One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro. net PLANNING AND PROGRAMMING COMMITTEE SEPTEMBER 18, 2013 SUBJECT: 2013 CALL FOR PROJECTS ACTION: APPROVE 2013 COUNTYWIDE CALL FOR PROJECTS RECOMMENDATION Approve the following actions for 2013 Countywide Call for Projects (Call), as further described in this report and attachments: A. Approve the recommendations in Attachment A responding to the Technical Advisory Committee (TAC) motions regarding the 2013 Call and additional funding recommendations; B. Program $199.39 million in eight modal categories as shown in Attachment B. This amount also programs the 2012 Deobligations and the 2013 Call TAC reserve; C. Conditionally approve the 2013 Call in Attachment B subject to later review by the MTA Board of Directors once the impacts of State and the Southern California Association of Governments (SCAG) project selection processes are finalized for the Active Transportation Program; D. Amend the recommended 2013 Call Program of Projects into the FY 2013-2014 Los Angeles County Regional Transportation Improvement Program (Regional TIP); E. Administer the 2013 Call as a project-specific grant program with the requirement that project sponsors bear all cost increases; F. Authorize the Chief Executive Officer (CEO) to administratively provide project sponsors with funding in earlier years than shown, if the project sponsor can demonstrate project readiness to proceed, has sufficient local match and such funds are available; and . G. Adopt the resolution contained in Attachment C required by SCAG which certifies that Los Angeles County has the resources to fund the projects in the FY 2013-2014 Regional TIP and affirms its commitment to implement all of the projects in the program. 13

Upload: others

Post on 08-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • One Gateway Plaza Los Angeles, CA 90012-2952

    213.922.2000 Tel metro. net

    PLANNING AND PROGRAMMING COMMITTEE SEPTEMBER 18, 2013

    SUBJECT: 2013 CALL FOR PROJECTS

    ACTION: APPROVE 2013 COUNTYWIDE CALL FOR PROJECTS

    RECOMMENDATION

    Approve the following actions for 2013 Countywide Call for Projects (Call), as further described in this report and attachments:

    A. Approve the recommendations in Attachment A responding to the Technical Advisory Committee (TAC) motions regarding the 2013 Call and additional funding recommendations;

    B. Program $199.39 million in eight modal categories as shown in Attachment B. This amount also programs the 2012 Deobligations and the 2013 Call TAC reserve;

    C. Conditionally approve the 2013 Call in Attachment B subject to later review by the MT A Board of Directors once the impacts of State and the Southern California Association of Governments (SCAG) project selection processes are finalized for the Active Transportation Program;

    D. Amend the recommended 2013 Call Program of Projects into the FY 2013-2014 Los Angeles County Regional Transportation Improvement Program (Regional TIP);

    E. Administer the 2013 Call as a project-specific grant program with the requirement that project sponsors bear all cost increases;

    F. Authorize the Chief Executive Officer (CEO) to administratively provide project sponsors with funding in earlier years than shown, if the project sponsor can demonstrate project readiness to proceed, has sufficient local match and such funds are available; and

    . G. Adopt the resolution contained in Attachment C required by SCAG which certifies that Los Angeles County has the resources to fund the projects in the FY 2013-2014 Regional TIP and affirms its commitment to implement all of the projects in the program.

    13

  • ISSUE

    In January 2013, we received 207 applications for 2013 Call funding. Over the past eight months, we have evaluated the applications, met with TAC and its Subcommittees, and TAC has held project sponsor appeals. Based on the evaluations and taking TAG's recommendations into consideration, we are recommending funding for 96 projects totaling $199.39 million. Board approval is necessary to program the funds to these 96 projects.

    DISCUSSION

    Background

    Federal statute (Title 23 U.S.C. 134 (g) & (h)) and State statute (P.U.C. 130303) require that we prepare a Transportation Improvement Program (TIP) for Los Angeles County. The TIP allocates revenues across all surface transportation modes based on the planning requirements of the federal Moving Ahead for Progress in the 21st Century Act (MAP-21).

    We accomplish these mandates, in part, by programming transportation revenues through the Call process wherein Los Angeles County local agencies may apply for funding of regionally significant projects. These regionally significant projects are often beyond the fiscal capabilities of local sponsors. The Call process provides an opportunity for these additional projects to be funded to meet the County's transportation needs. The Call implements MTA's multimodal programming responsibilities for Los Angeles County and the Board-adopted 2009 LRTP. The Call process awards funds on a competitive basis for projects that successfully demonstrate their mobility benefits.

    Call for Projects Overview

    Work on the 2013 Call process began in April 2012, earlier than typical by four months, in response to the 2011 Call for Projects Survey which identified the need for additional time for potential applicants to complete applications and avoid the holiday timeframe as well as to conduct additional outreach to local agency staff. The additional outreach and time resulted in applications received from three agencies which have not participated in the Call since prior to 2001- Bell, Cudahy, and La Verne. Applications from two of these agencies have been recommended for funding in this Call.

    MTA's TAC and its Subcommittees were consulted at various steps throughout the development process. In addition to monthly updates before T AC and the Streets & Freeways (S&F) Subcommittee, staff met approximately 10 times with the 2013 Call Working Group, comprised of members of the S&F Subcommittee, Bus Operations Subcommittee (80S), Transportation Demand Management/Air Quality (TDM/AQ)

    2013 Countywide Call for Projects Page 2

  • Subcommittee, and Local Transit Systems Subcommittee (L TSS), to consider potential technical changes for incorporation into the 2013 Call Draft Application Package.

    In October 2012, the Board approved the 2013 Call Application Package, which provided instructions to project applicants. We hosted a Call Workshop on October 10, 2012 and conducted workshops in the six subregions which requested them.

    A total of 207 project applications were received in January 2013, and the technical evaluation process began. This evaluation was conducted by internal technical teams who reviewed applications within each of the transportation modal categories using the Board-approved application requirements and evaluation criteria. After the Board approved the Preliminary Project Funding Strategy in June 2013, a preliminary project recommendations list was developed, posted online, and mailed to project applicants and TAC members in late June/early July.

    Fund Estimate Assumptions

    In April 2013, the Board adopted a preliminary fund estimate of $199.39 million for the five-year Call period. The Board also adopted the preliminary modal category funding marks based on federal, state and local fund forecasts used to develop the 2009 LRTP.

    Forecasts for the local fund sources are consistent with the 2009 LRTP and MTA's Debt Policy. Federal funding forecasts are based on historical trends, but are adjusted to reflect federal Highway Trust fund growth rates, changes in future federal reauthorizations, and possible downside risks (e.g., possible reductions in amounts of Congestion Mitigation and Air Quality Improvement [CMAQ] Program funds and Transportation Alternative [TA] Program funds for FY 2015 and beyond). State fund forecasts are also based on historical trends, but do not reflect growth due to higher priority needs such as State Highway Safety, Maintenance, and Operating costs. The specific funding sources and amounts chosen for the 2013 Call are subject to change based upon the projects finally selected and other factors, including project eligibility and funding availability.

    The Call for Projects process has been used by the Board to program Transportation Enhancements funding since 1991. In its MAP-21 legislation last year, Congress consolidated the Transportation Enhancements program into a new program entitled the TA program. As part of implementing MAP-21, the State Legislature is now considering using the Governor's Active Transportation Program proposal to guide the future use of these new TA funds. The Governor's proposal would consolidate the programming and administration of federal funding from theTA program, other federal funds, and funding from several state programs into a single state program called the Active Transportation Program. The CTC and/or SCAG would be responsible for project selection.

    The consolidation of the TA program into the Active Transportation Program means that $28.6 million in funds assumed to be available for the Call for Projects must now be secured through this new programming process. There are $49.5 million of bicycle and

    2013 Countywide Call for Projects Page 3

  • pedestrian improvement projects recommended for funding in this Call. We propose to require all recommended Bicycle and Pedestrian projects to reapply through the new Active Transportation program. If at least $28.6 million is secured through the Active Transportation program, MTA will fund up to $20.9 million of recommended Bicycle and Pedestrian projects that do not successfully compete in the new Active Transportation program process. In the event that the up to $20.9 million is insufficient, we would return to the Board with a final recommendation to address any potential shortfall. If the $28.6 million targeted amount from the Active Transportation Program is exceeded, MTA's Call for Projects funds will be freed-up for future Call for Project programming in a later cycle in a category to be determined by the Board. Once the State Active Transportation Program is established and guidelines are issued, staff will return to the Board with a final recommendation for project funding that is most advantageous to maximizing funds for Los Angeles County.

    Technical Advisorv Committee (TAC)

    A special TAC meeting was held on July 24th to review the preliminary project scores and funding recommendations, and again on July 30th to hear appeals from 1 0 agencies on 17 projects. TAC concurred with staffs preliminary modal recommendations in the Regional Surface Transportation Improvements, Goods Movement Improvements, Transportation Demand Management, Transit Capital, and Transportation Enhancement Activities modes. They recommended funding for one additional project in each of the following modes - Signal Synchronization and Bus Speed Improvements, Bicycle Improvements, and Pedestrian Improvements. Staff concurred with the TAC recommendations.

    Attachment A is a matrix of staff responses to the TAC motions.

    Final Recommendations

    In formulating our final funding recommendations, TAC motions were reviewed. Attachment C is the Board resolution certifying that Los Angeles County has the resources to fund the projects in the FY 2013-2014 Regional TIP. Attachment D provides additional background information on funding sources for the 2013 Call, while Attachment E provides a description of each project recommended for funding.

    DETERMINATION OF SAFETY IMPACT

    The 2013 Call will not have any adverse safety impacts on our employees and patrons.

    2013 Countywide Call for Projects Page 4

  • FINANCIAL IMPACT

    A total of $199.39 million is recommended to fund the 2013 Call listed in Attachment A. Call funding is subject to the availability of state and federal funding as planned. Should state and federal funding be reduced, we will return to the Board with recommendations on how to fund all of MTA's programs, including the 2013 Call. There is no funding programmed for projects approved through the 2013 Call in the FY 2013-14 Budget. Funding of $199.39 million for the 2013 Call will be included in FYs 2014-15, 2015-16, 2016-17, 2017-18, and 2018-19 budgets in cost centers 0441- Subsidies to Others and 0442- Subsidies to Others. Since this is a multi-year program, the cost center manager and Executive Directors of Countywide Planning and Highway Program will be accountable for budgeting the costs in future years.

