standardization of smart cities - efforts on city service ... · standardization of smart cities -...
TRANSCRIPT
Standardization of smart cities- Efforts on city service
continuity against disasters -
2019-06-04
Vice-Chair of IEC SyC Smart Cities
Panasonic Corporation
Tatsuya Shimoji
Table of Contens
1) Background
2) Overall of Standardization for City Service Continuity(CSC)
3) Next step
2
1)Background
• 1)-1 Lessons form huge disasters
• 1)-2 Concept of CSC
• 1)-3 Examples of CSC (Screen Only)
3
2011
Thailand floods
2008
Ice damage to power line in China
(Source)IEC Whitepaper Microgrids for disaster preparedness and recovery
http://www.iec.ch/whitepaper//pdf/iecWP-microgrids-LR-en.pdf
More than 1 800 people died.Estimated damage more than USD 108 billion.Blackouts across 3 states, lasting up to 2 weeks.
450 people died. Widespread
blackouts affecting 13 million people,
some for up to 2 months.
2011
Great East Japan EarthquakeMore than 15 000 people died. 4 nuclear reactors were destroyed.Widespread blackouts affected more than 4 million homes, lasting 7 to 8 days.
1)-1 Lessons form huge disasters
4
1)-2 Concept of CSC
• CSC: City Service ContinuityHow to continue city services against disasters, expanding by climate change ?
• Electricity is very essential
City Service Continuity(CSC)5
2) Overall of Standardization for City Service Continuity(CSC)
• 2)-1 Standardization for Smart Cities
• 2)-2 IEC Systems Approach
• 2)-3 IEC PT63152 proposed by Japan
• 2)-4 PT63152 project
• 2)-5 Key points
• 2)-6 Application example
6
【Standardization for social needs】 not technical specification- Use case sharing : For gathering oversea practical issues (connection with stakeholders)- Best practices : For promotion of solutions for the issues- Indicators: For creation of sound market
【Themes for smart city】 Various from each countries
- City data format(CN) 、Management indicator for City (CN, FR) 、Infrastructure indicators(JP)Smart transportation(JP) 、Water(FR) etc
7
Market Requirement(Analysis of usecase/stakeholder/system etc.)
Indicator/Management System
Reference Architecture
Basic Data Model
Disaster Recovery Logistics
Smart CityStandardization
Smart CityBusiness Area
・・・
ISO
IEC, ITUJTC1
IEC, ISO, JTC1
City Infra indicator City Maturity model
SmartTransportation
Energy
ICT/SecurityLightingWater
Smart CityReference Architecture
City Data Model
TownManagement
EnergySolution
Water Supply
Transportation
Security ICT ・・・Resilience
CommonTerminology
Reference ArchitectureMethodology
Smart City Business
2)-1 International standardization of Smart Cities
7
From :” IEC/SyC AAL Deliverables & Roadmap”,
IEC Systems Approach :6 phases
Systems viewpoints, models and registries
2)-2 IEC Systems Approach
8
9
• City Service Continuity (CSC) – Concept: How to continue city services against disasters, expanding by climate change ?
– Electricity is very essential for keeping city services.
• BCP (Business Continuity Plan) for electric service:Specification of requirement & guidelilnes for ECP/ECS for global market creation
– Electricity Continuity Plan (ECP): Action plan to provide emergency measures and processes for securing electricity supply continuity
– Electricity Continuity System (ECS): Defining necessary device, equipment and interoperability for continuously supplying electricity in disasters
2)-3 IEC PT63152 (proposed by Japan)
9
MS - Guideline
[PT63152]
・Started at 2017-08 as 1st project in SyC
・17 experts from 10 countries registered
* Japan: Mitsubishi, Azbil, Panasonic
IEC/SyC on Smart Cities
IEC/SyC/PT63152(CSC-Project)
・PL: Japan(Shimoji)・Experts: Japan, UK,
India, Korea, Italia, German, Mexico, USA, China, Singapore
WG1: Terminology
WG2: Market Analysis
WG3: Reference Architecture
- Smart Cities System –Vocabulary- Smart Cities System –Methodology for concepts and taxonomies building
(Now on discussion for NWIP)
Clean Water, Smart City Planning, City Information modeling, Intelligent Operation Center, etc.
- SCRAM (Smart Cities Reference Architecture Methodology
- SCRA (Smart Cities Reference Architecture)
- Smart City Standards Inventory and Mapping
(current themes)
2)-4 PT63152 project
10
CSC Sustain certainly & Recover faster Scenario
2)-5 Key point(1): Basic scenario
11
• Electricity Continuity Plan (ECP): Action plan to provide emergency measures and processes for securing electricity supply continuity
• Electricity Continuity System (ECS): Defining necessary device, equipment and interoperability for continuously supplying electricity in disasters
BCMS(ISO 22301)
BCMS(ISO 22313)
MS - Guideline
MS- Requirements
Other services
BCPElectricity relevant
Refer & Establish
ECP
ECS
Implemen-tation
Med
ical S
erv
ice
s
Tra
nsp
orta
tion
Serv
ices
Lo
gis
tics S
erv
ices
2)-5 Key points(2): ECP/ECS
12
CSC Concept Image building up system of ECSs
No description of power grid in here
ECP
ECS
BCP
Made byOrganization
Information CooperationArea
City
Power CooperationArea
IndependentBackupArea
Electricity Continuity System
Electricity Continuity Plan
Not applied Area
2)-5 Key points(3): Building up system of ECSs
13
2)-5 Key points(4): Example of ECP/ECs
14
2)-6 Application example
Planning and execution for safe・secure・resilientcommunities
Enhancement of disaster preparedness/recoveryInstallation of BCP
Strengthen of investment to disaster preparedness/recovery⇒ Base station for actual proof
・Administration leading companies and users for disaster preparedness・Clarification of necessary actions based on ECP/ECS
Standardization of resilient electricity system ⇒ Competitive resilient company
Administration for disaster preparedness/recovery
Disaster resilient Industry
Products for disaster preparedness/recovery
users for disaster preparedness/recovery ・
・・
Education/Training for disaster preparedness-> minimum damage / rapid recovery
From: Y.Ak,White Paper of MDR project Microgrids for disaster preparedness and recovery with electricity continuity plans and systems
Publicadministration
Privatecompanies
End users/Consumers
15
16For more practical
Scope
IEC PT63152Basic Requirements/Guideline
CSC reference modelincluding normal use?
Best practice (for reference)
Implementation guideline
3) Next Step
• Implementation guideline
• Reference model including normal use
・・・
17
Final goal of standardization fo CSC:
Contribution to assurance of electricity
"Anytime" ,"Anywhere" ,"In any case"-Manage both economic rationality of normal case and publicness of emergency case.
⇒ creation of new market and expansion
-Need to design energy saving/energy storage/energy creation , considering
emergency case
for SDGs
3) Next Step
Thank you for your attention.