 $0 $0

$0 $806,795

$0 $0 $0 $0 $0

$82,593 $917

$23,661 $0 $0

$193,353 $0 $0

$820 $201,699

$0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0

$0 $1,001,418

Region

Active

Active

Closeout10/20/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

8460

8461

9937

REGION THREE PROGRAM DE-OBLIGATION FUND

REGION FOUR PROGRAM DE-OBLIGATION FUND

Other: REGIONWIDE

Page 47: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 56 of 217

6500

9421

10020

10935

11419

11508

11510

PIN

F-I15-7(265)269

F-I15-7(306)304

F-R299(198)

S-ST99(192)

F-0089(351)0

F-R299(182)

F-I15-7(319)296

Project No.

I-15; HIGH OCCUPANCY TOLL (HOT) LANE

I-15; 2100 South to 3300

I-15 Mobility Study

I-15; SR-73 to 12300 South Widening

SR-89; Beck Street Ramp to I-15 NB, D-672

I-15/I-215 Interchange Improvements Phase I

I-15 NB; 9000 South to I-215

PIN Description / Project Location

ELECTRONIC TOLL IMPLEMENTATION

Choke Point

Planning

Widen Existing Facility

Replacement and Rehabilitation - Structure

Choke Point

Choke Point

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

15

15

15

15

15

15

269

304

264

280

1

296

Beg Len

38

2

61

12

2

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$16,815,057

$0

$16,321,869

Total

Total

Total

$3,151

$2,150,000

$82,010,000

$0

$0

$133,770,000

$0

$0

$19,870,000

$0

$0

$0

$0

$0

$0

$16,818,208

$2,150,000

$251,971,869

$13,919,313

$150,000

$0

$2,898,895

$2,000,000

$251,971,869

$0

$0

$0

Salt Lake County Projects

ST_EXPRESSST_CONSTST_ATMSSTP_FLX_STEQ_BONUS(MG)

NHPP_IM

FA_SHRP2ST_TIF

ST_TIFST_GF_HB185ST_CHF_TIFST_GF_TIFST_GF_CHNST_GF_HB173ST_TIF_SB229

NHPP_BR

NHPP_IM

NHPP_IM

$0 $0

$3,151 $0 $0

$3,000,000

$150,000 $2,000,000

$82,010,000 $0 $0 $0 $0 $0 $0

$0

$0

$0

$0 $0 $0 $0 $0

$0

$0 $0

$133,770,000 $0 $0 $0 $0 $0 $0

$0

$6,154,000

$5,714,000

$0 $0 $0 $0 $0

$0

$0 $0

$19,870,000 $0 $0 $0 $0 $0 $0

$800,000

$0

$0

$0 $0 $0 $0 $0

$0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0

$0

$0

$0 $0 $0 $0 $0

$0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0

$0

$0

$1,334,089 $436,140 $117,900

$4,079 $14,926,000

$3,000,000

$150,000 $2,000,000

$247,653,387 $0

$373,073 $3,034,728

$457,916 $147,740 $305,024

$800,000

$6,154,000

$5,714,000

$0 $0 $0

$3,803 $13,915,510

$2,825,400

$150,000 $0

$0 $0 $0 $0 $0 $0 $0

$745,840

$5,795,837

$5,381,445

$1,334,089 $436,140 $117,900

$276 $1,010,490

$174,600

$0 $2,000,000

$247,653,387 $0

$373,073 $3,034,728

$457,916 $147,740 $305,024

$54,160

$358,163

$332,555

$0 $0 $0 $0 $0

$0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0

$0

$0

$1,334,089 $436,140 $114,749

$4,079 $14,926,000

$0

$0 $0

$12,003,387 $0

$373,073 $3,034,728

$457,916 $147,740 $305,024

$0

$0

$0

Region

Closeout

STIP

Scoping

Awarded

STIP

STIP

STIP

03/10/09

02/28/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

I-15; HIGH OCCUPANCY TOLL (HOT) LANE

I-15; MP 303.50 - 305.20

I-15; MP 264.00 - 325.00

I-15; MP 279.80 - 291.50

FROM US-89; MP .00 - .12

COLLECTOR FROM I-215 TO I-15N; MP .70 - 1.13

I-15; MP 296.20 - 298.00

Page 48: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 57 of 217

12587

6587

10063

5262

7204

9430

PIN

S-I15-7(324)297

F-0048(22)8

F-0048(31)8

CM-0068(38)52

F-0068(54)48

F-0068(68)56

Project No.

I-15 & I-215; 5300 South to 9000 South, Phase II

7800 South & Airport Road

SR-48; 2700 West to 4000 West Phase II

SR-68; Redwood Rd 4700 S., & 5400 S.

SR-68; REDWOOD ROAD & 8200 SOUTH

SR-68; California to I-80

PIN Description / Project Location

Widen Existing Facility

INTERSECTION & ROADWAY CAPACITY IMPROVEMENTS

Reconstruct widening

Intersection Improvements

INTERSECTION IMPROVEMENTS

Reconstruct no widening

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

48

48

68

68

68

297

8

8

51

48

57

Beg Len

2

2

1

2

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$0

$1,915,214

$7,716,797

$1,404,054

Total

Total

Total

Total

$13,000,000

$0

$0

$220,000

$85,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$98,000,000

$1,915,214

$7,716,797

$1,624,054

$0

$1,098,000

$6,258,064

$1,308,999

$98,000,000

$0

$1,458,733

$0

$0

$817,214

$0

$315,054

Salt Lake County Projects

ST_TIF_SB229ST_TIF

LOCAL_GOVTST_INELIGIBLSTP_URB_SL

STP_FLX_ST

ST_CONCPT_D2ST_SIGNALSST_GF_HCPST_CONSTNHPP_NHSCMAQ_WFRCEQ_BONUS(MG)

STP_URB_SLLOCAL_GOVT

STP_FLX_ST

$0 $13,000,000

$0 $0 $0

$1,350

$0 $0 $0 $0 $0 $0 $0

$0 $220,000

$295,000

$0 $85,000,000

$0 $0 $0

$0

$0 $0 $0 $0 $0 $0 $0

$0 $0

$0

$0 $0

$0 $0 $0

$0

$0 $0 $0 $0 $0 $0 $0

$0 $0

$0

$0 $0

$0 $0 $0

$0

$0 $0 $0 $0 $0 $0 $0

$0 $0

$0

$0 $0

$0 $0 $0

$0

$0 $0 $0 $0 $0 $0 $0

$0 $0

$0

$0 $98,000,000

$737,482 $0

$1,177,732

$2,450,000

$116,468 $565,829 $250,000

$72,000 $1,100,000 $5,386,500

$226,000

$1,404,054 $220,000

$6,175,000

$0 $0

$0 $0

$1,098,000

$2,284,135

$0 $0 $0 $0

$1,025,530 $5,021,834

$210,700

$1,308,999 $0

$5,756,953

$0 $98,000,000

$0 $0 $0

$165,865

$116,468 $565,829 $250,000

$72,000 $74,470

$364,666 $15,300

$0 $0

$418,048

$0 $0

$737,482 $0

$79,732

$0

$0 $0 $0 $0 $0 $0 $0

$95,054 $220,000

$0

$0 $0

$737,482 $0

$1,177,732

$2,448,650

$116,468 $565,829 $250,000

$72,000 $1,100,000 $5,386,500

$226,000

$1,404,054 $0

$5,880,000

Region

Scoping

Closeout

Closeout

Closeout

Undr Const

Subst Comp

06/08/13

07/23/11

03/06/10

04/19/14

05/04/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

I-15; MP 297.28 - 299.05

7800 South & Airport Road

SR-48; MP 7.63 to MP 9.13

SR-68; Redwood Rd 4700 S., & 5400 S. Taylorsville

SR-68; REDWOOD ROAD & 8200 SOUTH

SR-68; MP 57.34 - 58.94

Page 49: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 58 of 217

9807

11082

12096

4303

8719

8840

11828

PIN

F-0068(67)57

F-0068(73)52

F-0068(90)62

SP-80-3(68)121

F-I80-3(167)128

F-I80-4(141)136

S-I80-4(151)139

Project No.

SR-68; 2100 S. to California

Redwood Road; Bruin Blvd. (4445 So) to 4700 South

Pedestrian Hybrid Beacon @ 1800 N & Redwood

PHASE ONE - P.E. ROW and Environmental - *ROW*

I-80; Mouth of Parley's Canyon to Parley's Summit

I-80; MP 136 TO 143, Lambs Canyon to Kimball Jct.

I-80; Parley's Summit to Jeremy Ranch WB Truck LN

PIN Description / Project Location

Major Rehabilitation - Roadway

Intersection Improvements

Intersection Improvements

Preliminary Engineering, Right of Way, Environmental

ENVIRONMENTAL ASSESMENT

Rotomill, Overlay with OGSC & Eastbound Auxiliary Lane

Passing Lane

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

68

68

68

80

80

80

80

56

52

62

121

125

136

139

Beg Len

1

6

8

4

2

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$4,716,000

$71,499

$39,539,420

$13,130,019

$0

Total

Total

Total

Total

Total

$113,713

$38,501

$2,657,027

$70,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,000,000

$0

$0

$0

$0

$15,000,000

$0

$0

$0

$0

$0

$4,829,713

$110,000

$42,196,447

$13,200,019

$17,000,000

$4,396,727

$53,646

$0

$12,243,400

$0

$319,273

$1,354

$42,196,447

$956,619

$17,000,000

$113,713

$55,000

$0

$0

$0

Salt Lake County Projects

NHSNHPP_NHSL_BETTERMENTSTP_FLX_STEQ_BONUS(MG)ST_BRIDGENHPP_BR

STP_URB_SL

LOCAL_GOVTSTP_FLX_STSTP_TAP_STEQ_BONUS(MG)

ST_GF_TIFST_CHF

STP_FLX_ST

ST_SPOT_SFTYIM

ST_TIFST_TIF_SB229

$0 $0

$113,713 $0 $0 $0 $0

$10,726

$38,501 $0 $0 $0

$176,119 $2,480,908

$293,990

$0 $70,000

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0

$0 $0 $0 $0

$0 $0

$0

$0 $0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$1,072,616

$0 $0 $0 $0

$0 $0

$0

$0 $0

$2,000,000 $0

$0 $0 $0 $0 $0 $0 $0

$1,896,385

$0 $0 $0 $0

$0 $0

$0

$0 $0

$15,000,000 $0

$0 $0 $0 $0 $0 $0 $0

$0

$0 $0 $0 $0

$0 $0

$0

$0 $0

$0 $0

$0 $285,000 $113,713 $250,000

$4,161,000 $0

$20,000

$2,979,727

$55,000 $0

$35,000 $20,000

$197,781 $41,998,666

$1,500,000

$200,019 $13,000,000

$17,000,000 $0

$0 $265,706

$0 $233,075

$3,879,300 $0

$18,646

$2,777,999

$0 $0

$35,000 $18,646

$0 $0

$1,398,450

$0 $12,243,400

$0 $0

$0 $19,295

$0 $16,925

$281,700 $0

$1,354

$201,728

$0 $0 $0

$1,354

$197,781 $41,998,666

$101,550

$200,019 $756,600

$17,000,000 $0

$0 $0

$113,713 $0 $0 $0 $0

$0

$55,000 $0 $0 $0

$0 $0

$0

$0 $0

$0 $0

$0 $285,000

$0 $250,000

$4,161,000 $0

$20,000

$0

$16,499 $0

$35,000 $20,000

$21,662 $39,517,758

$1,206,010

$200,019 $12,930,000

$0 $0

Region

Advertised

STIP

Cntr Comp

Closeout

Closeout

Subst Comp

STIP

05/24/14

05/17/14

08/16/07

05/14/11

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

SR-68; MP 56.33 - 57.34

SR-68; MP 52.31 - 52.65

SR-68; MP 61.96 - 61.96

I-80; State Street to 1300 East (Phase I)

I-80; Mouth of Parley's Canyon to Parley's Summit

I-80; MP 136 to 143, Lambs Canyon to Kimball Junction

I-80; MP 139.44 - 141.84

Page 50: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 59 of 217

3929

7001

12561

7137

7720

8166

8274

PIN

STP-TI-0089(82)313

F-0089(173)316

F-0089(375)364

S-0154(51)13

S-0154(52)16

S-0154(58)3

S-0154(59)1

Project No.

ROW has been cleared

SR-89 (STATE STREET)6400 S. to 8000 S. - *ROW*

US-89, 11400 South to 10600 South

SR-154; Bangerter at 7800 S, 7000 S, & 6200 S

SR-154; 4700 So. & 5400 So. & SR-173 Flex Lanes

BANGERTER HWY CORRIDOR PRESERVATION

SR-154, BANGERTER HIGHWAY & 600 WEST

PIN Description / Project Location

Preliminary Engineering

Bituminous Pavement, Reconstruction

Choke Point

INTERCHANGE CONSTRUCTION

Two CFI's and Managed Lanes

BANGERTER HIGHWAY CORRIDOR PRESERVATION

INTERCHANGE STUDY

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

89

89

89

154

154

154

154

313

368

364

13

16

1

Beg Len

3

2

1

2

1

12

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$46,193,675

$25,322,156

$48,416,457

$17,740,742

Total

Total

Total

Total

$0

$78,667

$333,543

$259,258

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$46,193,675

$25,400,823

$48,750,000

$18,000,000

$13,966,422

$8,696,725

$0

$0

$30,948,759

$16,608,069

$48,750,000

$18,000,000

$1,278,494

$96,029

$0

$0

Salt Lake County Projects

ST_QTR_QTRL_BETTERMENTSTP_URB_SLLOCAL_GOVTEM_TI_1934

L_BETTERMENTST_GF_HCPNHSST_GF_HB242ST_RET_ROWSTP_FLX_STSTP_URB_SL

NHPP_NHS

ST_SIGNALSST_CHF_TIFST_SB215

ST_GF_HB185ST_GF_TIF

ST_CORR_PRES

ST_GF_HB242

$0 $0 $0 $0 $0

$0 $78,667

$0 $0 $0 $0 $0

$0

$0 $333,543

$0

$0 $259,258

$1,038,303

$1,735,326

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0

$0

$0 $0 $0

$0 $0

$0

$0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0

$10,000,000

$0 $0 $0

$0 $0

$0

$0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0

$0

$0 $0 $0

$0 $0

$0

$0

$0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0

$0

$0 $0 $0

$0 $0

$0

$0

$30,948,759 $1,278,494

$11,700,450 $0

$2,265,972

$96,029 $14,834,833 $1,800,000 $1,000,000

$141,714 $2,165,167 $5,363,080

$10,000,000

$250,000 $36,500,000 $12,000,000

$15,000,000 $3,000,000

$1,038,303

$3,100,000

$0 $0

$11,700,450 $0

$2,265,972

$0 $0

$1,678,140 $0 $0

$2,018,586 $4,999,999

$9,323,000

$0 $0 $0

$0 $0

$0

$0

$30,948,759 $0 $0 $0 $0

$0 $14,834,833

$121,860 $1,000,000

$141,714 $146,582 $363,081

$677,000

$250,000 $36,500,000 $12,000,000

$15,000,000 $3,000,000

$1,038,303

$3,100,000

$0 $1,278,494

$0 $0 $0

$96,029 $0 $0 $0 $0 $0 $0

$0

$0 $0 $0

$0 $0

$0

$0

$30,948,759 $1,278,494

$11,700,450 $0

$2,265,972

$96,029 $14,756,166 $1,800,000 $1,000,000

$141,714 $2,165,167 $5,363,080

$0

$250,000 $36,166,457 $12,000,000

$15,000,000 $2,740,742

$0

$1,364,674

Region

Closeout

Closeout

STIP

Closeout

Closeout

Active

Closeout

09/25/06

08/13/11

02/03/11

01/23/10

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

State Street; 10600 South to 9000 South

US-89 (STATE STREET) 6400 South to 8000 South

US-89; MP 363.77 - 364.79

SR-154; Bangerter at 7800 S, 7000 S, & 6200 S

SR-154; 4700 So. & 5400 So. & SR-173 Flex Lanes

SR-154; BANGERTER HWY @ REDWOOD RD. CORRIDOR PRESERVATION

SR-154, BANGERTER HIGHWAY & 600 WEST

Page 51: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 60 of 217

8521

10006

12566

5608

12563

7650

8100

PIN

S-0154(63)19

F-0154(67)6

S-0154(12)11

SP-0171(18)6

F-0171(46)3

F-0172(18)

F-0172(20)0

Project No.

SR-154; BANGERTER HIGHWAY AND 3100 SOUTH

SR-154; Bangerter Hwy at 13400 South

SR-154 & 90th South Interchange

3500 S; Bangerter Hwy to 2700 W. Phase II

SR-171 (3500 South) & 5600 West Intersection

SR-172; 5600 WEST BUS RAPID TRANSIT (BRT)

5600 WEST; 6300 SOUTH TO 7000 SOUTH, West Jordan

PIN Description / Project Location

CONSTRUCT CFI

Intersection Improvements

New Capacity

Widening

Choke Point

AIR QUALITY - BRT IMPLEMENTATION

RECONSTRUCT & WIDEN

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

154

154

154

171

171

172

172

10

5

11

6

3

Beg Len

1

1

1

1

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$4,852,305

$7,212,514

$35,228,330

$0

$1,846,000

Total

Total

Total

Total

Total

$877,695

$0

$0

$10,726

$5,459,507

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,145,232

$0

$0

$0

$0

$3,217,848

$0

$5,730,000

$7,212,514

$35,228,330

$5,373,806

$7,305,507

$0

$6,724,227

$0

$5,009,999

$5,708,512

$5,730,000

$488,287

$26,392,886

$0

$0

$0

$0

$8,835,444

$363,807

$1,596,995

Salt Lake County Projects

ST_PVMTST_SB215

CMAQ_WFRCEQ_BONUS(MG)STP_URB_SL

ST_TIF

ST_BRIDGEOTHERLOCAL_GOVTST_CHF

NHPP_NHS

STP_URB_SLCMAQ_WFRC

FA_MISCSTP_URB_SLLOCAL_GOVT

$30,000 $847,695

$0 $0 $0

$0

$0 $0 $0 $0

$0

$10,726 $0

$0 $4,278,695 $1,180,812

$0 $0

$0 $0 $0

$0

$0 $0 $0 $0

$0

$0 $0

$0 $0 $0

$0 $0

$0 $0 $0

$0

$0 $0 $0 $0

$6,132,000

$0 $0

$0 $0 $0

$0 $0

$0 $0 $0

$49,200,000

$0 $0 $0 $0

$0

$0 $2,145,232

$0 $0 $0

$0 $0

$0 $0 $0

$0

$0 $0 $0 $0

$0

$3,217,848 $0

$0 $0 $0

$30,000 $5,700,000

$35,000 $3,123,025 $4,054,489

$49,200,000

$114,277 $6,875,034 $1,960,410

$26,278,609

$6,132,000

$3,228,574 $2,145,232

$11,646 $6,113,049 $1,180,812

$0 $0

$32,631 $2,911,596 $3,780,000

$0

$0 $0 $0 $0

$5,716,864

$3,010,000 $2,000,000

$9,317 $5,699,196

$0

$30,000 $5,700,000

$2,370 $211,429 $274,489

$49,200,000

$114,277 $0 $0

$26,278,609

$415,136

$0 $0

$0 $0 $0

$0 $0

$0 $0 $0

$0

$0 $6,875,034 $1,960,410

$0

$0

$218,574 $145,232

$2,329 $413,853

$1,180,812

$0 $4,852,305

$35,000 $3,123,025 $4,054,489

$0

$114,277 $6,875,034 $1,960,410

$26,278,609

$0

$0 $0

$11,646 $1,834,354

$0

Region

Closeout

Closeout

STIP

Closeout

STIP

Scoping

Active

01/27/11

08/04/12

08/16/08

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

SR-154; BANGERTER HIGHWAY AND 3100 SOUTH

State Route: SR-154 from: 5.30 to: 6.20 for: 0.90

SR-154; MP 11.00 - 11.75

3500 South; Bangerter Hwy to 2700 West, Phase II

SR-171; MP 3.36 - 3.69

SR-172; 5600 WEST BUS RAPID TRANSIT (BRT)

SR-172, 5600 WEST; 6300 SOUTH TO 7000 SOUTH

Page 52: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 61 of 217

10008

6599

8686

8626

9440

10004

12560

10012

PIN

F-0172(22)6

F-0190(5)4

S-R299(113)

F-0201(21)4

F-0201(25)13

F-0209(25)7

F-0209(31)7

F-R299(142)

Project No.

SR-172 at SR-201

SR-190;BIG COTTONWOOD CANYON-MAXFIELD BRIDGE *ROW*

WALKER DEVELOPMENT ON WASATCH BLVD

SR-201; NEAR KCC ARTHUR MILL RAILROAD SPUR CROSS

SR-201; Bangerter Highway to 3200 West

SR-209; 9000 South & 700 West

I-15, 9000 South Interchange

7000 South - SR-154 (Bangerter) to SR-68 (Redwood)

PIN Description / Project Location

Intersection Improvements

BRIDGE REPLACEMENT D-258

R/W PROJECT SETTLEMENT FROM SR-190 WIDENING PROJECT

DECK REPLACEMENT

New Construction

Intersection Improvements

Choke Point

Study

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

172

190

190

201

201

209

209

2104

6

4

1

4

13

7

7

1

Beg Len

1

2

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$2,416,578

$5,350,000

Total

Total

$18,940

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,435,518

$5,350,000

$1,933,262

$4,911,733

$502,256

$438,268

$0

$0

Salt Lake County Projects

STP_URB_SL

BR_ON/OFFST_BRIDGE

ST_STLMNT

BR_ON/OFFNHPP_BR

NHPP_NHS

STP_URB_SL

NHPP_IM

STP_URB_SL

$547,034

$0 $18,940

$3,356,354

$0 $0

$3,500,000

$1,483,996

$0

$0

$1,604,634

$0 $0

$0

$0 $0

$0

$0

$0

$0

$2,145,232

$0 $0

$0

$0 $0

$0

$0

$4,672,000

$0

$0

$0 $0

$0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0

$0 $0

$0

$0

$0

$0

$4,296,900

$2,416,578 $18,940

$3,465,000

$575,000 $4,775,000

$3,500,000

$4,422,396

$4,672,000

$196,289

$4,006,000

$1,933,262 $0

$0

$460,000 $4,451,733

$3,263,050

$4,123,000

$4,400,090

$183,000

$290,900

$483,316 $18,940

$3,465,000

$115,000 $323,268

$236,950

$0

$271,910

$0

$0

$0 $0

$0

$0 $0

$0

$299,396

$0

$13,289

$0

$2,416,578 $0

$108,646

$575,000 $4,775,000

$0

$2,938,400

$0

$196,289

Region

STIP

Closeout

Scoping

Subst Comp

STIP

Closeout

STIP

Active

05/19/12

04/13/13

06/29/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

State Route: SR-172 from: 6.00 to: 6.10 for: .10

SR-190; BIG COTTONWOOD CANYON - MAXFIELD BRIDGE D-258

WALKER DEVELOPMENT ON WASATCH BLVD.

SR-201; NEAR KCC ARTHUR MILL CROSSING KCC RAILROAD SPUR

State Route: SR-201 from: 13.03 to: 13.37 for: .33

SR-209; MP 6.71 - 7.15

SR-209; MP 6.80 - 8.00

Cnty:FA-2104; MP 1.24 - 3.19

Page 53: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 62 of 217

12010

8104

5296

8114

8555

11085

8112

PIN

F-LC35(237)

F-LC35(199)

CM-LC35(158)

F-0195(5)0

F-LC35(210)

F-2240(2)0

F-LC35(203)

Project No.

700 West HAWK; Bullion Street and 5900 South

13400 South; 4000 West to Mountain View Corridor

Cross Town Trail; West Valley City

2300 EAST; I-80 TO 3900 SOUTH, PHASE I, SL Co.

6200 SOUTH & HOLLADAY BOULEVARD

4700 South; 4000 West to 5600 West

300 East; 3300 South to 3900 South

PIN Description / Project Location

Safe Sidewalk/ADA ramps

RECONSTRUCTION AND WIDEN

Air Quality - Bike Ped Facility

RECONSTRUCT & WIDEN INCLUDING SAFETY IMPROVEMENTS

INTERSECTION IMPROVEMENT

Reconstruct no widening

RECONSTRUCT WITH DRAINAGE IMPROVEMENTS

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

2118

2152

2162

2186

2186

2240

2264

2

5

1

4

Beg Len

1

2

2

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$32,631

$8,484,851

$1,111,669

$2,178,000

Total

Total

Total

Total

$7,189

$372,105

$187,331

$6,475,769

$0

$0

$0

$1,172,308

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$39,820

$8,856,956

$1,299,000

$9,826,077

$32,631

$7,640,644

$730,000

$8,225,041

$0

$3,047

$0

$0

$7,189

$1,213,266

$569,000

$1,601,036

Salt Lake County Projects

TAP_URB_WFRCSTP_TAP_STLOCAL_GOVT

L_BETTERMENTSTP_URB_SLSTP_URB_SL@1ST_MATCH

LOCAL_GOVTCMAQ_WFRC

STP_URB_SLLOCAL_GOVT

CMAQ_WFRC

STP_URB_SL

STP_URB_SL

$0 $0

$7,189

$27,105 $300,000

$41,954 $3,047

$187,331 $0

$5,472,004 $1,003,765

$439,772

$726

$3,021,312

$0 $0 $0

$0 $0 $0 $0

$0 $0

$1,172,308 $0

$1,881,369

$391,548

$3,587,901

$0 $0 $0

$0 $0 $0 $0

$0 $0

$0 $0

$0

$2,536,780

$1,072,616

$0 $0 $0

$0 $0 $0 $0

$0 $0

$0 $0

$0

$5,363,081

$0

$0 $0 $0

$0 $0 $0 $0

$0 $0

$0 $0

$0

$0

$0

$32,631 $0

$7,189

$661,479 $8,150,477

$41,954 $3,047

$515,990 $783,010

$8,822,312 $1,003,765

$2,331,867

$8,302,135

$8,929,529

$32,631 $0 $0

$0 $7,598,690

$41,954 $0

$0 $730,000

$8,225,041 $0

$2,174,000

$7,740,080

$8,325,000

$0 $0 $0

$0 $0 $0

$3,047

$0 $0

$0 $0

$0

$0

$0

$0 $0

$7,189

$661,479 $551,787

$0 $0

$515,990 $53,010

$597,271 $1,003,765

$157,867

$562,055

$604,529

$32,631 $0 $0

$634,373 $7,850,477

$0 $0

$328,659 $783,010

$2,178,000 $0

$10,726

$10,000

$1,247,700

Region

Closeout

Cntr Comp

Closeout

Active

Scoping

Scoping

Active

12/10/11

06/01/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Cnty:FA-2118; MP 1.83 - 1.83 & 700 West HAWK; Bullion Street and 5900 South, Murray City

13400 SOUTH; 4000 WEST to Mountain View Corridor

Cross Town Trail; West Valley City

Cnty:FA-2186; MP 3.68 - 5.35

Cnty:FA-2186; MP .09 - .09

Cnty:FA-2240; MP .00 - 2.01

Cnty:FA-2264; MP .00 - .88

Page 54: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 63 of 217

2421

3523

7451

7704

8312

8523

PIN

SP-15-7(156)293

MP-STP-0182(2)0E

F-LC35(191)

S-0085(1)0

S-0085(4)0

S-0173(16)5

Project No.

11400 S;State St to Bangerter; New Intrch - *ROW*

Enviro - I-80 TO UT. CO. / Mtn View Corridor

PARLEY'S CREEK TRAIL, PHASE 4 - THE DRAW

MVC; UTILITIES TRANSMISSION LOCATION

MVC; AQ MONITOR AND FILTERS

SR-173; 5400 SOUTH BANGERTER HIGHWAY TO 4800 WEST

PIN Description / Project Location

Widen/Construct to Five Lane Road; State Street to Bangerter

Environmental

CONSTRUCTION OF PARLEY'S CREEK TRAIL

UTILITY TRANSMISSION LOCATION

MVC; AQ MONITOR AND FILTERS

WIDEN TO 7 LANES

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

MULT

MULT

Beg Len

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$239,797,274

$19,494,981

$3,955,130

$35,321,383

$29,375,576

Total

Total

Total

Total

Total

$6,118,078

$505,019

$203,967

$19,376,007

$6,770,133

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$245,915,352

$20,000,000

$4,159,097

$54,697,390

$36,145,709

$0

$7,200,000

$3,167,277

$0

$0

$235,965,242

$12,800,000

$200,000

$54,697,390

$35,600,000

$9,950,110

$0

$791,819

$0

$545,709

Salt Lake County Projects

L_BETTERMENTST_CHFST_GF_CHN

ST_GF_CHNSTP_URB_SLST_CONSTST_QTR_QTRSTP_URB_P/OEQ_BONUS(MG)

EM_HPP_1702ST_GF_TIF

ST_GF_CHNST_CHF_TIF

ST_CHF_TIF

L_BETTERMENTST_SB215ST_GF_OTHER

$653,389 $0

$5,464,689

$191,659 $0

$313,360 $0 $0 $0

$3,967 $200,000

$0 $19,376,007

$3,563,416

$0 $6,770,133

$0

$0 $0 $0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$0

$0 $0 $0

$0 $0 $0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$0

$0 $0 $0

$0 $0 $0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$0

$0 $0 $0

$0 $0 $0

$0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$0

$0 $0 $0

$9,950,110 $91,465,242

$144,500,000

$5,500,000 $3,500,000 $3,450,243 $3,849,757 $1,000,000 $2,700,000

$3,959,097 $200,000

$31,952,390 $22,745,000

$4,100,000

$545,709 $34,000,000 $1,600,000

$0 $0 $0

$0 $3,500,000

$0 $0

$1,000,000 $2,700,000

$3,167,277 $0

$0 $0

$0

$0 $0 $0

$0 $91,465,242

$144,500,000

$5,500,000 $0

$3,450,243 $3,849,757

$0 $0

$0 $200,000

$31,952,390 $22,745,000

$4,100,000

$0 $34,000,000 $1,600,000

$9,950,110 $0 $0

$0 $0 $0 $0 $0 $0

$791,819 $0

$0 $0

$0

$545,709 $0 $0

$9,296,721 $91,465,242

$139,035,311

$5,308,341 $3,500,000 $3,136,883 $3,849,757 $1,000,000 $2,700,000

$3,955,130 $0

$31,952,390 $3,368,993

$536,584

$545,709 $27,229,867 $1,600,000

Region

Closeout

Active

Cntr Comp

Active

Active

Contr Clsd

07/14/08

03/30/13

12/17/11

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11400 South; State St. to Bangerter; New I-15 Interchange

Mountain View Corridor (MVC); I-80 to Utah County

PARLEY'S CREEK TRAIL, PHASE 4 - THE DRAW

MVC; UTILITIES TRANSMISSION LOCATION (SR-201TO 4700 SOUTH)

MVC; AQ MONITOR AND FILTERS

SR-173; 5400 SOUTH BANGERTER HIGHWAY TO 4800 WEST

Page 55: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 64 of 217

8534

8828

9419

9622

10005

10890

10891

PIN

S-0089(240)362

F-0201(23)11

F-I215(175)16

F-ST99(133)

F-R299(137)

F-0186(21)0

F-0270(4)1

Project No.

US-89; State Street at 12300 South - *ROW*

SR-201; 9450 W. to 5600 W.

I-215 West; 4700 South to SR-201

Pavement Marking Warranty on Multiple Routes

4800 West; Skye Drive to 10200 South

I-80; 1700 East to East Canyon Bridge Rehab

SR-270; 9th South Connector Bridge Rehabilitation

PIN Description / Project Location

INTERSECTION IMPROVEMENT

CONCRETE OVERLAY / RAMP WIDENING

Reconstruct widening

Research

New Construction

Replacement and Rehabilitation - Structure

Replacement and Rehabilitation - Structure

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

MULT

MULT

MULT

Beg Len

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$5,677,164

$20,565,776

$12,439

$4,434,587

$0

$150,000

Total

Total

Total

Total

Total

Total

$46,445

$301,610

$55,000,000

$565,413

$0

$3,920,000

$0

$0

$30,000,000

$0

$10,400,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$5,723,609

$20,867,386

$85,012,439

$5,000,000

$10,400,000

$4,070,000

$0

$19,454,664

$80,053,000

$3,828,806

$9,695,920

$3,794,461

$5,723,609

$1,412,722

$4,959,439

$1,171,195

$704,080

$275,539

$0

$0

$0

$0

$0

$0

Salt Lake County Projects

ST_CONT_R2ST_CONT_PGST_SB215ST_PVMT

NHSEQ_BONUS(MG)STP_FLX_STNHPP_NHS

ST_CONCPT_D2NHPP_IM

NHPP_IMST_RET_ROWIM

STP_URB_SL

NHPP_BRSTP_BR

STP_BRNHPP_BR

$0 $0

$46,445 $0

$0 $0 $0

$301,610

$0 $55,000,000

$565,413 $0 $0

$0

$0 $0

$0 $3,920,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $30,000,000

$0 $0 $0

$0

$2,400,000 $8,000,000

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0

$0 $0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0

$0 $0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0

$0 $0

$0 $0

$0 $300,000

$4,144,794 $1,278,815

$350,000 $1,000,367 $1,999,633

$17,517,386

$12,439 $85,000,000

$1,550,413 $934,587

$2,515,000

$6,497,908

$2,400,000 $8,000,000

$0 $4,070,000

$0 $0 $0 $0

$326,305 $932,643

$1,864,257 $16,331,459

$0 $80,053,000

$1,460,179 $0

$2,368,627

$6,058,000

$2,237,520 $7,458,400

$0 $3,794,461

$0 $300,000

$4,144,794 $1,278,815

$23,695 $67,725

$135,375 $1,185,927

$12,439 $4,947,000

$90,234 $934,587 $146,373

$0

$162,480 $541,600

$0 $275,539

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$439,908

$0 $0

$0 $0

$0 $300,000

$4,098,349 $1,278,815

$350,000 $1,000,367 $1,999,633

$17,215,776

$12,439 $0

$985,000 $934,587

$2,515,000

$6,497,908

$0 $0

$0 $150,000

Region

Closeout

Undr Const

Scoping

Subst Comp

Undr Const

STIP

Active

05/28/11

01/25/14

05/12/12

04/19/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv.Const

US-89; State Street at 12300 South

SR-201; MP 5.83 - 10.93 & SR-201; MP 5.82 - 10.92

I-215; MP 15.52 - 19.88 & I-215; MP 15.52 - 19.89 & TO SR-266 4700 SOUTH EB; MP .00 - .01 & TO SR-266 4700 SOUTH; MP .00 - .17 & FROMSR-266 4700 SOUTH; MP .00 - .17 & FROM SR-171 3500 SOUTH; MP .06 - .16 & TO SR-171 3500 SOUTH; MP .00 - .15 & FROM S

State Route: I-15 from: 278.60 to: 380.00 for: 101.40

4800 WEST; 9800 SO TO 10200 SO

QUARRY OVERPASS; MP .03 - .03 & I-215 BELT ROUTE; MP .08 - .08 & FROM I-80N TO I-215P; MP .18 - .18 & FROM SR-186 TO I-215; MP .11 - .11 & FROM SR-186 TO I-215; MP .34 - .34 & FROM SR-186 TO I-215; MP .53 - .53 & I-80; MP 127.06 - 127.06 & Cnty:FA-22

TO SR-270 WEST TEMPLE; MP .56 - 1.00 & FROM SR-270 WEST TEMPLE; MP .15 - .52

Page 56: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 65 of 217

11202

11827

12095

12447

4943

5282

5284

PIN

F-I80-3(177)128

S-I15-7(314)294

F-R299(179)

F-I15-7(326)305

CM-STP-9999(804)

STP-LC35(154)

STP-LC35(155)

Project No.

I-80; Mouth of Parley's Canyon to the Ranch Exit

I-15 Northbound, 10600 S. Interchange Improvement

Bicycle Traffic Signal Detection

I-15; 1000 So. to 2100 So. Bridge Deck Overlays

Regions 1, 2 & 3 Commuter Link; 2005

10600 S; 1220 E to 1750 E. Sandy

1200 West Connector Road

PIN Description / Project Location

Major Rehabilitation - Roadway

Choke Point

Pedestrian/Bicycle Safety

Preservation - Structure

PUBLIC RELATIONS SERVICE CONTRACT

Road - Asphalt Pavement Reconstruction & Widening

New Construction

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

OTHER

OTHER

OTHER

Beg Len

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$3,748,245

$675,602

$0

$626,224

$3,678,033

Total

Total

Total

Total

Total

$451,755

$9,803,398

$200,000

$2

$429,994

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$4,200,000

$10,479,000

$200,000

$626,226

$4,108,027

$3,533,502

$3,296,300

$100,000

$583,830

$2,979,000

$666,498

$7,182,700

$0

$42,396

$0

$0

$0

$100,000

$0

$1,129,027

Salt Lake County Projects

NHPP_IMST_CONSTIM

NHPP_IMST_HB377/TFST_BRIDGE

LOCAL_GOVTSTP_TAP_STSTP_FLX_ST

NHPP_BR

CMAQ_WFRCCMAQ_MAGSTP_URB_P/O

STP_URB_SL

STP_URB_SLLOCAL_GOVTL_BETTERMENT

$0 $448,140

$3,615

$3,500,000 $6,141,082

$162,316

$100,000 $100,000

$0

$0

$0 $1 $1

$2,455,991

$0 $422,736

$7,258

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0

$0 $0 $0

$0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$6,100,000

$0 $0 $0

$0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0

$0 $0 $0

$0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0

$0 $0 $0

$0

$0 $0 $0

$3,035,796 $448,140 $716,064

$3,500,000 $6,149,000

$830,000

$100,000 $100,000

$0

$6,100,000

$425,000 $180,925

$20,301

$8,315,992

$3,195,323 $422,736 $489,968

$2,859,112 $0

$674,390

$3,296,300 $0 $0

$0 $100,000

$0

$5,687,030

$396,228 $168,676

$18,927

$7,752,999

$2,979,000 $0 $0

$176,683 $448,140

$41,675

$203,700 $6,149,000

$830,000

$0 $0 $0

$412,970

$28,773 $12,249 $1,374

$0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$100,000 $0 $0

$0

$0 $0 $0

$562,993

$216,323 $422,736 $489,968

$3,035,796 $0

$712,449

$0 $7,918

$667,684

$0 $0 $0

$0

$425,000 $180,924

$20,300

$5,860,001

$3,195,323 $0

$482,710

Region

Subst Comp

Scoping

Scoping

STIP

Closeout

Closeout

Closeout

10/05/13

05/14/11

09/10/11

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

I-80; MP 127.57 - 139.22 & I-80; MP 127.57 - 139.22

TO SR-151 10600 SOUTH; MP .10 - .18 & Reference I 15 MP 293.681 - 293.470

Cnty:FA-2180; MP .00 - 1.48 & Cnty:FA-2172; MP 9.49 - 15.53

I-15; MP 305.09 - 307.01 & I-15; MP 305.09 - 307.00

SALT LAKE, UTAH CO, OGDEN/LAYTON AREAS

10600 S; 1220 E to 1750 E. Sandy

1200 West Connector Road

Page 57: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 66 of 217

5482

6621

7208

7635

7703

7735

7849

PIN

HPP-LC35(163)

F-LC35(184)

F-R299(83)

F-LC35(197)

MP-0182(6)

F-LC35(195)

S-ST99(78)

Project No.

Bingham Junction Blvd. - Midvale City Phase I

1300 SOUTH; 500 WEST TO 700 WEST

ATMS / ITS IN SALT LAKE CITY AND SALT LAKE COUNTY

5600 West; Main Street to 11800 South

MVC; Salt Lake County PM

7800 SOUTH BINGHAM JUNCTION BLVD, MIDVALE CITY

STATEWIDE FIBER OPTIC REPAIR & VERIFICATION

PIN Description / Project Location

Bingham Junction Blvd. - Midvale City

BRIDGE REHABILITATION

UPGRADE 330 INTERSECTIONS & INSTALL NEW SIGNAL CONTROLLERS

NEW CONTRUCTION

NEW CONSTRUCTION

INTERSECTION IMPROVEMENT AND SIGNAL INSTALLATION

REPAIR 400 SOUTH CONDUIT, VERIFICATION OF FIBER OPTICS

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$3,551,921

$1,102,872

$4,826,773

$391,443,160

$638,316

$298,097

Total

Total

Total

Total

Total

Total

$887,980

$65,415

$1,250,000

$70,955,429

$157,883

$3

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$4,439,902

$1,168,288

$6,076,773

$462,398,589

$796,199

$298,100

$3,551,921

$1,088,289

$4,500,000

$0

$636,959

$0

$0

$568

$0

$424,401,064

$0

$3,900

$887,980

$79,431

$1,576,773

$37,997,525

$159,240

$294,200

Salt Lake County Projects

EM_HPP_1702LOCAL_INKIND

STP_URB_SL

FA_MISCST_ATMSSTP_URB_SL

LOCAL_GOVTSTP_URB_SL

L_BETTERMENTST_CONSTST_BONDS_MVCST_GF_TIFST_CHF_TIFST_GF_CHNLOCAL_INKIND

EM_HPP_1702LOCAL_INKIND

ST_ATMSUTA_FUNDS

$0 $887,980

$444,578

$0 $537

$64,878

$1,250,000 $0

$0 $500,000

$0 $4,550,951

$65,904,478 $0 $0

$0 $157,883

$3 $0

$0 $0

$0

$0 $0 $0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0 $0 $0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0 $0 $0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0 $0 $0

$0 $0

$0 $0 $0 $0 $0 $0 $0

$0 $0

$0 $0

$3,551,921 $887,980

$10,682,898

$2,841 $568

$1,164,878

$1,250,000 $4,826,773

$37,997,525 $500,000

$55,800,000 $7,500,000

$231,845,199 $128,755,865

$0

$636,959 $159,240

$3,900 $294,200

$3,551,921 $0

$9,959,666

$2,273 $0

$1,086,016

$0 $4,500,000

$0 $0 $0 $0 $0 $0 $0

$636,959 $0

$0 $0

$0 $0

$0

$0 $568

$0

$0 $0

$0 $500,000

$55,800,000 $7,500,000

$231,845,199 $128,755,865

$0

$0 $0

$3,900 $0

$0 $887,980

$723,232

$568 $0

$78,862

$1,250,000 $326,773

$37,997,525 $0 $0 $0 $0 $0 $0

$0 $159,240

$0 $294,200

$3,551,921 $0

$10,238,320

$2,841 $31

$1,100,000

$0 $4,826,773

$37,997,525 $0

$55,800,000 $2,949,049

$165,940,721 $128,755,865

$0

$636,959 $1,357

$3,897 $294,200

Region

Closeout

Awarded

Active

Closeout

Active

Closeout

Active

02/02/08

08/16/14

06/04/11

01/01/10

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Bingham Junction Blvd. - Midvale City

1300 SOUTH; 500 WEST TO 700 WEST

ATMS / ITS IN SALT LAKE CITY AND SALT LAKE COUNTY

5600 West; Main Street to 11800 South

MVC; Salt Lake County PM

7800 SOUTH BINGHAM JUNCTION BLVD, MIDVALE CITY

STATEWIDE FIBER OPTIC REPAIR & LOCATION VERIFICATION

Page 58: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 67 of 217

7947

8108

8110

8553

8557

8565

8599

8601

PIN

F-R299(102)

F-LC35(201)

F-LC35(202)

F-LC35(208)

F-2150(1)0

F-2082(11)11

NEWPROJECT-0027()

F-0210(16)0

Project No.

