September 2018 Public Draft CHAPTER 7 UTILITIES I. INTRODUCTION The Utilities chapter addresses both private and public utility services within Thurston County over the next 20 years. Goals and policies within this chapter cover issues relating to private utilities, including those that provide power and telecommunications, as well as goals and level of service (LOS) standards for the County‐operated utility functions of solid waste, stormwater, drinking water and sewer. Virtually all land uses require one or more of the utilities discussed in this Chapter. Local land use decisions and regulatory mandates drive the need for new or expanded utility facilities. In other words, utilities follow growth. Expansion of the utility systems is a function of the demand for reliable service that people, their land uses, and activities place on the systems. 2018 Update: Critical IssuesWater is obtained from private and public systems. Key challenges and opportunities facing utility services in Thurston County over the next 20 years include: Responding to rapidly changing technology and consumer needs, while maintaining a system of aging infrastructure Ensuring rural areas of the county have sufficient access to communication technology to support economic opportunity, such as home‐ based businesses Supporting the development of infrastructure to enable the widespread integration of renewable energy sources Balancing the desire for greater access to utilities, such as wireless services, with the impacts of locating the physical infrastructure for such utilities Ensuring Commented [KC1]: Existing text, Moved up in the chapter

Upload: others

Post on 14-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: September 2018 Public Draft CHAPTER 7 UTILITIES

September2018PublicDraft

CHAPTER 7 UTILITIES

I. INTRODUCTION

TheUtilitieschapteraddressesbothprivateandpublicutilityserviceswithinThurstonCountyoverthenext20years.Goalsandpolicieswithinthischaptercoverissuesrelatingtoprivateutilities,includingthosethatprovidepowerandtelecommunications,aswellasgoalsandlevelofservice(LOS)standardsfortheCounty‐operatedutilityfunctionsofsolidwaste,stormwater,drinkingwaterandsewer.

VirtuallyalllandusesrequireoneormoreoftheutilitiesdiscussedinthisChapter.Locallandusedecisionsandregulatorymandatesdrivetheneedforneworexpandedutilityfacilities.Inotherwords,utilitiesfollowgrowth.Expansionoftheutilitysystemsisafunctionofthedemandforreliableservicethatpeople,theirlanduses,andactivitiesplaceonthesystems.

2018 Update: Critical IssuesWater is obtained from private and public systems. KeychallengesandopportunitiesfacingutilityservicesinThurstonCountyoverthenext20yearsinclude:

Respondingtorapidlychangingtechnologyandconsumerneeds,whilemaintainingasystemofaginginfrastructure

Ensuringruralareasofthecountyhavesufficientaccesstocommunicationtechnologytosupporteconomicopportunity,suchashome‐basedbusinesses

Supportingthedevelopmentofinfrastructuretoenablethewidespreadintegrationofrenewableenergysources

Balancingthedesireforgreateraccesstoutilities,suchaswirelessservices,withtheimpactsoflocatingthephysicalinfrastructureforsuchutilities

Ensuring

Commented [KC1]: Existing text, Moved up in the chapter

Page 2: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐2

sufficientwasteandwatermanagementininplacetosupportagrowingpopulation.

GrowthManagementRequirements

ThischapterhasbeendevelopedinaccordancewiththeStateGrowthManagement(GMA)GoalsandCountyWidePlanningPolicies,andiscoordinatedwithotherchaptersoftheComprehensivePlan.GoalsandPolicieswithinthischapteraddressissuesrelatingtoprivateutilities,aswellasthoseaddressingtheCountyutilityfunctionsofstormwater,waterandsewer,andsolidwaste.

TheGrowthManagementAct(GMA)requiresthattheutilitieselementshall,atminimum,consistof“thegenerallocation,proposedlocation,andcapacityofallexistingandproposedutilities,includingbutnotlimitedto,electricallines,telecommunicationlinesandnaturalgaslines.”Inaddition,theStateguidelinesforimplementingtheGMA(Chapter365‐196‐420WAC)statethatpoliciesshouldbeadoptedwhichcallfor:

1. Jointuseoftransportationrights‐of‐wayandutilitycorridors,wherepossible;

2. Timelyandeffectivenotificationofinterestedutilitiesofroadconstruction,andofmaintenanceandupgradesofexistingroadstofacilitatecoordinationofpublicandprivateutilitytrenchingactivities;and

3. Considerationofutilitypermitssimultaneouslywiththeproposalsrequestingserviceand,whenpossible,approvalofutilitypermitswhentheprojecttobeservedisapproved.

ForCounty‐ownedandoperatedutilities,abriefoverviewofeachutilityisincludedinthischapter.Formoreinformationontheindividualplansforeach,pleasecontacttheirdepartmentorseetheirwebsiteforalistofthoseplans.AdditionalinformationonfutureprojectsregardingtheseutilitiesisfoundinthemostrecentlyadoptedCapitalFacilitiesPlan.

“”

Commented [AO2]: Moved into sidebar

Page 3: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐3

II. PLANNING CONTEXT FOR UTILITIES

ThischapterhasbeendevelopedinaccordancewithstateGrowthManagement(GMA)goals,andiscoordinatedwithotherchaptersoftheComprehensivePlan.

A. COUNTY WIDE PLANNING POLICIES TheCountyWidePlanningPoliciesincludeprovisionstoenablecoordinatedplanningforbothprivateandpublicutilitiesacrossjurisdictionsinThurstonCounty.Thesepoliciesfocusonencouragingandaccommodatingdevelopmentinurbanareasinwaysthatcanbestsupportandbesupportedbyutilities,andensuringdevelopmentinruralareascanbesupportedbyminimal,non‐urbanutilitiesandservices.

Maximizetheuseofexistinginfrastructureandassets,andleveragingthevalueoftheseinbuildingvital,healthy,andeconomicallyviablecommunities(3.2a)

Whereurbanservices&utilitiesarenotyetavailable,requiredevelopmenttobeconfiguredsourbangrowthareasmayeventuallyinfillandbecomeurban.(3.1h)

Provideandmaintainmunicipalservices(water,sewer,solidwaste,publicsafety,transportation,andcommunicationnetworks)inasustainable,andcost‐effectivemanner.(3.2d)

Phaseextensionsofurbanservicesandfacilitiesconcurrentwithdevelopmentandprohibitextensionsofurbanservicesandfacilities,suchassewerandwater,beyondurbangrowthboundariesexcepttoserveexistingdevelopmentinruralareaswithpublichealthorwaterqualityproblems.(3.2g)

Identify,inadvanceofdevelopment,sitesfor…majorstormwaterfacilities…andotherpublicassets.Acquisitionofsitesforthesefacilitiesshalloccurinatimelymannerandasearlyaspossibleintheoveralldevelopmentofthearea.(3.2h)

Providecapacitytoaccommodateplannedgrowthbyassuringthateachjurisdictionwillhaveadequatecapacityin…privateutilities,stormdrainagesystems,municipalservices…toservegrowththatisplannedforinadoptedlocalcomprehensiveplans.(3.4a)

Protectgroundwatersuppliesandmaintaingroundwaterinadequatesupplybyidentifyingandreservingfuturesupplieswellinadvanceofneed.(3.4b)

ThesepoliciesareespeciallyapplicabletoUrbanGrowthAreas,thoughsomeapplythroughouttheunincorporatedareasofThurstonCounty.

B. GROWTH MANAGEMENT ACT: THE GROWTH MANAGEMENT ACT (GMA) REQUIRES THAT LOCAL COMPREHENSIVE PLANS INCLUDE A UTILITIES ELEMENT. ACCORDING TO THE ACT, THE UTILITIES ELEMENT SHALL, AT MINIMUM, CONSIST OF “THE GENERAL LOCATION, PROPOSED LOCATION, AND CAPACITY OF ALL EXISTING AND PROPOSED UTILITIES, INCLUDING BUT NOT LIMITED TO, ELECTRICAL LINES, TELECOMMUNICATION LINES AND NATURAL GAS LINES.”

IN ADDITION, THE STATE GUIDELINES FOR IMPLEMENTING THE GMA (CHAPTER 365-195 WAC) STATE THAT POLICIES SHOULD BE ADOPTED WHICH CALL FOR:

Page 4: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐4

1. JOINT USE OF TRANSPORTATION RIGHTS-OF-WAY AND UTILITY CORRIDORS, WHERE POSSIBLE;

2. TIMELY AND EFFECTIVE NOTIFICATION OF INTERESTED UTILITIES OF ROAD CONSTRUCTION, AND OF MAINTENANCE AND UPGRADES OF EXISTING ROADS TO FACILITATE COORDINATION OF PUBLIC AND PRIVATE UTILITY TRENCHING ACTIVITIES; AND

3. CONSIDERATION OF UTILITY PERMITS SIMULTANEOUSLY WITH THE PROPOSALS REQUESTING SERVICE AND, WHEN POSSIBLE, APPROVAL OF UTILITY PERMITS WHEN THE PROJECT TO BE SERVED IS APPROVED.

COUNTY-WIDE PLANNING POLICIES: THE ADOPTED COUNTY-WIDE PLANNING POLICIES INCLUDES THE FOLLOWING POLICY RELATED TO PRIVATE UTILITIES:

“THURSTON COUNTY AND CITIES AND TOWNS WILL...PROVIDE CAPACITY TO ACCOMMODATE PLANNED GROWTH BY: ASSURING THAT EACH JURISDICTION WILL HAVE ADEQUATE CAPACITY IN...PUBLIC AND PRIVATE UTILITIES...TO SERVE GROWTH THAT IS PLANNED FOR IN ADOPTED LOCAL COMPREHENSIVE PLANS.”

REGULATORY AUTHORITIESY: TheprimaryregulatoryagencyformostprivateutilitiesinWashingtonStateistheWashingtonUtilitiesandTransportationCommission(WUTC),astateagency.TheWUTCensuresthatsafeandreliableserviceisprovidedtocustomersatreasonableratesservicesofregulatedcompaniesaresafe,available,reliableandfairlypriced.TheCommissionregulatestheratesandcharges,services,facilities,andpracticesofmostofWashington’sinvestor‐ownedgas,electricandtelecommunicationutilities.

AsdefinedbytheWUTC,someutilitiesareconsideredacriticalservice,namelyelectricityandstandardtelephone,andmustbeprovided“upondemand.”.Inordertofulfillpublicserviceobligations,theseutilityprovidersmustplantoextendoraddtotheirfacilitieswhenneeded.Ontheotherhand,nNaturalgasisnotconsideredanecessity,butratherautilityofconvenience.AllutilitiesregulatedbytheWUTCareprohibitedfrompassingthecostofnewconstructionontotheexistingratebase.

