TRANSCRIPT
Mission Statement
The Socorro Independent School District exists to maximize our children's
academic, artistic, athletic, and social skills.
Purpose
Parameters
Vision Statement
Mission Statement
New Technologies
Demographics
2011 Bond
Current Situation
District Level
Campus level
21st Century Learning
Inventory
Teaching and Learning
Educator Preparation and Development
Administration and Support Services
Infrastructure for Technology
Technology Bond Initiatives
Sustainability and Supporting Resources
Resources
Glossary
Acceptable Use Policy
STaR Chart
Contents
Executive Summary 1
Evaluation
62
66
Statement of Existing Conditions 4
Goals Objective Strategies 7
Technology Assessment
E-Rate
56
Technology Plan
2011-2013 12440 Rojas Drive
El Paso, Texas 79928
Phone: 915-937-0000
Website: http://www.sisd.net
Dr. Xavier De La Torre
Superintendent of Schools
Board Adopted
12/31/2011
TECHNOLOGY PLAN COMMITTEE
Committee Member Title
Eddie Arroya MHS Student Council Representative
Brittney Prince EDHS Student Council Representative
Hugo Rojo AHS Student Council Representative
Gil Doornward Library Media Specialist, Bill Sybert ES
Suzette De Santis Library Media Specialist, Socorro HS
Ruth Rivas Library Media Specialist, Robert Rojas ES
Lynn Hardimann Library Services
Denisa Morales Campus Representative, Americas HS
Ray Flores Campus Representative, Montwood HS
Yoscelina Hernandez Campus Representative, El Dorado HS
Veronica Macias Campus Representative, Mission Early College
Claudia Marquez Campus Representative, Bill Sybert
Efren Navarro Campus Representative, Desertwind ES
Rosa Ayala Campus Representative, Ernesto Serna ES
Melissa Trejo Campus Representative, John Drugan ES
Lesley Grigg Campus Representative, Campestre ES
Kim Holt Campus Representative, Elfida Chavez ES
Georgina Diaz Campus Representative, Chester E. Jordan ES
Herlinda De La Cruz Campus Representative, Dr. Sue Shook ES
Raquel Ocegueda Campus Representative, Escontrias ECC
Julie Headley Campus Representative, Sierra Vista ES
Frenda Serda-Gerardo Campus Representative, John Drugan ES
Luis Iturriaga Campus Representative, Paso Del Norte PK-8
Shivon Loya Campus Representative, Jane Hambric PK-8
Adela Pineda Oakley Campus Representative, Capt. Walter Clarke MS
Alberto Chavez Campus Representative, John Ensor MS
Lorena Martinez Campus Representative, Montwood MS
Jan Farnam Campus Representative, Sanchez MS
Jose Andazola Campus Representative, Socorro MS
Stanya Castillo Campus Representative, Rafael Hernando MS
Edith Carrillo Campus Representative, SunRidge MS
Ron Stone Campus Representative, William D. Slider MS
Debra Saucedo Campus Representative, Benito Martinez ES
Kim Rivera Campus Representative, Helen Ball ES
Edna Salas Campus Representative, H.D. Hilley ES
Steve Springer Campus Representative, Horizon Heights ES
William Barde Campus Representative, Hueco ES
Frances Gonzalez Campus Representative, Hurshel Antwine ES
Olga Terrazas Campus Representative, Lujan Chavez ES
Teresa Patton Campus Representative, Myrtle Cooper ES
TECHNOLOGY PLAN COMMITTEE
Committee Member Title
Brenda Chacon Campus Representative, O‟Shea Keleher ES
Mary Ann Paez Campus Representative, Robert Rojas ES
Laura Pon Campus Representative, Sgt. Robert Ituarte ES
Julietta Monroy Campus Representative, Vista Del Sol ES
Jeannette Williams Principal, Paso Del Norte PK-8
Gloria Aguirre District Technology Trainer
Miguel Moreno District Technology Trainer
Alvaro Ruiz Telecommunications/ICS Team Leader
Ben Ross Security Administrator
Oscar Dominguez Systems Administration Team Leader
Thomas Eyeington Asst. Superintendent for Operational Services
John Alarcon District Operations Director
Juanita Huerta Technology Services Administrative Specialist
Susan Thompson District Library Coordinator
Carla Cardoza El Paso Community College
Hector Reyna Technology Services Director
Arturo Gonzalez Principal, Robert Rojas ES
Rebecca Pennies District Technology Trainer
Jody Miranda District Technology Trainer
Denise Espinoza E-rate Administrator
Raul Rodriguez Infrastructure Services Team Leader
David Akers Technical Services Team Leader
Susan Olson Finance Director
Louisa Aguirre-Baeza Staff Development Director
Daniel Escobar Public Relations Communications Specialist
George Thomas Career & Technical Education Director
Erick Garcia El Paso Community College
Dr. Xavier De La Torre Superintendent of Schools
Executive Summary Technology provides teachers, students, and faculty with the effective productivity tools and extensive
resources for increased learning in the classroom. Across Socorro Independent School District, new
technologies are being utilized in a variety of innovative ways and settings. The Technology Plan
prepared by Socorro Independent School District allows teachers to increase their proficiency levels and
weave technology into the content areas, thus, taking student learning to a higher level. The district plan
assists campuses in establishing their own campus level technology plan. These plans identify continued
emphasis on the integration of technology for all stakeholders.
The development of this technology plan is undertaken by a diverse group of technology users and
planners, representing the district, the students, and the community. The Department of Technology and
Technology Committee work hand in hand to ensure that the district‟s technology plan is successfully
implemented.
The planning committee has a primary goal of aligning the integration of technology with the District‟s
developed goals and objectives. These goals are:
Socorro Independent School District will demonstrate sustained growth in student achievement by
providing optimal learning experiences to maximize student successes;
Socorro ISD will implement effective student management strategies that enhance the quality of
learning through support, collaboration, training, and communication;
Socorro ISD will support, maintain, and enhance an infrastructure that will optimize the
management of information necessary;
Socorro ISD will foster a learning environment equipped with the tools necessary maximizing the
use of resources and information to improve student achievement;
Socorro ISD will improve parent/community relations by creating welcoming environments and
allowing them to build technology competencies necessary to be active participants in the digital
age.
As Socorro ISD continues to grow, current technologies and services will be extended to new campuses
and administrative locations. The district has established a technology support budget to provide for
infrastructure, equipment, training, and support personnel to implement new technologies and assure
that current technologies are integrated successfully.
Purpose
Socorro Independent School District has prepared this plan to articulate a common vision for technology
at all levels and identify the strategies that will help teachers use advanced technology efficiently and
effectively. Technology is widely used in our district and has become part of our curriculum. Teachers at
many of our campuses are utilizing technology in diverse and innovative ways. As the number of
innovative classrooms continues to grow, it is vital that we establish clear standards for implementing
technology projects by ensuring that our technology is well supported and sustainable. With the opening
of new campuses and the rapid growth of the district, our infrastructure and equipment must be properly
supported and managed.
Currently, all students and staff have equitable access to telecommunications and networking services
through a MAN infrastructure based on 1 GB fiber-optics and over 22,000 computers (including
administrative/support staff) are connected to the network. In efforts to maintain an infrastructure based
on standards that will optimize the management of the current technological systems, it is necessary that
the district seek grant funding that will provide for the continual operations of the network and its internal
connections.
Page 1 of 72
Parameters This technology plan is driven by the state curriculum standards and supports the educational mission and
instructional goals of Socorro Independent School District. The plan stresses the importance of ongoing
and sustained staff development in the integration of technology into the curriculum for teachers,
principals, administrators, and school library media personnel to further the effective use of technology in
the classroom or library media center. It also is consistent with the recommendations for LEAs as defined
by the Texas Long Range Plan for Technology in the areas of Teaching and Learning, Educator
Preparation and Development, Administration and Support Services, and Infrastructure for Technology, as
well as the newly adopted Technology Applications Standards for Beginning Teachers.
Vision Statement As Socorro Independent School District enhances learning instruction, the progress of technology
implementation of districtwide applications and solutions will allow teachers to use technology in every
subject/content area. Socorro ISD relies on technology for curriculum, curriculum integration, and
operations as well as to carry out administrative tasks and responsibilities. Currently, the district‟s students,
faculty, and staff have access to telecommunications and networking services through the WAN
infrastructure based on fiber-optics and T1 lease lines. More than 22,000 computers are currently
connected to the network.
Mission Statement Socorro Independent School District recognizes that technology changes quickly and that more and
more students have access to computers and other computer technologies outside of school above all
grade levels. In an effort to provide a greater enriching learning experience that will provide more
access to computers within the instructional day, the district proposes that rather than requiring students
to leave their technology at the classroom door, Socorro ISD will work towards creating opportunities in
which these tools may be utilized in a safe and monitored manner on the district network. Currently, the
district is providing “cloud computing” capabilities districtwide, another tool that enhances quality
teaching and learning.
New Technologies
One of our new technologies that has been implemented is Microsoft SharePoint Services. The Socorro
Independent School District utilizes this collaboration tool for students, faculty, staff, and parents to
connect to our technology resources and information through the MySISD web portal. This encourages
our users to work together to provide an enhanced learning environment within our district.
Mobile versions of all district applications will be available in the upcoming school year for all handheld
devices. This technology will deliver information to the end user to make it accessible at any time, from
anywhere.
Demographics Socorro Independent School District is one of the fastest-growing school districts in Texas located right
outside of the El Paso area along the U.S. and Mexican border, established on July 8, 1961. Over the past
four (4) years, Socorro ISD has grown by more than 5,700 students or average of 3.58 percent per year.
Along with this growth, the district approved a bond which allocated $297,400.00 for district schools
through a voter election in May 2011. The district continues to be TEA Recognized, won the prestigious
2011 Blue Ribbon honors, and a two-time, Broad Award Finalist for Excellence in Urban Education,
guaranteeing the district a minimum of $250,000 in college scholarships for students.
Page 2 of 72
According to the Broad Foundation, the district continued success is due to the following:
In 2009, Socorro outperformed other Texas districts that serve students with similar family income
levels in reading and math at all school levels (elementary, middle, high school).
In recent years, Socorro narrowed achievement gaps between its Hispanic students and the
state‟s white students and between its low-income students and the state‟s non-low-income
students in math at all school levels. For example, from 2008 to 2009, Socorro narrowed the gap
between its low-income students and the state‟s non-low-income students in high school math
by 4 percentage points.
Between 2006 and 2009, SAT participation rates for Hispanic high school seniors increased an
average of 4 percentage points per year.
In 2009, 100 percent of schools in Socorro met AYP, compared with 81 percent of schools in
Texas.
District Profile
Ranked among U.S. school districts (by size): 144
Number of schools: 43
5- comprehensive high schools
1- ninth grade academy
8- middle schools
6- PreK-8 schools
19- elementary schools
4- specialty campuses
Number of students: 43,685
Number of teachers: 2,562
Per pupil expenditure: $7,939
Technology Expenditure per pupil: $671.84
Student Characteristics
Percent of students eligible for free and reduced-price lunch: 75%
The primary measure for determining Schools and Libraries support discounts is the percentage of
students eligible for free and reduced lunches under the National School Lunch Program (NSLP),
calculated by individual school.
A school district applicant calculates its shared discount by calculating a weighted average of
the discounts of all individual schools included in the school district which is currently at 84% for the
Socorro Independent School District.
Percent of students designated as English language learners: 23%
Student Demographics
Asian -.50% Native American-.35%
Black -1.43% White-3.24%
Hispanic -78.77% Other-15.72%
Page 3 of 72
Statement of Existing Conditions A comprehensive needs assessment was conducted to analyze the current status of technology in the
district and determine future needs. Items analyzed included: infrastructure, hardware, software,
programs, courses, student achievement, technology resources, staff development, and technical
support. As Socorro ISD meets the challenges of the 21st century, the district must provide the following
resources and solutions:
Maintain appropriate staff levels to ensure the efficient operation of district networks and
technologies.
Provide additional professional development classes that will help teachers integrate technology
into the classroom.
Provide all district classrooms with standardized up-to-date technology resources and tools that
include computers, projectors, digital/video cameras, interactive technologies and media
retrieval systems.
Purchase, maintain, and support all network related equipment by expanding the district‟s
infrastructure.
Review and standardize all software applications being requested to ensure that they meet the
needs for adequate instruction.
Help teachers develop and implement a TEKS-based plan to appropriately integrate technology
into all curriculum areas that will enrich each student‟s educational and learning experience.
2011 Bond
To address equality and improve opportunities for students and staff in the District‟s existing campuses,
the Facilities Advisory Committee and Board of Trustees identified improvements to high school science
labs, technology upgrades district wide, and elementary school climate control systems. In May 2011,
Bond 2011 was approved for $297.4 million of new construction and improvements districtwide.
Proposed Projects Cost Summary
Project Estimated Cost
New Construction
El Dorado 9th Grade Academy completion
(future Pebble Hills High School)
Eastlake High School completion
Combination school (elementary/middle)
Two (2) elementary schools
Fixtures, furniture & equipment for new schools
$229,400,000
High School Renovations/Additions
Science labs
$6,000,000
Technology Upgrades $6,000,000
Elementary School Renovations/Additions
HVAC /Emerging needs
$56,000,000
Total $297,400,000
Page 4 of 72
Current Situation Currently, the district facilitates access to telecommunications and networking services through a WAN
infrastructure based on fiber-optics and T1 lease lines districtwide. With over 22,000 desktop computers
connected to the network, the following additional technologies are now in place:
District Level
The Internet connects directly via broadband leased line.
District web servers are in place which host both internal and external sites to provide information to staff,
teachers, students, parents, and the community.
Users, groups, and servers are managed through an active directory.
Domain controllers are in place to deliver security authentication requests (such as logging in, checking
permissions, etc.) within our domain.