Salt Lake Area Traffic Adaptive Control System

5900 SOUTH; STATE STREET TO 700 WEST

FORT UNION BLVD & HIGHLAND DRIVE INTERSECTION

4700 SOUTH I-215 AREA; 2200 WEST TO 2700 WEST

6200 SOUTH; 6100 WEST TO SR-111

HIGHLAND DRIVE @ I-215; I215 WB ON-RAMP

TRANSIT ORIENTED DEVELOPMENT @ 1000 SO. TRAX STA.

WASATCH BOULEVARD & 7650 SOUTH

PIN Description / Project Location

TRAFFIC ADAPIVE CONTROL SYSTEM

RECONSTRUCTION & MINOR DRAINAGE IMPROVEMENTS

INTERSECTION IMPROVEMENT

FEASIBILITY STUDY

NEW CONSTRUCTION

CONSTRUCT RIGHT TURN LANE

Replace Surface Parking with Parking Structure

PARK AND RIDE LOT

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

1

1

1

1

1

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$619,437

$1,357,060

$128,476

Total

Total

Total

$3,383,813

$2,109,635

$4,815

$1,072,616

$1,072,616

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$5,075,866

$4,539,311

$133,291

$4,732,230

$4,232,000

$124,265

$0

$0

$4,513

$343,636

$307,311

$4,513

Salt Lake County Projects

CMAQ_WFRC

R/H_HAZ_ELIMSTP_URB_SL

STP_URB_SLSTP_URB_SL@1LOCAL_INKIND

LOCAL_GOVTSTP_URB_SLST_CONT_R2

STP_URB_SL

STP_URB_SL

STP_URB_SL

CMAQ_WFRC

$1,031,068

$100,000 $3,283,813

$2,066,696 $0

$42,939

$4,513 $0

$302

$1,061,890

$1,781,615

$0

$171,618

$0

$0 $1,072,616

$1,072,616 $0 $0

$0 $0 $0

$1,077,979

$0

$0

$349,673

$0

$0 $0

$0 $0 $0

$0 $0 $0

$2,145,232

$0

$0

$1,072,616

$0

$0 $0

$0 $0 $0

$0 $0 $0

$1,563,875

$0

$1,072,616

$0

$0

$0 $0

$0 $0 $0

$0 $0 $0

$0

$0

$1,072,616

$0

$5,481,068

$100,000 $4,975,866

$3,905,057 $591,315

$42,939

$4,513 $124,265

$4,513

$5,859,702

$1,781,615

$2,145,232

$1,593,907

$5,110,000

$93,230 $4,639,000

$3,640,685 $591,315

$0

$0 $124,265

$0

$5,463,000

$1,661,000

$2,000,000

$1,486,000

$371,068

$0 $0

$0 $0 $0

$0 $0

$4,513

$0

$0

$0

$0

$0

$6,770 $336,866

$264,372 $0

$42,939

$4,513 $0 $0

$396,702

$120,615

$145,232

$107,908

$4,450,000

$0 $619,437

$765,745 $591,315

$0

$0 $124,265

$4,211

$10,726

$0

$0

$0

Region

Active

Active

Active

Closeout

Active

Scoping

Scoping

Scoping

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

TRAFFIC ADAPIVE CONTROL SYSTEM

5900 SOUTH; STATE STREET TO 700 WEST

FORT UNION BLVD & HIGHLAND DRIVE INTERSECTION

4700 SOUTH I-215 AREA; 2200 WEST TO 2700 WEST

6200 SOUTH; 6100 WEST TO SR-111

HIGHLAND DRIVE @ I-215; I-215 WB ON-RAMP TO LA CRESTA

TRANSIT ORIENTED DEVELOPMENT (TOD) @ 10000 SOUTH TRAX STA.

WASATCH BOULEVARD & 7650 SOUTH

Page 59: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 68 of 217

10007

10010

10011

10193

10603

11076

11857

12094

PIN

F-R299(138)

F-R299(140)

F-2044(10)0

F-LC35(207)

S-0154(70)1

F-LC35(211)

F-LC35(231)

F-R299(178)

Project No.

1300 East; Pioneer Road (12400 So) to 13200 So

Closed transferred to PIN 8112

13800 South; Bangerter Hwy to 300 East

New Road from Laney Ave to Murray-Holliday Road

Bangerter Hwy. & 600 W. Design

Sugarhouse Park Trail

Larchwood Drive, Midvale City- Bridge Replacement

Spring Lane Sidewalk improvements

PIN Description / Project Location

Reconstruct widening

Reconstruct no widening

Intersection Improvements

New Construction

New Interchange on Existing Freeway

Pedestrian/Bicycle Safety

Off-System Bridge

Safe Sidewalk/ADA ramps

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

1

1

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$625

$102,536

$0

Total

Total

Total

$11

$297,464

$249,010

$0

$0

$0

$0

$0

$0

$0

$46,000,000

$0

$0

$0

$0

$636

$46,400,000

$249,010

$500

$0

$99,604

$0

$46,400,000

$0

$136

$0

$149,406

Salt Lake County Projects

STP_URB_SL

STP_URB_SL

STP_URB_SL

LOCAL_GOVTEM_2011_TCSPEM_2012_TCSP

ST_TIFST_GF_HB242ST_TIF_SB229

EM_HPP_1702

STP_BR

STP_TAP_STSTP_FLX_STLOCAL_GOVT

$650,120

$0

$240,726

$11 $0 $0

$0 $297,464

$0

$0

$600,000

$99,604 $0

$149,406

$808,924

$0

$1,072,261

$0 $0 $0

$0 $0 $0

$0

$0

$0 $0 $0

$1,522,041

$1,072,616

$1,786,978

$0 $0 $0

$0 $0 $0

$0

$0

$0 $0 $0

$0

$0

$0

$0 $0 $0

$46,000,000 $0 $0

$0

$0

$0 $0 $0

$1

$0

$0

$0 $0 $0

$0 $0 $0

$0

$0

$0 $0 $0

$3,909,846

$1,072,616

$3,109,965

$11 $625

$0

$46,000,000 $400,000

$0

$230,000

$600,000

$99,604 $0

$149,406

$3,645,149

$1,000,000

$2,899,420

$0 $500

$0

$0 $0 $0

$184,000

$559,380

$99,604 $0 $0

$0

$0

$0

$0 $0 $0

$46,000,000 $400,000

$0

$0

$0

$0 $0 $0

$264,697

$72,616

$210,545

$11 $125

$0

$0 $0 $0

$46,000

$40,620

$0 $0

$149,406

$928,760

$0

$10,000

$0 $625

$0

$0 $102,536

$0

$230,000

$0

$0 $0 $0

Region

Active

STIP

Scoping

Closeout

Scoping

Closeout

STIP

Scoping

10/20/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Other: 13TH EAST; 124TH TO 132ND to: 1.00 for: 1.00

Other: 300 EAST; HELM AVE TO 39TH SO. to: .50 for: .50

Other: 138TH SO; BANERTER TO 3RD EAST to: .50 for: .50

MIDBLOCK ROAD, HOLLADAY UT

SR-154; 600 W.

Sugar House Park

Midvale City, 6755 South 690 East; Structure Replacement 035014D

Spring lane from 1300 E. to Highland Drive in Holladay City

Page 60: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 69 of 217

5659

3616

3904

4308

8314

10009

10019

11049

PIN

F-LC35(171)

SP-0182(1)0

SP-0071(14)4

SP-9999(697)

S-0085(5)0

F-R299(139)

F-R299(143)

F-R299(157)

Project No.

Parley's Creek Trail Phase IV - Salt Lake County

Mountain View Corridor Presevation

700 East Corridor

Highland Drive Corridor

MVC; 5400 South to 4100 South

5600 West; 7800 South to 8600 South

200 North from 500 West to 440 West

FY 2013 - 2014 CPG for WFRC MPO UPWP

PIN Description / Project Location

Construction of Parley's Creek Trail

Purchase Parcels in advance of Project Activity

Purchace Parcaels in advance of project activity

Purchase Parcels in advance of project activity

New Capacity

New Construction

UTA/Transit

Planning

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

TRAIL

Beg Len

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$0

$6,009,491

Total

Total

$9,515,304

$436,386

$0

$0

$65,000,000

$0

$98,401,000

$0

$0

$0

$172,916,304

$6,445,877

$0

$6,009,491

$172,916,304

$0

$0

$436,386

Salt Lake County Projects

EM_HPP_1702

ST_CORR_PRES

ST_CORR_PRES

ST_CORR_PRES

ST_TIFST_TIF_SB229ST_CHF_TIF

STP_URB_SL

CMAQ_WFRC

STP_URB_SLL_PASS_MATCHSTP_URB_O/LPL_WFRCFTA_5303

$1

$6,756,000

$0

$10,508

$9,415,304 $0

$100,000

$815,188

$1,362,222

$0 $436,386

$0 $0 $0

$0

$0

$0

$0

$0 $0 $0

$1,090,770

$0

$0 $0 $0 $0 $0

$0

$0

$0

$0

$65,000,000 $0 $0

$2,044,406

$0

$0 $0 $0 $0 $0

$0

$0

$0

$0

$98,401,000 $0 $0

$1,072,620

$0

$0 $0 $0 $0 $0

$0

$0

$0

$0

$0 $0 $0

$0

$0

$0 $0 $0 $0 $0

$1,736,034

$61,424,000

$459,110

$1,392,000

$172,816,304 $0

$100,000

$5,022,984

$1,501,662

$186,000 $436,386 $514,000

$4,271,784 $1,037,707

$1,388,827

$0

$0

$0

$0 $0 $0

$4,682,928

$1,399,999

$186,000 $0

$514,000 $4,271,784 $1,037,707

$0

$61,424,000

$459,110

$1,392,000

$172,816,304 $0

$100,000

$0

$0

$0 $0 $0 $0 $0

$347,207

$0

$0

$0

$0 $0 $0

$340,056

$101,663

$0 $436,386

$0 $0 $0

$1,736,033

$54,668,000

$459,110

$1,381,492

$0 $0 $0

$0

$139,440

$186,000 $0

$514,000 $4,271,784 $1,037,707

Region

Subst Comp

Active

Active

Active

Active

STIP

Scoping

Closeout

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Parley's Creek Trail Phase IV - Salt Lake County

Mountain View Corridor

Corridor Preservation / Adv. Acquisition

Draper/Sandy to Highland Drive

MVC;5400 South to 4100 South

5600 West from 7800 South to 8600 South

200 North from 500 West to 440 West

FY 2013 - FY 2014 CPG for WFRC MPO UPWP

Page 61: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 70 of 217

11055

11083

11084

11086

11087

11093

11094

11095

11096

PIN

F-R299(161)

F-2076(1)

F-LC35(214)

F-LC35(215)

F-0154(72)1

F-LC35(216)

F-LC35(217)

F-LC35(218)

F-R299(162)

Project No.

Magna Livable Streets Project

1300 East; 1300 South to 2100 South

Portor Rockwell Blvd; 14942 South 550 West

Highland Drive & Minuteman Drive

SR-154, Bangerter Highway & 200 West

Bengal Blvd. & 2700 East Roundabout

7800 South & 1300 West

9000 South & 4000 West

I-215 Ramp Meters - I-215; 6200 So to State St.

PIN Description / Project Location

Pedestrian/Bicycle Safety

Reconstruct no widening

New Construction

Intersection Improvements

Intersection Improvements

Intersection Improvements

Intersection Improvements

Intersection Improvements

Ramp Meters

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$989,761Total $1,020,000 $0 $0 $0 $0 $2,009,761 $791,809 $0 $1,217,952

Salt Lake County Projects

EM_2012_TCSPLOCAL_GOVT

STP_URB_SL

STP_URB_SL

STP_URB_SL

STP_URB_SL

CMAQ_WFRC

CMAQ_WFRC

CMAQ_WFRC

CMAQ_WFRC

$0 $1,020,000

$369,123

$10,726

$10,726

$0

$0

$10,726

$10,726

$10,726

$0 $0

$0

$536,308

$536,308

$948,193

$0

$257,428

$257,428

$0

$0 $0

$72,616

$0

$536,308

$0

$0

$0

$0

$980,371

$0 $0

$4,279,738

$0

$766,921

$0

$0

$0

$536,308

$0

$0 $0

$0

$3,436,662

$0

$0

$1,072,616

$214,523

$0

$0

$989,761 $1,020,000

$4,721,477

$3,983,696

$1,850,263

$948,193

$1,072,616

$482,677

$804,462

$991,097

$791,809 $0

$4,401,833

$3,714,000

$1,725,000

$884,000

$1,000,000

$450,000

$750,000

$924,000

$0 $0

$0

$269,696

$125,263

$64,193

$72,616

$32,677

$54,462

$67,097

$197,952 $1,020,000

$319,644

$0

$0

$0

$0

$0

$0

$0

$989,761 $0

$0

$0

$0

$0

$0

$0

$0

$0

Region

Active

STIP

STIP

STIP

STIP

STIP

STIP

STIP

STIP

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Magna Livable Streets Project

1300 East; 1300 South to 2100 South

New Route; 14942; 550 West to 0.4 Miles South

Highland & Minuteman Drive

Bangerter Hwy (SR-154) & 200 West

Bengal Blvd & 2700 East

7800 South & 1300 West

9000 South & 4000 West

I-215 Various Locations; 6200 South to State Street

Page 62: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 71 of 217

11097

11098

11963

11984

11985

11986

11987

11988

PIN

F-LC35(219)

F-LC35(220)

F-ST99(290)

F-LC35(239)

F-LC35(240)

F-LC35(241)

F-LC35(242)

F-LC35(243)

Project No.

Jordan River Trail - Gardner Village TRAX Station

U of U Central Campus Electrified Shuttle Route

FY 2015-2016 WFRC CPG; Planning - SL,WV, O/L Areas

Salt Lake Central Bus Maintenance Facility

Project Planning Support - Salt Lake County

Porter Rockwell Blvd (5th Segment)

Vine Street; 900 East to 1300 East

4700 South to Southbound I-215

PIN Description / Project Location

Pedestrian/Bicycle Safety

UTA/Transit

Annual Work Program

UTA/Transit

Local/MPO/Other Agency Pass-Through

New Construction

Reconstruct widening

Reconstruct widening

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$2,904,497Total $3,547,596 $0 $0 $0 $0 $6,452,093 $6,015,286 $0 $436,807

Salt Lake County Projects

CMAQ_WFRC

STP_URB_SL

FTA_5303L_PASS_MATCHSTP_URB_SLSTP_URB_O/LPL_WFRC

STP_URB_SL

STP_URB_SL

STP_URB_SL

STP_URB_SL

STP_URB_SL

$10,726

$643,290

$636,023 $436,807 $272,000 $128,000

$2,074,766

$0

$278,880

$10,726

$10,726

$0

$311,059

$0

$0 $0 $0 $0 $0

$0

$278,880

$0

$0

$1,340,770

$0

$0

$0 $0 $0 $0 $0

$0

$278,880

$2,145,232

$268,154

$1,308,592

$0

$0

$0 $0 $0 $0 $0

$0

$278,880

$1,887,804

$1,866,352

$0

$0

$0

$0 $0 $0 $0 $0

$3,217,848

$278,880

$1,072,616

$2,145,232

$0

$321,785

$713,290

$1,272,044 $436,807 $520,000 $280,000

$3,943,242

$3,217,848

$1,673,280

$5,116,378

$4,290,464

$2,649,362

$300,000

$665,000

$1,272,044 $0

$520,000 $280,000

$3,943,242

$3,000,000

$1,559,999

$4,769,999

$4,000,000

$2,470,000

$0

$0

$0 $0 $0 $0 $0

$217,848

$0

$0

$0

$0

$21,785

$48,290

$0 $436,807

$0 $0 $0

$0

$113,281

$346,379

$290,464

$179,362

$0

$70,000

$636,021 $0

$248,000 $152,000

$1,868,476

$0

$278,880

$0

$0

$0

Region

Scoping

Scoping

Active

STIP

Active

STIP

STIP

STIP

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Jordan River Trail - Gardner Village TRAX Station

U of U Central Campus Electrified Shuttle Route

Various Locations in Salt Lake/Ogden/Layton Urban Areas

Salt Lake Central Bus Maintenance Facility

Project Planning Support - Salt Lake County

Porter Rockwell Blvd (Fifth Segment); Redwood Road to 0.46 miles east

Vine Street; 900 East to 1300 East

4700 South Seperated Right Turn Lane to Southbound I-215

Page 63: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 72 of 217

11989

11998

11999

12000

12001

12006

12007

12008

PIN

F-LC35(244)

F-LC35(245)

F-LC(246)

F-LC35(247)

F-LC35(232)

F-LC35(233)

F-LC35(234)

F-LC35(235)

Project No.

9000 South; 4800 West to 5300 West

Little Cottonwood Canyon - Snowbird Entry 1

Black Line TRAX Service; SL Central Station to U

Bengal Blvd & 2300 East Round-About

1300 East Buttercup Pedestrian Bridge

200 West; North Temple to 900 South

Holladay City - Bicycle Trails Improvement Project

Salt Lake City - Bike Share Expansion

PIN Description / Project Location

Reconstruct no widening

Intersection Modification

UTA/Transit

Intersection Modification

School Zone Safety

Trails

Trails

Trails

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$0

$38,224

$27,037

$308,075

Total

Total

Total

Total

$10,000

$491,538

$88,806

$16,925

$1,341,496

$0

$0

$0

$2,054,060

$0

$0

$0

$0

$0

$0

$268,154

$0

$0

$0

$347,527

$3,405,556

$529,762

$115,843

$940,681

$3,175,000

$85,000

$108,000

$876,997

$0

$0

$0

$0

$230,556

$444,762

$7,843

$63,684

Salt Lake County Projects

STP_URB_SLST_SIB_LG

CMAQ_WFRC

CMAQ_WFRC

CMAQ_WFRC

CMAQ_WFRC

TAP_URB_WFRCLOCAL_GOVT

LOCAL_GOVTTAP_URB_WFRC

LOCAL_GOVTSPR_PCMAQ_WFRCTAP_URB_WFRC

$10,000 $0

$10,726

$10,726

$10,726

$10,726

$46,776 $444,762

$7,843 $80,963

$16,925 $0 $0 $0

$1,341,496 $0

$0

$0

$0

$1,072,616

$0 $0

$0 $0

$0 $0 $0 $0

$2,054,060 $0

$364,689

$0

$0

$1,061,890

$0 $0

$0 $0

$0 $0 $0 $0

$0 $0

$0

$0

$1,072,616

$0

$0 $0

$0 $0

$0 $0

$268,154 $0

$0 $0

$0

$2,134,506

$1,764,454

$0

$0 $0

$0 $0

$0 $0

$347,527 $0

$3,405,556 $0

$375,415

$2,145,232

$2,847,796

$2,145,232

$85,000 $444,762

$7,843 $108,000

$16,925 $0

$690,681 $233,075

$3,175,000 $0

$349,999

$2,000,000

$2,655,000

$2,000,000

$85,000 $0

$0 $108,000

$0 $0

$643,922 $233,075

$0 $0

$25,416

$0

$0

$0

$0 $0

$0 $0

$0 $0 $0 $0

$230,556 $0

$0

$145,232

$192,796

$145,232

$0 $444,762

$7,843 $0

$16,925 $0

$46,759 $0

$0 $0

$0

$0

$0

$0

$38,224 $0

$0 $27,037

$0 $0

$75,000 $233,075

Region

Active

STIP

STIP

STIP

Scoping

Active

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv.Const 9000 South; 4800 West to 5300 West

Little Cottonwood Canyon Intersection - Snowbird Entry 1

Black Line TRAX Service; SL Central Station to University of Utah

Bengal Blvd & 2300 East Round-About

1300 East Buttercup Pedestrian Bridge

200 West - Enhanced/ Separated Bikeway; North Temple to 900 South

Holladay City- Bicycle Trails Improvement Project

Salt Lake City - Bike Share Expansion

Page 64: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 73 of 217

12009

12011

13112

13113

13114

13115

13116

13117

5930

PIN

F-LC35(236)

F-LC35(238)

F-LC35(249)

F-LC35(250)

F-0089(392)0

F-LC35(251)

F-LC35(252)

F-LC35(253)

S-I15-7(310)305

Project No.

700 West; 7200 South to 7800 South

Welby Jacob & Bingham Creek, South Jordan

Porter Rockwell Blvd (4th Seg); East Jordan Canal

11800 South; Mountain View Corridor to 5600 West

9270 South & State Street; 150 East to State St.

Redwood Road; 4100 South to Bruin Blvd. (4445 So.)

3200 West; 10431 South to 10600 South

4100 South; Bangerter Highway to 4400 West

I-15 MP 305; attenuator

PIN Description / Project Location

Trails

Trails

New Capacity

New Capacity

Intersection Improvements

Operations/Maintenance

Reconstruct widening

Reconstruct widening

Spot improvement

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

305

Beg Len

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$52,209

$0

Total

Total

$279,229

$40,000

$0

$0

$0

$0

$0

$0

$0

$0

$331,438

$40,000

$309,000

$37,292

$0

$0

$22,438

$2,708

Salt Lake County Projects

TAP_URB_WFRCLOCAL_GOVT

TAP_URB_WFRCLOCAL_GOVT

STP_URB_SL

STP_URB_SL

STP_URB_SL

STP_URB_SL

STP_URB_SL

STP_URB_SL

ST_SPOT_MNT

$256,791 $22,438

$37,292 $2,708

$0

$0

$0

$0

$0

$0

$1,451

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$6,474,700

$2,145,232

$3,436,400

$4,749,000

$1,072,616

$4,284,400

$0

$309,000 $22,438

$37,292 $2,708

$6,474,700

$2,145,232

$3,436,400

$4,749,000

$1,072,616

$4,284,400

$20,000

$309,000 $0

$37,292 $0

$6,036,363

$2,000,000

$3,203,756

$4,427,493

$1,000,000

$3,994,346

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$20,000

$0 $22,438

$0 $2,708

$438,337

$145,232

$232,644

$321,507

$72,616

$290,054

$0

$52,209 $0

$0 $0

$0

$0

$0

$0

$0

$0

$18,549

Region

Active

Scoping

STIP

STIP

STIP

STIP

STIP

STIP

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11177

700 West; 7200 South to 7800 South, Midvale City

Welby Jacob and Bingham Creek; North City Limit to South City Limit, South Jordan

Porter Rockwell Blvd (4th Seg); East Jordan Canal

11800 South; Mountain View Corridor to 5600 West

9270 South & State Street; 150 East to State St.

Redwood Road; 4100 South to Bruin Blvd. (4445 So.)

3200 West; 10431 South to 10600 South

4100 South; Bangerter Highway to 4400 West

I-15; MP 305.03 - 305.03

Page 65: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 74 of 217

5930

8549

11798

5589

6129

6632

10032

5930

5952

PIN

S-I15-7(311)306

F-I15-7(291)303

S-I15-7(327)290

S-0048(37)3

S-0048(38)11

S-0048(27)12

F-0048(32)6

S-0068(74)62

S-R299(151)

Project No.

I-15 MP-306; 1300 S. off ramp; drainage

3300 So & I-15 Landscaping

I-15; 12300 So. NB Approach Repair, 1F-694

SR-48 and 9000 S. Road Transfer Evaluation

SR-48; Heartland Elementary Lighting

SR-48, 700 WEST TO STATE STREET

SR-48; Copperhills Highschool to 4800 W.

SR-68 MP-62; drainage system (Pet Adoption Center)

New Traffic Signal at SR-68 & North Star Drive

PIN Description / Project Location

Spot improvement

Landscaping

Replacement and Rehabilitation - Structure

Contingency Funds

Lighting

OVERLAY AND REPLACE WITH 1 INCH OGSC

Preservation - Roadway

Grade & Drainage

Traffic Signal - New

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

15

15

48

48

48

48

68

68

303

290

3

11

12

6

62

60

Beg Len

1

2

5

1

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$700,000Total $0 $0 $0 $0 $0 $700,000 $652,610 $47,390 $0

Salt Lake County Projects

ST_SPOT_MNT

STP_ENH_ST

ST_BRIDGE

ST_CONT_R2

ST_LIGHTING

ST_PVMT

NHPP_NHSSTP_FLX_ST

ST_SPOT_MNT

ST_SIGNALS

$5,506

$565,000

$21,923

$13,000

$30,000

$0

$0 $0

$30

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$20,000

$625,000

$75,000

$13,000

$30,000

$345,313

$680,000 $20,000

$20,200

$447,181

$0

$500,000

$0

$0

$0

$0

$633,964 $18,646

$0

$0

$20,000

$125,000

$75,000

$13,000

$30,000

$345,313

$46,036 $1,354

$20,200

$447,181

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$14,494

$60,000

$53,077

$0

$0

$345,313

$680,000 $20,000

$20,170

$447,181

Region

Closeout

Active

Active

Active

Active

Closeout

Contr Clsd

Closeout

Closeout

07/30/11

10/19/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11178

9938

13144

12887

13090

8845

9692

11186

10684

From I-15P CLTR to 1300 South; MP .11 - .11

State Route: I-15 from: 303.34 to: 303.94 for: .60

I-15; MP 289.51 - 291.67

SR-48; MP 3.03 - 8.46

SR-48; MP 10.67 - 10.67

SR-48, 700 WEST TO STATE STREET; M.P. 11.67 TO 12.699

SR-48; MP 5.80 - 6.50

SR-68; MP 62.05 - 62.05

SR-68; MP 59.72 to MP 59.84

Page 66: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 75 of 217

5996

8074

10031

5589

5775

5952

6019

PIN

F-0068(91)41

F-0068(75)47

F-0068(69)60

S-0071(44)7

S-0071(43)11

F-0071(42)17

F-0071(39)1

Project No.

Fiber: Redwood Road - 12600 S to Bangerter

SR-68; 9000 South to 6600 South

SR-68; 250 South to 1000 North

SR-71 MP 6.7-7.1 Striping

SR-71/8600 S. Int. Reconst. (MP 10.59-10.71)

SR-71 & 3900 South, Traffic Signal Reconstruct

SR-71/2700 W Signal Reconstruction

PIN Description / Project Location

ITS Communications

Minor Rehabilitation - Roadway

Minor Rehabilitation - Roadway

Contingency Funds

Intersection Improvements

Traffic Signal - Upgrade

Traffic Signal - Upgrade

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

68

68

68

71

71

71

71

41

47

59

7

11

17

1

Beg Len

2

3

2

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$1,448,343

$2,987,780

$0

$50,858

$22,083

$1,200,000

Total

Total

Total

Total

Total

Total

$0

$307,230

$60,000

$69,142

$977,917

$600,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,448,343

$3,295,010

$60,000

$120,000

$1,000,000

$1,800,000

$1,350,290

$3,071,929

$0

$0

$489,458

$1,678,140

$98,053

$223,082

$60,000

$120,000

$510,543

$121,860

$0

$0

$0

$0

$0

$0

Salt Lake County Projects

CMAQ_WFRC

EQ_BONUS(MG)STP_FLX_ST

ST_BRIDGEST_INELIGIBLNHPP_BRNHPP_NHS

ST_CONT_R2ST_SPOT_SFTY

ST_SIGNALSST_SPOT_SFTY

HSIPST_SIGNALS

SEC164_HSIPHSIPSTP_FLX_ST

$270,000

$0 $0

$0 $0 $0

$307,230

$50,000 $10,000

$9,142 $60,000

$515,000 $462,917

$0 $300,000 $300,000

$0

$0 $0

$0 $0 $0 $0

$0 $0

$0 $0

$0 $0

$0 $0 $0

$0

$0 $0

$0 $0 $0 $0

$0 $0

$0 $0

$0 $0

$0 $0 $0

$0

$0 $0

$0 $0 $0 $0

$0 $0

$0 $0

$0 $0

$0 $0 $0

$0

$0 $0

$0 $0 $0 $0

$0 $0

$0 $0

$0 $0

$0 $0 $0

$300,000

$1,446,285 $2,058

$0 $10

$295,000 $3,000,000

$50,000 $10,000

$60,000 $60,000

$525,000 $475,000

$100,000 $1,400,000

$300,000

$279,690

$1,348,372 $1,919

$0 $0

$275,029 $2,796,900

$0 $0

$0 $0

$489,458 $0

$93,230 $1,305,220

$279,690

$20,310

$97,914 $139

$0 $10

$19,972 $203,100

$50,000 $10,000

$60,000 $60,000

$35,543 $475,000

$6,770 $94,780 $20,310

$0

$0 $0

$0 $0 $0 $0

$0 $0

$0 $0

$0 $0

$0 $0 $0

$30,000

$1,446,285 $2,058

$0 $10

$295,000 $2,692,770

$0 $0

$50,858 $0

$10,000 $12,083

$100,000 $1,100,000

$0

Region

Scoping

Closeout

Phys Compl

Scoping

Closeout

Active

Active

05/18/13

03/08/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12632

11201

9436

12886

12776

12714

11402

SR-68; MP 40.80 - 42.35

SR-68; MP 46.75 - 50.06

SR-68; MP 58.94 - 60.83

SR-71; MP 6.59 - 7.21

SR-71; MP 10.71 - 10.71

SR-71; MP 17.39 - 17.39

SR-71; MP 1.38 - 1.38

Page 67: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 76 of 217

6019

10032

11731

5589

8071

8073

8074

5775

PIN

F-0071(40)13

F-0071(35)0

F-0071(45)18

S-I80-3(178)123

F-R299(130)

F-I80-3(172)128

F-I80-2(59)103

S-0089(353)380

Project No.

SR-71/Ft. Union Blvd Int. Dual Lefts

SR-71; Bangerter Hwy to I-15

SR-71 (700 East); 3300 South to 400 South

I80 STATE ST. SOUTH SALT LAKE CITY STUDY

I-80; Parley's Canyon Drainage Improvements

I-80; Ranch Exit to Lambs SMA

I-80; End of Asphalt to 6000 W.

Region 2 Enhanced Crosswalk System - Experimental

PIN Description / Project Location

Intersection Improvements

Preservation - Roadway

Minor Rehabilitation - Roadway

Contingency Funds

Drainage

Major Rehabilitation - Roadway

Concrete Pavement, Rehabilitation

Pedestrian/Bicycle Safety

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

71

71

71

80

80

80

80

89

13

18

123

129

132

103

380

Beg Len

5

4

11

4

10

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$3,299,372

$11,837,176

$4,701,000

Total

Total

Total

$50,000

$10,599

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$3,349,372

$11,847,775

$4,701,000

$3,076,005

$11,113,240

$4,427,402

$273,367

$686,760

$273,598

$0

$47,775

$0

Salt Lake County Projects

HSIP

STP_FLX_STNHPP_NHSST_PVMTNHS

NHPP_NHS

ST_CONT_R2

L_BETTERMENTIMNHPP_IM

NHPP_IMIM

NHPP_IM

ST_SPOT_SFTY

$2,000,000

$0 $0

$50,000 $0

$4,300,000

$20,000

$10,599 $0 $0

$0 $0

$0

$63,499

$0

$0 $0 $0 $0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0 $0 $0 $0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0 $0 $0 $0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0 $0 $0 $0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$2,000,000

$600,000 $2,659,667

$50,000 $39,705

$4,400,000

$20,000

$47,775 $5,315,854 $6,484,146

$0 $4,701,000

$3,302,000

$71,000

$1,864,600

$559,380 $2,479,607

$0 $37,017

$4,102,120

$0

$0 $5,006,471 $6,106,769

$0 $4,427,402

$3,109,824

$0

$135,400

$40,620 $180,059

$50,000 $2,688

$297,880

$20,000

$0 $309,383 $377,377

$0 $273,598

$192,176

$71,000

$0

$0 $0 $0 $0

$0

$0

$47,775 $0 $0

$0 $0

$0

$0

$0

$600,000 $2,659,667

$0 $39,705

$100,000

$0

$37,176 $5,315,854 $6,484,146

$0 $4,701,000

$3,302,000

$7,501

Region

Scoping

Subst Comp

Active

Active

Cntr Comp

Contr Clsd

Closeout

Active

12/21/13

04/03/13

09/17/11

03/23/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11407

9716

10863

11578

10087

9685

10865

12149

SR-71; MP 12.69 - 12.69

SR-71; MP .00 - 4.97

SR-71; MP 18.28 - 22.47

I-80; MP 123.20 - 123.20

I-80; MP 128.90 - 139.40

I-80; MP 131.80 - 136.11

I-80; MP 102.53 - 112.86

US-89; MP 379.85 - 379.93

Page 68: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 77 of 217

5952

5952

5952

5952

6019

8074

10032

12132

5930

PIN

S-0089(352)378

S-0089(370)0

S-0089(378)0

S-0089(381)378

F-0089(355)376

F-0089(296)380

F-0089(341)374

F-0089(380)363

S-0111(21)2

Project No.

Overhead RSSZ Flasher at US-89 & Harvard Ave

US-89; Ped Signal between S Temple and 100 S

US-89 (State Street) & 2700 South, Signal Upgrade

US-89 (State St) & Herbert Ave (1060 S); MP 377.65

US-89/2700 S Int. Reconstruction

SR-89; North Temple to Victory Road

SR 89; 3300 South to 400 South

US-89; VARIOUS LOCATIONS

SR-111 MP2, 7800 S; repair dip

PIN Description / Project Location

Traffic Signal - New

Traffic Signal - New

Traffic Signal - New

Traffic Signal - New

Intersection Improvements

Major Rehabilitation - Roadway

Preservation - Roadway

Preservation - Roadway

Spot improvement

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

89

89

89

89

89

89

89

89

111

377

380

375

378

375

380

374

363

2

Beg Len

2

4

5

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$2,486,529

$4,019,741

$240,000

Total

Total

Total

$15,588

$80,259

$1,760,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,502,117

$4,100,000

$2,000,000

$2,332,723

$3,822,430

$1,864,600

$169,393

$277,570

$135,400

$0

$0

$0

Salt Lake County Projects

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

HSIP

EQ_BONUS(MG)STP_FLX_ST

NHPP_NHSNHS

NHPP_NHSSTP_FLX_ST

ST_SPOT_MNT

$9,296

$150,000

$133,865

$150,000

$0

$15,588 $0

$80,259 $0

$1,084,000 $676,000

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$100,000

$150,000

$140,000

$150,000

$110,000

$2,402,117 $100,000

$3,315,248 $784,752

$1,324,000 $676,000

$70,000

$0

$0

$0

$0

$102,553

$2,239,493 $93,230

$3,090,805 $731,625

$1,234,365 $630,235

$0

$100,000

$150,000

$140,000

$150,000

$7,447

$162,623 $6,770

$224,442 $53,128

$89,635 $45,765

$70,000

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$90,704

$0

$6,135

$0

$110,000

$2,386,529 $100,000

$3,234,988 $784,752

$240,000 $0

$70,000

Region

Closeout

STIP

Active

STIP

Closeout

Closeout

Subst Comp

Active

Active

11/10/12

10/19/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12125

12933

12934

13052

11406

10468

10437

12361

11188

US-89; MP 377.50 - 377.51

US-89; MP 379.74 - 379.74

US-89; MP 375.35 - 375.35

US-89; MP 377.66 - 377.66

US-89; MP 375.35 - 375.35

US-89; MP 379.88 to MP 381.50

US-89; MP 374.47 - 378.63

US-89; MP 363.25 - 368.09

SR-111; MP 2.34 - 2.34

Page 69: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 78 of 217

5952

5952

10032

5952

10032

5952

5589

9862

5775

PIN

S-0111(23)8

S-0111(25)2

F-0140(18)0

S-0151(75)

F-0151(76)2

S-0152(31)1

S-R299(135)

S-R299(136)

S-0171(40)0

Project No.

Signal Upgrade at SR-111 & 4100 South Magna

SR-111 @ 8200 South AWS, West Jordan

SR-140; 14400 S., Redwood Rd. to I-15

SR-151 (106th South) & South Jordan Gateway

SR-151; Redwood to I-15

Signal Safety Improvements at SR-152 & 5600 South

SR-154 MP 10.3 - 19.5

SR-154; Bangerter Hwy from 14000 S to 13600

SR-171; Sidewalk Connection (MP 0.491-0.572)

PIN Description / Project Location

Traffic Signal - Upgrade

Traffic Signal - New

Preservation - Roadway

Traffic Signal - New

Preservation - Roadway

Traffic Signal - Upgrade

Other - Traffic & Safety Project

Preservation - Structure

Pedestrian/Bicycle Safety

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

111

111

140

151

151

152

154

154

171

8

2

4

2

1

10

Beg Len

3

2

9

2

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$643,464Total $177,611 $0 $0 $0 $0 $821,075 $702,092 $118,983 $0

Salt Lake County Projects

ST_SIGNALS

ST_SIGNALS

STP_FLX_STST_BRIDGE

ST_SIGNALS

STP_FLX_ST

ST_SIGNALS

ST_CONT_R2

ST_BRIDGE

ST_SPOT_SFTY

$4,497

$125,578

$177,611 $0

$150,000

$2,250,000

$317,603

$4,046

$90,545

$106,245

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$352,608

$150,000

$753,075 $68,000

$150,000

$2,500,000

$404,000

$71,000

$281,300

$250,000

$0

$0

$702,092 $0

$0

$2,330,750

$0

$0

$0

$0

$352,608

$150,000

$50,983 $68,000

$150,000

$169,250

$404,000

$71,000

$281,300

$250,000

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$348,111

$24,422

$575,464 $68,000

$0

$250,000

$86,397

$66,954

$190,755

$143,755

Region

Closeout

Active

Contr Clsd

Scoping

Scoping

Active

Closeout

Closeout

Closeout

10/19/13

06/23/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11487

12681

11462

12976

12499

11848

10343

10633

11369

SR-111; MP 8.06 - 8.16

SR-111; MP 1.83 - 1.83

SR-140; MP .00 - 2.56

SR-151; MP 3.89 - 3.89

SR-151; MP 2.01 - 4.24

SR-152; MP 1.39 - 1.49

SR-154; MP 10.30 to MP 19.50

SR-154; MP .47 - 2.67

SR-171; MP .49 - .57

Page 70: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 79 of 217

5775

5952

6019

8072

8073

8549

5996

8074

PIN

S-0171(47)

S-0171(39)15

F-0171(45)6

F-0171(38)8

F-0171(30)7

F-0171(33)9

F-0172(28)0

F-0172(24)5

Project No.

SR-171/4000 W, Signal Upgrades

Signal at SR-171 & 2940 East, Millcreek

SR-171/4000 W, Signal Upgrades

SR-171; Redwood Road to State Street

SR-171, 3500 SOUTH; 2700 WEST TO REDWOOD RD.

SR-171, 3300 So. Pathway Jordan Rv Trail - Trax

5600 West Interconnect

SR-172; 3100 S. to SR-201

PIN Description / Project Location

Traffic Signal - Upgrade

Traffic Signal - New

Traffic Signal - Upgrade

Preservation - Roadway

4" ROTOMILL, OVERLAY, OGSC

Pedestrian/Bicycle Safety

ITS Communications

Major Rehabilitation - Roadway

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

171

171

171

171

171

171

172

172

6

15

6

8

7

9

4

Beg Len

3

1

1

6

2

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$0

$1,334,252

$65,000

Total

Total

Total

$80,000

$25,000

$635,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$80,000

$1,359,252

$700,000

$0

$1,248,585

$500,000

$80,000

$110,667

$50,000

$0

$0

$150,000

Salt Lake County Projects

ST_SPOT_SFTYST_SIGNALS

ST_SIGNALS

HSIP

NHS

ST_ATMSSTP_FLX_ST

LOCAL_GOVTST_CONT_R2TAP_URB_WFRC

CMAQ_WFRC

NHS

$50,000 $30,000

$10,000

$0

$87,067

$0 $25,000

$113,692 $50,000

$471,308

$200,000

$0

$0 $0

$0

$0

$0

$0 $0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0 $0 $0

$0

$0

$50,000 $30,000

$510,000

$50,000

$1,287,000

$20,000 $1,339,252

$113,692 $50,000

$536,308

$200,000

$1,543,000

$0 $0

$0

$46,615

$1,199,870

$0 $1,248,585

$0 $0

$500,000

$186,460

$1,438,539

$50,000 $30,000

$510,000

$3,385

$87,130

$20,000 $90,667

$0 $50,000

$0

$13,540

$104,461

$0 $0

$0

$0

$0

$0 $0

$113,692 $0

$36,308

$0

$0

$0 $0

$500,000

$50,000

$1,199,933

$20,000 $1,314,252

$0 $0

$65,000

$0

$1,543,000

Region

Scoping

Closeout

Closeout

Closeout

Closeout

Active

STIP

Closeout

09/29/12

09/30/10

05/11/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12923

11255

12219

10862

8507

9647

12633

11284

SR-171; MP 5.51 - 5.51

SR-171; MP 14.84 - 14.94

SR-171; MP 5.51 - 5.51

SR-171; MP 8.02 - 10.73

SR-171, 3500 SOUTH; 2700 WEST TO REDWOOD RD.