    Impact to Budget

    Proposition C 1 0% and 25% local sales tax funds will be included in the fiscal years' budgets as outlined above. The sources of funds for these activities are Proposition C 10%, Proposition C 25%, Congestion Mitigation and Air Quality (CMAQ), Regional Improvement Program (RIP), and Regional Surface Transportation Program (RSTP). The Proposition C 1 0% and Proposition C 25% funds are not eligible for Metro bus and rail operating and capital expenditures.

    While the source of CMAQ funds is eligible for operating purposes or transit capital, there are no additional operating expenses eligible under CMAQ funding. However, CMAQ funds could be used for transit capital purposes. Los Angeles County must strive to fully obligate its share of CMAQ funding by May 1st of each year, otherwise we risk its redirection to other California Regional Transportation Planning Agencies by Caltrans. We recommend the use of long-lead-time CMAQ funds as planned to ensure utilizing our federal funds.

    RSTP funds in this action could be used for our transit capital needs. Also, while these funds cannot be used directly for our bus or rail operating needs, they could free-up other such operating eligible funds by exchanging the funds used for our paratransit provider, Access Services Incorporated. Since these RSTP funds originate in the Highway portion (Title 23) of SAFETEA-LU, they are among the most flexible funds available to us. We do not recommend this action.

    ALTERNATIVES CONSIDERED

    The Board may suggest alternative projects for funding through the 2013 Call process. Projects added to the recommended list will result in other projects either moving off the funded list or projects receiving reduced levels of funding.

    The Board could also choose to defer the 2013 Call. This is not recommended because the 2009 LRTP assumed the Call would continue. In addition, the Call provides funding to local agencies for transportation improvements, allowing local agencies to partner

    2013 Countywide Call for Projects Page 5

  • with us in improving the transportation system, thereby fulfilling our statutory transportation programming responsibilities.

    NEXT STEPS

    Upon Board approval of the 2013 Call, the TIP will formally be transmitted to SCAG and the CTC for processing. This same TIP will be amended into the 2014 STIP.

    Project sponsors will be notified of the final funding awarded by the Board and the sponsor's local match necessary to proportionally match awarded funds. A MTA-sponsored workshop will be scheduled with successful project sponsors for October 2013 to review and discuss MTNproject sponsor administrative conditions, and federal, state and local programming requirements.

    Through the 2013 Call development process, MTA acknowledges the opportunity to use federal and state funds to accelerate the programming of approved projects. Upon Board approval of the 2013 Call, we will notify successful project sponsors of the possibility for advancing federal and state funds to earlier years in the 2013 Call cycle. As part of this notification, instructions will be provided as to the deadline for submitting requests and the criteria we will use to evaluate the submittals. To provide all project sponsors equal access to earlier year funding, all requests will be evaluated concurrently after the submittal deadline. If more requests are received than available funds, project advancement will be based on the project's ranking as determined by its overall evaluation score and the readiness of the project for early delivery.

    After Board approval of the Call, the following schedule reflects the next steps.

    Successful Project Sponsor Workshop SCAG Approves Regional TIP Caltrans Approves Regional TIP CTC Adopts the 2014 State TIP U.S. Department of Transportation Approves Federal TIP

    ATTACHMENTS

    October 10, 2013 December 2013 March 2014 March 2014 April2014

    A. Final Staff Recommendations Resulting from TAC Motions B. MTA 2013 Countywide Call for Projects Recommended Program of Projects C. 2013 Call for Projects Resolution D. Additional Background Information E. 2013 TIP Countywide Call for Projects Descriptions of Recommended Projects

    Prepared by: Brad McAIIester, Executive Officer, (213) 922-2814 David Yale, Executive Officer, (213) 922-2469 Renee Berlin, Executive Officer, (213) 922-3035

    2013 Countywide Call for Projects Page 6

  • Executive Director, Countywide Planning

    Arthur T. Leahy Chief Executive Officer

    2013 Countywide Call for Projects Page 8

  • ATTACHMENT A

    MTA Staff Response to TAC Motions

    RAINBOW APPL MTA

    MTAADDL TOTALMTA RPT AMOUNT

    ORIGINAL FUNDS FUNDING

    MODE MODE PROJ# PROJ TITLE SPONSOR MOTION STAFF RESPONSE REQUEST AMOUNT RECOM RECOM RANKING (inflated$) RECOM (inflated$) (inflated$) # (inflated$)

    TAC MOTIONS (July 30, 2013)

    Regional Surface Transportation Improvements, Goods Approve staff Movement Improvements, Transportation Demand funding Staff concurs with T AC recommendation Management, Transit Capital and Transportation recommendations Enhancement Activities modes for the projects

    Staff concurs with TAC

    Partially fund recommendation and will fund the

    Long Beach's amount

    project with SS& Metro Blue

    City of requested in 2013 Call for

    22 BSIP

    F7313 Line Signal

    Long application with Projects T AC $1,254,600 0 $992,893 $992,893

    Beach 2013 Call for Prioritization

    Projects T AC Reserve funds of $292,893 in

    Reserve Fund FY 15 and $700,000 in FY 16

    Staff concurs with TAC

    El Monte Fully fund amount recommendation and will fund the

    Regional requested in project with 17 Bike F7520

    Bicycle City of El application with 2013 Call for $986,803 0 $986,803 $986,803 Commuter Monte 2013 Call for

    Projects T AC Access Projects T AC Reserve Funds Improvements Reserve Fund of $971 ,895 in

    FY17 and $14,908 in FY18

    ' -

    2013 Countywide Call for Projects Attachment A Page 1

  • ATTACHMENT A

    MTA Staff Response to TAC Motions

    RAINBOW APPL MTA MTAADDL RPT

    AMOUNT ORIGINAL FUNDS MODE MODE PROJ# PROJ TITLE SPONSOR MOTION STAFF RESPONSE REQUEST AMOUNT RECOM RANKING (inflated$) RECOM (inflated$) # (inflated$)

    Staff concurs with TAC recommendation

    Florence Fully fund amount and will fund the

    Avenue requested in project with

    14 Ped F7634 Pedestrian City of Bell application with 2013 Call for

    $2,220,304 0 $2,220,304 2013 Call for Projects T AC Improvement

    Projects T AC Reserve Funds Project

    Reserve Fund of $243,543 in FY18 and $1,976,761 in FY19

    Notes: At its July 17,2013 meeting, the TDM/AQ Subcommittee took action approving the Call for Projects staff funding recommendations At its July 18, 2013 meeting, the S&F Subcommittee took action approving the Call for Projects staff funding recommendations On July 24, 2013, the L TSS Subcommittee took action approving the Call for Projects staff funding recommendations On August 5, 2013, the BOS Subcommittee took action approving the Call for Projects staff funding recommendations

    2013 Countywide Call for Projects

    TOTAL MTA FUNDING RECOM

    (inflated$)

    $2,220,304

    Attachment A Page 2

  • MTA Staff Response to TAC Motions

    MTA TECHNICAL ADVISORY COMMITTEE MEMBERSHIP

    Auto Club of Southern California (1) Marianne Kim

    Bus Operations Subcommittee (2) Joyce Rooney Beach Cities Transit

    Paula Faust Gardena Municipal Bus Lines

    California Highway Patrol (1) Lieut. Cindy Pontes

    Caltrans (2) Alberto Angelini David Sosa

    Steve Finnegan (Alternate)

    Susan Lipman (Alternate) City of Santa Clarita - Transit

    Jane Leonard (Alternate) Culver City- City Bus

    Ofc. Christian Cracraft (Alternate)

    Jimmy Shih (Alternate) Vijay Kopparam (Alternate)

    Citizen Representative-Technical Expertise On ADA Requirements (1) Ellen Blackman Vacant (Alternate)

    City Of Long Beach (1) Nancy Villasenor

    City Of Los Angeles (3) James Lefton Zaki Mustafa FerdyChan

    2013 Countywide Call for Projects

    Dave Roseman (Alternate)

    Corinne Ralph (Alternate) Ken Husting (Alternate) Shirley Lau (Alternate)

    ATTACHMENT A

    Attachment A Page 3

  • County Of Los Angeles (3) Leon Freeman John Walker Patrick V. DeChellis

    Goods Movement (1 *) Lupe Valdez

    League of California Cities (8) David Kriske City of Burbank

    Mohammad Mostahkami City of South Gate

    Robert L. Brager City of Malibu

    Allen Thompson City of Lancaster

    Larry Stevens City of San Dimas

    Robert Newman City of Santa Clarita

    Robert Beste City ofTorrance

    2013 Countywide Call for Projects

    MTA Staff Response to TAC Motions

    MTA TECHNICAL ADVISORY COMMITTEE MEMBERSHIP (Cont.)

    Troy Evangelho (Alternate) Allan Abramson (Alternate) Paul Maselbas (Alternate)

    LaDonna DiCamillo (Alternate)

    Dennis Woods (Alternate) City of South Pasadena

    Lisa Rapp (Alternate) City of Lakewood

    Ramiro Adeva (Alternate) City of Agoura Hills

    Mike Behen (Alternate) City of Palmdale

    Craig Bradshaw (Alternate) City of Claremont

    Vacant (Alternate)

    Ted Semaan (Alternate) City ofTorrance

    ATTACHMENT A

    Attachment A Page 4

  • MTA Staff Response to TAC Motions

    MTA TECHNICAL ADVISORY COMMITTEE MEMBERSHIP (Cont.)