Telecommunicationsservicesareregulatedbyseveralentities,includingtheFederalCommunicationsCommission(FCC)andtheWUTC.ThurstonCountyhassomeregulatoryauthorityovertelecommunicationsservicesthroughfranchisesandthedevelopmentapprovalprocess,howeverrecentchangestoFCCruleshavelimitedlocaldiscretionoverthelocationofcommunicationinfrastructure. Commented [AO3]: Note wireless limitations of local

authority

Page 5: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐5

Localgovernment,too,hasaroleinregulatingforcertainprivateutilities,suchasfranchiseagreementswithcablecompanies.However,theeffortbehindmeetingGrowthManagementActrequirementsisnotprimarilyregulatory,ratheritistopromotecoordinationandcooperationbetweenjurisdictionsandutilityproviders.

C. LEVEL OF SERVICE (LOS) STANDARDS Levelofservice(LOS)standardsareusedtoevaluatewhetherafacilityorutilityismeetingthebasicneedsandexpectationsofthecommunity.Typically,LOSstandardsareestablishedtoprovideaquantitativegoalfortheamountofserviceorfacilitythatisexpectedtobeavailable.SomeLOSStandardsarebasedonnationalandstatestandards,whileotherscanbeinfluencedbycitizeninputandrecommendations.LOSStandardsforpublicutilitieshelpdeterminewheninvestmentinafacilityisneededtomeetcommunitydemand,andhelpdriveprojectstobeincludedintheCapital

RenewableEnergy

ThepassageofStateInitiative937inRCW19.285,requiresalllargeutilitiestoobtainfifteenpercentoftheirelectricityfromnewrenewableresourcessuchassolarandwindby2020andundertakecost‐effectiveenergyconservation.

ThurstonCountyhasalsoadoptedanEnergyEfficiencyandConservationStrategy,designedtocombat climate change. The plan includes strategies tomakeThurstonCounty governmentbuildingsandoperationsmoreenergy‐efficient,aswellaspromoteenergy‐efficiencyinnewconstruction, land‐use, transportation, and the management of natural resources withinunincorporatedareasofthecounty.

TheCountyW‐widePlanningPoliciesalsoincludeapolicyformorerenewableenergieswithinThurstonCounty:

1.12 Champion energy efficiency and renewable energy strategies that contribute toenergy independence, economic stability, reduced climate impacts, and long‐termhouseholdandcommunityhealth.

Page 6: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐6

FacilitiesPlan(Chapter6).Forcounty‐ownedandoperatedutilities,moreelaborateinformationthancouldbeincludedinthisplanisavailableintheindividualplansforeachutility(water,sewer,solidwaste,stormwater,etc.).SeeAppendixCforalistofthoseplans.Additionalinformationonfutureprojectsregardingtheseutilitiesisfoundinthemostrecentlyadoptedcapitalfacilitiesplan.Telecommunications:Telecommunicationtechnologieshavechangedrapidlyinthepastdecade,andwillcontinuetochangeasnewtechnologiesemerge.Inthecomingyears,thetelecommunicationsystemmaymakelittledistinctionbetweencable,telephoneandcellular.Telecommunicationservicesincludevoice,data,videoandothercommunicationservicesonvariousmediumsincluding,butnotlimitedto,wire,fiberopticorradiowave.

Expandedtelephoneandcableavailabilityandtechnologyhaveincreasedcompetitionintheindustry.Effectivetelecommunicationsservicesarecriticaltoresidentsinseveralways.Theypromoteandenhanceindividualinformationexchange,contributetoarobustregionaleconomy,andaffordnumerouspublicservices,includingdeliveryofemergencyservices,educationandopportunitiesforcommunityinvolvement.

Telecommunicationsservicesareregulatedbyseveralentities,includingtheFederalCommunicationsCommissionandtheWashingtonUtilitiesandTransportationCommission.ThurstonCountyhassomeregulatoryauthorityovertelecommunicationsservicesthroughfranchisesandthedevelopmentapprovalprocess.

Federalagenciesalsoplayaroleinregulatingsomeoftheseprivateutilities.Forexample,theFederalCommunicationsCommission(FCC)regulatestelecommunications.

TheFederalTelecommunicationsActof1996wasthefirstmajoroverhaulofthenation’stelecommunicationslawssincetheoriginalCommunicationsActof1934.TheActrecognizesemergingandconvergingtelecommunicationstechnologies,andsetsapolicytoencouragefuturedevelopment.Tohelpachievethis,theActbarslocalregulationsthathavetheeffectofprohibiting

Commented [KC4]: Moved into the ‘box’

Page 7: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐7

thesitingoftelecommunicationfacilitiessuchascellulartelephonetowers,ordiscriminatingamongserviceproviders.Balancingthisgoalhowever,theActspecificallyleavesinplacetheauthoritythatlocalzoningauthoritieshaveovertheplacementofcellulartelephonefacilities(alsocalledWirelessCommunicationFacilitiesinThurstonCounty’sZoningOrdinances).Inaddition,theActstatesthattheFederalCommunicationsCommission(FCC)shallregulatecellulartelephonefacilitiesregardingradiofrequencyradiation.AslongastheoperatorsofthosefacilitiescomplywiththeapplicableFCCregulations,stateandlocalgovernmentsarepreemptedfromtakingactionbasedonradiofrequencyemissions.

Thepurposeofthetelecommunicationspoliciesinthischapterareto:

(i)pProtectthepublichealth,safety,andwelfare;

P(ii)protectpropertyvalues;and

(iii)mMinimizevisualimpactwhilefurtheringthedevelopmentofenhancedtelecommunicationservicesintheCounty.

ThegoalsoftheCounty’stelecommunicationpoliciesandregulationsareto:(i)

EenhancetheabilityofwirelesscommunicationserviceproviderstoprovidesuchservicesthroughouttheCountyquickly,effectively,andefficiently;

(iiE)encouragewirelesscommunicationproviderstoco‐locateonnewandexistingtowersites;

(iii)eEncouragewirelesscommunicationproviderstolocatetowersandantennas,totheextentpossible,inareaswheretheadverseimpacttoCountyresidentsisminimal;and

(iv)Eencouragewirelesscommunicationproviderstoconfiguretowersandantennasinawaythatminimizesanysignificantadversevisualimpact.

IN ADDITION, THE FEDERAL ENERGY REGULATORY COMMISSION (FERC), AN INDEPENDENT COMMISSION WITHIN THE U.S. DEPARTMENT OF ENERGY, SETS RATES AND CHARGES FOR THE TRANSPORTATION AND SALE OF NATURAL GAS, AND FOR THE TRANSPORTATION OF OIL BY PIPELINE, FOR THE TRANSMISSION AND SALE OF ELECTRICITY, AND THE LICENSING OF HYDROELECTRIC POWER PROJECTS.

LOCAL GOVERNMENT, TOO, HAS A ROLE IN REGULATING FOR CERTAIN PRIVATE UTILITIES, SUCH AS FRANCHISE AGREEMENTS WITH CABLE COMPANIES.III HOWEVER, THE EFFORT BEHIND MEETING GROWTH MANAGEMENT ACT REQUIREMENTS IS NOT PRIMARILY REGULATORY, RATHER IT IS TO PROMOTE COORDINATION AND COOPERATION BETWEEN JURISDICTIONS AND UTILITY PROVIDERS.

VIRTUALLY ALL LAND USES REQUIRE ONE OR MORE OF THE PRIVATE UTILITIES DISCUSSED IN THIS CHAPTER. LOCAL LAND USE DECISIONS DRIVE THE NEED FOR NEW OR EXPANDED UTILITY FACILITIES. IN OTHER WORDS, PRIVATE UTILITIES FOLLOW GROWTH. EXPANSION OF THE UTILITY SYSTEMS IS A FUNCTION OF THE DEMAND FOR RELIABLE SERVICE THAT PEOPLE, THEIR LAND USES, AND ACTIVITIES PLACE ON THE SYSTEMS.

IN THURSTON COUNTY, PRIVATE UTILITIES ARE CURRENTLY PROVIDED BY THE FOLLOWING COMPANIES:

Commented [AO5]: Move

Commented [KC6]: Moved to earlier section

Page 8: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐8

ELECTRICITY: PUGET SOUND ENERGY

NATURAL GAS: PUGET SOUND ENERGY

STANDARD TELEPHONE: TENINO TELEPHONE COMPANY

QWEST COMMUNICATIONS

YCOM NETWORKS

CELLULAR TELEPHONE: VARIOUS PROVIDERS

CABLE: COMCAST

THE BONNEVILLE POWER ADMINISTRATION (BPA), A POWER MARKETING AGENCY OF THE U.S. FEDERAL GOVERNMENT, OWNS AND OPERATES THE PRINCIPLE HIGH VOLTAGE TRANSMISSION LINES SERVING THE PUGET SOUND REGION. IN ADDITION, WILLIAMS PIPELINE CORPORATION (“WILLIAMS”) OWNS AND OPERATES AN EXTENSIVE INTERSTATE PIPELINE SYSTEM WHICH PROVIDES NATURAL GAS TO THE REGION. BOTH BPA TRANSMISSION LINES AND “WILLIAMS” PIPELINES RUN THROUGH THURSTON COUNTY AS SHOWN ON MAP M-44.

II. EXISTING FACILITIES

III. PRIVATE UTILITIES

InordertTomeettheGMArequirementthatexistingutilityfacilitiesbeidentified,thefollowinglistinformationisprovidedforontheexistingandproposedlocations,aswellasthecapacityofbothprivateandpublicutilitiestomeettheGMArequirement..Inaddition,MapM‐44showsexistingelectricalandnaturalgasfacilities,whileMapM‐45showsexistingtelecommunicationsservice.Thereisgreatvariabilityinthelevelofdetailprovidedforfutureutilityfacilities.Thisisbecausesomeutilities,likePugetSoundEnergy,havedoneextensivefutureplanningwhileothershavedonemuchless.Morecurrentandcompleteinformationmaybeavailablebycontactingtherelevantcompany.

StatelawmandatesthatelectricandgaspublicservicecompaniesprovidethesamelevelofserviceLOSonauniformbasis,regardlessoflocation.(RevisedCodeofWashington80.28.110).

Asof2018,iInThurstonCounty,privateutilitiesarecurrentlyprovidedbythefollowingcompanies:

Electricity: PugetSoundEnergy

NaturalGas: PugetSoundEnergy

StandardTelephone: VariousProviders

CellularTelephone: VariousProviders

Cable: Comcast

Page 9: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐9

A. ELECTRICITY: Utility Provider: Puget Sound Energy TheelectricalserviceproviderinThurstonCountyandtheunincorporatedareasisPugetSoundEnergy(PSE).PSEservesover1,000,000customerswithelectricalserviceineightWashingtoncounties.InThurstonCounty,PSEservesapproximately119,300electricalcustomers.Electricserviceisconsideredacriticalservice;thus,PSEisrequiredtoprovideservicetocustomerswhoapplyandcanbesuitablyfurnishedwithavailableelectricity.

