Power Grid Corporation of India Ltd.
Date: August 14, 2004 New Delhi
RLDC::BrainGeneration ::Heart
Sub-Transmission:: Sub Arteries
Transmission:: Main Arteries
Distribution: Capillaries
POWER SYSTEM Vs HUMAN BODY
POWERGRID – Introduction
POWERGRID, the Central Transmission Utility, is responsible for
Establishment and Operation of Inter-state, Regional & National Power Grid
Grid Management / System Operation of the five Regional Load Despatch Centres (RLDCs) .
Contd..
2300
Regional Grids of India Regional Grids of India
Total Capacity = 1,12,360 MWTotal Capacity = 1,12,360 MW
30,860 MW
32,700 MW
16,000
30,500 MW
2300 MW
POWERGRID & System Operation
RLDCs - Responsiblities Apex Body for Integrated Grid Operation of the
Region Scheduling and Despatch of Electricity on real time
basis Energy Accounting Supervision and Control of Inter – State Transmission
System Ensure Grid Security and adherence to Indian
Electricity Grid Code(IEGC)
RTU RTU RTU
SUB LDC SUB LDC SUB LDC
SLDC SLDC SLDC
ERLDC
WRLDC NRLDC SRLDC
NERLDC
NLDC
32 Nos.
51 Nos.
1160Nos.
Unified Grid OperationUnified Grid Operation
5 Nos.
Three RLDCs namely Northern, Southern & North-Eastern
Regions have been modernised at an cost of about
Rs. 1600 Crs. Mordernisation of Eastern & Western Regions RLDCs
underway. Estimated cost : Rs. 564 Crs. Schedule : ER by June ’05 & WR by March’06
Modernisation of RLDCs
WR ULDC: Challenges
Initial delays caused by non availability of concurrence from Constituents.
POWERGRID making efforts to reduce execution time from 4 Year to 3 Year. Scheduled Commissioning -March’ 2006 Expected Commissioning - March’ 2005
Dovetailing of existing SCADA/EMS of Maharashtra into Regional ULDC scheme.
Integration of communication network of Gujarat being setup by them.
Setting up of SLDC for GOA at this stage of Project.
Main Feature of Unified Load Despatch System
Unified Supervision & Control of Grid throughdedicated Communication System on real time Basis. Supervisory Control & Data Acquisition ( SCADA)
Real time acquisition of critical electrical parameters like Voltage, Frequency, MW & MVAR
Real Time Energy Management System Contigency Analysis Optimum Power Flow for reliability & security of the system Merit Order Operation including Hydro-Thermal Mix
Load Forcasting Quick Restoration of Grid in case of disturbance Real Time Environment For Training Operators to
cope with contingencies
Modernisation of RLDCs
Has Resulted Into: Considerable Improvement in System Parameters viz.,
Frequency & Voltage. Merit Order Operation, Leading to Overall Economy Introduction of ABT (Availability Based Tariff), resulting in
improved Grid stability Transparency in grid operation Quantum leap in intra and Inter Regional Power Exchange
and Trading Infused Grid Discipline
THERE HAS BEEN NO MAJOR GRID DISTURBANCE IN LAST 22 MONTHS
POWERGRID the Transmission Utility
POWERGRID started its commercial operation in 92-93
Over 40% of total power generated ( about 45,000 MW) is wheeled by POWERGRID
It operates & maintains 50,000 Ckms. of EHV Tr. System along with 82 Sub-stations at over 99% system availability.
Contd..
POWERGRID the Transmission Utility
Excellent performance is through:
Robust system design after detailed studies with thrust on integrated development
Deployment of Hot line maintenance technique
Use of Emergency Restoration System
Trained and dedicated manpower with decentralized administrative powers.
Financial Profile of POWERGRIDFinancial Profile of POWERGRIDFINANCIAL GROWTH OF POWERGRID
17702533
3900
8700
236
2805
983634
3600
1260643 748
275 444
0
2000
4000
6000
8000
10000
1992-93 1995-96 1998-99 2002-03 2003-04 2006-07 20011-12
YEAR
RS
.IN
CR
OR
E
Turn Over
Net Profit
GROSS FIXED ASSETS (RS. CRORES)
3521 54928851
18943 19800
37000
70300
0
10000
20000
30000
40000
50000
60000
70000
80000
1992-93 1995-96 1998-99 2002-03 2003-04 2006-07 2011-12
POWERGRID’s Perspective PlanInvestment of Rs. 71,000 Crore in X and XI Plan
(2012) Rs. 51,000 Crs. to be brought in through IR and loans Balance Rs.20,000 Crs. through private investment.
National Grid of 30,000 MW capacity planned by 2012 to utilise the generation resources optimally. Inter Regional Transfer Capacity
Existing capacity : 8,500 MW by 2011-12 : 30,000 MW
Benefits of Inter-Regional Exchanges Exchange of Power from Surplus to Deficit Region Higher Consumer Demand Met Better Utilisation of available Generating Capacity.