    David Feinberg City of Santa Monica

    Local Transit Systems Subcommittee (2) Ryan Thompson City of Calabasas

    Alex Gonzalez City of Covina

    Metropolitan Transportation Authority (2) Fanny Pan Christopher Gallanes

    Southern California Regional Rail Authority (SCRRA) (1 *) Anne Louise Rice

    South Coast Air Quality Management District (SCAQMD) (1 *) Eyvonne Drummonds

    Southern California Association of Governments (SCAG) (1 *) Warren Whiteaker

    Sharon Perlstein (Alternate) City ofWest Hollywood

    Kathryn Engel (Alternate) City of Glendale

    Joe Barrios (Alternate) City of Santa Fe Springs

    Matthew Abbott (Alternate) Diane Corral-Lopez (Alternate)

    Karen Sakoda (Alternate)

    Kathryn Higgins (Alternate)

    Annie Nam (Alternate)

    Transportation Demand Management/Air Quality Subcommittee (2) Mark Yamarone Phil Aker (Alternate) City of Pasadena - Transportation City of Los Angeles

    2013 Countywide Call for Projects

    ATTACHMENT A

    Attachment A Page 5

  • Mark Hunter City of Santa Clarita

    * Ex-Officio Member

    2013 Countywide Call for Projects

    MTA Staff Response to TAC Motions

    Vacant (Alternate)

    ATTACHMENT A

    Attachment A Page 6

  • 2013 TIP CALL FOR PROJECTS- RECOMMENDED PROGRAM OF PROJECTS PRELIMINARY PROJECT RECOMMENDATIONS

    INFLATED IN WHOLE DOLLARS

    Number of Applications Inflated Total Inflated Total Submitted Funded Project Expenses Project Requests

    2A Regional Surface Transportation Improvements 32 12 $277,405,382 $130,349,476

    2B Goods Movement Improvements 11 5 $157,532,342 $58,950,121

    3 Signal Synchronization and Bus Speed Improvements 23 20 $63,321,365 $47,901,837

    4 Transportation Demand Management 9 8 $10,340,963 $6,999,413

    SA Bicycle Improvements 43 17 $112,679,733 $87,285,206

    SB Pedestrian Improvements 36 12 $83,145,579 $61,513,302

    6 Transit Capital 32 17 $133,392,013 $77,565,484

    7 Transportation Enhancement Activities 21 5 $42,840,466 $28,693,311

    207 96 $880,65 7,843 $499,258,1 so

    2013 Countywide Call for Projects

    ATTACHMENT 8

    AMOUNT RECOMMENDED

    $43,149,002 $30,105,000

    $34,172,888

    $5,661,688

    $26,796,719

    $22,753,388

    $31,515,001

    $5,236,314

    $199,390,000

    Attachment 8 Page 1

  • 2013 TIP CALL FOR PROJECTS· RECOMMENDED PROGRAM OF PROJECTS ATTACHMENT B

    PRELIMINARY PROJECT RECOMMENDATIONS INFLATED IN WHOLE DOLLARS

    Mode: 2A Regional Surface Transportation Improvements

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY17 FY 18 FY 19 Total

    F7117 Redondo & Anaheim Intersection CITY OF LONG BEACH $741,600 $0 $0 $0 $0 $741,600 Improvements

    2 F7118 Florence Ave. Bridge over San CITY OF DOWNEY $0 $944,290 $972,770 $0 $0 $1,917,060 Gabriel River

    -------- ---------------------

    3 F71 01 Prairie Avenue Mobility Project CITY OF HAWTHORNE $0 $0 $35,385 $813,844 $1,739,667 $2,588,896 ------------ ---- - -------- -

    4 F7123 Magnolia Bl Widening (North Side) CITY OF LOS ANGELES $100,425 $413,790 $2,843,221 $2,104,213 $0 $5,461,649 Cahuenga Bl to Vineland

    -

    5 F7119 Huntington Drive M ultimodal CITY OF SAN MARl NO $0 $105,304 $834,131 $0 $0 $939,435 Capacity Enhancements

    - - -- --------- ------ --------

    6 F7121 Rancho Vista Blvd Widening CITY OF PALM DALE $0 $333,723 $52,346 $3,528,619 $959,560 $4,874,248

    7 F7125 Sherman Way Widening between CITY OF LOS ANGELES $0 $0 $142,090 $62,212 $769,924 $974,226 Whitsett Ave to Hollywood Fwy

    -- ----- -- ------- - - --------- ---------------- -----------------------

    8 F7105 Lyons AvenuefDockweiler Drive CITY OF SANTA CLARITA $0 $0 $0 $103,993 $5,795,000 $5,898,993 Extension

    --- -- --

    9 F7115 The Old Road-Lake Hughes Rd to COUNTY OF LOS ANGELES $0 $0 $2,745,976 $1,261,120 $1,591,749 $5,598,845 Hillcrest Pkwy Phase I

    10 F7131 Century Boulevard Extension CITY OF LOS ANGELES $4,157,975 $1,740,391 $0 $0 $0 $5,898,366 between Grape Street and Alameda

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 2

  • 2013 TIP CALL FOR PROJECTS· RECOMMENDED PROGRAM OF PROJECTS PRELIMINARY PROJECT RECOMMENDATIONS

    INFLATED IN WHOLE DOLLARS

    Mode: 2A Regional Surface Transportation Improvements

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY 17 FY 18

    11 F71 09 Soto Street Widening from CITY OF LOS ANGELES $0 $4,962,502 $1,093,000 $0 Multnomah St to Mission Rd

    12 F7120 Eastern Avenue and Florence CITY OF BELL GARDENS $0 $0 $31,082 $1 '126,000 Avenue RSTI Project

    ----- -- ----------------- ----

    $5,000,000 $8,500,000 $8,750,001 $9,000,001

    ATTACHMENT B

    FY19 Total

    $0 $6,055,502

    $1,043,100 $2,200,182

    $11 ,899,000 $43,149,002

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 3

  • 2013 TIP CALL FOR PROJECTS • RECOMMENDED PROGRAM OF PROJECTS PRELIMINARY PROJECT RECOMMENDATIONS

    INFLATED IN WHOLE DOLLARS

    Mode: 28 Goods Movement Improvements

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY17 FY 18

    1 F7200 SR57f60 Confluence:WB SR60fNB CITY OF INDUSTRY $0 $0 $0 $3,411,780 SR57 Grand Off-Ramp lnterchg

    2 F7205 Alameda St. Widening from CITY OF LOS ANGELES $0 $861,635 $1,498,660 $3,513,120 Anaheim St. to 300ft South of PCH

    --------------------- -----------------------

    3 F7207 Anaheim Street Widening--Farragut CITY OF LOS ANGELES $0 $424,400 $382,550 $2,334,500 Ave to Dominguez Channel

    4 F7201 Commerce Goods Movement CITY OF COMMERCE $0 $68,965 $618,788 $0 Atlantic Blvd: Washington to Como

    5 F7204 Pier B Street Freight Corridor PORT OF LONG BEACH $0 $0 $0 $3,490,600 Reconstruction

    $0 $1,355,000 $2,499,998 $12,750,000

    ATIACHMENTB

    FY19 Total

    $6,036,001 $9,447,781

    $0 $5,873,415

    $0 $3,141,450

    $0 $687,753

    $7,464,001 $1 0, 954,601

    $13,500,002 $30,1 05,000

    **NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 4

  • 2013 TIP CALL FOR PROJECTS - RECOMMENDED PROGRAM OF PROJECTS ATIACHMENT B

    PRELIMINARY PROJECT RECOMMENDATIONS INFLATED IN WHOLE DOLLARS

    Mode: 3 Signal Synchronization and Bus Speed Improvements

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY 17 FY 18 FY 19 Total

    F731 0 South Bay Forum Traffic Signal COUNTY OF LOS ANGELES $0 $0 $0 $1,203,651 $1,858,390 $3,062,041 Corridors Project

    2 F7305 Gateway Cities Forum Traffic Signal COUNTY OF LOS ANGELES $0 $0 $0 $1,273,007 $1,965,474 $3,238,481 Corridors Project, Phase

    ----- ------

    3 F7316 Artesia Corridor ATCS CITY OF LONG BEACH $0 $196,035 $176,924 $1,454,078 $0 $1,827,037 Enhancement Project

    --- -----------

    4 F7307 San Gabriel Valley Forum Traffic COUNTY OF LOS ANGELES $0 $0 $0 $1,424,705 $2,199,689 $3,624,394 Signal Corridor Project

    5 F7303 Network-wide Signal Synch with CITY OF CULVER CITY $30,000 $471,084 $488,433 $0 $0 $989,517 VI D & Arterial Performance Me

    -- - ---- ---- ------------------------- ---- - -- ---- --

    6 F7314 Santa Fe Avenue Synchronization CITY OF LONG BEACH $0 $212,200 $191,275 $1,516,722 $0 $1,920,197 Enhancement Project

    7 F7317 Pasadena Area Rapid Transit CITY OF PASADENA $0 $0 $0 $455,057 $702,590 $1,157,647 System- Transit Signal Priority

    ---------------

    8 F7308 East Los Angeles Traffic Signal COUNTY OF LOS ANGELES $0 $0 $0 $1,078,470 $1,665,117 $2,743,587 Corridor Project.

