ST. MARY'S SECONDARY SCHOOL BLOCK B OCTOBER 2016 BQ/1 ST. MARY'S SECONDARY SCHOOL BLOCK B SUBSTRUCTURE Notes : (i) The items and quantities included under this heading include all structural work below the top of the structural ground floor slab (ii) No allowance for working space has been allowed in computing the quantities of excavation. Any working space which is considered necessary by tenderers must be allowed for in their unit rates for these items. Excavations A Excavate over area of building to remove top soil and stockpile on site 172 CY B Ditto below ditto in isolated pits not exceeding 5'0" deep and ditto 305 CY C Ditto exceeding 5'0" but not exceeding 10'0" deep and ditto 61 CY D Prepare, level and ram bottom of excavations to receive concrete 183 SY E Planking and strutting to sides of pit excavations not exceeding 5'0" deep 233 SY F Ditto exceeding 5'0" but not exceeding 10'0" deep 47 SY G Backfilling to pits well compacted in maximum 8" layers 58 CY H Ditto to foundation walls after built 40 CY I Well compacted backfilling in maximum 8" layers within foundations under slabs 77 CY J Imported fill material well compacted in 8" layers within ditto 94 CY K Prepare surface of fill to receive concrete 154 SY L 500 gauge polythene damp proof membrane well lapped 300 SY Concrete Work M 2" thick blinding concrete (1:4:8) 183 SY Reinforced insitu concrete 3000 psi at 28 days

Upload: others

Post on 07-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/1

ST.  MARY'S  SECONDARY  SCHOOL

BLOCK  B

SUBSTRUCTURE

Notes:    (i)    The  items  and  quantities  included  under                                    this  heading  include  all  structural  work                                    below  the  top  of  the  structural  ground                                    floor  slab                          (ii)  No  allowance  for  working  space  has                                      been  allowed  in  computing  the  quantities                                    of  excavation.    Any  working  space  which                                    is  considered  necessary  by  tenderers                                    must  be  allowed  for  in  their  unit  rates  for                                    these  items.

Excavations

A Excavate  over  area  of  building  to  remove  top  soiland  stockpile  on  site 172 CY

B Ditto  below  ditto  in  isolated  pits  not  exceeding5'0"  deep  and  ditto 305 CY

C Ditto  exceeding  5'0"  but  not  exceeding  10'0"  deepand  ditto 61 CY

D Prepare,  level  and  ram  bottom  of  excavations  toreceive  concrete 183 SY

E Planking  and  strutting  to  sides  of  pit  excavationsnot  exceeding  5'0"  deep 233 SY

F Ditto  exceeding  5'0"  but  not  exceeding  10'0"  deep 47 SY

G Backfilling  to  pits  well  compacted  in  maximum8"  layers 58 CY

H Ditto  to  foundation  walls  after  built 40 CY

I Well  compacted  backfilling  in  maximum  8"  layerswithin  foundations  under  slabs 77 CY

J Imported  fill  material  well  compacted  in  8"  layers  within  ditto 94 CY

K Prepare  surface  of  fill  to  receive  concrete 154 SY

L 500  gauge  polythene  damp  proof  membrane  welllapped 300 SY

Concrete  Work

M 2"  thick  blinding  concrete  (1:4:8) 183 SY

Reinforced  insitu  concrete  3000  psi  at  28  days

Page 2: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/2

3/4"  aggregate

N In  isolated  column  bases 12 CYTo  Collection $

Substructure  (Cont'd)

A Cistern  base  slab  10"  thick 146 SY

B In  columns 5 CY

C In  beams 19 CY

D In  slabs  6"  thick 130 SY

E In  suspended  slabs  6"  thick 130 SY

Reinforcement  to  ASTM  A615

In  foundations

F          #6  bars 2070 Lbs.

In  cistern  base  slab

G          #4  bars 2600 Lbs.

In  columns

H          #5  bars 1050 Lbs.

In  beams

I          #6  bars 4150 Lbs.

In  slabs

J          #4  bars 6550 Lbs.

In  stirrups  and  the  like

K          #3  bars 2145 Lbs.