State Route: SR-171 from: 9.23 to: 10.27 for: 1.04

SR-172; MP .00 - 6.16

SR-172; MP 4.49 - 6.04

Page 71: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 80 of 217

10031

5589

5589

5952

6019

11731

5589

5930

8071

PIN

F-0172(26)2

S-0173(24)5

S-0173(28)9

S-0173(27)

F-0173(25)9

F-0173(26)7

S-0186(24)2

S-0186(22)1

F-0186(17)4

Project No.

SR-172: 4700 S. to 3100 S.

SR-173; 5400 S. between Bangerter hwy. & 4015 W

SR-173 MP 8.6; Curb and gutter joint with Murray

SR-173 & Rockford Street, Crosswalk Improvements

SR-173; 700 W. Int. Imps & Signal Upgrade

SR-173; Redwood Rd. to State Street

SR-186, MP2; CROSSING SIGNAGE STATE STREET

SR-186 Capitol Hill; Curb and gutter

SR-186; 700 East to 1300 East

PIN Description / Project Location

Minor Rehabilitation - Roadway

Contingency Funds/Traffic

Drainage - Maint

Traffic Signal - New

Intersection Improvements

Minor Rehabilitation - Roadway

Signing - T/S

Drainage

Preservation - Roadway

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

172

173

173

173

173

173

186

186

186

2

5

9

3

9

7

2

2

4

Beg Len

3

2

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$2,580,000

$376,478

Total

Total

$20,000

$6,782,522

$0

$0

$0

$0

$0

$0

$0

$0

$2,600,000

$7,159,000

$2,423,980

$6,674,336

$176,020

$484,664

$0

$0

Salt Lake County Projects

NHPP_NHSNHS

ST_CONT_R2

ST_CONT_R2

ST_SIGNALS

HSIP

HSIPSTP_FLX_ST

ST_CONT_R2

ST_SPOT_MNT

NHS

$20,000 $0

$1,288

$8,000

$100,000

$0

$1,259,000 $5,523,522

$7

$0

$0

$0 $0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$2,345,000 $255,000

$10,000

$8,000

$100,000

$241,000

$1,259,000 $5,900,000

$7,000

$20,000

$1,050,000

$2,186,244 $237,737

$0

$0

$0

$224,684

$1,173,766 $5,500,570

$0

$0

$978,915

$158,757 $17,264

$10,000

$8,000

$100,000

$16,316

$85,234 $399,430

$7,000

$20,000

$71,085

$0 $0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$2,325,000 $255,000

$8,712

$0

$0

$241,000

$0 $376,478

$6,993

$20,000

$1,050,000

Region

Phys Compl

Active

STIP

Scoping

Active

Active

Closeout

Closeout

Closeout

08/17/13

05/05/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11492

6727

13236

12997

11388

11494

11561

11176

9441

SR-172; MP 1.99 - 4.49

SR-173; MP 4.72 - 5.04

SR-173; MP 8.60 - 8.60

SR-173; MP 3.08 - 3.08

SR-173; MP 8.77 - 8.77

SR-173; MP 7.05 - 9.20

SR-186; MP 2.00 - 2.00

SR-186; MP 1.63 - 1.90

STATEWIDE; FY 2012 PAVEMENT PRESERVATION PROGRAM

Page 72: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 81 of 217

10032

11731

5775

5930

5930

10032

12132

5954

5996

PIN

F-0186(23)0

F-0186(26)2

S-0190(17)15

S-0190(15)14

S-0190(11)9

F-0190(13)8

F-0190(16)2

S-0201(30)14

F-0201(31)0

Project No.

SR-186; Beck Street to North Temple

SR-186; North Temple to 400 S.

SR-190; MP 14.7-14.9, Barrier Upgrade

SR-190; Maintenance Pipe Replacement

SR-190 MP-9; Replace Pipe @ Cardiff

SR-190; MP 8.1 to Brighton Ski Resort

SR-190; Jct SR-210 to MP 8.1

Additional CCTV at I-215 / 201 Interchange

SR-201 Fiber: 8400 W to I-80

PIN Description / Project Location

Preservation - Roadway

Minor Rehabilitation - Roadway

Barrier - T/S

Spot improvement

Spot improvement

Preservation - Roadway

Preservation - Roadway

ATMS

ITS Communications

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

186

186

190

190

190

190

190

201

201

2

15

14

9

8

2

14

Beg Len

2

1

2

8

6

1

7

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$150,000Total $1,645,000 $0 $0 $0 $0 $1,795,000 $1,673,479 $121,522 $0

Salt Lake County Projects

NHPP_NHSSTP_FLX_ST

NHPP_NHS

ST_SPOT_SFTY

ST_SPOT_MNT

ST_SPOT_MNT

STP_FLX_ST

STP_FLX_ST

ST_ATMS

CMAQ_WFRC

$1,645,000 $0

$2,250,000

$75,000

$66,706

$0

$419,278

$2,400,000

$40,000

$730,000

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$1,775,000 $20,000

$2,350,000

$75,000

$68,000

$13,000

$2,600,000

$2,450,000

$40,000

$780,000

$1,654,833 $18,646

$2,190,905

$0

$0

$0

$2,423,980

$2,284,135

$0

$727,194

$120,168 $1,354

$159,095

$75,000

$68,000

$13,000

$176,020

$165,865

$40,000

$52,806

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$130,000 $20,000

$100,000

$0

$1,294

$13,000

$2,180,722

$50,000

$0

$50,000

Region

Active

Active

STIP

Active

Active

Contr Clsd

Advertised

STIP

Scoping

11/02/13

10/18/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

9691

10867

12231

6742

11192

11461

12364

12634

12583

SR-186; MP .00 - 1.91

SR-186; MP 1.91 - 2.66

SR-190; MP 14.70 - 14.90

SR-190; MP 14.10 - 16.10

SR-190; MP 9.06 - 9.06

2014 PAVEMENT PRESERVATION (ORANGE BOOK) PROGRAM

SR-190; MP 1.83 - 7.90

SR-201; MP 14.40 - 14.92

SR-201; MP .00 - 7.18

Page 73: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 82 of 217

5589

5952

5996

5589

5954

5589

5589

5589

5930

PIN

S-0209(29)13

S-0209(27)8

F-0209(30)10

F-0210(13)11

S-0210(19)2

S-I215(165)15

S-I215(166)17

S-I215(168)17

S-1215(174)18

Project No.

SR-209; MP13.135; 9655 S. GLACIER LANE

Traffic Signal at SR-209 & 150 East

Fiber: 9400 S - 1300 E to mouth of LCCanyon

Bicycle Safety Shoulders;GAZEX Avalanche Control

LIttle Cottonwood Canyon Devices & Integration

I215, MP15-16; 4700 S TO 5300 S

I-215, MP17; 4700 S NB ON RAMP

I215 3900 S. DRAINAGE

I-215/3500 S.

PIN Description / Project Location

Preservation - Roadway

Traffic Signal - New

ITS Communications

Contingency Funds

ATMS

Landscaping

Contingency Funds

Contingency Funds

Spot improvement

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

209

209

209

210

210

215

215

215

215

13

8

10

11

2

15

17

18

Beg Len

4

1

10

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$1,760,479Total $46,807 $0 $0 $0 $0 $1,807,286 $1,679,950 $127,336 $0

Salt Lake County Projects

ST_CONT_R2

ST_SIGNALS

CMAQ_WFRC

ST_GF_TIFST_CONT_R2STP_FLX_STEM_2011_PLHD

ST_ATMS

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_SPOT_MNT

$0

$483,654

$600,000

$0 $46,807

$0 $0

$50,000

$0

$4,977

$47,603

$70,000

$0

$0

$0

$0 $0 $0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0 $0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0 $0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0 $0 $0

$0

$0

$0

$0

$0

$50,000

$602,000

$600,000

$0 $77,961

$729,325 $1,000,000

$50,000

$26,250

$5,000

$100,000

$70,000

$0

$0

$559,380

$0 $0

$679,950 $1,000,000

$0

$0

$0

$0

$0

$50,000

$602,000

$40,620

$0 $77,961 $49,375

$0

$50,000

$26,250

$5,000

$100,000

$70,000

$0

$0

$0

$0 $0 $0 $0

$0

$0

$0

$0

$0

$50,000

$118,346

$0

$0 $31,154

$729,325 $1,000,000

$0

$26,250

$23

$52,397

$0

Region

Closeout

Awarded

STIP

Closeout

Active

Closeout

Closeout

Active

Active

07/26/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11571

11220

12637

10044

12635

11564

11570

11577

6735

SR-209; MP 13.14 - 13.14

SR-209; MP 8.08 - 8.18

SR-209; MP 10.19 - 14.59

SR-210; MP 11.00 - 12.00

SR-210; MP 2.46 - 12.52

I-215; MP 15.00 - 16.00

FROM SR-266 4700 SOUTH; MP .00 - .07

I-215; MP 16.80 - 16.80

I-215; MP 17.53 - 17.53

Page 74: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 83 of 217

5930

5930

5996

5589

5952

6019

6019

6019

6019

PIN

S-I215(161)21

S-I215(162)16

F-I215(159)11

S-0266(64)3

S-0266(59)7

F-0266(61)4

F-0266(62)3

F-0266(63)3

F-0266(60)4

Project No.

I-215 at California, off ramp; curb and gutter

I-215 at 4700 s. off ramp; drainage

I-215 Ramp Meters

SR-266 MP 3.3; Reapir wall

Signal at SR-266 & 2700 East in Holladay

SR-266/SR-71 Intersection Reconstruction

SR-266; Auto Blvd/Main St Intersection Imps

SR-266/500 W. Intersection Imps

SR-266/500 E & Gordon Ln Int. Mod.

PIN Description / Project Location

Drainage

Drainage

Ramp Meters

Other structure item repair

Traffic Signal - Upgrade

Intersection Improvements

Intersection Improvements

Intersection Improvements

Intersection Improvements

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

215

215

215

266

266

266

266

266

266

11

3

7

4

3

3

4

Beg Len

17

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$800,000

$170,000

Total

Total

$1,300,000

$1,030,000

$0

$0

$0

$0

$0

$0

$0

$0

$2,100,000

$1,200,000

$1,957,830

$1,118,760

$142,170

$81,240

$0

$0

Salt Lake County Projects

ST_SPOT_MNT

ST_SPOT_MNT

CMAQ_WFRC

ST_CONT_R2

ST_SIGNALS

HSIP

SEC164_HSIPHSIP

HSIPSEC164_HSIP

HSIP

$750

$3,994

$200,000

$35,000

$19,644

$1,318,000

$0 $1,300,000

$1,030,000 $0

$1,450,000

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$7,100

$27,100

$200,000

$35,000

$285,000

$1,500,000

$80,000 $2,020,000

$1,170,000 $30,000

$1,650,000

$0

$0

$186,460

$0

$0

$1,398,450

$74,584 $1,883,246

$1,090,791 $27,969

$1,538,295

$7,100

$27,100

$13,540

$35,000

$285,000

$101,550

$5,416 $136,754

$79,209 $2,031

$111,705

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$6,350

$23,106

$0

$0

$265,356

$182,000

$80,000 $720,000

$140,000 $30,000

$200,000

Region

Closeout

Closeout

Active

STIP

Closeout

Active

Active

Active

Scoping

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:Adv.Const

11183

11184

10820

13234

11221

11404

11405

11408

11409

TO CALIFORNIA AVE.; MP .00 - .23

TO SR-266 4700 SOUTH; MP .11 - .17

I-215; MP 10.62 - 27.79

SR-266; MP 3.30 - 3.30

SR-266; MP 7.36 - 7.46

SR-266; MP 4.42 - 4.42

SR-266; MP 3.38 - 3.38

SR-266; MP 2.63 - 2.63

SR-266; MP 4.01 - 4.13

Page 75: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 84 of 217

5952

5996

6019

5954

5954

5954

5954

5954

5954

PIN

S-0282(12)3

F-2044(11)3

F-R299(189)

S-ST99(263)

S-ST99(255)

S-ST99(258)

S-ST99(259)

S-ST99(260)

S-ST99(261)

Project No.

Pedestrian Signal at SR-282 & 100 South, U of U

Fiber: 1300 E - 11400 S to 12300 S

500 W/4800 S; Signal Upgrades

ATMS Mapping Arcserver Deployment

AIMS Enhancements

UDOT Traffic Website Enhancements

UDOT Traffic Mobile App Improvements

Transuite Local Support

Transuite Miscellaneous Work Orders

PIN Description / Project Location

Traffic Signal - New

ITS Communications

Traffic Signal - Upgrade

Traveler Information

Operations/Maintenance

Traveler Information

Traveler Information

ATMS

ATMS

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

282

2044

2118

2135

2135

2135

2135

2135

2135

3

3

3

1

1

1

1

1

Beg Len

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

Salt Lake County Projects

ST_SIGNALS

CMAQ_WFRC

HSIP

ST_ATMS

ST_ATMS

ST_ATMS

ST_ATMS

ST_ATMS

ST_ATMS

$14,912

$150,000

$350,000

$30,000

$150,000

$100,000

$50,000

$100,000

$400,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$241,000

$150,000

$350,000

$30,000

$150,000

$100,000

$50,000

$100,000

$400,000

$0

$139,845

$326,305

$0

$0

$0

$0

$0

$0

$241,000

$10,155

$0

$30,000

$150,000

$100,000

$50,000

$100,000

$400,000

$0

$0

$23,695

$0

$0

$0

$0

$0

$0

$226,088

$0

$0

$0

$0

$0

$0

$0

$0

Region

Closeout

STIP

Scoping

Scoping

Active

Active

Active

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12126

12636

12218

12607

12621

12645

12646

12647

12648

SR-282; MP 2.92 - 2.94

Cnty:FA-2044; MP 3.33 - 4.52

Cnty:FA-2118; MP 3.39 - 3.39

Cnty:FA-2135; MP .52 - .52

Cnty:FA-2135; MP .53 - .53

Cnty:FA-2135; MP .51 - .51

Cnty:FA-2135; MP .49 - .49

Cnty:FA-2135; MP .50 - .50

Cnty:FA-2135; MP .51 - .51

Page 76: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 85 of 217

6019

6019

6019

5589

5589

5589

5589

5589

5589

PIN

F-0172(27)4

F-2186(1)3

F-2240(3)3

S-R299(187)

S-0210(18)8

S-I215(171)15

S-0154(74)1

S-0190(14)4

S-0171(43)0

Project No.

SR-172/4100 S Intersection and Signal Imps

2300 E/Suada Dr.; Upgrade Midblock Ped Crossing

4700 S & 3200 W; Intersection Improvements

Traverse Ridge Road Transfer Evaluation

SR-210 MP 8 High-T Entry Improvements to Snowbird

I-215 Trail Crossing @ 5400 S.

Bangerter Highway Improvement Study

SR-190 Rock Fall Mitigation

SR-171 Curb & Gutter 7080 W.

PIN Description / Project Location

Intersection Improvements

Pedestrian/Bicycle Safety

Intersection Improvements

Contingency Funds

Contingency Funds

Contingency Funds

Contingency Funds

Contingency Funds

Contingency Funds

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

2172

2186

2240

2920

MULT

MULT

MULT

MULT

MULT

4

3

3

Beg Len

8

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

Salt Lake County Projects

HSIP

HSIP

HSIP

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

$750,000

$150,000

$1,590,000

$1,250

$154,069

$100,000

$6,163

$150,000

$85

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,248,000

$150,000

$1,600,000

$12,000

$200,000

$100,000

$111,000

$150,000

$66,000

$1,163,510

$139,845

$1,491,680

$0

$0

$0

$0

$0

$0

$84,490

$10,155

$0

$12,000

$200,000

$100,000

$111,000

$150,000

$66,000

$0

$0

$108,320

$0

$0

$0

$0

$0

$0

$498,000

$0

$10,000

$10,750

$45,931

$0

$104,837

$0

$65,915

Region

Active

Scoping

Scoping

Closeout

Active

Active

Closeout

Active

Closeout

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12215

12220

12206

6729

11872

11879

11980

12049

12052

Cnty:FA-2172; MP 3.51 - 3.51

Cnty:FA-2186; MP 3.41 - 3.41

Cnty:FA-2240; MP 3.00 - 3.00

Cnty:FA-2920; MP .00 - 8.47

SR-210; MP 8.00 - 8.00

I-215; MP 14.53 - 14.53

SR-154; MP .60 - 21.50 & Bangerter Highway Traffic Study

SR-190; MP 4.00 - 8.00

SR-171; MP 1.00 - 1.00

Page 77: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 86 of 217

5589

5589

5589

5589

5589

5589

5589

5589

5589

PIN

S-0186(25)0

S-0071(37)8

S-0048(33)5

S-0048(34)12

S-0048(35)12

S-0048(36)12

S-0089(358)0

S-0071(41)21

S-0171(48)10

Project No.

Traffic Modeling Study - Capitol Hill

700 E. Citizen Improvements

Curb/Gutter/Sidewalk addition SR48, MP5

Sidewalk addition SR48, MP12

Sidewalk addition SR48, MP11.7

Sidewalk addition SR48, 290W.

Curb/Gutter repairs along SR89

Curb/Gutter repairs along 700 E.

SR-171; MP 10-11 Crosswalks and ADA access

PIN Description / Project Location

Contingency Funds

Contingency Funds

Safe Sidewalk/ADA ramps

Safe Sidewalk/ADA ramps

Contingency Funds

Safe Sidewalk/ADA ramps

Drainage - Maint

Drainage - Maint

Pedestrian/Bicycle Safety

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

MULT

MULT

MULT

MULT

MULT

Beg Len

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

Salt Lake County Projects

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

$3,825

$9,657

$0

$2,147

$0

$79

$342

$23

$110,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$60,000

$32,895

$23,100

$10,900

$34,000

$11,000

$23,000

$22,000

$110,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$60,000

$32,895

$23,100

$10,900

$34,000

$11,000

$23,000

$22,000

$110,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$56,175

$23,238

$23,100

$8,753

$34,000

$10,921

$22,658

$21,977

$0

Region

Active

Closeout

Closeout

Closeout

Active

Closeout

Closeout

Closeout

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12105

12124

12450

12451

12452

12453

12454

12455

13203

SR-186; MP .50 - 1.00 & Traffic Study SR-186 & SR-89 around Capitol HIll

SR-71; MP 8.48 - 8.48 & 700 E. Citizen Improvements

SR-48; MP 5.00 - 5.00

SR-48; MP 12.00 - 12.00

SR-48; MP 11.70 - 11.70

SR-48; MP 11.90 - 11.90

Various location on State St. between 900 S. and 1300 S.

SR-71; MP 21.00 - 21.00 & Various locations on 700 E. near Liberty Park

SR-171; MP 10.13 - 10.13 & SR-171; MP 10.13 - 10.74 & SR-171; MP 10.73 - 10.73

Page 78: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 87 of 217

5589

5930

5930

5930

5952

5952

5952

5954

5954

PIN

S-I80-3(182)128

S-R299(164)

S-0085(7)11

S-R299(165)

S-ST99(224)

S-R299(171)

S-0089(361)376

S-0190(12)2

S-R299(190)

Project No.

I-80; MP 127-128 Remove Fallen Rock

I-80 at SR-186 ramps and SR-65 MP-0-3; delineators

SR-85 MP-11; salt pad

SR-154 MP-7 and 10; drainage

Reconstruct Two Signals on SR-71 in SLC

Reconstruct Two Traffic Signals in SL County

US-89; Signal Upgrades @ 1300 S, 1700 S & 2100 S

Big Cottonwood Canyon ATMS Devices

I-15 / I-215 South Interchange Detection

PIN Description / Project Location

Contingency Funds

Spot improvement

Other - Traffic & Safety Project

Spot improvement

Traffic Signal - New

Traffic Signal - New

Traffic Signal - New

ATMS

ATMS

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

MULT

MULT

MULT

MULT

MULT

Beg Len

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

Salt Lake County Projects

ST_CONT_R2

ST_SPOT_MNT

ST_SPOT_MNT

ST_SPOT_MNT

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

ST_ATMS

ST_ATMS

$60,000

$15

$23,006

$2,005

$404,419

$687,393

$981,692

$11,890

$100,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$60,000

$12,200

$100,000

$8,500

$550,000

$1,015,000

$1,000,000

$70,000

$100,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$60,000

$12,200

$100,000

$8,500

$550,000

$1,015,000

$1,000,000

$70,000

$100,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$12,185

$76,994

$6,495

$145,581

$327,607

$18,308

$58,110

$0

Region

Active

Active

Closeout

Closeout

Active

Advertised

Active

Active

STIP

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

13204

11179

11187

11190

11705

11846

12678

11424

12813

I-80; MP 127.79 - 127.79 & I-80; MP 127.79 - 128.80 & I-80; MP 128.80 - 128.80

SR-65; MP .00 - 3.03 & TO SR-186; MP .00 - .04 & TO SR-186; MP .00 - .36

Cnty:FA-2152; MP 5.75 - 5.75 & SR-71; MP .00 - .00

SR-154; MP 9.56 - 9.56 & SR-154; MP 6.71 - 6.71

SR-71; MP 21.11 - 21.21 & SR-71; MP 20.55 - 20.65

SR-71; MP 19.11 - 19.21 & SR-71; MP 18.23 - 18.33 & SR-71; MP 17.34 - 17.44

US-89; MP 376.22 - 376.22 & US-89; MP 377.32 - 377.32 & US-89; MP 376.77 - 376.77

SR-190; MP 11.94 - 16.83 & SR-190; MP 1.87 - 11.92

TO I-215N FROM I-15N; MP .00 - .22 & TO I-215N FROM I-15P; MP .00 - .31 & TO I-15N FROM I-215P; MP .00 - .57 & TO I-15P FROM I-215N; MP .00 - .35 & TO I-215N FROM I-15P; MP .24 - .25 & TO I-15N FROM I-215N; MP .00 - .21 & I-215; MP 11.11 - 11.89 & I-

Page 79: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 88 of 217

6019

6019

6019

6364

8072

8074

9862

11214

PIN

F-0201(29)0

F-0089(391)370

F-LC35(248)

S-R299(194)

F-0068(77)61

F-R299(166)

S-0172(23)9

S-0071(36)13

Project No.

SR-201/SR-202 Intersection Realignment and Signal

US-89; 6100 S & 5900 S, Lane Realignment

4100 S; 4000 W, 2700 W & 1300 W Signal Imps

I-80; Exit 111,113 and 114

SR-68; 1000 N. To Davis County Line

I-215; SR-201 to North Temple

SR-172; 5600 West over I-80, Structure: C-669

I-215; 700 E. over I-215, C-725

PIN Description / Project Location

Intersection Improvements/Intersection Improvements

Highway Safety Improvement

Traffic Signal - Upgrade

Signing-T&S

Preservation - Roadway

Concrete Pavement, Rehabilitation

Preservation - Structure

Preservation - Structure

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

MULT

MULT

MULT

MULT

Beg Len

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$4,041,584

$711,485

$4,500,000

Total

Total

Total

$738,416

$4,015

$2,000,001

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$4,780,000

$715,500

$6,500,001

$4,456,394

$667,061

$4,238,101

$323,606

$48,439

$2,261,900

$0

$0

$0

Salt Lake County Projects

HSIPSEC164_HSIP

HSIP

HSIP

ST_SIGNING

NHPP_NHSSTP_FLX_ST

ST_BRIDGENHPP_IMIM

ST_BRIDGE

ST_GF_BRIDGE

$738,416 $0

$250,000

$1,500,000

$122,505

$4,015 $0

$2,000,000 $0 $1

$185,061

$529,507

$0 $0

$0

$0

$0

$0 $0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0

$0 $0

$0 $0 $0

$0

$0

$4,130,072 $649,928

$250,000

$1,500,000

$122,505

$685,500 $30,000

$2,000,000 $3,440,000 $1,060,001

$655,000

$530,000

$3,850,466 $605,928

$233,075

$1,398,450

$0

$639,092 $27,969

$0 $3,239,792

$998,309

$0

$0

$279,606 $44,000

$16,925

$0

$122,505

$46,408 $2,031

$2,000,000 $200,208

$61,692

$655,000

$530,000

$0 $0

$0

$101,550

$0

$0 $0

$0 $0 $0

$0

$0

$3,391,656 $649,928

$0

$0

$0

$681,485 $30,000

$0 $3,440,000 $1,060,000

$469,939

$493

Region

Advertised

STIP

Scoping

Closeout

Closeout

Undr Const

Closeout

Scoping

09/20/14

03/30/13

03/16/13

07/07/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11367

11390

12225

12907

9854

11200

10632

11248

SR-202; MP .00 - .57 & SR-201; MP 2.80 - 3.25

US-89; MP 370.25 - 370.25 & US-89; MP 370.56 - 370.56

Cnty:FA-2172; MP 5.50 - 5.50 & Cnty:FA-2172; MP 8.52 - 8.52 & Cnty:FA-2172; MP 6.99 - 6.99

I-80; MP 110.78 - 114.51 & I-80; MP 110.78 - 114.51

SR-68; MP 60.81 - 62.88 & SR-68; MP 60.82 - 62.88

FROM I-215N; MP .00 - 1.25 & FROM I-215N TO I-80P & SR-68; MP .00 - .60 & TO SR-68 REDWOOD ROAD; MP .00 - .87 & FROM SR-68 TO I-80N; MP .00 - .16 & FROM SR-68 REDWOOD ROAD; MP .00 - .30 & TO I-215P FROM REDWOOD ROAD; MP .00 - .27 & TO I-215P; MP .00

SR-172; 5600 West over I-80

SR-71; MP 13.16 - 13.32

Page 80: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 89 of 217

11903

5589

5589

5589

5589

5954

5954

5954

PIN

F-R299(191)

S-I15-7(315)311

S-I15-7(316)306

S-0071(33)14

S-R299(186)

S-TOC9(1)

S-TOC9(50)

S-R299(115)

Project No.

Pipe Lining on SR-201 and I-80

Warm Springs Road at I-15 (MP 311)

I-15 MP 306 Drainage NB off-ramp to 1300 S.

SR-71 MP 14 Curb & Gutter

Masonry Wall Repair 2000 E.

UDOT TOC CONTROL ROOM UPGRADES

5400 SOUTH FLEX LANE

TRAFFIC MANAGEMENT CONTRACTOR SUPPORT

PIN Description / Project Location

Drainage

Drainage - Maint

Contingency Funds

Contingency Funds

Contingency Funds

PRELIMINARY ENGINEERING STUDY TO RECOMMEND UPGRADES

ANALYZE PROPSED DESIGN FOR TRAFFIC SIGNAL SYSTEM

U OF U SUPPORT; ATMS PLAN, REVIEW & INSPECTION

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

1

1

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$1,471,122Total $28,878 $0 $0 $0 $0 $1,500,000 $1,403,200 $96,800 $0

Salt Lake County Projects

NHPP_NHSIMSTP_FLX_STEQ_BONUS(MG)NHPP_IM

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_ATMS

ST_ATMS

ST_ATMS

$0 $0

$28,878 $0 $0

$1,189

$5,091

$20,000

$0

$14,526

$11,987

$252,653

$0 $0 $0 $0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0 $0 $0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0 $0 $0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0 $0 $0 $0

$0

$0

$0

$0

$0

$0

$0

$500,000 $500,000 $415,000

$85,000 $0

$10,000

$61,000

$20,000

$14,920

$50,000

$100,000

$630,010

$466,150 $470,900 $386,905

$79,246 $0

$0

$0

$0

$0

$0

$0

$0

$33,850 $29,100 $28,096 $5,755

$0

$10,000

$61,000

$20,000

$14,920

$50,000

$100,000

$630,010

$0 $0 $0 $0 $0

$0

$0

$0

$0

$0

$0

$0

$500,000 $500,000 $386,122

$85,000 $0

$8,811

$55,909

$0

$14,920

$35,474

$88,013

$377,357

Region

Advertised

Closeout

Active

Active

Scoping

Active

Active

Active

09/20/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

6721

11560

11874

11878

12449

6642

8350

8777

I-80; MP 149.00 - 155.00 & I-80; MP 149.00 - 155.00 & I-80; MP 103.00 - 117.00 & I-80; MP 103.00 - 117.00 & SR-201; MP 7.50 - 14.50 & SR-201; MP 7.50 - 14.50

NB off-ramp from I15 to 1300 S

SR-71 MP 14. 900 E & about 5700 S.

2000 E just south of 6425 S.

UDOT TRAFFIC OPERATIONS CENTER CONTROL ROOM UPGRADES

5400 SOUTH FLEX LANE

TRAFFIC MANAGEMENT CONTRACTOR SUPPORT

Page 81: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 90 of 217

5954

5996

5996

5996

6432

5962

8549

5589

PIN

S-R299(116)

F-TOC9(42)

F-TOC9(43)

F-TOC9(44)

F-LC35(192)

F-LC35(169)

F-R299(131)

S-R299(192)

Project No.

TOC - IT SOFTWARE AND NETWORK HARDWARE

VARIABLE MESSAGE SIGN OPTIMIZATION

SALT LAKE COUNTY TRAFFIC SIGNAL INTERCONNECT

TRAFFIC ADAPTIVE RAMP METER OPERATIONS

BIG COTTONWOOD TRAIL - PHASE I

WASATCH TRAIL PHASE II

Point of the Mountain Trail Phase II

Porter Rockwell Analysis

PIN Description / Project Location

MISC. IT HARDWARE AND NETWORK HARDWARE UPGRADE

VARIABLE MESSAGE SIGN OPTIMIZATION

ATMS EXPANSION

RAMP METERING IN SALT LAKE COUNTY

LINK TO WASATCH FRONT REGIONAL SYSTEM

CONSTRUCT SOIL NAIL WALL AND WIDEN PAVEMENT FOR BIKE LANE

Trails

Contingency Funds

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

OTHER

OTHER

TRAIL

TRAIL

Beg Len

1

1

1

1

1

2

Prior

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

SALT L

$1,088,908

$1,081,252

$563,812

Total

Total

Total

$475,649

$489,458

$337,688

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,564,557

$1,570,710

$901,500

$750,000

$767,071

$451,050

$0

$0

$0

$814,557

$803,639

$450,450

Salt Lake County Projects

ST_ATMS

CMAQ_WFRC

CMAQ_WFRC

CMAQ_WFRC

STP_ENH_EACLOCAL_GOVT

STP_ENH_EACLOCAL_GOVT

STP_ENH_EACLOCAL_GOVT

ST_CONT_R2

$167,472

$100,001

$0

$0

$0 $475,649

$489,458 $0

$0 $337,688

$12,000

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$309,000

$170,001

$168,691

$230,000

$937,500 $627,057

$958,839 $611,871

$563,812 $337,688

$12,000

$0

$158,492

$157,271

$214,429

$750,000 $0

$767,071 $0

$451,050 $0

$0

$309,000

$11,509

$11,420

$15,571

$0 $0

$0 $0

$0 $0

$12,000

$0

$0

$0

$0

$187,500 $627,057

$191,768 $611,871

$112,762 $337,688

$0

$141,528

$70,000

$168,691

$230,000

$937,500 $151,408

$469,381 $611,871

$563,812 $0

$0

Region

Active

Active

Active

Closeout

Phys Compl

Closeout

Phys Compl

STIP

08/11/12

05/16/09

03/01/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

8776

8241

8242

8243

7718

6005

10145

12891

TOC - IT SOFTWARE

VARIABLE MESSAGE SIGN OPTIMIZATION

SALT LAKE COUNTY TRAFFIC SIGNAL INTERCONNECT

TRAFFIC ADAPTIVE RAMP METER OPERATIONS

BIG COTTONWOOD TRAIL PHASE I

WASATCH TRAIL PHASE II - 6200 SO. TO BIG COTTONWOOD CYN.

POINT OF THE MOUNTAIN

Portor Rockwell Road

Page 82: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 91 of 217

6212

PIN

F-ST99(209)

Project No.

SRTS Cottonwood Heights 2012

PIN Description / Project Location

School Zone Safety

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

SALT L

$491,757Total $0 $0 $0 $0 $0 $491,757 $452,005 $0 $39,752

Salt Lake County Projects

SR2S_OPTLOCAL_GOVTSR2S_INFR

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$10,000 $39,752

$442,005

$10,000 $0

$442,005

$0 $0 $0

$0 $39,752

$0

$10,000 $39,752

$442,005

Region

Closeout04/25/13

Status

Adv Dt:

11040

Local Routes

Page 83: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 101 of 217

8662

4040

4675

4677

6429

6503

6511

PIN

F-ST99(100)

TPF-TPF5(064)

STP-9999(387)

SP-9999(743)

SPR-2008(002)

F-SPR-2(207)

F-TPF-5(145)

Project No.

TRUCK PARKING GRANT PROGRAM IN UTAH

Pooled Fund Study, Western Alliance QTC

UDOT Wetland Mitigation Sites Federal Projects

UDOT Wetland Mitigation Sites State Funded Project

STATEWIDE, FY 2008 PLANNING WORK PROGRAM

TRANSPORTATION MANAGEMENT CENTER

TRANSPORTATION POOL FUND PROJECT

PIN Description / Project Location

RESEARCH & EVALUATE LONG-TERM TRUCK PARKING ALONG I-15

POOLED FUND STUDY, WESTERN ALLIANCE QTC

Monitor and Maintain Federal Mitigation Sites

Wetland Mitigation

FY 2008 PLANNING WORK PROGRAM

TRANSPORTATION MANAGEMENT CENTER

WESTERN MAINTENANCE PARTNERSHIP

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

350

1

Prior

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

$123,138

$16,066

$4,431

$147,038

Total

Total

Total

Total

$440,269

$23,934

$70,569

$10,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$563,407

$40,000

$75,000

$157,038

$253,685

$0

$50,000

$132,038

$0

$40,000

$25,000

$10,000

$309,722

$0

$0

$15,000

Statewide County Projects

FA_MISC_100%

FA_MISC_100%OTHERSPR_R_100%STP_FLX_100%SPR_P_100%SPR_R

STP_FLX_ST

ST_APPROPST_CONST

SPR_P

SPR_PST_ATMS

OTHERSPR_RST_CONSTSPR_P_100%

$0

$0 $254,722 $185,548

$0 $0 $0

$0

$13,934 $10,000

$5,449

$45,569 $25,000

$0 $0

$10,000 $0

$0

$0 $0 $0 $0 $0 $0

$0

$0 $0

$0

$0 $0

$0 $0 $0 $0

$0

$0 $0 $0 $0 $0 $0

$0

$0 $0

$0

$0 $0

$0 $0 $0 $0

$0

$0 $0 $0 $0 $0 $0

$0

$0 $0

$0

$0 $0

$0 $0 $0 $0

$0

$0 $0 $0 $0 $0 $0

$0

$0 $0

$0

$0 $0

$0 $0 $0 $0

$545,000

$30,000 $309,722 $185,548

$15,028 $23,109

$0

$120,000

$30,000 $10,000

$4,957,938

$50,000 $25,000

$15,000 $128,159

$10,000 $3,880

$545,000

$30,000 $0

$185,548 $15,028 $23,109

$0

$111,876

$0 $0

$3,966,350

$50,000 $0

$0 $128,159

$0 $3,880

$0

$0 $0 $0 $0 $0 $0

$8,124

$30,000 $10,000

$991,588

$0 $25,000

$0 $0

$10,000 $0

$0

$0 $309,722

$0 $0 $0 $0

$0

$0 $0

$0

$0 $0

$15,000 $0 $0 $0

$545,000

$30,000 $55,000

$0 $15,028 $23,109

$0

$120,000

$16,066 $0

$4,952,489

$4,431 $0

$15,000 $128,159

$0 $3,880

Region

Active

Active

Active

Active

Closeout

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

TRUCK PARKING GRANT PROGRAM IN UTAH

Pooled Fund Study, Western Alliance QTC

UDOT Wetland Mitigation Sites Federal Projects

UDOT Wetland Mitigation Sites State Funded Project

STATEWIDE; FY 2008 PLANNING WORK PROGRAM

TRANSPORTATION MANAGEMENT CENTER - TRAFFIC MGMT COOP INFO.

TRANSFER FUND; WESTERN MAINTENANCE PARTNERSHIP POOLED FUND

Page 84: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 102 of 217

7444

8402

8705

9933

10235

10504

10741

PIN

CPG-0100(006)

S-ST99(89)

F-ST99(107)

F-TPF5(244)

S-ST99(155)

F-TPF-5(257)

F-ST99(182)

Project No.

RURAL TRANSIT UNIFIED PLANNING PROGRAM

STATEWIDE UTILITY PROCESS CONTRACT

FY 10- FY13 TAX EVASION (COMPLIANCE)

Pooled Fund Project - TPF5(244) Shaking Table Test

Total Maintenance Contracting Feasibility Study

Evaluation of Spliced Sleeve Connections

Statewide Pavement Condition Data Collection

PIN Description / Project Location

PLANNING GRANTS FOR SMALL URBAN & RURAL PLANNING PROJECTS

STATEWIDE UTILITY PROCESS CONTRACT

FY 10 TAX EVASION (COMPLIANCE)

Research

Planning

Research

Planning

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

1

1

1

Prior

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

$1,072,716

$202,010

$115,000

$1,631,700

Total

Total

Total

Total

$268,179

$47,990

$1

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,340,896

$250,000

$115,001

$1,631,700

$1,072,716

$0

$115,001

$1,362,619

$0

$250,000

$0

$269,081

$268,179

$0

$0

$0

Statewide County Projects

FTA_5304_80%L_PASS_MATCH

ST_CONT_R1ST_CONT_R2ST_CONT_PGST_CONT_R4ST_CONT_R3

STP_FLX_ST

SPR_R_100%SPR_R

ST_CONST

SPR_R

SPR_PST_CONT_R3EQ_BONUS(MG)NHSSTP_FLX_STST_BRIDGENHPP_IMHSIP

$0 $268,179

$0 $0 $0

$47,990 $0

$0

$1 $0

$62,480

$0

$0 $0 $0 $0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0

$0

$0 $0

$0

$0

$0 $0 $0 $0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0

$0

$0 $0

$0

$0

$0 $0 $0 $0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0

$0

$0 $0

$0

$0

$0 $0 $0 $0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0 $0

$0

$0 $0

$0

$0

$0 $0 $0 $0 $0 $0 $0 $0

$1,072,716 $268,179

$50,000 $50,000 $50,000 $50,000 $50,000

$400,327

$1 $115,000

$62,500

$110,000

$825,000 $3,200 $5,700 $1,000 $8,000

$50,000 $13,800

$725,000

$1,072,716 $0

$0 $0 $0 $0 $0

$400,327

$1 $115,000

$0

$110,000

$660,000 $0

$5,314 $932

$7,458 $0

$12,997 $675,918

$0 $0

$50,000 $50,000 $50,000 $50,000 $50,000

$0

$0 $0

$62,500

$0

$165,000 $3,200

$386 $68

$542 $50,000

$803 $49,083

$0 $268,179

$0 $0 $0 $0 $0

$0

$0 $0

$0

$0

$0 $0 $0 $0 $0 $0 $0 $0

$1,072,716 $0

$50,000 $50,000 $50,000 $2,010

$50,000

$400,327

$0 $115,000

$20

$110,000

$825,000 $3,200 $5,700 $1,000 $8,000

$50,000 $13,800

$725,000

Region

Closeout

Active

Closeout

Active

Active

Active

Closeout

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

RURAL TRANSIT UNIFIED PLANNING PROGRAM (CPG)

STATEWIDE UTILITY PROCESS CONTRACT

FY 10 TAX EVASION (COMPLIANCE)

Other: RESEARCH PROJECT

STATEWIDE STUDY

Pooled Project with Texas & New York

Statewide Pavement Condition Data Collection

Page 85: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 103 of 217

10903

10972

11075

11890

11911

11912

PIN

F-TPF-5(264)

F-ST99(193)

F-TPF-5(272)

F-ST99(231)

F-ST99(233)

F-ST99(234)

Project No.

