SPS 800 MHz RF Power upgrade. Progress report 18 June 2014. SPS 800 MHz power. All eight individual IOT transmitters validated Line #1 tested up to 200 kW CW on load New cavity controllers ready Still very bad news from Electrosys Second Circulator and no spare at all delivered. ?. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

18

June

201

4

LHC Inject

orUpgrade

SPS 800 MHzRF Power upgradeProgress report18 June 2014

Eric

Mon

tesin

os

Page 2: SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

18

June

201

4

LHC Inject

orUpgrade

SPS 800 MHz power

All eight individual IOT transmitters validated

Line #1 tested up to200 kW CW on load

New cavity controllers ready

Still very bad news from ElectrosysSecond Circulator and no spare at all delivered

Eric

Mon

tesin

os

2

Cavity #2Load

Short

Cavity #1

Load

Short

?

Page 3: SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

18

June

201

4

LHC Inject

orUpgrade

SPS 800 MHz powerMoved circulator toline #2

Line #2 tested up to200 kW CW on load

Completed the RF conditioning up to180 kW CW on cavity #2Yesterday

Just started the RF conditioning on cavity #1 (without circulator ! So it will be slow as we will be very careful)

Eric

Mon

tesin

os

3

Cavity #2Load

Short

Cavity #1

Load

Short

?

Load

Page 4: SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

18

June

201

4

LHC Inject

orUpgrade

Two x four transmitters

Eric

Mon

tesin

os

4

Front view

Rear view

Page 5: SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

18

June

201

4

LHC Inject

orUpgrade

CavitiesAntennas have been added on both cavities

Combiner is still to be provided (LLRF)

Two old filters are overheating (has probably been always the case, discovered while checking the antennas)

We added a heat cooler

Eric

Mon

tesin

os

5

New antenna design

Sébastien adding a new antenna on all 74 cells

Page 6: SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

18

June

201

4

LHC Inject

orUpgrade

CavitiesAntennas have been added on both cavities

Combiner is still to be provided (LLRF)

Two old filters are overheating (has probably been always the case, discovered while checking the antennas)

We added a heat cooler

Eric

Mon

tesin

os

6Old filter overheating while having 200 kW CW during several minutes

(NOT the case in operation)

Page 7: SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

18

June

201

4

LHC Inject

orUpgrade

Schedule

Eric

Mon

tesin

os

7

2014

Jan Feb Mar Apr May Jun Jul AugDec

8 Individual transmitters

TWC 160 kW total

TWC 260 kW total TWC 1

220 kW total

TWC 2220 kW total

LLRF commissioning

SPS setup with beam

SPS closed

LLRF antennae calibration

TWC 1 & 22 x 220 kW total

+Cavity conditioning

Page 8: SPS 800 MHz RF Power upgrade

Thank you for your attention