Sawn  formwork  to:

L Sides  of  foundations 47 SY

M Vertical  faces  of  columns 64 SY

N Sides  and  soffit  of  beams 176 SY

O Soffit  of  suspended  slabs 130 SY

P Edges  of  slabs  6"  high 6 LY

Blockwork

Page 3: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/3

Hollow  concrete  blocks  1000  psi  laid  in  1:3  cement/sand  mortar

Q In  walls  8"  thick  filled  solid  with  concrete 150 SY

To  Collection $

Substructure  (Cont'd)

A #4  bars  in  vertical  reinforcement 3500 Lbs.

 'Durowall'  or  similar  horizontal  mild  steel  ladderreinforcement  laid  in

B          8"  thick  walls 337 LY

Insitu  Finishes

Cement  and  sand  render  (1:4)  finished  smooth

C ½"  thick  in  one  coat  on  concrete/block  walls 119 SY

D ¾"  thick  in  two  coats  on  ditto 197 SY

E 6"  radius  cove  at  junction  of  walls  and  base 96 LY

F 2  coats  thoroseal  on  cistern  base 121 SY

G Ditto  on  rendered  walls 197 SY

Sundries

H Allow  a  provisional  sum  for  cistern  accessmanhole  covers PROV SUM

Protection

I Allow  for  the  protection  of  all  of  the  work  containedin  this  section Item

To  Collection $

Collection

Amount  of  Page  No.  BQ/1Amount  of  Page  No.  BQ/2Amount  of  Page  No.  BQ/3

Page 4: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/4

Amount  of  SubstructureTo  Block  B  Summary $

Page 5: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/5

Page 6: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/6

Page 7: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/7

1,000.00

Page 8: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/8

Page 9: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/9

CONCRETE  WORK

Reinforced  insitu  concrete  3000  psi  at  28  days¾"  aggregate

A In  columns  and  stiffeners 26 CY

B In  beams 29 CY

in  suspended  slabs

C          6"  thick 33 SY

D          5"  thick 88 SY

E In  upstand  beams 15 CY

F In  beam  filling  between  timber  rafters  at  2'0"  centres 5 CY

G 6"  dia  metal  columns  8'0"  long  welded  both  endsto  12"  x  6"  x  ⅜"  thick  metal  plates  twice  drilled  forbolts 7 No.

H Drill  concrete  for  and  including  ⅝"  expansion  bolts5"  long 14 No.

I Non-­shrinking  grout  12"  x  6"  to  top  and  bottom  ofcolumns 14 No.

Reinforcement  to  ASTM  A615

In  columns  and  stiffeners

J          #6  bars 1800 Lbs.

K          #5  bars 260 Lbs.

In  beams  and  upstand  beams

L          #6  bars 3350 Lbs.

M          #5  bars 2150 Lbs.

N          #4  bars 1640 Lbs.

In  suspended  slabs

O          #4  bars 3270 Lbs.

In  stirrups  and  the  like

P          #3  bars 3036 Lbs.

Sawn  formwork  to:

Q Vertical  faces  of  columns 136 SY

Page 10: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/10

R Sides  and  soffits  of  beams 350 SY

To  Collection $

Concrete  Work  (Cont'd)

A Soffit  of  suspended  slabs 99 SY

B Sides  of  beamfilling  average  10"  high  cut  andfitted  between  2"  x  6"  rafters  at  2'0"  centres 96 LY

C To  projecting  band  2"  x  6" 48 LY

D Saw  cut  concrete/blockwork  for  flashings 120 LY

Protection

E Allow  for  the  protection  of  all  of  the  work  containedin  this  section Item

To  Collection $

Collection

Amount  of  Page  No.  BQ/4Amount  of  Page  No.  BQ/5

Amount  of  Concrete  WorkTo  Block  B  Summary $

Page 11: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/11

Page 12: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/12

Page 13: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/13

Page 14: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/14

Page 15: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/15

BLOCKWORK  WALLS

Hollow  concrete  blockwork  1000  psi  laid  in  1:3cement  mortar

In  walls

A          6"  thick 303 SY

B          4"  thick 43 SY

Concrete  filling  (2000  psi  at  28  days)  to  single  coreof  blockwork  reinforced  with  1No.  ½"  dia  ht  bar

C            6"  thick  walls 574 LY

D          4"  thick  walls 64 LY

"Durowall"  or  similar  horizontal  mild  steel  ladderreinforcement  laid  in

E          6"  thick  walls 340 LY

F          4"  thick  walls 53 LY

G Drill  concrete  4"  deep  for  and  grout  in  #3  bars  16"  long,  built  into  joints  of  blockwork  at  connection  of  walls  to  columns 105 No.