Passive Force-Displacement for Skewed Abutments

FY 2013 Research Work Program

Evaluation of Lateral Pile Resistance

Fiscal YR 2014 LTAP Program

FY 2014 Research Work Program

FY 2014 SPR Work Program

PIN Description / Project Location

Research

Research

Research

Research

Annual Work Program

Annual Work Program

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

$270,000

$1,530,783

$312,000

$3,003,560

$7,529,193

Total

Total

Total

Total

Total

$0

$2,172

$0

$71,440

$104,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$270,000

$1,532,956

$312,000

$3,075,000

$7,633,193

$270,000

$631,280

$312,000

$1,864,800

$6,053,029

$0

$901,676

$0

$1,210,200

$1,476,164

$0

$0

$0

$0

$104,000

Statewide County Projects

SPR_R_100%EM_2012_IBRD

SPR_RST_APPROPST_INELIGIBLSPR_R_100%

SPR_R_100%HSIP_100%

FA_LTAP

SPR_RST_APPROPST_ATMSSPR_R_100%

LOCAL_GOVTCMAQ_WFRCL_PASS_MATCHSPR_P_100%SPR_P

$0 $0

$0 $0

$2,172 $0

$0 $0

$0

$0 $71,440

$0 $0

$100,000 $0

$4,000 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0

$0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0

$0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0

$0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0

$0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$245,000 $25,000

$681,600 $763,183

$2,172 $86,000

$302,000 $10,000

$300,000

$2,306,000 $734,000

$15,000 $20,000

$100,000 $139,523

$4,000 $56,076

$7,333,594

$245,000 $25,000

$545,280 $0 $0

$86,000

$302,000 $10,000

$150,000

$1,844,800 $0 $0

$20,000

$0 $130,078

$0 $56,076

$5,866,875

$0 $0

$136,320 $763,183

$2,172 $0

$0 $0

$150,000

$461,200 $734,000

$15,000 $0

$0 $9,446

$0 $0

$1,466,719

$0 $0

$0 $0 $0 $0

$0 $0

$0

$0 $0 $0 $0

$100,000 $0

$4,000 $0 $0

$245,000 $25,000

$681,600 $763,183

$0 $86,000

$302,000 $10,000

$300,000

$2,306,000 $662,560

$15,000 $20,000

$0 $139,523

$0 $56,076

$7,333,594

Region

Scoping

Closeout

Active

Active

Closeout

Closeout

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Passive Force-Displacement Relationships for Skewed Abutments

FY 2013 Research Work Program

Evaluation of Lateral Pile Resistance Near MSE Walls at a Dedicated Wall Site

Statewide Program

Statewide Program

Statewide Planning

Page 86: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 104 of 217

11964

11965

12507

12668

12761

12981

12990

PIN

F-ST99(253)

F-ST99(237)

F-ST99(249)

F-ST99(262)

F-ST99(265)

F-ST99(283)

F-ST99(289)

Project No.

FY 2015 Research Work Program

FY 2015 Statewide Planning Work Program

FMIS 5.0 Upgrade

GIS / Enterprise Data Management Support

2014 Statewide Pavement Condition Data Collection

Fiscal Year 2015 LTAP Program

RURAL TRANSIT UNIFIED PLANNING PROGRAM

PIN Description / Project Location

Annual Work Program

Annual Work Program

Data System Development/Enhancement

Staffing Support

Develop Documents

Annual Work Program

UTA/Transit

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

$35,004

$5,245,000

$400,000

$200,197

$1,350,000

$220,217

Total

Total

Total

Total

Total

Total

$3,114,996

$23,000

$10,000

$49,803

$550,000

$55,054

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$3,150,000

$5,268,000

$410,000

$250,000

$1,900,000

$275,271

$1,864,800

$4,216,914

$372,920

$153,230

$1,632,455

$220,217

$1,285,200

$1,047,086

$37,080

$96,770

$267,545

$0

$0

$4,000

$0

$0

$0

$55,054

Statewide County Projects

SPR_RST_SIGNL_M&OSPR_R_100%ST_APPROP

SPR_PSPR_P_100%L_PASS_MATCHCMAQ_PM2.5

ST_CONT_PGEQ_BONUS(MG)

SPR_PST_CONSTHSIP

HSIPSEC164_HSIPSPR_P

FA_LTAP

FTA_5304_80%L_PASS_MATCH

$2,270,996 $90,000 $20,000

$734,000

$0 $0

$4,000 $19,000

$10,000 $0

$0 $49,803

$0

$0 $0

$550,000

$0

$0 $55,054

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0 $0 $0

$0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0 $0 $0

$0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0 $0 $0

$0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0 $0 $0

$0

$0 $0

$2,306,000 $90,000 $20,000

$734,000

$5,229,000 $16,000 $4,000

$19,000

$10,000 $400,000

$75,000 $75,000

$100,000

$0 $850,000

$1,050,000

$301,091

$220,217 $55,054

$1,844,800 $0

$20,000 $0

$4,183,200 $16,000

$0 $17,714

$0 $372,920

$60,000 $0

$93,230

$0 $792,455 $840,000

$150,546

$220,217 $0

$461,200 $90,000

$0 $734,000

$1,045,800 $0 $0

$1,286

$10,000 $27,080

$15,000 $75,000 $6,770

$0 $57,545

$210,000

$150,546

$0 $0

$0 $0 $0 $0

$0 $0

$4,000 $0

$0 $0

$0 $0 $0

$0 $0 $0

$0

$0 $55,054

$35,004 $0 $0 $0

$5,229,000 $16,000

$0 $0

$0 $400,000

$75,000 $25,197

$100,000

$0 $850,000 $500,000

$301,091

$220,217 $0

Region

Active

Active

Scoping

Active

Active

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv.Const Statewide

Various Locations

This is for ePM programming enhancements.

Statewide; Staffing Support

Data is collected at various locations in the state, these locations are not known at this time and can change throughout the duratin of the contract

Fiscal Year 2015 LTAP Program

Various Locations in State of Utah

Page 87: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 105 of 217

12991

13060

13218

6364

5925

5954

5954

5954

5954

PIN

F-ST99(291)

F-ST99(306)

S-ST99(313)

S-ST99(151)

S-ST99(123)

S-ST99(23)

S-ST99(47)

S-TOC9(30)

S-TOC9(51)

Project No.

Highway Use Tax Evasion Project FY 2014-FY2017

Utility Data Storage & Retrieval System

Decision Lens

I-15; MP 2 to MP 398

STATEWIDE CEVP/CRA RISK MANAGEMENT

STATEWIDE TMD SYSTEM INHANCMENTS & MAINTENANCE

ROAD WEATHER INFORMATION SYSTEM SITE UPGRADES

SUMMIT CAMERAS & RWIS LIGHTS

GIS IMPLEMENTATION FOR COMMUTERLINK WEB SITE

PIN Description / Project Location

Annual Work Program

Data System Development/Enhancement

Planning

Signing - T/S

STATEWIDE CEVP/CRA RISK MANAGEMENT

MINOR SYSTEM ENHANCEMENTS AND MAINTENANCE TO EXISTING TMD

UPGRADE RWIS SITES WITH INSTRUMENTATIONS TO ACHIEVE NTCIP

SOLAR POWER CAMERAS & WEATHER INSTRUMENTS

PURCHASE TWO YEAR CONTRACT FOR HOSTED GIS INFRASTRUCTURE

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

OTHER

OTHER

OTHER

OTHER

OTHER

2

Beg Len

396

1

1

1

Prior

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

$33,000

$100,000

Total

Total

$233,000

$25,000

$0

$0

$0

$0

$0

$0

$0

$0

$266,000

$125,000

$166,000

$100,000

$100,000

$25,000

$0

$0

Statewide County Projects

STP_FLX_STST_CONT_PG

ST_CONSTFA_MISC_100%

ST_CONT_PG

ST_SIGNING

ST_CORR_CEVP

ST_ATMS

ST_ATMS

ST_ATMS

ST_ATMS

$133,000 $100,000

$25,000 $0

$130,000

$0

$50,000

$0

$39

$66,489

$18,272

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$166,000 $100,000

$25,000 $100,000

$130,000

$67,626

$50,000

$800,000

$998,714

$224,997

$150,000

$166,000 $0

$0 $100,000

$0

$0

$0

$0

$0

$0

$0

$0 $100,000

$25,000 $0

$130,000

$67,626

$50,000

$800,000

$998,714

$224,997

$150,000

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$33,000 $0

$0 $100,000

$0

$67,626

$0

$800,000

$998,674

$158,508

$131,728

Region

Active

Active

Active

Closeout

Active

Closeout

Closeout

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

10197

8855

5959

6643

8017

8349

Higway Use Tax Evasion Project

Implementation of a Utility Data Storage & Retrieval System.

Statewide - Study, Not Mappable.

I-15; MP 2.00 to MP 398.00

STATEWIDE CEVP/CRA RISK MANAGEMENT

STATEWIDE TMD SYSTEM ENHACEMENTS

ROAD WEATHER INFORMATION SYSTEMS SITE UPGRADES

SUMMIT CAMERAS & RWIS LIGHTS

GIS IMPLEMENTATION FOR COMMUTERLINK WEB SITE

Page 88: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 106 of 217

5954

5954

5954

5954

5954

6019

6019

6019

6062

PIN

S-ST99(115)

S-ST99(116)

S-ST99(117)

S-ST99(132)

S-ST99(174)

F-ST99(59)

F-ST99(146)

F-ST99(158)

S-ST99(45)

Project No.

TOC - STATEWIDE

TOC - TRAVELER INFORMATION

TOC - TRAFFIC MANAGEMENT SOFTWARE

Salt Lake , Ogden, Provo Metropolitan Areas

Central Signal System Replacement Support

STATEWIDE SAFETY CONCIENCE PLANNING - DEVELOPMENT

FY2011 Safety Education & Enforcement - 10% Flex

BYU Traffic Safety Data Research 2011-2012

MOTOR CARRIER SCALES

PIN Description / Project Location

ATMS INFRASTRUCTURE UPGRADES

511, COMMUTERLINK, MOBIL WEBSITE ENHANCEMENTS

TRAFFIC MANAGEMENT SOFTWARE; SYSTEM UPGRADES & MAINTENANCE

Study

Traffic Signal Coordination

Safety

Safety Education/Enforcement

Research

MOTOR CARRIER SCALES

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

1

1

1

1

Prior

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

$432,149Total $9,315 $0 $0 $0 $0 $441,464 $0 $441,464 $0

Statewide County Projects

ST_CONT_R4ST_ATMS

ST_ATMS

ST_ATMS

ST_ATMS

ST_ATMS

HSIP

HSIP

HSIP

ST_CONT_PG

$0 $9,315

$67,275

$111,723

$90,000

$48,174

$0

$0

$0

$150,000

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$15,000 $426,464

$855,000

$1,274,000

$90,000

$240,000

$200,000

$1,262,308

$275,000

$150,000

$0 $0

$0

$0

$0

$0

$186,460

$1,176,850

$256,383

$0

$15,000 $426,464

$855,000

$1,274,000

$90,000

$240,000

$13,540

$85,458

$18,618

$150,000

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$15,000 $417,149

$787,725

$1,162,277

$0

$191,826

$200,000

$1,262,308

$275,000

$0

Region

Active

Active

Active

Active

Active

Active

Closeout

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

8773

8772

8771

9573

10522

7112

9405

10304

6634

TOC - STATEWIDE

TOC - TRAVELER INFORMATION

TOC - TRAFFIC MANAGEMENT SOFTWARE

Other: STATEWIDE ITS STUDY to: 1.00 for: 1.00

Statewide Signal System Support

STATEWIDE SAFETY CONCIENCE PLANNING - DEVELOPMENT

Other: STATEWIDE to: .10 for: .10

STATEWIDE

MOTOR CARRIER SCALES

Page 89: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 107 of 217

6212

6212

6364

6364

8418

8528

8922

PIN

SRS-2009(15)

F-ST99(148)

S-ST99(68)

TS-ST99(73)

EFFICENCY-FUND()

S-ST99(129)

S-ST99(122)

Project No.

NON-INFRASTRUCTURE PROJECTS 2009 - 2010 SR2S

Statewide SRTS SNAP Program 2011-2012

STATEWIDE; STATE PARK SIGNING ON STATE ROUTES

STATEWIDE, MISC SIGNS FOR TRAFFIC AND SAFETY

REGION ONE PROGRAM DE-OBLIGATION FUND

UDOT ABC Program Support

STATEWIDE; "KNOW WHERE KNOW WHY" CAMPAIGN

PIN Description / Project Location

Safety Education/Enforcement

Safety Education/Enforcement

Signing-T&S

Signing-T&S

REGION ONE PROGRAM EFFICIENCY FUND

Study

"KNOW WHERE KNOW WHY" CAMPAIGN

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

1

1

1

1

Prior

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

$910,219

$0

$2,090,000

Total

Total

Total

$0

$521,839

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$910,219

$521,839

$2,090,000

$910,219

$486,511

$0

$0

$35,329

$2,090,000

$0

$0

$0

Statewide County Projects

SR2S_PRGM

SR2S_OPTSR2S_PRGM

ST_SIGNING

ST_SIGNING

NHSIMEQ_BONUS(MG)STP_FLX_ST

ST_BRIDGE

ST_CONT_R2ST_CONT_R4ST_PRST_CONT_R3ST_KW_KW_CST_CONT_R1

$0

$0 $0

$0

$59,597

$370,354 $0 $0

$151,485

$41,476

$0 $0 $0 $0 $0 $0

$0

$0 $0

$0

$0

$0 $0 $0 $0

$0

$0 $0 $0 $0 $0 $0

$0

$0 $0

$0

$0

$0 $0 $0 $0

$0

$0 $0 $0 $0 $0 $0

$0

$0 $0

$0

$0

$0 $0 $0 $0

$0

$0 $0 $0 $0 $0 $0

$0

$0 $0

$0

$0

$0 $0 $0 $0

$0

$0 $0 $0 $0 $0 $0

$111,988

$469,735 $440,484

$309,413

$118,197

$370,354 $0 $0

$151,485

$255,000

$60,000 $60,000

$1,245,000 $60,000

$600,000 $65,000

$111,988

$469,735 $440,484

$0

$0

$345,281 $0 $0

$141,230

$0

$0 $0 $0 $0 $0 $0

$0

$0 $0

$309,413

$118,197

$25,073 $0 $0

$10,256

$255,000

$60,000 $60,000

$1,245,000 $60,000

$600,000 $65,000

$0

$0 $0

$0

$0

$0 $0 $0 $0

$0

$0 $0 $0 $0 $0 $0

$111,988

$469,735 $440,484

$309,413

$58,599

$0 $0 $0 $0

$213,524

$60,000 $60,000

$1,245,000 $60,000

$600,000 $65,000

Region

Active

Active

Active

Active

Active

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

7911

10160

7479

7651

8458

9272

8842

NON-INFRASTRUCTURE PROJECTS 2009 - 2010 SR2S

STATEWIDE

STATEWIDE; STATE PARK SIGNING ON STATE ROUTES

STATEWIDE, MISC SIGNS FOR TRAFFIC AND SAFETY

REGION ONE PROGRAM DE-OBLIGATION FUND

STATEWIDE; UDOT ABC PROGRAM SUPPORT

STATEWIDE; "KNOW WHERE KNOW WHY" CAMPAIGN

Page 90: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 108 of 217

5775

5775

5775

5952

5952

5952

5952

5952

5952

PIN

S-ST99(219)

S-ST99(254)

S-ST99(302)

S-ST99(270)

S-ST99(271)

S-ST99(272)

S-ST99(273)

S-ST99(275)

S-ST99(276)

Project No.

Speed Studies for Rural Interstates

OSR Document Preparation

General Barrier Program Support

Warrant Studies

Traffic Studies

Pedestrian Improvements - Signalized

Traffic Engineering Orders

Region 1 Signal Improvements/Upgrades

Region 2 Signal Improvements/Upgrades

PIN Description / Project Location

Study

Safety

Staffing Support

Safety

Traffic

Pedestrian/Bicycle Safety

Operations/Maintenance

Traffic Signal - Upgrade

Traffic Signal - Upgrade

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

Statewide County Projects

ST_SPOT_SFTY

ST_SPOT_SFTY

ST_SPOT_SFTY

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

$71,716

$86,144

$80,000

$2,863

$100,000

$141,000

$27,901

$83,247

$110,426

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$200,000

$100,000

$80,000

$40,000

$140,000

$213,473

$40,000

$200,000

$300,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$200,000

$100,000

$80,000

$40,000

$140,000

$213,473

$40,000

$200,000

$300,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$128,284

$13,856

$0

$37,137

$40,000

$72,473

$12,099

$116,753

$189,574

Region

Closeout

Active

Active

Active

Active

Active

Active

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11451

12615

13020

12784

12785

12786

12789

12790

12791

Statewide Study

Statewide OSR Document Preparation

Staff Support and Manual Development

Various Locations

Various Locations

Various Locations

Various Locations

Various Locations in Region 1

Various Locations in Region 2

Page 91: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 109 of 217

5952

5952

5954

5996

6019

6019

6019

6019

6019

PIN

S-ST99(277)

S-ST99(278)

S-ST99(190)

F-ST99(176)

F-ST99(177)

F-ST99(212)

F-ST99(216)

F-ST99(218)

F-ST99(220)

Project No.

Region 3 Signal Improvements/Upgrades

Region 4 Signal Improvements/Upgrades

RWIS Expansion and Upgrades

Commuterlink Web Enhancements

Highway Safety Manual Training 2012

FY 2012 Education & Enforcement - HSIP Flex$

GIS and Safety Planning Support Services - 2013

Traffic & Safety Program Mgmt Support 2013

Safety Campaigns, Education, & Enforcement FFY2013

PIN Description / Project Location

Traffic Signal - Upgrade

Traffic Signal - Upgrade

Other - Traffic Management & ITS Projects

Other - Traffic Management & ITS Projects

Safety

Safety Education/Enforcement

Safety

Staffing Support

Safety Education/Enforcement

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

$1,056,240

$2,500,000

Total

Total

$760

$2,540

$0

$0

$0

$0

$0

$0

$0

$0

$1,057,000

$2,502,540

$957,472

$2,333,118

$99,528

$169,422

$0

$0

Statewide County Projects

ST_SIGNALS

ST_SIGNALS

ST_ATMS

CMAQ_WFRC

HSIP

HSIP

HSIP

ST_SPOT_SFTYHSIP

SEC164_HSIPHSIP

$164,000

$26,334

$115,401

$0

$0

$0

$0

$760 $0

$0 $2,540

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$264,000

$40,000

$550,000

$200,000

$160,000

$1,183,158

$200,000

$30,000 $1,027,000

$2,500,000 $2,540

$0

$0

$0

$186,460

$149,168

$1,103,058

$186,460

$0 $957,472

$2,330,750 $2,368

$264,000

$40,000

$550,000

$13,540

$10,832

$80,100

$13,540

$30,000 $69,528

$169,250 $172

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$100,000

$13,666

$434,599

$200,000

$160,000

$1,183,158

$200,000

$29,240 $1,027,000

$2,500,000 $0

Region

Active

Active

Active

Active

Closeout

Closeout

Active

Closeout

Closeout

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12792

12793

10827

10542

10546

10572

11230

11324

11463

Various Locations in Region 3

Various Locations in Region 4

Various - statewide

Statewide, Commuterlink Web Enhancements

Statewide

Statewide

Statewide

Statewide Traffic & Safety Project and Program Management Support 2013

Statewide Safety Campaigns

Page 92: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 110 of 217

6019

6019

6019

6019

6019

6019

6019

6019

6062

PIN

F-ST99(244)

F-ST99(245)

F-ST99(282)

F-ST99(298)

F-ST99(299)

F-ST99(300)

F-ST99(301)

F-ST99(314)

S-ST99(188)

Project No.

Safety Campaigns, Education, & Enforcement FY14

Traffic & Safety Program Management Support FY14

Research External Factors' Effect on Crashes

usRAP Safer Road Investment Plans

Local Roads GIS Web Interface

U of U Crash Database 2014-2015

Utah CODES 2014-2015

Statewide SRTS SNAP Program FY15

Innovative Project Financing

PIN Description / Project Location

Safety Education/Enforcement

Staffing Support

Research

Safety

Safety

Safety

Safety

Safety Education/Enforcement

Planning

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

Statewide County Projects

SEC164_HSIP

HSIP

HSIP

HSIP

HSIP

HSIP

HSIP

HSIP

ST_CONT_PG

$0

$565,000

$0

$0

$0

$0

$0

$10,000

$200,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,000,000

$1,765,000

$40,000

$150,000

$50,000

$300,000

$75,000

$10,000

$200,000

$1,864,600

$1,645,510

$37,292

$139,845

$46,615

$279,690

$69,923

$9,323

$0

$135,400

$119,491

$2,708

$10,155

$3,385

$20,310

$5,078

$677

$200,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,000,000

$1,200,000

$40,000

$150,000

$50,000

$300,000

$75,000

$0

$0

Region

Active

Active

Active

Active

Active

Active

Active

Active

STIP

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12207

12209

12963

13019

13021

13022

13027

13167

10871

Statewide Campaigns, Education, & Enforcement

Staffing Support

Study with statewide application

Statewide Model

Statewide study

Statewide crash database

Statewide study

Statewide

Innovative Project Financing

Page 93: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 111 of 217

6064

6364

9862

10948

10948

10948

10948

10948

10948

PIN

F-ST99(195)

S-ST99(153)

S-ST99(185)

S-ST99(197)

S-ST99(200)

S-ST99(201)

S-ST99(204)

S-ST99(203)

F-ST99(199)

Project No.

RR Crossing Program Management thru FY2014

Statewide Fender Bender signs

Bridge Inventory Management

Region 1 Signal Maintenance

Region 2 Signal Maintenance

Region 3 Signal Maintenance

Region 4 Signal Maintenance

Statewide Signal LED Replacement

Statewide Traffic Data Acquisition & Study

PIN Description / Project Location

Staffing Support

Signing - T/S

Other structure item repair

Other - Traffic Management & ITS Projects

Other - Traffic Management & ITS Projects

Other - Traffic Management & ITS Projects

Other - Traffic Management & ITS Projects

Other - Traffic Management & ITS Projects

Planning

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

STATEW

$215,705Total $184,295 $0 $0 $0 $0 $400,000 $100,000 $300,000 $0

Statewide County Projects

R/H_HAZ_ELIM

ST_SIGNING

ST_BRIDGE

ST_SIGNL_M&O

ST_SIGNL_M&O

ST_SIGNL_M&O

ST_SIGNL_M&O

ST_SIGNL_M&O

ST_SIGNL_M&OSPR_P

$0

$12,678

$67,644

$8,216

$0

$3,265

$0

$400,000

$184,295 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$500,000

$122,302

$260,000

$92,919

$75,100

$50,000

$25,000

$1,400,000

$275,000 $125,000

$466,150

$0

$0

$0

$0

$0

$0

$0

$0 $100,000

$33,850

$122,302

$260,000

$92,919

$75,100

$50,000

$25,000

$1,400,000

$275,000 $25,000

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$500,000

$109,624

$192,356

$84,703

$75,100

$46,735

$25,000

$1,000,000

$90,705 $125,000

Region

Closeout

Active

Active

Closeout

Closeout

Closeout

Closeout

Undr Const

Closeout

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11011

10195

10678

11016

11017

11018

11019

11020

11021

Statewide

Statewide Interstate

Statewide

Statewide

Statewide

Statewide

Statewide

Statewide

Statewide

Page 94: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 112 of 217

10948

10948

11798

PIN

S-ST99(198)

S-ST99(202)

S-ST99(236)

Project No.

Statewide Traffic Signal Equipment

Statewide Traffic Signal Consultant Support

FY 2014 Bridge Preservation Design Support

PIN Description / Project Location

Other - Traffic Management & ITS Projects

Other - Traffic Management & ITS Projects

Minor Rehabilitation - Structure

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

STATEW

STATEW

STATEW

Statewide County Projects

ST_SIGNL_M&O

ST_SIGNL_M&O

ST_BRIDGE

$1,950,000

$1,048,695

$44,499

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$6,356,980

$2,627,824

$125,000

$0

$0

$0

$6,356,980

$2,627,824

$125,000

$0

$0

$0

$4,406,980

$1,579,129

$80,501

Region

Active

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

11022

11023

11954

Statewide

Statewide

Statewide

Page 95: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 119 of 217

10768

11204

9999

11856

12987

8102

5500

8597

PIN

S-0036(31)51

F-0036(137)52

F-0138(8)13

F-0138(12)18

F-R299(196)

F-LC45(9)

F-LC45(6)0

F-LC45(11)

Project No.

SR-36 at South Mountain Road

SR-36; 3 O'clock Drive to 1000 N

SR-138 & Erda Way

SR-138 & Village Road Improvements, Tooele County

Active Warnings on Faust Rd

OLD MORMON TRAIL ROAD

Midvalley Highway Tooele County

TOOELE - STANSBURY PARK AND RIDE LOT

PIN Description / Project Location

Intersection Modification

Major Rehabilitation - Roadway

Non-Urban

Small Urban

Railway-Highway Grade Crossing

Non-Urban

Road - new Construction

PARK AND RIDE LOT

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

36

36

138

138

2644

MULT

OTHER

OTHER

51

52

13

18

2

Beg Len

3

1

1

Prior

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

$1,606,263

$0

$2,145,232

$2,354,625

$1,359,499

Total

Total

Total

Total

Total

$24,008,502

$0

$451,589

$1,920,716

$98,722

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,420,000

$0

$0

$0

$25,614,766

$1,420,000

$2,596,821

$4,275,341

$1,458,221

$23,866,881

$1,000,000

$2,000,000

$3,418,968

$1,359,499

$1,747,885

$0

$0

$1,631

$0

$0

$420,000

$596,821

$854,742

$98,722

Tooele County Projects

ST_GF_HB173

NHPP_NHSST_CONCPT_D2

STP_RURAL

STP_SU_JHCLOCAL_GOVT

R/H_HAZ_ELIM

LOCAL_GOVTSTP_RURAL

EM_HPP_1702ST_INELIGIBL

LOCAL_INKINDCMAQ_TOOELECMAQ_WFRC

$127,845

$24,008,502 $0

$11

$0 $0

$600,000

$451,589 $0

$1,919,085 $1,631

$98,722 $0 $0

$0

$0 $0

$0

$0 $0

$0

$0 $0

$0 $0

$0 $0 $0

$0

$0 $0

$0

$0 $0

$0

$0 $0

$0 $0

$0 $0 $0

$0

$0 $0

$0

$0 $0

$0

$0 $0

$0 $0

$0 $0 $0

$0

$0 $0

$0

$1,000,000 $420,000

$0

$0 $0

$0 $0

$0 $0 $0

$969,000

$25,600,001 $14,765

$927,273

$1,000,000 $420,000

$600,000

$451,589 $2,145,232

$4,273,710 $1,631

$98,722 $334,000

$1,025,499

$0

$23,866,881 $0

$864,497

$1,000,000 $0

$600,000

$0 $2,000,000

$3,418,968 $0

$0 $334,000

$1,025,499

$969,000

$1,733,120 $14,765

$62,776

$0 $0

$0

$0 $0

$0 $1,631

$0 $0 $0

$0

$0 $0

$0

$0 $420,000

$0

$451,589 $145,232

$854,742 $0

$98,722 $0 $0

$841,155

$1,591,499 $14,765

$927,262

$0 $0

$0

$0 $2,145,232

$2,354,625 $0

$0 $334,000

$1,025,499

Region

Closeout

Scoping

Closeout

STIP

STIP

Undr Const

Closeout

Closeout

06/16/12

06/01/13

07/12/14

05/18/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

SR-36; MP 51.02 - 51.02

SR-36; MP 52.46 - 55.77

SR-138; MP 12.88 - 13.84

SR-138; MP 18.13 - 18.25

Cnty:FA-2644; MP 2.07 - 2.07

OLD MORMON TRAIL ROAD & Cnty:FA-2650; MP 10.00 - 13.50

Midvalley Highway Tooele County

TOOELE - STANSBURY PARK & RIDE LOT

Page 96: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 120 of 217

10081

11294

12926

6019

6064

12132

5589

5589

PIN

F-LC45(10)

F-LC45(12)

F-R299(193)

F-0036(33)57

F-0036(30)41

F-0036(36)56

S-I80-2(65)84

S-0138(11)11

Project No.

Grantsville Park and Ride Lot Project

Operation & Maint. for the Tooele Valley Shuttle

Tooele Co. 1 Call - 1 Click Center & Outreach Prgm

SR-36; Safety and Signal Improvements

SR-36 near Stockton Crossing Safety Improvement

SR-36; 2000 N to Stansbury

I-80 MP 84 Cattle guard replacement

SR-138, MP11-12. Main Street Asphalt Grantsville

PIN Description / Project Location

Other - Traffic Management & ITS Projects

UTA/Transit

UTA/Transit

Barrier - T/S

Railway-Highway Grade Crossing

Preservation - Roadway

Structures

Preservation - Roadway

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

36

36

36

80

138

54

41

57

84

11

Beg Len

11

6

1

Prior

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

$271,768

$65,261

$0

$1,192,387

$886,176

$100,000

Total

Total

Total

Total

Total

Total

$47

$4,739

$277,767

$110,000

$1

$4,900,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$271,814

$70,000

$277,767

$1,302,387

$886,177

$5,000,000

$220,000

$65,261

$227,230

$1,214,215

$826,183

$4,661,500

$0

$0

$0

$88,172

$59,994

$338,500

$51,814

$4,739

$50,537

$0

$0

$0

Tooele County Projects

CMAQ_TOOELELOCAL_GOVT

L_PASS_MATCHCMAQ_TOOELE

LOCAL_GOVTFA_MISCFA_MISC_100%

HSIPSEC164_HSIPCMAQ_TOOELE

R/H_HAZ_ELIMR/H_DEVICES

NHPP_NHSNHS

ST_CONT_R2

ST_CONT_R2

$0 $47

$4,739 $0

$50,537 $177,230

$50,000

$0 $110,000

$0

$0 $1

$4,900,000 $0

$6,617

$960

$0 $0

$0 $0

$0 $0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0 $0

$0 $0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0 $0

$0 $0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0 $0

$0 $0

$0 $0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$235,976 $35,839

$4,739 $65,261

$50,537 $177,230

$50,000

$40,254 $1,092,133

$170,000

$1,958 $884,219

$4,900,000 $100,000

$90,000

$15,331

$220,000 $0

$0 $65,261

$0 $177,230

$50,000

$37,529 $1,018,195

$158,491

$1,826 $824,357

$4,568,270 $93,230

$0

$0

$0 $0

$0 $0

$0 $0 $0

$2,725 $73,937 $11,509

$133 $59,862

$331,730 $6,770

$90,000

$15,331

$15,976 $35,839

$4,739 $0

$50,537 $0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$235,976 $35,792

$0 $65,261

$0 $0 $0

$40,254 $982,133 $170,000

$1,958 $884,218

$0 $100,000

$83,383

$14,371

Region

Closeout

Active

STIP

Closeout

Subst Comp

Active

Closeout

Closeout

09/01/12

09/07/13

08/10/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11362

10609

12363

12890

11557

GRANTSVILLE PARK N RIDE

Tooele Valley

Tooele County - One Call - One Click Center & Veterans Outreach Program

SR-36; MP 54.36 - 65.47

SR-36; MP 40.71 - 41.13

SR-36; MP 55.77 - 62.49

I-80; MP 83.87 - 83.87

SR-138; MP 11.00 - 12.00

Page 97: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 121 of 217

8072

5589

5589

5589

5589

5952

6019

10031

PIN

F-0138(10)12

S-0196(4)0

S-0199(5)15

S-I80-2(63)101

S-I80-2(66)88

S-0112(10)8

F-I80-2(60)41

F-I80-1(52)0

Project No.

SR-138; Sheep Lane to SR-36

SR-196; ROW fence

SR-199 MP15-18 Pipe crossing replacement

I-80 Drainage MP 100.76

I-80 MP 88-89 ROW Fence

SR-112 (1000 N) & 200 West, Tooele

I-80; Cable Barrier (MP.8-49 Various Locations)

I-80; MP 0 to MP 10.46

PIN Description / Project Location

Preservation - Roadway

Fencing

Drainage - Maint

Contingency Funds

Fencing

Traffic Signal - New

Barrier - T/S

Minor Rehabilitation - Roadway

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

138

196

199

MULT

MULT

MULT

MULT

MULT

15

1

15

Beg Len

5

7

3

Prior

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

$435,000

$2,775,000

$7,266,426

Total

Total

Total

$0

$5,100

$399,049

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$435,000

$2,780,100

$7,665,475

$405,550

$2,591,887

$6,889,714

$29,449

$188,213

$775,761

$0

$0

$0

Tooele County Projects

STP_FLX_STEQ_BONUS(MG)

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_CONT_R2

ST_SIGNALS

ST_SPOT_SFTYHSIP

NHPP_IMST_BRIDGE

$0 $0

$15,000

$38

$0

$665

$179,422

$0 $5,100

$49,049 $350,000

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$25,000 $410,000

$15,000

$44,600

$26,300

$38,000

$200,000

$0 $2,780,100

$7,315,475 $350,000

$23,308 $382,243

$0

$0

$0

$0

$0

$0 $2,591,887

$6,889,714 $0

$1,693 $27,757

$15,000

$44,600

$26,300

$38,000

$200,000

$0 $188,213

$425,761 $350,000

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$25,000 $410,000

$0

$44,562

$26,300

$37,335

$20,578

$0 $2,775,000

$7,266,426 $0

Region

Closeout

Active

Closeout

Closeout

Closeout

Active

Closeout

Subst Comp

12/15/12

08/03/13

10/19/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

10864

6744

12889

12050

12888

12799

11364

10917

SR-138; MP 15.35 - 20.44

SR-196; MP 1.00 - 8.00

SR-199; MP 15.00 - 18.01

I-80; MP 100.76 - 100.76

I-80; MP 88.00 - 88.05 & I-80; MP 87.95 - 89.02

SR-112; MP 7.98 - 7.98 & SR-112; MP 7.98 - 7.98

I-80; MP 41.23 - 48.98 & I-80; MP 41.23 - 48.98 & I-80; MP 32.50 - 38.50 & I-80; MP 32.50 - 38.50 & I-80; MP 7.00 - 12.00 & I-80; MP 7.00 - 12.00 & I-80; MP .88 - 1.29

I-80; MP .00 - 10.46 & I-80; MP .00 - 10.46

Page 98: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 122 of 217

10031

10032

12132

6026

6026

PIN

F-I80-2(61)94

F-I80-2(62)50

F-I80-2(67)40

F-R299(133)

F-R299(168)

Project No.

I-80; MP 94 to 99

I-80; MP 50 to 60

I-80; MP 40 to 50

Droubay Rd; Roadway Improvements at RR Crossing

Rural Roads in Tooele County

PIN Description / Project Location

Minor Rehabilitation - Roadway

Preservation - Roadway

Preservation - Roadway

Rural Road Safety

Roadside Improvements

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

OTHER

Beg Len

Prior

TOOELE

TOOELE

TOOELE

TOOELE

TOOELE

$1,421,294

$65,000

$296,444

Total

Total

Total

$674,624

$1,935,000

$28,556

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,095,918

$2,000,000

$325,000

$1,158,814

$1,883,600

$325,000

$937,104

$116,400

$0

$0

$0

$0

Tooele County Projects

NHPP_IM

NHPP_IMIMST_GF_BRIDGE

NHPP_IMIM

HSIP_HRRR

HSIP_HRRR@1HSIP_HRRR

$321

$0 $0

$674,624

$1,935,000 $0

$20,000

$28,556 $0

$0

$0 $0 $0

$0 $0

$0

$0 $0

$0

$0 $0 $0

$0 $0

$0

$0 $0

$0

$0 $0 $0

$0 $0

$0

$0 $0

$0

$0 $0 $0

$0 $0

$0

$0 $0

$1,021,411

$1,218,167 $12,258

$865,493

$1,935,000 $65,000

$885,207

$325,000 $0

$961,965

$1,147,269 $11,545

$0

$1,822,383 $61,217

$825,278

$325,000 $0

$59,446

$70,897 $713

$865,493

$112,617 $3,783

$0

$0 $0

$0

$0 $0 $0

$0 $0

$59,928

$0 $0

$1,021,090

$1,218,167 $12,258

$190,869

$0 $65,000

$865,207

$296,444 $0

Region

Contr Clsd

Undr Const

Advertised

Closeout

Phys Compl

03/22/14

10/19/13

10/18/14

07/28/12

02/15/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11489

11484

12362

10236

11302

TO SR-36 TOOELE INT.; MP .00 - .25 & I-80; MP 94.44 - 98.62 & I-80; MP 94.43 - 98.62

I-80; MP 50.00 - 60.00 & I-80; MP 50.00 - 60.00

I-80; MP 40.00 - 50.00 & I-80; MP 40.00 - 50.00

DROUBAY RD

Rural Roads in Tooele County

Page 99: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 149 of 217

12120

7748

12118

13055

12150

13051

11433

10675

PIN

F-0006(166)174

F-R499(85)

F-R499(215)

S-R199(179)

S-R399(180)

S-R199(177)

F-0191(123)113

F-R499(173)

Project No.

US-6; Spanish Fork to I-70 Traffic Study

I-15; ITS PROJECTS AT VARIOUS LOCATIONS

I-15; Safety Study Region 4

SR-30; Passing Lanes (Box Elder/Cache Counties)

Uintah Transportation Plan

SR-108; Corridor Preservation

US-191; South Moab to Blue Hill

US-89 Passing Lanes & Improve Alton Intersection

PIN Description / Project Location

Traffic

ITS PROJECTS

Safety

Choke Point

Planning

Corridor Preservation

Choke Point

New Construction

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

6

15

15

30

40

108

191

MULT

174

97

117

4

113

Beg Len

127

150

194

4

9

12

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$1,866,589

$74

$4,324,999

Total

Total

Total

$4,393

$19,926

$11,416

$0

$100,000

$0

$0

$4,880,000

$0

$0

$0

$0

$0

$0

$0

$1,870,982

$5,000,000

$4,336,416

$1,479,551

$0

$4,032,198

$391,431

$5,000,000

$304,218

$0

$0

$0

Various County Projects

NHPP_NHS

IMST_ATMS

NHPP_IM

ST_TIFST_TIF_SB229

ST_HB377/TF

ST_CORR_PRES

NHPP_NHS

NHSST_CONT_R4NHPP_NHS

$0

$0 $4,393

$0

$19,926 $0

$468,725

$10,000

$0

$0 $11,416

$1

$0

$0 $0

$0

$100,000 $0

$0

$0

$0

$0 $0 $0

$0

$0 $0

$0

$4,880,000 $0

$0

$0

$4,000,000

$0 $0 $0

$0

$0 $0

$0

$0 $0

$0

$0

$0

$0 $0 $0

$0

$0 $0

$0

$0 $0

$0

$0

$0

$0 $0 $0

$115,000

$1,570,982 $300,000

$45,000

$5,000,000 $0

$904,000

$10,000

$4,000,000

$395,000 $11,416

$3,930,000

$107,215

$1,479,551 $0

$42,381

$0 $0

$0

$0

$3,729,200

$368,259 $0

$3,663,939

$7,786

$91,431 $300,000

$2,619

$5,000,000 $0

$904,000

$10,000

$270,800

$26,742 $11,416

$266,061

$0

$0 $0

$0

$0 $0

$0

$0

$0

$0 $0 $0

$115,000

$1,570,982 $295,607

$45,000

$74 $0

$435,275

$0

$0

$395,000 $0

$3,929,999

Region

Scoping

Contr Clsd

Active

Scoping

Scoping

STIP

STIP

Undr Const

07/16/11

09/28/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

US-6; MP 173.60 - 300.30

I-15; ITS PROJECTS AT VARIOUS LOCATIONS

I-15; MP .00 - 194.30

SR-30; MP 97.00 - 101.00

US-40; MP 116.62 - 116.62

SR-108; MP 4.01 - 12.92

US-191; MP 112.50 - 124.00

US-89 Passing Lanes & Alton Intersection Improvements

Page 100: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 150 of 217

10018

10306

10308

10309

11894

11895

12086

10386

PIN

F-ST99(162)

F-ST99(159)

F-ST99(160)

F-ST99(157)

S-R399(169)

S-R399(170)

S-ST99(214)

NEWPROJ(10386)

Project No.

Travelwise

Scenic Byway Livability Plan Development

OJT SUPPORT SERVICES PROGRAM FY 2013 - 2014

Infrastructure Voluntary Eval. Sustainability Tool

Uintah Basin Environmental Study

Unitah Basin Program Management

Construction Portal

US-89; Passing/Turn out Study

PIN Description / Project Location

ATMS

Scenic Byways

Other - Non-Construction Project

Other - Non-Construction Project

Document EA/EIS

Annual Work Program

Data System Development/Enhancement

New Construction

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

1

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$0

$1,425,904

$300,000

Total

Total

Total

$233,523

$5,602,096

$75,000

$318,523

$6,000,000

$0

$145,876

$0

$0

$145,876

$0

$0

$0

$0

$0

$843,798

$13,028,000

$375,000

$786,673

$0

$0

$57,125

$13,028,000

$375,000

$0

$0

$0

Various County Projects

CMAQ_MAGCMAQ_WFRCCMAQ_PM2.5

EM_2011_PLHD

FA_MISC_100%

FA_MISC_50%

ST_HB377/TFST_TIFST_TIF_SB229

ST_HB377/TF

ST_TIF_SB229ST_TIF

ST_CONCPT_D4

$0 $214,523

$19,000

$0

$0

$0

$0 $5,602,096

$0

$665,437

$0 $75,000

$0

$48,000 $214,523

$56,000

$0

$0

$0

$0 $6,000,000

$0

$0

$0 $0

$0

$0 $145,876

$0

$0

$0

$0

$0 $0 $0

$0

$0 $0

$0

$0 $145,876

$0

$0

$0

$0

$0 $0 $0

$0

$0 $0

$0

$0 $0 $0

$0

$0

$0

$0 $0 $0

$0

$0 $0

$0

$48,000 $720,798

$75,000

$334,000

$182,349

$40,000

$1,028,000 $12,000,000

$0

$1,068,000

$0 $375,000

$38,149

$44,750 $672,000

$69,923

$334,000

$182,349

$20,000

$0 $0 $0

$0

$0 $0

$0

$3,250 $48,798 $5,078

$0

$0

$20,000

$1,028,000 $12,000,000

$0

$1,068,000

$0 $375,000

$38,149

$0 $0 $0

$0

$0

$0

$0 $0 $0

$0

$0 $0

$0

$0 $0 $0

$334,000

$182,349

$40,000

$1,028,000 $397,904

$0

$402,563

$0 $300,000

$38,149

Region

STIP

Active

Active

Active

Active

Scoping

Scoping

Closeout

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Other: STATEWIDE TRAVEL PROGRAM

SCENIC BYWAYS IN UTAH

NON-ROUTE PROJECT

PILOT TEST - INVEST

Unitah Basin

Unitah Basin

Project Location to be UDOT Headquarters

Study of Passing Lanes along US-89 in Region 4

Page 101: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 151 of 217

10732

11142

11619

11869

12084

12121

12360

12372

PIN

F-ST99(183)

F-ST99(214)

F-R499(201)

F-ST99(232)

S-ST99(213)

F-ST99(242)

F-ST99(247)

F-ST99(246)

Project No.

