Giving Yourself Options – Using Oracle Assemble To Order (ATO)

Bob Collins, CFPIM, CIRMSSI North America

Chicago, ILAugust 15, 2003

Page 2: Star Item Ato

Agenda

• Why consider ATO?• Advantages to ATO?• Example of Oracle ATO

Page 3: Star Item Ato

ATO – Assemble-to-Order• A production environment where a good or

service can be assembled after receipt of a customer’s order. The key components . . . used in the assembly or finishing process are planned and usually stocked in anticipation of a customer order. Receipt of an order initiates assembly of the customized product. This strategy is useful where a large number of end products (based on the selection of options and accessories) can be assembled from common components.

- APICS Online Dictionary (10th Edition)

Page 4: Star Item Ato

ATO Bills and . . .

• Modular Bills• Planning Bills• PTO Bills (Oracle)• Hybrid Bills (Oracle)

Page 5: Star Item Ato

Why consider ATO?

• Options make planning and stocking EVERY possible end item unrealistic to impossible

• Difference between customer delivery lead time vs. procurement and manufacturing lead time

Page 6: Star Item Ato

Stock issue• When options are considered, there

may be hundreds of thousands of end items

• Potentially millions of dollars of inventory

• Many potential configurations are never ordered

• Space problems, maintenance issues

Page 7: Star Item Ato

Lead Time issue

• Customer delivery lead time = 4 weeks

• Procure materials, fabricate and assemble – 28 weeks!

Total Lead Time

Customer Delivery

Lead Time

Page 8: Star Item Ato

MTS – MTOTotal Lead Time

Customer Delivery Lead Time

MTS

MTOTotal Lead Time

Customer Delivery Lead Time

Page 9: Star Item Ato

ATO

Total Lead Time

Customer Delivery Lead Time

Final Assembly Lead Time

Subassembly Lead Time

Page 10: Star Item Ato

Inventory Implications

End Items End Items

Raw Materials Raw Materials

Inventory

Inventory

Order placed

MTS MTO

Page 11: Star Item Ato

ATO and InventoryEnd Items

Subassemblies

Raw Materials

Order placedInventory

Page 12: Star Item Ato

Advantages to ATO

• Better response time• Reduced costs• Lower inventory• Reduced number of master

scheduled and forecast items• Faster and fewer errors in order

entry

Page 13: Star Item Ato

Example: ComputerComputer Options

Processor(1 of 8)

RAM(1 of 4)

Modem(1 of 3)

Optical Drive (1 of 6)

Monitor(1 of 6)

Speakers(1 of 3)

Printers(1 of 7)

Hard Drive

(1 of 6)

Graphics Card(1 of 5)

Ethernet Card(1 of 3)

Software package(1 of 5)

8 x 4 x 6 x 5 x 6 x 3 x 7 x 6 x 3 x 3 x 5 = 32,659,200 end items!

Page 14: Star Item Ato

Maintenance Nightmare?

8 x 4 x 6 x 5 x 6 x 3 x 7 x 6 x 3 x 3 x 5 = 32,659,200 end items

OR

8 + 4 + 6 + 5 + 6 + 3 + 7 + 6 + 3 + 3 + 5 =56 items at the option level

ATO allows you to create fewer Bills!

Page 15: Star Item Ato

More advantages• Fewer Bills of Materials• Less BOM maintenance• More efficient order entry• Forecast/plan at level below the end

item• Helps isolate opportunities for

standardizing and changing the manufacturing process.

Page 16: Star Item Ato

ExamplePentium 4 Family

Level0 ATO Model

Processors Hard Drives MonitorsATO Option Class

1

21.4 GB 2.1 GB

60 GB 80 GB 120 GB

17” Flat 21” Super

ATO ItemsSubassemblies

Components.20 .60 .20

.30 .70 .40 .60

3

Page 17: Star Item Ato

Planning Percentages

Page 18: Star Item Ato

Planning Process• 100 Pentium 4’s in September

– 30 1.4 GB processors– 70 2.1 GB processors– 20 60 GB Hard Drives– 60 80 GB Hard Drives– 20 120 GB Hard Drives– 40 17” Flat Screen monitors– 60 21” Super Screen monitors

Page 19: Star Item Ato

Optional/Mutually Exclusive

Page 20: Star Item Ato

Optional/Mutually Exclusive

Description [ ] Mutually Exclusive (default)

[X] Mutually Exclusive

[X] Optional

Choose any number or no options on the option class bill

Choose one or no options on the option class bill

[ ] Optional (default)

Choose at least one option on the option class bill

Choose one, and only one, option on the option class bill

Page 21: Star Item Ato

Configurator

Page 22: Star Item Ato

Configurator

• When the order is placed, Order Entry picks the options the customer wants

• Rules to guide Order Entry• Can reuse existing numbers if profile

option is set

Page 23: Star Item Ato

Configurator Rules

• E.g., Automotive Manufacturer– IF air conditioning ordered for vehicle– THEN must include tinted windshield

Page 24: Star Item Ato

Configured Bill (*)Pentium 4 Family*1234

Level0 ATO Model

Processors Hard Drives MonitorsATO Option Class

1

2 80 GB 21” SuperATO Items

Subassemblies

Components

.60.70 .60

3

2.1 GB

Page 25: Star Item Ato

Creation of Configured Item

• Creation of configuration bill of material based on the model bill of material

• Creation of configuration routing based on the model routing

• Link the configuration item to the sale order

Page 26: Star Item Ato

Creation of Configured Item

• Kick off the configuration item workflow process, which completes the following:– Lead time calculation for the configuration

item (discrete manufacturing items only)– Supply Chain cost rollup for the

configuration item

Page 27: Star Item Ato

Affect on Forecast

• Forecast at the Model level, using planning percentages

• Configured items will consume the forecast for the Model

Page 28: Star Item Ato

Want to try it?

Metalink.oracle.com

Flow for ATO Configuration

Step-by-step instructions

Page 29: Star Item Ato

Summary

• Oracle Applications supports ATO (and PTO & CTO) with a range of features in order entry, demand forecasting, master scheduling, production, shipping and financial accounting.

Page 30: Star Item Ato

Thank you!