shri prithviraj chavan hon’ble minister of state in prime minister office shri prithviraj chavan...

55
Shri Prithviraj Shri Prithviraj Chavan Chavan Hon’ble Minister of State Hon’ble Minister of State in in Prime Minister Office Prime Minister Office Power Grid Corporation of India Ltd. Date: August 14, 2004 New Delhi

Upload: clifford-lewis-ball

Post on 05-Jan-2016

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Shri Prithviraj Shri Prithviraj ChavanChavan

Hon’ble Minister of State Hon’ble Minister of State in in

Prime Minister OfficePrime Minister Office

Power Grid Corporation of India Ltd.

Date: August 14, 2004 New Delhi

Page 2: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

RLDC::BrainGeneration ::Heart

Sub-Transmission:: Sub Arteries

Transmission:: Main Arteries

Distribution: Capillaries

POWER SYSTEM Vs HUMAN BODY

Page 3: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

POWERGRID – Introduction

POWERGRID, the Central Transmission Utility, is responsible for

Establishment and Operation of Inter-state, Regional & National Power Grid

Grid Management / System Operation of the five Regional Load Despatch Centres (RLDCs) .

Contd..

Page 4: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

2300

Regional Grids of India Regional Grids of India

Total Capacity = 1,12,360 MWTotal Capacity = 1,12,360 MW

30,860 MW

32,700 MW

16,000

30,500 MW

2300 MW

Page 5: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

POWERGRID & System Operation

RLDCs - Responsiblities Apex Body for Integrated Grid Operation of the

Region Scheduling and Despatch of Electricity on real time

basis Energy Accounting Supervision and Control of Inter – State Transmission

System Ensure Grid Security and adherence to Indian

Electricity Grid Code(IEGC)

Page 6: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

RTU RTU RTU

SUB LDC SUB LDC SUB LDC

SLDC SLDC SLDC

ERLDC

WRLDC NRLDC SRLDC

NERLDC

NLDC

32 Nos.

51 Nos.

1160Nos.

Unified Grid OperationUnified Grid Operation

5 Nos.

Page 7: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Three RLDCs namely Northern, Southern & North-Eastern

Regions have been modernised at an cost of about

Rs. 1600 Crs. Mordernisation of Eastern & Western Regions RLDCs

underway. Estimated cost : Rs. 564 Crs. Schedule : ER by June ’05 & WR by March’06

Modernisation of RLDCs

Page 8: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

WR ULDC: Challenges

Initial delays caused by non availability of concurrence from Constituents.

POWERGRID making efforts to reduce execution time from 4 Year to 3 Year. Scheduled Commissioning -March’ 2006 Expected Commissioning - March’ 2005

Dovetailing of existing SCADA/EMS of Maharashtra into Regional ULDC scheme.

Integration of communication network of Gujarat being setup by them.

Setting up of SLDC for GOA at this stage of Project.

Page 9: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Main Feature of Unified Load Despatch System

Unified Supervision & Control of Grid throughdedicated Communication System on real time Basis. Supervisory Control & Data Acquisition ( SCADA)

Real time acquisition of critical electrical parameters like Voltage, Frequency, MW & MVAR

Real Time Energy Management System Contigency Analysis Optimum Power Flow for reliability & security of the system Merit Order Operation including Hydro-Thermal Mix

Load Forcasting Quick Restoration of Grid in case of disturbance Real Time Environment For Training Operators to

cope with contingencies

Page 10: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Modernisation of RLDCs

Has Resulted Into: Considerable Improvement in System Parameters viz.,

Frequency & Voltage. Merit Order Operation, Leading to Overall Economy Introduction of ABT (Availability Based Tariff), resulting in

improved Grid stability Transparency in grid operation Quantum leap in intra and Inter Regional Power Exchange

and Trading Infused Grid Discipline

THERE HAS BEEN NO MAJOR GRID DISTURBANCE IN LAST 22 MONTHS

Page 11: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power
Page 12: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

POWERGRID the Transmission Utility

POWERGRID started its commercial operation in 92-93

Over 40% of total power generated ( about 45,000 MW) is wheeled by POWERGRID

It operates & maintains 50,000 Ckms. of EHV Tr. System along with 82 Sub-stations at over 99% system availability.