Statewide; Home Travel Survey

Enhanced Traveler Information for Weather

Ferry Boat Discretionary Funds

Slide-In Construction Implementation Guide

WINTER ROADWAY CLOSURES STUDY

State Training Budget

OJT Supportive Services Program - FY 2015

DBE Supportive Services Program - FY 2015

PIN Description / Project Location

Study

ITS Communications

Local/MPO/Other Agency Pass-Through

Other structure item repair

Planning

Education

Reimbursement/Settlement

Reimbursement/Settlement

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$1,200,000

$609,095

$98,139

$593,484

Total

Total

Total

Total

$87,139

$15,497

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,287,139

$624,592

$98,139

$593,484

$1,200,000

$383,000

$78,511

$404,137

$0

$241,592

$19,628

$189,347

$87,139

$0

$0

$0

Various County Projects

STP_URB_SLSTP_URB_O/LL_PASS_MATCH

ITS_RESEARCHL_PASS_MATCHST_CONST

FA_MISCEM_2014_FBD

BRD_F

ST_HB377/TF

ST_CONSTSTP_FLX_ST

FA_MISC_100%

FA_MISC_100%

$0 $0

$87,139

$0 $0

$15,497

$0 $0

$0

$13,359

$0 $0

$0

$0

$0 $0 $0

$0 $0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$816,000 $384,000

$87,139

$383,000 $0

$241,592

$49,278 $48,861

$200,000

$200,000

$160,000 $433,484

$71,341

$108,968

$816,000 $384,000

$0

$383,000 $0 $0

$39,422 $39,089

$200,000

$0

$0 $404,137

$71,341

$108,968

$0 $0 $0

$0 $0

$241,592

$9,856 $9,772

$0

$200,000

$160,000 $29,347

$0

$0

$0 $0

$87,139

$0 $0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$816,000 $384,000

$0

$383,000 $0

$226,095

$49,278 $48,861

$200,000

$186,641

$160,000 $433,484

$71,341

$108,968

Region

Active

Contr Clsd

Scoping

Active

Active

Closeout

Active

Active

11/10/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Statewide Home Travel Survey

Statewide weather forecasts, signal control in various locations

Ferry Boat Discretionary Funds

Statewide

WINTER ROADWAY CLOSURES STUDY

State wide training

OJT Supportive Services Program

DBE Supportive Services Program

Page 102: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 152 of 217

12436

12930

13003

13004

13006

13012

13031

10032

PIN

F-TPF-5(296)

S-ST99(281)

F-ST99(292)

F-ST99(295)

F-ST99(293)

F-ST99(297)

F-ST99(296)

F-0006(163)256

Project No.

SPT Perf-Based Assessment of Liquefaction TPF-5296

Asset Management Review RFQ

INVEST, FHWA'S SUSTAINABILITY SELF-EVALUATION TOOL

Tax Commission Joint Operations Center

UTA 1 Call - 1 Click & Outreach Program

State Training Budget

National Summer Transportation Institute Program

US-6; Grassy Trail to Icelander

PIN Description / Project Location

Research

Planning

Annual Work Program

Annual Work Program

UTA/Transit

Education

Annual Work Program

Preservation - Roadway

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

6

256

Beg Len

6

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$0

$438,036

$1,783,001

Total

Total

Total

$550,000

$156,964

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$550,000

$595,000

$1,783,001

$450,000

$435,000

$1,662,292

$0

$160,000

$120,709

$100,000

$0

$0

Various County Projects

SPR_R_100%

ST_CONT_PG

FA_MISC_50%

FA_MISC_100%

FA_MISC_100%FA_MISCUTA_FUNDS

STP_FLX_STST_CONST

NSTI

NHPP_NHSNHSSTP_FLX_ST

$59,000

$50,000

$0

$0

$50,000 $400,000 $100,000

$0 $156,964

$0

$0 $0 $0

$0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0 $0 $0

$0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0 $0 $0

$0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0 $0 $0

$0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0 $0 $0

$148,000

$50,000

$29,950

$100,000

$50,000 $400,000 $100,000

$435,000 $160,000

$20,000

$1,692,161 $68,658 $22,181

$148,000

$0

$14,975

$100,000

$50,000 $400,000

$0

$435,000 $0

$20,000

$1,577,602 $64,010 $20,680

$0

$50,000

$14,975

$0

$0 $0 $0

$0 $160,000

$0

$114,559 $4,648 $1,502

$0

$0

$0

$0

$0 $0

$100,000

$0 $0

$0

$0 $0 $0

$89,000

$0

$29,950

$100,000

$0 $0 $0

$435,000 $3,036

$20,000

$1,692,161 $68,658 $22,181

Region

Scoping

Active

Active

Active

STIP

Active

Active

Closeout12/21/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11538

Statewide study

Study of UDOT's Transportation Asset Management Plan - No Locations Defined

Various Locations

Various Locations

Utah Transit Authority (UTA) One Call - One Click Center & Veterans

Various Locations

No mappable location at University of Utah

US-6; MP 256.27 - 262.00

Page 103: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 153 of 217

11903

6019

8074

11731

5954

10032

5954

8074

PIN

F-R499(239)

F-R499(218)

F-I15-5(42)233

F-0025(3)0

S-R399(187)

F-0060(6)1

S-R499(229)

F-I70-4(58)163

Project No.

Region 4 Culvert Program on US-6

SR-12; MP 64.3-117.0, Sign and Geometry Improv

I-15; NB AUX. LANE SANTAQUIN HILL

SR-25; Fish Lake Road

CCTV along US-40

SR-60; SR-168 to US-89

I-70; Fiber from Green River to Thompson Springs

I-70; MP 154 to Floy

PIN Description / Project Location

Drainage

Roadside Improvements

Minor Rehabilitation - Roadway/Adding a lane/shoulder

Minor Rehabilitation - Roadway

ATMS

Preservation - Roadway

ITS Communications

Major Rehabilitation - Roadway

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

6

12

15

25

40

60

70

70

205

64

240

105

1

157

154

Beg Len

20

53

2

10

53

7

74

22

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$3,270,421

$848,131

$18,780,808

Total

Total

Total

$461,026

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$3,731,447

$848,131

$18,780,808

$3,514,277

$737,102

$14,438,495

$217,170

$96,653

$4,342,313

$0

$14,376

$0

Various County Projects

STP_FLX_ST

HSIP

IMNHPP_IM

STP_FLX_ST

ST_ATMS

L_BETTERMENTSTP_FLX_STST_SAFE_SIDE

ST_ATMS

ST_RET_ROWNHPP_IMIM

$500,000

$775,000

$0 $461,026

$2,600,930

$46,871

$0 $0 $0

$13,999

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0

$0 $0 $0

$500,000

$800,000

$400,000 $3,331,447

$2,650,930

$85,000

$14,376 $790,627

$43,128

$15,000

$3,450,063 $15,080,745

$250,000

$466,150

$745,840

$376,720 $3,137,557

$2,471,462

$0

$0 $737,102

$0

$0

$0 $14,203,045

$235,450

$33,850

$54,160

$23,280 $193,890

$179,468

$85,000

$0 $53,525 $43,128

$15,000

$3,450,063 $877,699

$14,550

$0

$0

$0 $0

$0

$0

$14,376 $0 $0

$0

$0 $0 $0

$0

$25,000

$400,000 $2,870,421

$50,000

$38,129

$14,376 $790,627

$43,128

$1,001

$3,450,063 $15,080,745

$250,000

Region

Scoping

Active

Closeout

Active

Undr Const

Closeout

Active

Closeout

01/05/13

06/08/13

12/08/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12669

12186

10215

12486

12805

11782

12807

10403

US-6; MP 205.00 - 225.00

SR-12; MP 64.30 - 117.00

I-15; MP 239.92 - 242.27

SR-25; MP .00 - 10.00

US-40; MP 104.77 - 157.94

SR-60; MP .78 - 7.50

I-70; MP 157.42 - 231.67

I-70; MP 154.30 - 175.81

Page 104: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 154 of 217

5954

5954

6019

6061

6019

5954

5954

5954

5954

PIN

S-I80-3(176)129

S-I80-2(64)97

F-I80-3(181)100

S-R499(204)

F-0189(57)7

S-0191(125)71

S-ST99(256)

S-ST99(257)

S-ST99(274)

Project No.

I-80 Parley's Canyon VSL

Tooele Travel Times I-80

I-80; MP 99.50-113, Upgrade Barrier

Region 4 Texas Turndown Replacement

US-189; MP 7.43-24.90, Variable Speed Limits

US 191 Fiber: Moab to Monticello

Travel Weather Information

Fiber Hub Switches

Statewide Interconnect and Device Deployment

PIN Description / Project Location

ATMS

Traveler Information

Barrier - T/S

Barrier - T/S

Signing-T&S

ITS Communications

Traveler Information

ITS Communications

ATMS

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

80

80

80

89

189

191

2135

2135

2135

129

97

100

148

7

71

1

Beg Len

15

20

14

35

17

56

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$100,000Total $1,800,000 $0 $0 $0 $0 $1,900,000 $1,771,370 $128,630 $0

Various County Projects

ST_ATMS

ST_ATMS

HSIPSEC164_HSIP

ST_BARRIER

HSIP

ST_ATMS

ST_ATMS

ST_ATMS

ST_ATMS

$60,163

$100,000

$1,800,000 $0

$16,788

$150,000

$4,875

$150,000

$200,000

$294,849

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$721,000

$100,000

$1,800,000 $100,000

$363,000

$150,000

$5,000

$150,000

$200,000

$300,000

$0

$0

$1,678,140 $93,230

$0

$139,845

$0

$0

$0

$0

$721,000

$100,000

$121,860 $6,770

$363,000

$10,155

$5,000

$150,000

$200,000

$300,000

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$660,837

$0

$0 $100,000

$346,212

$0

$125

$0

$0

$5,151

Region

Closeout

Active

Active

Closeout

Scoping

Active

Scoping

Active

Active

06/22/13

11/02/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

10763

12622

12221

11824

11410

13025

12625

12627

12814

I-80; MP 128.79 - 143.74 & (Foothill Blvd. to Kimball Jct.)

STATEWIDE ITS EXPANSION PROGRAM

I-80; MP 99.50 - 113.00

US-89; MP 148.22 - 183.33 & Various Locations in Region 4

US-189; MP 7.43 - 24.90

US-191; MP 70.68 - 126.94

Cnty:FA-2135; MP .48 - .48

Cnty:FA-2135; MP .54 - .54

Cnty:FA-2135; MP .49 - .49

Page 105: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 155 of 217

5954

5930

5954

5954

5981

5981

6019

6019

PIN

S-ST99(308)

S-R199(146)

S-R399(186)

S-0030(57)91

F-R199(164)

F-R199(165)

F-R199(147)

F-I84-6(120)81

Project No.

ITS Standards Support

Texas Turn Down Replacements at Various Locations

Region 3 Signal Interconnect

Logan Fiber Hub Relocation

CCTV Ogden / Layton area - various locations

Traffic Signal Interconnect - Ogden / Layton area

SR-134, SR-126, US-89; Turn Lanes and Chip Seal

I-84; Cable Barrier (MP 81.14-87.10)

PIN Description / Project Location

ATMS

Pavement Fix

ITS Communications

ITS Communications

ATMS

ITS Communications

Highway Safety Improvement

Barrier - T/S

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

2135

MULT

MULT

MULT

MULT

MULT

MULT

MULT

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$0

$1,642,030

$355,115

Total

Total

Total

$498,900

$356,814

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$498,900

$1,998,843

$355,115

$437,155

$559,380

$331,073

$61,745

$1,439,463

$24,041

$0

$0

$0

Various County Projects

ST_ATMS

ST_SPOT_MNT

ST_ATMS

ST_ATMS

CMAQ_WFRC

CMAQ_WFRCST_ATMS

ST_PVMTST_SPOT_SFTYHSIP

HSIPSEC164_HSIP

$150,000

$0

$86,318

$125,000

$200,000

$468,900 $30,000

$356,814 $0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0 $0

$0 $0

$150,000

$244,650

$110,000

$125,000

$200,000

$468,900 $30,000

$1,398,843 $0

$600,000

$54,021 $301,094

$0

$0

$0

$0

$186,460

$437,155 $0

$0 $0

$559,380

$50,364 $280,709

$150,000

$244,650

$110,000

$125,000

$13,540

$31,745 $30,000

$1,398,843 $0

$40,620

$3,657 $20,384

$0

$0

$0

$0

$0

$0 $0

$0 $0 $0

$0 $0

$0

$244,650

$23,682

$0

$0

$0 $0

$1,042,030 $0

$600,000

$54,021 $301,094

Region

Active

Closeout

Scoping

Active

STIP

STIP

Reg Rev

Cntr Comp

09/21/13

05/18/13

05/17/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

13108

11627

12774

13107

12630

12631

11359

11385

Cnty:FA-2135; MP .49 - .49

SR-102; MP 18.70 - 18.90 & SR-13; MP 17.80 - 18.20 & SR-203; MP 5.60 - 5.90

SR-198; MP 13.10 - 13.48 & SR-74; MP 1.55 - 1.55 & SR-74; MP 3.13 - 3.13

SR-30; MP 90.77 - 91.15 & SR-30; MP 108.64 - 109.93

I-15; MP 323.66 - 323.66 & SR-204; MP 2.08 - 2.08 & SR-273; MP 2.45 - 2.45 & US-89; MP 414.51 - 414.51 & US-89; MP 413.05 - 413.05 & SR-108; MP 11.34 - 11.34 & US-89; MP 410.24 - 410.24 & I-15; MP 322.47 - 322.48 & SR-204; MP 2.66 - 2.66

SR-97; MP 4.09 - 5.10 & Cnty:FA-3308; MP 1.50 - 3.00 & SR-37; MP 1.50 - 1.50 & SR-107; MP 1.95 - 3.52 & Cnty:FA-1456; MP 1.70 - 1.70 & SR-106; MP 7.29 - 7.29 & SR-106; MP 9.03 - 9.03 & SR-106; MP 8.30 - 8.30 & Cnty:FA-1404; MP 2.08 - 2.74 & Cnty:FA-1

SR-126; MP 14.48 - 21.59 & US-89; MP 424.90 - 425.20 & SR-134; MP .00 - 11.24

I-84; MP 81.14 - 87.10 & I-84; MP 81.14 - 87.10

Page 106: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 156 of 217

6019

6019

6019

6019

6019

6019

8072

8072

PIN

F-R199(156)

F-R199(161)

F-R499(219)

F-R499(238)

F-R499(234)

F-R399(197)

F-R199(130)

F-R199(134)

Project No.

I-84; Rumble Strips (MP 19.6-40.27; 102.31-112.24)

I-15 & I-84; Interstate Structure Protection

I-15; MP 108.0 to 188.6 Structure Protection

No Passing Zone Signage; Various Locations

I-15 & I-70; Interstate Structure Protection

I-15 Freeway Structure Protection, 8 Locations

Microsurface Various Locations Davis & Weber

I-15 & I-84; Pavement Repair, Weber/Davis

PIN Description / Project Location

Roadside Improvements

Barrier - T/S

Barrier - T/S

Signing - T/S

Barrier - T/S

Barrier - T/S

Preservation - Roadway

Preservation - Roadway

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

MULT

MULT

MULT

MULT

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$226,646

$1,503,826

$1,601,317

Total

Total

Total

$2,733,354

$1,777

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,960,000

$1,505,604

$1,601,317

$2,759,608

$1,403,657

$1,508,120

$200,392

$101,947

$93,197

$0

$0

$0

Various County Projects

HSIP

HSIP

HSIPSEC164_HSIP

HSIP

HSIP

HSIP

ST_INELIGIBLEQ_BONUS(MG)STP_FLX_ST

NHPP_IMIM

$0

$68,000

$2,733,354 $0

$450,000

$1,400,000

$457,231

$19 $0

$1,759

$0 $0

$0

$0

$0 $0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0 $0

$0

$0

$0

$0 $0 $0

$0 $0

$199,301

$1,260,000

$2,937,938 $22,062

$500,000

$1,500,000

$1,000,000

$19 $1,490,585

$15,000

$1,467,492 $133,825

$185,808

$1,174,698

$2,739,039 $20,569

$466,150

$1,398,450

$932,300

$0 $1,389,673

$13,985

$1,382,084 $126,036

$13,493

$85,302

$198,898 $1,494

$33,850

$101,550

$67,700

$19 $100,913

$1,016

$85,408 $7,789

$0

$0

$0 $0

$0

$0

$0

$0 $0 $0

$0 $0

$199,301

$1,192,000

$204,584 $22,062

$50,000

$100,000

$542,769

$0 $1,490,585

$13,241

$1,467,492 $133,825

Region

Undr Const

Awarded

Advertised

Active

Active

Awarded

Closeout

Closeout

01/18/14

09/20/14

10/18/14

08/23/14

12/15/12

06/29/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11951

12176

12189

12301

12931

12984

10275

11292

I-84; MP 102.31 - 112.24 & I-84; MP 102.31 - 112.24 & I-84; MP 19.60 - 40.27 & I-84; MP 19.60 - 40.27

I-84; MP .03 - 112.00 & I-84; MP .00 - 112.00 & I-15; MP 312.00 - 400.59 & I-15; MP 312.00 - 400.59

I-15; MP 188.49 - 188.56 & I-15; MP 178.29 - 178.39 & I-15; MP 175.78 - 175.85 & I-15; MP 174.67 - 174.75 & I-15; MP 173.47 - 173.54 & I-15; MP 164.46 - 164.51 & I-15; MP 163.33 - 163.46 & I-15; MP 156.35 - 156.43 & I-15; MP 152.97 - 153.05 & I-15; M

US-191; MP 20.70 - 71.86 & SR-24; MP 7.31 - 69.53 & SR-62; MP .00 - 42.83 & SR-12; MP 13.60 - 122.86 & SR-56; MP .00 - 25.11 & SR-211; MP .00 - 18.92 & SR-153; MP .00 - 40.49 & US-6; MP 89.40 - 107.51 & US-6; MP .00 - 89.40 & US-89; MP 141.10 - 146.0

I-70; MP 221.70 - 222.07 & I-70; MP 221.70 - 222.07 & I-70; MP 204.74 - 204.98 & I-70; MP 204.74 - 204.98 & I-70; MP 193.37 - 193.56 & I-70; MP 193.37 - 193.56 & I-70; MP 175.49 - 175.68 & I-70; MP 175.49 - 175.68 & I-70; MP 164.45 - 164.64 & I-70; M

I-15; MP 248.74 - 248.84 & I-15; MP 247.43 - 247.53 & I-15; MP 246.93 - 247.03 & I-15; MP 247.33 - 247.43 & I-15; MP 246.83 - 246.93 & I-15; MP 232.07 - 232.17 & I-15; MP 232.17 - 232.27 & I-15; MP 263.00 - 263.10 & I-15; MP 259.65 - 259.75 & I-15; M

SR-37; MP .00 - 12.35 & SR-39; MP .00 - 3.52

I-84; MP 81.05 - 87.80 & I-15; MP 312.32 - 349.40

Page 107: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 157 of 217

8072

8074

10031

10032

11798

11903

11904

PIN

F-R199(138)

F-R199(139)

F-0121(21)0

F-R199(152)

F-R199(172)

F-R199(184)

F-R299(184)

Project No.

Microsurface Various Locations, Weber/Davis

SR-126; Various Locations, Weber/Davis

SR-121; 2 Locations in Uintah & Duchesne County

US-89; Logan Canyon to Idaho, Various Locations

I-84, SR-67; Bridge Preservation

Culvert Repair; Box Elder, Weber & Davis Counties

Overhead Sign Replacement; I-15 & 80, SR-201 & 154

PIN Description / Project Location

Preservation - Roadway

Major Rehabilitation - Roadway

Minor Rehabilitation - Roadway

Preservation - Roadway

Preservation - Structure

Drainage

Signing - T/S

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

MULT

MULT

MULT

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$1,723,812

$4,392,326

$1,694,499

$584,545

$1,979,222

Total

Total

Total

Total

Total

$53,188

$0

$0

$130,455

$20,778

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,777,000

$4,392,326

$1,694,499

$715,000

$2,000,000

$816,695

$4,094,966

$1,572,982

$667,402

$1,864,600

$960,305

$297,360

$114,224

$47,598

$135,400

$0

$0

$7,293

$0

$0

Various County Projects

NHPP_NHSNHSST_PVMT

EQ_BONUS(MG)STP_FLX_ST

STP_FLX_STL_BETTERMENT

NHPP_NHS

NHSNHPP_NHSST_BRIDGENHPP_IM

STP_FLX_ST

STP_FLX_STHSIP

$0 $7,713

$45,475

$0 $0

$0 $0

$97,206

$0 $130,455

$0 $0

$325,000

$20,778 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0 $0 $0 $0

$0

$0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0 $0 $0 $0

$0

$0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0 $0 $0 $0

$0

$0 $0

$0 $0 $0

$0 $0

$0 $0

$0

$0 $0 $0 $0

$0

$0 $0

$13,239 $862,761 $901,000

$450,000 $3,942,326

$1,687,206 $7,293

$2,025,000

$25,000 $605,000

$0 $85,000

$325,000

$1,000,000 $1,000,000

$12,342 $804,352

$0

$419,535 $3,675,431

$1,572,982 $0

$1,887,908

$23,308 $564,042

$0 $80,053

$302,998

$932,300 $932,300

$896 $58,409

$901,000

$30,465 $266,895

$114,224 $0

$137,093

$1,693 $40,959

$0 $4,947

$22,003

$67,700 $67,700

$0 $0 $0

$0 $0

$0 $7,293

$0

$0 $0 $0 $0

$0

$0 $0

$13,239 $855,048 $855,525

$450,000 $3,942,326

$1,687,206 $7,293

$1,927,794

$25,000 $474,545

$0 $85,000

$0

$979,222 $1,000,000

Region

Closeout

Reg Rev

Undr Const

Cntr Comp

Undr Const

STIP

Awarded

04/06/13

04/20/13

10/19/13

10/19/13

07/12/14

08/16/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11293

11287

10219

11787

12979

13198

11499

SR-227; MP .00 - .70 & SR-134; MP 11.24 - 12.40 & SR-108; MP .69 - 3.00 & SR-79; MP 2.02 - 3.05

SR-126; MP .62 - 5.74 & SR-126; MP 8.74 - 9.15 & SR-126; MP 14.24 - 14.73 & SR-39; MP 3.21 - 3.71

SR-121; MP .00 - 1.61 & SR-121; MP 39.83 - 40.29

US-89; MP 492.10 - 502.58 & US-89; MP 472.62 - 479.84

I-84; MP 107.62 - 107.82 & I-84; MP 110.76 - 110.96 & I-84; MP 111.20 - 111.40 & SR-67; MP .16 - .55 & SR-67; MP .16 - .55

SR-60; MP 3.56 - 3.57 & SR-107; MP .24 - .25 & SR-134; MP 2.53 - 2.54 & SR-106; MP 4.20 - 4.21 & SR-68; MP 64.30 - 64.31 & I-84; MP 85.52 - 85.53 & I-84; MP 85.52 - 85.53 & SR-240; MP .80 - .81 & SR-30; MP 55.40 - 55.41 & SR-102; MP 15.00 - 15.50 & S

I-80; MP 114.30 - 124.13 & SR-201; MP 10.81 - 16.51 & I-15; MP 303.47 - 306.77 & SR-154; MP .20 - 24.30 & SR-201; MP 10.81 - 16.51 & I-80; MP 114.30 - 124.13 & I-15; MP 303.47 - 306.77

Page 108: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 158 of 217

12137

5589

5591

5591

5597

5597

5597

5597

5597

PIN

S-R199(171)

S-R299(176)

S-R499(148)

S-R499(169)

S-R399(159)

S-R399(160)

S-R399(163)

S-R399(184)

S-R(399)188

Project No.

SR-67; Legacy South End Bridge Deck Treatments

Construction Zone Safety Study

Regionwide Partnership w/DWR Wildlife Monitoring

Partnership with Local Gov. for Radar Speed Signs

Region Wide Safety Projects

Region Wide Design Work For Safety Projects

Project Close Out Support

OSR Studies in Various Locations

Region 3 Construction PI

PIN Description / Project Location

Preservation - Structure

Contingency Funds

Research

Other - Traffic & Safety Project

Rural Road Safety

Rural Road Safety

Staffing Support

Safety

Public Relations

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$118,572

$331,203

Total

Total

$40,678

$88,797

$0

$0

$0

$0

$0

$0

$0

$0

$159,250

$420,000

$0

$0

$115,000

$420,000

$44,250

$0

Various County Projects

ST_BRIDGE

ST_CONT_R2

ST_CONT_R4

ST_CONT_R4LOCAL_GOVT

ST_CONT_R3ST_BARRIER

ST_CONT_R3

ST_CONT_R3

ST_CONT_R3

ST_CONT_R3

$1,870,000

$6,283

$22,533

$24,625 $16,054

$88,797 $0

$30,902

$11,679

$10,000

$11,017

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$1,870,000

$65,000

$50,000

$115,000 $44,250

$400,000 $20,000

$60,000

$40,000

$10,000

$15,000

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$1,870,000

$65,000

$50,000

$115,000 $0

$400,000 $20,000

$60,000

$40,000

$10,000

$15,000

$0

$0

$0

$0 $44,250

$0 $0

$0

$0

$0

$0

$0

$58,717

$27,467

$90,375 $28,197

$311,203 $20,000

$29,098

$28,321

$0

$3,983

Region

Scoping

Active

Active

Active

Undr Const

Active

Active

Scoping

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12370

11981

10142

10642

11466

11474

11661

12736

12833

SR-67; MP .00 - 4.33 & Cnty:FA-1392; MP .49 - .63 & I-215; MP 26.91 - 27.09 & I-215; MP 26.91 - 27.23 & 500 SOUTH OVERPASS; MP .28 - .51

Multiple Locations across Region 2

VARIOUS LOCATIONS

Various Location in Region Four

Region Wide

Region Wide

Region Wide

Various locations in Region 3

Region Wide

Page 109: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 159 of 217

5597

5597

5597

5930

5996

5996

6026

6850

PIN

S-R(399)189

S-R399(201)

S-R399(203)

S-R399(205)

F-TOC9(8)

F-TOC9(9)

F-ST99(118)

S-ST99(150)

Project No.

Region 3 Local Collaboration Map

Misc. ROW Design and Review Services

Modeling for Project Prioritization

Tree removal and trimming various locations

REG 1 & 2 ITS TECH STANDARDS SUPPORT CONTRACT

UDOT STATEWIDE FIBER OPTIC SUPPORT CONTRACT

STATEWIDE HRRR PROJECT MANAGEMENT

Bridge Design and Operations Manual, Phase 2

PIN Description / Project Location

Public Relations

ROW

Traffic

Spot improvement

CONTRACT ITS TECH SUPPORT

CONTRACT FOR MANAGEMENT AND PLANNING OF FIBRE NETWORK

Staffing Support

Other structure item repair

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

OTHER

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$271,022

$1,842,424

Total

Total

$58,978

$0

$0

$0

$0

$0

$0

$0

$0

$0

$330,000

$1,842,424

$214,429

$1,316,802

$115,571

$525,621

$0

$0

Various County Projects

ST_CONT_R3

ST_CONT_R3

ST_CONT_R3

ST_SPOT_MNT

STP_FLX_MAGCMAQ_WFRCST_ATMS

STP_FLX_MAGST_ATMSCMAQ_WFRC

HSIP_HRRR

ST_BRIDGE

$3,063

$25,000

$15,000

$28,500

$0 $0

$58,978

$0 $0 $0

$0

$318,117

$0

$0

$0

$0

$0 $0 $0

$0 $0 $0

$0

$0

$0

$0

$0

$0

$0 $0 $0

$0 $0 $0

$0

$0

$0

$0

$0

$0

$0 $0 $0

$0 $0 $0

$0

$0

$0

$0

$0

$0

$0 $0 $0

$0 $0 $0

$0

$0

$20,000

$25,000

$15,000

$58,000

$50,000 $180,000 $100,000

$83,424 $430,000

$1,329,000

$337,000

$1,500,000

$0

$0

$0

$0

$46,615 $167,814

$0

$77,776 $0

$1,239,027

$314,185

$0

$20,000

$25,000

$15,000

$58,000

$3,385 $12,186

$100,000

$5,648 $430,000

$89,973

$22,815

$1,500,000

$0

$0

$0

$0

$0 $0 $0

$0 $0 $0

$0

$0

$16,938

$0

$0

$29,500

$50,000 $180,000

$41,022

$83,424 $430,000

$1,329,000

$337,000

$1,181,883

Region

Active

Active

Scoping

Scoping

Active

Active

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12834

13088

13163

13162

7123

7124

8746

10173

Region Wide

Region Wide

Region Wide

Region Wide

UDOT STATEWIDE ITS STANDARDS SUPPORT

UDOT STATEWIDE FIBER OPTIC SUPPORT

STATEWIDE HRRR PROJECT MANAGEMENT

BRIDGE DESIGN AND OPERATIONS

Page 110: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 160 of 217

9299

9369

9615

5591

5591

5591

5591

5591

PIN

F-ST99(139)

F-ST99(134)

F-ST99(138)

S-R499(190)

S-R499(198)

S-R499(200)

S-R499(203)

S-R499(213)

Project No.

Statewide Unknown Foundation Program

Statewide Supplemental Bridge Safety Inspection

Bridge Load Rating Program FY2012

R4 Right of Way Consultant Support

Region In-house Right of Way Activities

Permanent VMS Boards in 5 Locations

Region 4 UCI Scanning Project

Improvements to Wildlife Carcass App

PIN Description / Project Location

Scour Repair

Preservation - Structure

Off-System Bridge

ROW

ROW

ATMS

Data System Development/Enhancement

Data System Development/Enhancement

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

OTHER

OTHER

OTHER

Beg Len

1

1

1

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$1,460,362

$5,600,000

$11,000,000

Total

Total

Total

$326,138

$1,200,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,786,500

$6,800,000

$11,000,000

$469,200

$5,757,520

$8,800,000

$1,317,300

$1,042,480

$2,200,000

$0

$0

$0

Various County Projects

ST_BRIDGEBR_ON/OFF

BR_ON/OFFNHPP_BRSTP_FLX_STSTP_BRIDGE

BR_OFFSTP_BRBR_ON/OFF

ST_CONT_R4

ST_CONT_R4

ST_CONT_R4

ST_CONT_R4

ST_CONT_R4

$326,138 $0

$0 $864,000

$79,000 $257,000

$0 $0 $0

$4,916

$19,028

$18,888

$7,002

$3,600

$0 $0

$0 $0 $0 $0

$0 $0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0 $0 $0

$0 $0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0 $0 $0

$0 $0 $0

$0

$0

$0

$0

$0

$0 $0

$0 $0 $0 $0

$0 $0 $0

$0

$0

$0

$0

$0

$1,200,000 $586,500

$4,400,000 $2,064,000

$79,000 $257,000

$3,750,000 $0

$7,250,000

$50,000

$30,000

$170,000

$9,000

$3,600

$0 $469,200

$3,520,000 $1,924,267

$73,652 $239,601

$3,000,000 $0

$5,800,000

$0

$0

$0

$0

$0

$1,200,000 $117,300

$880,000 $139,733

$5,348 $17,399

$750,000 $0

$1,450,000

$50,000

$30,000

$170,000

$9,000

$3,600

$0 $0

$0 $0 $0 $0

$0 $0 $0

$0

$0

$0

$0

$0

$873,862 $586,500

$4,400,000 $1,200,000

$0 $0

$3,750,000 $0

$7,250,000

$45,084

$10,972

$151,112

$1,998

$0

Region

Active

Active

Active

Active

Active

Active

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

9437

9431

10025

11133

11562

11568

11814

12116

STATEWIDE BRIDGE PROGAM

Other: BRIDGE INSPECTION PROGRAM to: 1.00 for: 1.00

VARIOUS, STATEWIDE

Regionwide Right of Way

Region Wide R/W Activities

Various locations on SR-14, I-15 and I-70

Region 4 Headquarters

Region Wide

Page 111: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 161 of 217

5591

5591

5591

5591

5597

5597

5597

5599

5599

PIN

S-R499(214)

S-R499(225)

S-R(499)228

S-R499(230)

S-R399(104)

S-R399(138)

S-R399(147)

S-R199(140)

S-R199(141)

Project No.

Chain-Up Signage Project

Funds for Materials for Permits & T&S Requests

Portable Variable Speed Limit Signs for Work Zones

Region 4; Wildlife - Vehicle Collision Mitigation

Pavement Coring at VARIOUS LOCATION IN REGION

Region Wide Misc. Maintenance Work

Miscellaneous Regionwide Maintenance Work

Region One Transportation Expo

Cost Based Estimating Pilot Program

PIN Description / Project Location

Signing-T&S

Spot Safety

Work Zone Safety

Fencing

TRAFFIC CONTROL FOR PAVEMENT COREING

Preservation - Roadway

Other - Non-Construction Project

Other - Non-Construction Project

Staffing Support

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$20,628

$76,863

Total

Total

$104,372

$183,137

$0

$0

$0

$0

$0

$0

$0

$0

$125,000

$260,000

$0

$0

$75,000

$260,000

$50,000

$0

Various County Projects

ST_CONT_R4

ST_CONT_R4

ST_CONT_R4

LOCAL_GOVTST_CONT_R4OTHER

ST_CONT_R3

ST_CONT_R3

ST_CONT_R3ST_CONST

ST_CONT_R1

ST_CONT_R1

$26,737

$12,599

$60,000

$4,372 $75,000 $25,000

$43,717

$6,395

$23,137 $160,000

$0

$2,915

$0

$0

$0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$50,000

$50,000

$60,000

$25,000 $75,000 $25,000

$50,000

$200,000

$100,000 $160,000

$17,000

$2,950

$0

$0

$0

$0 $0 $0

$0

$0

$0 $0

$0

$0

$50,000

$50,000

$60,000

$0 $75,000

$0

$50,000

$200,000

$100,000 $160,000

$17,000

$2,950

$0

$0

$0

$25,000 $0

$25,000

$0

$0

$0 $0

$0

$0

$23,263

$37,401

$0

$20,628 $0 $0

$6,283

$193,606

$76,863 $0

$17,000

$35

Region

Active

Active

Active

Active

Active

Undr Const

Undr Const

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12119

12429

12830

12895

8779

10808

11156

11452

11611

Various locations throughout Region 4

Variousl Locations in Region 4

Various Locations withing Region Work Zones

Various Locations in Region 4

VARIOUS LOCATION IN REGION

Region Wide

Regionwide

Location for Expo to be determined

UDOT Central Preconstruction

Page 112: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 162 of 217

5599

5599

5775

5775

5775

5930

5930

5947

5947

PIN

S-R199(142)

S-R199(145)

S-ST99(248)

S-ST99(286)

S-ST99(303)

S-R499(236)

S-R499(237)

S-R199(128)

S-R299(153)

Project No.

Signal Optimaztion - 7403

Interstate Lighting Conversion to LED

Statewide Pedestrian Crossing Upgrades FY14

Statewide Pedestrian Crossing Upgrades FY15

Interstate Speed Studies 2014-2015

R4 East District Maintenance Spot Improvement Proj

R4 West District Maintenance Spot Improvement Proj

SSW Program in Region One - FY2013

SSW Program in Region Two - FY2013

PIN Description / Project Location

Contingency Funds

Lighting

Pedestrian/Bicycle Safety

Pedestrian/Bicycle Safety

Traffic

Fencing

Drainage - Maint

Safe Sidewalk/ADA ramps

Safe Sidewalk/ADA ramps

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$146,078

$247,036

Total

Total

$0

$37,489

$0

$0

$0

$0

$0

$0

$0

$0

$146,078

$284,525

$0

$0

$146,078

$284,525

$0

$0

Various County Projects

ST_CONT_R1

ST_CONT_R1

ST_SPOT_SFTY

ST_SPOT_SFTY

ST_SPOT_SFTY

ST_SPOT_MNT

ST_SPOT_MNT

ST_SAFE_SIDEST_ADA_RAMPS

ST_ADA_RAMPSST_SAFE_SIDE

$3,600

$0

$28,380

$62,681

$200,000

$0

$62,500

$0 $0

$0 $37,489

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$55,000

$50,000

$148,000

$100,000

$200,000

$62,500

$62,500

$79,428 $66,650

$122,000 $162,525

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$55,000

$50,000

$148,000

$100,000

$200,000

$62,500

$62,500

$79,428 $66,650

$122,000 $162,525

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0 $0

$51,401

$50,000

$119,620

$37,319

$0

$62,500

$0

$79,428 $66,650

$122,000 $125,036

Region

Active

Active

Closeout

Active

Active

Closeout

Active

Closeout

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11614

11634

12374

12954

13017

13044

13045

10737

10738

Region One

Region One: I-15 & I-84

Statewide Ped Crossing Upgrades, Various Locations

Various Locations

Various Locations Statewide

Various Locations in Region 4

Various location in West District in Region 4

Region One at Various Locations

Region Two at Various Locations

Page 113: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 163 of 217

5947

5947

5947

5947

5947

5947

5947

5947

5952

PIN

S-R199(153)

S-R299(174)

S-R399(172)

S-R499(206)

S-R199(174)

S-R299(197)

S-R399(200)

S-R499(240)

S-ST99(230)

Project No.

Region 1 Safe Sidewalk Projects FY2014

SSW Projects in Region Two - FY14

SSW Projects in Region Three - FY14

SSW Projects in Region Four - FY14

Region 1 Safe Sidewalk Projects FY15

Region 2 Safe Sidewalk Projects FY15

Region 3 Safe Sidewalk Projects FY15

Region 4 Safe Sidewalk Projects FY15

Left Turn Warrant Signal Upgrades FY 2014

PIN Description / Project Location

Safe Sidewalk/ADA ramps

Safe Sidewalk/ADA ramps

Safe Sidewalk/ADA ramps

Safe Sidewalk/ADA ramps

Safe Sidewalk/ADA ramps

Safe Sidewalk/ADA ramps

Safe Sidewalk/ADA ramps

Safe Sidewalk/ADA ramps

Traffic Signal - Upgrade

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

Various County Projects

ST_SAFE_SIDE

ST_SAFE_SIDE

ST_SAFE_SIDE

ST_SAFE_SIDE

ST_SAFE_SIDE

ST_SAFE_SIDE

ST_SAFE_SIDE

ST_SAFE_SIDE

ST_SIGNALS

$211,662

$364,884

$191,190

$4,780

$120,307

$234,438

$99,517

$45,738

$300,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$277,500

$410,475

$200,000

$100,000

$120,307

$234,438

$99,517

$45,738

$1,279,729

$0

$0

$0

$0

$0

$0

$0

$0

$0

$277,500

$410,475

$200,000

$100,000

$120,307

$234,438

$99,517

$45,738

$1,279,729

$0

$0

$0

$0

$0

$0

$0

$0

$0

$65,838

$45,591

$8,810

$95,220

$0

$0

$0

$0

$979,729

Region

Scoping

Active

Active

Closeout

Active

Scoping

Scoping

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11862

11927

11928

11930

13013

13014

13015

13016

11844

Safe Sidewalk Projects located throughout Region One

Various locations within the region.

Variuos locations in the region.

Various locations in the region.

Various Locations in Region One

Various Locations in Region Two

Various Locations in Region Three

Various Locations in Region Four

Various point locations along various state routes.

Page 114: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 164 of 217

5952

5952

5952

5952

5952

5952

5952

5952

5952

PIN

S-ST99(284)

S-ST99(285)

S-R199(173)

S-R299(195)

S-R399(196)

S-R499(233)

S-ST99(310)

S-ST99(311)

S-ST99(312)

Project No.

Warrant Studies FY15

Traffic Studies FY15

Region 1 Signal Improvements/Upgrades FY15

Region 2 Signal Improvements/Upgrades FY15

Region 3 Signal Improvements/Upgrades FY15

Region 4 Signal Improvements/Upgrades FY15

Statewide Signal and Lighting Specifications

Miscellaneous Signals Statewide

Pedestrian Improvements - Signalized FY15

PIN Description / Project Location

Safety

Traffic

Traffic Signal - Upgrade

Traffic Signal - Upgrade

Traffic Signal - Upgrade

Traffic Signal - Upgrade

Traffic Signal - New

Traffic Signal - New

Pedestrian/Bicycle Safety

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

Various County Projects

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

ST_SIGNALS

$150,000

$150,000

$140,000

$190,000

$140,000

$140,000

$100,000

$100,000

$50,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$150,000

$150,000

$140,000

$190,000

$140,000

$140,000

$100,000

$100,000

$50,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$150,000

$150,000

$140,000

$190,000

$140,000

$140,000

$100,000

$100,000

$50,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Region

Active

Active

Active

Active

Active

Active

Active

Active

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12948

12949

12950

12951

12952

12953

13102

13103

13176

Various Locations

Various Locations

Various Locations in Region 1

Various Locations in Region 2

Various Locations in Region 3

Various Locations in Region 4

Various Locations Statewide

Various Locations Statewide

Various Locations Statewide

Page 115: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 165 of 217

5954

5954

5954

5954

5981

5981

5996

6019

6019

PIN

S-ST99(173)

S-ST99(221)

S-ST99(222)

S-ST99(235)

F-R199(126)

F-ST99(215)

F-R299(169)

F-R299(148)

F-R499(178)

Project No.