Create, send, receive, and manage facsimile directly from a user‟s desktop by utilizing a RightFax System
No-cost, feature–rich, web accessible email system sponsored by Microsoft and Socorro ISD that allows all
district users to communicate using an array of tools, effective communication between students,
teachers, and staff
Email archiving preserves and protects our email data to be captured and accessible for disaster
recovery, backups, and legal compliances.
Data protection offers an easy-to-use backup and recovery solution using disk, tape, and cloud-based
repositories from Microsoft environments such as servers, desktops, and laptops.
Data storage infrastructure stores and manages our district‟s data using solutions such as HP EVA, and
EMC VNX SAN.
HyperV virtualization solution delivers tools and services to create and manage virtual environments.
Terminal Services gives district users access to data and applications over the network using the remote
desktop protocol.
Ericom Software approaches a “cloud-computing” environment to deliver technology resources
including applications, files, and desktops across different platforms.
SISD implements a disaster recovery plan to ensure the protection of the district‟s data by supporting on-
site and off-site storage systems.
APC air conditioners allocate room cooling for to the district‟s data center.
Written policies are in place on acceptable use of the district technology resources (e.g. Internet content,
network management, and equipment).
School Messenger is the callout system to connect with staff, students, and parents through e-mail, SMS
text, voice, and social media.
SchoolWires Web Content Management System encourages communication between staff, faculty,
students, parents, and community members by providing the ability to create, update, and provide
important information in one shared location.
MySISD portal provides a central environment for staff, faculty, and students to access a variety of useful
resources and services such as e-mail, custom applications, news, tools, calendar, etc.
Page 5 of 72
Campus Level Campuses are directly connected to the Internet via a 1000 MB/s fiber-optic WAN.
There is at least one computer and two network drops in every classroom.
There are at least two computer labs at each campus.
Teachers have access to peripherals (e.g. printers, digital cameras, scanners, and projectors).
The campus instructional coach is available daily to support both faculty and students through on-going
professional development.
Additional computer research stations are available in the campus library.
District-supported software includes: Microsoft Web Access, C-Scope, ACTIVprimary/studio/inspire,
SchoolWires, iStation, Read & Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK, eBooks,
Compass Learning, Agile Mind, A+, eBooks, Read 180, and Syllabus Maker.
21st Century Learning Layout
In our efforts to create an engaging educational environment, we are embracing 21st Century learning and
transforming the classroom by providing emerging and interactive technologies wherever possible. The
classroom of the future is now here and is making a remarkable difference in how teachers teach and
students learn. The concept being applied at Socorro ISD is not about learning to use technology but
about using technology to learn. Technology has now become integral to the teaching and learning
experience in the sense that it defines the very nature of the experience, which could not happen without
it. It plays a vital role to better prepare our students in continuing their education and to assist teachers in
implementing curriculum in new and exciting ways. In following this learning methodology, we are creating
positive effects on teaching and learning. The following are the elements which we are providing for the
21st century classroom.
As the district proceeds to outfit and maintain classrooms with interactive technologies, we will do the
following:
When a projector in a classroom malfunctions, it will be replaced with a similar model.
When an interactive white board malfunctions, we will replace it with a metallic board and replace the
projector with an interactive projector. The replaced projector will be kept for re-use.
Any other place where an interactive setup is required, a new installation with an interactive projector
and a white metallic board will be installed.
Portables that need to use interactive boards may check out an interactive projector from the library
and use their white boards for projection.
In new construction, we will be using interactive projectors and new 15 foot metallic boards. These
boards will take the place of the tack board, the marker board and the interactive white board. This
will reduce the amount of components for classroom interactivity which will also reduce the cost of
providing technology for these classrooms. In the year 2012-2013, we will be building an elementary
school, a middle school and creating 120 new classrooms for two high schools. We expect the savings
in using the new interactive projectors will be substantial.
21st Century Classroom Layout
Interactive Whiteboards
Projector
Teacher Computer
Student Computers and Printers
Audio System
Other Devices
Digital Content
Page 6 of 72
Inventory
Additionally, campuses have interactive devices in each of the classrooms. In a computer lab setting,
Elementary Schools is comprised of 2-3 labs with up to (25) twenty-five computers. For the K-8 and
Middle Schools, a computer lab is comprised of 3-4 labs with up to (30) thirty computers. The High
Schools are comprised of 4-5 labs with up to (80) eighty computers. The computer labs also have
network printers and interactive technology for use.
Goals & Objectives Socorro Independent School District has developed goals and objectives based upon the recommendations
defined by the Texas Long-Range Plan for Technology (LRPT) in the areas of Teaching and Learning, Educator
Preparation and Development, Leadership Administration and Support, and Infrastructure for Technology, as
well as the newly adopted Technology Applications Standards for Beginning Teachers.
Goal 1 - Teaching and Learning
Technology upgrades will be implemented over the next five years districtwide with $6M allocated through the
May 2011 bond. Through school administration and well-prepared teachers, the initiatives to successfully
provide opportunities for students to succeed in the global workforce will be made through the availability,
reliability, and effectiveness of technology use in the classroom.
The vision for technology in the classroom is motivated by the understanding that students must graduate from
Socorro I.S.D. well-rounded, prepared, and competitive for the demands of the 21st century. Our learning
community will acquire critical thinking and problem solving, collaboration across networks and leading by
influence, agility and adaptability, initiative and entrepreneurialism, effective oral and written communication,
accessing and analyzing information, and curiosity and imagination. The skills previously mentioned have been
studied and identified as Tony Wagner‟s seven survival skills, all of which support increased opportunities in a
global economy.
The plan for the 2011 Technology Bond funding is to support current and future district initiatives. Twenty first
century technology such as mobile carts, computers for teachers, libraries, and computer labs, and
printers/copiers will enhance the educational opportunities for students. The technology listed will facilitate the
delivery and implementation of the following types of initiatives:
Programs: Destination Reading, Destination Math, Scan TEK, Lexia, Istation, Ignite
Assessment: TELPAS, Accuplacer, PSAT, EOC Exams
Data Analysis: CSCOPE, Eduphoria
Curriculum and Instruction: CSCOPE, Algebra I-Fuse, E-readers, Wiki-links, STEMScopes, Distance Learning
Through the use of current and cutting edge technology, we must support new learning opportunities for 21st
century learners. Socorro ISD is committed to maintaining its reputation for innovation and forward thinking,
while also maintaining a focus on rigor and differentiation, two practices that will create self-directed lifelong
learners.
NAME NUMBER OF
STUDENTS
TOTAL
COMPUTERS
Socorro ISD – Campuses 43,685 18,000
Page 7 of 72
GOALS, OBJECTIVES, AND STRATEGIES GOAL 1: SISD students will demonstrate improved academic achievement through the use of
challenging and developmentally appropriate instructional technologies..
OBJECTIVE 1.1:
Students will use 21st Century technology to communicate, create and collaborate with other students and the
global community.
Budget: $1,500,145
LRPT Category: Teaching and Learning
Erate Correlates: ER01
NCLB Correlates: 01, 02, 03, 04a, 05, 06, 07, 08, 12
Strategies Status Timeline Person(s) Responsible Evidence
1.1.1 Ensure TEKS
integration
into activities
and projects
in all
curricular
areas to
improve
academic
achievement.
LEA LRPT
Correlates:
LAS05, LAS10,
LAS12, LAS13,
TL01, TL04,
TL05, TL06,
TL08, TL09,
TL10, TL11
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Specialty
Teachers, Instructional
Support, Special
Education Department,
Dyslexia Program, Library
Media Services, Library
Media Specialists
Student Performance,
TAKS Results, Lesson
Plans (TA TEKS), 8th
Grade Technology
Application Benchmark,
Benchmarks, Student
Projects, Teacher
STaRChart
1.1.2 Implement
instructional
resources to
facilitate the
mastery of
TEKS.
LEA LRPT
Correlates:
I01, LAS05,
LAS10, LAS12,
TL01, TL05,
TL06, TL08,
TL09, TL10,
TL11, TL13
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Special
Education Department,
Dyslexia Program, Library
Media Services, Library
Media Specialists
Student Performance,
TAKS Results, Lesson
Plans (TA TEKS), 8th
Grade Technology
Applications
Benchmark, Unit
Assessments
Page 8 of 72
1.1.3 Provide
student-
centered
learning
opportunities
with national,
international,
business,
industry,
university and
communities
of inquiry.
LEA LRPT
Correlates:
I09, LAS12,
LAS13, TL08,
TL09, TL12,
TL13, TL15
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Technology
Services (DOTS), CTE
Teachers, Library Media
Services, Library Media
Specialists, Counselors,
Special Education
Department, Dyslexia
Program
Student Performance,
Project Assessment,
Student Presentations,
Rubrics, Lesson Plans
1.1.4 Provide
student
opportunities
for distance,
distributed
and online
learning.
LEA LRPT
Correlates:
LAS05, LAS10,
LAS12, LAS15,
TL08, TL09,
TL11, TL13
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Department of
Technology Services
(DOTS), Library Media
Services, Library Media
Specialists, Special
Education Department,
Dyslexia Program, Dual
Credit
Facilitators/Instructors
Student Performance,
Credit Hours, Purchase
Orders, Learning Plans,
Usage Reports,
Correspondence
1.1.5 Provide
equitable
learning
resources to
all students,
to include
virtual
computing.
LEA LRPT
Correlates:
EP09, LAS05,
LAS12, TL03,
TL05, TL09,
TL10, TL13
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Counselors,
Special Education
Department, Dyslexia
Program
Student Performance,
Budget Allocations,
Inventories, Purchase
Orders, Lesson Plans,
Computer: Student
Ratios
Page 9 of 72
1.1.6 Work collaboratively
in communities of
inquiry to propose,
assess, and
implement solutions
to real world
problems with a
variety of audiences.
LEA LRPT Correlates:
LAS10, LAS12, LAS13,
TL04, TL08, TL09, TL10,
TL12, TL13
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Specialty
Teachers, Library Media
Services, Library Media
Specialists, CTE
Teachers, Special
Education Department,
Dyslexia Program
Project Assessment,
Student Performance,
Correspondence,
Internships, Lesson
Plans, Student Projects
1.1.7 Use available
facilities and
technology to
provide digital
collaboration at
each campus to
facilitate student-
centered learning
activities.
LEA LRPT Correlates:
I05, LAS05, LAS10,
TL09
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Specialists, Computer
Lab Teachers, Special
Education Department,
Dyslexia Program
Open Lab Schedule,
Mobile Cart Schedule,
Library Schedule,
Student Performance
1.1.8 Provide curriculum
and/or resources for
teachers,
administrators,
students and parents
that foster digital
citizenship, modeling
safe computing and
district expectations
as outlined in
Acceptable Use
Policies embedded
in the Student Code
of Conduct and
Children's Internet
Protection Act
(CIPA).
LEA LRPT Correlates:
LAS12, TL14, TL15
State:
Original
Status:
Planned
Campus Administration,
Teachers, Instructional
Support, Specialty
Teachers, Library Media
Services, Library Media
Specialists, CTE
Teachers, Special
Education Department,
Dyslexia Program,
Department of
Technology Services
(DoTS), Security
Administrator
Sign-in Sheets, Lesson
Plans, Website Hit
Counter, Usage Logs,
Instructional
Technology Cyber
bullying/Internet Safety
District Website
Page 10 of 72
GOAL 1: SISD students will demonstrate improved academic achievement through the use of
challenging and developmentally appropriate instructional technologies.
OBJECTIVE 1.2:
Students will have equitable access and use of technology and information resources to meet their learning
and productivity needs within and beyond the school day.
Budget: $1,550,000
LRPT Category: Teaching and Learning
Erate Correlates: ER01
NCLB Correlates: 01, 02, 03, 04a, 05, 06, 07, 08, 12
Strategies Status Timeline Person(s) Responsible Evidence
1.2.1 Continue to
ensure TEKS
integration
into activities
and projects
in all
curricular
areas to
improve
academic
achievement.
LEA LRPT
Correlates:
EP01, EP02,
LAS05, LAS10,
LAS12, TL01,
TL05, TL06,
TL09, TL10,
TL11
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Special
Education Department,
Dyslexia Program
Student Performance,
TAKS Results, Lesson
Plans, 8th Grade
Technology
Applications
Benchmark, Teacher
STaRChart, Excellence
in Technology Awards
entries
1.2.2 Implement
instructional
resources to
facilitate the
mastery of
TEKS.
LEA LRPT
Correlates:
EP01, EP02,
LAS05, LAS10,
LAS12, TL05,
TL06, TL09,
TL10, TL11
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Special
Education Department,
Dyslexia Program
Student Performance,
TAKS Results, Lesson
Plans, 8th Grade
Technology
Applications
Benchmark,
Benchmarks, Teacher
STaRChart, Excellence
in Technology Awards
entries
Page 11 of 72
1.2.3 Provide
equitable
technology,
instructional
and learning
resources to
all students
including
appropriate
adaptive,
assistive
devices for
those with
special
needs.
LEA LRPT
Correlates:
EP05, I05,
LAS05, LAS10,
LAS12, TL09,
TL10, TL11
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Special
Education Department,
Dyslexia Program,
Instructional Support,
Library Media Services,
Library Media Specialists,
Department of
Technology Services
(DOTS)
Student Performance,
Budget Allocations,
Individual Educ. Plans
(IEPs), Lesson Plans,
Purchase Orders,
Inventories, Teacher
STaRChart
1.2.4 Provide
opportunities
for students
to access
technology
resources
beyond
school hours.
LEA LRPT
Correlates:
I05, LAS05,
LAS10, LAS12
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Instructional Support,
Computer Lab Teachers,
Library Media Services,
Library Media Specialists,
Classroom Teachers,
Special Education
Department, Dyslexia
Program
Open Lab Schedule,
Sign-in Sheet/Log,
Usage Reports
1.2.5 Integrate
computer
technologies
and
peripherals
by using
multimedia
presentations
in all
curricular
areas.