H Concrete  3000  psi  at  28  days  in  lintel  and  cappingbeams 1 CY

I Reinforcement  in  ditto 95 Lbs.

J Sawn  formwork  to  sides  and  soffit  of  ditto 9 SY

K Form  concrete  sills  10"  x  4"  once  checked,bevelled  and  grooved  on  underside,  include  rebarand  formwork 69 LY

L Concrete  in  surrounds  to  circular  window  Type  #11 ½ CY

M Reinforcement  in  ditto 50 Lbs.

N Sawn  formwork  to  sides 7 SY

O Ditto  6"  wide  curved  to  3'0"  dia 6 LY

Protection

P Allow  for  the  protection  of  all  of  the  work  containedin  this  section Item

Page 16: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/16

Amount  of  Blockwork  WallsTo  Block  B  Summary $

Page 17: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/17

Page 18: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/18

Page 19: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/19

ROOF  &  ROOF  FINISHES

Timber  Roof

Note:    All  timber  in  this  section  to  be  treated  pitch                    pine

A 2"  x  8"  ridge 69 LF

B 2"  x  6"  rafters 840 LF

C T111  plywood  sheeting  ½"  thick 1932 SF

D 1"  x  3"  battens 828 LF

E PVF2  metal  roof  sheeting  24  gauge  screw  fixedto  battens  at  3'0"  centres 1932 SF

F Ditto  ridge  capping 69 LF

G Ditto  in  verge  flashing  girth  16"  overall,  3  times  bent,  fixed  to  sheeting,  dressed  up  wall  and  intogroove  at  top,  include  for  sealing  with  non-­settingsealant 56 LF

H Foam  filler  strip  at  eave  and  ridge 276 LF

I 1"  thick  rigid  foam  insulation 1932 SF

J Allow  a  provisional  sum  for  metal  connectors PROV SUM

Flat  Roof  Finishes

Cement  and  sand  screed  (1:4)  laid  to  falls  and  crossfalls  on  concrete  slab

K Average  2"  thick 99 SY

L 3"  x  3"  triangular  fillet 120 LY

M Torch-­on  roofing  mineral  fibre  membrane  in  two  layers  laid  to  falls  and  crossfalls 99 SY

N Ditto  upstand  flashing  dressed  over  triangular  filletand  up  wall,  girth  16"  overall 120 LY

O Dress  roof  membrance  to  roof  outlets 8 No.

Roof  Drainage

P Harmer  or  similar  cast  iron  roof  outlets  with  dome  grating,  set  in  concrete  and  connection  to  3"  dia  pipe 8 No.

Q 3"  dia  PVC  pipe  set  in  concrete 53 LY

To  Collection $

Page 20: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/20

Roof  &  Roof  Finishes  (Cont'd)

A Extra  over  for  45  degree  bends 24 No.

Provisional  Sum

B Allow  a  provisional  sum  for  the  fabrication  andinstallation  of  roof  access  ladder PROV SUM

Protection

C Allow  for  the  protection  of  all  of  the  work  containedin  this  section Item

To  Collection $

Collection

Amount  of  Page  No.  BQ/7Amount  of  Page  No.  BQ/8

Amount  of  Roof  &  Roof  FinishesTo  Block  B  Summary $

Page 21: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/21

Page 22: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/22

500.00

Page 23: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/23

1,300.00

Page 24: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/24

Page 25: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/25

DOORS  AND  WINDOWS

Windows

Refer  to  Drawing  BA11

Supply  and  fix  the  following,  include  for  8.28mm  thick  laminated  grey  tinted  glass  (3mm  glass/2.28mm  pvb/3mm  glass)

White  aluminium  awning  windowsA          Type  1 6 No.

B          Type  2 4 No.

C          Type  3 10 No.

D          Type  4 1 No.

E          Type  5 9 No.

F          Type  9 1 No.

White  aluminium  fixed  louvre  windowG          Type  11,  with  insect  screen 2 No.

Doors

Refer  to  Drawing  BA10

Aluminium  door  with  fanlight  over,  aluminiumframes

H          Type  D1 8 No.

Solid  core  timber  doors  with  frames  and  stops,natural  oak  finish  to  doors

I          Type  D2 1 No.

J          Type  D3 1 No.

K          Type  D3  with  laminate  glass  insert 1 No.