US-6, I-70, and US-191 ATMS Infrastructure

ATMS Performance Measurmnt Data Tranfer & Analysis

Fiber Optic System Support - Statewide

Congestion Reporting Tool

Weber-Davis Signal Interconnect

Fiber Optic Expansion - Wasatch Front

SL County Metro Area Signal Interconnect

SR-266, SR-152, US-40 Median Cable Barrier

Region 4 Rumble Strips - Phase II

PIN Description / Project Location

ATMS

Operations/Maintenance

ITS Communications

ATMS

ITS Communications

ITS Communications

ATMS

Barrier - T/S

Roadside Improvements

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$498,228Total $409,833 $0 $0 $0 $0 $908,061 $0 $785,000 $123,061

Various County Projects

ST_ATMS

ST_ATMS

OTHERST_ATMS

ST_ATMS

CMAQ_WFRC

CMAQ_WFRC

CMAQ_WFRC

HSIP

HSIP

$52,463

$2,095

$0 $409,833

$89,968

$0

$0

$20,000

$41,307

$8,679

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0 $0

$0

$0

$0

$0

$0

$0

$897,964

$20,000

$123,061 $785,000

$150,037

$20,000

$200,000

$400,000

$1,163,785

$1,531,753

$0

$0

$0 $0

$0

$18,646

$186,460

$372,920

$1,084,997

$1,428,054

$897,964

$20,000

$0 $785,000

$150,037

$1,354

$13,540

$27,080

$78,788

$103,700

$0

$0

$123,061 $0

$0

$0

$0

$0

$0

$0

$845,501

$17,905

$123,061 $375,167

$60,069

$20,000

$200,000

$380,000

$1,122,478

$1,523,075

Region

Cntr Comp

Active

Active

Active

Active

Active

Active

Closeout

Closeout

01/11/14

09/08/12

09/01/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

10520

11617

11618

11921

10712

11143

11641

9612

10567

US-6, I-70, and US-191,Various Locations

Data from various locations

Statewide support of fiber network

This is a traffic management tool that applies to many corridors, statewide.

REGION ONE COMMUTER LINK PROGRAM

various locations along the Wasatch Front

Misc locations in SLCo metro area - connect signals

SR-266, SR-152 & US-40

Various locations in Region 4

Page 116: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 166 of 217

6019

6019

6019

6064

6064

6064

6064

6064

6129

PIN

F-R499(220)

F-R499(223)

F-R299(185)

F-ST99(228)

F-ST99(239)

F-R199(163)

F-ST99(250)

F-ST99(251)

S-ST99(194)

Project No.

Various Locations; Install Rumble Strips

No Passing Zone Signing; Various Locations

I-15, I-215, I-80; Interstate Structure Protection

Commuter Rail North Pedestrian Treatments Program

Statewide Railroad Signal Preemption Upgrades

Public Grade Crossing Signage Upgrades

RR Crossing Program Management

FRA Railroad Crossing Inventory

Statewide Freeway LED Lighting

PIN Description / Project Location

Roadside Improvements

Signing - T/S

Barrier - T/S

Railroad Safety

Railway-Highway Grade Crossing

Railway-Highway Grade Crossing

Staffing Support

Railway-Highway Grade Crossing

Lighting

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$453,250

$600,000

$320,000

Total

Total

Total

$0

$700,000

$480,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$453,250

$1,300,000

$800,000

$422,565

$1,211,990

$745,840

$30,685

$88,010

$54,160

$0

$0

$0

Various County Projects

HSIP

HSIPSEC164_HSIP

HSIP

R/H_HAZ_ELIMR/H_DEVICES

R/H_HAZ_ELIMR/H_DEVICES

R/H_HAZ_ELIM

R/H_HAZ_ELIM

R/H_HAZ_ELIM

ST_LIGHTING

$287,487

$0 $0

$850,000

$700,000 $0

$480,000 $0

$273,214

$0

$0

$26,694

$0

$0 $0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$0

$0 $0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$2,800,000

$91,865 $361,385

$1,000,000

$700,000 $600,000

$800,000 $0

$400,000

$120,000

$120,000

$168,381

$2,610,440

$85,646 $336,919

$932,300

$652,610 $559,380

$745,840 $0

$372,920

$111,876

$111,876

$0

$189,560

$6,219 $24,466

$67,700

$47,390 $40,620

$54,160 $0

$27,080

$8,124

$8,124

$168,381

$0

$0 $0

$0

$0 $0

$0 $0

$0

$0

$0

$0

$2,512,513

$91,865 $361,385

$150,000

$0 $600,000

$320,000 $0

$126,786

$120,000

$120,000

$141,687

Region

Advertised

Awarded

Scoping

Active

Active

Active

Active

Active

Active

09/06/14

05/10/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12190

12202

12222

11746

12042

12396

12515

12516

10996

Various locations to be determined by Project Manager

Various Locations in Region Four

I-15, I-215 & I-80; Various Locations

Weber, Davis, & SL Co Commuter Rail Line

Various Railroad Crossings Statewide

Various grade crossings in various counties

Statewide non-construction project

Statewide non-construction project

Various Locations Statewide

Page 117: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 167 of 217

6129

6129

6364

8072

11798

11798

11903

12137

PIN

S-ST99(309)

S-ST99(317)

S-ST99(241)

F-R499(180)

S--ST99(240)

S-ST99(264)

F-R499(210)

S-ST99(315)

Project No.

Statewide Lighting

Highway Lighting Monitor System

80 MPH Signs I-15, I-80, I-84 & I-70

I-70; Rest Areas on I-70

Statewide ABC Inspections/Lessons Learned

Bridge Design Support

Region 4 Culvert Program; Various Locations

Bridge Planning Non-Destructive Testing

PIN Description / Project Location

Lighting

Lighting

Signing-T&S

Preservation - Roadway

Inspection

Other structure item repair

Drainage

Other structure item repair

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

Beg Len

Prior

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

VARIOU

$689,297

$454,457

Total

Total

$2

$0

$0

$0

$0

$0

$0

$0

$0

$0

$689,298

$454,457

$649,181

$423,690

$40,117

$30,767

$0

$0

Various County Projects

ST_LIGHTING

ST_LIGHTING

ST_SIGNING

NHPP_IMIM

ST_BRIDGE

ST_BRIDGE

STP_FLX_STEQ_BONUS(MG)

ST_BRIDGE

$50,000

$30,000

$0

$2 $0

$7,575

$92,040

$0 $0

$50,000

$0

$0

$0

$0 $0

$0

$0

$0 $0

$0

$0

$0

$0

$0 $0

$0

$0

$0 $0

$0

$0

$0

$0

$0 $0

$0

$0

$0 $0

$0

$0

$0

$0

$0 $0

$0

$0

$0 $0

$0

$50,000

$30,000

$32,751

$619,298 $70,000

$40,000

$130,000

$343,831 $110,626

$50,000

$0

$0

$0

$583,255 $65,926

$0

$0

$320,554 $103,136

$0

$50,000

$30,000

$32,751

$36,043 $4,074

$40,000

$130,000

$23,277 $7,489

$50,000

$0

$0

$0

$0 $0

$0

$0

$0 $0

$0

$0

$0

$32,751

$619,297 $70,000

$32,425

$37,960

$343,831 $110,626

$0

Region

Active

Active

Closeout

Subst Comp

Active

Scoping

Closeout

STIP

05/10/14

01/25/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

13101

13219

12065

10836

12067

12750

12033

13225

Various Locations Statewide

Various Locations Statewide

Various Locations on I-15, I-80, I-84 & I-70

I-70; Various Rest Areas along I-70

Statewide

Design Support

Various Location on I-15 & I-70

Statewide NDT Testing

Page 118: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 181 of 217

4855

5941

8732

7447

7503

10709

11966

PIN

SP-15-8(34)342

IMD-15-7(235)0

F-I15-8(133)331

S-0026(10)2

S-0026(12)0

S-0026(22)0

S-0026(15)0

Project No.

I-15; New Ogden Weber Expansion (I-15 NOW) *ROW*

I-15; 24th Street Interchange

I-15; I-215 to US-89 & SR-232 TO I-84

RIVERDALE RD; 550 W TO CHIMES VIEW DR. - *ROW*

RIVERDALE ROAD CORRIDOR PRESERVATION

SR-26; 1900 West to I-84

SR-26; SR-126 to I-84, Phase 1

PIN Description / Project Location

Widen and Reconstruct

STUDY

Categorical Exclusion (CE) Study

Roadway Reconstruction and Widening

CORRIDOR PRESERVATION

Major Rehabilitation - Roadway

Reconstruct widening

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

15

15

26

26

26

26

342

331

2

Beg Len

5

14

1

1

1

Prior

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

$259,710,088

$2,452,915

$2,442,695

$30,212,192

$2,757,316

$15,254,295

Total

Total

Total

Total

Total

Total

$7,816,517

$258,226

$0

$165,264

$96,665

$9,764,725

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$267,526,606

$2,711,141

$2,442,695

$30,377,456

$2,853,981

$25,019,020

$0

$2,427,501

$2,272,786

$0

$0

$0

$267,253,000

$283,640

$169,909

$28,101,357

$0

$24,974,515

$273,606

$0

$0

$2,276,099

$2,853,981

$44,505

Weber County Projects

ST_BRIDGEOTHERST_CHF

EM_2010_IMDST_CONT_PGEM_2005_IMD

STP_FLX_STST_TIF_SB229

ST_SPOT_SFTYL_BETTERMENTST_GF_CHNST_CHF

L_CORR-WEBERL_CORR_MATCH

ST_GF_CHNST_GF_HB173L_BETTERMENT

ST_GF_HB173

$2,253,000 $0

$5,563,517

$258,226 $0 $0

$0 $0

$0 $0

$165,264 $0

$96,665 $0

$0 $9,764,725

$0

$0

$0 $0 $0

$0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0

$0 $0 $0

$0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0

$0 $0 $0

$0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0

$0 $0 $0

$0 $0 $0

$0 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0

$2,253,000 $273,606

$265,000,000

$2,222,223 $35,000

$453,918

$2,437,826 $4,868

$61,043 $2,276,099

$28,030,314 $10,000

$1,500,000 $1,353,981

$391,663 $24,582,852

$44,505

$3,417,148

$0 $0 $0

$2,000,001 $0

$427,500

$2,272,786 $0

$0 $0 $0 $0

$0 $0

$0 $0 $0

$0

$2,253,000 $0

$265,000,000

$222,222 $35,000 $26,418

$165,041 $4,868

$61,043 $0

$28,030,314 $10,000

$0 $0

$391,663 $24,582,852

$0

$3,417,148

$0 $273,606

$0

$0 $0 $0

$0 $0

$0 $2,276,099

$0 $0

$1,500,000 $1,353,981

$0 $0

$44,505

$0

$0 $273,606

$259,436,483

$1,963,997 $35,000

$453,918

$2,437,826 $4,868

$61,043 $2,276,099

$27,865,050 $10,000

$1,403,335 $1,353,981

$391,663 $14,818,128

$44,505

$3,417,148

Region

Closeout

Scoping

Closeout

Closeout

Active

Undr Const

Closeout

12/14/05

04/07/09

12/07/13

08/15/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

I-15; New Ogden Weber Expansion (I-15 NOW)

I-15; 24TH STREET INTERCHANGE

I-15; I-215 to US 89 & SR-232 TO I-84

RIVERDALE ROAD; 550 WEST TO CHIMES VIEW DRIVE

RIVERDALE ROAD CORRIDOR PRESERVATION

SR-26; MP .00 - .92

SR-26; MP .00 - 1.00

Page 119: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 182 of 217

10016

10831

13037

4400

10191

12446

12964

PIN

F-LC57(22)

F-0037(10)10

F-0037(12)10

CM-0039(12)4

F-0039(20)32

S-0039(32)9

S-0039(31)9

Project No.

SR-37 (4000 South); 3500 West to 3900 West

SR-37; 5100 West to SR-108

SR-37; 5100 West to SR-108

SR-39; I-15 to US-89 & Wall Ave. Intersection

SR-39; Beaver Creek Bridge at MP 32.4

SR-39; Ogden to Pineview Reservoir Bridge Rehab

SR-39; Ogden Canyon Transportation Use Study

PIN Description / Project Location

Reconstruct widening

Enviro. Mitigation/Storm Water Pollution/ etc

Widen Existing Facility

Intersection Improvements & Pavement Rehabilitation

Other structure item repair

New Bridge/Bridge Replacement

Planning

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

37

37

37

39

39

39

39

11

10

10

6

32

9

9

Beg Len

1

3

3

5

5

Prior

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

$1,066,300

$180,226

$23,809,416

$0

Total

Total

Total

Total

$0

$1,550,000

$2,148,361

$0

$0

$0

$0

$0

$0

$20,281,300

$0

$1,830,000

$0

$0

$0

$0

$0

$0

$0

$0

$1,066,300

$22,011,526

$25,957,777

$1,830,000

$994,111

$0

$22,291,085

$400,889

$72,189

$15,230,226

$1,618,692

$1,429,111

$0

$6,781,300

$2,048,000

$0

Weber County Projects

STP_URB_O/L

EQ_BONUS(MG)STP_FLX_ST

ST_TIF_SB229ST_CONT_R1ST_TIFLOCAL_GOVT

LOCAL_GOVTNHPP_NHSCMAQ_WFRCNHSSTP_URB_O/L

EM_2011_IBRD

ST_BRIDGESTP_BR

ST_TIF_HB377

$0

$0 $0

$0 $50,000

$0 $1,500,000

$1,048,892 $1,098,207

$1,262 $0 $0

$0

$0 $0

$197,480

$0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0

$0 $0

$0

$1,931,782

$0 $0

$0 $0

$15,000,000 $5,281,300

$0 $0 $0 $0 $0

$0

$1,400,000 $430,000

$0

$1,877,078

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0

$0 $0

$0

$0

$0 $0

$0 $0 $0 $0

$0 $0 $0 $0 $0

$0

$0 $0

$0

$3,808,860

$994,300 $72,000

$0 $230,226

$15,000,000 $6,781,300

$2,048,000 $1,098,207 $4,424,544

$16,241,793 $2,145,233

$84,432

$1,400,000 $430,000

$200,000

$3,551,000

$926,986 $67,126

$0 $0 $0 $0

$0 $1,023,858 $4,125,002

$15,142,224 $2,000,001

$84,432

$0 $400,889

$0

$0

$67,314 $4,874

$0 $230,226

$15,000,000 $0

$0 $74,349

$299,542 $1,099,569

$145,232

$0

$1,400,000 $29,111

$200,000

$257,860

$0 $0

$0 $0 $0

$6,781,300

$2,048,000 $0 $0 $0 $0

$0

$0 $0

$0

$0

$994,300 $72,000

$0 $180,226

$0 $0

$999,108 $0

$4,423,282 $16,241,793 $2,145,233

$84,432

$0 $0

$2,520

Region

STIP

Active

Scoping

Closeout

Closeout

STIP

Scoping

06/28/08

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

State Route: SR-37 from: 11.00 to: 11.50 for: .50

SR-37; MP 9.51 - 12.35

SR-37; MP 9.51 - 12.35

SR-39; I-15 to US-89 & Wall Ave. Intersection

SR-39; MP 32.41 to MP 32.42

SR-39; MP 8.89 - 13.42

SR-39; MP 8.62 - 13.79

Page 120: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 183 of 217

7435

10708

10707

11088

11481

12508

5522

10760

PIN

S-0079(5)0

F-0089(326)408

F-0097(8)5

F-0108(28)11

S-0108(30)11

F-0134(21)11

HPP-0158(116)0

S-0158(118)0

Project No.

HINCKLEY DRIVE TO SR-108

US-89; SR-203 Intersection Improvements

SR-97; 2200 West to SR-126

SR-108 (Midland Dr); 4000 South to Hinckley Dr

SR-108; SR-37 to SR-79

SR-134; I-15 interchange modifications

SR-158 Improvements, Weber County, Utah

SR-158 Utility Work for PIN 5522

PIN Description / Project Location

CONSTRUCT NEW ROAD, RAILROAD OVERPASS

Choke Point

Choke Point

Reconstruct widening

Reconstruct widening

Intersection Modification

SR-158; Improvements

Other-Roadway Project

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

79

89

97

108

108

134

158

158

408

5

11

11

11

Beg Len

1

1

1

8

8

Prior

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

$18,246,735

$615,000

$4,783,225

$4,252,043

Total

Total

Total

Total

$358,498

$4,685,000

$12,132,678

$56,201

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$18,605,232

$5,300,000

$16,915,903

$4,308,244

$0

$4,661,500

$0

$3,400,898

$18,605,232

$638,500

$10,000,000

$40,000

$0

$0

$6,915,903

$867,346

Weber County Projects

ST_GF_CHNST_GF_HCP

NHPP_NHSST_SIGNALSNHSEQ_BONUS(MG)

STP_FLX_ST

STP_URB_O/L

ST_TIF_HB377LOCAL_GOVTL_BETTERMENT

STP_FLX_ST

L_BETTERMENTST_BRIDGEEM_HPP_1702

ST_PVMT

$0 $358,498

$4,385,000 $300,000

$0 $0

$125,000

$0

$5,330,110 $6,618,700

$183,868

$0

$17,121 $39,079

$1

$11,861

$0 $0

$0 $0 $0 $0

$1,450,000

$0

$0 $0 $0

$0

$0 $0 $0

$0

$0 $0

$0 $0 $0 $0

$0

$0

$0 $0 $0

$4,500,000

$0 $0 $0

$0

$0 $0

$0 $0 $0 $0

$0

$0

$0 $0 $0

$0

$0 $0 $0

$0

$0 $0

$0 $0 $0 $0

$0

$0

$0 $0 $0

$0

$0 $0 $0

$0

$555,232 $18,050,000

$4,760,000 $300,000

$40,000 $200,000

$1,750,000

$0

$10,000,000 $6,618,700

$297,203

$4,500,000

$17,121 $40,000

$4,251,123

$30,000

$0 $0

$4,437,748 $0

$37,292 $186,460

$1,631,525

$0

$0 $0 $0

$4,195,350

$0 $0

$3,400,898

$0

$555,232 $18,050,000

$322,252 $300,000

$2,708 $13,540

$118,475

$0

$10,000,000 $0 $0

$304,650

$0 $40,000

$0

$30,000

$0 $0

$0 $0 $0 $0

$0

$0

$0 $6,618,700

$297,203

$0

$17,121 $0

$850,225

$0

$555,232 $17,691,503

$375,000 $0

$40,000 $200,000

$175,000

$0

$4,669,890 $0

$113,335

$0

$0 $921

$4,251,123

$18,139

Region

Closeout

Active

Scoping

STIP

Awarded

STIP

Closeout

Closeout

04/11/09

08/30/14

05/26/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

HINCKLEY DRIVE TO SR-108

US-89; MP 408.33 to MP 408.72

SR-97; MP 4.68 - 5.10 & Bridges #013007C, #013005C, #013064C

SR-108; MP 11.35 - 11.98

SR-108; MP 11.34 - 12.00

SR-134; MP 11.24 - 11.45

SR-158 Improvements, Weber County, Utah

SR-158; MP .00 - 8.19

Page 121: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 184 of 217

6568

8141

8559

8612

10014

10900

12166

11091

PIN

F-LC57(18)

F-R199(70)

F-LC57(24)

F-LC57(23)

S-LC57(21)

ER-R199(125)

F-LC57(30)

F-R199(133)

Project No.

SKYLINE DRIVE IN PLEASANT VIEW

40TH STREET; WASHINGTON BLVD TO GRAMERCY AVE

Adams Avenue; Washington Blvd. to 5600 South

1ST STREET, HUNTSVILLE

Harrison Blvd. (South): 7th Street to 2nd Street

Emergency Flooding Repair, Old Snowbasin Road 226

River Parkway Trail; D&RGW Rail to 1800 So, Weber

Washington Blvd & Larsen Lane

PIN Description / Project Location

PE & ROW

RECONSTRUCT AND WIDEN

RECONSTRUCTION

Non-Urban

Reconstruct widening

Emergency Repair - Roadway

Trails

Intersection Improvements

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

MULT

MULT

MULT

OTHER

OTHER

Beg Len

Prior

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

$7,330

$1,316,254

$0

Total

Total

Total

$4,200,170

$84,966

$1,400,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$4,207,500

$1,401,221

$1,400,000

$0

$1,230,837

$736,009

$3,825,000

$0

$0

$382,500

$170,384

$663,991

Weber County Projects

STP_URB_O/L

STP_URB_O/L

STP_URB_O/L

STP_RURAL

LOCAL_GOVTST_EXCHANGESTP_URB_O/L

LOCAL_GOVTEQ_BONUS(MG)

CMAQ_WFRCLOCAL_GOVTSTP_FLX_STSTP_TAP_ST

STP_URB_O/L

$0

$547,034

$632,695

$125

$382,500 $3,817,670

$0

$81,005 $3,961

$136,009 $663,991

$0 $600,000

$0

$278,880

$3,743,430

$0

$0

$0 $0 $0

$0 $0

$0 $0 $0 $0

$0

$364,689

$3,754,156

$0

$0

$0 $0 $0

$0 $0

$0 $0 $0 $0

$0

$3,029,258

$0

$0

$0

$0 $0 $0

$0 $0

$0 $0 $0 $0

$572,777

$0

$0

$0

$0

$0 $0 $0

$0 $0

$0 $0 $0 $0

$0

$3,682,827

$8,044,620

$5,324,774

$321,785

$382,500 $3,825,000

$0

$81,005 $1,320,215

$136,009 $663,991

$0 $600,000

$572,777

$3,433,500

$7,499,999

$4,964,287

$300,000

$0 $0 $0

$0 $1,230,837

$136,009 $0 $0

$600,000

$534,000

$0

$0

$0

$0

$0 $3,825,000

$0

$0 $0

$0 $0 $0 $0

$0

$249,327

$544,621

$360,487

$21,785

$382,500 $0 $0

$81,005 $89,379

$0 $663,991

$0 $0

$38,777

$10,000

$0

$4,692,079

$321,660

$0 $7,330

$0

$0 $1,316,254

$0 $0 $0 $0

$0

Region

Scoping

Scoping

Awarded

Subst Comp

Active

Awarded

Scoping

Scoping

06/07/14

03/22/14

05/03/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

SKYLINE DRIVE IN PLEASANT VIEW

40TH STREET; WASHINGTON BLVD TO GRAMERCY AVENUE

ADAMS AVENUE; CITY LIMITS TO US-89

1ST STREET, HUNTSVILLE

Other: HARRISON BLVD. 7TH TO 2ND ST to: .50 for: .50

Old Snowbasin Road 226, M.P. 0.0 - 7.0

West Haven; D&RGW Rail to Ogden River Trail

Washington Blvd. & Larsen Lane

Page 122: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 185 of 217

11993

11995

12003

12014

13123

13124

5952

5599

PIN

F-LC57(26)

S-LC57(27)

F-LC57(28)

F-LC57(29)

F-LC57(31)

F-LC57(32)

S-I15-8(154)346

S-0039(27)8

Project No.

Larsen Lane; N. Harrisville Rd to Washington Blvd

Harrison Blvd./ 2nd Street/ Sheridan Drive

638 North to 2200 North (Lund Lane)

Ogden City Bicycle Study

Midland Drive (SR-108)' 4800 South to 4275 South

4700 West; 4200 South to 4800 South

I-15 NB Ramp & Pioneer Road (Exit 346)

SR-39 Fiber Optics in Ogden Canyon

PIN Description / Project Location

Reconstruct widening

Intersection Modification

Pedestrian/Bicycle Safety

Traffic

Widen Existing Facility

Reconstruct widening

Traffic Signal - New

Contingency Funds

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

15

39

8

Beg Len

6

Prior

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

$0

$93,000

$386,235

Total

Total

Total

$2,337,500

$9,753

$1,765

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,337,500

$102,753

$388,000

$0

$93,000

$0

$2,125,000

$3,000

$388,000

$212,500

$6,753

$0

Weber County Projects

STP_URB_O/L

ST_EXCHANGESTP_URB_O/LLOCAL_GOVT

CMAQ_WFRC

TAP_URB_WFRCST_CONT_R1LOCAL_GOVT

STP_URB_O/L

STP_URB_O/L

ST_SIGNALS

ST_CONT_R1ST_ATMS

$10,726

$2,125,000 $0

$212,500

$10,726

$0 $3,000 $6,753

$0

$0

$250,000

$0 $1,765

$0

$0 $0 $0

$0

$0 $0 $0

$0

$0

$0

$0 $0

$0

$0 $0 $0

$268,154

$0 $0 $0

$0

$0

$0

$0 $0

$804,462

$0 $0 $0

$761,557

$0 $0 $0

$0

$0

$0

$0 $0

$2,402,663

$0 $0 $0

$0

$0 $0 $0

$3,432,371

$2,681,540

$0

$0 $0

$3,217,851

$2,125,000 $0

$212,500

$1,040,437

$93,000 $3,000 $6,753

$3,432,371

$2,681,540

$250,000

$100,000 $288,000

$3,000,002

$0 $0 $0

$969,999

$93,000 $0 $0

$3,199,999

$2,500,000

$0

$0 $0

$0

$2,125,000 $0 $0

$0

$0 $3,000

$0

$0

$0

$250,000

$100,000 $288,000

$217,849

$0 $0

$212,500

$70,438

$0 $0

$6,753

$232,372

$181,540

$0

$0 $0

$0

$0 $0 $0

$0

$93,000 $0 $0

$0

$0

$0

$100,000 $286,235

Region

STIP

Scoping

STIP

Active

STIP

STIP

STIP

Active

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

13216

11453

Larsen Lane; North Harrisville Road to Washington Blvd

Harrison Blvd./ 2nd Street/ Sheridan Drive

Frontage Road Bike Lanes; 638 North to 2200 North (Lund Lane)

Ogden City Bicycle Study; Municipal Boundaries of Ogden City

Midland Drive (SR-108) 4800 South to 4275 South

4700 West; 4200 South to 4800 South

TO 400 NORTH HARRISVILLE; MP .18 - .18

SR-39; MP 8.00 - 13.79

Page 123: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 186 of 217

5775

6019

8072

8074

10032

10031

5599

5599

PIN

S-0039(24)9

F-0039(30)38

F-0039(28)8

F-0039(22)14

F-0039(29)19

F-0053(19)2

S-0089(294)411

S-0089(390)412

Project No.

SR-39 Ogden Canyon Barrier Scoping and Design

SR-39; Shoulder Imps (MP 36.86 - 48.12) FFY14

SR-39; SR-203 to SR-158

SR-39; Various Locations

SR-39; Huntsville to Causey

SR-53; Lincoln to US-89

SR-89; Weber County, ADA Ramps

US-89; Bus Stop at 40th, South Ogden

PIN Description / Project Location

Barrier - T/S

Roadside Improvements

Preservation - Roadway

Major Rehabilitation - Roadway

Preservation - Roadway

Minor Rehabilitation - Roadway

Safe Sidewalk/ADA ramps

Drainage - Maint

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

39

39

39

39

39

53

89

89

9

37

8

9

19

2

411

412

Beg Len

1

11

6

26

8

Prior

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

$530,128

$2,518,817

$596,348

$1,199,200

Total

Total

Total

Total

$175,300

$129,183

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$705,428

$2,648,000

$596,348

$1,199,200

$494,518

$2,468,730

$555,975

$1,118,014

$210,910

$179,270

$40,373

$81,186

$0

$0

$0

$0

Weber County Projects

ST_SPOT_SFTY

HSIP

STP_FLX_STEQ_BONUS(MG)ST_PVMT

HSIPSTP_FLX_ST

STP_FLX_STST_PVMT

EQ_BONUS(MG)STP_FLX_ST

ST_CONT_R1

ST_CONT_R1

$34,823

$2,471

$0 $300

$175,000

$0 $129,183

$0 $0

$0 $0

$3,893

$6,642

$0

$0

$0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0

$0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0

$100,000

$370,000

$474,780 $55,648

$175,000

$48,000 $2,600,000

$596,348 $0

$1,073,987 $125,213

$4,000

$15,000

$0

$344,951

$442,637 $51,880

$0

$44,750 $2,423,980

$555,975 $0

$1,001,278 $116,736

$0

$0

$100,000

$25,049

$32,143 $3,767

$175,000

$3,250 $176,020

$40,373 $0

$72,709 $8,477

$4,000

$15,000

$0

$0

$0 $0 $0

$0 $0

$0 $0

$0 $0

$0

$0

$65,177

$367,529

$474,780 $55,348

$0

$48,000 $2,470,817

$596,348 $0

$1,073,987 $125,213

$107

$8,358

Region

Closeout

Advertised

Subst Comp

Closeout

Subst Comp

Cntr Comp

Active

Active

08/09/14

12/14/13

06/02/12

03/22/14

03/29/14

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

10554

11382

9558

10367

11784

11553

10484

13208

SR-39; MP 9.00 to MP 10.00

SR-39; MP 36.86 - 48.12

State Route: SR-39 from: 7.71 to: 13.79 for: 6.08

SR-39; MP 8.90 - 35.00

SR-39; MP 19.32 - 27.72

SR-53; MP 1.63 - 1.95

US-89; MP 410.50 to MP 410.51

US-89; MP 411.65 - 411.66

Page 124: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 187 of 217

5952

6019

8072

8074

8074

5775

6019

5599

PIN

S-0089(382)0

F-0089(354)414

F-0089(316)408

F-0089(314)416

F-0104(8)1

S-0108(29)10

F-0126(19)15

S-0134(10)6

Project No.

US-89 (Washington Blvd) & 32nd Street, Ogden

US-89; MP 413.7-414.2, Upgrade Mid-Block Crossings

US-89; SR-203 to 40th, South Ogden

US-89; SR-235 to SR-204

SR-104; I-15 to Wall Ave

SR-108; Close 3500 W. Access (MP 10.08)

SR-126 Turn Lanes at 700 South

SR-134; Warren Canal Bridge Safety Improvements

PIN Description / Project Location

Traffic Signal - New

Pedestrian/Bicycle Safety

Preservation - Roadway

Major Rehabilitation - Roadway

Minor Rehabilitation - Roadway

Spot Safety

Spot Safety

Other structure item repair

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

89

89

89

89

104

108

126

134

413

414

408

416

1

10

15

6

Beg Len

1

3

1

2

Prior

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

$403,862

$1,582,225

$2,705,418

$28,679

Total

Total

Total

Total

$25,882

$0

$494,582

$971,321

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$429,744

$1,582,225

$3,200,000

$1,000,000

$270,367

$1,421,758

$2,796,900

$0

$49,633

$103,243

$403,100

$100,000

$109,744

$57,225

$0

$900,000

Weber County Projects

ST_SIGNALS

HSIPSEC164_HSIPST_CONT_R1L_BETTERMENTLOCAL_GOVT

NHS

L_BETTERMENTEQ_BONUS(MG)STP_FLX_ST

ST_BRIDGESTP_FLX_ST

LOCAL_GOVTST_SPOT_SFTY

HSIP

ST_CONT_R1

$250,000

$0 $0

$23,880 $2,002

$0

$0

$0 $0 $0

$200,000 $294,582

$900,000 $71,321

$0

$42,844

$0

$0 $0 $0 $0 $0

$0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0

$0 $0 $0 $0 $0

$0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0

$0 $0 $0 $0 $0

$0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$0

$0 $0 $0 $0 $0

$0

$0 $0 $0

$0 $0

$0 $0

$0

$0

$250,000

$50,000 $240,000

$30,000 $109,744

$0

$5,000

$57,225 $60,000

$1,465,000

$200,000 $3,000,000

$900,000 $100,000

$212,037

$75,000

$0

$46,615 $223,752

$0 $0 $0

$4,662

$0 $55,938

$1,365,820

$0 $2,796,900

$0 $0

$197,682

$0

$250,000

$3,385 $16,248 $30,000

$0 $0

$339

$0 $4,062

$99,181

$200,000 $203,100

$0 $100,000

$14,355

$75,000

$0

$0 $0 $0

$109,744 $0

$0

$57,225 $0 $0

$0 $0

$900,000 $0

$0

$0

$0

$50,000 $240,000

$6,120 $107,742

$0

$5,000

$57,225 $60,000

$1,465,000

$0 $2,705,418

$0 $28,679

$212,036

$32,156

Region

STIP

Cntr Comp

Scoping

Closeout

Closeout

Scoping

Closeout

Closeout

05/03/14

05/25/13

03/09/13

09/01/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

13053

12177

11062

10700

9568

11360

10551

10159

US-89; MP 412.76 - 412.76

US-89; MP 413.63 - 414.22

US-89; MP 408.38 - 411.69

US-89; MP 416.46 - 417.41

State Route: SR-104 from: .59 to: 2.49 for: 1.91

SR-108; MP 10.08 - 10.08

SR-126; MP 14.93 to MP 14.93

SR-134; MP 6.30 to MP 6.40

Page 125: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 188 of 217

5599

5599

5599

5599

5599

8072

5599

5952

PIN

S-0134(17)4

S-0134(18)11

S-0134(19)11

S-0134(20)10

S-0134(22)11

F-0158(119)6

S-0203(19)1

S-0203(17)0

Project No.

SR-134; Roadside Ditch Safety Improvements

SR-134; I-15 to US-89 Traffic Study

SR-134; Widen Structure D-804

SR-134; Sidewalk; Farr West

SR-134; SR-126 to US-89, Farr West/Pleasant View

SR-158; Wolf Creek to Powder Mountain, Eden

SR-203; Bike Lane/Sidewalk Shadow Valley to 48th

Traffic Signal Improvements at SR-203 & 5600 South

PIN Description / Project Location

Contingency Funds

Traffic

Contingency Funds

Contingency Funds

Striping

Preservation - Roadway

Contingency Funds

Traffic Signal - Upgrade

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

134

134

134

134

134

158

203

203

4

11

11

10

11

6

1

Beg Len

7

3

1

2

6

1

Prior

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

$400,126

$1,087,815

$0

Total

Total

Total

$0

$38,077

$500,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$400,126

$1,125,892

$500,000

$0

$490,289

$0

$400,126

$635,603

$225,000

$0

$0

$275,000

Weber County Projects

ST_CONT_R1

ST_CONT_R1

ST_CONT_PGST_CONT_R1

ST_CONT_R1

ST_CONT_R1

EQ_BONUS(MG)STP_FLX_STST_PVMT

LOCAL_GOVTST_CONT_R1

ST_SIGNALS

$3,911

$4,955

$0 $0

$0

$50,000

$0 $0

$38,077

$275,000 $225,000

$3,362

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0 $0

$0

$0

$0 $0 $0

$0 $0

$0

$40,000

$5,000

$100,126 $300,000

$10,000

$50,000

$520,892 $5,000

$600,000

$275,000 $225,000

$305,000

$0

$0

$0 $0

$0

$0

$485,628 $4,662

$0

$0 $0

$0

$40,000

$5,000

$100,126 $300,000

$10,000

$50,000

$35,264 $339

$600,000

$0 $225,000

$305,000

$0

$0

$0 $0

$0

$0

$0 $0 $0

$275,000 $0

$0

$36,089

$45

$100,126 $300,000

$10,000

$0

$520,892 $5,000

$561,923

$0 $0

$301,638

Region

Closeout

Active

Active

Scoping

STIP

Cntrl Rev

STIP

Closeout

02/09/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

11580

11653

11669

11975

13190

11066

12168

10683

SR-134; MP 3.79 - 11.24

SR-134; MP 11.33 - 14.30

SR-134; MP 10.87 - 10.87

SR-134; MP 10.49 - 11.00

SR-134; MP 11.00 - 12.50

SR-158; MP 6.00 - 11.69

REGION ONE CONTINGENCY FUNDS

SR-203; MP .39 to MP .51

Page 126: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 189 of 217

10031

11731

11731

5952

5599

5952

8074

8074

PIN

F-0203(22)2

F-0203(21)4

F-0203(23)0

S-0284(2)1

S-I84-6(117)82

S-R199(149)

F-0053(18)0

F-I84-6(111)81

Project No.

SR-203; 4600 S to SR-79

SR-203; SR-79 to SR-39

SR-203; US-89 to 4600 S

Pedestrian Crossing Improvements at SR-284 WSU

I-84; Safety Drainage Repair Near SR-26

3 Locations in Weber County

SR-53; I-15 to A Ave.

I-84; I-15 to SR-26

PIN Description / Project Location

Minor Rehabilitation - Roadway

Minor Rehabilitation - Roadway

Minor Rehabilitation - Roadway

Traffic Signal - New

Contingency Funds

Traffic Signal - Upgrade

Preservation - Roadway

Major Rehabilitation - Roadway

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

203

203

203

284

MULT

MULT

MULT

MULT

2

4

1

Beg Len

2

2

2

Prior

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

WEBER

$3,446,877

$75,000

$520,000

$878,722

$3,742,550

Total

Total

Total

Total

Total

$53,123

$4,475,000

$2,480,000

$50

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$3,500,000

$4,550,000

$3,000,000

$878,772

$3,742,550

$3,263,050

$4,241,965

$2,796,900

$819,279

$3,524,734

$236,950

$308,035

$203,100

$59,493

$217,816

$0

$0

$0

$0

$0

Weber County Projects

NHPP_NHSEQ_BONUS(MG)

NHSNHPP_NHS

EQ_BONUS(MG)STP_FLX_ST

ST_SIGNALS

ST_CONT_R1

ST_SIGNALS

EQ_BONUS(MG)STP_FLX_ST

ST_PVMTIM

$53,123 $0

$375,000 $4,100,000

$0 $2,480,000

$70,647

$2,421

$42,131

$0 $50

$0 $0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0 $0

$0 $0

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0 $0

$0 $0

$53,123 $3,446,877

$450,000 $4,100,000

$300,000 $2,700,000

$220,000

$7,000

$500,000

$35,000 $843,772

$0 $3,742,550

$49,527 $3,213,523

$419,535 $3,822,430

$279,690 $2,517,210

$0

$0

$0

$32,631 $786,649

$0 $3,524,734

$3,596 $233,354

$30,465 $277,570

$20,310 $182,790

$220,000

$7,000

$500,000

$2,370 $57,123

$0 $217,816

$0 $0

$0 $0

$0 $0

$0

$0

$0

$0 $0

$0 $0

$0 $3,446,877

$75,000 $0

$300,000 $220,000

$149,353

$4,579

$457,869

$35,000 $843,722

$0 $3,742,550

Region

Undr Const

Active

Active

Active

Closeout

Active

Closeout

Closeout

05/03/14

04/20/13

06/02/12

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

12274

11685

12292

11486

11583

11765

10205

10379

SR-203; MP 1.87 - 3.87

SR-203; MP 3.87 - 6.14

SR-203; MP .00 - 1.87

SR-284; MP .71 - .81

I-84; MP 81.50 - 81.90 & I-84; MP 81.50 - 81.90

SR-203; MP 2.24 - 2.34 & US-89; MP 411.64 - 411.74 & SR-53; MP 1.61 - 1.71

SR-53; MP .00 - .99 & SR-53; MP .00 - .99

I-84; MP 81.04 to MP 81.72

Page 127: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 190 of 217

10031

12132

6064

5599

5981

PIN

F-R199(162)

F-R199(175)

F-ST99(225)

S-R199(168)

F-R199(113)

Project No.

US-89, SR-235; Concrete Rehabilitation

US-89; SR-204 to SR-134 & SR-235; N. St to SR-134

Uintah Crossing, 2275 East; DOT 810534D

Ogden/Weber State U. Transit Corridor Study

Ogden Area, Fiber & Signal Interconnect

PIN Description / Project Location

Minor Rehabilitation - Roadway

Preservation - Roadway

Railway-Highway Grade Crossing

Planning

ATMS

Concept DescriptionFund CD OtherFed Aid StateTotal2015 2016 2017 2018

Rt.