LEA LRPT
Correlates:
I06, LAS05,
LAS10, TL01,
TL06, TL09
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, CTE Teachers,
Special Education
Department, Dyslexia
Program
Student Performance,
District/Campus
Inventories, Teacher
STaRChart, Student
Projects, Equipment
Checkout Sheets
Page 12 of 72
1.2.6 Afford electronic
discussion forums,
blogs, wikis and
podcasts for curricular
subjects and tutorial
needs.
LEA LRPT Correlates:
LAS05, LAS10, LAS12,
TL08, TL09
State:
Revised
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), District
Webmasters, Teachers,
Instructional Support,
Computer Lab Teachers,
CTE Teachers, Library
Media Specialists, Special
Education Department,
Dyslexia Program
Student Performance,
District Network,
District/Campus Web
Pages, Lesson Plans
1.2.7 Assure each student
has individual access
to their own
workstation or
handheld device.
LEA LRPT Correlates: I05,
LAS05, LAS10, TL01,
TL05, TL09
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Special
Education Department,
Dyslexia Program,
Department of
Technology Services
(DOTS)
Student Performance,
District/Campus
Inventories, Purchase
Orders, Mobile Cart
Schedule
1.2.8 Use distance learning
and digital content
services for expanding
curricular offerings and
meeting the needs of
all students.
LEA LRPT Correlates: I09,
LAS05, LAS10, LAS12,
LAS15, TL01, TL05, TL08,
TL09, TL13
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Counselors,
Department of
Technology Services
(DOTS), Mobile Lab
Coordinator, Special
Education Department
Student Performance,
Course Credit, Agenda &
Sign-in Sheets, District
Network, Purchase
Orders, Correspondence,
Usage Reports, Lesson
Plans, Teacher STaRChart
Page 13 of 72
1.2.9 Establish sustainable
programs that offer
economically
disadvantaged
students use of
technologies.
LEA LRPT Correlates: I03,
I05, LAS05, LAS10, TL01,
TL03, TL05
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Department of
Technology Services
(DOTS), Special Programs
Lab Coordinators, Special
Education Department,
Dyslexia Program, Career
and Technical Education
Department, Curriculum &
Instruction,
District/Campus
Inventories, Student
Performance, Student
Participation, Community
Outreach Labs
(SOCRATES) Schedule
District/Campus
Inventories, Student
Performance, Student
Participation, Community
Outreach Labs
(SOCRATES) Schedule
1.2.10 Provide curriculum
and/or resources for
teachers,
administrators, students
and parents that foster
digital citizenship,
modeling safe
computing and district
expectations as
outlined in Acceptable
Use Policies embedded
in the Student Code of
Conduct and
Children's Internet
Protection Act (CIPA).
LEA LRPT Correlates:
LAS12, LAS13, TL14, TL15
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Specialists, Library Media
Services, CTE Teachers,
Special Education
Department, Dyslexia
Program, Department of
Technology Services
(DOTS), Parent Liaisons,
Security Administrator
Sign-in Sheets, Lesson
Plans, Website Hit
Counter, Usage Logs,
Instructional Technology
Cyber Bullying/Internet
Safety District Website
Page 14 of 72
GOAL 1: SISD students will demonstrate improved academic achievement through the use of
challenging and developmentally appropriate instructional technologies.
OBJECTIVE 1.3:
Students will use technologies effectively to access, analyze, evaluate, create and communicate information
between and among others in the global community.
Budget: $1,543,935
LRPT Category: Teaching and Learning
Erate Correlates: ER01
NCLB Correlates: 01, 02, 03, 04a, 04b, 05, 06, 07, 08, 11, 12
Strategies Status Timeline Person(s) Responsible Evidence
1.3.1 Ensure TEKS
integration into
activities and
projects in all
curricular areas to
improve academic
achievement.
LEA LRPT Correlates:
EP09, I09, LAS05,
LAS10, LAS12, TL01,
TL05, TL06, TL08, TL11,
TL12, TL13
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Specialty
Teachers, Special
Education Department,
Dyslexia Program,
Career and Technical
Education Department,
C & I
Student
Performance, TAKS
Results, Lesson Plans
(TEKS), 8th Grade
Technology
Applications
Benchmark
1.3.2 Implement
instructional
resources to
facilitate the
mastery of TEKS.
LEA LRPT Correlates:
EP09, I09, LAS05,
LAS10, LAS12, TL01,
TL03, TL05, TL06, TL09,
TL10, TL11
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Specialty
Teachers, Special
Education Department,
Dyslexia Program
Student
Performance, TAKS
Results, Lesson Plans
(TEKS), 8th Grade
Technology
Applications
Benchmark
1.3.3 Provide student-
centered learning
opportunities with
national,
international,
business, industry,
university and
communities of
inquiry.
LEA LRPT Correlates:
I02, I03, I09, LAS05,
LAS10, LAS12, LAS13,
TL05, TL08, TL10, TL11,
TL13
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Department
of Technology Services
(DOTS), Special
Education Department,
Dyslexia Program, CTE
Teachers
Student
Performance,
Lesson Plans,
Student Projects,
Teacher STaRChart
Page 15 of 72
1.3.4 Implement
innovative practices
in the use of
technology
applications to
meet or exceed
standards.
LEA LRPT Correlates:
EP02, LAS05, LAS10,
LAS12, TL01, TL05,
TL08, TL09, TL10, TL11,
TL13
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Special
Education Department,
Dyslexia Program
Student
Performance,
Lesson Plans,
Student Projects,
Purchase Orders,
Teacher STaRChart
1.3.5 Provide seamless
opportunities to
create/demonstrate
interdisciplinary
technology-based
projects.
LEA LRPT Correlates:
EP02, LAS05, LAS10,
LAS12, TL01, TL05,
TL06, TL09, TL10, TL11
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Specialty
Teachers, Special
Education Teachers,
Dyslexia Program
Student
Performance,
Project Assessment,
Rubrics, Lesson
Plans, Web Pages,
Equipment
Checkout Sheets,
Student Projects,
Excellence in
Technology Awards,
Teacher STaRChart
Page 16 of 72
GOAL 1: SISD students will demonstrate improved academic achievement through the use of
challenging and developmentally appropriate instructional technologies.
OBJECTIVE 1.3:
Students will use technologies effectively to access, analyze, evaluate, create and communicate information
between and among others in the global community.
Budget: $1,543,935
LRPT Category: Teaching and Learning
Erate Correlates: ER01
NCLB Correlates: 01, 02, 03, 04a, 04b, 05, 06, 07, 08, 11, 12
Strategies Status Timeline Person(s) Responsible Evidence
1.3.6 Employ
appropriate
strategies for
students to
effectively use
and cite
copyrighted,
Creative
Commons and
other materials
to become
information
literate.
LEA LRPT
Correlates:
EP05, I05, I09,
LAS05, LAS10,
LAS12, TL09,
TL10, TL11
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Specialists, Specialty
Teachers, Special
Education Department,
Dyslexia Program
Student Performance,
Lesson Plans, Library
Database, DKC Usage
Reports, Teacher
STaRChart
Page 17 of 72
1.3.7 Demonstrate
increased
proficiencies
and
implementation
across all areas
measured by
the Texas STAR
Chart to
facilitate
student
learning.
LEA LRPT
Correlates: I01,
I05, I09, LAS03,
LAS05, LAS10,
LAS12, TL01,
TL04, TL05, TL06,
TL09, TL10, TL11,
TL14
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Specialty
Teachers, Special
Education Department,
Dyslexia Program
Teacher STaR Chart,
Training Agendas &
Sign-in Sheets, Student
Performance, Student
Projects, Excellence in
Technology Awards
1.3.8 Give students
the opportunity
to experience
technology‟s
role in the
workplace
through
internships with
the
public/private
sector.
LEA LRPT
Correlates: I05,
I09, LAS05,
LAS13, TL12
State:
Original
Status: In
Progress
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, Department of
Technology Services (DOTS),
CTE Teachers, Special
Education Department,
Dyslexia Program
Job Evaluations, Student
Participation, Intern
Timesheets, Mobile Cart
Schedule, Work Orders,
Teacher STaRChart
Page 18 of 72
1.3.9 Work
collaboratively
in the creation
and
communication
of student-
centered
projects
supported by
emerging
technologies.
LEA LRPT
Correlates: I01,
I05, I09, LAS05,
LAS10, LAS12,
LAS13, TL01,
TL05, TL08, TL09,
TL10, TL11, TL12
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, CTE Teachers,
Special Education
Department, Dyslexia
Program
Student Performance,
Project Assessment,
Purchase Orders, Lesson
Plans, Student Projects,
Teacher STaRChart
1.3.10 Provide
curriculum
and/or
resources for
teachers,
students and
parents that
foster digital
citizenship,
modeling safe
computing and
district
expectations as
outlined in
Acceptable
Use Policies
embedded in
the Student
Code of
Conduct and
Children's
Internet
Protection Act
(CIPA).
LEA LRPT
Correlates:
LAS13, TL14,
TL15
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Instructional
Support, Library Media
Services, Library Media
Specialists, CTE Teachers,
Special Education
Department, Dyslexia
Program, Department of
Technology Services (DoTS),
Parent Liaisons, Career and
Technical Education
Department, C & I
Sign-in Sheets, Lesson
Plans, Website Hit
Counter, Usage Logs
Page 19 of 72
Goals and Objectives
Goal 2 - Educator Preparation and Development
Socorro Independent School District envisions 21st century learning that will allow students to engage
interactively and teach them to think critically and creatively. Technology will assist all teachers to
actively engage all students in the process of learning on a daily basis. The tools we use to accomplish this
task, which historically are using paper and pencil and mounted devices such as TVs and telephones, are
now transformed into digital media and environments accessed via laptops, desktops, mobile devices,
and interactive technologies. Yet, at the heart of it all, remain the indispensable relationships of teacher
to student and home to school. Therefore, it is in the context of these relationships that we set out our
vision for the next three to five years.
Effective integration of technology within the curriculum is directly affected by the level of educator
preparation, development, and support.
Educators benefit from multiple modes of training, including face-to-face, online, self-paced,
distance learning, community sources (i.e. ESC 19, UTEP, EPCC, conferences), and learning
communities (cadres).
Career and Technical Education supports teachers to attain industry-recognized certifications.
The long-term objective partnerships with Career and Technical Education will provide new and
existing training opportunities for teachers locally through in-house and contracted vendors.
Instructional support will include District Title I Instructional Coach of Excellence (DICE), Campus
Instructional Coach of Excellence (CICE), Teacher on Special Assignment (TSA), Instructional
Technologist, and/or Library Media Specialist.
SISD is committed to100% of teachers and campuses reaching the „Target‟ level of the Texas STaR
Chart assessment to ensure effective implementation of innovative practices within the classroom.
Additional training will be provided during nine weeks and summer intersessions. Training that
requires travel will be provided when ample funding is available and skill attainment/industry
certification is required.
Page 20 of 72
GOALS, OBJECTIVES, AND STRATEGIES
GOAL 2: All SISD personnel will integrate technologies to meet instructional and productivity goals.
OBJECTIVE 2.1: Design educator professional development that integrates technology into teaching and
learning, instructional management, and administration.
Budget: $2,400,000
LRPT Category: Educator Preparation and Development
Erate Correlates: ER02
NCLB Correlates: 01, 02, 03, 04a, 04b, 05, 06, 07, 08, 11, 12
Strategies Status Timeline Person(s) Responsible Evidence
2.1.1 Provide
technology
resource
personnel at
each campus
who are
designated to
promote,
model, teach,
and train all
campus
teachers in
the use of
technology
integration
strategies as
per district
policy.
LEA LRPT
Correlates:
EP09, TL11
State:
Revised
Status:
Planned
2010-
2013
Human Resources
Department, Campus
Administration, Curriculum
& Instruction, Instructional
Support, Career &
Technology Education,
Library Media Specialists
Personnel Action Forms,
Policy EEB, Employee
Evaluation Forms
2.1.2 Sustain
funding for
educator
technology
professional
development,
a minimum of
30% of State
Technology
allotment, per
campus.
LEA LRPT
Correlates:
LAS06
State:
Original
Status:
Planned
2010-
2013
Business Services,
Curriculum & Instruction,
Career & Technology
Education
30% Technology
Allotment Budget
Spreadsheet,
Instructional Technology
Services Expenditure
Reports
Page 21 of 72
2.1.3 Expand staff
development
for all district
employees to
include how
to access just-
in-time
assistance.
LEA LRPT
Correlates:
EP01, EP02,
EP03, EP04,
EP05, EP06,
EP07, EP08,
EP09, LAS06,
LAS10, TL13
State:
Revised
Status:
Planned
2010-
2013
Curriculum & Instruction,
Department of
Technology Services
(DOTS), Campus
Administration, District
Operational Services,
Administrative Services,
Business Services, Human
Resources Department,
Career & Technology
Education
Agenda and Sign-in
Sheets, Employee
Evaluations, Teacher
STaRChart Results,
District Technology
Rubric, TAC Work
Orders, Outside
Contracts
2.1.4 Facilitate
online
learning
opportunities
for staff and
administrators.
LEA LRPT
Correlates:
EP01, EP05,
EP08, LAS03,
LAS15
State:
Revised
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Campus
Administration, Curriculum
& Instruction, District
Operational Services,
Administrative Services,
Career & Technology
Education
Agenda and Sign-in
Sheets, Breeze
Meetings,
Correspondence,
Completion Certificates,
Teacher STaRChart
2.1.5 Ensure all
campus and
district
improvement
plans
integrate rich
technology
that is
grounded in
research and
aligned with
district
strategies
focused on
student
success.
LEA LRPT
Correlates:
LAS01, LAS02,
TL01, TL03
State:
Revised
Status:
Planned
2010-
2013
Curriculum & Instruction,
Department of
Technology Services
(DOTS), Campus
Administration, District
Operational Services,
Administrative Services,
Human Resources
Department, Teachers,
Career & Technology
Education, Library Media
Specialists
Copies of Plans and
Agendas, PDAS,
Teacher STaRChart,
Planning Meeting
Minutes, District
Technology
Performance Indicator
Assessment, District
Improvement Plan,
Campus Action Plans
Page 22 of 72
2.1.6 Provide a system to
give credit to
teachers for any
training received that
meets SBEC
Technology
Application
standards.
