A 17 MW distributed solar PV plant designed for the City of Phoenix's Sky Harbor International Airport in response to an APS RFP for RE Small Generation Resources. Modeled all financial and energy components with SAM and HOMER. Proposal would generate ~$750,000 annual savings for the City of Phoenix.

TRANSCRIPT

Page 1: Sky Harbor Airport Renewable Powerplant Project

Sky

Harbor

Airport

Renewable

Photovoltaic

ProjectDecember 2011

Page 2: Sky Harbor Airport Renewable Powerplant Project

17 MEGAWATT PHOTOVOLTAIC INSTALLATION AT SKY HARBOR AIRPORT

• Siting

• Investment and value

• Simulation and analysis

• Technology

• Considerations and concerns

• Multiple benefits

Page 3: Sky Harbor Airport Renewable Powerplant Project

~100 acres above parking lots and atop parking structures throughout Phoenix Sky Harbor International Airport

Page 4: Sky Harbor Airport Renewable Powerplant Project

DEMAND SAVINGS

APS E-32 and E-34 rate structures1. Charged for kWh used (usage)2. Charged on monthly kW peak (demand)

minimum bill is 80% of annual peak

Terminal 4 (E-34 rate structure)• $17.337/kW at peak demand

= $1,927,593.49

Terminal 4, with 50% demand reduction• $17.337/kW at peak demand

= $963,796.75

$963,797/yr savings just from shaving

peak demand

Page 5: Sky Harbor Airport Renewable Powerplant Project

RATE SAVINGS

“12 largest loads” at Sky Harbor Airport,

FY 2011 electricity usage:

124,670,900 kWh

$10,763,808

= 8.56 cents/kWh

SHARPP produces 29,171,538 kWh annually

@ 8.56 cents/kWh from APS

= $2,497,084/yr

SHARPP cost of 29,171,538 kWh

= $1,750,292/yr

$746,792/yr (7%) savings just on

replacing APS electricity with SHARPP

Page 6: Sky Harbor Airport Renewable Powerplant Project

COST and EFFICIENCY

SHARPP as an investment• Government-owned

• No sales tax• No property tax• No income tax

• 100% “loan” through bonds (3% interest)

• LCOE 6.00 cents/kWh(compare to 8.56 cents/kWh with APS)

Net Annual Energy 29,171,538 kWh

PPA price (LCOE) 6.00 cents/kWh

Debt Fraction 100%

kWh/kW 1,716

Total Land Area 72.82 acres

Page 7: Sky Harbor Airport Renewable Powerplant Project

TECHNOLOGY

Axis

Fixed tilt, latitude - 15° = 18° due south

Inverters

179 Solectria PVI 95kW 480V

Modules

60,764 Suntech 280 Watt polycrystalline solar module, STP280-24-Vb

11 modules per string5,524 strings in parallel

Page 8: Sky Harbor Airport Renewable Powerplant Project

CONSTRUCTION CONCERNS• Federal Aviation Administration

• Wildlife

• Hohokam ruins

• Pollution and noise

• City of Phoenix property

• Risk of aircraft collision / power interruption

Arizona cliff rose Lesser long-nosed bat

California least tern

Page 9: Sky Harbor Airport Renewable Powerplant Project

STORAGE CONSIDERATION

• Batteries• Compressed air• Methane production• Grid-tied net metering

Sky harbor usage

Local substations

Page 10: Sky Harbor Airport Renewable Powerplant Project

BENEFITS• 6.00 cents/kWh

• Mitigates peak demand rates, multiplying the savings of a solar installation

• Financially viable for the City of Phoenix

• Grid-connected

• Increases energy independence

• Less taxpayer money funding airport utilities

• Boosts local economy through jobs

• Creates positive community image

• Visible representation of Arizona’s renewable energy efforts