MULT

MULT

OTHER

Beg Len

Prior

WEBER

WEBER

WEBER

WEBER

WEBER

$3,225,000

$20,000

Total

Total

$205,378

$1,730,000

$0

$0

$0

$0

$0

$0

$0

$0

$3,430,378

$1,750,000

$3,006,669

$1,631,525

$218,333

$118,475

$205,377

$0

Weber County Projects

STP_FLX_STEQ_BONUS(MG)L_BETTERMENT

STP_FLX_STNHPP_NHS

R/H_DEVICES

ST_CONT_R1

CMAQ_WFRC

$1 $0

$205,377

$880,000 $850,000

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$0 $0 $0

$0 $0

$0

$0

$0

$275,000 $2,950,001

$205,377

$900,000 $850,000

$250,000

$50,000

$551,982

$256,383 $2,750,286

$0

$839,070 $792,455

$233,075

$0

$514,612

$18,618 $199,715

$0

$60,930 $57,545

$16,925

$50,000

$37,369

$0 $0

$205,377

$0 $0

$0

$0

$0

$274,999 $2,950,001

$0

$20,000 $0

$250,000

$50,000

$551,982

Region

Undr Const

Advertised

Active

Scoping

Closeout

05/24/14

10/18/14

01/19/13

Status

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv Dt:

Adv.Const

12250

12261

11744

12823

10543

SR-235; MP .00 - .51 & US-89; MP 414.22 - 416.46

SR-235; MP .49 - 3.20 & US-89; MP 417.45 - 420.45

2275 East at RR Crossing, Uintah City

Ogden Intermodel Hub to WSU

Ogden Area, Several Locations

Page 128: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 191 of 217

8752

8754

8756

8758

9299

9369

9615

9616

9862

1

2

3

4

S

S

S

S

S

County Programs

PIN

REGION 1 - Region 1 CONCEPT MASTER PIN

REGION 2 - Region 2 CONCEPT MASTER PIN

REGION 3 - Region 3 CONCEPT MASTER PIN

REGION 4 - Region 4 CONCEPT MASTER PIN

UNKNOWN FOUNDATIONS PROGRAM

BRIDGE INSPECTION PROGRAM

LOAD RATING PROGRAM

BRIDGE SCOUR INSPECTION PROGRAM

2012 STATEWIDE BRIDGE PRESERVATION PROGRAM

Program Description

ST_CONCPT_D1

ST_CONCPT_D2

ST_CONCPT_D3

ST_CONCPT_D4

ST_BRIDGE

BR_ON/OFF

NHPP_BR

STP_FLX_ST

BR_ON/OFF

STP_BRIDGE

BR_OFF

BR_ON/OFF

BR_ON/OFF

ST_BRIDGE

ST_SPOT_MNT

ST_BRIDGE

Fund

$268,623

$291,440

$322,086

$210,840

$326,138

$0

$864,000

$79,000

$0

$257,000

$0

$0

$97,231

$6,129

$7,763

$461,478

$0

$0

$0

$0

$0

$0

$1,200,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,200,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$268,623

$291,440

$322,086

$210,840

$1,200,000

$586,500

$4,464,000

$79,000

$4,400,000

$257,000

$3,750,000

$7,250,000

$420,000

$6,129

$7,763

$2,597,096

Other

$0

$0

$0

$0

$0

$469,200

$4,161,787

$73,652

$3,520,000

$239,601

$3,000,000

$5,800,000

$336,000

$0

$0

$0

Fed Aid

$268,623

$291,440

$322,086

$210,840

$1,200,000

$117,300

$302,213

$5,348

$880,000

$17,399

$750,000

$1,450,000

$84,000

$6,129

$7,763

$2,597,096

State

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Total2015 2016 2017 2018

$0

$0

$0

$0

$873,862

$586,500

$1,200,000

$0

$4,400,000

$0

$3,750,000

$7,250,000

$322,769

$0

$0

$2,135,617

Prior

Total

Total

Total

Total

Total

$1,460,362

$5,600,000

$11,000,000

$322,769

$2,135,617

$326,138

$1,200,000

$0

$103,360

$469,242

$0

$1,200,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,200,000

$0

$0

$0

$1,786,500

$9,200,000

$11,000,000

$426,129

$2,604,859

$469,200

$7,995,040

$8,800,000

$336,000

$0

$1,317,300

$1,204,960

$2,200,000

$90,129

$2,604,859

$0

$0

$0

$0

$0

Region

Page 129: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 192 of 217

10031

10032

10948

11214

S

S

S

S

County Programs

PIN

2014 PAVEMENT REHABILITATION (PURPLE BOOK) PROGRAM

2014 PAVEMENT PRESERVATION (ORANGE BOOK) PROGRAM

STATEWIDE SIGNALS MAINTENANCE & OPERATION

2013 BRIDGE PRESERVATION PROGRAM

Program Description

IM

L_BETTERMENT

STP_FLX_ST

ST_CONCPT_D3

NHS

ST_INELIGIBL

NHPP_NHS

NHPP_IM

EQ_BONUS(MG)

ST_BRIDGE

NHPP_BR

ST_PVMT

BR_ON/OFF

IM

STP_RURAL

NHS

NHPP_IM

ST_SAFE_SIDE

STP_FLX_ST

ST_PVMT

ST_BRIDGE

ST_GF_BRIDGE

NHPP_BR

EQ_BONUS(MG)

L_BETTERMENT

NHPP_NHS

SPR_P

ST_SIGNL_M&O

ST_GF_BRIDGE

ST_CONCPT_D4

ST_BRIDGE

Fund

$1

$205,377

$9,645,841

$0

$0

$0

$12,051,456

$3,012,960

$113,082

$534,038

$0

$1,377,523

$0

$0

$0

$0

$2,755,117

$0

$3,964,545

$3,536,730

$0

$674,624

$140,000

$0

$0

$4,150,553

$0

$3,594,471

$1,609,258

$0

$785,123

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$1,197,568

$212,669

$21,952,086

$3,747

$3,416,855

$10

$48,153,682

$18,310,093

$8,981,821

$565,000

$295,000

$1,377,523

$45,000

$917,451

$2,145,232

$3,108,602

$5,768,036

$43,128

$12,752,042

$4,141,007

$94,000

$865,493

$601,000

$1,514,589

$14,376

$20,372,956

$125,000

$10,902,824

$1,610,000

$11,503

$1,222,610

Other

$1,127,870

$0

$20,465,930

$0

$3,185,534

$0

$44,893,678

$17,244,446

$8,373,752

$0

$275,029

$0

$36,000

$864,056

$2,000,000

$2,898,149

$5,432,336

$0

$11,888,729

$0

$0

$0

$560,312

$1,412,051

$0

$18,993,707

$100,000

$0

$0

$0

$0

Fed Aid

$69,698

$0

$1,486,156

$3,747

$231,321

$10

$3,260,004

$1,065,647

$608,069

$565,000

$19,972

$1,377,523

$9,000

$53,396

$145,232

$210,452

$335,700

$43,128

$863,313

$4,141,007

$94,000

$865,493

$40,688

$102,538

$0

$1,379,249

$25,000

$10,902,824

$1,610,000

$11,503

$1,222,610

State

$0

$212,669

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$14,376

$0

$0

$0

$0

$0

$0

Total2015 2016 2017 2018

$1,197,567

$7,293

$12,306,245

$3,747

$3,416,855

$10

$36,102,226

$15,297,133

$8,868,739

$30,962

$295,000

$0

$45,000

$917,451

$2,145,232

$3,108,601

$3,012,919

$43,128

$8,787,497

$604,277

$94,000

$190,869

$461,000

$1,514,589

$14,376

$16,222,403

$125,000

$7,308,352

$742

$11,503

$437,487

Prior

Total

Total

Total

Total

$77,525,778

$37,161,342

$7,433,352

$449,732

$26,940,276

$15,221,570

$3,594,471

$2,394,381

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$104,466,054

$52,382,912

$11,027,824

$2,844,113

$95,566,237

$44,085,340

$100,000

$0

$8,687,148

$8,283,196

$10,927,824

$2,844,113

$212,669

$14,376

$0

$0

Region

Page 130: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 193 of 217

11731

11798

11903

11904

12132

S

S

S

S

S

County Programs

PIN

2015 PAVEMENT REHABILITATION (PURPLE BOOK) PROGRAM

2014 STATEWIDE BRIDGE PREVENTIVE MAINTENANCE PROGRAM

STATEWIDE CULVERT PROGRAM

STATEWIDE SIGN PROGRAM

2015 PAVEMENT PRESERVATION (ORANGE BOOK) PROGRAM

Program Description

NHPP_IM

NHPP_NHS

HSIP

ST_BRIDGE

EQ_BONUS(MG)

NHS

ST_SPOT_SFTY

ST_CONCPT_D3

IM

STP_FLX_ST

NHPP_IM

ST_BRIDGE

NHPP_NHS

NHS

EQ_BONUS(MG)

IM

STP_FLX_ST

NHPP_NHS

HSIP

STP_FLX_ST

IM

NHPP_IM

NHPP_NHS

ST_PVMT

STP_FLX_ST

NHS

STP_RURAL

Fund

$22,193,975

$23,290,169

$1,259,000

$582,000

$515,342

$642,715

$349,000

$0

$0

$30,623,180

$0

$1,894,037

$155,455

$0

$40,517

$0

$2,778,286

$0

$0

$41,556

$20,000

$10,285,000

$16,390,000

$5,339,574

$12,589,618

$0

$2,145,232

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,000,000

$0

$0

$1,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,000,000

$0

$0

$1,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,000,000

$0

$0

$1,000,000

$0

$0

$0

$0

$0

$0

$0

CD

$22,293,975

$23,490,169

$1,259,000

$582,000

$1,125,342

$767,715

$349,000

$3,213

$190,000

$31,724,658

$85,000

$2,098,000

$630,000

$25,000

$236,142

$500,000

$10,000,000

$500,000

$1,000,000

$4,020,778

$165,000

$10,305,000

$16,645,000

$5,339,574

$13,140,618

$300,000

$2,145,232

Other

$20,996,466

$21,899,885

$1,173,766

$0

$1,049,157

$715,741

$0

$0

$178,942

$29,576,898

$80,053

$0

$587,349

$23,308

$220,156

$470,900

$9,323,000

$466,150

$932,300

$3,748,571

$155,397

$9,705,249

$15,518,134

$0

$12,250,998

$279,690

$2,000,000

Fed Aid

$1,297,509

$1,590,284

$85,234

$582,000

$76,186

$51,974

$349,000

$3,213

$11,058

$2,147,759

$4,947

$2,098,000

$42,651

$1,693

$15,987

$29,100

$677,000

$33,850

$67,700

$272,207

$9,603

$599,751

$1,126,867

$5,339,574

$889,620

$20,310

$145,232

State

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Total2015 2016 2017 2018

$100,000

$200,000

$0

$0

$610,000

$125,000

$0

$3,213

$190,000

$1,101,478

$85,000

$203,963

$474,545

$25,000

$195,626

$500,000

$1,221,714

$500,000

$1,000,000

$979,222

$145,000

$20,000

$255,000

$0

$551,000

$300,000

$0

Prior

Total

Total

Total

Total

Total

$2,329,691

$788,508

$2,417,339

$1,979,222

$1,271,000

$79,455,381

$2,049,492

$2,818,803

$41,556

$46,769,424

$0

$0

$2,000,000

$1,000,000

$0

$0

$0

$2,000,000

$1,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$2,000,000

$1,000,000

$0

$81,785,072

$2,838,000

$11,236,142

$5,020,778

$48,040,424

$75,590,854

$690,710

$10,480,206

$4,680,871

$39,909,467

$6,194,218

$2,147,291

$755,937

$339,907

$8,130,956

$0

$0

$0

$0

$0

Region

Page 131: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 194 of 217

12133

12134

12135

12136

12137

12138

12139

12781

S

S

S

S

S

S

S

S

County Programs

PIN

2016 PAVEMENT PRESERVATION (ORANGE BOOK) PROGRAM

2017 PAVEMENT PRESERVATION (ORANGE BOOK) PROGRAM

2016 PAVEMENT REHABILITATION (PURPLE BOOK) PROGRAM

2017 PAVEMENT REHABILITATION (PURPLE BOOK) PROGRAM

2015 STATEWIDE BRIDGE PREVENTIVE MAINTENANCE PROGRAM

2016 STATEWIDE BRIDGE PREVENTIVE MAINTENANCE PROGRAM

2017 STATEWIDE BRIDGE PREVENTIVE MAINTENANCE PROGRAM

UNOBLIGATED TIF/CHNF FUNDS PROGRAM

Program Description

NHPP_IM

STP_FLX_ST

NHPP_NHS

NHPP_IM

NHPP_NHS

STP_FLX_ST

STP_FLX_ST

NHPP_NHS

NHPP_IM

NHPP_NHS

NHPP_IM

STP_FLX_ST

ST_BRIDGE

BR_ON/OFF

ST_BRIDGE

ST_BRIDGE

ST_TIF

Fund

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$5,395,889

$1,700,000

$0

$0

$16,713,011

$8,000,000

$8,000,000

$20,000,000

$0

$0

$0

$27,600,000

$54,300,000

$24,000,000

$0

$0

$0

$0

$0

$2,000,000

$0

$0

$0

$0

$0

$8,000,000

$20,000,000

$8,000,000

$0

$0

$0

$54,300,000

$24,000,000

$27,500,000

$0

$0

$0

$2,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,800,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$8,000,000

$8,000,000

$20,000,000

$8,000,000

$20,000,000

$8,000,000

$27,600,000

$54,300,000

$24,000,000

$54,300,000

$24,000,000

$27,500,000

$5,397,793

$1,700,000

$2,000,000

$2,000,000

$19,513,011

Other

$7,534,400

$7,458,400

$18,646,000

$7,534,400

$18,646,000

$7,458,400

$25,731,480

$50,623,890

$22,603,200

$50,623,890

$22,603,200

$25,638,250

$0

$1,360,000

$0

$0

$0

Fed Aid

$465,600

$541,600

$1,354,000

$465,600

$1,354,000

$541,600

$1,868,520

$3,676,110

$1,396,800

$3,676,110

$1,396,800

$1,861,750

$5,397,793

$340,000

$2,000,000

$2,000,000

$19,513,011

State

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Total2015 2016 2017 2018

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,904

$0

$0

$0

$0

Prior

Total

Total

Total

Total

Total

Total

$0

$0

$0

$0

$1,904

$0

$0

$0

$0

$0

$7,095,889

$16,713,011

$36,000,000

$0

$105,900,000

$0

$0

$0

$0

$36,000,000

$0

$105,800,000

$0

$0

$0

$0

$0

$0

$0

$2,800,000

$0

$0

$0

$0

$0

$0

$36,000,000

$36,000,000

$105,900,000

$105,800,000

$7,097,793

$19,513,011

$33,638,800

$33,638,800

$98,958,570

$98,865,340

$1,360,000

$0

$2,361,200

$2,361,200

$6,941,430

$6,934,660

$5,737,793

$19,513,011

$0

$0

$0

$0

$0

$0

Region

Page 132: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 195 of 217

12956

12957

12958

S

S

S

County Programs

PIN

2018 PAVEMENT PRESERVATION (ORANGE BOOK) PROGRAM

2018 PAVEMENT REHABILITATION (PURPLE BOOK) PROGRAM

2018 STATEWIDE BRIDGE PREVENTIVE MAINTENANCE PROGRAM

Program Description

NHPP_NHS

STP_FLX_ST

NHPP_IM

NHPP_NHS

STP_FLX_ST

NHPP_IM

ST_BRIDGE

Fund

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$20,000,000

$9,500,000

$6,000,000

$60,000,000

$27,600,000

$18,500,000

$4,500,000

$0

$0

$0

$0

$0

$0

$0

CD

$20,000,000

$9,500,000

$6,000,000

$60,000,000

$27,600,000

$18,500,000

$4,500,000

Other

$18,646,000

$8,856,850

$5,650,800

$55,938,000

$25,731,480

$17,423,300

$0

Fed Aid

$1,354,000

$643,150

$349,200

$4,062,000

$1,868,520

$1,076,700

$4,500,000

State

$0

$0

$0

$0

$0

$0

$0

Total2015 2016 2017 2018

$0

$0

$0

$0

$0

$0

$0

Prior

Total

Total

$0

$0

$0

$0

$0

$0

$0

$0

$35,500,000

$106,100,000

$0

$0

$35,500,000

$106,100,000

$33,153,650

$99,092,780

$2,346,350

$7,007,220

$0

$0

Region

Page 133: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 196 of 217

5981

8418

5996

8419

5999

8420

8421

1

1

2

2

3

3

4

Region County Programs

PIN

REGION ONE COMMUTER LINK PROGRAM

REGION ONE PROGRAM DE-OBLIGATION FUND

ITS - REGION TWO COMMUTER LINK

REGION TWO PROGRAM DE-OBLIGATION FUND

REGION THREE COMMUTER LINK - EXPANSION HARDWARE

REGION THREE PROGRAM DE-OBLIGATION FUND

REGION FOUR PROGRAM DE-OBLIGATION FUND

Program Description

CMAQ_WFRC

ST_ATMS

STP_FLX_ST

NHS

ST_ATMS

CMAQ_WFRC

STP_FLX_MAG

NHPP_NHS

ST_QTR_QTR

STP_FLX_ST

NHPP_IM

CMAQ_MAG

CMAQ_PM2.5

STP_FLX_ST

NHS

NHPP_NHS

STP_FLX_ST

NHPP_IM

Fund

$3,004,705

$30,000

$151,485

$370,354

$58,978

$4,937,186

$0

$2,187,614

$188,438

$938,550

$279,418

$363,170

$181,000

$13,539

$1

$1,219,982

$349,505

$3,322,215

$1,179,978

$0

$0

$0

$0

$1,608,924

$0

$0

$0

$0

$0

$520,000

$0

$0

$0

$0

$0

$0

$1,179,978

$0

$0

$0

$0

$1,608,925

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,359,756

$0

$0

$0

$0

$1,867,423

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$8,496,399

$30,000

$151,485

$370,354

$530,000

$12,660,149

$133,424

$2,187,614

$188,438

$938,550

$279,418

$1,325,000

$181,000

$13,539

$1

$1,219,982

$349,505

$3,322,215

Other

$7,921,193

$0

$141,230

$345,281

$0

$11,803,057

$124,391

$2,039,513

$0

$875,011

$263,156

$1,235,298

$168,746

$12,623

$1

$1,137,389

$325,843

$3,128,862

Fed Aid

$575,206

$30,000

$10,256

$25,073

$530,000

$857,092

$9,033

$148,101

$188,438

$63,540

$16,262

$89,703

$12,254

$917

$0

$82,593

$23,661

$193,353

State

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Total2015 2016 2017 2018

$771,982

$0

$0

$0

$471,022

$2,637,691

$133,424

$0

$0

$0

$0

$441,830

$0

$0

$0

$0

$0

$0

Prior

Total

Total

Total

Total

Total

Total

Total

$771,982

$0

$3,242,137

$0

$441,830

$0

$0

$3,034,705

$521,839

$4,996,164

$3,594,020

$544,170

$1,233,522

$3,671,720

$1,179,978

$0

$1,608,924

$0

$520,000

$0

$0

$1,179,978

$0

$1,608,925

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,359,756

$0

$1,867,423

$0

$0

$0

$0

$8,526,399

$521,839

$13,323,573

$3,594,020

$1,506,000

$1,233,522

$3,671,720

$7,921,193

$486,511

$11,927,448

$3,177,679

$1,404,044

$1,150,013

$3,454,706

$605,206

$35,329

$1,396,125

$416,341

$101,956

$83,509

$217,014

$0

$0

$0

$0

$0

$0

$0

Region

Page 134: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 197 of 217

5954

6019

5775

5925

9

B

S

S

Statewide County Programs

PIN

STATEWIDE ITS EXPANSION PROGRAM

HIGHWAY SAFETY IMPROVEMENT PROGRAM - (HSIP)

STATEWIDE SPOT SAFETY IMPROVEMENT PROGRAM

2007- 2009 STATEWIDE CORRIDOR STUDIES / CEVP PROGRAM

Program Description

CMAQ_WFRC

ST_CONT_R4

ST_ATMS

OTHER

STP_FLX_ST

HSIP

ST_BRIDGE

ST_CONCEPT_D

ST_CONT_R4

L_BETTERMENT

CMAQ_TOOELE

ST_PVMT

ST_SPOT_SFTY

ST_CONT_R1

HSIP_100%

SEC164_HSIP

ST_CONCPT_D3

ST_SIGNALS

ST_SPOT_MNT

ST_CONT_R4

ST_SPOT_SFTY

STP_FLX_ST

ST_SIGNALS

ST_ADA_RAMPS

ST_BARRIER

LOCAL_GOVT

ST_CORR_CEVP

ST_GF_OTHER

Fund

$8,348

$0

$7,319,240

$0

$300,141

$32,032,571

$17,000

$2,000

$16,361

$2,002

$0

$1,006,814

$600,760

$23,880

$10,000

$0

$0

$400,000

$35,000

$0

$3,391,328

$0

$39,142

$0

$0

$900,000

$350,068

$9,609

$0

$0

$0

$0

$0

$22,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$22,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$22,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$8,348

$15,000

$15,677,205

$123,061

$300,141

$131,413,302

$17,000

$2,000

$16,361

$109,744

$170,000

$2,048,843

$630,000

$30,000

$10,000

$14,375,075

$11,355

$400,000

$35,000

$24,023

$6,023,480

$950,000

$90,000

$10,000

$60,000

$900,000

$350,068

$9,609

Other

$7,783

$0

$0

$0

$279,821

$122,516,621

$0

$0

$0

$0

$158,491

$0

$0

$0

$0

$13,401,882

$0

$0

$0

$0

$0

$885,685

$0

$0

$0

$0

$0

$0

Fed Aid

$0

$15,000

$15,677,205

$0

$20,320

$8,662,795

$17,000

$2,000

$16,361

$0

$11,509

$2,048,843

$630,000

$30,000

$10,000

$973,193

$11,355

$400,000

$35,000

$24,023

$6,023,480

$64,315

$90,000

$10,000

$60,000

$0

$350,068

$9,609

State

$565

$0

$0

$123,061

$0

$233,886

$0

$0

$0

$109,744

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$900,000

$0

$0

Total2015 2016 2017 2018

$0

$15,000

$8,357,964

$123,061

$0

$33,380,730

$0

$0

$0

$107,742

$170,000

$1,042,030

$29,240

$6,120

$0

$14,375,075

$11,355

$0

$0

$24,023

$2,632,152

$950,000

$50,858

$10,000

$60,000

$0

$0

$0

Prior

Total

Total

Total

Total

$8,496,026

$49,122,292

$3,727,033

$0

$7,327,588

$34,446,529

$4,330,470

$359,677

$0

$22,000,000

$0

$0

$0

$22,000,000

$0

$0

$0

$22,000,000

$0

$0

$0

$0

$0

$0

$15,823,614

$149,568,820

$8,057,503

$359,677

$7,783

$136,356,816

$885,685

$0

$15,692,205

$12,868,375

$6,271,818

$359,677

$123,626

$343,630

$900,000

$0

Region

Page 135: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 198 of 217

5928

5930

5947

5952

5962

6025

6026

S

S

S

S

S

S

S

Statewide County Programs

PIN

2009 PAVEMENT PRESERVATION PROGRAM

STATEWIDE MAINTENANCE SPOT IMPROVEMENTS PROGRAM

STATEWIDE SAFE SIDEWALK & ADA INSTALLATION PROGRAM

STATEWIDE TRAFFIC SIGNALS NEW CONSTRUTION

TRANSPORTATION ENHANCEMENT PROGRAM FY 2008

NATIONAL RECREATIONANAL TRAILS PROGRAM

HIGH RISK RUAL ROADS PROGRAM - (HRRR)

Program Description

L_BETTERMENT

STP_FLX_ST

ST_PVMT

ST_BRIDGE

ST_SPOT_MNT

ST_SAFE_SIDE

ST_ADA_RAMPS

ST_SIGNALS

ST_CONT_R3

ST_CONT_PG

ST_SPOT_SFTY

HSIP

STP_ENH_ST

STP_ENH_EAC

LOCAL_GOVT

NRT

ST_MATCH

HSIP_HRRR@1

HSIP_HRRR

Fund

$0

$0

$0

$0

$1,229,235

$1,398,736

$23,671

$12,544,666

$70,653

$100,000

$0

$515,000

$74,280

$518,693

$0

$1,372,720

$1,372,720

$28,556

$411,087

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$43,900

$250,000

$957,985

$500,000

$1,969,149

$1,818,659

$212,321

$20,235,732

$70,653

$100,000

$25,000

$525,000

$74,280

$988,074

$611,871

$1,372,720

$1,372,720

$325,000

$1,718,294

Other

$0

$233,075

$0

$0

$0

$0

$0

$0

$0

$0

$0

$489,458

$59,424

$790,459

$0

$1,372,720

$0

$325,000

$1,601,965

Fed Aid

$0

$16,925

$957,985

$500,000

$1,969,149

$1,818,659

$212,321

$20,235,732

$70,653

$100,000

$25,000

$35,543

$14,856

$0

$0

$0

$1,372,720

$0

$29,768

State

$43,900

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$197,615

$611,871

$0

$0

$0

$86,560

Total2015 2016 2017 2018

$43,900

$250,000

$957,985

$500,000

$739,914

$419,923

$188,650

$7,691,066

$0

$0

$25,000

$10,000

$0

$469,381

$611,871

$0

$0

$296,444

$1,307,207

Prior

Total

Total

Total

Total

Total

Total

Total

$1,751,885

$739,914

$608,573

$7,726,066

$1,081,252

$0

$1,603,650

$0

$1,229,235

$1,422,407

$13,230,319

$592,973

$2,745,440

$439,644

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,751,885

$1,969,149

$2,030,980

$20,956,385

$1,674,225

$2,745,440

$2,043,294

$233,075

$0

$0

$489,458

$849,883

$1,372,720

$1,926,965

$1,474,910

$1,969,149

$2,030,980

$20,466,927

$14,856

$1,372,720

$29,768

$43,900

$0

$0

$0

$809,486

$0

$86,560

Region

Page 136: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 199 of 217

6061

6064

6129

6212

6364

6432

S

S

S

S

S

S

Statewide County Programs

PIN

STATEWIDE BARRIER TREATMENTS

RAILROAD CROSSING PROGRAM

STATEWIDE SMALL AREA LIGHTING

STATEWIDE SAFE ROUTES TO SCHOOL PROGRAM

STATEWIDE SIGN MODIFICATIONS & REPLACEMENT PROGRAM

STATEWIDE-TRANSPORTATION ENHANCEMENT PROGRAM FY 2010 & 201

Program Description

ST_BARRIER

LOCAL_GOVT

R/H_DEVICES

ST_SPOT_SFTY

R/H_HAZ_ELIM

ST_LIGHTING

ST_CONT_R3

TAP_URB_WFRC

LOCAL_GOVT

SR2S_PRGM

TAP_URB_MAG

TAP_SU_CMPO

SR2S_INFR

SR2S_OPT

TAP_SU_DMPO

TAP_FLEX

ST_SIGNING

TAP_FLEX

STP_ENH_EAC

CMAQ_WFRC

STP_ENH_ST

TAP_NU_JHC

LOCAL_GOVT

ST_CONT_PG

Fund

$1,044,199

$8,697

$284,160

$171,776

$1,658,470

$412,650

$42,480

$545,430

$0

$80,599

$177,420

$33,620

$2,126

$0

$43,630

$800,000

$394,780

$39,108

$0

$0

$21,403

$558

$475,649

$46,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$1,390,411

$8,697

$5,403,596

$276,357

$4,468,640

$774,883

$42,480

$545,430

$39,752

$633,071

$177,420

$33,620

$771,711

$541,642

$43,630

$800,000

$972,792

$257,950

$1,442,500

$0

$21,403

$278,358

$627,057

$46,000

Other

$0

$0

$5,037,772

$0

$4,166,113

$0

$0

$508,504

$0

$633,071

$165,409

$31,344

$771,711

$541,642

$40,676

$745,840

$0

$240,487

$1,154,000

$0

$17,123

$259,513

$0

$0

Fed Aid

$1,390,411

$0

$365,823

$276,357

$302,527

$774,883

$42,480

$36,926

$0

$0

$12,011

$2,276

$0

$0

$2,954

$54,160

$972,792

$0

$0

$0

$0

$0

$0

$46,000

State

$0

$8,697

$0

$0

$0

$0

$0

$0

$39,752

$0

$0

$0

$0

$0

$0

$0

$0

$17,463

$288,500

$0

$4,281

$18,845

$627,057

$0

Total2015 2016 2017 2018

$346,212

$0

$5,119,436

$104,581

$2,810,171

$362,234

$0

$0

$39,752

$552,472

$0

$0

$769,584

$541,642

$0

$0

$578,012

$218,842

$1,442,500

$0

$0

$277,800

$151,408

$0

Prior

Total

Total

Total

Total

Total

Total

$346,212

$8,034,187

$362,234

$1,903,450

$578,012

$2,090,550

$1,044,199

$2,123,102

$455,130

$1,682,825

$394,780

$582,718

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,390,411

$10,157,290

$817,363

$3,586,275

$972,792

$2,673,268

$0

$9,203,885

$0

$3,438,197

$0

$1,671,123

$1,390,411

$944,707

$817,363

$108,327

$972,792

$46,000

$0

$8,697

$0

$39,752

$0

$956,146

Region

Page 137: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 200 of 217

6632

6672

6850

6938

7231

7496

S

S

S

S

S

S

Statewide County Programs

PIN

2011 STATEWIDE PAVEMENT PRESERVATION PROGRAM

STATEWIDE HIGHWAY JURISDICTIONAL TRANSFERS PROGRAM

STATEWIDE; BRIDGE PROGRAM UNSPENT FUNDS

FY 2007 SCENIC BYWAYS PROGRAM AWARDS

STATEWIDE BRIDGE COLLISION REPAIR PROJECTS

SCENIC BYWAYS PROGRAM AWARDS

Program Description

IM

STP_FLX_ST

ST_BRIDGE

ST_PVMT

ST_HWY_TRNSF

BR_ON/OFF

ST_BRIDGE

NHPP_BR

BR_OFF

STP_FLX_ST

BYWAYS

L_PASS_MATCH

ST_INELIGIBL

ST_INS-RECOV

ST_INELIGIBL

L_PASS_MATCH

BYWAYS

ST_PVMT

Fund

$104,420

$294,103

$202,791

$674,665

$1,194,767

$0

$751,458

$35,000

$479,966

$681,000

$126,607

$14,536

$104

$710,954

$2,000

$89,789

$128,530

$14,882

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$104,420

$2,504,103

$220,000

$2,682,845

$1,194,767

$40,000

$1,933,341

$35,000

$479,966

$681,000

$126,607

$14,536

$104

$717,341

$2,000

$89,789

$487,686

$14,882

Other

$98,342

$2,334,575

$0

$0

$0

$32,000

$0

$32,631

$383,973

$634,896

$101,286

$0

$0

$0

$0

$0

$459,226

$0

Fed Aid

$6,077

$169,528

$220,000

$2,682,845

$1,194,767

$8,000

$1,933,341

$2,370

$95,993

$46,104

$0

$0

$104

$717,341

$2,000

$0

$0

$14,882

State

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$25,321

$14,536

$0

$0

$0

$89,789

$28,459

$0

Total2015 2016 2017 2018

$0

$2,210,000

$17,209

$2,008,180

$0

$40,000

$1,181,883

$0

$0

$0

$0

$0

$0

$6,387

$0

$0

$359,156

$0

Prior

Total

Total

Total

Total

Total

$4,235,389

$1,221,883

$0

$6,387

$359,156

$1,275,979

$1,947,424

$141,247

$710,954

$235,201

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$5,511,368

$3,169,307

$141,247

$717,341

$594,357

$2,432,917

$1,083,500

$101,286

$0

$459,226

$3,078,450

$2,085,807

$104

$717,341

$16,882

$0

$0

$39,857

$0

$118,248

Region

Page 138: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 201 of 217

8071

8072

8073

S

S

S

Statewide County Programs

PIN

STATEWIDE; FY 2012 PAVEMENT PRESERVATION PROGRAM

STATEWIDE; FY 2013 PAVEMENT PRESERVATION PROGRAM

STATEWIDE; FY 2012 PAVEMENT REHABILITATION PROGRAM

Program Description

STP_FLX_ST

NHPP_IM

L_BETTERMENT

IM

NHPP_NHS

NHS

ST_PVMT

NHPP_NHS

NHPP_IM

NHS

STP_FLX_ST

ST_CONT_R3

ST_PVMT

IM

ST_INELIGIBL

ST_BRIDGE

EQ_BONUS(MG)

HSIP

STP_RURAL

STP_FLX_ST

ST_INELIGIBL

STP_SU_JHC

ST_ATMS

NHPP_IM

IM

ST_PVMT

EQ_BONUS(MG)

NHS

Fund

$267,502

$120,785

$10,599

$0

$1

$91

$105,557

$899,856

$1,380,135

$211,129

$144,750

$5,000

$429,931

$0

$399

$369,000

$55,860

$0

$363,806

$750,854

$481

$0

$0

$196,840

$78,947

$65,711

$35,864

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$280,000

$6,604,932

$47,775

$5,315,854

$1

$1,050,091

$645,165

$3,541,641

$10,649,390

$4,960,474

$1,855,059

$5,000

$1,847,379

$1,881,200

$399

$369,000

$4,987,520

$1,721,365

$1,000,000

$5,680,232

$481

$0

$20,000

$236,839

$29,464,454

$67,911

$55,864

$6,472,221

Other

$261,044

$6,220,525

$0

$5,006,471

$0

$979,000

$0

$3,301,872

$10,029,595

$4,624,650

$1,729,471

$0

$0

$1,771,715

$0

$0

$4,649,865

$1,604,829

$932,300

$5,295,681

$0

$0

$0

$185,383

$27,749,623

$0

$52,082

$6,034,051

Fed Aid

$18,956

$384,407

$0

$309,383

$0

$71,091

$645,165

$239,769

$619,794

$335,824

$125,588

$5,000

$1,847,379

$109,486

$399

$369,000

$337,655

$116,536

$67,700

$384,552

$481

$0

$20,000

$51,456

$1,714,831

$67,911

$3,782

$438,169

State

$0

$0

$47,775

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Total2015 2016 2017 2018

$12,498

$6,484,146

$37,176

$5,315,854

$0

$1,050,000

$539,607

$2,641,785

$9,269,255

$4,749,345

$1,710,309

$0

$1,417,448

$1,881,200

$0

$0

$4,931,660

$1,721,365

$636,194

$4,929,378

$0

$0

$20,000

$39,999

$29,385,507

$2,200

$20,000

$6,472,221

Prior

Total

Total

Total

$13,439,282

$28,322,367

$41,505,499

$504,535

$3,496,061

$1,492,503

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$13,943,817

$31,818,427

$42,998,002

$12,467,040

$27,711,997

$40,249,120

$1,429,001

$4,106,431

$2,748,882

$47,775

$0

$0

Region

Page 139: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 202 of 217

8074

8528

8549

S

S

S

Statewide County Programs

PIN

STATEWIDE; FY 2012 & 2013 PAVEMENT REHABILITATION PROGRAM

FY2011 BRIDGE PREVENTIVE MAINTENANCE PROGRAM

FY 2012 & 2013 ENHANCEMENT PROGRAM

Program Description

HSIP

ST_RET_ROW

EQ_BONUS(MG)

NHS

L_BETTERMENT

ST_BRIDGE

ST_CONCPT_D4

NHPP_IM

NHPP_NHS

ST_INELIGIBL

ST_CONCPT_D3

STP_ENH_ST

STP_FLX_ST

IM

ST_BRIDGE

STP_TAP_ST

OTHER

ST_CONST

ENH_EAC_100%

LOCAL_INKIND

TAP_SU_JHC

STP_ENH_ST

BYWAYS

TAP_URB_MAG

EM_2012_PLHD

LOCAL_GOVT

ST_CONT_PG

ST_INELIGIBL

ST_LIGHTING

ST_CONT_R2

NHS

TAP_URB_WFRC

L_BETTERMENT

STP_ENH_EAC

Fund

$0

$0

$555,117

$1,410,031

$0

$2,200,000

$0

$5,733,329

$5,013,473

$1

$0

$0

$2,412,789

$1

$138,254

$0

$26,593

$6,184

$0

$98,554

$53,189

$720,281

$1

$284,285

$0

$668,572

$22,883

$820

$75,000

$50,000

$0

$471,308

$229,605

$625,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$973,000

$3,450,063

$13,128,971

$22,325,216

$57,225

$2,200,000

$2,399

$48,904,241

$23,736,676

$1

$10,195

$500,000

$22,320,610

$5,552,551

$351,778

$315,117

$100,000

$6,184

$516,000

$98,554

$53,189

$3,553,257

$1,204,592

$284,285

$1,525,000

$2,110,006

$22,883

$820

$75,000

$50,000

$270,000

$536,308

$229,605

$2,313,812

Other

$907,128

$0

$12,240,139

$20,813,799

$0

$0

$0

$46,058,014

$22,129,703

$0

$0

$400,000

$20,809,505

$5,229,393

$0

$315,117

$0

$0

$516,000

$0

$49,589

$2,842,606

$963,674

$265,039

$1,525,000

$0

$0

$0

$0

$0

$251,721

$500,000

$0

$1,951,050

Fed Aid

$65,872

$3,450,063

$888,831

$1,511,417

$0

$2,200,000

$2,399

$2,846,227

$1,606,973

$1

$10,195

$100,000

$1,511,105

$323,158

$351,778

$0

$0

$6,184

$0

$0

$0

$710,651

$0

$0

$0

$0

$22,883

$820

$75,000

$50,000

$18,279

-$4,401

$0

$0

State

$0

$0

$0

$0

$57,225

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$100,000

$0

$0

$98,554

$3,601

$0

$240,918

$19,246

$0

$2,110,006

$0

$0

$0

$0

$0

$40,709

$229,605

$362,762

Total2015 2016 2017 2018

$973,000

$3,450,063

$12,573,854

$20,915,185

$57,225

$0

$2,399

$43,170,912

$18,723,203

$0

$10,195

$500,000

$19,907,821

$5,552,550

$213,524

$315,117

$73,407

$0

$516,000

$0

$0

$2,832,976

$1,204,591

$0

$1,525,000

$1,441,434

$0

$0

$0

$0

$270,000

$65,000

$0

$1,688,812

Prior

Total

Total

Total

$125,836,407

$213,524

$9,932,338

$17,324,741

$138,254

$3,332,274

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$143,161,148

$351,778

$13,264,613

$128,587,680

$0

$9,179,795

$15,169,069

$351,778

$879,417

$57,225

$0

$3,205,401

Region

Page 140: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 203 of 217

8922S

Statewide County Programs

PIN

PUBLIC RELATIONS PROGRAM

Program Description

ST_CONT_R2

ST_CONT_R4

ST_PR

ST_CONT_R1

ST_KW_KW_C

ST_CONT_R3

Fund

$0

$0

$645,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$60,000

$60,000

$1,890,000

$65,000

$600,000

$60,000

Other

$0

$0

$0

$0

$0

$0

Fed Aid

$60,000

$60,000

$1,890,000

$65,000

$600,000

$60,000

State

$0

$0

$0

$0

$0

$0

Total2015 2016 2017 2018

$60,000

$60,000

$1,245,000

$65,000

$600,000

$60,000

Prior

Total $2,090,000 $645,000 $0 $0 $0 $0 $2,735,000 $0 $2,735,000 $0

Region

Page 141: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 204 of 217

5599

5589

5597

5591

6062

1

2

3

4

S

Various County Programs

PIN

Region One Contingency Funds

Region Two Contingency Funds

Region Three Contingency Funds

Region Four Contingency Funds

PROGRAMMING DIRECTOR CONTINGENCY FUNDS

Program Description

ST_CONT_R1

ST_ATMS

LOCAL_GOVT

ST_CONT_PG

STP_FLX_ST

ST_SPOT_MNT

EM_2011_PLHD

ST_SPOT_SFTY

ST_CONT_R2

ST_BARRIER

L_PASS_MATCH

ST_CONT_R3

ST_CONST

PL_MAG

TAP_FLEX

ST_CONT_R4

STP_ENH_ST

LOCAL_GOVT

OTHER

ST_PVMT

NHPP_NHS

STP_RURAL

ST_CONT_PG

LOCAL_GOVT

STP_FLX_ST

NHPP_IM

ER_2010

NHS

Fund

$1,801,556

$1,765

$374,918

$0

$0

$0

$0

$10,000

$2,235,055

$0

$1,354

$2,017,498

$160,000

$7,771

$0

$2,166,383

$0

$20,426

$30,000

$309,130

$3,350,000

$1,800,000

$1,907,445

$284,695

$4,542,182

$2,000,000

$513,580

$50,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

CD

$3,370,683

$288,000

$375,000

$100,126

$729,325

$6,000

$1,000,000

$10,000

$3,552,965

$20,000

$1,354

$2,720,590

$160,000

$7,771

$343,237

$2,884,543

$120,000

$69,250

$30,000

$309,130

$3,350,000

$1,800,000

$2,044,364

$900,000

$4,542,182

$2,000,000

$513,580

$50,000

Other

$0

$0

$0

$0

$679,950

$0

$1,000,000

$0

$0

$0

$0

$0

$0

$7,771

$320,000

$0

$96,000

$0

$0

$0

$3,123,205

$1,678,140

$0

$0

$4,542,182

$1,883,600

$478,811

$46,615

Fed Aid

$3,370,683

$288,000

$0

$100,126

$49,375

$6,000

$0

$10,000

$3,552,965

$20,000

$0

$2,720,590

$160,000

$0

$23,237

$2,884,543

$24,000

$0

$0

$309,130

$226,795

$121,860

$2,044,364

$0

$0

$116,400

$34,769

$0

State

$0

$0

$375,000

$0

$0

$0

$0

$0

$0

$0

$1,354

$0

$0

$0

$0

$0

$0

$69,250

$30,000

$0

$0

$0

$0

$900,000

$0

$0

$0

$3,385

Total2015 2016 2017 2018

$1,569,127

$286,235

$82

$100,126

$729,325

$6,000

$1,000,000

$0

$1,317,910

$20,000

$0

$703,092

$0

$0

$343,237

$718,160

$120,000

$48,824

$0

$0

$0

$0

$136,919

$615,305

$0

$0

$0

$0

Prior

Total

Total

Total

Total

Total

$1,955,570

$3,053,235

$723,092

$1,230,222

$752,225

$2,178,239

$2,245,055

$2,186,623

$2,216,809

$14,757,031

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$4,133,809

$5,298,290

$2,909,715

$3,447,031

$15,509,256

$0

$1,679,950

$7,771

$416,000

$11,752,553

$3,758,809

$3,618,341

$2,900,590

$2,931,781

$2,853,318

$375,000

$0

$1,354

$99,250

$903,385

Region

Page 142: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 206 of 217

AIR QUALITY - FTA FUND TRANSFER

PROVO/OREM URBANIZED AREA

TRANSIT - NEW SERVICE

TRANSIT - TRAVEL DEMAND MANAGMENT

PROVO/OREM URBANIZED AREA

TRANSIT - UTAH COUNTY SERVICE AREA

TRANSIT - VAN ACQUISITION

AIR QUALITY - FTA FUND TRANSFER

LOGAN/CVTD BIKE RACK INSTALLATION - COVERED BIKE STORAGE

UTA VAN POOL EXPANSION - PURCHASE 10 EXPANSION VANS

UTA SOUTH COUNTY COMMUTER RAIL EXPRESS BUS

UTA; RIDESHARE PROGRAM (MAG)

UTA RIDESHARE - PM 2.5 FUNDS (MAG)

UTA OREM CENTER - PASSENGER AMENITIES

UTA; VAN POOL PROGRAM (MAG)