LEA LRPT Correlates:
EP05, EP06, I01,
LAS03, LAS05, LAS06,
LAS10, LAS12
State:
Original
Status:
Planned
2010-
2013
Instructional Services,
Campus Administration,
Administrative Services,
Human Resources
Department, Curriculum
& Instruction, Career &
Technology Education
PDAS, Agenda and
Sign in Sheets, Staff
Development
Certificates
2.1.7 Use technology
evaluation tools to
determine, design,
and implement staff
development.
LEA LRPT Correlates:
EP01, EP02, EP04,
EP05, EP06, EP09, I01,
I06, I09, LAS03, LAS05,
LAS08, LAS10, LAS12,
TL04, TL07
State:
Original
Status:
Planned
2010-
2013
Instructional Services,
Campus Administrators,
Curriculum & Instruction,
Computer Lab Teachers,
Career and Technical
Education Department
Staff Development
Evaluations, Teacher
STaRChart, District
Technology
Performance Indicator
Assessment
2.1.8 Provide managerial
technology trainings
to new instructional
staff.
LEA LRPT Correlates:
EP03, EP04
State:
Original
Status:
Planned
2010-
2013
Human Resources
Department,
Information Services,
Campus Administration
New Teacher
Orientation Sessions,
Sign-in Sheets
2.1.9 Provide curriculum
and resources for
SISD personnel that
foster digital
citizenship, model
safe computing and
district expectations
as outlines in the
Acceptable Use
Policy (AUP).
LEA LRPT Correlates:
EP03, TL14
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Campus
Administration,
Instructional Services,
Curriculum & Instruction,
Security Administrator,
Career & Technology
Education
SISD Staff Development
Website, Instructional
Technology Cyber
bullying/Internet Safety
District Website,
Website Hit Counter
Page 23 of 72
2.1.10 Provide highly
qualified staff at all
comprehensive high
schools to teach
Technology
Applications
courses.
LEA LRPT Correlates:
EP02, TL02
State:
Original
Status:
Planned
2010-
2013
Career and Technical
Education Department,
Human Resources
Department, Campus
Administrators
Personnel Action
Forms, PDAS, Lesson
Plans
GOAL 2: All SISD personnel will integrate technologies to meet instructional and productivity goals.
OBJECTIVE 2.2:
Ensure professional development is provided to integrate technology into the curriculum, instructional
management and administration to improve student achievement and job performance.
Budget: $2,118,920
LRPT Category: Educator Preparation and Development
Erate Correlates: ER02
NCLB Correlates: 01, 02, 03, 04a, 04b, 05, 06, 07, 08, 09, 10, 11, 12
Strategies Status Timeline Person(s) Responsible Evidence
2.2.1 Provide
technology
resource
personnel at
each campus
to model,
teach, and
train all
campus
personnel in
the use of
technology
as per district
policy.
LEA LRPT
Correlates:
EP09, LAS10
State:
Revised
Status:
Planned
2010-
2013
Instructional Services,
Campus Administration,
Human Resources
Department, Curriculum
& Instruction, Library
Services, Career &
Technical Education
Personnel Action
Forms, Policy EEB, Sign-
in Sheets, Staff
Development
Evaluations
Page 24 of 72
2.2.2 Provide a
District
Technology
Trainer per
cluster to
ensure all
teachers and
administrators
receive 30
hours of
sustained and
intensive, high
quality
technology
professional
development.
LEA LRPT
Correlates:
EP01, EP02,
EP03, EP04,
EP08, EP09,
LAS03, LAS06
State:
Original
Status:
Planned
2010-
2013
Human Resources
Department, Curriculum
& Instruction
Personnel Action Form,
Number and Type of
District Technology
Professional
Development Course
Offerings
2.2.3 Increase
professional
training to
include on-
line learning,
distance
learning,
web-based
instruction
and local
university
opportunities
to include
educational
blogs, wiki,
forums and
podcasting.
LEA LRPT
Correlates:
EP06, EP07,
EP08
State:
Original
Status:
Planned
2010-
2013
Instructional Services,
Department of
Technology Services
(DOTS), Campus
Administration,
Instructional
Technology
Coordinator, Library
Services, Career &
Technical Education
Agenda and Sign-in
Sheets,
Correspondence,
Web Log Reports, SISD
Staff Development
Website, Library
Websites
Page 25 of 72
2.2.4 Expand and provide
district level staff
development.
LEA LRPT Correlates:
EP01, EP02, EP03,
EP04, EP09, LAS03,
LAS06, LAS10
State:
Revised
Status:
Planned
2010-
2013
Instructional Services,
Department of Technology
Services (DOTS), Campus
Administration, Administrative
Services, Instructional Support,
Curriculum & Instruction,
Career & Technical
Education, Library Media
Specialists
Sign-in Sheets, SISD
Staff Development
Website
2.2.5 Teachers will meet
the Target Level, 30
hours, of
professional
development
annually.
LEA LRPT Correlates:
EP01, EP04, EP05,
EP07, EP08, EP09,
LAS03, LAS06, LAS12
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Instructional Support,
Teachers, Community
Sources, all Instructional
Departments
Staff Development
Certificate, Course
Offerings, PDAS
Page 26 of 72
GOAL 2: All SISD personnel will integrate technologies to meet instructional and productivity goals.
OBJECTIVE 2.3:
Maximize the use of technology to meet instructional and productivity goals on an ongoing basis.
Budget: $772,000
LRPT Category: Educator Preparation and Development
Erate Correlates: ER01, ER02
NCLB Correlates: 01, 02, 03, 04a, 04b, 05, 07, 11
Strategies Status Timeline Person(s) Responsible Evidence
2.3.1 Provide a
variety of
learning
opportunities
through
different
delivery
systems on a
timely basis for
all employees.
LEA LRPT
Correlates:
EP01, EP02,
EP03, EP04,
EP06, EP07,
EP08, EP09, I01,
I05, I06, I09,
LAS03, LAS05,
LAS06, LAS10,
TL04, TL07, TL16
State:
Revised
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Campus
Administration,
Administrative Services,
Library Services,
Community Sources,
Instructional Support
Agendas, Lesson
Plans, Sign-in Sheets,
PDAS, Professional
Development
Website Evaluations,
Completion
Certificates, IWB
Trainings
2.3.2 Use and
interpret
disaggregated
data to
improve
student
achievement.
LEA LRPT
Correlates:
EP03, I01, I05,
I06, I09, LAS05,
LAS08, LAS10,
TL04, TL07
State:
Original
Status:
Planned
2010-
2013
Instructional Support,
Department of
Technology Services
(DOTS), Director of
Research & Analysis,
Campus Administration,
Teachers
Student Academic
Data, PDAS, Lesson
Plans, Benchmarks,
TAKS Results,
TPRI/Tejas Lee
Reports, At-Risk
Reports, Online
Student Profile (OSP)
Page 27 of 72
2.3.3 Ensure constant
integration of
appropriate
resources to create
core curriculum,
student-centered
projects.
LEA LRPT Correlates:
EP01, EP07, EP08,
EP09, I01, I05, I06, I09,
LAS05, LAS09, LAS10,
TL01, TL03, TL05, TL08,
TL09, TL10, TL11, TL12,
TL13, TL16
State:
Revised
Status:
Planned
2010-
2013
Instructional Support,
Department of
Technology Services
(DOTS), Campus
Administration,
Curriculum & Instruction,
Computer Lab Teachers,
Library Media Specialists
Agenda and Sign-in
Sheets, Student
Projects, Teacher
Lesson Plans,
Benchmarks,
Excellence in
Technology Awards,
Library Collaboration
Forms, SISD
SchoolHouse Resources
2.3.4 Follow vertically-
aligned integration of
evolving technologies
in support of all TEKS.
LEA LRPT Correlates:
EP01, EP05, EP09, I01,
I04, I05, I09, LAS01,
LAS02, LAS03, LAS05,
LAS10, TL01, TL03,
TL05, TL06, TL08, TL10,
TL11, TL13
State:
Original
Status:
Planned
2010-
2013
Instructional Support,
Department of
Technology Services
(DOTS), Campus
Administration, Teachers,
Library Media Specialists
PDAS, Student
Performance, TAKS
Results, SISD
SchoolHouse Pacing
Guides and Resources,
Benchmarks,
Instructional
Technologists' Learning
Plans
2.3.5 Provide opportunities
for library media
specialists and
teacher collaboration
that will integrate the
use of technology
into all curriculum
areas.
LEA LRPT Correlates:
EP04, EP09, I01, I05,
I06, I09, LAS01, LAS03,
LAS05, LAS10, TL07,
TL10, TL11
State:
Revised
Status:
Planned
2010-
2013
Campus Administration,
Library Media Specialists,
Teachers, Career &
Technical Education
Library Schedule,
Library Usage Report,
Database Usage
Report, Collaborative
Lesson Plans, Student
Projects
Page 28 of 72
2.3.6 Model exemplary use
of technology in daily
work in
communications,
presentations, online
collaborations, and
student-centered
projects.
LEA LRPT Correlates:
EP04, EP09, I01, I05,
I06, I09, LAS05, LAS10,
TL04, TL07, TL08, TL09,
TL10, TL11, TL12, TL14,
TL16
State:
Original
Status:
Planned
2010-
2013
Instructional Support,
Department of
Technology Services
(DOTS), Campus
Administration, Teachers,
Curriculum & Instruction,
Computer Lab Teachers,
Library Media Specialists,
Career & Technical
Education Staff
Lesson Plans, PDAS,
Student Performance,
TAKS Results, Number &
Type of Student
Technology Products,
Web Pages
2.3.7 Ensure participation in
technology contests
to showcase the
variety and quality of
student technology
knowledge and skills.
LEA LRPT Correlates:
LAS10, TL06, TL08
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Curriculum &
Instruction, Library Media
Specialists, Department
of Technology Services
(DOTS)
Number & Type of
contest entries
Page 29 of 72
GOAL 2: All SISD personnel will integrate technologies to meet instructional and productivity goals.
OBJECTIVE 2.4:
All teachers will be competent and highly qualified in technology applications as defined by the SBEC
standards for all beginning teachers.
Budget: $418,000
LRPT Category: Educator Preparation and Development
Erate Correlates: ER02
NCLB Correlates: 01, 02, 03, 04a, 04b, 08, 11, 12
Strategies Status Timeline Person(s) Responsible Evidence
2.4.1 Ensure all teachers
use technology
related terms,
concepts, data
input strategies,
and ethical
practices to make
informed decisions
about current
technologies and
their applications.
LEA LRPT
Correlates: EP03,
EP04, EP05, LAS02,
LAS08, TL03, TL05,
TL07
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Curriculum &
Instruction, Library Media
Specialists, Instructional
Support, Career and
Technical Education
Facilitators
Lesson Plans, Student
Projects, Walk-
Throughs, PDAS, Word
Walls, Electronic
Bulletin Board, Library
Schedules, Teacher
STaRChart, District
Technology
Performance Indicator
Assessment
Page 30 of 72
2.4.2 Ensure all teachers
identify task
requirements, apply
search strategies,
and use current
technology to
efficiently acquire,
analyze, evaluate,
and cite a variety
of electronic
information.
LEA LRPT Correlates:
EP03, EP04, LAS08
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Curriculum &
Instruction, Library Media
Specialists, Instructional
Support, Career and
Technical Education
Facilitators
Lesson Plans, Student
Projects, Walk-
Throughs, PDAS, Library
Schedule, District
Technology
Performance Indicator
Assessment
2.4.3 Ensure all teachers
use task-
appropriate tools to
synthesize
knowledge, create
and modify
solutions, and
evaluate results in a
way that supports
the work of
individuals and
groups in problem-
solving situations.
LEA LRPT Correlates:
EP03, EP04, EP05,
I09, LAS08, TL04,
TL08
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Curriculum &
Instruction, Library Media
Specialists, Instructional
Support, Career and
Technical Education
Facilitators
Lesson Plans, Student
Projects, Walk-
Throughs, PDAS,
Equipment Check-Out,
Lab Schedules, Library
Schedule, Teacher
STaRChart
2.4.4 Ensure all teachers
communicate
information in
different formats
and for diverse
audiences.
LEA LRPT Correlates:
EP05, TL03, TL09,
TL16
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Curriculum &
Instruction, Library Media
Specialists, Instructional
Support, Career and
Technical Education
Facilitators
Lesson Plans, Student
Projects, Walk-
Throughs, PDAS,
Teacher Web Pages,
Library Schedule,
Technology Night,
Teacher STaRChart
Page 31 of 72
2.4.5 Ensure all teachers
know how to plan,
organize, deliver,
and evaluate
instruction for all
students that
incorporates the
effective use of
technology for
teaching and
integrating the
Technology
Applications Texas
Essential
Knowledge and
Skills (TEKS) into the
curriculum.
LEA LRPT Correlates:
EP01, EP02, EP05,
EP07, LAS03, LAS06,
LAS10, LAS12, TL01,
TL03, TL04
State:
Original
Status:
Planned
2010-
2013
Campus Administration,
Teachers, Curriculum &
Instruction, Library Media
Specialists, Instructional
Support, Career and
Technical Education
Facilitators
Lesson Plans, Student
Projects, Walk-
Throughs, PDAS, Usage
Reports, Library
Schedule, Number &
Type of Teacher
Submissions to Socorro
SchoolHouse, Teacher
STaRChart
2.4.6 Provide highly
qualified staff at all
comprehensive
high schools to
teach Technology
Applications
courses.