    9 F7309 Tweedy Boulevard and Signal CITY OF SOUTH GATE $0 $0 $0 $517,780 $799,432 $1,317,212 Synchronization Project

    10 F7311 Downey Citywide Transit Priority CITY OF DOWNEY $0 $0 $31,835 $495,440 $764,940 $1,292,215 System Program

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 5

  • 2013 TIP CALL FOR PROJECTS· RECOMMENDED PROGRAM OF PROJECTS ATTACHMENT B

    PRELIMINARY PROJECT RECOMMENDATIONS INFLATED IN WHOLE DOLLARS

    Mode: 3 Signal Synchronization and Bus Speed Improvements

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY 17 FY 18 FY 19 Total

    11 F7306 Foothill Boulevard Traffic Signal COUNTY OF LOS ANGELES $0 $0 $0 $1,151,091 $1,777,240 $2,928,331 Corridor Project

    12 F7321 Glendale Regional Arterial Traffic CITY OF GLENDALE $0 $409,546 $121,323 $0 $0 $530,869 Performance Measurement System

    -

    13 F7322 Broadway Intersection CITY OF CARSON $0 $257,027 $271,611 $0 $0 $528,638 Improvements· Traffic Signal Modifications

    ----------

    14 F7300 Diamond Bar Adaptive Traffic CITY OF DIAMOND BAR $0 $454,108 $218,600 $734,152 $0 $1,406,860 Control System Project

    -- ----------- --

    15 F7312 Huntington Park Signal CITY OF HUNTINGTON PARK $0 $0 $0 $368,294 $568,633 $936,927 Synchronization & Bus Speed lmproveme

    16 F7318 Adaptive Traffic Control Network· CITY OF PASADENA $0 $0 $0 $651,509 $1,005,904 $1,657,413 Phase II

    ------------------ ------- ----------- ----- -

    17 F7301 Intelligent Transportation Systems CITY OF SANTA CLARITA $0 $0 $0 $682,409 $1,261,350 $1,943,759 (ITS) Phase VI

    18 F7320 Santa Monica Signal Sync CITY OF SANTA MONICA $0 $0 $0 $540,480 $0 $540,480 Improvements

    19 F7319 Intelligent Transportation Systems CITY OF INGLEWOOD $0 $0 $0 $603,150 $931,240 $1,534,390 (ITS) · Phase V

    ** NOTE. Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 6

  • 2013 TIP CALL FOR PROJECTS • RECOMMENDED PROGRAM OF PROJECTS PRELIMINARY PROJECT RECOMMENDATIONS

    INFLATED IN WHOLE DOLLARS

    Mode: 3 Signal Synchronization and Bus Speed Improvements

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY17 FY18

    20 F7313 Long Beach's Metro Blue Line CITY OF LONG BEACH $292,893 $700,000 $0 $0 Signal Prioritization

    $322,893 $2,700,000 $1,500,001 $14,149,995

    ATIACHMENT B

    FY 19 Total

    $0 $992,893

    $15,499,999 $34,1 72,888

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 7

  • 2013 TIP CALL FOR PROJECTS - RECOMMENDED PROGRAM OF PROJECTS ATTACHMENT B

    PRELIMINARY PROJECT RECOMMENDATIONS INFLATED IN WHOLE DOLLARS

    Mode: 4 Transportation Demand Management

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY17 FY 18 FY 19 Total

    --F7700 Willowbrook Interactive COUNTY OF LOS ANGELES $0 $0 $0 $55,184 $88,074 $143,258

    Information Kiosks

    2 F7702 Downtown Huntington Park CITY OF HUNTINGTON PARK $0 $0 $84,161 $0 $461,813 $545,974 "i-Park" System Implementation

    ----

    3 F7704 Multi-modal Wayfinding: CITY OF SANTA MONICA $0 $364,263 $570,537 $354,339 $0 $1,289,139 Congestion Reduction/Station Access

    ---------- -- -- - - --- --- --- --- ---

    4 F7703 ExperienceLA 3.0--Mobility in the COUNTY OF LOS ANGELES $0 $465,975 $170,421 $71,833 $70,775 $779,004 Cloud

    5 F7707 Last Mile Folding Bike Incentive CITY OF LOS ANGELES $0 $169,760 $174,880 $180,160 $169,770 $694,570 Program

    -- --- ------

    6 F7701 East Los Angeles Demonstration COUNTY OF LOS ANGELES $0 $0 $0 $91,206 $824,049 $915,255 Bicycle Sharing Program

    -

    7 F7708 Interactive Bicycle Board Demo CITY OF LOS ANGELES $0 $0 $26,232 $256,728 $264,252 $547,212 Project

    8 F7709 Glendale Regional Bike Parking CITY OF GLENDALE $0 $0 $0 $747,276 $0 $747,276 Network

    ----- ------- -----------~~------- ----

    $0 $999,998 $1,026,231 $1,756,726 $1,878,733 $5,661,688

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment 8 Page 8

  • 2013 TIP CALL FOR PROJECTS • RECOMMENDED PROGRAM OF PROJECTS ATTACHMENT B

    PRELIMINARY PROJECT RECOMMENDATIONS INFLATED IN WHOLE DOLLARS

    Mode: SA Bicycle Improvements

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY 17 FY 18 FY 19 Total

    1 F7508 Vincent Community Bikeway COUNTY OF LOS ANGELES $0 $0 $0 $164,959 $3,260,847 $3,425,806 Access

    2 F7521 Bicycle Transportation Plan CITY OF REDONDO BEACH $0 $233,420 $0 $1,328,680 $0 $1,562,100 Implementation- Phase II

    3 F7506 Chandler Bikeway Extension CITY OF BURBANK $0 $0 $0 $743,160 $1,896,124 $2,639,284 -- -------------------

    4 F7502 Pico Rivera Regional Bikeway CITY OF PICO RIVERA $0 $0 $0 $354,690 $1,954,249 $2,308,939 Project

    --------- --- -------" ------

    5 F7507 Ballona Creek Bike Path CITY OF CULVER CITY $0 $230,927 $0 $384,698 $0 $615,625 Connectivity Project at Higuera Bridge

    ----------

    6 F7516 Mulholland Highway Gap Closure CITY OF CALABASAS $0 $63,950 $0 $371,760 $0 $435,710

    7 F7519 Whittier Greenway Trail East CITY OF WHITTIER $0 $307,032 $0 $2,151,358 $0 $2,458,390 Extension

    ------------- ---- ------- --

    8 F7512 West Athens and West Carson COUNTY OF LOS ANGELES $0 $0 $0 $176,332 $894,238 $1,070,570 Community Bikeways

    -- ------ --- -

    9 F7522 Delta Avenue Bicycle Boulevard in CITY OF LONG BEACH $0 $150,940 $0 $864,974 $0 $1,015,914 the City of Long Beach

    10 F7523 Rosemead/South El Monte CITY OF ROSEMEAD $0 $0 $0 $73,190 $850,531 $923,721 Regional Bicycle Connector Project

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 9

  • 2013 TIP CALL FOR PROJECTS - RECOMMENDED PROGRAM OF PROJECTS ATIACHMENTB

    PRELIMINARY PROJECT RECOMMENDATIONS INFLATED IN WHOLE DOLLARS

    Mode: SA Bicycle Improvements --Proj

    Rank Num Project Title Project Sponsor FY 15 FY 16 FY17 FY 18 FY 19 Total

    11 F7524 La Verne Regional Commuter CITY OF LA VERNE $0 $0 $0 $428,521 $693,945 $1,122,466 Bicycle Gap Closure Project

    12 F7517 Bicycle Facility Improvements CITY OF ARCADIA $0 $0 $0 $118,230 $1,038,317 $1,156,547

    13 F7500 Hawthorne Boulevard Class II CITY OF LAWNDALE $0 $15,915 $0 $170,927 $0 $186,842 Bicycle Lanes

    - -- -- --------

    14 F7526 Las Tunas Drive Bicycle CITY OF TEMPLE CITY $0 $2,164,494 $557,374 $0 $0 $2,721,868 Improvements

    -- ------- ------ -

    15 F7514 Expo Bicycle Path Extension CITY OF SANTA MONICA $0 $0 $0 $1,466,052 $461,282 $1,927,334

    16 F7539 Bicycle Friendly Street Treatments CITY OF LOS ANGELES $0 $0 $437,200 $1,801,600 $0 $2,238,800 (3)

    17 F7520 El Monte Regional Bicycle CITY OF EL MONTE $0 $0 $971,895 $14,908 $0 $986,803 Commuter Access Improvements

    - - ---- --- ----------- ---- --- ---

    $0 $3,166,678 $1,966,469 $10,614,039 $11 ,049,533 $26,796,719

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 1 0

  • 2013 TIP CALL FOR PROJECTS - RECOMMENDED PROGRAM OF PROJECTS PRELIMINARY PROJECT RECOMMENDATIONS

    INFLATED IN WHOLE DOLLARS

    Mode: 58 Pedestrian Improvements

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY 17 FY18

    F7618 Las Tunas Dr Improvements and CITY OF TEMPLE CITY $0 $2,910,046 $0 $0 Safety Enhancement Project-PED

    2 F7600 Alhambra Ped CITY OF ALHAMBRA $0 $0 $59,787 $604,969 Improvement/Walking Viability Project on Valley

    3 F7620 Fernwood Avenue Pedestrian CITY OF LYNWOOD $0 $0 $0 $1,013,400 Transit Access and Connectivity

    4 F7624 Walk Pico! A Catalyst for CITY OF LOS ANGELES $0 $0 $222,010 $0 Community Vitality & Connectivity

    5 F7610 Aviation/LAX Green Line Station COUNTY OF LOS ANGELES $0 $0 $249,364 $0 Pedestrian Improvements

    6 F7622 LAN I- West Boulevard Community CITY OF LOS ANGELES $0 $0 $132,800 $136,809 Linkages Project

    7 F7636 Broadway Streetscape CITY OF LOS ANGELES $0 $425,758 $1,958,481 $0 Implementation (8th-9th)

    8 F7609 Hawthorne/Lennox Green Line COUNTY OF LOS ANGELES $0 $0 $287,553 $1,498,948 Station Pedestrian Improvements

    ---------------- - -------------

    9 F7612 Long Beach Boulevard Pedestrian CITY OF SOUTH GATE $0 $156,290 $652,635 $672,339 Improvements

    10 F7615 Market Street Pedestrian and CITY OF LONG BEACH $0 $833,716 $2,400,121 $0 Streetscape Enhancements

    ATIACHMENTB

    FY19 Total

    $0 $2,910,046

    $0 $664,756

    $1,582,371 $2,595,771

    $1,618,984 $1,840,994

    $1,337,972 $1,587,336

    $1,109,163 $1,378,772

    $0 $2,384,239

    $0 $1,786,501

    --------------

    $0 $1,481,264

    $0 $3,233,837

    -- -- -------------- --- --------------

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 11

  • 2013 TIP CALL FOR PROJECTS - RECOMMENDED PROGRAM OF PROJECTS PRELIMINARY PROJECT RECOMMENDATIONS

    INFLATED IN WHOLE DOLLARS

    Mode: 58 Pedestrian Improvements

    Proj Rank Num Project Title Project Sponsor FY 15 FY16 FY17 FY18

    11 F7628 Watts Streetscape Improvements CITY OF LOS ANGELES $0 $98,461 $0 $571 '107 Phase 2

    -- ---------

    12 F7634 Florence Avenue Pedestrian CITY OF BELL $0 $0 $0 $243,543 Improvement Project

    - ------- - -------------- - ------- ----

    $0 $4,424,271 $5,962,751 $4,741,115

    ATTACHMENT B

    FY 19 Total

    $0 $669,568

    $1,976,761 $2,220,304

    --------

    $7,625,251 $22,753,388

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 12

  • 2013 TIP CALL FOR PROJECTS - RECOMMENDED PROGRAM OF PROJECTS ATIACHMENTB

    PRELIMINARY PROJECT RECOMMENDATIONS INFLATED IN WHOLE DOLLARS

    Mode: 6 Transit Capital

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY17 FY18 FY 19 Total

    1 F7404 Vista Canyon Regional Transit CITY OF SANTA CLARITA $576,800 $2,231,707 $0 $0 $0 $2,808,507 Center

    2 F7422 Pasadena Replacement and Added CITY OF PASADENA $741,600 $742,700 $627,600 $0 $0 $2,111,900 Capacity of Clean Fuel Buses