ITS/APTS DEPLOYMENT IN SALT LAKE

RIDESHARE - WFRC - SALT LAKE AREA

RIDESHARE - WFRC OGDEN/LAYTON AREA

VAN LEASE IN SALT LAKE

CMPO PROJECTS

UTA MAG PROJECT

UTA MAG PROJECT

UTA MAG PROJECT

UTA MAG PROJECT

UTA MAG PROJECT

UTA MAG PROJECT

WFRC SALT LAKE PROJECT

WFRC SALT LAKE PROJECT

WFRC SALT LAKE PROJECT

WFRC SALT LAKE PROJECT

$134,470

$135,000

$666,000

$120,000

$0

$0

$0

$0

$341,879

$168,540

$296,257

$0

$180,000

$0

$202,000

$0

$218,000

$0

$0

$341,879

$168,540

$296,257

$0

$180,000

$0

$0

$193,000

$0

$0

$0

$341,879

$168,540

$321,785

$0

$0

$0

$194,000

$0

$0

$180,000

$268,154

$341,879

$168,540

$0

$0

$0

$0

$0

$0

$0

$0

$268,154

$704,580

$337,080

$296,042

$125,366

$125,861

$620,912

$111,876

$0

$0

$0

$0

$318,734

$157,130

$276,200

$0

$167,814

$0

$188,325

$0

$203,241

$0

$0

$318,734

$157,130

$276,200

$0

$167,814

$0

$0

$179,934

$0

$0

$0

$318,734

$157,130

$300,000

$0

$0

$0

$180,866

$0

$0

$167,814

$250,000

$318,734

$157,130

$0

$0

$0

$0

$0

$0

$0

$0

$250,000

$656,880

$314,260

$276,000

$9,104

$9,140

$45,088

$8,124

$0

$0

$0

$0

$23,145

$11,410

$20,057

$0

$12,186

$0

$13,675

$0

$14,759

$0

$0

$23,145

$11,410

$20,057

$0

$12,186

$0

$0

$13,066

$0

$0

$0

$23,145

$11,410

$21,785

$0

$0

$0

$13,134

$0

$0

$12,186

$18,154

$23,145

$11,410

$0

$0

$0

$0

$0

$0

$0

$0

$18,154

$47,700

$22,820

$20,042

CMAQ_CACHE

CMAQ_MAG

CMAQ_PM2.5

CMAQ_WFRC

TRANSIT:Fund

Fund

Fund

Fund

Program Description

Program Description

Program Description

Program Description

Program Description

Program Description

Program Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

$134,470

$495,000

$666,000

$516,000

$193,000

$218,000

$180,000

$536,308

$2,072,096

$1,011,240

$1,210,341

$125,366

$461,489

$620,912

$481,067

$179,934

$203,241

$167,814

$500,000

$1,931,815

$942,779

$1,128,401

$9,104

$33,512

$45,088

$34,933

$13,066

$14,759

$12,186

$36,308

$140,281

$68,461

$81,940

Page 143: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 207 of 217

AIR QUALITY - FTA FUND TRANSFER

SALT LAKE OGDEN URBANIZED AREA

SALT LAKE URBANIZED AREA

LOGAN URBANIZED AREA

OGDEN/LAYTON URBANIZED AREA

ITS/APTS DEPLOYMENT IN WEBER COUNTY

VAN LEASE IN WEBER COUNTY

BUS SERVICE FROM DOWNTOWN OGDEN TO OGDEN VALLEY

CENTRAL GARAGE CONSTRUCTION, INCLUDE CNG FUELING FACILITY

PREVENTATIVE MAINTENANCE - TRANSIT (CVTD)

REPLACE SUPPORT VEHICLES - (CVTD)

REPLACEMENT PARA TRANSIT BUSES- (CVTD)

SECURITY CONTRACTS & EQUIPMENT- (CVTD)

TRANSIT FACILITY IMPROVEMENTS - (CVTD)

UTA PLANNING - OGDEN/LAYTON URBANIZED AREA

ADA PARATRANSIT SERVICES OPERATING ASSISTANCE - O/L AREA

PREVENTIVE MAINTENANCE OF BUSES AND FACILITIES - O/L AREA

WFRC WEBER PROJECT

WFRC WEBER PROJECT

UTA WFRC PROJECT

WFRC UTA PROJECT

CACHE

CACHE

CACHE

CACHE

CACHE

UTA WFRC PROJECT

WFRC UTA PROJECT

WFRC UTA PROJECT

$0

$127,427

$0

$0

$780,000

$25,000

$150,000

$32,000

$200,000

$290,220

$1,450,764

$12,476,503

$0

$127,427

$0

$0

$830,000

$0

$0

$35,000

$200,000

$290,220

$1,504,935

$12,953,211

$354,500

$127,427

$482,677

$0

$850,000

$0

$0

$35,000

$200,000

$290,220

$1,530,519

$13,178,350

$354,500

$70,793

$536,308

$0

$850,000

$0

$480,000

$35,000

$200,000

$290,220

$1,556,538

$13,407,315

$0

$127,427

$1,027,566

$1,018,985

$1,750,000

$115,000

$170,000

$80,000

$400,000

$580,440

$3,192,909

$27,517,164

$0

$118,800

$0

$0

$624,000

$20,000

$120,000

$25,600

$160,000

$232,176

$1,160,611

$9,981,202

$0

$118,800

$0

$0

$664,000

$0

$0

$28,000

$160,000

$232,176

$1,203,948

$10,362,569

$330,500

$118,800

$450,000

$0

$680,000

$0

$0

$28,000

$160,000

$232,176

$1,224,415

$10,542,680

$330,500

$66,000

$500,000

$0

$680,000

$0

$384,000

$28,000

$160,000

$232,176

$1,245,230

$10,725,852

$0

$118,800

$958,000

$950,000

$1,400,000

$92,000

$136,000

$64,000

$320,000

$464,352

$2,554,327

$22,013,731

$0

$8,627

$0

$0

$156,000

$5,000

$30,000

$6,400

$40,000

$58,044

$290,153

$2,495,301

$0

$8,627

$0

$0

$166,000

$0

$0

$7,000

$40,000

$58,044

$300,987

$2,590,642

$24,000

$8,627

$32,677

$0

$170,000

$0

$0

$7,000

$40,000

$58,044

$306,104

$2,635,670

$24,000

$4,793

$36,308

$0

$170,000

$0

$96,000

$7,000

$40,000

$58,044

$311,308

$2,681,463

$0

$8,627

$69,566

$68,985

$350,000

$23,000

$34,000

$16,000

$80,000

$116,088

$638,582

$5,503,433

CMAQ_WFRC

FTASEC_5307

TRANSIT:Fund

Fund

Program Description

Program Description

Program Description

Program Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

$709,000

$580,501

$2,046,552

$1,018,985

$5,060,000

$140,000

$800,000

$217,000

$1,200,000

$1,741,320

$9,235,664

$79,532,543

$661,001

$541,201

$1,908,000

$950,000

$4,048,000

$112,000

$640,000

$173,600

$960,000

$1,393,056

$7,388,531

$63,626,034

$47,999

$39,300

$138,552

$68,985

$1,012,000

$28,000

$160,000

$43,400

$240,000

$348,264

$1,847,133

$15,906,509

Page 144: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 208 of 217

OGDEN/LAYTON URBANIZED AREA

PROVO/OREM URBANIZED AREA

SALT LAKE URBANIZED AREA

ST. GEORGE URBANIZED AREA

TRANSIT - NEW SERVICE

SECURITY EQUIPMENT - O/L AREA

TRANSIT ENHANCEMENTS - O/L AREA

UTA PLANNING (MAG)

UTA PLANNING - SALT LAKE URBANIZED AREA

ADA PARATRANSIT SERVICE OPERATING ASSISTANCE - SL AREA

PREVENT MAINT OF BUSES, LIGHT RAIL VEHICLES, AND FACILITIES

SECURITY EQUIPMENT - SALT LAKE AREA

TRANSIT ENHANCEMENTS - SALT LAKE AREA

ENHANCEMENT / PREVENTATIVE MAINTENANCE (DIXIE MPO)

REPLACEMENT BUSES (DIXIE MPO)

INTERMODAL TRANSIT CENTER IMPROVEMENTS- (CVTD)

TRANSIT PLANNING; SHORT RANGE TRANSIT PLAN- (CVTD)

WFRC UTA PROJECT

WFRC UTA PROJECT

UTA MAG PROJECT

UTA WFRC PROJECT

WFRC UTA PROJECT

WFRC UTA PROJECT

WFRC UTA PROJECT

WFRC UTA PROJECT

DIXIE MPO PROJECTS

DIXIE MPO PROJECTS

CACHE

CACHE

$145,076

$145,076

$160,888

$756,985

$3,258,228

$27,915,415

$325,823

$325,823

$220,000

$410,000

$60,000

$0

$150,494

$150,494

$163,623

$756,985

$3,379,890

$28,986,043

$337,989

$337,989

$240,000

$410,000

$0

$232,000

$153,053

$153,053

$166,405

$756,985

$3,437,348

$29,491,674

$343,735

$343,735

$260,000

$410,000

$60,000

$0

$155,654

$155,654

$169,234

$756,985

$3,495,783

$30,005,901

$349,579

$349,579

$280,000

$410,000

$0

$0

$319,291

$319,291

$172,111

$1,513,970

$7,170,861

$61,589,600

$717,086

$717,086

$300,000

$410,000

$0

$0

$116,061

$116,061

$128,710

$605,588

$2,606,582

$22,332,332

$260,658

$260,658

$176,000

$328,000

$48,000

$0

$120,395

$120,395

$130,898

$605,588

$2,703,912

$23,188,834

$270,391

$270,391

$192,000

$328,000

$0

$185,600

$122,442

$122,442

$133,124

$605,588

$2,749,878

$23,593,339

$274,988

$274,988

$208,000

$328,000

$48,000

$0

$124,523

$124,523

$135,387

$605,588

$2,796,626

$24,004,721

$279,663

$279,663

$224,000

$328,000

$0

$0

$255,433

$255,433

$137,689

$1,211,176

$5,736,689

$49,271,680

$573,669

$573,669

$240,000

$328,000

$0

$0

$29,015

$29,015

$32,178

$151,397

$651,646

$5,583,083

$65,165

$65,165

$44,000

$82,000

$12,000

$0

$30,099

$30,099

$32,725

$151,397

$675,978

$5,797,209

$67,598

$67,598

$48,000

$82,000

$0

$46,400

$30,611

$30,611

$33,281

$151,397

$687,470

$5,898,335

$68,747

$68,747

$52,000

$82,000

$12,000

$0

$31,131

$31,131

$33,847

$151,397

$699,157

$6,001,180

$69,916

$69,916

$56,000

$82,000

$0

$0

$63,858

$63,858

$34,422

$302,794

$1,434,172

$12,317,920

$143,417

$143,417

$60,000

$82,000

$0

$0

FTASEC_5307TRANSIT:

FundProgram Description

Program Description

Program Description

Program Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

$923,568

$923,568

$832,261

$4,541,910

$20,742,109

$177,988,633

$2,074,211

$2,074,211

$1,300,000

$2,050,000

$120,000

$232,000

$738,854

$738,854

$665,809

$3,633,528

$16,593,687

$142,390,906

$1,659,369

$1,659,369

$1,040,000

$1,640,000

$96,000

$185,600

$184,714

$184,714

$166,452

$908,382

$4,148,422

$35,597,727

$414,842

$414,842

$260,000

$410,000

$24,000

$46,400

Page 145: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 209 of 217

TRANSIT - NEW SERVICE

TRANSIT - UTAH COUNTY SERVICE AREA

NON URBANIZED AREA

PROVO/OREM URBANIZED AREA

EXPANSION BUSES - (DIXIE DMPO)

UTA ADA OPERATING ASSISTANCE FOR PARATRANSIT SERVICE (MAG)

UTA PREVENTATIVE MAINTENANCE (MAG)

UTA SECURITY EQUIPMENT (MAG)

UTA TRANSIT ENHANCEMENTS (MAG)

35' EXPANSION BUSES (PARK CITY)

35' REPLACEMENT BUSES (PARK CITY)

40' COMMUTER BUSES (PARK CITY)

BUS SHELTERS (PARK CITY)

KIMBALL JUNCTION AREA TRANSFER FACILITY (PARK CITY)

PARK AND RIDE FACILITIES (PARK CITY)

REPLACEMENT TROLLEY BUS (PARK CITY)

DIXIE MPO PROJECTS

UTA MAG PROJECT

UTA MAG PROJECT

UTA MAG PROJECT

UTA MAG PROJECT

PARK CITY

PARK CITY

PARK CITY

PARK CITY

PARK CITY

PARK CITY

PARK CITY

$820,000

$775,202

$6,660,890

$77,520

$77,520

$0

$990,000

$1,750,000

$0

$3,800,000

$0

$0

$820,000

$788,381

$6,774,125

$78,838

$78,838

$630,000

$630,000

$0

$0

$0

$2,500,000

$330,000

$820,000

$801,783

$6,889,286

$80,178

$80,178

$0

$660,000

$1,750,000

$0

$0

$2,500,000

$0

$820,000

$815,413

$7,006,403

$81,541

$81,541

$0

$0

$0

$0

$0

$0

$0

$820,000

$829,275

$7,125,512

$82,927

$82,927

$660,000

$0

$1,200,000

$150,000

$0

$1,250,000

$0

$656,000

$620,162

$5,328,712

$62,016

$62,016

$0

$792,000

$1,400,000

$0

$3,040,000

$0

$0

$656,000

$630,705

$5,419,300

$63,070

$63,070

$504,000

$504,000

$0

$0

$0

$2,000,000

$264,000

$656,000

$641,426

$5,511,429

$64,142

$64,142

$0

$528,000

$1,400,000

$0

$0

$2,000,000

$0

$656,000

$652,330

$5,605,122

$65,233

$65,233

$0

$0

$0

$0

$0

$0

$0

$656,000

$663,420

$5,700,410

$66,342

$66,342

$528,000

$0

$960,000

$120,000

$0

$1,000,000

$0

$164,000

$155,040

$1,332,178

$15,504

$15,504

$0

$198,000

$350,000

$0

$760,000

$0

$0

$164,000

$157,676

$1,354,825

$15,768

$15,768

$126,000

$126,000

$0

$0

$0

$500,000

$66,000

$164,000

$160,357

$1,377,857

$16,036

$16,036

$0

$132,000

$350,000

$0

$0

$500,000

$0

$164,000

$163,083

$1,401,281

$16,308

$16,308

$0

$0

$0

$0

$0

$0

$0

$164,000

$165,855

$1,425,102

$16,585

$16,585

$132,000

$0

$240,000

$30,000

$0

$250,000

$0

FTASEC_5307

FTASEC_5309

TRANSIT:Fund

Fund

Program Description

Program Description

Program Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

$4,100,000

$4,010,054

$34,456,216

$401,004

$401,004

$1,290,000

$2,280,000

$4,700,000

$150,000

$3,800,000

$6,250,000

$330,000

$3,280,000

$3,208,043

$27,564,973

$320,803

$320,803

$1,032,000

$1,824,000

$3,760,000

$120,000

$3,040,000

$5,000,000

$264,000

$820,000

$802,011

$6,891,243

$80,201

$80,201

$258,000

$456,000

$940,000

$30,000

$760,000

$1,250,000

$66,000

Page 146: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 210 of 217

PROVO/OREM URBANIZED AREA

SALT LAKE OGDEN URBANIZED AREA

SALT LAKE/OGDEN/LAYTON URBANIZED AREA

TRANSIT - NEW SERVICE

OGDEN/LAYTON URBANIZED AREA

SALT LAKE URBANIZED AREA

TRANSIT - NEW SERVICE

SALT LAKE/OGDEN/LAYTON URBANIZED AREA

UTA - TRANSIT ORIENTATED DEVELOPMENT (TOD) PROJECTS

UTA - UTAH CO. PROPERTY ACQUISITION,DESIGN AND CONSTRUCT (MAG)

ITS / APTS DEPLOYMENT - BUS

TRANSIT ORIENTED DEVELOPMENT PROJECTS

PARK AND RIDE LOT PROPERTY ACQUISITION,DESIGN AND CONSTRUCT

2 35' HYBRID ELECTRIC BUSES (PARK CITY)

3 SUPPORT VEHICLES (PARK CITY)

PCMR TRANSIT CENTER (PARK CITY)

ENHANCED MOBILITY OF SENIORS & INDIVIIDUALS WITH DISABILITIES - O/L AREA

ENHANCED MOBILITY OF SENIORS & INDIVIIDUALS WITH DISABILITIES - SL AREA

6 BUSES FOR & IMPROVEMENTS/REPAIRS TO CANYON PARK N RIDE LOT

UTA MAG PROJECT

UTA MAG PROJECT

WFRC UTA PROJECT

UTA WFRC PROJECT

WFRC UTA PROJECT

PARK CITY

PARK CITY

PARK CITY

UTA WFRC PROJECT

WFRC SALT LAKE PROJECT

WFRC UTA PROJECT

$0

$0

$0

$0

$0

$1,120,000

$110,000

$0

$445,444

$805,008

$2,661,040

$0

$0

$0

$0

$0

$0

$0

$4,000,000

$454,353

$821,108

$0

$2,000,000

$2,900,000

$0

$0

$0

$0

$0

$0

$463,440

$837,529

$0

$2,000,000

$0

$0

$2,500,000

$0

$0

$0

$0

$472,709

$8,542,800

$0

$0

$0

$5,000,000

$5,000,000

$5,800,000

$0

$0

$0

$973,970

$1,760,158

$0

$0

$0

$0

$0

$0

$896,000

$88,000

$0

$356,355

$644,006

$2,128,832

$0

$0

$0

$0

$0

$0

$0

$3,200,000

$363,482

$656,886

$0

$1,600,000

$2,320,000

$0

$0

$0

$0

$0

$0

$370,752

$670,023

$0

$1,600,000

$0

$0

$2,000,000

$0

$0

$0

$0

$378,167

$6,834,240

$0

$0

$0

$4,000,000

$4,000,000

$4,640,000

$0

$0

$0

$779,176

$1,408,126

$0

$0

$0

$0

$0

$0

$224,000

$22,000

$0

$89,089

$161,002

$532,208

$0

$0

$0

$0

$0

$0

$0

$800,000

$90,871

$164,222

$0

$400,000

$580,000

$0

$0

$0

$0

$0

$0

$92,688

$167,506

$0

$400,000

$0

$0

$500,000

$0

$0

$0

$0

$94,542

$1,708,560

$0

$0

$0

$1,000,000

$1,000,000

$1,160,000

$0

$0

$0

$194,794

$352,032

$0

FTASEC_5309

FTASEC_5310

FTASEC_5320

FTASEC_5337

TRANSIT:Fund

Fund

Fund

Fund

Program Description

Program Description

Program Description

Program Description

Program Description

Program Description

Program Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

$4,000,000

$2,900,000

$5,000,000

$7,500,000

$5,800,000

$1,120,000

$110,000

$4,000,000

$2,809,915

$12,766,601

$2,661,040

$3,200,000

$2,320,000

$4,000,000

$6,000,000

$4,640,000

$896,000

$88,000

$3,200,000

$2,247,932

$10,213,281

$2,128,832

$800,000

$580,000

$1,000,000

$1,500,000

$1,160,000

$224,000

$22,000

$800,000

$561,983

$2,553,320

$532,208

Page 147: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 211 of 217

SALT LAKE/OGDEN/LAYTON URBANIZED AREA

LOGAN URBANIZED AREA

SALT LAKE URBANIZED AREA

SALT LAKE/OGDEN/LAYTON URBANIZED AREA

ST. GEORGE URBANIZED AREA

TRANSIT - UTAH COUNTY SERVICE AREA

LOGAN URBANIZED AREA

ST. GEORGE URBANIZED AREA

TRANSIT - RURAL

STATE OF GOOD REPAIR PROGRAM - HIGH INTENSITY FIXED GUIDEWAY

FACILITY EXPANSION - (CVTD)

REPLACEMENT FIXED ROUTE BUSES - (CVTD)

SLC DOWNTOWN STREETCAR ALTERNATIVES ANALYSIS

REPLACE, REHAB, PURCHASE BUSES & RELATED FACILITIES

EXPANSION BUSES (DIXIE MPO)

MAINTENANCE FACILITY CONSTRUCTION (DIXIE MPO)

REPLACEMENT BUSES - (DIXIE MPO)

PURCHASE 5 CLEAN FUEL BUSES & RELATED EQUIP - 1 BUSES/YR (MAG)

OPERATING ASSISTANCE - (CVTD)

OPERATING ASSISTANCE (DIXIE MPO)

WFRC UTA PROJECT

CACHE

CACHE

WFRC UTA PROJECT

WFRC UTA PROJECT

DIXIE MPO PROJECTS

DIXIE MPO PROJECTS

DIXIE MPO PROJECTS

UTA MAG PROJECT

CACHE

DIXIE MPO PROJECTS

$9,927,670

$0

$2,000,000

$587,500

$3,897,853

$820,000

$125,000

$410,000

$779,349

$2,000,000

$1,120,000

$10,440,014

$3,000,000

$840,000

$0

$4,162,321

$820,000

$200,000

$410,000

$802,729

$2,000,000

$1,160,000

$24,345,165

$500,000

$0

$0

$4,233,081

$820,000

$125,000

$410,000

$826,811

$2,400,000

$1,200,000

$24,685,998

$5,000,000

$1,380,000

$0

$4,305,044

$820,000

$200,000

$410,000

$851,615

$2,400,000

$1,240,000

$57,914,863

$5,000,000

$2,460,000

$0

$8,830,888

$820,000

$200,000

$410,000

$877,164

$5,400,000

$1,280,000

$7,942,136

$0

$1,600,000

$470,000

$3,118,282

$656,000

$100,000

$328,000

$623,479

$1,000,000

$560,000

$8,352,011

$2,400,000

$672,000

$0

$3,329,857

$656,000

$160,000

$328,000

$642,183

$1,000,000

$580,000

$19,476,132

$400,000

$0

$0

$3,386,465

$656,000

$100,000

$328,000

$661,449

$1,200,000

$600,000

$19,748,798

$4,000,000

$1,104,000

$0

$3,444,035

$656,000

$160,000

$328,000

$681,292

$1,200,000

$620,000

$46,331,890

$4,000,000

$1,968,000

$0

$7,064,710

$656,000

$160,000

$328,000

$701,731

$2,700,000

$640,000

$1,985,534

$0

$400,000

$117,500

$779,571

$164,000

$25,000

$82,000

$155,870

$1,000,000

$560,000

$2,088,003

$600,000

$168,000

$0

$832,464

$164,000

$40,000

$82,000

$160,546

$1,000,000

$580,000

$4,869,033

$100,000

$0

$0

$846,616

$164,000

$25,000

$82,000

$165,362

$1,200,000

$600,000

$4,937,200

$1,000,000

$276,000

$0

$861,009

$164,000

$40,000

$82,000

$170,323

$1,200,000

$620,000

$11,582,973

$1,000,000

$492,000

$0

$1,766,178

$164,000

$40,000

$82,000

$175,433

$2,700,000

$640,000

FTASEC_5337

FTASEC_5339

FTA_5307_50%

FTA_5310_50

TRANSIT:Fund

Fund

Fund

Fund

Program Description

Program Description

Program Description

Program Description

Program Description

Program Description

Program Description

Program Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

$127,313,709

$13,500,000

$6,680,000

$587,500

$25,429,186

$4,100,000

$850,000

$2,050,000

$4,137,668

$14,200,000

$6,000,000

$101,850,967

$10,800,000

$5,344,000

$470,000

$20,343,349

$3,280,000

$680,000

$1,640,000

$3,310,134

$7,100,000

$3,000,000

$25,462,742

$2,700,000

$1,336,000

$117,500

$5,085,837

$820,000

$170,000

$410,000

$827,534

$7,100,000

$3,000,000

Page 148: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 212 of 217

TRANSIT - RURAL

TRANSIT - SMALL URBAN

TRANSIT - RURAL

TRANSIT - SMALL URBAN

IRON CO. ON AGING: OPERATING

KANE CO. SENIORS: OPERATING

PIUTE COUNTY SENIORS: OPERATING

UINTAH BASIN AOG: OPERATING

CACHE EMPLOYMENT TRAINING CNTR: OPERATING

RED ROCK CENTER FOR INDEPENDENCE: OPERATING

FIVE COUNTY AOG - CAPITAL (RURAL)

FOUR CORNERS: CAPITAL (RURAL)

PIUTE CO. SENIORS: CAPITAL (RURAL)

PROGRAM FUNDS FORMULA RURAL (5310) (UDOT)

TRANSITIONS: CAPITAL (RURAL)

CACHE EMPLOYMENT TRAINING CNTR: CAPITAL (SMALL URBAN)

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

$12,000

$4,960

$3,750

$15,000

$94,434

$2,000

$8,155

$80,000

$58,438

$0

$60,000

$187,500

$0

$0

$0

$0

$0

$0

$0

$0

$0

$311,274

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$311,274

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$311,274

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$6,000

$2,480

$1,875

$7,500

$47,217

$1,000

$6,524

$64,000

$46,750

$0

$48,000

$150,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$249,019

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$249,019

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$249,019

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$6,000

$2,480

$1,875

$7,500

$47,217

$1,000

$1,631

$16,000

$11,688

$0

$12,000

$37,500

$0

$0

$0

$0

$0

$0

$0

$0

$0

$62,255

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$62,255

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$62,255

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

FTA_5310_50

FTA_5310_80

TRANSIT:Fund

Fund

Program Description

Program Description

Program Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

$12,000

$4,960

$3,750

$15,000

$94,434

$2,000

$8,155

$80,000

$58,438

$933,822

$60,000

$187,500

$6,000

$2,480

$1,875

$7,500

$47,217

$1,000

$6,524

$64,000

$46,750

$747,058

$48,000

$150,000

$6,000

$2,480

$1,875

$7,500

$47,217

$1,000

$1,631

$16,000

$11,688

$186,764

$12,000

$37,500

Page 149: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 213 of 217

TRANSIT - SMALL URBAN

RURAL PUBLIC TRANSIT PROGRAM

TRANSIT - RURAL

TRANSIT - RURAL

FIVE COUNTY AOG: MOBILITY MNGT - CAPITAL (SMALL URBAN)

PROGRAM FUNDS FORMULA SMALL URBAN (5310) (UDOT)

ADMINISTRATION (UDOT)

CACHE VALLEY TRANSIT: OPERATING

CEDAR CITY CORPORATION: OPERATING

GREYHOUND: (ICB) OPERATING

MOBILITY MANAGEMENT - OPERATING

PARK CITY TRANSIT: OPERATING

UINTAH BASIN AOG: OPERATING

CACHE VALLEY TRANSIT; ADMINISTRATION

CEDAR CITY CORPORATION - ADMINISTRATIONI

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

$21,278

$0

$642,992

$338,000

$190,116

$670,000

$1,180,176

$3,863,788

$305,000

$221,000

$66,500

$0

$376,796

$649,422

$341,380

$211,420

$676,700

$1,198,276

$3,962,284

$308,050

$357,136

$66,915

$0

$394,598

$655,916

$341,380

$211,420

$676,700

$1,198,276

$3,962,284

$308,050

$357,136

$66,500

$0

$394,598

$662,475

$341,380

$211,420

$676,700

$1,198,276

$3,962,284

$308,050

$357,136

$66,500

$0

$0

$1,351,582

$682,760

$422,840

$1,341,400

$2,396,552

$7,924,568

$617,000

$714,272

$133,000

$17,022

$0

$642,992

$169,000

$95,058

$335,000

$590,088

$1,931,894

$152,500

$176,800

$53,200

$0

$301,437

$649,422

$170,690

$105,710

$338,350

$599,138

$1,981,142

$154,025

$285,709

$53,532

$0

$315,678

$655,916

$170,690

$105,710

$338,350

$599,138

$1,981,142

$154,025

$285,709

$53,200

$0

$315,678

$662,475

$170,690

$105,710

$338,350

$599,138

$1,981,142

$154,025

$285,709

$53,200

$0

$0

$1,351,582

$341,380

$211,420

$670,700

$1,198,276

$3,962,284

$308,500

$571,418

$106,400

$4,256

$0

$0

$169,000

$95,058

$335,000

$590,088

$1,931,894

$152,500

$44,200

$13,300

$0

$75,359

$0

$170,690

$105,710

$338,350

$599,138

$1,981,142

$154,025

$71,427

$13,383

$0

$78,920

$0

$170,690

$105,710

$338,350

$599,138

$1,981,142

$154,025

$71,427

$13,300

$0

$78,920

$0

$170,690

$105,710

$338,350

$599,138

$1,981,142

$154,025

$71,427

$13,300

$0

$0

$0

$341,380

$211,420

$670,700

$1,198,276

$3,962,284

$308,500

$142,854

$26,600

FTA_5310_80

FTA_5311_100

FTA_5311_50%

FTA_5311_80

TRANSIT:Fund

Fund

Fund

Fund

Program Description

Program Description

Program Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

$21,278

$1,165,992

$3,962,387

$2,044,900

$1,247,216

$4,041,500

$7,171,556

$23,675,208

$1,846,150

$2,006,680

$399,415

$17,022

$932,794

$3,962,387

$1,022,450

$623,608

$2,020,750

$3,585,778

$11,837,604

$923,075

$1,605,344

$319,532

$4,256

$233,198

$0

$1,022,450

$623,608

$2,020,750

$3,585,778

$11,837,604

$923,075

$401,336

$79,883

Page 150: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 214 of 217

TRANSIT - RURAL

TRANSIT - RURAL

CEDAR CITY CORPORATION - CONSTRUCTION

CEDAR CITY CORPORATION: CAPITAL (RURAL)

ELEVATED TRANSIT (ICB) MOBILITY MANAGEMENT - CAPITAL (RURAL)

PARK CITY TRANSIT - ADMINISTRATION

PARK CITY TRANSIT - CAPITAL (RURAL)

PARK CITY TRANSIT: CONSTRUCTION

UINTAH BASIN AOG - CAPITAL (RURAL)

UINTAH BASIN AOG: ADMINISTRATION

UINTAH BASIN AOG: COMMUNICATIONS EQUIP

CACHE VALLEY TRANSIT - CAPITAL (RURAL)

CEDAR CITY CORPORATION: CAPITAL (RURAL)

PARK CITY TRANSIT - CAPITAL (RURAL)

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

$0

$4,863

$0

$114,739

$0

$2,153,533

$0

$220,000

$35,600

$1,214,346

$50,000

$0

$0

$0

$250,000

$115,887

$1,966,629

$0

$0

$222,200

$0

$0

$50,000

$407,500

$200,000

$0

$250,000

$115,887

$584,006

$0

$360,000

$222,200

$0

$0

$0

$1,562,500

$0

$0

$250,000

$115,887

$1,201,503

$0

$0

$222,200

$0

$0

$0

$1,562,500

$0

$0

$500,000

$231,774

$0

$0

$0

$444,400

$0

$0

$0

$0

$0

$3,890

$0

$91,791

$0

$1,722,826

$0

$176,000

$28,480

$971,477

$40,000

$0

$0

$0

$200,000

$92,710

$1,573,303

$0

$0

$177,760

$0

$0

$40,000

$326,000

$160,000

$0

$200,000

$92,710

$467,205

$0

$288,000

$177,760

$0

$0

$0

$1,250,000

$0

$0

$200,000

$92,710

$961,202

$0

$0

$177,760

$0

$0

$0

$1,250,000

$0

$0

$400,000

$185,419

$0

$0

$0

$355,520

$0

$0

$0

$0

$0

$973

$0

$22,948

$0

$430,707

$0

$44,000

$7,120

$242,869

$10,000

$0

$0

$0

$50,000

$23,177

$393,326

$0

$0

$44,440

$0

$0

$10,000

$81,500

$40,000

$0

$50,000

$23,177

$116,801

$0

$72,000

$44,440

$0

$0

$0

$312,500

$0

$0

$50,000

$23,177

$240,301

$0

$0

$44,440

$0

$0

$0

$312,500

$0

$0

$100,000

$46,355

$0

$0

$0

$88,880

$0

$0

$0

$0

FTA_5311_80

FTA_5339_80

TRANSIT:Fund

Fund

Program Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

$200,000

$4,863

$1,250,000

$694,174

$3,752,138

$2,153,533

$360,000

$1,331,000

$35,600

$1,214,346

$100,000

$3,532,500

$160,000

$3,890

$1,000,000

$555,339

$3,001,710

$1,722,826

$288,000

$1,064,800

$28,480

$971,477

$80,000

$2,826,000

$40,000

$973

$250,000

$138,835

$750,428

$430,707

$72,000

$266,200

$7,120

$242,869

$20,000

$706,500

Page 151: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 215 of 217

TRANSIT - RURAL

TRANSIT - SMALL URBAN

SALT LAKE OGDEN URBANIZED AREA

SALT LAKE/OGDEN/LAYTON URBANIZED AREA

TRANSIT - GREEN/ ENERGY REDUCTION GRANT

TRANSIT - NEW CONSTRUCTION (UNFUNDED)

PARK CITY TRANSIT: CONSTRUCTION

SUN TRANS ST. GEORGE - CONSTRUCTION

SUN TRANS ST. GEORGE: CAPITAL (RURAL)

CACHE VALLEY TRANSIT: CAPITAL (SMALL URBAN)

SUN TRANS ST. GEORGE - CAPITAL (SMALL URBAN)

OGDEN INTERMODAL TERMINAL TO WEBER STATE UNIVERSITY CORRIDOR

ELECTRIC CHARGING STATIONS AT TWO PARK AND RIDE LOTS

MOUNTAIN VIEW CORRIDOR (5600 WEST BRT PROJECT)

SUGARHOUSE STREETCAR EXTENSION - STUDY

TRANSIT ORIENTED DEVELOPMENT

CAPACITORS ON LRT LINES TO STORE/USE ENERGY

CLEARFIELD CIRCULATORS

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

UTAH DEPT. OF TRANSPORTATION

WFRC UTA PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

WFRC UTA PROJECT

UTA WFRC PROJECT

$295,029

$0

$0

$391,174

$0

$0

$62,500

$25,000,000

$500,000

$0

$0

$0

$0

$37,500

$1,067,500

$398,543

$0

$0

$0

$0

$0

$6,250,000

$2,000,000

$0

$0

$0

$0

$0

$398,543

$0

$0

$7,500,000

$0

$6,250,000

$0

$0

$0

$0

$0

$0

$398,543

$0

$0

$75,000,000

$0

$6,250,000

$0

$3,000,000

$0

$0

$0

$0

$0

$93,750,000

$250,000

$59,500,000

$0

$12,500,000

$0

$0

$236,023

$0

$0

$312,939

$0

$0

$50,000

$20,000,000

$400,000

$0

$0

$0

$0

$30,000

$854,000

$318,834

$0

$0

$0

$0

$0

$5,000,000

$1,600,000

$0

$0

$0

$0

$0

$318,834

$0

$0

$6,000,000

$0

$5,000,000

$0

$0

$0

$0

$0

$0

$318,834

$0

$0

$60,000,000

$0

$5,000,000

$0

$2,400,000

$0

$0

$0

$0

$0

$75,000,000

$200,000

$47,600,000

$0

$10,000,000

$0

$0

$59,006

$0

$0

$78,235

$0

$0

$12,500

$5,000,000

$100,000

$0

$0

$0

$0

$7,500

$213,500

$79,709

$0

$0

$0

$0

$0

$1,250,000

$400,000

$0

$0

$0

$0

$0

$79,709

$0

$0

$1,500,000

$0

$1,250,000

$0

$0

$0

$0

$0

$0

$79,709

$0

$0

$15,000,000

$0

$1,250,000

$0

$600,000

$0

$0

$0

$0

$0

$18,750,000

$50,000

$11,900,000

$0

$2,500,000

$0

$0

FTA_5339_80

FTA_ILL

TRANSIT:Fund

Fund

Program Description

Program Description

Program Description

Program Description

Program Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

$295,029

$37,500

$1,067,500

$789,717

$797,086

$93,750,000

$312,500

$167,000,000

$500,000

$31,250,000

$2,000,000

$3,000,000

$236,023

$30,000

$854,000

$631,774

$637,669

$75,000,000

$250,000

$133,600,000

$400,000

$25,000,000

$1,600,000

$2,400,000

$59,006

$7,500

$213,500

$157,943

$159,417

$18,750,000

$62,500

$33,400,000

$100,000

$6,250,000

$400,000

$600,000

Page 152: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 216 of 217

TRANSIT - NEW CONSTRUCTION (UNFUNDED)

TRANSIT - NEW SERVICE

DRAPER TO UTAH COUNTY LIGHT RAIL (124TH SO. TO 146TH SO.)

FOOTHILL DRIVE BRT - STUDY

MOUNTAIN TRANSPORTATION IMPROVEMENTS - STUDY

PLEASANT VIEW TO BRIGHAM CITY TRANSIT IMPROVEMENT - ROW

PLEASANT VIEW TO BRIGHAM CITY TRANSIT IMPROVEMENTS - CONSTR.

SALT LAKE CITY DOWNTOWN CIRCLATOR - STUDY

SANDY/SOUTH JORDAN CIRCULATOR

SOUTH DAVIS TRANSIT IMPLEMENTATION

TAYLORSVILLE/MURRAY TRANSIT IMPROVEMENTS

3500 SOUTH BUS RAPID TRANSIT (BRT) PHASE III

9400 SOUTH EAST-WEST TRANSIT IMPROVEMENTS - STUDY

INTELLIGENT TRANSPORTATION SYSTEMS

CLEAN FUEL BUS PROGRAM (HYBRID ELECTRIC) 45 BUSES

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

UTA WFRC PROJECT

WFRC UTA PROJECT

$0

$250,000

$0

$0

$0

$500,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$4,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$32,500,000

$4,000,000

$0

$10,000,000

$0

$0

$0

$250,000

$0

$0

$0

$75,000,000

$5,000,000

$0

$4,000,000

$0

$10,000,000

$9,734,400

$470,500,000

$0

$500,000

$17,500,000

$100,000,000

$0

$62,500,000

$75,000,000

$0

$0

$2,000,000

$10,000,000

$20,652,504

$0

$200,000

$0

$0

$0

$400,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$3,200,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$26,000,000

$3,200,000

$0

$8,000,000

$0

$0

$0

$200,000

$0

$0

$0

$60,000,000

$4,000,000

$0

$3,200,000

$0

$8,000,000

$7,787,520

$376,400,000

$0

$400,000

$14,000,000

$80,000,000

$0

$50,000,000

$60,000,000

$0

$0

$1,600,000

$8,000,000

$16,522,003

$0

$50,000

$0

$0

$0

$100,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$800,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$6,500,000

$800,000

$0

$2,000,000

$0

$0

$0

$50,000

$0

$0

$0

$15,000,000

$1,000,000

$0

$800,000

$0

$2,000,000

$1,946,880

$94,100,000

$0

$100,000

$3,500,000

$20,000,000

$0

$12,500,000

$15,000,000

$0

$0

$400,000

$2,000,000

$4,130,501

FTA_ILLTRANSIT:

FundProgram Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

Match

$470,500,000

$250,000

$750,000

$17,500,000

$100,000,000

$500,000

$137,500,000

$80,000,000

$32,500,000

$12,000,000

$2,000,000

$30,000,000

$30,386,904

$376,400,000

$200,000

$600,000

$14,000,000

$80,000,000

$400,000

$110,000,000

$64,000,000

$26,000,000

$9,600,000

$1,600,000

$24,000,000

$24,309,523

$94,100,000

$50,000

$150,000

$3,500,000

$20,000,000

$100,000

$27,500,000

$16,000,000

$6,500,000

$2,400,000

$400,000

$6,000,000

$6,077,381

Page 153: SECTION IX TRANSPORTATION IMPROVEMENT PROGRAM (TIP) … · 2017-12-28 · STIP Planning Fund Table UDOT electronic Program Management Page 1 epm381_plan_fund (v 1.0) Report run on:

Statewide Transportation Improvement ProgramUDOT electronic Program Management

Report Run on: Oct 28, 2014, 04:40 P.M.STIP 2015-2020

FINAL

epm345_stip_report (v 3.1)

FHWA/FTA APPROVED 1 October 2014

Page 217 of 217

SALT LAKE OGDEN URBANIZED AREA

SALT LAKE/OGDEN/LAYTON URBANIZED AREA

TRANSIT - UTAH COUNTY SERVICE AREA

SALT LAKE URBANIZED AREA

SALT LAKE/OGDEN/LAYTON URBANIZED AREA

PURCHASE 88 CNG,ELEC, HYBRID REPLACEMENT BUSES/ EQUIP

REPLACE 202 PARATRANSIT VEHICLES & RELATED EQUIPMENT

PURCHASE 234 CNG,ELEC, HYBRID REPLACEMENT BUSES/ EQUIP

PURCHASE 25 REPLACEMENT BUSES (CLEAN FUEL) - APPROX 5 BUSES PER/YR (MA

CENTRAL GARAGE CONSTRUCTION, INCLUDE CNG FUELING FACILITY

CENTRAL GARAGE CONSTRUCTION, INCLUDE CNG FUELING FACILITY

WFRC UTA PROJECT

WFRC UTA PROJECT

WFRC UTA PROJECT

UTA MAG PROJECT

WFRC UTA PROJECT

UTA WFRC PROJECT

$7,680,729

$4,648,254

$12,651,490

$2,403,570

$0

$7,500,000

$7,963,129

$5,292,112

$26,065,354

$2,499,713

$0

$7,500,000

$8,221,654

$5,474,040

$18,778,776

$2,611,140

$0

$0

$8,612,920

$5,902,130

$27,726,127

$2,673,808

$0

$0

$18,273,170

$12,053,230

$42,612,564

$2,766,768

$3,217,848

$0

$0

$0

$0

$0

$0

$7,500,000

$0

$0

$0

$0

$0

$7,500,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$3,000,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$217,848

$0

LOCAL_GOVT

STP_URB_SL

TIGGER

TRANSIT:Fund

Fund

Fund

Program Description

Program Description

Program Description

Program Description

Program Description

Total2015 2016 2017 2018 CD

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Federal Aid

Match

Match

Match

Match

Match

Match

$50,751,602

$33,369,766

$127,834,311

$12,954,999

$3,217,848

$15,000,000

$0

$0

$0

$0

$3,000,000

$15,000,000

$0

$0

$0

$0

$217,848

$0