Contd..

Page 13: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

POWERGRID the Transmission Utility

Excellent performance is through:

Robust system design after detailed studies with thrust on integrated development

Deployment of Hot line maintenance technique

Use of Emergency Restoration System

Trained and dedicated manpower with decentralized administrative powers.

Page 14: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Financial Profile of POWERGRIDFinancial Profile of POWERGRIDFINANCIAL GROWTH OF POWERGRID

17702533

3900

8700

236

2805

983634

3600

1260643 748

275 444

0

2000

4000

6000

8000

10000

1992-93 1995-96 1998-99 2002-03 2003-04 2006-07 20011-12

YEAR

RS

.IN

CR

OR

E

Turn Over

Net Profit

GROSS FIXED ASSETS (RS. CRORES)

3521 54928851

18943 19800

37000

70300

0

10000

20000

30000

40000

50000

60000

70000

80000

1992-93 1995-96 1998-99 2002-03 2003-04 2006-07 2011-12

Page 15: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

POWERGRID’s Perspective PlanInvestment of Rs. 71,000 Crore in X and XI Plan

(2012) Rs. 51,000 Crs. to be brought in through IR and loans Balance Rs.20,000 Crs. through private investment.

National Grid of 30,000 MW capacity planned by 2012 to utilise the generation resources optimally. Inter Regional Transfer Capacity

Existing capacity : 8,500 MW by 2011-12 : 30,000 MW

Page 16: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Benefits of Inter-Regional Exchanges Exchange of Power from Surplus to Deficit Region Higher Consumer Demand Met Better Utilisation of available Generating Capacity.

Utilisation of diversity of Peak / Off-Peak period Inter-Regional exchanges

22,000 MUs valued at around Rs. 4,400 Crores (2003-04) 10,018 MUs valued at around Rs 2,000 Crores (April’04 to July 2004 )

States Maximum benefited : Maharashtra, Gujrat Madhya Pradesh Punjab, Haryana, U.P. Karnataka, Tamilnadu, A.P. West Bengal, Orissa and NER States

Improvement in system stability and grid parameters.

Page 17: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Constituents : Madhya Pradesh,

Maharashtra,

Gujarat,Chhattisgarh Goa, UT of

DD & DNHInstalled capacity : 32,700 MW ( Central Sector – 6100 MW)

Peak Demand : 30,000 MW

Energy requirement : 550-600 MUs per day

Peak Availability : 24,000-25,000 MW

Peak Shortage : 5,000-6,000 MW (about 21%)

Energy Shortage : about 10%

Energy import through: 15-18 MUs per day East-West IR link

Western Region-present Power Scenario

Page 18: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

TRANSMISSION FACILITIES OF POWERGRID IN WR

Transmission lines :About 10,700 Ckt km.400 kV – 9700 Ckt km

220 kV – 1025 Ckt km

400 kV Substations- 7 nos. with 2835 MVA capacity (Jabalpur, Satna, Raipur, Dehgam, Mapusa, Bhadravati, Itarsi)

Inter-Regional Links : 3550 MW1000 MW, HVDC back to back link at Chandrapur

500 MW, HVDC back-to-back link at Vindhyachal

1200 MW, Raipur – Rourkela 400 kV D/c lines

220 kV lines between WR & ER ( 450 MW) and WR & NR (400 MW)

Page 19: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Peak Demand by 2006-07 – 35,223 MW Central Sector Gen. addition – 5,000 MW Transmission lines Addition :About 8700 Ckt km ( 765

kV, 400 kV & 220 kV)

Main schemes include transmission system associated with Sipat I & II( 2980 MW), Vindhyachal III( 1000 MW), Tarapur 3&4 ( 1000 MW), and Grid strengthening schems

New Substations- 11 Nos ( 10800 MVA = 8500 MW) 765/400kV : 1 nos. with 4500 MVA capacity (Seoni) 400/220kV : 10 nos. with 6300 MVA capacity (Seoni, Rajgarh,

Gwalior, Bhatpara, Wardha, Raigarh, Vapi, Boisar, Khandwa, BIna)