    -- ---------

    3 F7400 Clean Fuel Bus Replacements CITY OF MONTEREY PARK $309,000 $424,400 $497,322 $0 $0 $1,230,722

    4 F741 0 Florence-Firestone/Walnut Park COUNTY OF LOS ANGELES $329,600 $367,374 $0 $0 $0 $696,974 Transit Vehicles

    5 F7414 Clean Fuel Buses for the Baldwin CITY OF BALDWIN PARK $329,600 $424,400 $396,481 $0 $0 $1 '150,481 Park Transit Service

    - - ---- -------- --

    6 F7413 Bus Replacement CITY OF CALABASAS $219,708 $0 $0 $0 $0 $219,708

    7 F7406 Avalon Clean Fuel Fleet CITY OF AVALON $309,000 $318,300 $393,480 $0 $0 $1,020,780 Replacement Project

    -- - --------------

    8 F7405 Purchase of Alternative Fuel CITY OF GARDENA $309,000 $742,700 $1,093,000 $0 $0 $2,144,700 Replacement Buses

    9 F7423 Downtown Bus Maintenance CITY OF LOS ANGELES $0 $0 $0 $0 $4,636,000 $4,636,000 Facility

    ---------------

    10 F7430 Purchase of Alternative Fuel Buses CITY OF GLENDALE $309,000 $424,400 $1,264,339 $0 $0 $1,997,739 for Glendale Beeline

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 13

  • 2013 TIP CALL FOR PROJECTS • RECOMMENDED PROGRAM OF PROJECTS ATTACHMENT B

    PRELIMINARY PROJECT RECOMMENDATIONS INFLATED IN WHOLE DOLLARS

    Mode: 6 Transit Capital

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY17 FY18 FY 19 Total

    11 F7402 LBT Clean Fuel Bus Replacement LONG BEACH TRANSIT $0 $0 $0 $900,800 $1,201,605 $2,102,405 Project

    12 F7407 City of La Canada-Flintridge Bus CITY OF LA CANADA FLINTRIDGE $343,497 $0 $0 $0 $0 $343,497 Replacement Project

    - - --------------- --- -----------

    13 F7424 Purchase DASH Replacement Clean CITY OF LOS ANGELES $0 $0 $0 $1,807,138 $1 '159,552 $2,966,690 Fuel Vehicles

    14 F7408 Burbank Transit Vehicle CITY OF BURBANK $723,195 $542,310 $878,433 $0 $0 $2,143,938 Replacement

    15 F7412 Los Angeles County/USC Medical COUNTY OF LOS ANGELES $0 $281,708 $0 $0 $0 $281,708 Center Transit Vehicle

    -- - -------- ------ -

    16 F7401 Culver CityBus Clean Fuel Bus CITY OF CULVER CITY $0 $0 $0 $1,690,231 $2,517,843 $4,208,074 Replacement

    17 F7420 El Monte Clean Fuel Bus CITY OF EL MONTE $0 $0 $349,346 $1,101,832 $0 $1,451 '178 Replacement

    ----------

    $4,500,000 $6,499,999 $5,500,001 $5,500,001 $9,515,000 $31,515,001

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 14

  • 2013 TIP CALL FOR PROJECTS • RECOMMENDED PROGRAM OF PROJECTS PRELIMINARY PROJECT RECOMMENDATIONS

    INFLATED IN WHOLE DOLLARS

    Mode: 7 Transportation Enhancement Activities --

    Proj Rank Num Project Title Project Sponsor FY 15 FY 16 FY17 FY 18

    F7807 Expo Station 4th Street Streetscape CITY OF SANTA MONICA $0 $0 $0 $337,800 Improvements to Downtown

    -- -------- ----- -- -------------

    2 F7806 Vermont Avenue Streetscape COUNTY OF LOS ANGELES $0 $0 $62,301 $662,088 Improvement Project

    3 F7814 LADOT Streets for People: Parklets CITY OF LOS ANGELES $0 $0 $437,200 $0 and Plazas

    ----------- ---

    4 F7817 Vermont Ave Stormwater Capture & CITY OF LOS ANGELES $721,000 $424,400 $0 $0 Greenstreet Transit Project

    5 F7812 Las Tunas Drive Complete Streets CITY OF TEMPLE CITY $257,500 $1,018,560 $0 $0 Improvement Project

    --

    $978,500 $1,442,960 $499,501 $999,888

    ATTACHMENT B

    FY 19 Total

    $1,274,900 $1,612,700

    $40,565 $764,954

    $0 $437,200

    $0 $1,145,400

    $0 $1,276,060

    $1,315,465 $5,236,314

    ** NOTE- Annual programmed amounts for projects are estimated and may be revised depending upon individual project needs and State funding availability, without changing total programmed amounts for projects.

    2013 Countywide Call for Projects Attachment B Page 15

  • ATTACHMENT C

    RESOLUTION CERTIFYING THAT THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (MTA) HAS RESOURCES

    TO FUND PROJECTS IN FFY 2014/2015-2019/2020 TRANSPORTATION IMPROVEMENT PROGRAM AND AFFIRMS ITS COMMITMENT TO

    IMPLEMENT ALL PROJECTS IN THE PROGRAM

    WHEREAS, Los Angeles County is located within the metropolitan planning boundaries of the Southern California Association of Governments (SCAG); and

    WHEREAS, the Moving Ahead for Progress in the 21st Century Act (MAP-21) requires SCAG to adopt a regional transportation improvement program for the metropolitan planning area; and

    WHEREAS, MAP-21 also requires that the regional transportation improvement program include a financial plan that demonstrates how the transportation improvement program can be implemented; and

    WHEREAS, MTA is the agency responsible for short-range capital and service planning and programming for the Los Angeles County area within the SCAG region; and

    WHEREAS, as the responsible agency for short-range transportation planning, MTA is responsible for the development of the Los Angeles County Transportation Improvement Program (TIP), including all projects utilizing federal and state highway/road and transit funds; and

    WHEREAS, MTA must determine, on an annual basis, the total amount of funds that could be available for transportation projects within its boundaries; and

    WHEREAS, MTA has adopted the Federal Fiscal Year (FFY) 2014/2015-2019/2020 Los Angeles County TIP with funding for FFY 2014/2015 and 2015/2016 available and committed, and reasonably committed for FFY 2016/2017 through 2019/2020.

    NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Los Angeles County Metropolitan Transportation Authority that it affirms its continuing commitment to the projects in the FFY 2014/2015 - 2019/2020 Los Angeles County TIP; and

    BE IT FURTHER RESOLVED, that the FFY 2014/2015-2019/2020 Los Angeles County TIP Financial Plan identifies the resources that are available and

    2013 Countywide Call for Projects Attachment C Page 1

  • ATIACHMENTC

    committed in the first two years and reasonably available to carry out the program in the last four years, and certifies that:

    1. The Regional Improvement Program projects in the FY2014/2015-2019/2020 Los Angeles County TIP are consistent with the proposed 2014 State Transportation Improvement Program scheduled to be approved by the California Transportation Commission in March 2014;

    2. Los Angeles County has the funding capacity in its county Surface Transportation Program (STP) and Congestion Mitigation and Air Quality Improvement Program (CMAQ) allocations to fund all of the projects in the FFY 2014/2015-2019/2020 Los Angeles County TIP;

    3. The local match for projects funded with federal STP and CMAQ program funds is identified in the FTIP; and

    4. All the Federal Transit Administration funded projects are programmed within MAP-21 Guaranteed Funding levels.

    CERTIFICATION

    The undersigned, duly qualified and serving as Secretary of the Board of the Los Angeles County Metropolitan Transportation Authority, certifies that the forgoing is a true and correct representation of a Resolution adopted at a legally convened meeting of the Board of Directors of the Los Angeles County Metropolitan Transportation Authority held on

    DATED:

    (SEAL)

    2013 Countywide Call for Projects

    MICHELE JACKSON MTA Board Secretary

    Attachment C Page 2

  • ATIACHMENTD

    ADDITIONAL BACKGROUND INFORMATION

    New TIP Countywide Call for Projects Programming

    MTA recommends programming $199.39 million over five years to projects in eight modal categories. All projects recommended for funding are listed in Attachment B and are described in Attachment F. Although this TIP Countywide Call for Projects action will program funds for several years, Board action would authorize expenditure for the first year of the program only (FY 2014-2015). Board action will be required annually through the TIP Countywide Call for Projects Recertification process to authorize the expenditure of funds for each subsequent fiscal year. After projects are approved for funding by the Board, specific fund sources will be assigned to each project based on fund source eligibility requirements and in an effort to leverage the maximum amount of State and Federal funds for the County.

    California Transportation Commission

    Two key fund estimate assumptions revolve around the State Highway Operations and Protection Program's (SHOPP) financial constraints, and the disposition of sales tax on gas revenues. For the second STIP cycle in a row, SHOPP is experiencing unprecedented financial constraints and will need all the available State Highway Account (SHA) capacity. The SHA capacity will be used to fund Caltrans operating costs, the SHOPP program's capital outlay, support, construction costs increases, rights-of-way and the SHOPP minor program. Therefore, no per gallon gas tax revenues will be available for the 2014 STIP because all available gas tax revenues are consumed by operations and maintenance expenses for the existing State Highway System.