PSEobtainsandgeneratesitselectricityfromseveralsources:renewablessuchashydro,wind,solar,andco‐generation;andelectricitygeneratedfromcoal,gas,andoil‐firedplants.PSEisalsoanationalleaderinwindpowerandisrecognizedasthesecondlargestutilityownerofwindenergyfacilitiesintheUnitedStates.

PSEPower‐deliveryfacilitiesinThurstonCounty,asof20121:

1,538milesofoverheaddistributionlines 1,231milesofundergroundcable 182milesofhigh‐voltagetransmissionlines 30distributionsubstations Sixtransmissionsubstations

Proposed Facilities ThefollowinglistisasummaryofPugetSoundEnergyproposedfacilitiesforThurstonCounty.Formoredetailsontheseproposedfacilities,pleaseseethePugetSoundEnergy2017IntegratedResourcePlan(IRP),aforecastofconservationresourcesandsupply‐sideresourcetomeetgrowingneedsofPSEcustomersoverthenext20years2.PSEdeliverysysteminfrastructureplanningisdoneona10‐yearbasis,andthoseplansareupdatedcontinuallyasconditions,technologiesandcustomerbehaviorchange.

AlthoughtheIRPisnotspecifictoThurstonCounty,PSEanticipatesfutureimprovementswillbenefittheirservicenetworkregionwide.

Transmission:statewide

Inthenextdecade,PSEanticipatesbuildingapproximately104‐plusmilesofnewtransmissionlines(100kVandabove)andupgradingover122milesofexistingtransmissionlines.Inaddition,PSEanticipatesneedingtoadduptothree230kVbulkpowersubstationsacrossourservicearea.Theseplannedimprovementsdonotincludetransmissionneededtosupportthebroaderregionorimprovementsneededasaresultofprovidinginterconnectionsforlargegenerationresources.FuturetransmissionprojectsintheThurstonCountyregioninclude:

1 PSE and Thurston County working together: Profile 2 2017 PSE Integrated Resource Plan. https://pse.com/aboutpse/EnergySupply/Pages/Resource-Planning.aspx

Page 10: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐10

SpurgeonCreekTransmissionSubstationDevelopment(Phase2)

EstimatedDateofOperation:2020

InPhase2,thisprojectwillimprovethereliabilityoftransmissionservicetothecitiesofLacey,OlympiaandTumwaterbyloopingthefuturetransmissiontapextensionfromOlympiaviatheAirportsubstationtoSpurgeonCreek.ThisprojectalsoloopsintheOlympia–StClair#1115kVlineintoSpurgeonCreek.

Woodland–St.Clair115kV(Phase2)

EstimatedDateofOperation:2021+

ThisprojectwillincreasethetransmissionintertiecapabilityandreliabilitybetweenPierceandThurstoncountiesbyaddingathirdtransmissionintertiebetweenPierceandThurstonCountieswithconstructionoftheremaining8miles115kVlinebetweenGravellyLakeandWoodlandsubstations.

Distribution:statewideInthenextdecade,PSEanticipatestheneedtobuildapproximately6to8newdistributionsubstationstoserveloadasexistingsubstationcapacityisexceededandanother2to4newsubstationstoservespecificpointloads.Theyalsoanticipateupgradingapproximately3existingsubstationstoreplaceaginginfrastructureandaddingadditionalcapacitytoservelocalloadgrowth.Intotal,theneworexpandedsubstationswillrequire32to48newdistributionlines.PSEwillcontinueworkonimprovingreliabilityofitsworstperformingcircuitsaswellasinstallingsmartreadyequipmentforincreasingtheresiliencyofthegrid.

OngoingMaintenance:statewideBaseduponcurrentprojectionsandpastexperience,inthenextdecadePSEexpectstoreplace1,800milesofundergroundhighmolecularweight,failure‐pronedistributioncable,approximately1,000transmissionand10,000distributionpoles.Additionally,PSEanticipatesreplacementofseveralmajorsubstationcomponentsasaresultofongoinginspectionanddiagnostics.PSEanticipatesreplacementofitscurrentagingandobsoleteAutomatedMeterReading(AMR)communicationsystemaswellasitselectriccustomermeterswithAdvancedMeteringInfrastructure(AMI)technologytoenablesmartgridenhancementsandcustomerofferingsinthefuture.

ExistinngandproposedelectricalfacilitiesarebothlistedbelowandillustratedonMapM‐44.Formoredetailsonelectricalfacilities,pleasecontactthecompany.FormoredetailsontheseexistingPugetSoundEnergyfacilities,pleaseseetheThurstonCountyGrowthManagementActDraftElectricalFacilitiesPlanpreparedbyPugetSoundEnergy,whichisthesourceforthefollowingsummaryinventoryofexistingelectricalfacilitiesfortheunincorporatedcountyasof2004.

1. GenerationFacilities:None

2. TransmissionSwitchingStations:None

3. TransmissionSubstation:St.Clair

4. DistributionSubstations:

Page 11: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐11

a. Griffin

b. Mottman

c. FriendlyGrove

d. PleasantGlade

e. LuhrBeach

f. Tanglewilde

h. Southwick

i. Patterson

j. McAllisterSprings

k. Longmire

l. Rochester

m. Chambers

n. OlympicVailPipeline

o. Yelm

5. TransmissionLines(230kV):None

6. TransmissionLines(115kV):

a. Olympia‐WestOlympia#1&2

b. BPAOlympia‐Olympia#1&2

c. Tono‐Olympia

d. Olympia‐Airport

e. Olympia‐St.Clair#1&2

f. WhiteRiver‐StClair

g. Blumaer‐St.Clair

h. ElectronHeights‐Blumaer

i. Rochester‐BlumaerTie

j. Tono‐Blumaer

7. TransmissionLines(Below115kV):

a. PlumStreet‐PleasantGlade(55kV)

b. St.Clair‐PleasantGlade(55kV)

Page 12: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐12

c. StClair‐FernHill(55kV)

B. NATURAL GAS: Utility Provider: Puget Sound Energy PugetSoundEnergy(PSE)operatesandmaintainsapproximately26,000milesofnaturalgasmainsandservicelinesinsixcountiescovering2,900squaremiles.About75percentofthenaturalgassystemconsistsofcorrosion‐resistantplasticpipingandtheremainderiscathodically‐protected,coatedsteelpipe.InThurstonCounty,PSEservesapproximately46,973naturalgascustomersthrough863milesofnaturalgaslines.

Naturalgasisconsideredautilityofconvenience,andisthereforenotamandatoryprovisionofservicebyPSE.PSEactivitiesassociatedwiththeprovisionofnaturalgasserviceareregulatedthroughfederalandstatelegislation.

Proposed Facilities PressureRegulationStations:statewideInthenextdecade,PSEplanstobuildorupgradeapproximately7NorthwestPipeline‐suppliedgateorlimitstationsand16districtregulatorstationstoserveloadasexistingstationcapacityisexceeded.

Pipelines:statewideInthenextdecade,PSEexpectstoaddapproximately24milesofhighpressuremainand23milesofintermediatepressuremainasloadsgrowinourservicearea.

OngoingMaintenance:statewideAswiththeelectricsystem,PSEiscontinuallyaddressingaginggasinfrastructurewithinthesysteminaccordancewithregulatoryrequirementsandoperatingpractices.Inthenextdecade,PSEplanstoreplace200to300milesofgasmainthatisreachingtheendofitsusefullife.PSEalsoanticipatesreplacingitscurrentagingandobsoleteAutomatedMeterReading(AMR)communicationsystemandgascustomermoduleswithAdvancedMeteringInfrastructure(AMI)technologytoenablesmartgridenhancementsandfuturecustomerofferings.

Existingandproposednaturalgasfacilitiesasof2004arebothlistedbelowandillustratedonMapM‐44.Formoredetailsonnaturalgasfacilities,pleasecontactthecompany.

1. GateStations:

a. WestOlympiaGateStation

b. LittlerockRoadGateStation

c. OlympiaTownBorderStation

d. YelmTownBorderStation

e. YelmGateStation

f. RainierGateStation

Page 13: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐13

2. DistrictRegulators:Thereareapproximately20districtregulatorsintheunincorporatedarea.

3. Highpressuresupplylinesprovidegastoareasthroughthedistrictregulators.Thereareapproximately230,000feetofcombined8”,6”,4”,and2”highpressuresupplylinesservingtheentireThurstonCountyarea.Togethertheselinesarecapableofsupplyingapproximately2millioncubicfeetperhourtoThurstonCounty.

4. Distributionmainsarefedfromthedistrictregulatorsandaretypically8,6,4,2,and1¼inchindiameterlines.Thereareapproximately750milesofdistributionmaininallofThurstonCounty.

5. Individualresidentialservicelinesaretypically5/8”indiameter.Individualcommercialandindustrialservicelinesaretypically1¼”or2”indiameter.

C. STANDARD TELEPHONE:

Utility Provider: Qwest Communications Telephone Company CenturyLink CenturyLlink,formerlyQuest,isthemainstandardtelephoneserviceproviderforunincorporatedThurstonCounty.CenturyLinkisaninvestor‐ownedcorporationofferinglocaltelecommunicationservicestocustomersin14states.Theyalsoprovidebroadbanddataandvoice(includinglong‐distance)communicationsservicesoutsidetheirlocalservicearea,aswellasglobally.Ascommunitiesgrow,facilitiesareupgradedtoensureadequateservicelevels.Facilitiesarealsoupgradedwithnewtechnologytomakeadditionalservicesavailable.

TherearethreeQwestCenturyLinkCommunicationscentralswitchingoffices(CO)servingThurstonCounty.Oneislocatedintheunincorporatedcounty,andtheothertwoarelocatedinOlympiaandLacey.ThethreeCO’sworktogethertoprovideservicetothatpartoftheunincorporatedareathatispartofQwestCenturyLink’sterritory.Fromtheswitchingstationsaremaincableroutes,branchfeederroutesandlocalloopsthatprovidedialtone...

CenturyLinkalsomaintainsabroadbandtelecommunicationsnetworkoveramixofopticalfiber,coaxialcableandcopperwire.CenturyLinkstatesthatitcurrentlyprovidestelecommunicationsservicetoThurstonCountyandiscommittedtocontinuingtoprovidestateoftheartservicesinthefuture.

Proposed Facilities CenturyLinkstatesthat,asof2018,itprovidestelecommunicationsservicetoamajorportionofThurstonCountyanddoesnotexpectdifficultiesincontinuingtoprovidethatservicetothefutureresidentsoverthenext20years.Fromtheswitchingstationsaremaincableroutes,branchfeederroutesandlocalloopsthatprovidedialtone.