Utilisation of diversity of Peak / Off-Peak period Inter-Regional exchanges
22,000 MUs valued at around Rs. 4,400 Crores (2003-04) 10,018 MUs valued at around Rs 2,000 Crores (April’04 to July 2004 )
States Maximum benefited : Maharashtra, Gujrat Madhya Pradesh Punjab, Haryana, U.P. Karnataka, Tamilnadu, A.P. West Bengal, Orissa and NER States
Improvement in system stability and grid parameters.
Constituents : Madhya Pradesh,
Maharashtra,
Gujarat,Chhattisgarh Goa, UT of
DD & DNHInstalled capacity : 32,700 MW ( Central Sector – 6100 MW)
Peak Demand : 30,000 MW
Energy requirement : 550-600 MUs per day
Peak Availability : 24,000-25,000 MW
Peak Shortage : 5,000-6,000 MW (about 21%)
Energy Shortage : about 10%
Energy import through: 15-18 MUs per day East-West IR link
Western Region-present Power Scenario
TRANSMISSION FACILITIES OF POWERGRID IN WR
Transmission lines :About 10,700 Ckt km.400 kV – 9700 Ckt km
220 kV – 1025 Ckt km
400 kV Substations- 7 nos. with 2835 MVA capacity (Jabalpur, Satna, Raipur, Dehgam, Mapusa, Bhadravati, Itarsi)
Inter-Regional Links : 3550 MW1000 MW, HVDC back to back link at Chandrapur
500 MW, HVDC back-to-back link at Vindhyachal
1200 MW, Raipur – Rourkela 400 kV D/c lines
220 kV lines between WR & ER ( 450 MW) and WR & NR (400 MW)
Peak Demand by 2006-07 – 35,223 MW Central Sector Gen. addition – 5,000 MW Transmission lines Addition :About 8700 Ckt km ( 765
kV, 400 kV & 220 kV)
Main schemes include transmission system associated with Sipat I & II( 2980 MW), Vindhyachal III( 1000 MW), Tarapur 3&4 ( 1000 MW), and Grid strengthening schems
New Substations- 11 Nos ( 10800 MVA = 8500 MW) 765/400kV : 1 nos. with 4500 MVA capacity (Seoni) 400/220kV : 10 nos. with 6300 MVA capacity (Seoni, Rajgarh,
Gwalior, Bhatpara, Wardha, Raigarh, Vapi, Boisar, Khandwa, BIna)
Estimated Investment – Rs 5500 Cr
WESTERN REGION – by end of X Plan
Peak Demand by 2011-12 – 46,825 MW Transmission lines Addition :About 11070
Ckt km ( 765 kV, 400 kV & 220 kV)Main schemes include transmission system
associated with Kawas II (1300 MW), Gandhar II (1300 MW), East – West & North – West Inter-regional links, and Grid strengthening schemes
New Substations- 400/220kV : 4 nos. with 2520 MVA capacity
(Pandharpur, Pune, Navi Mumbai, Damoh)Total Investment - about Rs. 7000 Cr
WESTERN REGION – by end of XI Plan
R&D and Technology Development in POWERGRIDR&D and Technology Development in POWERGRID
Deployment of State-of-the-Art technology HVDC & EHVAC Transmission System upto
800 kV with multi Ckts. Use of fixed & variable Series Compensator (FACTS)Extra High Towers to avoid deforestation and protection of
wild lifeCompact Towers to reduce Right Of WayHigh Temperature Conductors for increased LoadingAutomation of Sub-stations. Compact S/stn to reduce land requirement. Satellite imagery for Transmission Line Survey.
Manpower And System DevelopmentManpower And System Development
5725 employees in 92-93 and 6828 at present though Operations have grown six (6) times Possible due to effective systems in Design,
Engineering, Contracts, HR, O&M and Project Management.
Structured training of personnel at all levels.
5 Regional Training Centers already established and plans to establish R&D and National Training Center at Bhiwadi, Rajasthan in 2 years time.
Training of SEBs in Design, Operation and Maintenance of Transmission System and Load Despatch System
POWERGRID:Undertaking Social ResponsiblityPOWERGRID:Undertaking Social Responsiblity
The only company to adopt ESPP document with wide consultation with Public, Environmentalists, NGOs and Multilateral funding agencies.
POWERGRID : First to assist whenever disaster struck.
Gujarat Cyclone (1998) Orissa Cyclone (1999) Gujarat Earthquake (2001)
Establishment of Green S/Stn. Establishment of Ultra modern office, Group Housing Soci
ety, School & Township.