LEA LRPT Correlates:
EP02, TL02
State:
Original
Status:
Planned
2010-
2013
Career and Technical
Education Department,
Human Resources
Department, Campus
Administration
Personnel Action
Forms, PDAS, Lesson
Plans
Page 32 of 72
Goals and Objectives
Goal 3 – Leadership, Administration and Support Community Education is based on the philosophy that learning is a lifelong process. Socorro
Independent School District will provide the opportunities to support the community‟s engagement into
the digital age to encourage parental involvement, increase technological accessibility and, in turn,
enable the community to become full partners in their children‟s education. Socorro ISD Community
members will be provided the opportunities to acquire the technology competencies necessary to be
active participants in the digital age through the following objectives:
Involve Socorro ISD Community members in the planning and partnership in the technology
competencies.
Increase the community access and awareness of technology and information.
Expand technology classes and training opportunities for parent and community members.
Assess the technology needs of the community twice a year.
Acquire the technology competencies necessary to be active participants in the digital age.
Maximize the community‟s educational and personal goals and showcase Socorro ISD as a
builder of community learners.
Page 33 of 72
GOALS, OBJECTIVES, AND STRATEGIES GOAL 3: SISD community members will be provided opportunities to acquire the technology
competencies necessary to be active participants in the digital age.
OBJECTIVE 3.1:SISD community members will be involved in the planning and partnerships in the technology
competencies.
Budget: $386,000
LRPT Category: Leadership, Administration and Support
Erate Correlates: ER01, ER02
NCLB Correlates: 01, 02, 05, 06, 07, 08, 09, 10, 12
Strategies Status Timeline Person(s) Responsible Evidence
3.1.1 Involve
parents and
community
members in
all
technology
planning
committees.
LEA LRPT
Correlates:
I03, I09,
LAS01, LAS05,
LAS07, LAS09,
LAS13, TL15
State:
Original
Status:
Planned
2010-
2013
Campus & District
Administrators, School
Improvement Teams
Technology Agenda,
Attendance Sign-in
Sheets, Planning
Documents, Campus
Action Plan, District
Improvement Plan
Page 34 of 72
3.1.2 Seek to find
partnerships
with
technological
and
educational
entities both
locally,
nationally,
and globally
where
possible.
LEA LRPT
Correlates:
I03, LAS07,
LAS09, LAS13,
TL15
State:
Original
Status:
Planned
2010-
2013
Director of Governmental
Relations and Partnerships,
District Grant Writers,
District/Campus
Administration, Community
Education Services,
Administrative Services,
Career and Technical
Education Department
Partner in Education
Agreements, Grants,
CTE Program Meeting
Agendas
3.1.3 Disseminate
information to
parents and
community
regarding
technology
initiatives,
expectations,
and TEKS.
LEA LRPT
Correlates:
I03, I08,
LAS02, LAS04,
LAS05, LAS07,
LAS09, LAS11,
TL15
State:
Original
Status:
Planned
2010-
2013
Director of Public
Relations, Department of
Technology Services
(DOTS), Webmasters,
District/Campus
Administration, Community
Education Services, Mobile
Lab Coordinator, Assistive
Technology Team,
Administrative Services
Publications,
Announcements, Media
Stories, District/Campus
Web Pages, Parent
Information Portal
Reports, Department
Flyers, Superintendent
Communications
Page 35 of 72
GOAL 3: SISD community members will be provided opportunities to acquire the technology
competencies necessary to be active participants in the digital age.
OBJECTIVE 3.2:
Increase the community’s access to and awareness of technology and information both within and beyond the
district.
Budget: $500,000
LRPT Category: Leadership, Administration and Support
Erate Correlates: ER01, ER02
NCLB Correlates: 01, 02, 05, 06, 07, 08, 09, 10, 12
Strategies Status Timeline Person(s) Responsible Evidence
3.2.1 Work with
existing adult
literacy service
providers to
maximize the
use of
technology.
LEA LRPT
Correlates: I01,
I08, LAS01,
LAS04, LAS05,
LAS07, LAS09,
LAS13, TL15
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Community
Education Services,
Communities in Schools
Counselors, Counselors,
Mobile Lab Coordinator
Agenda and Sign-in
Sheets, Socorro
Community
Participation
3.2.2 Continue to
provide parents
and community
member‟s
access to
district
technology
facilities.
LEA LRPT
Correlates: I08,
LAS09, LAS11,
LAS13, TL15
State:
Revised
Status:
Planned
2010-
2013
District/Campus
Administrators,
Community Education
Services, Department of
Technology Services
(DOTS), Library Media
Services, Mobile Lab
Coordinator
Schedules of Facility
Availability, Parent
Information Portal
Reports, Guest
Account Sign-in Sheet
Page 36 of 72
3.2.3 24/7 online
access to the
existing SISD
network and
expand
availability of
information to
include
libraries,
medical
facilities,
agencies, and
other sources of
information.
LEA LRPT
Correlates: I03,
I08, LAS02,
LAS04, LAS05,
LAS07, LAS09,
LAS10, LAS11,
TL13, TL15
State:
Revised
Status:
In
Progress
2010-
2013
District/Campus
Administrators,
Department of
Technology Services
(DOTS), Community
Education Services,
Library Media Services
Network Design,
Campus After-Hours
Schedules, District
Website, Guest
Account Sign-in Sheet
3.2.4 Use distance
education and
distributed
learning to
provide
increased
services and
educational
opportunities
for parents and
community.
LEA LRPT
Correlates: I03,
I08, LAS02,
LAS09, TL15
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Community
Education Services,
Mobile Lab Coordinator
Schedule of Classes,
Web Conferencing
Meetings, Agenda and
Sign-in Sheet
Page 37 of 72
3.2.5 Increase the
use of
technology in
existing
community
education
classes.
LEA LRPT
Correlates: I03,
LAS04, LAS05,
LAS09, TL15
State:
Original
Status:
Planned
2010-
2013
Community Education
Services, Communities in
Schools Counselors,
District/Campus
Administrators, Mobile
Lab Coordinator
Class Outlines, Number
of Participants/Class,
Number of Individuals,
Agenda and Sign-in
Sheets
3.2.6 Continue to
expand District,
Department
and Campus
Websites to
include links
that promote
parental
involvement
and increase
communication
to allow
reinforcement
of technology
skills instruction
at home.
LEA LRPT
Correlates:
EP09, I03, I08,
I09, LAS01,
LAS09, LAS11,
TL15
State:
Revised
Status:
In
Progress
2010-
2013
District/Campus
Administrators,
Community Education
Services, Department of
Technology Services
(DOTS), Library Media
Services, Mobile Lab
Coordinator
District/Campus
Webpages
Page 38 of 72
GOAL 3: SISD community members will be provided opportunities to acquire the technology
competencies necessary to be active participants in the digital age.
OBJECTIVE 3.3:
Expand technology classes and training opportunities for parents and community members.
Budget: $300,000
LRPT Category: Leadership, Administration and Support
Erate Correlates: ER01, ER02
NCLB Correlates: 08, 09
Strategies Status Timeline Person(s) Responsible Evidence
3.3.1 Provide
classes in
technology
literacy at
campus and
other district
facilities.
LEA LRPT
Correlates:
I03, I08,
LAS05,
LAS09,
LAS13, TL15
State:
Revised
Status:
Planned
2010-
2013
Community Education
Services, District/Campus
Administrators, Parent
Liaisons, Instructional
Technologists, Mobile Lab
Coordinator
Attendance Sign-in
Sheets, Lab Schedules,
Flyers, Media Stories
3.3.2 Train parents
and
community
members to
use
computers
and to
access
district web
sites.
LEA LRPT
Correlates:
I03, LAS09,
LAS11,
LAS13, TL15
State:
Original
Status:
Planned
2010-
2013
Department of Technology
Services (DOTS),
District/Campus
Administrators, Community
Education Services, Parent
Liaisons, Instructional
Technologists, Mobile Lab
Coordinator
Training Records,
Attendance Sign-in
Sheets, Guest Account
Sign-in Sheets
Page 39 of 72
3.3.3 Offer a
variety of
technology
classes open
to the
community.
LEA LRPT
Correlates:
I03, I08,
LAS09, TL15
State:
Revised
Status:
Planned
2010-
2013
Community Education
Services, District/Campus
Administrators, Parent
Liaisons, Instructional
Technologists,
Communities in Schools
Counselors, Counselors,
Special Programs Lab
Coordinators, Department
of Technology Services
(DOTS)
Training Schedules,
Attendance & Sign-in
Sheets
3.3.4 Provide
curriculum
and/or
resources for
parents that
foster digital
citizenship,
model safe
computing,
and district
expectations
as outlined
in the Guest
Account
Acceptable
Use Policy
and
Children's
Internet
Protection
Act (CIPA).
LEA LRPT
Correlates:
I03, LAS09,
LAS11,
LAS13, TL15
State:
Original
Status:
Planned
2010-
2013
Department of Technology
Services (DOTS), Campus
Administration, Instructional
Technologists, Library
Media Specialists
Training Records,
Attendance, Sign-in
Sheets, Guest Account
Sign-in Sheets
Page 40 of 72
GOAL 3: SISD community members will be provided opportunities to acquire the technology
competencies necessary to be active participants in the digital age.
OBJECTIVE 3.4:
Assess the technology needs of the community on a regular basis.
Budget: $300,000
LRPT Category: Leadership, Administration and Support
Erate Correlates: ER01
NCLB Correlates: 09, 11
Strategies Status Timeline Person(s) Responsible Evidence
3.4.1 Conduct a
needs
assessment
of skills.
LEA LRPT
Correlates:
I03, I08,
LAS07,
LAS09, TL15
State:
Revised
Status:
Planned
2010-
2013
Community Education
Services, Department of
Technology Services
(DOTS), Parent Liaisons,
Communities in Schools
Counselors, Counselors,
Mobile Lab Coordinator
Needs Assessment
Survey
3.4.2 Maintain
evaluations
records of
community
access to
open,
mobile labs
and
scheduled
classes.
LEA LRPT
Correlates:
I03, I08,
LAS07,
LAS09, TL15
State:
Original
Status:
Planned
2010-
2013
Community Education
Services, Parent Liaisons,
Instructional Technologists,
Mobile Lab Coordinator,
Library Media Specialists
Usage Reports, Agenda
and Sign-in Sheets,
Course Offerings,
Inventories, Comment
Sheets, Course
Evaluations
Page 41 of 72
3.4.3 Collect and
maintain
qualitative
and
quantitative
data about
community
access and
utilization.
LEA LRPT
Correlates:
I03, I08,
LAS09, TL15
State:
Original
Status:
Planned
2010-
2013
Community Education
Services, Department of
Technology Services
(DOTS), Mobile Lab
Coordinator, Parent
Liaisons, Instructional
Technologists, Library
Media Specialists
Survey Questionnaires,
Sign-in Sheets, Usage
Reports, Course
Offerings
3.4.4 Revise plan
annually
based on
needs
assessment
evaluations
and
collective
data.
LEA LRPT
Correlates:
LAS02,
LAS07
State:
Original
Status:
Planned
2010-
2013
Community Education
Services, Department of
Technology Services
(DOTS), Mobile Lab
Coordinator
Survey Questionnaires,
Sign-in Sheets, Usage
Reports, Course
Offerings
Page 42 of 72
GOAL 3: SISD community members will be provided opportunities to acquire the technology
competencies necessary to be active participants in the digital age.
OBJECTIVE 3.5:
SISD community members will acquire the technology competencies necessary to be active participants in the
digital age.
Budget: $300,000
LRPT Category: Leadership, Administration and Support
Erate Correlates: ER01
NCLB Correlates: 03, 05, 06, 09, 10, 12
Strategies Status Timeline Person(s) Responsible Evidence
3.5.1 Include a
component
to increase
adult
technology
literacy
through
grant
funding and
adult
literacy.
LEA LRPT
Correlates:
I03, I08,
LAS09, TL15
State:
Original
Status:
Planned
2010-
2013
Department of Technology
Services (DOTS), District
Grant Writers, Community
Education Services, Mobile
Lab Coordinator
Grant Award
Notification,
Attendance Records,
Grant Applications,
Course Offerings, Syllabi
3.5.2 Continuously
explore
opportunities
for
additional
funding from
grants and
foundations
for
community
training.
LEA LRPT
Correlates:
I03, I08,
LAS09, TL15
State:
Original
Status:
Planned
2010-
2013
Community Education
Services, Department of
Technology Services
(DOTS), District Grant
Writers, Instructional
Services, Research and
Analysis Department
Grant Applications,
Grant Award
Notifications
Page 43 of 72
Goals and Objectives
Goal 4 – Infrastructure for Technology Socorro I.S.D. promotes student achievement through the implementation of cutting edge infrastructure and 21st
century technologies.
Technology accessibility has been enhanced by the district in the form of high speed wired internet and
wireless internet access district wide. The district is currently at a 3:1 computer ratio. Upcoming initiatives such as
mobile devices, virtual desktops, and the ability to utilize personal wireless devices will facilitate the district‟s
goal to achieve a 1:1 computer ratio.
With the implementation of these new technologies, a comprehensive network and data security is in place to
help ensure confidentiality, integrity, and availability of district data. Socorro I.S.D. operates a hybrid security
management system while abiding by state and local federal laws. There are also comprehensive disaster
recovery measures in place to help support availability and integrity of district data.
As the district continues to grow, our objective is to revitalize current legacy systems to utilize new innovative
technologies through virtualization and private cloud infrastructure. In addition, Socorro I.S.D is incorporating
the use of various Microsoft products such as Microsoft System Center Configuration Manager which will
standardize desktop images with Microsoft Windows and Office applications.
Socorro I.S.D maintains the district database systems and provides web services including database driven web
applications, middleware, and content management systems. These are designed to support district initiatives
to improve education and make a positive difference in students' lives, enhancing interaction between the
community and the district as well.
Page 44 of 72
GOALS, OBJECTIVES, AND STRATEGIES GOAL 4: SISD will support a safe and secure technology infrastructure that maximizes the use of
resources and information to foster student achievement.
OBJECTIVE 4.1:
Establish and support an infrastructure that is accessible by all district entities.