Page 14: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐14

Utility Provider: Tenino Telephone Company TeninoTelephoneCompanyhasoneswitchingstationlocatedatcompanyheadquartersinTenino.ThecompanyservesnotonlytheCityofTeninobutalsopartoftheunincorporatedcountyaroundthecity.

Utility Provider: YCOM NetworksConsolidated Communications YCOMNetworksConsolidatedCommunications,formerlyYCOMandFairpoint,providesphoneandinternetservicestoruralandunincorporatedThurstonCounty.ServicesarefedcentrallyoutofYelm,alongwiththeregionalcentralofficeandswitchingstation.hasoneswitchingstationlocatedatcompanyheadquartersinYelm.

Proposed Facilities TeninoTelephoneCompanyandConsolidatedCommunicationsbothstatethatwithintheirserviceareastheycanincreasecapacityindefinitelyanddonotforeseeanyproblemsinprovidingtelephoneservicetocustomersintheirareasoverthenext20years.Itisnotanticipatedthattheseserviceboundarieswillchangeintheforeseeablefuture.ThecompanyservespartoftheunincorporatedcountyaswellastheCityofYelm.

D. CELLULAR TELEPHONE: SincepassageoftheFederalTelecommunicationsActof1996,therehasbeenrapidgrowthinthenumberofcellulartelephoneantennasintheunincorporatedCounty.ThelocationoftheexistingsitesasofAugust2004areshownonMap45.Forup‐to‐dateinformationpleaseseeThurstonGeodata’swebsiteathttp://www.geodata.orgforcurrentlocationsofcellularstructures.

Togethertheseantennasprovidecellulartelephoneserviceforthecounty.Thecellularphonesystemconsistsofaseriesoftheselow‐poweredantennasinahoneycombpatternof“cells”thatinvisiblyblankettheservicearea.Eachcellsitehasaneffectivesignalradiusofonlyafewmilesdependingonterrainandcapacitydemand.Asacallerdrivesfromonecelltoanother,thecallisautomaticallyhandedofftoanothercellbyacentralcomputer.Thiscentralcomputeralsoconnectsthecellularphonetransmissionwiththelocaltelephonecompanysystemthatcompletesthecall.

Atthestatelevel,cellulartelecommunicationscompaniesareregulatedbytheWUTC.Althoughcellulartechnologyisincreasinglyusedasareliablebackupcommunicationsystemduringtimesofemergency,forexampleduringnaturaldisasters,theWUTCdefinescellulartechnologysimilarlytonaturalgas,thatis,asautilityofconvenience,notnecessity.Therefore,cellularphoneprovidersarenotrequiredtoprovideserviceupondemand.

Proposed Facilities Unlikeotherutilities,thecellulartelephoneindustrydoesnotplanfacilitiesfarintothefutureandanalyzesmarketdemandtodetermineexpansionintonewserviceareas.TherearemultiplecellulartelephoneprovidersinThurstonCounty,eachofwhichwillbeproposingtoaddnewantennasitesoverthecomingyears.

E. CABLE:

Page 15: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐15

Utility Provider: Comcast Cable CabletelevisioninThurstonCountyisservedbyComcast.Coaxialcableistheprimarymethodoftransportingsignalsfromtheheadendtoindividualhouseservicedrops.

Proposed Facilities Comcastworkscloselywithotherutilitycompaniesandthecountytostayinformedonproposeddevelopmentssothatcablecanbepartofdevelopersplans.Eachyear,companyengineersassesstheneedforsystemexpansionbasedontelephoneinquiries,permittingdatafromthecountyandtechnologicaladvancesindistributionequipment.

III. PROPOSED FACILITIES

TheGMArequiresthattheutilityelementshowproposedutilityfacilities.Thereisgreatvariabilityinthelevelofdetailprovidedforfutureutilityfacilities.Thisisbecausesomeutilities,likePugetSoundEnergy,havedoneextensivefutureplanningwhileothershavedonemuchless.ProposedelectricalfacilitiesarebothlistedbelowandillustratedonMapM‐44.

Forproposedandfutureprojectsforcounty‐ownedandoperatedutilityfacilitiespleaseseethemostrecentadoptedversionoftheCapitalFacilitiesPlan.

Allotherproposedutilityfacilitiesarelistedinthissectionbutarenotmapped.

A. Electricity:

UtilityProvider:PugetSoundEnergy

ThefollowinglistisasummaryofPugetSoundEnergyproposedfacilitiesforThurstonCounty.totheyear2014fortheunincorporatedcounty.Formoredetailsontheseproposedfacilities,pleaseseethePugetSoundEnergy2017IntegratedResourcePlan(IRP),aforecastofconservationresourcesandsupply‐sideresourcetomeetgrowingneedsofPSEcustomersoverthenext20years3ThurstonCountyGrowthManagementActDraftElectricalFacilitiesPlan

3 2017 PSE Integrated Resource Plan. https://pse.com/aboutpse/EnergySupply/Pages/Resource-Planning.aspx

Commented [KC7]: To update the PSE information, I used their 2017 Integrated Resource Plan, which talks more broadly about future plans, with a few specific mentions of upgrades in our area.

Page 16: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐16

preparedbythecompanyin1992,whichisthesourceforthefollowingplannedimprovements.PSEdeliverysysteminfrastructureplanningisdoneona10‐yearbasis,andthoseplansareupdatedcontinuallyasconditions,technologiesandcustomerbehaviorchange.

AlthoughtheIRPisnotspecifictoThurstonCounty,PSEanticipatesfutureimprovementswillbenefittheirservicenetworkregionwide.

Transmission:statewide

Inthenextdecade,PSEanticipatesbuildingapproximately104plusmilesofnewtransmissionlines(100kVandabove)andupgradingover122milesofexistingtransmissionlines.Inaddition,PSEanticipatesneedingtoadduptothree230kVbulkpowersubstationsacrossourservicearea.Theseplannedimprovementsdonotincludetransmissionneededtosupportthebroaderregionorimprovementsneededasaresultofprovidinginterconnectionsforlargegenerationresources.FuturetransmissionprojectsintheThurstonCountyregioninclude:

SpurgeonCreekTransmissionSubstationDevelopment(Phase2)

EstimatedDateofOperation:2020

InPhase2,thisprojectwillimprovethereliabilityoftransmissionservicetothecitiesofLacey,OlympiaandTumwaterbyloopingthefuturetransmissiontapextensionfromOlympiaviatheAirportsubstationtoSpurgeonCreek.ThisprojectalsoloopsintheOlympia–StClair#1115kVlineintoSpurgeonCreek.

Woodland–St.Clair115kV(Phase2)

EstimatedDateofOperation:2021+

ThisprojectwillincreasethetransmissionintertiecapabilityandreliabilitybetweenPierceandThurstoncountiesbyaddingathirdtransmissionintertiebetweenPierceandThurstonCountieswithconstructionoftheremaining8miles115kVlinebetweenGravellyLakeandWoodlandsubstations.

Distribution:statewide

Inthenextdecade,PSEanticipatestheneedtobuildapproximately6to8newdistributionsubstationstoserveloadasexistingsubstationcapacityisexceededandanother2to4newsubstationstoservespecificpointloads.Theyalsoanticipateupgradingapproximately3existingsubstationstoreplaceaginginfrastructureandaddingadditionalcapacitytoservelocalloadgrowth.Intotal,theneworexpandedsubstationswillrequire32to48newdistributionlines.PSEwillcontinueworkonimprovingreliabilityofitsworstperformingcircuitsaswellasinstallingsmartreadyequipmentforincreasingtheresiliencyofthegrid.

OngoingMaintenance:statewide

Baseduponcurrentprojectionsandpastexperience,inthenextdecadePSEexpectstoreplace1,800milesofundergroundhighmolecularweight,failure‐pronedistributioncable,approximately1,000transmissionand10,000distributionpoles.Additionally,PSEanticipatesreplacementofseveralmajorsubstationcomponentsasaresultofongoinginspectionanddiagnostics.PSE

Page 17: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐17

anticipatesreplacementofitscurrentagingandobsoleteAutomatedMeterReading(AMR)communicationsystemaswellasitselectriccustomermeterswithAdvancedMeteringInfrastructure(AMI)technologytoenablesmartgridenhancementsandcustomerofferingsinthefuture.

Inclusionofthisreferencetotheplanindicatesgeneralschematic,notsitespecific,approvaloffuturefacilitiesandacknowledgesplanningbeingdonebyPugetSoundEnergytoprovideserviceforanticipatedgrowth.DuetoPugetSoundEnergy’sresourcelimitations,anupdateoftheplanwasnotpossibleduringthe2004updateoftheCounty’sComprehensivePlan.

1. SystemImprovementsinProgress:

a. TCLSouthwest‐St.Clair230kVLine

b. Southwest‐St.Clair230kVLine

c. Christopher230kVDevelopment

2. FutureTransmissionImprovements:

a. NorthOlympia55kVConversion

b. PleasantGladeTransmissionSubstation

c. HoffmanTransmissionStation

d. SpurgeonTransmissionSubstation

e. YelmTransmissionStation

f. Thurston230kVPlan

g. St.Clair‐Spurgeon115kVRebuild

h. BPAOlympia‐Spurgeon230kVLine

i. Frederickson‐St.Clair&Tono230kVProject

j. Tono‐Spurgeon230kVLine

k. SouthSeattle‐OlympiaSystemReinforcement,BPA

l. St.Clair‐BPAOlympia230kVline

m. 230kVlinefromBPAOlympiatotheproposedSpurgeonSubstationSite

n. Olympia‐Shelton500kVline

3. FutureDistributionSubstations:

Page 18: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐18

a. RainierView

b. Spurgeon

c. FortEaton

d. Libby

e. Ayers

f. Offut

g. Littlerock

B. NaturalGas:

UtilityProvider:PugetSoundEnergy

PressureRegulationStations:statewide

Inthenextdecade,PSEplanstobuildorupgradeapproximately7NorthwestPipeline‐suppliedgateorlimitstationsand16districtregulatorstationstoserveloadasexistingstationcapacityisexceeded.

Pipelines:statewide

Inthenextdecade,PSEexpectstoaddapproximately24milesofhighpressuremainand23milesofintermediatepressuremainasloadsgrowinourservicearea.

OngoingMaintenance:statewide

Aswiththeelectricsystem,PSEiscontinuallyaddressingaginggasinfrastructurewithinthesysteminaccordancewithregulatoryrequirementsandoperatingpractices.Inthenextdecade,PSEplanstoreplace200to300milesofgasmainthatisreachingtheendofitsusefullife.PSEalsoanticipatesreplacingitscurrentagingandobsoleteAutomatedMeterReading(AMR)communicationsystemandgascustomermoduleswithAdvancedMeteringInfrastructure(AMI)technologytoenablesmartgridenhancementsandfuturecustomerofferings.