Oragnises annual Cultural & Art Mela
Transparent Policies & Procedures
Well Defined “Works & Procurement Policy and Procedure”( WPP) To facilitate transparent and consistent decision makingSystems and procedures detailed for Pre-Award( Vol I)
and Post-Award ( Vol II) procurement activitiesDeveloped “Environmental and Social Policy & Procedures”
(ESPP)First Power Sector PSU to develop such policyDeveloped in-house with detailed interactions with world
Bank, NGOs, Funding Agencies, Govt Agencies etc.Widely appreciated by Funding agencies
Transparent Policies & Procedures
Committees of Independent Agencies POWERGRID is committed to excel in every area of its
operations which is not possible unless its performance is monitored by Independent agencies. For this, following committees have been constituted:
To advise on financial management, policies, systems, strategies etc.
To advise on issues related with procurement, project execution and financial aspects raised by external agencies
To advise on issues related to R&D For upgradation and compliance assessment of
environment and social safeguards
International ConsultancyInternational Consultancy Completed Survey and Soil Investigation of 205 Kms.
of transmission line in Afghanistan in Hindukush mountain
Consultancy for establishment of Load Despatch Center and Telecom network in Bhutan
Shortlisted by the World Bank as consultant for Transmission and Load Despatch System.
Consultancy projects in Ethiopia, Djibouti, Sudan, Nepal and Bangladesh under consideration
POWERGRID’s Visionary ApproachPOWERGRID’s Visionary Approach
For facilitating much needed power system development in integrated and unified manner, POWERGRID is assisting:
SEBs in implementation of Transmission / Sub-transmission systems
SEBs as Advisor cum Consultant for APDRP schemes in 18 states.
Goa , Bihar, Mizoram & Meghalaya for Implementing APDRP works.
States & REC in Rural Electrification
Attracting Private InvestmentAttracting Private Investment Established First Public-Private JV Company in
Transmission Sector with Tata for implementation of Tala Transmission system at an estimated cost of Rs 1374 Crore.
Two more projects i.e. Transmission System associated with Koldam, Parbati & Maithon, Estimated to Cost Rs 1300 Crore, have been floated under JV route.
Transmission lines under Western Region Strengthening scheme (Estimated Cost: Rs 4,800 Crore) is also being considered for implementation under JV route.
To utilize spare capacity of ULDC schemes and maximize return on its transmission infrastructure, POWERGRID decided to diversify into TelecomThrough an incremental investment
Telecom networks on Transmission InfrastructureSturdy & secure Rodent menace free Vandalism proof
Only utility in the country providing overhead fibre optic cable for telecom networks
DWDM/SDH equipment deployedScalable to Terabit Capacity
Obtained IP-II license in Jan 2001 and ISP Category-A license in May 2003
POWERGRID’s Diversification into TelecomPOWERGRID’s Diversification into Telecom
All India Fibre Optic Network of 20,000 kms, spread over 60 cities including all Metros & major cities
Links under commercial operationDelhi-Lucknow -Mumbai Delhi-Ambala-Chandigarh-Shimla-Jallandar-JammuDelhi- Jaipur Ahmedabad-Mumbai-PuneMumbai-Hyderabad-Bangalore-CochinWithin NER
Maintaining availability of 100% on overhead OFC network
POWERGRID’s Broadband NetworkPOWERGRID’s Broadband Network
Complete network to be in place by 2004 Chennai August, 2004 Allahabad, Kanpur, Agra August, 2004 Kolkatta, NER August, 2004 Trivandrum Sept, 2004
Thank YouThank You
Deviation Of Frequency From Normal Band of 49.0-50.5 Hz
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04
% O
f Tim
e
Improvement of grid voltage recorded at Dadri 400 kV bus
330
340
350
360
370
380
390
400
Vol
tage
in k
V
Prior To ABT & RLDC Administration
After ABT & RLDC Administration
Growth Of Inter Regional Exchanges
8230
13000
22500
9730
7350
0
5000
10000
15000
20000
25000
1999-2000 2000-2001 2001-2002 2002-2003 2003-2004
Year
MU
IR Exchanges
Natural Energy Resources.
Coal
Hydro
Inter Regional LinksInter Regional Links
Present IR CapacityPresent IR Capacity= 8,500 MW= 8,500 MW
By the year 2012By the year 2012= 30,000 MW= 30,000 MW
500 MW500 MW1200 MW1200 MW
1000MW1000MW
2000MW2000MW
500 MW500 MW
500 MW500 MW
Profile of POWERGRIDPHYSICAL GROWTH OF POWERGRID
46500
22228
27244
35119
40289
34288
28820
12,201
22748
48000
0
10,000
20,000
30,000
40,000
50,000
60,000
92-93 95-96 98-99 2001-02 2003-04
YEAR
MVA
CKM
765 kV Delta Configuration Tower
Proposed Compact Single pole tower Mode :Noida
Single Pole Tower
ERS in Service-Gujarat.