    The disposition of the sales tax on gas revenues is the other important item in the 2014 STIP Fund Estimate. Currently, the sales tax on gas is subject to two different statutory arrangements: Proposition 42 and the "Spillover" into the Public Transportation Account (PTA). Proposition 42 enjoys a higher level of protection from the State's General Fund deficit needs than does the Spillover into the PTA.

    Los Angeles County Regional Transportation Improvement Program (RTIP)

    In addition to the TIP Countywide Call for Projects, the Los Angeles County Regional Transportation Improvement Program (RTIP) consists of the following three components:

    1. The TIP Local Program;

    2. The Transit TIP; and

    3. The State Transportation Improvement Program (STIP).

    2013 Countywide Call for Projects Attachment D Page 1

  • ATTACHMENT D

    The TIP Local Program consists of projects added to the RTIP at the discretion of local agencies. This includes all projects that are required to be included in the RTIP and that are funded with local, state and/or federal revenues.

    The Transit TIP consists of transit projects added to the RTIP by Los Angeles County transit operators. This includes all capital and operating projects financed with formula funds, including the MTA's Bus Capital Allocation Formula. The Transit TIP will be consistent with the Short Range Transit Plan (SRTP). The SRTP will be submitted to the Board in a separate report.

    The STIP consists of projects funded with Regional Improvement Program (RIP) (75%) revenues nominated by MTA and lntermodal Transportation Improvement Program (ITIP) (25%) programmed at the discretion of the CTC. This Call has programmed projects that could receive STIP funds, if available, between FY 2015 and FY 2019. After the Board action, some projects approved through the Call process will be submitted to the CTC for RIP funds.

    2013 Countywide Call for Projects Attachment D Page 2

  • ATTACHMENT E

    Project Summaries

    Based on Preliminary Staff Recommendations

    • RSTI ..................................................................................................................... 2

    • Goods Movement ............................................................................................... 1 0

    • Signal Synchronization And Bus Speed Improvements ...................................... 13

    • Transportation Demand Management ................................................................ 26

    • Bicycle Improvements ........................................................................................ 30

    • Pedestrian Improvements ................................................................................... 4 7

    • Transit Capital .................................................................................................... 55

    • TEA .................................................................................................................... 64

    The following project summaries contain the information that will be entered into the Countywide Transportation Improvement Program (TIP). The "Total Original Project Cost" is the unescalated amount submitted by the sponsor in their original application. "Total Revised Project Cost" reflects the escalated costs of the project after adjusting for any downscoping of the project described in the project summary. "Recommended Funding" is the total escalated amount of the 2013 Call for Projects grant for the project. "Local Match Commitment" and percentage identify the escalated match funding required from the project sponsor.

    2013 Countywide Call for Projects Attachment E Page 1

  • ATTACHMENT E RSTI

    F7117 Redondo Avenue and Anaheim Street Intersection Improvements- City of Long Beach

    This project is located in the City of Long Beach at the intersection of Redondo Av and Anaheim St, extends approximately 200 feet to the north, west, and east of the intersection and addresses capacity constraints, deficient level of service (LOS), and extensive queuing/bottlenecks while enhancing multimodal connections to regional facilities. It will widen the intersection and relocate bus stops and utilities to enable the project to lengthen the left-turn pockets in the westbound and eastbound directions on Anaheim St and add an exclusive right-turn lane on the southbound approach on Redondo Av. Further, the project includes bus stop enhancements such as bus pads, four bus benches, four transmart signs, four quasar canopies, four sets of lighting, enhanced crosswalks and eight pedestrian signals with countdown and audible signals, and ADA-compliant ramps. Also included are bicycle-sensitive loop detectors and decorative bike racks at all four corners of the intersection. Funds are requested for design, utilities relocation, equipment, and construction costs.

    The original requested funding of this project was reduced by $22,320 and the sponsor has agreed to complete the scope as contained in the application within the project limits, including being responsible for any cost increases.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $1,200,000

    $1,236,000

    $741,600

    $494,400 (40% of revised project cost)

    F7118 Florence Avenue Bridge over San Gabriel River- City of Downey

    This project is located in the City of Downey on Florence Av between Lesterford Av and Little Lake Rd, approximately two miles northeast of downtown Downey at the San Gabriel River Crossing, just west of the 1-605 Freeway. The bridge will replace the existing 62 year-old, four-lane structurally deficient facility with a dual 45-feet-wide, 3-lane bridge (14 feet separation). It will also improve the 200-feet approaches on either side of the bridge with widened/ADA-compliant sidewalks and a two foot wider shoulder to improve cyclist safety. The City of Downey has received $13.8 million in federal Highway Bridge Program (HBP) funds pending Caltrans approval. Funds are requested for design, right-of-way, construction engineering, and construction costs.

    2013 Countywide Call for Projects Attachment E Page 2

  • ATTACHMENT E RSTI

    The original requested funding of this project was reduced by $116,590 and the sponsor has agreed to complete the scope as contained in the application within the project limits, including being responsible for any cost increases.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $15,570,000

    $16,768,890

    $1,917,060

    $14,851,830 (88.6% of revised project cost, including federal HBP funds))

    F7101 Prairie Avenue Mobility Project- City of Hawthorne

    This project is located in the City of Hawthorne on Prairie Av between the 1-105 Freeway and the southern City Limits, encompassing 10 intersections. It will provide improved traffic flow by widening Prairie Av as it intersects with El Segundo Bl and with Rosecrans Av. The two widenings will enable double left-turn pockets to be constructed and accommodation of a Class Ill bike route on both sides of Prairie Av. In addition to the widenings, traffic signal improvements will be implemented at the intersections of 118th, Broadway, 132nd, 135th, 137th, 139th, 14ih, and Marine. Bicycle detection equipment will be installed at the intersections as well as pedestrian countdown signals, pedestrian lights, and upgraded sidewalks (of 2,000 feet in length) with ADA access ramps. Project is inclusive of new median curbs and landscaping. Funds are requested for design, right-of-way, and construction costs.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $4,446,992

    $5,102,852

    $2,588,896

    $2,513,956 (49.3% of revised project cost)

    F7123 Magnolia Boulevard Widening (North Side)- Cahuenga Boulevard to Vineland - City of Los Angeles

    This project is located in the City of Los Angeles in the North Hollywood Valley Village community. It will widen Magnolia Bl for a distance of approximately 0.57 mile, from Cahuenga Bl to Vineland Av. The existing 50-foot roadway will be widened to a 65-foot roadway width bringing it to a modified Secondary Highway standard. The project includes an eight-foot continuous sidewalk while the widening will allow for a center left-turn lane, on-street parking, and two traffic lanes in each direction. Improvements

    2013 Countywide Call for Projects Attachment E Page 3

  • ATTACHMENT E RSTI

    include shade trees and landscaping, curbs and gutter, access ramps, 17 street light poles, bicycle actuation at ten signals, and upgraded traffic signals (10 Type 1 poles and 10 poles with mast arms). Funds are requested for design, construction engineering, and construction costs.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $7,627,000

    $8,402,537

    $5,461,649

    $2,940,888 (35% of revised project cost)

    F7119 Huntington Drive Multimodal Capacity Enhancements- City of San Marino

    This project is located in the City of San Marino at the Huntington Dr intersections of San Marino Av and San Gabriel Bl. It will reconfigure the two intersections to increase capacity, improve traffic flow and pedestrian movement. The project will construct a second left-turn lane at both intersections (eastbound on Huntington Dr and northbound on San Marino Av and San Gabriel Bl) with signal timing modified to shorten the left-turn movement on Huntington Dr, allowing for longer through traffic. Additional project components include six enhanced crosswalks, six curb bulb-outs, and 13,000 feet of sidewalk extensions which will provide a wider area for bus shelters, trash receptacles, and other amenities including two bus pads, two bus route information kiosks, three bike racks, 16 pedestrian-level street lights, 24 countdown pedestrian signal heads, eight bicycle signal detection, and 15 curb ramps. Funds are requested for design, construction engineering, and construction costs.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $1,326,780

    $1,445,285

    $939,435

    $505,850 (35% of revised project cost)

    F7121 Rancho Vista Boulevard Widening - City of Palmdale

    This project, located in the City of Palmdale on Rancho Vista Bl (West Av P) between 15th St West and West Av N (approximately 1.4 miles), adds capacity by removing gaps in the roadway width. The widenings, a distance of 4,900 feet (0.9 mile), are west of 15th Stand 2,600 feet (0.5 mile) north of Arnie Quinones Pk, and will enable the roadway to have three continuous lanes in each direction, eliminating gaps and

    2013 Countywide Call for Projects Attachment E Page 4

  • ATTACHMENT E RSTI

    bottlenecks. In addition, the project includes a new 1 0-foot wide sidewalk and a five-foot wide Class Ill bicycle route (1.3 miles long) in each direction. Funds are requested for design, right-of-way, utilities relocation, construction engineering, and construction costs.

    Project sponsor will be required to coordinate and seek input with the Antelope Valley Transit Authority on any impacts to transit service as necessary.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $6,652,486

    $7,498,844

    $4,874,248

    $2,624,596 (35% of revised project cost)

    F7125 Sherman Way Widening between Whitsett Avenue to Hollywood Freeway - City of Los Angeles

    This project is located in the City of Los Angeles on Sherman Wy, east of Whitsett Av, to the Hollywood Freeway southbound on-ramp (approximately 0.1 mile). The project will widen the south side of Sherman Wy by approximately 20 feet, enabling the intersection to provide a through and dedicated right-turn only lane onto the Hollywood Freeway southbound on-ramp. It includes construction of two concrete curb returns, two curb ramps, crosswalk illumination, 12 pedestrian signal heads, utility relocation, 12 shade trees/landscaping, and restriping. The project accommodates safe bicycle travel by widening the outside curb lane by six feet. Funds are requested for design, utilities relocation, construction engineering, and construction costs.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $1,307,000

    $1,498,808

    $974,226

    $524,582 (35% of revised project cost)

    F7105 Lyons Av/Dockweiler Dr Extension- City of Santa Clarita

    This project, located in the City of Santa Clarita in the community of Newhall along Lyons Av, is the first phase of a multi-phased project. It extends two lanes of Lyons Av in each direction from Railroad Av, east for a distance of approximately 500 feet to connect with a future extension planned for Dockweiler Dr. The project includes new eight-foot sidewalks on both sides of the street and Class II bike lanes for both

    2013 Countywide Call for Projects Attachment E Page 5

  • ATTACHMENT E RSTI

    directions. It also includes 16 pedestrian signal heads, eight high visibility crosswalks, 16 street/pedestrian lighting, landscaping, two bicycle actuation signals, and two wayfinding signs. Funds are requested for construction engineering, and construction costs. Local match includes committed Bridge and Thoroughfare Funds.