Estimated Investment – Rs 5500 Cr

WESTERN REGION – by end of X Plan

Page 20: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Peak Demand by 2011-12 – 46,825 MW Transmission lines Addition :About 11070

Ckt km ( 765 kV, 400 kV & 220 kV)Main schemes include transmission system

associated with Kawas II (1300 MW), Gandhar II (1300 MW), East – West & North – West Inter-regional links, and Grid strengthening schemes

New Substations- 400/220kV : 4 nos. with 2520 MVA capacity

(Pandharpur, Pune, Navi Mumbai, Damoh)Total Investment - about Rs. 7000 Cr

WESTERN REGION – by end of XI Plan

Page 21: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

R&D and Technology Development in POWERGRIDR&D and Technology Development in POWERGRID

Deployment of State-of-the-Art technology HVDC & EHVAC Transmission System upto

800 kV with multi Ckts. Use of fixed & variable Series Compensator (FACTS)Extra High Towers to avoid deforestation and protection of

wild lifeCompact Towers to reduce Right Of WayHigh Temperature Conductors for increased LoadingAutomation of Sub-stations. Compact S/stn to reduce land requirement. Satellite imagery for Transmission Line Survey.

Page 22: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Manpower And System DevelopmentManpower And System Development

5725 employees in 92-93 and 6828 at present though Operations have grown six (6) times Possible due to effective systems in Design,

Engineering, Contracts, HR, O&M and Project Management.

Structured training of personnel at all levels.

5 Regional Training Centers already established and plans to establish R&D and National Training Center at Bhiwadi, Rajasthan in 2 years time.

Training of SEBs in Design, Operation and Maintenance of Transmission System and Load Despatch System

Page 23: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

POWERGRID:Undertaking Social ResponsiblityPOWERGRID:Undertaking Social Responsiblity

The only company to adopt ESPP document with wide consultation with Public, Environmentalists, NGOs and Multilateral funding agencies.

POWERGRID : First to assist whenever disaster struck.

Gujarat Cyclone (1998) Orissa Cyclone (1999) Gujarat Earthquake (2001)

Establishment of Green S/Stn. Establishment of Ultra modern office, Group Housing Soci

ety, School & Township.

Oragnises annual Cultural & Art Mela

Page 24: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Transparent Policies & Procedures

Well Defined “Works & Procurement Policy and Procedure”( WPP) To facilitate transparent and consistent decision makingSystems and procedures detailed for Pre-Award( Vol I)

and Post-Award ( Vol II) procurement activitiesDeveloped “Environmental and Social Policy & Procedures”

(ESPP)First Power Sector PSU to develop such policyDeveloped in-house with detailed interactions with world

Bank, NGOs, Funding Agencies, Govt Agencies etc.Widely appreciated by Funding agencies

Page 25: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Transparent Policies & Procedures

Committees of Independent Agencies POWERGRID is committed to excel in every area of its

operations which is not possible unless its performance is monitored by Independent agencies. For this, following committees have been constituted:

To advise on financial management, policies, systems, strategies etc.

To advise on issues related with procurement, project execution and financial aspects raised by external agencies

To advise on issues related to R&D For upgradation and compliance assessment of

environment and social safeguards

Page 26: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

International ConsultancyInternational Consultancy Completed Survey and Soil Investigation of 205 Kms.

of transmission line in Afghanistan in Hindukush mountain

Consultancy for establishment of Load Despatch Center and Telecom network in Bhutan

Shortlisted by the World Bank as consultant for Transmission and Load Despatch System.

Consultancy projects in Ethiopia, Djibouti, Sudan, Nepal and Bangladesh under consideration

Page 27: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

POWERGRID’s Visionary ApproachPOWERGRID’s Visionary Approach

For facilitating much needed power system development in integrated and unified manner, POWERGRID is assisting:

SEBs in implementation of Transmission / Sub-transmission systems

SEBs as Advisor cum Consultant for APDRP schemes in 18 states.

Goa , Bihar, Mizoram & Meghalaya for Implementing APDRP works.

States & REC in Rural Electrification

Page 28: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Attracting Private InvestmentAttracting Private Investment Established First Public-Private JV Company in

Transmission Sector with Tata for implementation of Tala Transmission system at an estimated cost of Rs 1374 Crore.