ERS erected across River Tapi in Gujrat, to rectify special towers endangered due to change in course of river, had a span of 860m, which is the longest span ever achieved in the world using ERS.
ERS in Service-Gujarat…
ERS erected across River Tapi in Gujrat, to rectify special towers endangered due to change in course of river, had a span of 860m, which is the longest span ever achieved in the world using ERS.
Orissa Cyclone (Erection of ERS)
Remote Operation Of Bhiwadi S/S
Switchyard ,Bhiwadi
Control Room , Ballabhgarh
Control Room,Bhiwadi
1
2
3
B
SYNCHRONOUS OPERATION OF GRIDS
2500 Kms
RLDCs
AREA OF
16 lac sq.kms
Commercial PerformanceCommercial Performance
2002 - 03 (Actual)
2003 - 04 (Provisional)
2006-07 (End of 10th plan)
2011-12 (End of 11th plan)
Turn Over 2533 2783 3900 8700
Net Profit 643 740 1260 3600
Gross Margin 1929 2301 3300 8000
Net Worth 7312 7865 11500 20000
Return on
Net Worth
8.79% 8.54% 11% 18%
Gross Block 18943 19800 37000 70300
Key Financial Indicators (Rs. in Crore)
ASSISTANCE SOUGHTASSISTANCE SOUGHT
Compensation for revenue loss in NER
Net Budgetary Support to POWERGRID
Expeditious Investment Approval
NAVRATNA Status to POWERGRID
Enhancement in Delegation of Power to BOD (to cover multilateral funded projects)
Reduced GOI Guarantee Fee for WB/ADB/JBIC Loans
Mega Power Project status to Transmission System associated with Mega generation projects/ National Grid Elements.
ULD & C PROJECT: OBJECTIVESULD & C PROJECT: OBJECTIVES
To haveTo have• Greater and deeper visibility of the power system Greater and deeper visibility of the power system
under controlunder control
• Better communication and co-ordination between Better communication and co-ordination between control centers control centers
• Effective management of grid parameters viz. Effective management of grid parameters viz. frequency, voltage etc. and better grid security frequency, voltage etc. and better grid security through various SCADA/EMS features resulting in through various SCADA/EMS features resulting in betterbetter
Operations schedulingOperations schedulingOperations monitoring and controlOperations monitoring and controlPower system analysisPower system analysis
• A real time environment for dispatcher trainingA real time environment for dispatcher training
ULD & C PROJECT: OBJECTIVESULD & C PROJECT: OBJECTIVES
To haveTo have• Greater and deeper visibility of the power system Greater and deeper visibility of the power system
under controlunder control
• Better communication and co-ordination between Better communication and co-ordination between control centers control centers
• Effective management of grid parameters viz. Effective management of grid parameters viz. frequency, voltage etc. and better grid security frequency, voltage etc. and better grid security through various SCADA/EMS features resulting in through various SCADA/EMS features resulting in betterbetter
Operations schedulingOperations schedulingOperations monitoring and controlOperations monitoring and controlPower system analysisPower system analysis
• A real time environment for dispatcher trainingA real time environment for dispatcher training
WorldWorld Bank BenchmarkingBank Benchmarking
Considering POWERGRID’s exemplary performance in project execution, O&M and its growth profile, the WB has fielded its mission to benchmark POWERGRID with respect to International utilities in following areas :
Procurement management
Financial management
Environmental & Social Safeguards
REGION EST. COST (Crs. Rs.)
STATUS COMPLETION SCHEDULE
NORTHERN
658.92 SYSTEM UNDER OPERATION
COMPLETED IN
Jan 2002
SOUTHERN
683.80 SYSTEM UNDER OPERATION
COMPLETED IN
Jan 2002
NORTH EASTER
N
263.81 SYSTEM UNDER OPERATION
COMPLETED IN
Mar 2003
EASTERN
399.73 UNDER CONSTRUCTION
June’2005
WESTERN
224.72 UNDER CONSTRUCTION
March 2006
NLDC 94 TECHNICAL SPECS.UNDER
PREPARATION
Dec’ 2007
IMPLEMENTATION STATUS OF REGIONAL LD&C SCHEMES
BENEFITS OF SCHEME
Reduce outages
Quick localization of faults
Improve restoration time
Ensure efficient utilization of substation equipments
Improve power quality
Reduce maintenance cost
Reduce loss of energy
Reduce operational costs
Improve customer service
Better operational and management control
Availability of historic data
Better load planning
Features of ER ULDC Scheme
Regional Load Despatch Center- KolkattaState Load Despatch Centres
• Bihar - Patna• DVC - Maithon• Jharkhand - Ranchi• West Bengal - Howrah• Sikkim - Gangtok
Status
Scheduled Commissioning - June’ 2005Expected Commissioning - Dec’ 2004