    The original requested funding of this project was reduced by $857,007 and the sponsor has agreed to complete the scope as contained in the application within the project limits, including being responsible for any cost increases.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $9,492,000

    $9,332,210

    $5,898,993

    $3,433,217 (36.8% of revised project cost)

    F7115 The Old Road (TOR)- Lake Hughes Road to Hillcrest Parkway Phase 1-County of Los Angeles

    This project is located in the unincorporated Castaic area of Los Angeles County, north of the City of Santa Clarita. TOR runs in a north/south direction, parallel to the 1-5 Freeway. The project is approximately 2.1 miles in length extending along TOR from Lake Hughes Rd to Hillcrest Pkwy, and will reconstruct and widen TOR to 68 feet from curb to curb, increasing the roadway's capacity from one lane to two lanes in each direction. The project will widen sidewalks from four to eight-foot width and install a Class II bike lane in both directions. The project also includes curbs and gutters, eight ADA compliant curb ramps, driveway aprons, drainage facilities, slope grading, 23 signs, striping, street lights, and traffic signal upgrades at two intersections. Funds are requested for design, right-of-way acquisition, utilities relocation, construction engineering, and construction costs.

    The original requested funding of this project was reduced by $1,355,155 and the sponsor has agreed to complete the scope as contained in the application within the project limits, including being responsible for any cost increases.

    Project sponsor will also be required to coordinate and seek input with the City of Santa Clarita Transit on any impacts to transit service as necessary.

    2013 Countywide Call for Projects Attachment E Page 6

  • Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $27,900,000

    $24,342,802

    $5,598,845

    $18,743,957

    ATTACHMENT E RSTI

    (77% of revised project cost)

    F7131 Century Boulevard Extension between Grape Street and Alameda Street - City of Los Angeles

    This project is located in the City of Los Angeles where Century Bl dead ends at Grape St. The project will extend Century Bl by approximately 2,600 feet along land owned by the Housing Authority of the City of Los Angeles (HACLA), from Grape St to Alameda St. HAC LA is donating the land to the City of Los Angeles and a small portion of the project in unincorporated Los Angeles County will be incorporated into the City. The project will design and construct a new two-lane roadway inclusive of sidewalks on both sides of the street, a Class II bike lane, 14 pedestrian signal heads, 24 curb ramps, 12 high visibility crosswalks, 70 shade trees/landscaping, two benches, two wayfinding signs, and short-term bicycle parking. The project also includes curbs and gutters, street lights, traffic signals, drainage pipes and catch basins, landscaping, and green street elements. Funds are requested for soil cleanup, final design, construction engineering and construction costs.

    The original requested funding of this project was reduced by $281,634 and the sponsor has agreed to complete the scope as contained in the application within the project limits, including being responsible for any cost increases.

    Project sponsor will also be required to coordinate and seek input with Metro Planning and Operations and other service providers on any impacts to transit service as necessary.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    2013 Countywide Call for Projects

    $11,448,151

    $11 '128,993

    $5,898,366

    $5,230,627 (47% of revised project cost)

    Attachment E Page 7

  • ATTACHMENT E RSTI

    F71 09 Soto Street Widening from Multnomah Street to Mission Road - City of Los Angeles

    This project is located in the City of Los Angeles on Soto St between Multnomah St and North Mission Rd. It widens Soto St from a bi-directional one lane roadway to two lanes in each direction (2,963 linear feet). The widening will enable existing sidewalks to be widened from four feet to eight feet, thereby making the sidewalks wheelchair accessible. The project will include a Class II bike lane in both directions, 20 LED pedestrian street lights, a new striped median, and shoulders on both sides of the street. Funds are requested for design, utilities relocation, construction engineering, and construction costs.

    The original requested funding of this project was reduced by $472,116 and the sponsor has agreed to complete the scope as contained in the application within the project limits, including being responsible for any cost increases. Project sponsor will also be required to coordinate and seek input with Metro Planning and Operations and other service providers on any impacts to transit service as necessary.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $9,230,000

    $9,330,511

    $6,055,502

    $3,275,009 (35.1% of revised project cost)

    F7120 Eastern Avenue and Florence Avenue RSTI Project- City of Bell Gardens

    This project is located in the City of Bell Gardens at the intersection of Florence Av and Eastern Av. The project will widen Florence Av to enable two westbound left-turn lanes and a westbound dedicated right-turn lane to be constructed, thereby increasing the intersection's capacity. The project will widen sidewalks from five feet to eight feet on Florence Av, for a distance of 1 ,500 linear feet, and includes four high visibility crosswalks, five pedestrian-level lights, landscaping, and upgraded traffic signal timing at two locations. Funds are requested for design, right-of-way, construction engineering, and construction costs.

    The original requested funding of this project was reduced by $371 ,863 and the sponsor has agreed to complete the scope as contained in the application within the project limits, including being responsible for any cost increases.

    2013 Countywide Call for Projects Attachment E Page 8

  • Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    2013 Countywide Call for Projects

    $3,421,250

    $3,384,895

    $2,200,182

    $1,184,713

    ATTACHMENT E RSTI

    (35% of revised project cost)

    Attachment E Page 9

  • Goods Movement

    ATTACHMENT E Goods Movement

    F7200 SR57/60 Confluence: WB SR60/NBSR57 Grand Avenue Off ramp Interchange - City of Industry

    This project is located in the City of Industry on the westbound SR-60 at the Grand Av off ramp. It will improve truck mobility and reduce congestion by adding an additional lane to the Grand Av off-ramp. Funds are requested for right-of-way and construction costs. The original scope of this project was reduced by eliminating the auxiliary lane between the westbound SR-60/northbound SR-57 merge and Grand Av.

    The original project request amount was reduced by $4,377,720. The sponsor agreed to increase their local match by $4,377,720 to complete all project elements originally submitted.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $19,490,000

    $21 ,302, 775

    $9,447,781

    $11 ,854,994 (55.7% of revised project cost)

    F7205 Alameda Street Widening from Anaheim Street to 300 ft. South of PCH -City of Los Angeles

    This project is located in the City of Los Angeles on Alameda St between Anaheim St and 300 feet south of Pacific Coast Highway. It will provide congestion relief and improve goods movement mobility by widening Alameda St from two to three lanes in each direction, adding left-turn channelization at signalized intersections, and adding a missing sidewalk on the east side of Alameda St. Funds are requested for right-of-way, design, and construction costs.

    The original project request amount was reduced by $436,865. The sponsor agreed to increase their local match by $436,865 to complete all project elements originally submitted.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    2013 Countywide Call for Projects

    $8,650,500

    $9,708,125

    $5,873,415

    $3,834,710 (39.5% of revised project cost)

    Attachment E Page 1 0

  • ATTACHMENT E Goods Movement

    F7207 Anaheim Street Widening - Farragut Avenue to Dominguez Channel -City of Los Angeles

    This project is located in the City of Los Angeles on Anaheim St between Farragut Av and Dominguez Channel. It will provide congestion relief and improve goods movement mobility by widening Anaheim St from 2 to 3 lanes in each direction and adding left-turn channelization at signalized intersections, and adding a missing sidewalk on the south side of Anaheim St. Funds are requested for design and construction costs.

    The original project request amount was reduced by $331,542. The sponsor agreed to increase their local match by $331,542 to complete all project elements originally submitted.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $5,900,000

    $6,565,203

    $3,141,450

    $3,423,753 (52.2% of revised project cost)

    F7201 Commerce Goods Movement Atlantic Boulevard: Washington Boulevard to Como Street - City of Commerce

    This project is located in the City of Commerce on Atlantic 81 between Washington 81 and Como St. It will improve mobility for trucks and vehicles as well as reduce vehicle/pedestrian conflicts along Atlantic 81. This project will implement raised medians along the entire length of the project on Atlantic 81, as well as crossing improvements such as high-visibility crosswalks, signage, striping, and pedestrian lighting with ADA-compliant wheelchair ramps (at 12 intersections in total). At the four signalized intersections, improvements include pedestrian countdown signals and pedestrian push buttons in addition to the crossing improvements. Trash cans and covered bus benches will be provided at each transit stop. A dedicated right-turn phase for vehicles traveling southbound from Atlantic 81 to Washington 81 will also be provided. Funds are requested for design and construction costs.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    2013 Countywide Call for Projects

    $1,075,450

    $1,171,840

    $687,753

    $484,087 (41.3% of revised project cost)

    Attachment E Page 11

  • ATTACHMENT E Goods Movement

    F7204 Pier B Street Freight Corridor Reconstruction - Port of Long Beach

    This project is located in the Port of Long Beach along Pier B St between Pico Av and Pier A Wy. It will improve goods movement mobility and enhance pedestrian travel by realigning Pier B Stand widening it from a two-lane facility (one lane in each direction) to a four-lane facility (two lanes in each direction, for a length of 1.42 miles) and constructing a new sidewalk on the south side of Pier B St. The project also includes a J-hook flyover that will be constructed to connect Pier B St with Anaheim St. Funds are requested for design and construction costs.