Tentativefutureprojectsplannedfor2004‐2014:

a. Aproposed8”high‐pressurelinefromFortLewistoOlympia.

b. Apotential12milesof8”high‐pressurelinefromOlympiatoLacey.

c. Apotential3milesof12”high‐pressurelinefromsouthThurstonCountytoLacey.

d. Install6”intermediatepressure(IP)linealongRainierRoadfromFirTreeRoadnorthwesterlytoChambersRoadandYelmHighway.

e. Replaceexisting2”IPwith8”IPmainalongFirTreeRoadfromRainierRoadwesterlytoCountrywoodDrive.

Page 19: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐19

f. Replaceexisting4”IPwith8”IPmainalongLittlerockRoadfromLittlerockGateStation(90LN)northerlyto“C”Street.

g. RebuildLittlerockGateStation.

C. StandardTelephone:

UtilityProvider:QwestCenturyLinkCommunications

QwestCommunicationsoperatesabroadbandtelecommunicationsnetworkcapableofprovidingvideo,dataandvoicecommunicationsservice.Thenetworkcarriesthesemultimediasignalsoveramixofopticalfiber,coaxialcableandcopperwire.Itisalsoequippedwithsophisticatedelectronicequipmentthatmakesiteasiertodiagnoseandfixproblems.QwestCenturyLinkstatesthatitcurrentlyprovidestelecommunicationsservicetoamajorportionofThurstonCountyanddoesnotexpectdifficultiesincontinuingtoprovidethatservicetothefutureresidentsoverthenext20years.

UtilityProvider:TeninoTelephoneCompanyand

UtilityProvider:ConsolidatedCommunicationsYCOMNetworks

TeninoTelephoneCompanyandYCOMNetworksConsolidatedCommunicationsbothstatethatwithintheirserviceareastheycanincreasecapacityindefinitelyanddonotforeseeanyproblemsinprovidingtelephoneservicetocustomersintheirareasoverthenext20years.Itisnotanticipatedthattheseserviceboundarieswillchangeintheforeseeablefuture.

D. CellularTelephone:

Unlikeotherutilities,thecellulartelephoneindustrydoesnotplanfacilitiesfarintothefutureandanalyzesmarketdemandtodetermineexpansionsintonewserviceareas.TherearemultiplecellulartelephoneprovidersinThurstonCounty,eachofwhichwillbeproposingtoaddnewantennasitesoverthecomingyears.

E. Cable:

UtilityProvider:Comcast

Comcastworkscloselywithotherutilitycompaniesandthecountytostayinformedonproposeddevelopmentssothatcablecanbepartofdevelopersplans.Eachyear,companyengineersassesstheneedforsystemexpansionbasedontelephoneinquiries,permittingdatafromthecountyandtechnologicaladvancesindistributionequipment.

F. IV. COUNTY-OWNED/ AND/OR OPERATED FACILITIESUTILITIES:

AbriefoverviewofthreeCounty‐ownedandoperatedutilityfacilitiesisincludedinthischapter.

SolidWaste

Page 20: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐20

Stormwater WaterandSewer

Thissectionalsoincludeslevelofservicestandardsforeachutility

Formoreinformationontheindividualplansforeach,pleasecontactthedepartmentsorseetheirwebsiteforalistofthoseplans.,utilitiesForproposedprojectsforcounty‐ownedandoperatedutilityiespleaseseethemostrecentadoptedversionoftheCcapitalFfacilitiesPplan.

A. SOLID WASTE InThurstonCounty,solidwasteservicesareprovidedbyboththepublicandprivatesectorsasdescribedintheThurstonCountySolidWasteManagementPlan(SWMP).TheSWMPisacoordinated,comprehensivesolidwastemanagementplan,incooperationwiththecitieswithintheCounty.Thepurposeistoserveasaguidingdocumentforlocalgovernments’solidwasteservices,includingprogramsforwastereduction,collection,handling,recycling,anddisposal.AnotherimportantdocumentrelatedtosolidwasteplanningistheThurstonCountyHazardousWasteManagementPlan.Moreinformationtheseplansareavailableonthedepartmentswebsite.

Collectionofsolidwastefromresidencesandbusinessesisprovidedeitherbyindividualsubscriptionserviceorbytheincorporatedjurisdictionsthroughaprivatecollectioncompanyor,inthecaseoftheCityofOlympia,bycitycollectioncrews.ThurstonCountygovernmentisresponsibleforwastetransferanddisposal.ThurstonCountyPublicWorks,SolidWasteDivision,managestheWasteandRecoveryCenter(WARC),whichincludes:

Aclosedlandfill; Amoderateriskwastecollectionfacility;and Acontractor‐operatedtransferstationalongwithseparatecollectionareasforresidential

trash,yardwaste,andrecyclablematerials.

Thecounty’stransferstationreceivesandmanagesmostofthesolidwastegeneratedinthecounty,aswellasasmallamountofwastegeneratedinnearbycounties.TheWARC,alongwithtwodrop‐boxfacilitieslocatedinRainierandRochester,comprisethedesignateddisposalsystemforallsolidwastesgeneratedinThurstonCounty.Solidwasteacceptedatthesefacilitiesisultimatelytransferredforfinaldisposaltoalandfilllocatedoutsideofthecounty.

TheSolidWasteDivision’soperationsandprogramsarefundedlargelybytippingfeespaidbyusersoftheCounty’ssolidwastefacilities,aswellasasmallamountfromgrantfundsprovidedbytheDepartmentofEcology.Solidwastefundsarealsousedforcapitalprojectsthatarecriticaltomaintainingthecounty’sexistingsolidwastefacilitiesandconstructingimprovementsrequiredtomeetfuturedemandforservices.Theseprojectsaredescribedinthecounty’sCapitalFacilitiesPlan.

LOS Standard for Solid Waste

LOSLevel LOSUnits LOSStandard

Page 21: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐21

LOS A – Includes all 3 service level units.

LOS B – Includes a combination of any 2 service level units.

LOS C – Includes 1 or no service level units.

1. Regulatory New or Existing Facility: Meets or exceeds federal, state, and/or local regulatory requirements.

2. Health/Safety New or Existing Facility: Meets or exceeds federal, state, and/or local health / safety issues for public or employees.

3. Policy New or Existing Facility: Addresses a solid waste comprehensive plan goal or policy.

Forup‐to‐dateinformationpleaseseeThurstonGeodata’swebsiteathttp://www.geodata.orgforcurrentlocationsofcounty‐ownedoroperatedfacilities.Pleasealsoseethemostcurrentlyadoptedversionofthecapitalfacilitiesplan.

B. STORMWATER UTILITY TheStormwaterUtility,aratepayer‐financedprogram,reducesflooding,erosion,andtheamountofpollutioninrainwaterrunoff.PropertyownersinunincorporatedThurstonCountypayStormwaterUtilityratesaspartoftheirpropertytaxstatement.

TheoriginalUtilitywasformedin1985inthenorthernpartoftheCountyandin2007expandedtoincludeallportionsofunincorporatedThurstonCounty..andTheU.S.EnvironmentalProtectionAgency(EPA)enforcestheCleanWaterActnationally,buthasdelegatedthatauthorityinWashingtonStatetotheWashingtonStateDepartmentofEcology.5Candin2007expandedtoincludeallportionsofunincorporatedThurstonCountySinceJanuaryof2007,ThurstonCountyhasbeenrequiredtocomplywiththeupdatedfederalandstatewaterpollutioncontrollaws.TheCountywasissuedamunicipalstormwaterpermit(Permit)bytheWashingtonDepartmentofEcology,whichrequirestheCountytotakeanumberofactionstomanagewhereandhowrainwaterfromstorms,or“stormwater,”entersourstreams,rivers,lakes,andgroundwaterwithintheregulatedarea.

Whilerainisanaturaloccurrence,thebyproductsofoursociety—–suchaspavement,oilfromvehicles,andyardchemicals–—arepickedupandcarriedtoourvitalwaterresourcesduringstorms.ThePermitrequirestheCountytodevelop,implementandannuallyupdateaStormwaterManagementProgramPlandesignedtoreducedischargesofpollutantsfromitsmunicipalstormwatersystemstoprotectwaterquality.

TheStormwaterUutilityhascompletedseven(7)basinplanstodateasof2018,andhaspartneredwiththecitiesontwoothers.,,,ThurstonCountyStormwaterUtilityprogramsincludes,butisnotlimitedto:

PlanningforcommunitygrowththroughBasinPlanningandWatershedCharacterizationstudiesofourlocalwaters.

Page 22: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐22

PublishingtheDrainageDesignandErosionControlManualwhichcontainsrulesdevelopersmustfollowtomanagerainwaterrunoff.

Inspectingstormwaterfacilitiesinneighborhoodsandatbusinessestomakesuretheyworkright.

Constructingstormwaterfacilitiestoimprovewaterqualityandreducefloodinganderosioninolderneighborhoodsbuiltbeforedevelopmentruleswereineffect.

Pollutionpreventionprogramsaswellasconstructionofstormwaterfacilitiesandrestorationprojects,includingfloodplain,riparianandwetlandrestoration,toaddressregulatoryobligationscontainedinTotalMaximumDailyLoadwatercleanupplans.

MonitoringtheCounty’sstormwaterdrainagesystembydetecting,eliminating,andpreventingillicitdischarge(illegaldumping)intothesystem.

Publiceducationandoutreachprogramstoreduceoreliminatebehaviorsandpracticesthecauseorcontributetoadversestormwaterimpactsaswellasencourageparticipationinstewardshipactivities.

Developing,implementing,andannuallyupdatingaStormwaterManagementProgramPlan,designedtoreducedischargesofpollutantsfromitsmunicipalstormwatersystemstoprotectwaterquality.

CurrentandfuturestormwaterfacilitiesplansarefoundintheCapitalFacilitiesPlan(CFP)andareplacedonthe6‐yearand20‐yearstormwaterCFP.Capitalprojectsareintendedtoaddressemergingenvironmentalorregulatoryissuesrelatingtoflooding,waterqualityand/orhabitatdegradation.

LOS Standard for Stormwater Forup‐to‐dateinformationpleaseseeThurstonGeodata’swebsiteathttp://www.geodata.orgforcurrentlocationsofcounty‐ownedoroperatedfacilities.

LOSLevel LOSUnits LOSStandard

LOS A - Includes all 3 service level units

LOS B - Includes a combination of any two service level units.

LOS C – Includes 1 or no service level unit.

1. Local Flood Control: Provide capacity to store stormwater runoff volume and / or reduce peak flow from an “x” year storm event.