Two more projects i.e. Transmission System associated with Koldam, Parbati & Maithon, Estimated to Cost Rs 1300 Crore, have been floated under JV route.

Transmission lines under Western Region Strengthening scheme (Estimated Cost: Rs 4,800 Crore) is also being considered for implementation under JV route.

Page 29: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

To utilize spare capacity of ULDC schemes and maximize return on its transmission infrastructure, POWERGRID decided to diversify into TelecomThrough an incremental investment

Telecom networks on Transmission InfrastructureSturdy & secure Rodent menace free Vandalism proof

Only utility in the country providing overhead fibre optic cable for telecom networks

DWDM/SDH equipment deployedScalable to Terabit Capacity

Obtained IP-II license in Jan 2001 and ISP Category-A license in May 2003

POWERGRID’s Diversification into TelecomPOWERGRID’s Diversification into Telecom

Page 30: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

All India Fibre Optic Network of 20,000 kms, spread over 60 cities including all Metros & major cities

Links under commercial operationDelhi-Lucknow -Mumbai Delhi-Ambala-Chandigarh-Shimla-Jallandar-JammuDelhi- Jaipur Ahmedabad-Mumbai-PuneMumbai-Hyderabad-Bangalore-CochinWithin NER

Maintaining availability of 100% on overhead OFC network

POWERGRID’s Broadband NetworkPOWERGRID’s Broadband Network

Complete network to be in place by 2004 Chennai August, 2004 Allahabad, Kanpur, Agra August, 2004 Kolkatta, NER August, 2004 Trivandrum Sept, 2004

Page 31: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Thank YouThank You

Page 32: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Deviation Of Frequency From Normal Band of 49.0-50.5 Hz

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04

% O

f Tim

e

Page 33: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Improvement of grid voltage recorded at Dadri 400 kV bus

330

340

350

360

370

380

390

400

Vol

tage

in k

V

Prior To ABT & RLDC Administration

After ABT & RLDC Administration

Page 34: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power
Page 35: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Growth Of Inter Regional Exchanges

8230

13000

22500

9730

7350

0

5000

10000

15000

20000

25000

1999-2000 2000-2001 2001-2002 2002-2003 2003-2004

Year

MU

IR Exchanges

Page 36: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Natural Energy Resources.

Coal

Hydro

Page 37: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Inter Regional LinksInter Regional Links

Present IR CapacityPresent IR Capacity= 8,500 MW= 8,500 MW

By the year 2012By the year 2012= 30,000 MW= 30,000 MW

500 MW500 MW1200 MW1200 MW

1000MW1000MW

2000MW2000MW

500 MW500 MW

500 MW500 MW

Page 38: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Profile of POWERGRIDPHYSICAL GROWTH OF POWERGRID

46500

22228

27244

35119

40289

34288

28820

12,201

22748

48000

0

10,000

20,000

30,000

40,000

50,000

60,000

92-93 95-96 98-99 2001-02 2003-04

YEAR

MVA

CKM

Page 39: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

765 kV Delta Configuration Tower

Page 40: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Proposed Compact Single pole tower Mode :Noida

Page 41: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Single Pole Tower

Page 42: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

ERS in Service-Gujarat.

ERS erected across River Tapi in Gujrat, to rectify special towers endangered due to change in course of river, had a span of 860m, which is the longest span ever achieved in the world using ERS.

Page 43: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

ERS in Service-Gujarat…

ERS erected across River Tapi in Gujrat, to rectify special towers endangered due to change in course of river, had a span of 860m, which is the longest span ever achieved in the world using ERS.