    The original project request amount was reduced by $12,023,084. The sponsor agreed to increase their local match by $12,023,084 to complete all project elements originally submitted.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    2013 Countywide Call for Projects

    $92,106,000

    $105,790,445

    $10,954,601

    $94,835,844 (89.6% of revised project cost)

    Attachment E Page 12

  • ATTACHMENT E Signal Synchronization

    Signal Synchronization And Bus Speed Improvements

    F731 0 South Bay Forum Traffic Signal Corridors Project- County of Los Angeles

    This project is located in the South Bay area of Los Angeles County within the Cities of Gardena, Hawthorne, Lawndale, Manhattan Beach, Redondo Beach, and the unincorporated areas of Los Angeles County on Normandie Av between 92nd St and El Segundo Bl (11 intersections), Manhattan Beach Bl between Manhattan Av and Van Ness Av (24 intersections), and Hawthorne Bl between Imperial Highway and Manhattan Beach Bl (15 intersections). Enhancements include synchronization and retiming of traffic signals, traffic signal control, system detection, CCTV cameras, and changeable message signs. It will upgrade traffic signal operations along the listed routes by providing additional vehicle detection to enable each signal to be capable of time-based coordination. The traffic signals will be timed to improve the overall progression of traffic. Funds are requested for design and construction costs. The original scope of this project can be delivered at the revised project cost by reassessing equipment requirements during the project design phase, without a reduction in project scope.

    Project sponsor will be required to participate in the Los Angeles County Regional ITS Architecture Consistency and the Signal Synchronization and Bus Speed Improvement Program.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $5,690,000

    $5,103,402

    $3,062,041

    $2,041,361 (40% of revised project cost)

    F7305 Gateway Cities Forum Traffic Signal Corridor Project - County of Los Angeles

    This project is located in the southeast portion of Los Angeles County within the Cities of Artesia, Cerritos, Hawaiian Gardens, Norwalk, Santa Fe Springs, Whittier, and the unincorporated areas of Los Angeles County on Norwalk BI/San Antonio Or/Pioneer Bl between Beverly Bland Carson St (31 intersections). The project involves the design and construction of traffic signal synchronization and ITS improvements to increase the capacity of major arterials without adding lanes. Enhancements include synchronization and retiming of traffic signals, traffic signal control hardware, communications interconnect, system detection, CCTV cameras, changeable message signs, and operational improvements such as left-turn phasing and striping modifications. Funds are requested for design and construction costs. The original scope of this project can

    2013 Countywide Call for Projects Attachment E Page 13

  • ATTACHMENT E Signal Synchronization

    be delivered at the revised project cost by reassessing equipment requirements during the project design phase, without a reduction in project scope.

    Project sponsor will be required to participate in the Los Angeles County Regional ITS Architecture Consistency and the Signal Synchronization and Bus Speed Improvement Program.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $4,576,000

    $4,048,101

    $3,238,481

    $809,620 (20% of revised project cost)

    F7316 Artesia Corridor ATCS Enhancement Project- City of Long Beach

    This project is primarily located in the City of Long Beach on Artesia Bl between the city limit on the west (Gale Av) to the city limit on the east (Downey Av) (12 intersections). The project will upgrade traffic signals along the corridor between Long Beach Bl and Downey Av to advanced traffic controllers to connect with the Adaptive Traffic Control System (ATCS). Closed Circuit Television cameras (CCTV) will be installed at seven intersections along with four changeable message signs on Artesia Bl. The project will include a new traffic signal at the El Camino College Entrance, west of Gale, in Compton. A Class II bike lane in both directions from Atlantic Av to Susana Rd will be installed which will also include dedicated use lane markings, legends, crosswalks, and signs. Pedestrian improvements will be furnished at all pedestrian crossing locations along Artesia Bl. Fiber optic cable and other communication devices will be installed to close existing gaps. The installation of fiber optic cable along the entire length of the corridor will assure that all signals are connected to each other and the traffic management center (TMC). Funds are requested for design and construction costs.

    Project sponsor will be required to participate in the Los Angeles County Regional ITS Architecture Consistency and the Signal Synchronization and Bus Speed Improvement Program.

    Project sponsor will be required to fund Class II bicycle lane elements with local match funds. Project sponsor will also be required to coordinate and seek input with Metro Planning and Operations and other service providers on any impacts to transit service as necessary.

    2013 Countywide Call for Projects Attachment E Page 14

  • Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $2,730,000

    $3,045,062

    $1,827,037

    $1,218,025

    ATTACHMENT E Signal Synchronization

    (40% of revised project cost)

    F7307 San Gabriel Valley Forum Traffic Signal Corridor Project- County of Los Angeles

    This project is located in the San Gabriel Valley subregion within the Cities of El Monte, Industry, and South El Monte and the unincorporated areas of Los Angeles County on Peck Rd between Lower Azusa Rd and Rush St (31 intersections). It will include time-based traffic signal synchronization, traffic signal control hardware, and intersection operational improvements such as left-turn phasing and striping modifications. In addition, this project will deploy ITS technologies to ensure coordinated timing remains robust and responsive to actual traffic conditions. Enhancements include synchronization and retiming of traffic signals, equipment upgrades, system detection, CCTV cameras, and changeable message signs. The ITS portion of this project will expand the Advanced Transportation Management System (ATMS) installed with prior grants and build upon the benefits achieved by the proposed time-based signal synchronization improvements. Funds are requested for design and construction costs. The original scope of this project can be delivered at the revised project cost by reassessing equipment requirements during the project design phase, without a reduction in project scope.

    Project sponsor will be required to participate in the Los Angeles County Regional ITS Architecture Consistency and the Signal Synchronization and Bus Speed Improvement Program.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $4,993,500

    $4,530,492

    $3,624,394

    $906,098 (20% of revised project cost)

    F7303 Network-wide Signal Sync with VID & Arterial Performance Measurement System for ATCS - City of Culver City

    This project is located in the City of Culver City in the Westside subregion. It will optimize signal coordination timing network-wide and upgrade major intersections with

    2013 Countywide Call for Projects Attachment E Page 15

  • ATTACHMENT E Signal Synchronization

    enhanced system detection and arterial performance measurement capabilities along Washington Bl (six intersections), Sepulveda Bl (five intersections), Jefferson Bl (three intersections), and 1-405 on/off ramp locations along Sawtelle Bland Sepulveda Bl to support the city's planned adaptive traffic control system (ATCS) operations. Traffic and performance measurement information will be shared with neighboring and regional partners in the Information Exchange Network (lEN), Metro's Regional Integration of ITS (RIITS) and other systems to support multi-jurisdictional traffic signal coordination and regional arterial performance management. Funds are requested for design and construction costs.

    Project sponsor will be required to participate in the Los Angeles County Regional ITS Architecture Consistency and the Signal Synchronization and Bus Speed Improvement Program.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $1,150,000

    $1,236,896

    $989,517

    $247,379 (20% of revised project cost)

    F7314 Santa Fe Avenue Synchronization Enhancement Project- City of Long Beach

    This project is located in the City of Long Beach on Santa Fe Av between Anaheim St and Wardlow Rd (13 intersections). It will upgrade traffic signals along the Santa Fe Av corridor and replace obsolete equipment. All intersections along the Santa Fe Av corridor with existing Type 170 signal controllers will be replaced with new advanced traffic controllers to connect with the Adaptive Traffic Control System (ATCS). Closed Circuit Television cameras (CCTV) will be installed at six intersections and a Class Ill bike route will be installed along the entire length of Santa Fe Av within the project area. Pedestrian push buttons and LED countdown pedestrian heads (up to 82) shall be furnished at all pedestrian crossing locations. Funds are requested for design and construction costs.

    Project sponsor will be required to participate in the Los Angeles County Regional ITS Architecture Consistency and the Signal Synchronization and Bus Speed Improvement Program.

    Project sponsor will be required to fund Class Ill bicycle route elements with local match funds. Project sponsor will also be required to coordinate and seek input with Metro Planning and Operations and other service providers on any impacts to transit service as necessary.

    2013 Countywide Call for Projects Attachment E Page 16

  • Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $2,870,000

    $3,200,328

    $1,920,197

    $1,280,131

    ATTACHMENT E Signal Synchronization

    (40% of revised project cost)

    F7317 Pasadena Area Rapid Transit System TSP - City of Pasadena

    This project is located in the City of Pasadena on Lake Av between California Bl and Rio GrandeSt (16 intersections), California Bl from Arroyo Parkway to Lake Av (four intersections), Arroyo Parkway from California Bl to Glenarm St (two intersections), Raymond Av from Glenarm St to Walnut St (11 intersections), and Foothill Bl from Altadena Dr to Halstead St (nine intersections). It will design and install Transit Signal Priority equipment for the Pasadena Area Rapid Transit System (ARTS) bus fleet and intersections including the upgrade of 42 traffic signal controllers and nine traffic signal cabinets (where appropriate) along the listed corridors. Approximately 23 buses and 42 intersections are targeted for signal priority enhancements as part of this project. In addition, the project will provide for the installation of three closed circuit television cameras (CCTV) at critical locations along the corridors to monitor the transit corridors and adjust signal timing as needed. Funds are requested for design and construction costs.

    Project sponsor will be required to participate in the Los Angeles County Regional ITS Architecture Consistency and the Signal Synchronization and Bus Speed Improvement Program.

    Total Original Project Cost

    Total Revised Project Cost

    Recommended Funding

    Local Match Commitment

    $1,263,040

    $1,447,191

    $1,157,647

    $289,544 (20.01% of revised project cost)

    F7308 East Los Angeles Traffic Signal Corridor Project- County of Los Angeles

    This project is located in the unincorporated area of East Los Angeles County on Eastern Av between Medford Stand Olympic Bl (14 intersections), Cesar Chavez Av between Lorena Stand Eastern Av (8 intersections), Ramona Bl between Eastern Av and Campus Rd (communications), and on Atlantic Bl between Telegraph Rd and Pomona Bl (11 intersections). It will synchronize traffic signals and implement upgrades

    2013 Countywide Call for Projects Attachment E Page 17

  • ATTACHMENT E Signal Synchronization

    as required by federal and state guidelines on Eastern Av. Fiber Optic Communications will be installed along Eastern Av, Cesar Chavez Av, Ramona Bl, and Atlantic Bl. In addition, the traffic signals along the listed routes