Facilities for new growth: Conveyance meets 25-year 24-hour event for public and private street piped systems and 100-year, 24-hour event for open channels and property protection.

Detention: Provide capacity to store stormwater runoff volume and reduce peak durations such that post-development stormwater discharge durations match pre-development durations for a range of pre-developed discharge rates from 50% of the 2-year peak flow up to the full 50-year peak flow.

Page 23: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐23

On-Site Mitigation (Low Impact Development) Meet the LID Performance Standard of 8% of the 2-year peak flow to 50% of the 2-year peak flow or use LID BMPs from a list, in preferential order, to meet the LID standard.

Facilities to improve existing deficiencies: Meet the new growth standard wherever possible.

2. Water Quality: Meet federal, state, or local water quality standards in streams, rivers, lakes, and Puget Sound

Facilities for new growth:

Water Quality Design Storm Volume: The 91st percentile, 24-hour runoff volume estimated by an approved continuous runoff model. Water Quality Design Flow Rate: Preceding detention facilities: Flow rate at or below which 91 percent of runoff volume is routed through the facility as determined by a continuous runoff model. Downstream of detention facilities: Flow rate of 2-year recurrence interval release from detention facility designed to meet flow duration standard using an approved continuous runoff model.

Provide basic treatment (80% TSS removal), enhanced treatment (50% metals removal), phosphorous, and/or oil treatment based on project type & size.

Facilities to improve existing deficiencies: Meet the new growth standards wherever possible.

3. Habitat: Maintain or restore in-stream flows, reduce peaks, minimize bank full flow durations, improve water quality to address habitat related

In-stream Flow Goals at Basin Build out Conditions

Peak Flows: Maintain, or where possible, reduce durations.

Page 24: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐24

issues (e.g. salmonid, shellfish, etc)

Bank full Flows: Maintain or where possible, reduce durations.

Base Flows: Maintain, or where possible, increase.

Pleasealsoseethemostcurrentlyadoptedversionofthecapitalfacilitiesplan.

C. WATER AND SEWER Asamatterofpolicy,ThurstonCountydoesnotprovidemunicipalwaterand/ormunicipalsewerservicetoruralareas,withtheexceptionofthoseareaswhereapublichealth‐relatedissueorwaterqualityconcernnecessitatescountyinvolvement.Citiesareexpectedtoprovidewaterandsewerfacilitiestounincorporatedareaswithintheirrespectiveurbangrowthareas.

Thecountyowns3watersystems(BostonHarbor,GrandMound,andTamoshan),and35ruralsewersystems(GrandMound,BostonHarbor,Tamoshan/BeverlyBeach,andOlympicView),andonesewerlinesystemintheLaceyUrbanGrowthArea(WoodlandCreekSanitarySewer).

Thereareoccasionswhenotherruralprivately‐ownedwaterandsewersystemsexperienceoperatingtroublesorfailureswhichhaveahighpotentialforaffectingarisktopublichealth.Inthosecases,thecountywilloftenassistthelocalresidentsintheplanning,engineeringandconstructionofimprovementstotheexistingwaterandsewersystemstosolvetheselocalproblems.

Urban Growth Areas Sewerandwatersystemsareexpectedtobeprovidedtounincorporatedpartsofareasidentifiedandzonedforurbangrowth,withthesesystemsconstructedastheareasurbanize.Thecitiesaretypicallyresponsibleforextendingtheseserviceswithintheunincorporatedpartsofurbangrowthareas.TheWoodlandCreeksewerlineisoperatedandmaintainedbytheCityofLaceybyagreementbetweenthecityandthecounty.ThecountywillownthesystemuntiltheconstructionloanispaidoffatwhichtimethesystemwillcomeundertheownershipoftheCityofLacey.

GrandMoundUGA:AnurbangrowthareawasestablishedintheRochester/GrandMoundareainthelate1970s.TheUGAboundariesandzoningwereupdatedin1995.AUtilityLocalImprovementDistrict(ULID)wasformedthroughapprovalbythecommunityinlate1996toprovidewaterandsewersystemimprovementsintheGrandMoundUGA.BothwaterandsewersystemsareinoperationprovidingservicetocustomerslocatedwithintheUGA.In2002,thecountyestablishedpoliciestoprovidewaterservicetopropertieslocatedoutsideoftheUGA.

LaceyUGA:AnurbangrowthareawasestablishedintheLaceyareaintheearly1990s.TheUGAboundariesandzoningwereupdatedincompliancewithCityandCountyJointPlanningfortheLaceyUGA.ThurstonCountyhasreceivedloanandgrantfundingfromtheWashingtonStateDepartmentofEcologytoconvert131septicsystemsintheWoodlandCreekandCovingtonPlacedevelopmentstoaSTEPsewersystemthatconnectstotheCityofLaceysewercollectionsystem.TheCountywillownthisSTEPsystemuntiltheloanispayed‐off,whenownershipwillbeturnedovertotheCityofLacey.UntilthenbymutualagreementwiththeCityofLacey,theywilloperateandmaintainthesystem.ThesystemwascompletedandhasbeenoperationalsinceMarch2014.Overviewofservicesandwhatyoudohere

Commented [AO8]: Information moved from Capital Facilities Plan

Page 25: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐25

LOS Standards for Water & Sewer

Facility LOSUnits LOSStandardWaterSystemsRural:BostonHarborandTamoshan;Urban:GrandMound

EquivalentResidentialUnits(ERU):Cubicfeetpermonthofwaterconsumedasmeasuredatthesource,basedonthefollowingminimums:Rural:ERU=900cf/moUrban:ERU‐700cf/mo

Rural:Capacitytoprovidedomesticwaterandfireflowservicesforresidentialandlimitedcommercialuses.Urban:Capacitytoprovidedomesticwaterandfireflowservicesforresidential,commercial,andindustrialuses.Inaddition,RuralandUrbanwatersystemsshallmeetcurrentfederal,stateandlocaldrinkingwaterstandards,wheneverpossible.

SewerSystemsRural:BostonHarbor,Tamoshan,BeverlyBeach,andOlympicViewUrban:GrandMoundWoodlandCreekEstates

EquivalentResidentialUnits(ERU):Cubicfeetpermonthofseweragedischargeasmeasuredatthesource,basedonthefollowingminimums;Rural:ERU=900cf/moUrban:ERU=700cf/mo

Rural:Capacitytoprovidesewercollectionandwastewatertreatmentservicesforresidentialuses.Urban:Capacitytoprovidesewercollectionandwastewatertreatmentservicesforresidential,commercial,andindustrialuses.Inaddition,RuralandUrbansystemsshallmeetfederal,stateandlocalpermitrequirementsforreceivingwaterstandards,wheneverpossible.

F. County‐Ownedand/orOperatedFacilities:

Forproposedprojectsforcounty‐ownedandoperatedutilityfacilitiespleaseseethemostrecentadoptedversionofthecapitalfacilitiesplan.

IV. GOALS, OBJECTIVES, AND POLICIES

V. GOALS, OBJECTIVES, AND POLICIES

Page 26: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐26

A. PRIVATE UTILITIES

GOAL 1: TOFACILITATEPRIVATEUTILITYSERVICESATTHEAPPROPRIATELEVELSTOACCOMMODATETHEDEMANDASSOCIATEDWITHCURRENTANDFUTURELANDUSES.SUCHSERVICESSHOULDBEPROVIDEDINAMANNERTHATMAXIMIZESPUBLICSAFETYANDMINIMIZESPOTENTIALADVERSEENVIRONMENTALIMPACTS.

OBJECTIVEA:Thecountyshouldmaintainscurrentinformationontheexistingandproposedfacilitiesofprivateutilities.

POLICIES:

1. Expansionandimprovementofprivateutilitysystemsshouldberecognizedprimarilyastheresponsibilityoftheprivateutilityprovidingthecorrespondingservice.Thecountyshouldgenerallyparticipateinthedevelopmentof,andrelyupon,planspreparedbyeachutilityundertakingfacilityandcapitalimprovementplanning.

2. ThecountyshouldmaintaincurrentinformationintheComprehensivePlanonthefutureplansofprivateutilityprovidersandasnewinformationfromprivateutilityprovidersbecomesavailable.

3. Thecountyshouldmaintaincopiesofutilityproviders’long‐rangesystemimprovementplansandmakethemavailableaspublicinformation.

4. ThecountyshouldencouragePugetSoundEnergytoupdatetheThurstonCountyGrowthManagementActElectricalFacilitiesPlanonaregularbasis.

OBJECTIVEB:Thecountyshouldpromotesthejointuseoftransportationrights‐of‐wayandotherutilitycorridors.

POLICIES:

1. Thecountyshouldpromote,whereverfeasible,theco‐locationofnewutilitydistributionandcommunicationfacilitieswhendoingsoisconsistentwithutilityindustrypracticesandnationalelectricalandothercodes.Examplesoffacilitieswhichcouldbesharedaretrenches,transportationrights‐of‐way,towers,poles,andantennas.

2. Thecountyshouldprovidetimelyandeffectivenoticetoallaffectedprivateutilitiesofroadconstruction,includingthemaintenanceandrepairofexistingroads,inordertopromotethejointplanningandcoordinationofpublicandprivateutilitytrenchingactivities.

3. Thecountyshouldreviewcountystandardsandprocedurestoensurethattheysupportjointuseoftransportationrights‐of‐wayandutilitycorridors.

4. Thecountyshouldstandardizelocationsforutilitieswithinroadrights‐of‐waywhenfeasible.

OBJECTIVEC:Thecountyshouldcoordinateswiththecitiesandtownsthroughoutthecountyonprivateutilityplanning.

POLICIES:

Commented [KC9]: I think this policy is obsolete. The document hadn’t been updated since 1992, and wasn’t used in the 2004 update. PSE future plans information was taken from their 2017 IRP

Page 27: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐27

1. Thecountyshouldcoordinateonanongoingbasiswiththecitiesandtownsonprivateutilityplanningtoensureconsistencyinlong‐rangeplansandregulationstopromoteefficientandeffectiveprovisionofutilityservices.

2. Thecountyshouldcoordinatewiththecitiesandtownsintheplanningofmulti‐jurisdictionalprivateutilityfacilityimprovements.

3. Thecountyshouldencouragedecisionsmaderegardingprivateutilityfacilitiestobeconsistentwithandcomplementarytoregionaldemandandresources,andshouldreinforceaninterconnectedregionaldistributionnetwork.

OBJECTIVED:ThecCountyshouldcoordinateswithprivateutilityproviders.

POLICIES:

1. Thecountyshouldcoordinateonanongoingbasisplanningactivitieswithprivateutilityproviderstoensureconsistencybetweenthefacilities’plansofprivateutilitiesandthelong‐rangeplansandregulationsoftheCounty.