Budget: $6,000,000
LRPT Category: Infrastructure for Technology
Erate Correlates: ER01
NCLB Correlates: 03,05,06,12
Strategies Status Timeline Person(s) Responsible Evidence
4.1.1 To maintain and
enhance the
district-wide
network with
high speed
access which
includes district-
wide wireless, to
the Internet for
students and
staff.
LEA LRPT
Correlates: EP08,
I01, I02, I05, I06,
I07, I09, LAS01,
LAS04
Original
Status:
In
Progress
2013 Department of
Technology Services
Purchase Orders,
Inventories, Erate
Expenditures, Bond
Reports
4.1.2 Ensure secure
and compatible
databases for
administrative
applications on
student/financial
information
systems.
LEA LRPT
Correlates: I01,
I08, LAS08,
LAS14, TL07
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Information
Services
Programs and
Applications, Bond
Reports
Page 45 of 72
4.1.3 Investigate
multiple
financial
arrangements
for securing and
maintaining
workstations,
infrastructure
and other
technologies.
LEA LRPT
Correlates: I01,
I02, I04, I05, I09,
LAS15
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), District Grant
Writers, Financial
Services
Grant Reports,
Department/Campus
Budget Reports, Bond
Reports
4.1.4 Meet the
technology
equipment
target of a
student to
workstation ratio
of 1:1 to ensure
that access is
available as
appropriate.
LEA LRPT
Correlates: I04,
I05, LAS15
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Campus
Administration,
SIT/Technology
Committees,
Instructional
Technologists,
Construction
Department,
Operational Services
Inventory of Student
Workstation Technology
vs. Student Population,
Construction Reports,
Bond Reports, Purchase
Orders, Campus
STaRChart
4.1.5 Sustain the
technology
equipment
target of all
professional
educational
staff to a
workstation ratio
of 1:1.
LEA LRPT
Correlates: I01,
I04, I05
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Campus
Administration, SIT
Committees,
Construction
Department,
Operational Services
Inventory of Staff
Workstation Technology
vs. Total Number of Staff,
Bond Reports, Purchase
Orders, Campus
STaRChart
Page 46 of 72
GOAL 4: SISD will support a safe and secure technology infrastructure that maximizes the use of
resources and information to foster student achievement.
OBJECTIVE 4.2:
Establish policies and procedures which align with state and federal guidelines.
Budget: $1,000,000
LRPT Category: Infrastructure for Technology
Erate Correlates: ER01
NCLB Correlates: 03,05,06,12
Strategies Status Timeline Person(s) Responsible Evidence
4.2.1 Provide
secure
network to
meet local,
state and
federal
standards
requirements.
LEA LRPT
Correlates:
I07, LAS02,
LAS04, LAS05
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), District
Administration, Board of
Trustees
District Policy Manual,
Board Approved
Minutes, District
Technology Policies
4.2.2 Provide for
confidentiality
and security
on all data.
LEA LRPT
Correlates:
I01, LAS05,
LAS09, LAS14
State:
Original
Status:
In
Progress
2010-
2013
Department of
Technology Services
(DOTS), All District
Employees
Acceptable Use Policies,
Firewalls, User-based
Security Policies, User-
awareness Training &
Sign-in Sheets, Intrusion
Detection/Prevention
System
Page 47 of 72
4.2.3 Provide
access,
according to
ADA
guidelines, to
ensure
accessibility
to disabled
students and
staff to
technologies
in all district
locations.
LEA LRPT
Correlates:
I01, I05, I07
State:
Original
Status:
In
Progress
2010-
2013
Building Construction
Committee, Operational
Services, At-Risk
Management
Department, Special
Education Department,
Department of
Technology Services
(DOTS), Campus
Administration,
Instructional Support
Work Orders,
Construction Plans,
District Compliance
Documents, PBMAS
Reports
4.2.4 Provide
curriculum
and/or
resources for
district
personnel,
students and
parents that
foster digital
citizenship,
model safe
computing
and district
expectations
as outlined in
Acceptable
Use Policies
and the
Student Code
of Conduct.
LEA LRPT
Correlates:
LAS10, LAS13,
TL14, TL15
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Instructional
Technology Services,
Campus Administration,
Instructional
Technologists, Library
Media Specialists,
Teachers, Security
Administrator
Cyber Safety Curriculum
& Sign-in Sheets, Lesson
Plans, Signed Code of
Conduct, Signed
Acceptable Use Policies,
Instructional Technology
Cyber bullying/Internet
Safety District Website,
Website Hit Counter
Page 48 of 72
GOAL 4: SISD will support a safe and secure technology infrastructure that maximizes the use of
resources and information to foster student achievement.
OBJECTIVE 4.3:
Develop recommendations for the purchase, refresh, and repositioning of technologies.
Budget: $3,510,000
LRPT Category: Infrastructure for Technology
Erate Correlates: ER01
NCLB Correlates: 03, 04a, 05, 06, 07, 12
Strategies Status Timeline Person(s) Responsible Evidence
4.3.1 Integrate
technology into
all classrooms,
libraries,
campus and
district planning
(TEC 11.252).
LEA LRPT
Correlates:
EP03, EP08, I01,
I02, I05, I08,
LAS01, LAS02,
LAS04, LAS05,
TL08, TL10, TL11
State:
Original
Status:
Planned
2010-
2013
District Technology
Committee, Campus
Technology
Committees,
Department of
Technology Services
(DOTS), Library Media
Services, C&I,CaTE,
Construction
Department,
Operational Services,
Instructional Support,
Campus
Administration,
Financial Services
Campus/District
Technology Plans,
Construction Reports,
Bond Reports, Erate
Expenditure Reports,
Purchase Orders
4.3.2 Recommend
and review
current and
emerging
technologies.
LEA LRPT
Correlates: I02,
I06, LAS01,
LAS02, LAS15
State:
Original
Status:
In
Progress
2010-
2013
District Technology
Committee, Campus
Technology
Committees,
Department of
Technology Services
(DOTS), Library Media
Services,C&I,CaTE,
Construction
Department,
Operational Services,
Instructional Support
Services, Campus
Administration,
Financial Services
Technology
Recommendation/Support
List, District Inventory, Bond
Reports, Construction
Reports
Page 49 of 72
4.3.3 Facilitate the
implementation
of current and
emerging
technologies.
LEA LRPT
Correlates: I01,
I02, I04, I05, I08,
LAS01, LAS02,
LAS05, LAS08,
LAS15, TL05,
TL09, TL10, TL13
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), District
Technology
Committee, Campus
Technology
Committee, Library
Media Services,
Instructional Support,
Construction
Department,
Operational Services,
Services, Campus
Administration,
Financial Services
Board Approved Minutes,
District Inventory, Bond
Reports, Purchase Orders,
Work Orders, Training Sign-
in Sheets
4.3.4 Establish a life
cycle policy for
repositioning
and support of
district
technologies.
LEA LRPT
Correlates: I07,
LAS05
Status:
Planned
(DOTS), Campus
Technology
Committees, Board of
Trustees, Business
Services, Operational
Services, Financial
Services, Operational
Services, Instructional
Technology Services
Orders, Board of Trustee
Approval, Surplus
Equipment, Established
District Policy
4.3.5 Develop a list
of supported
and
compatible
technologies.
LEA LRPT
Correlates: I07
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Instructional
Services, Instructional
Technology Services,
Financial Services
Technology
Recommendation,
Quotes, District Awarded
Bids
Page 50 of 72
GOAL 4: SISD will support a safe and secure technology infrastructure that maximizes the use of
resources and information to foster student achievement.
OBJECTIVE 4.3:
Develop recommendations for the purchase, refresh, and repositioning of technologies.
Budget: $3,510,000
LRPT Category: Infrastructure for Technology
Erate Correlates: ER01
NCLB Correlates: 03, 04a, 05, 06, 07, 12
Strategies Status Timeline Person(s) Responsible Evidence
4.3.6 Allocate
internal/external
funds for
technology
purchases.
LEA LRPT
Correlates: I02,
I03, LAS01,
LAS02, LAS04,
LAS05
State:
Original
Status:
Planned
2010-
2013
Board of Trustees,
Department of
Technology Services
(DOTS), District
Administrators, District
Grant Writer, Business
Services, Financial
Services
Purchase Orders,
Budget Allocations,
Grant Applications,
Grant Awards, Board
Approved Minutes
4.3.7 Develop a
process of
conducting
preventive
maintenance of
technologies.
LEA LRPT
Correlates: I07,
LAS14
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Instructional
Support
Work Orders,
Maintenance
Schedule, Erate
Expenditure Reports
4.3.8 Maintain highly
qualified district
personnel to
orchestrate cost
effective
technology
solutions.
LEA LRPT
Correlates: I01,
I07, LAS01,
LAS02, LAS03,
LAS05
State:
Original
Status:
In
Progress
2010-
2013
Department of
Technology Services
(DOTS), Human
Resources Department
Department
Organization Chart,
Evaluations, Agendas
and Sign-in Sheets,
Certification
Documentation,
Professional
Development
Page 51 of 72
4.3.9 Support library
automation
system
adequate to
the needs of
the District's
Library Program.
LEA LRPT
Correlates: I01,
I07, LAS01,
LAS02, LAS03,
LAS04, LAS05,
LAS14, TL10
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Library Media
Services
Library Automation
Program, Work Orders
4.3.10 Implementation
of distance
learning
technologies to
enhance
classroom
instruction.
LEA LRPT
Correlates: I03,
I09, LAS15
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Instructional
Support, Campus
Administration,
Purchase Orders,
Inventories
Page 52 of 72
GOAL 4: SISD will support a safe and secure technology infrastructure that maximizes the use of
resources and information to foster student achievement.
OBJECTIVE 4.4:
Commit to an infrastructure that enhances student academic achievement and community involvement.
Budget: $6,500,000
LRPT Category: Infrastructure for Technology
Erate Correlates: ER01
NCLB Correlates: 03, 05, 06, 09, 11, 12
Strategies Status Timeline Person(s) Responsible Evidence
4.4.1 Maintain a
database of
essential
information, i.e.
inventory,
demographics,
TAKS scores,
attendance,
etc.
LEA LRPT
Correlates: I06,
I08, I09, LAS05,
LAS08, LAS11,
LAS14
State:
Original
Status:
In
Progress
2010-
2013
Department of
Technology Services
(DOTS), Information
Services, Research and
Analysis Department
Student Data
Records, Website
Usage Reports, Parent
Information Portal
Reports
4.4.2 Allocate funds
to automate
administrative
functions.
LEA LRPT
Correlates: I02
State:
Original
Status:
Planned
2010-
2013
Board of Trustees,
Department of
Technology Services
(DOTS), Instructional
Services, Business
Services, Financial
Services
District Budgets,
Purchase Orders,
Payroll Records, Board
Approved Minutes
4.4.3 Maintain and
expand intra-
district
electronic
communication.
LEA LRPT
Correlates: I01,
I05, I06, I07,
LAS14
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Public Relations
Department,
District/Campus
Personnel,
Web Log Files, District
Budgets, Purchase
Orders, Erate
Expenditure Reports,
Bandwidth Utilization
Page 53 of 72
4.4.4 Maintain and
expand access
to public
information for
the SISD
community.
LEA LRPT
Correlates: I01,
I06, I08, LAS09,
LAS11, LAS13,
TL15, TL16
State:
Original
Status:
In
Progress
2010-
2013
Department of
Technology Services
(DOTS), Public Relations
Department,
District/Campus
Personnel
Web Log Files, District
Budgets, Purchase
Orders, Effective
Schools Survey, Erate
Expenditure Reports
4.4.5 Provide and
maintain an
infrastructure for
communications
with parents
and community
members,
including access
to school news,
educational
resources, data,
and personnel.
LEA LRPT
Correlates: I01,
I06, I08, LAS09,
LAS13, LAS14,
TL14, TL15, TL16
State:
Original
Status:
Planned
2010-
2013
Department of
Technology Services
(DOTS), Public Relations
Department
Web Log Files, District
Budgets, Purchase
Orders, Effective
Schools Survey, Erate
Expenditure Reports,
Parent Information
Portal Reports
Page 54 of 72
GOAL 4: SISD will support a safe and secure technology infrastructure that maximizes the use of
resources and information to foster student achievement.
OBJECTIVE 4.5:
Develop a disaster recovery plan to provide business and instructional continuity.
Budget: $250,000
LRPT Category: Infrastructure for Technology
Erate Correlates:
NCLB Correlates: 03, 06, 11, 12
Strategies Status Timeline Person(s) Responsible Evidence
4.5.1 Develop
plans for
disaster
recovery in
case of
natural or
man-made
disasters.
LEA LRPT
Correlates:
LAS13, LAS14
State:
Original
Status:
Planned
2010-
2013
Information Services,
Instructional Technology
Services, Department of
Technology Services
(DOTS), Operational
Services
Off-site Storage for
backup of Critical Data
Implemented,
Published Technology
Disaster Plan
4.5.2 Develop
business
continuity
plan in case
of natural or
man-made
disasters.
Special
consideration
taken for
weather-
related
disasters.
LEA LRPT
Correlates:
I01, I02,
LAS14
State:
Original
Status:
Planned
2010-
2013
Operational Services,
Cabinet, Board of Trustees,
Financial Services, Human
Resources Department,
Information Services
Department, Public
Relations Department,
Instructional Technology
Services, Department of
Technology Services
(DOTS)
Business Continuity
Process Mapped
Page 55 of 72
Technology Assessment The Department of Technology Services maintains over 18,000 desktop and laptop computers at the Socorro
ISD campuses. We have an additional 1500 desktop and laptop computers at our support facilities. We service
all other technology devices within the district such as printers, scanners, etc. We are standardizing the desktop
operating system as Windows 7 Enterprise/Professional via the purchasing of Microsoft Enrollment for Education
Solutions (EES). This allows Socorro ISD to install Microsoft Office and Microsoft Windows 7 or newer on all district
owned computers. Socorro ISD is incorporating the use of various Microsoft products such as Microsoft System
Center Configuration Manager. This will allow the standardization of desktop images around the district with the
Microsoft Windows and Office applications. Currently, we have a centrally managed Enterprise Antivirus
Program Kaspersky Antivirus.