Page 44: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Orissa Cyclone (Erection of ERS)

Page 45: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Remote Operation Of Bhiwadi S/S

Switchyard ,Bhiwadi

Control Room , Ballabhgarh

Control Room,Bhiwadi

Page 46: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

1

2

3

B

Page 47: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

SYNCHRONOUS OPERATION OF GRIDS

2500 Kms

RLDCs

AREA OF

16 lac sq.kms

Page 48: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Commercial PerformanceCommercial Performance

2002 - 03 (Actual)

2003 - 04 (Provisional)

2006-07 (End of 10th plan)

2011-12 (End of 11th plan)

Turn Over 2533 2783 3900 8700

Net Profit 643 740 1260 3600

Gross Margin 1929 2301 3300 8000

Net Worth 7312 7865 11500 20000

Return on

Net Worth

8.79% 8.54% 11% 18%

Gross Block 18943 19800 37000 70300

Key Financial Indicators (Rs. in Crore)

Page 49: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

ASSISTANCE SOUGHTASSISTANCE SOUGHT

Compensation for revenue loss in NER

Net Budgetary Support to POWERGRID

Expeditious Investment Approval

NAVRATNA Status to POWERGRID

Enhancement in Delegation of Power to BOD (to cover multilateral funded projects)

Reduced GOI Guarantee Fee for WB/ADB/JBIC Loans

Mega Power Project status to Transmission System associated with Mega generation projects/ National Grid Elements.

Page 50: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

ULD & C PROJECT: OBJECTIVESULD & C PROJECT: OBJECTIVES

To haveTo have• Greater and deeper visibility of the power system Greater and deeper visibility of the power system

under controlunder control

• Better communication and co-ordination between Better communication and co-ordination between control centers control centers

• Effective management of grid parameters viz. Effective management of grid parameters viz. frequency, voltage etc. and better grid security frequency, voltage etc. and better grid security through various SCADA/EMS features resulting in through various SCADA/EMS features resulting in betterbetter

Operations schedulingOperations schedulingOperations monitoring and controlOperations monitoring and controlPower system analysisPower system analysis

• A real time environment for dispatcher trainingA real time environment for dispatcher training

Page 51: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

ULD & C PROJECT: OBJECTIVESULD & C PROJECT: OBJECTIVES

To haveTo have• Greater and deeper visibility of the power system Greater and deeper visibility of the power system

under controlunder control

• Better communication and co-ordination between Better communication and co-ordination between control centers control centers

• Effective management of grid parameters viz. Effective management of grid parameters viz. frequency, voltage etc. and better grid security frequency, voltage etc. and better grid security through various SCADA/EMS features resulting in through various SCADA/EMS features resulting in betterbetter

Operations schedulingOperations schedulingOperations monitoring and controlOperations monitoring and controlPower system analysisPower system analysis

• A real time environment for dispatcher trainingA real time environment for dispatcher training

Page 52: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

WorldWorld Bank BenchmarkingBank Benchmarking

Considering POWERGRID’s exemplary performance in project execution, O&M and its growth profile, the WB has fielded its mission to benchmark POWERGRID with respect to International utilities in following areas :

Procurement management

Financial management

Environmental & Social Safeguards

Page 53: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

REGION EST. COST (Crs. Rs.)

STATUS COMPLETION SCHEDULE

NORTHERN

658.92 SYSTEM UNDER OPERATION

COMPLETED IN

Jan 2002

SOUTHERN

683.80 SYSTEM UNDER OPERATION

COMPLETED IN

Jan 2002

NORTH EASTER

N

263.81 SYSTEM UNDER OPERATION

COMPLETED IN

Mar 2003

EASTERN

399.73 UNDER CONSTRUCTION

June’2005

WESTERN

224.72 UNDER CONSTRUCTION

March 2006

NLDC 94 TECHNICAL SPECS.UNDER

PREPARATION

Dec’ 2007

IMPLEMENTATION STATUS OF REGIONAL LD&C SCHEMES

Page 54: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

BENEFITS OF SCHEME

Reduce outages

Quick localization of faults

Improve restoration time

Ensure efficient utilization of substation equipments

Improve power quality

Reduce maintenance cost

Reduce loss of energy

Reduce operational costs

Improve customer service

Better operational and management control

Availability of historic data

Better load planning

Page 55: Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Shri Prithviraj Chavan Hon’ble Minister of State in Prime Minister Office Power

Features of ER ULDC Scheme

Regional Load Despatch Center- KolkattaState Load Despatch Centres

• Bihar - Patna• DVC - Maithon• Jharkhand - Ranchi• West Bengal - Howrah• Sikkim - Gangtok

Status

Scheduled Commissioning - June’ 2005Expected Commissioning - Dec’ 2004