2. Thecountyshouldseekinputfromprivateutilityproviderswhendevelopingnewplans,regulationsandprocedureswhichaffectprivateutilityserviceandactivities,suchasstreetexcavation,streetobstructions,andfeeschedulerevisions.

3. Thecountyshouldsupportoutreacheffortsofutilitiestoeducatecommercialandresidentialpowercustomersaboutthebenefitsofcleanandefficientenergytechnologiesandpractices.

OBJECTIVEE:Potentialadverseimpactsofutilityfacilitiesshouldarebeminimized.

POLICIES:

1. Thecountyshouldencourageutilityfacilitiessuchaselectricsubstations,naturalgasgatestations,wirelesscommunicationfacilities(cellulartelephonetowers),andtelephoneswitchingstationsbedesignedtominimizeaestheticandotherimpactsonsurroundinglanduses.Landscapedscreening,buffers,setbacks,andotherdesignandsitingtechniquesshouldbeusedtoaccomplishthisobjective.Theextentoftheserequirementsdependontheadjacentlandusesandzoning.

2. Thecountyshouldencouragethelocationofprivateutilityfacilitiesnearcompatiblelandusesasdefinedinthecounty’sSpecialUsestandards.

3. Thecountyshouldencouragetelecommunicationproviderstouseexistingstructures,suchasexistingtowersandbuildings,wherefeasible.

4. Thecountyshouldencouragethatcommunityinputissolicitedpriortocountyapprovalofprivateutilityfacilitieswhichmaysignificantlyimpactthesurroundingcommunity.

5. Inordertominimizeadverseimpactsonwaterqualityandhumanhealth,theCountyshouldcontinuetoreview,throughtheexistingpermittingprocess(a)themanagement,sprayingandclearingofvegetationinutilitycorridorsandinthesanitarycontrolportionsofpublicright‐of‐waycorridors,and(b)thenewconstructionandexpansionoflines.

Commented [AO10]: Added as T-10 from the Thurston Climate Adaptation Plan

Commented [KC11]: Telecommunication and Wireless standards currently being updated. Goals and policies should probably be updated concurrently to ensure our polices reflect the new standards

Page 28: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐28

6. Thecountyshouldencouragethatutilitycorridorsonpubliclandsaremadeavailableforrecreationalusewhensuchusedoesnotnegativelyimpactadjacentlanduses,anddoesnotposeapublichealthorsafetyhazard,orresultinpropertydamageonadjacentlands.

7. Iffederallawsonelectromagneticfieldschange,theCountyshouldreviewitspoliciesandregulationsaccordingly.

B. SOLID WASTE

GOAL 2: PROVIDEFORTHEMANAGEMENTOFSOLIDWASTEANDHAZARDOUSWASTESONACOUNTY‐WIDEBASIS,INCLUDINGPLANNINGFORFACILITIESANDSERVICES.

POLICIES:

1. Thecountyshouldrequirethathandlinganddisposalofsolidandhazardouswastebedoneinwaysthatminimizeland,air,andwaterpollutionandprotectpublichealth.

2. TheThurstonCountySolidWasteManagementPlanandtheThurstonCountyHazardousWasteManagementPlanwillidentifytheservicesthatshouldbeprovidedinthecounty.

3. Thecountyshouldpromoteanintegratedsolidwastemanagementstrategythatplacespriorityonwastereduction,reuse,andrecyclingofsolidwasteaboveresourcerecovery,incineration,anddisposalinlandfills.

4. Thecountyhastheresponsibilityfortransferanddisposalofallsolidwastesgeneratedinthecountyandtherefore,shouldcontinuetomaintainitsexistingsolidwastefacilitiesandconstructimprovements,asneeded,tomeetcurrentandfuturedemandforservices.

5. Thecountyshouldcontinuetopromotesafedisposalofhouseholdandsmallbusinesshazardouswastesoutsideoflandfills,aswellastheuseofsafer,lesshazardousproductsandthereductionofhazardousmaterials.

6. Thecountyshouldseekpracticalsolutionstoproblemsofillegaldumping.

7. Thecountyshouldrequirethatallfacilitiesthatstore,processorusehazardousmaterialsorgenerateortreathazardouswastesintheiroperationsbesitedincompliancewithstateandlocallaws,andconsistentwiththecounty’sSolidWasteManagementPlan;usebestmanagementpracticesfortheprotectionofgroundwater,surfacewaters,andairqualityandbeperiodicallymonitoredforcompliancewithsuchlawsandpractices.

8. ThecountyshouldrevisetheZoningCodetoensureconsistencywiththeadoptedModerateRiskWastePlan,theNorthernThurstonCountyGroundWaterManagementPlan,theCriticalAreasOrdinanceandtheComprehensivePlan’spolicies.

C. STORMWATER UTILITY

Commented [KC12]: All edits to Solid Waste come from Monica Gorman, Solid Waste Manager

Page 29: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐29

GOAL 23: PROVIDEFORSTORMWATERMANAGEMENTINAMANNERTHATPROTECTSENVIRONMENTALQUALITYANDAVOIDSINCREASINGTHERISKOFPROPERTYDAMAGEFROMSTORMWATERRUNOFFNATURALHAZARDS.

OBJECTIVE:ProvideToprovideforsstormwatermanagementinamannerthatprotectsreceivingwatersandpropertyavoidsexacerbatingnaturalhazards,consistentwithstateandfederallaw.

POLICIES:

1. ThecountyshouldmMaintainorimprovethequantityandqualityofwaterenteringwetlands,groundwater,streamsandsurfacewaterspondsthroughtheimplementationoftheCounty’sDrainage,Design,andErosionControlManual(DDECM)andtheStormwaterManagementProgramPlan(SWMPP).soitmimicsnaturalconditionsascloselyaspossible.Thecountyshouldrequirethatstormwaterismanagedsoitdoesnotsignificantlyincreasethefrequencyanddurationofpeakstreamflows,diminishsummerflows,orelevateinstreamwatertemperaturesoutsideoftherangenecessarytosustaindependentfish,generatesedimentorpollutantsdamagingtofishorshellfish,orotherwisedegradewaterquality.

2. ThecountyshouldmMinimizestormwaterrunofffromexistingdevelopmentandrequirenewdevelopmenttolimitrunofftopredevelopmentconditions,exceptwherestormwaterinfiltrationwouldincreasegroundwaterfloodingorlandsliderisktothemaximumextentfeasible,andavoidalteringnaturaldrainagesystemstopreventincreasesinpeakstormwaterrunoff,flooding,streamdegradation,andwaterqualitydegradation.

3. Thecountyshouldencourageuseofperviouspaving(suchaslatticeblockpaversorotheralternatives)tothemaximumextentpossibleforlowvolume,off‐streetparkingandinotherlightlyusedareas.

4. Thecountyshouldconsideradopting“lowimpactdevelopment”standardsthatreduceimpervioussurfacesandattempttomimicnaturalhydrologicfunctionsforuseinareasthataresensitivetostormwaterimpacts.

52. ThecountyshouldrequirethatstormwaterfromnewdevelopmentadjacenttoProtectsteepslopesandunstablesoilsthroughtheimplantationimplementationofDDECMandThurstonCountyCriticalAreasRegulationstcCodeTitle17andTitle24toisarecontrolledsuchthatreducethepotentialforslopefailureisreducedoratleastnotincreased.

6. ThecountyshouldrRequirethatlanduseandactivities,andincludingseptictankeffluent,notgeneratepollutedstormwaterrunoffthathasthepotentialtoreleasepollutantstotheCounty’’smunicipalstormwatersystemordegradessurfaceorgroundwater,includingshellfishharvestareas.

37. AddressthecumulativeimpactsofexistinglandandresourceuseswithindrainagebasinswhenidentifyingprioritiesformanagingstormwaterrunoffusingtThecCounty’sStormwaterCapitalFacilitiesPlan(CFP)andSWMPPshouldaddressthecumulativeimpactsofexistingandplannedfuturelandandresourceuseswithindrainagebasinswhenmanagingstormwater.

Page 30: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐30

8. Siteplansandconstruction,forestandagriculturalpracticesshouldbedesignedandconductedtopreventon‐siteandoff‐siteerosionandsedimentationduringandaftertheactivity,particularlyincloseproximitytoanadromousfishstreams,shellfishbeds,andwaterbodiesusedasadrinkingwatersourceandinareasdrainingtosuchlocations.Runoffalsoshouldberoutedandsufficientlydiffusedorcontrolledsothattheflowsdonotcreatechannelsorerosion.

9. Thecountyshouldtakestepstoensurethatstormwatersystemsareadequatelymaintainedinordertoprotectsurfaceandgroundwaterquality,especiallyinareasthatdraintoshellfishbeds,anadromousfishstreams,orwaterbodiesusedasadrinkingwatersource.

10. Thecountyshouldprovideeducationandtechnicalassistanceinacomprehensive,regionalmannertopromoteunderstandingoftheconnectionsbetweengroundandsurfacewaters,andthewatershedboundarytranscendenceoverjurisdictionalboundaries.

11. Thecountyshouldprovidesupportforimplementingthestormwatermanagementprogramandconsidertheexpansionofsimilarprogrameffortsinthesouthernportionofthecounty.

124. ThecountyshouldrReviewandupdateongoingwaterresourcetheSWMPP,DDECM,andStormwaterCFPplansonaregularbasistoreflectadvancementsinstormwatermanagement.

135. ThecountyshoulddDeterminethedesiredlevelofstormwatermanagementserviceactivityaswellasalternativepermanentadequatestormwaterutilityratefundingneededsourcesfortomeetregulatoryobligationsanddesiredservicelevelsassociatedwithprogramadministrationandplanning,publicinformationandeducation,monitoring,operationandmaintenance,capitalimprovements,reserves,andinspectionandcodeenforcementregulation.Asapriority,primarysourcesofstormwaterpollutionshouldbeidentifiedandfundsprovidedforongoingeffortswithincountygovernmenttocorrectpollutedrunoff.problemsastheyareidentified.

146. ThecCountyshouldEencourageWorkwiththeThurstonConservationDistrictBoardtomeetstormwatermanagementobjectivescontinuetheirvoluntaryeffortsregardingeducation,conservationplanning,anduseofbestmanagementpracticesonexistingfarms,golfcourses,parks,schools,individualresidencesandotherfacilitiesthatusepesticidesandfertilizers,toreducetheseandothercontaminantsinstormwaterrunoff.

7. Ensurenewandreplacementdrainageinfrastructurecanaccommodateprojectedfutureclimateconditions,suchashigherpeakflowsassociatedwithmorefrequentandintenseprecipitationevents.