High Schools
Campus Current Enrollment (November 2011) Computers Ratio
Americas High School 2508 1406 2:1
Socorro High School 2721 1236 2:1
Montwood High School 2873 1158 2:1
El Dorado High School 2667 1133 2:1
Eastlake High School 986 345 3:1
Options High School 176 264 1:1
Mission Early College High
School
491 507 1:1
El Dorado 9th Grade
Academy
868 242 4:1
Keys Academy 91 235 1:1
Total 13,381 6526
Page 56 of 72
Middle Schools
Campus Current Enrollment (November 2011) Computers Ratio
Capt. Walter Clarke MS 1086 562 2:1
Col John Ensor MS 864 428 2:1
Montwood MS 806 366 2:1
Salvador Sanchez MS 758 483 2:1
Spec. Rafael Hernando MS 1125 514 2:1
SunRidge MS 942 564 2:1
Socorro MS 611 394 2:1
William D. Slider MS 900 350 3:1
Total 7,092 3,661
Page 57 of 72
Elementary Schools / Pre K- 8
Campus Current Enrollment (November 2011) Computers Ratio
Benito Martinez 713 210 3:1
Bill Sybert (Pre K - 8) 1333 410 3:1
Campestre 653 291 2:1
Chester Jordan 721 283 3:1
Desertwind (Pre K - 8) 936 414 2:1
Dr. Sue Shook 818 217 4:1
Elfida P. Chavez 967 326 3:1
Ernesto Serna (Pre K - 8) 754 310 2:1
Escontrias / ECC 1044 528 2:1
H.D. Hilley 772 327 2:1
Helen Ball 937 344 3:1
Horizon Heights 1072 208 5:1
Hueco 592 209 3:1
Hurshel Antwine 1219 400 3:1
Jane Hambric (Pre K- 8) 1600 565 3:1
John Drugan (Pre K - 8) 1002 466 2:1
Loma Verde 785 239 3:1
Lujan Chavez 1170 298 4:1
Myrtle Cooper 594 271 2:1
O'Shea Keleher 924 266 3:1
Page 58 of 72
Paso Del Norte (Pre K - 8) 1234 384 3:1
Robert Rojas 566 257 2:1
Sgt. Robert Ituarte 1177 259 5:1
Sierra Vista 925 346 3:1
Vista Del Sol 780 239 3:1
Total 23,288 8,067
Technology Bond Initiatives The objective of the 2011Bond Technology Purchase is to replace aging technology equipment in the
classroom and labs over five (5) years. Each phase will be targeted at a specific area and will utilize a Virtual
Desktop Client via Citrix Zen Desktop allowing the repurposing of aging and existing computers in the
classroom. If computers are purchased, this will require that a computer from the campus is removed following
established guidelines for equipment removal set forth by the Socorro Independent School District. There will be
no exceptions to this, if the campuses wish to take advantage of this Technology Bond Purchase.
Replacement of Workgroup LaserJet Printers will occur; this will also require a one for one removal/replacement
of old Workgroup LaserJet Printers. No Inkjet printers will be purchased and this may require the removal of all
Inkjet printers from the campus due the high cost of maintaining and operating of these printers.
During this time all purchases of all classroom computers and printers for classrooms will be disapproved due to
the replacement being provided during this Bond Technology Refresh program. Dates for rollout and purchases
of all computers and printers will be coordinated with the Department of Business Services/Purchasing
Department.
The Technology Bond initiative will target the following of technology upgrades:
$6 million dollar allotment:
Virtual Desktop
Network Printers
Interactive Technology
Curriculum & Instruction Initiatives
Student/Finance System Servers
Page 59 of 72
2012-2013 School Year
Phase1:
The transition phase will be initiated in April 2012 with full implementation complete for the 2012-2013
school year. This will target the oldest of the computers at various campuses throughout Socorro ISD. We
have standardized all desktops and laptops with Windows 7 Enterprise via our EES agreement. We will
deploy as an initiative 1,000 Virtual Desktop Clients to High Schools and Middle Schools labs and 5,000
Virtual Desktop Clients to student and teachers in the classroom. An additional 1,000 clients will be
deployed in December of 2012. This phase will also cover the 12 servers to implement the
Student/Finance System software. The total cost of this phase is $3,214,000.
High
School
Labs
Middle
School Labs
Teacher
Workstations
Additional
Clients
Student/Financial
System Servers
Total
500
clients
500
clients
5,000
clients
1,000
clients
12
servers
$247,000 $247,000 $2,470,000 $494,000 $250,000 $3,214,000
Phase 2: Printers
The transition phase will be initiated in April 2012 with full implementation complete for the 2012-2013
school year. 306 Large Workgroup LaserJet printers will be distributed to campuses around the district.
This phase will be at a cost of $306,000.
Phase 3: Projectors
The transition phase will be initiated in April 2012. This will target the replacement of non-functional
projectors with an interactive capability. This phase will be at a cost of $150,000.
2013-2014 School Year
Phase 4: Curriculum and Instruction Initiatives
The transition phase will be initiated in April 2012. This will target Curriculum & Instructional Initiatives. This
phase will be at a cost of $1,834,000.
Year VDI S/F System
Servers
Printers Projectors C & I
Initiatives
Expenditures
2012-2013 7,000 12 306 TBD TBD $4,166,000
2013-2014 TBD $1,834,000
Total $6,000,000
Page 60 of 72
Sustainability and Supporting Resources Socorro Independent School District is committed to sustaining and improving the use of technology to
increase the academic performance of all students. Beyond the Bond that recently passed, the district has
contributed local funds and E-Rate in the past for technology enhancements and will continue to do so in the
future.
Socorro ISD is also committed to continuing to maintain infrastructure equipment to include the upgrade of
servers, network equipment, wireless equipment, and data drops to sustain all wireless computer access for
both students and staff through grant funding by E-Rate.
The technology staff is also actively working to ensure that all technology equipment functions well and to seek
additional funding sources for equipment, services, software. Computer hardware will be purchased out of
local and other available funds. The school district will follow state approved bidding policies.
E-rate The E-rate program was approved by Congress in 1996. Under this program the Federal Communications
Commission (FCC) was charged with providing telecommunications infrastructure support to all schools and
libraries. Under the direction of the Universal Service Administrative Company (USAC), the Schools and Libraries
Division (SLD) administers the program‟s day-to-day operations.
E-rate funding does not cover all the technology costs for our school district. Socorro ISD must cover 16 percent
of eligible costs, and 100 percent of the cost of non-eligible items such as computers, printers and software
applications. Over the years that E-rate has been available, our district has enjoyed a state-of-the-art
telecommunications infrastructure. With E-rate we have developed long-term, comprehensive technology
implementation plans that have allowed us to expand technology in the classroom. This implementation plans
have relied on E-rate discounts as a major source of funding.
With the Two-in-Five Rule that E-rate initiated in 2005, we can only apply for E-rate funds on two out of every five
funding years. This rule does not include any priority one services (telecommunications and internet access) or
any basic maintenance funding requests. As we plan ahead for needed infrastructure, we need to take this
rule into account. Good planning will allow us to request what will be needed in upcoming infrastructure
projects, whether it‟s new schools or replacing obsolete equipment.
For the 2011 E-rate year, we requested priority 1 funding for Internet connections, local and long distance
telephone service, metropolitan area network which connect our schools, PBX maintenance, and network
equipment maintenance. The total requests amount to $1.26 million, the district‟s cost is estimated $202
thousand.
The priority 2 requests for 2011 include network equipment for campuses, PBX replacements for campuses,
Video conferencing equipment and video broadcasting equipment. These priority 2 requests total $6.3 million
with estimated cost to the district of 1 million.
For the next five years, priority 1 E-rate will be requested every year. These requests are expected to be similar
to E-rate year 2011. These requests are needed to keep current infrastructure improvements in place and
provide continuance and maintenance.
A priority 2 request, which may only be awarded 2 out of 5 years, requires us to apply every year. If funding is
not received in one year, we will apply for similar funding the following year. On receiving funding, we will wait
two years before we can apply again.
Page 61 of 72
E-Rate Budget
2011-2012
Objective: Priority One consists of services that are used to communicate information electronically
between sites such as the Internet and Telecommunications. Priority Two consists of the wiring and
components that expand data access within a school as well as maintenance for eligible equipment
that is essential to the daily operations of the district.
Priority
Service:
1 & 2
Estimated
Cost: $7,566,808 District 16%
Erate $1,210,686.00
Projected Needs (Priority 1) Estimated Cost(s) District 16% E-rate Internet Connection $137,700.00 $22,032.00
Local Telephone Service $518,958.00 $83,033.00
Long Distance Service $12,000.00 $1,920.00
MAN Connection $374,400.00 $59,904.00
PBX Maintenance $147,310.00 $23,569.00
Cisco Hardware/Software Maint. $74,536.00 $11,925.00
Projected Needs (Priority 2) Estimated Cost(s) District 16% E-rate
Network Equipment Campuses $3,703,320.00 $592,531.00
PBX Upgrades Campuses $558,991.00 $89,438.00
Central Switch Upgrade $8,525.00 $1,364.00
Video Codec $1,426,327,000 $228,212.00
Media Streaming $604,741.00 $96,758.00
Page 62 of 72
2012-2013
Objective: Priority One consists of services that are used to communicate information electronically
between sites such as the Internet and Telecommunications. Priority Two consists of the wiring and
components that expand data access within a school as well as maintenance for eligible equipment
that is essential to the daily operations of the district.
Priority
Service:
1 & 2
Estimated
Cost: $4,287,400 District 16%
Erate $685,984
Projected Needs (Priority 1) Estimated Cost(s) District 16% E-rate Internet Connection $140,000.00 $22,400.00
Local Telephone Service $520,000.00 $83,200.00
Long Distance Service $13,000.00 $2,080.00
MAN Connection $374,400.00 $59,904.00
PBX Maintenance $150,000.00 $24,000.00
Cisco Hardware/Software Maint. $80,000.00 $12,800.00
Projected Needs (Priority 2) Estimated Cost(s) District 16% E-rate
Network Switches $1,300,000.00 $208,000.00
PBX Upgrades Campuses $300,000.00 $48,000.00
Central Switch Upgrade $10,000.00 $1,600.00
Video Codec $1,400,000.00 $224,000.00
Page 63 of 72
2013-2014
Objective: Priority One consists of services that are used to communicate information electronically
between sites such as the Internet and Telecommunications.
Priority
Service:
1
Estimated
Cost: $1,360,400 District 16%
Erate $217,664
Projected Needs (Priority 1) Estimated Cost(s) District 16% E-rate Internet Connection $154,000.00 $24,640.00
Local Telephone Service $570,000.00 $91,200.00
Long Distance Service $14,000.00 $2,240.00
MAN Connection $374,400.00 $59,904.00
PBX Maintenance $160,000.00 $25,600.00
Cisco Hardware/Software Maint. $88,000.00 $14,080.00
2014-2015
Objective: Priority One consists of services that are used to communicate information electronically
between sites such as the Internet and Telecommunications.
Priority
Service:
1
Estimated
Cost: $1,425,000 District 16%
Erate $228,000
Projected Needs (Priority 1) Estimated Cost(s) District 16% E-rate Internet Connection $160,000.00 $25,600.00
Local Telephone Service $580,000.00 $92,800.00
Long Distance Service $15,000.00 $2,400.00
MAN Connection $400,000.00 $64,000.00
PBX Maintenance $180,000.00 $28,800.00
Cisco Hardware/Software Maint. $90,000.00 $14,400.00
Page 64 of 72
Evaluation Currently, technology usage by students and teachers is increasing. Socorro Independent School District
will complete a comprehensive evaluation of the technology plan annually. Key performance indicators
will be evaluated quarterly. Reporting of the outcomes will be provided to the superintendent of schools,
assistant superintendents, and the technology bond committee. In addition, all district campuses will be
required to submit a campus technology plan annually that includes an evaluation element.
According to the Texas STaR Chart, the district is only at the Developing Tech Level in the areas of
Teaching and Learning and Educator Preparation and Development. The district will enhance their
technology trainings to teachers and staff in order to enable them to learn how to integrate technology
into curriculum by utilizing project-based activities and collaborative learning. The district has provided
the STaR Chart results for all district campuses that will be used to assist these campuses and the school
district toward meeting the goals of the District‟s Long Range Plan for Technology.
Evaluation of the technology plan will be a systematic ongoing process. All aspects of the Plan will be
evaluated formally two times each year:
September .................................................. 2011, 2012, 2013
April ................................................................ 2011, 2012, 2013
The intention of the evaluation will be to make decisions on the impact that technology has on the
learning process for all students. A report will be given to the Superintendent and the Board of Trustees
after each formal evaluation occurs.
Both the Director for Technology Services and the Technology Bond Committee will be actively
responsible for updating the technology plan in accordance to the Texas Education Code, Section
32.001 and as required by the NCLB Act of 2001, Title II, Part D, Enhancing Education through Technology.
The district will continue to submit a revised Technology Plan electronically yearly via the Texas e-Plan
system.
Page 65 of 72
Resources Socorro Independent School District STaR Chart results by campus for 2010. Accessed on 14 July
2010.
http://programs.sisd.net/techpilot/documents/STaRChart2010_forTechPlan.pdf
Socorro Independent School District Technology Plan. Accessed on 8 July 2010.
http://www.sisd.net/socorroisd/lib/socorroisd/_shared/sisd_docs/SISDTechPlan2010_2013.pdf.