8. Increaseeducationandenforcementeffortstoensurethatcommercialandresidentialbuildingownersproperlymaintainlow‐impactdevelopment(LID)facilitiesthattreatstormwaterrunoffonsite. Commented [AO13]: New Policies added from the Thurston

Climate Adaptation Plan

Page 31: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐31

NOTE: OtherrelatedpoliciesdealingwithwaterqualityarefoundinChapter9(NaturalEnvironment).15. Thecountyshouldevaluatethepotentialforcreatingproblemsforexistingdevelopmentorincreasingtheriskforslopefailureasaresultofinfiltratingstormwaterinareaswithseasonallysaturatedsoilconditions.

16. ThecountyshouldevaluateandamendasnecessarytheDrainageDesignandErosionControlManualtoaddressalternativestoinfiltrationinareasadjacenttosteepunstableslopestoreducethepotentialforslopefailureinordertoprotectpublicsafetyandproperty.

17. Thecountyshouldaddresspollutionproblemsassociatedwithfailingsepticsystems.

D. DRINKING WATER & SEWER UTILITY

GOAL 3: PRovideforthemanagementofsolidwasteandhazardouswastesonacounty‐widebasis,includingplanningforfacilitiesandservices.

POLICIES:

1. THECOUNTYSHOULDREQUIRETHATHANDLINGANDDISPOSALOFSOLIDANDHAZARDOUSWASTEBEDONEINWAYSTHATMINIMIZELAND,AIRANDWATERPOLLUTIONANDPROTECTPUBLICHEALTH.

2. THETHURSTONCOUNTYSOLIDWASTEMANAGEMENTPLANANDTHETHURSTONCOUNTYHAZARDOUSWASTEMANAGEMENTPLANWILLIDENTIFYTHESERVICESTHATSHOULDBEPROVIDEDINTHECOUNTY.

23. THECOUNTYSHOULDUNDERTAKESTRATEGIESFORDEALINGWITHSOLIDWASTESINTHEFOLLOWINGORDER:WASTEREDUCTION,RECYCLING,ENERGYRECOVERY,ANDDISPOSAL.THECOUNTYSHOULDPROMOTEANINTEGRATEDSOLIDWASTEMANAGEMENTSTRATEGYTHATPLACESPRIORITYONWASTEREDUCTION,REUSE,ANDRECYCLINGOFSOLIDWASTEABOVERESOURCERECOVERY,INCINERATION,ANDDISPOSALINLANDFILLS.

4. THECOUNTYHASTHERESPONSIBILITYFORTRANSFERANDDISPOSALOFALLSOLIDWASTESGENERATEDINTHECOUNTYANDTHEREFORE,SHOULDCONTINUETOMAINTAINITSEXISTINGSOLIDWASTEFACILITIESANDCONSTRUCTIMPROVEMENTS,ASNEEDED,TOMEETCURRENTANDFUTUREDEMANDFORSERVICES.

3. THECOUNTYSHOULDCONTINUALLYEXPLORENEWAPPROACHESFORWASTEREDUCTION,RECYCLING,ENERGYRECOVERY,ANDMETHODSOFDISPOSINGOFSOLIDWASTES.

5.4. THECOUNTYSHOULDCONTINUETOIMPLEMENTPROGRAMSRECOMMENDEDINTHECOUNTY’SMODERATERISKWASTEPLANTOPROVIDEPROMOTEFORSAFE

Page 32: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐32

DISPOSALOFHOUSEHOLDANDSMALLBUSINESSHAZARDOUSWASTESOUTSIDEOFLANDFILLS,ASWELLASTHEUSEOFSAFER,LESSHAZARDOUSPRODUCTSANDTHEREDUCTIONOFHAZARDOUSMATERIALS.

6.5. THECOUNTYSHOULDSEEKPRACTICALSOLUTIONSTOPROBLEMSOFILLEGALDUMPING.

6. THECOUNTYSHOULDREQUIRETHATDREDGINGANDDISPOSALOFSEDIMENTSBEDONEINAMANNERTHATDOESNOTPOSESERIOUSHEALTHRISKTOHUMANSORRESULTINADVERSEEFFECTSTOWATERANDLANDRESOURCES,INCLUDINGBIOLOGICALORGANISMS.

7. THECOUNTYSHOULDREQUIRETHATALLFACILITIESTHATWHICHSTORE,PROCESSORUSEHAZARDOUSMATERIALSORGENERATEORTREATHAZARDOUSWASTESINTHEIROPERATIONSBESITEDINCOMPLIANCEWITHSTATEANDLOCALLAWS,ANDCONSISTENTWITHTHECOUNTY’SSOLIDWASTEMANAGEMENTPLAN;USEBESTMANAGEMENTPRACTICESFORTHE PROTECTIONOFGROUNDWATER,SURFACEWATERS,ANDAIRQUALITYANDBEPERIODICALLYMONITOREDFORCOMPLIANCEWITHSUCHLAWSANDPRACTICES.

138. THECOUNTYSHOULDREVISETHEZONINGCODETOENSURECONSISTENCYWITHTHEADOPTEDMODERATERISKWASTEPLAN,THENORTHERNTHURSTONCOUNTYGROUNDWATERMANAGEMENTPLAN,THECRITICALAREASORDINANCEANDTHECOMPREHENSIVEPLAN’SPOLICIES.

14. THECOUNTYSHOULDENCOURAGETHROUGHEDUCATIONANDTECHNICALASSISTANCETHEUSEOFSAFER,LESSHAZARDOUSPRODUCTSANDTHEREDUCTIONOFHAZARDOUSMATERIALS.

15. THECOUNTYSHOULDCONSULTWITHTHEAPPROPRIATEREGIONALTRANSPORTATIONPLANNINGAGENCIESANDNEIGHBORINGJURISDICTIONSPRIORTOESTABLISHINGPROHIBITIONSFORCOMMERCIALHAZARDOUSMATERIALSTRANSPORT.GOAL 4: PROVIDEPUBLICWATERANDSEWERUTILITYSERVICEATTHEAPPROPRIATELEVELSWHEREITSERVESTHEPUBLICINTEREST.

OBJECTIVEA:ProvideSsewersystemsshouldbeprovidedindesignatedurbangrowthareasandinruralareasonlyunderlimitedcircumstances.

POLICIES:

1. ThurstonCountyshouldallowsewersystemsindesignatedurbangrowthareas. Inruralareas,sewersystemsshouldbeallowedonlytocorrectidentifiedhealthhazardsorwaterqualitydeficienciesofareasofexistingdevelopment.ExpansionorextensionintoruralareasmustbeconsistentwiththeGrowthManagementAct.

Page 33: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐33

2. Decisionsonthedesigncapacityandserviceareadesignationforsuchsewersystemsinruralareasshouldbemadewithconsiderationofadoptedzoningdesignationsofadjacentareas.

3. WheresewersystemsarebeingprovidedtounincorporatedruralareasortheRochester‐GrandMoundarea,ThurstonCountyshouldbetheprimarysewersystemproviderthroughtheCountyServicesAct.

4. InunincorporatedareasinsidetheUrbanGrowthAreasaroundcities,thecitiesshouldbetheprimarysewerprovider. Asanexception,thecountycouldprovidesewersinaUGAonaninterimbasis(ifthecitiesareunabletoprovidetheservice)ortoprotectwaterquality.

5. Utilityserviceswithingrowthareasshouldbephasedoutwardfromtheurbanizingcoreasthatcorebecomessubstantiallydeveloped,inordertoconcentrateurbangrowthandinfilling.

6. TheCountyshoulddevelop,andperiodicallyreviewandupdate,acomprehensiveseweragegeneralplanforallunincorporatedruralareaswheretherearehealthandwaterqualityproblemsrelatedtosewageinareasofexistingdevelopment,andinallurbangrowthareaswherenosewerageplanninghasbeendone.

NOTE: OtherrelatedpoliciesdealingwithsewersystemsandwaterqualityarefoundintheChapter9(NaturalEnvironment).

OBJECTIVEB:ConsideraAllfactorsandimpactsshouldbeconsideredindeterminingappropriatesewagetreatmentanddisposalmethods.

POLICIES:

1. Wastewaterdisposalmethodsshouldbedeterminedbyconsideringallfactors,suchasenvironmentalimpacts,long‐termeffects,technicalfeasibility,andcosteffectiveness,especiallythemaintenanceandimprovementofwaterquality.

2. Wastewatercollection,treatment,anddisposalalternativesshouldbeencouragedwherefeasible,wherewaterqualitycanbeprotectedand/orwhereappropriateoperationandmaintenanceareprovided.

3. Alternativemethodsofwastewatercollection,treatment,anddisposalshouldbediscouragedinareaswheresewerserviceisprovidedorplanned. Inotherareas,theyshouldbeconsideredonlywhenanacceptableplanforoperationandmaintenanceisprovided,andtheywillnotadverselyaffectgroundandsurfacewaterqualityand/orpublichealth.

4. Thecountyshouldmonitorthefunctioningofon‐sitewastewaterdisposalsystemsandrequirethattheybemaintainedinaconditionthatwillassuretheirlongevity,protectpublichealth,andpreventcontaminationofsurfaceandgroundwater.

5. ThecountyshouldperiodicallyreviewandupdatethecapacityandalternativesforwastewatertreatmentrelatedtothelimitsoftheLOTTtreatmentplant.

Page 34: September 2018 Public Draft CHAPTER 7 UTILITIES

Utilities THURSTON COUNTY COMPREHENSIVE PLAN

September 2018 Public Draft

7‐34

6. Thecountyshouldreviewandrevisepoliciesforon‐sitewastewaterdisposalalternativestocomplywiththeabovepoliciesandadoptedstatewastewaterdisposalregulations.

7. Thecountyshouldexaminethebuildingcodeforstandardsforlow‐waterusefixtures,andshouldmakeavailabletoresidentsliteraturecomparingefficiencyoflow‐waterusefixturesandissuesrelatedtotheno‐flowalternative.

NOTE:Ecologydoesnotallowdischargeofchlorine.

OBJECTIVEC:Drinkingwaterserviceinsideurbangrowthareasshouldbeareprovidedbycitiesorprivateutilitysystemswhicharethedesignatedserviceprovidersthroughcoordinatedwatersystemplanning;theCountyshouldprovidesdrinkingwatersystemsinruralareasonlyunderlimitedcircumstances.

POLICIES:

1. Inordertoresolvedocumentedhealthhazards,safetyorpollutioninareasofexistingruraldevelopment,thecountymayserveasthewaterutilityowner,ordevelopaproactiveassistanceprogramfocusedonkeepingsmalldistributionsystemsinprivateownership.

2. Inruralareaswherethecountyprovidessewerservice,thecountyoraprivateutilitysystemshouldalsobethewaterprovider.

NOTE: SeeChapter9(NaturalEnvironment)forotherpoliciesrelatedtomanagementofwatersystemsandwaterresources.