Socorro Independent School District Student Handbook & Code of Conduct. Accessed 10 July
2010.
http://socorroisd.schoolwires.net/225710426103021680/lib/225710426103021680/FINAL_Code_of_C
onduct_English_2009-10.pdf
The Broad Prize for Urban Education. District Fact Sheet. Accessed on 8 July 2010.
http://broadprize.org/asset/1334-tbp2009factsheetsocorro.pdf
Glossary E-Rate – The purpose is to provide discounts to assist most schools and libraries in the United States
to obtain affordable telecommunications and Internet access provided by The Schools and
Libraries Program of the Universal Service Fund administered by the Universal Service
Administrative Company (USAC) under the direction of the Federal Communications Commission
(FCC) that has an annual budget of 6 to 8 billion dollars.
Infrastructure - Design, install and maintain a technology and telecommunications for
communications and services that ensures equitable access.
NCLB Act of 2001, Title II, Part D, Enhancing Education through Technology –Law states that in
order to be eligible to receive a sub grant from TEA, a local education agency shall submit to TEA
an application containing a new or updated local long-range strategic educational technology
plan that is consistent with the objectives of the statewide educational plan.
SBOE adopted the Long-Range Plan for Technology, 2006-2020 (LRPT), presented to Legislature.
This plan is reflected the ongoing changes in the key areas of: Teaching and Learning; Educator
Preparation and Development; Administration and Support Services; and Infrastructure for
Technology; and their effect on students and education.
Texas Education Code, Section 32.001, requires the State Board of Education (SBOE) to develop a
long-range plan for technology and requires that biennial reports be completed and provided to
the governor and Legislature on the progress toward implementation of this plan. The original
plan was adopted in November 1988.
Page 66 of 72
Acceptable Use Policy
SOCORRO ISD INTERNET USE POLICY
SISD provides Network and internet access to all students, teachers, and administrators. We are happy
to offer these services and believe that they offer an array of diverse and unique resources to both
students and teachers. In providing Network and internet access, our goal is to promote educational
excellence in the Socorro Independent School District by facilitating resource sharing, innovation, and
communication. Students, teachers, and administrators have access to:
SISD provides Network and internet access to all students, teachers, and administrators. We are happy
to offer these services and believe that they offer an array of diverse and unique resources to both
students and teachers. In providing Network and internet access, our goal is to promote educational
excellence in the Socorro Independent School District by facilitating resource sharing, innovation, and
communication.
Students, teachers and administrators have access to:
1) E-mail (both within and outside of the District)
2) The Internet;
3) SISD‟s internal Network: file storage, employee intranet, shared Network folders, shared printers, etc.
Users of SISD‟s Network will abide by the following policies:
1) Users must respect the privacy of others. Users shall not intentionally obtain copies of or modify files,
passwords, or data that belong to anyone else.
2) Users will not represent themselves as someone else by using another‟s account. No one should
forward personal material without prior consent.
3) All users must respect the legal protection provided by the copyright license to programs, books,
movies, music, articles and data.
4) Users must respect the integrity of computing systems. Users will not develop programs that harass
other users, attempt to infiltrate or “hack” a computer or computing system, or by spreading computer
malware (e.g. viruses)
5) No advertising or campaigns for political lobbying are allowed through the Network.
6) Users may not use the SISD system for commercial purposes.
7) Use of the Network for games is not considered acceptable, as this places a heavy load on scarce
resources.
8) Users must not post chain letters or engage in “spamming.”
9) Users must respect the rights of other individuals. Use of language that is threatening, abusive,
profane, or sexually offensive will be investigated; penalties for use of such language may include but
are not limited to suspension of Network privileges.
10) Users have no expectation of privacy. E-mail, files and data may be examined by System
Administrators and supervisors without warning. Materials that deal with illegal or inappropriate activities
or subjects may be reported to the appropriate authorities. Penalties for such activities may include but
are not limited to suspension of Network privileges.
11) If a user suspects that there may be security problem on the Network, s/he must email the Computer
Services Help Desk ([email protected]) immediately and report any potential security issues or concerns.
12) Always protect your password. Call the Help Desk (937-1111) if you forget your password.
13) Any abuse of your account by someone else is your responsibility. If you believe someone else may
have your password, you should immediately change it and report the problem to the Help Desk.
Page 67 of 72
14) All users must abide by existing Federal and State laws regarding electronic communication. This
includes accessing information without authorization, giving passwords out, or causing a system to
malfunction. These laws carry penalties of up to 20 years in prison.
15) Access to the Network is considered a privilege. Anyone who uses the Network inappropriately will
be denied future access.
16) If a user access inappropriate material or information by accident, s/he must notify his/her teacher
or supervisor immediately.
I understand and will abide by the above Socorro ISD Acceptable Use Policy for Network Use. I
understand that any violation of the regulations is unethical and may constitute a criminal offense.
Should I commit any violation, my access privileges may be revoked, and school disciplinary action
may be taken. Additionally, appropriate legal action may be taken.
As the parent or guardian of this student, I have read the Socorro ISD Acceptable Use Policy for Network
Access. I understand that this access is designed for educational purposes and that Socorro ISD has
taken steps to eliminate controversial materials. I further understand that correct and appropriate use
of the Network will be emphasized. However, I also recognize that it is impossible to restrict access to all
controversial materials, and I agree that I will not hold SISD responsible for materials acquired on the
Network. Further, I accept full responsibility for supervision if and when my child‟s internet use takes
place outside of a school setting. I understand that Network access affords my son/daughter powerful
opportunities and responsibilities to become a learner in the 21st century. Parents or guardians who are
interested in further information or training can call the campus their child attends, or SISD‟s Department
of Technology Services.
Page 68 of 72
STaR Chart
Assessment Process:
A comprehensive needs assessment based on the District Improvement Plan is conducted annually to analyze the current
status of technology in the district and plan for future needs. Items analyzed include: infrastructure, hardware, software,
instructional programs, course offerings, student achievement, technology resources, professional development and technical
support. As we identify areas of need in our district, we utilized different methods to assess the current status of instructional
technology. One measure used is the Teacher and Campus School Technology and Readiness Assessment, STaRChart, which
is conducted each annually during the month of January. It is through this instrument that instructional technology is gauged in
our district.
Our primary goal is to demonstrate mastery at the Target Level in all key areas. These are the key areas of concern as we
move forward from a Developing Level to a Target Level:
Socorro ISD Campus STaRChart Results: 2010-11 School Year
Campus Teaching & Learning Educator Preparation
& Development
Leadership,
Administration &
Support Services
Infrastructure for
Technology
Americas HS 14 Developing 15 Advanced 16 Advanced 20 Advanced
Benito Martinez ES 16 Advanced 13 Developing 14 Developing 17 Advanced
Bill Sybert School 17 Advanced 15 Advanced 18 Advanced 17 Advanced
Campestre ES 11 Developing 14 Developing 15 Advanced 17 Advanced
Capt. Walter Clarke
MS
14 Developing 14 Developing 18 Advanced 14 Developing
Chester E. Jordan ES 18 Advanced 18 Advanced 20 Advanced 21 Target
Col. John Ensor MS 14 Developing 13 Developing 14 Developing 14 Developing
Desert Wind School 16 Advanced 18 Advanced 18 Advanced 21 Advanced
Dr. Sue Shook ES 18 Advanced 17 Advanced 19 Advanced 18 Advanced
Eastlake HS 14 Developing 14 Developing 18 Advanced 17 Advanced
El Dorado 9th Grade
Academy
13 Developing 12 Developing 16 Advanced 18 Advanced
El Dorado HS 14 Developing 13 Developing 16 Advanced 14 Developing
Elfida Chavez ES 19 Advanced 16 Advanced 18 Advanced 19 Advanced
Ernesto Serna School 18 Advanced 16 Advanced 17 Advanced 17 Advanced
Escontrias ECC 20 Advanced 21 Target 24 Target 20 Advanced
Escontrias ES 20 Advanced 21 Target 24 Target 20 Advanced
HD Hilley ES 16 Advanced 14 Developing 20 Advanced 19 Advanced
Helen Ball ES 19 Advanced 18 Advanced 18 Advanced 19 Advanced
Horizon Heights ES 16 Advanced 13 Advanced 17 Advanced 15 Advanced
Hueco ES 17 Advanced 17 Advanced 21 Target 18 Advanced
Hurshel Antwine ES 17 Advanced 15 Advanced 18 Advanced 17 Advanced
Jane A Hambric 17 Advanced 17 Advanced 19 Advanced 17 Advanced
Page 69 of 72
School
John Drugan 17 Advanced 17 Advanced 19 Advanced 18 Advanced
KEYS Academy 13 Developing 12 Developing 12 Developing 14 Developing
Loma Verde ES 13 Developing 14 Developing 16 Advanced 15 Advanced
Lujan Chavez ES 17 Advanced 14 Developing 18 Advanced 16 Advanced
Mission Early College
HS
18 Advanced 16 Advanced 20 Advanced 23 Target
Montwood HS 17 Advanced 16 Advanced 21 Target 19 Advanced
Montwood MS 15 Advanced 15 Advanced 18 Advanced 14 Developing
Myrtle Cooper ES 17 Advanced 15 Advanced 18 Advanced 15 Advanced
O’Shea Keleher ES 19 Advanced 19 Advanced 24 Target 17 Advanced
Options HS 18 Advanced 16 Advanced 19 Advanced 21 Target
Paso del Norte School 15 Advanced 13 Developing 17 Advanced 17 Advanced
Robert Rojas ES 21 Target 18 Advanced 21 Target 16 Advanced
Salvador Sanchez MS 17 Advanced 17 Advanced 18 Advanced 16 Advanced
Sgt. Roberto Ituarte ES 18 Advanced 16 Advanced 19 Advanced 17 Advanced
Sierra Vista ES 18 Advanced 17 Advanced 18 Advanced 18 Advanced
Socorro HS 16 Advanced 15 Advanced 13 Developing 18 Advanced
Socorro MS 14 Advanced 13 Developing 17 Advanced 16 Advanced
Spec. Raphael
Hernando III MS
18 Advanced 14 Developing 20 Advanced 18 Advanced
SunRidge MS 16 Advanced 14 Developing 18 Advanced 17 Advanced
Vista del Sol ES 18 Advanced 16 Advanced 18 Advanced 16 Advanced
William D. Slider MS 19 Advanced 19 Advanced 20 Advanced 15 Advanced
District Average 19 Advanced 16 Advanced 18 Advanced 17 Advanced
Point Ranges 6-8= Early Tech
9-14=Developing Tech
15-20=Advanced Tech
21-24=Target Tech
6-8= Early Tech
9-14=Developing Tech
15-20=Advanced Tech
21-24=Target Tech
6-8= Early Tech
9-14=DevelopingTech
15-20=AdvancedTech
21-24=Target Tech
6-8= Early Tech
9-14=DevelopingTech
15-20=Advanced Tech
21-24=Target Tech
Another method to be utilized is to have all certified educators take an annual assessment of their technology proficiency skills
as defined by the ISTE NETS. The District Technology Performance Indicator Assessment will be created during the spring 2011
and implemented starting the fall of 2011. Additionally, we will use the Professional Development Records of all technology
trainings offered, both at the district and campus level. These trainings will be infused with the State Board of Educator
Certification Standards (I-V) for all teachers and the International Society for Technology in Education NETS (National
Educational Technology Standards) for teachers and administrators.
Page 70 of 72
TECHNOLOGY BOND PLAN COMMITTEE
Committee Member Title
Hector Reyna Director, Technology Services
Miguel Serrano Principal , Socorro High School
Rosemary Menchaca Principal , Montwood High School
Janie L. Tidwell Principal , Montwood Middle School
Jeannette Williams Principal , Paso Del Norte Pre K- 8
Ricardo Damian Principal , Ernesto Serna Pre K-8
Isabel Andresen Principal , Campestre Elementary School
Marivel Macias Principal , Escontrias Elementary School
Denisa Morales Instructional Coach, Americas High School
Miguel Moreno Instructional Coach, Socorro High School
Shivon Loya Instructional Coach, Jane Hambric Pre K-8
John Alarcon Executive Director, Maintenance & Operations
George Thomas Director for Career & Technical Education
Susan Thompson Library Coordinator, District
Louisa Aguirre-Baeza Director, Staff Development
David Akers Team Leader, Technical Services
Ben Ross Team Leader, Telecom/Network IT Security
Oscar Dominguez Team Leader, Systems Administration
Philip Acosta Team Leader, Database Administration
Denise Espinoza Administrator, E-rate
Juanita Huerta Administrative Specialist I, District Operations
Claudia Rodriguez Systems Administrator, Systems Administration
Trisha Dominguez Administrative Specialist II, Technology Services
Eric Carreon Assistant Principal, Sanchez Middle School
Mary Jo Ochoa Community Education
Martha Serna Community Education
Raul Rodriguez Team Leader, ICS and Planning
Page 71 of 72
TECHNOLOGY BOND PLAN COMMITTEE
Committee Member Title
Hector Reyna Director, Technology Services
Miguel Serrano Principal , Socorro High School
Rosemary Menchaca Principal , Montwood High School
Janie L. Tidwell Principal , Montwood Middle School
Jeannette Williams Principal , Paso Del Norte Pre K- 8
Ricardo Damian Principal , Ernesto Serna Pre K-8
Isabel Andresen Principal , Campestre Elementary School
Marivel Macias Principal , Escontrias Elementary School
Denisa Morales Instructional Coach, Americas High School
Miguel Moreno Instructional Coach, Socorro High School
Shivon Loya Instructional Coach, Jane Hambric Pre K-8
John Alarcon Executive Director, Maintenance & Operations
George Thomas Director for Career & Technical Education
Susan Thompson Library Coordinator, District
Louisa Aguirre-Baeza Director, Staff Development
David Akers Team Leader, Technical Services
Ben Ross Team Leader, Telecom/Network IT Security
Oscar Dominguez Team Leader, Systems Administration
Philip Acosta Team Leader, Database Administration
Denise Espinoza Administrator, E-rate
Juanita Huerta Administrative Specialist I, District Operations
Claudia Perez Systems Administrator, Systems Administration
Trisha Dominguez Administrative Specialist II, Technology Services
Page 72 of 72