L        Type  D4 6 No.

M          Type  D5 2 No.

White  aluminium  accoustical  sliding/folding  door(8No.  3'0"  wide  panels)  with  aluminium  framesincluding  all  tracks,  hinges,  locks  and  bolts

N          Type  D4,  24'0"  wide  x  8'0"  high 2 No.

To  Collection $

Page 26: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/26

Doors  and  Windows  (Cont'd)

Ironmongery

Supply,  fit  and  fix  the  following  Elite  ArchitecturalIronmongery  or  equal  and  approved:

A Stainless  steel  hinges 33 No.

B Ditto  falling  hinge 16 No.

C Aluminium  lever  lockets,  (Note:  allow  for  master  and  sub-­master  keying) 11 No.

Weather  saddle  screwed  to  concrete

D          3'0"  long 8 No.

E Toilet  indicator  bolt 8 No.

F Push  plates 16 No.

G Male/female  toilet  signs 2 No.

Decoration

Prepare  and  paint  1  coat  primer  and  2  coats  glossoil  paint  on:

H Timber  frames  girth  over  9"  but  not  exceeding12" 60 LY

Sundries

I Caulk  around  frames  with  non-­setting  sealant 258 LY

Protection

J Allow  for  the  protection  of  all  of  the  work  containedin  this  section Item

To  Collection $

Collection

Amount  of  Page  No.  BQ/9Amount  of  Page  No.  BQ/10

Page 27: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/27

Amount  of  Doors  and  WindowsTo  Block  B  Summary $

Page 28: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/28

Page 29: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/29

Page 30: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/30

Page 31: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/31

FLOOR  FINISHES

A 12"  x  12"  Porcelain  floor  tiles  fixed  with  adhesiveand  grouted  with  acid  resistant  grout 51 SY

B Epoxy  floor  paint,  include  for  preparing  screed 447 SY

C Trowelled  finish  to  concrete  slab  to  receive  ditto 447 SY

Skirtings

D 1"  x  6"  wpp  skirting  once  bevelled,  plugged  to  blockwork 138 LF

Prepare  and  paint  1  coat  primer  and  2  coats  glossoil  paint  on:

E Skirtings  girth  6"  to  9" 46 LY

Protection

F Allow  for  protection  of  all  work  contained  in  thissection Item

Amount  of  Floor  FinishesTo  Block  B  Summary $

Page 32: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/32

Page 33: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/33

Page 34: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/34

Page 35: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/35

WALL  FINISHES

In-­situ  Finishes  (Internal  &  External)

Cement/sand  render  (1:4)  1/2"  thick  in  one  coatfinished  smooth  on:

A Concrete/block  walls 1178 SY

Tiling

B 12"  x  12"  Porcelain  tiles  fixed  with  adhesive  and  grouted  with  acid  resistant  grout 105 SY

C 2"  x  1"  hardwood  rail  pencil  rounded  on  twoarrises,  plugged  to  blockwork 155 LF

D Prepare  and  paint  3  coats  matt  varnish  on  dittogirth  3"  to  6" 52 LY

Decoration

Prepare  and  paint  1  coat  concrete  primer  and  2coats  emulsion  paint  on:

E Cement/sand  render  walls 1159 SY

Protection

E Allow  for  the  protection  of  all  of  the  work  containedin  this  section Item

Amount  of  Wall  FinishesTo  Block  B  Summary $

Page 36: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/36

Page 37: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/37

Page 38: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/38

Page 39: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/39

CEILING  FINISHES

Suspended  Ceilings

A Gyproc  ceiling  boarding  ½"  thick  with  joints  tapedand  finished  smooth,  include  for  2"  x  2"  wppframing  at  2'0"  centres  both  ways  and  for  hangersto  rafters  above 160 SY

B Ex  1"  x  3"  wpp  cornice  moulding 224 LF

Decoration

Rub  down,  fill,  prepare  and  paint  1  coat  concreteprimer  and  2  coats  emulsion  paint  on:

C Soffit  of  concrete  slabs 349 SY

Prepare  and  paint  3  coats  emulsion  paint  on:

D Gyproc  ceiling  boarding 160 SY

Prepare  and  paint  1  coat  primer  and  2  coats  glossoil  paint  on:

E Timber  cornice  moulding  girth  3"  to  6" 75 LY

Protection

F Allow  for  the  protection  of  all  of  the  work  containedin  this  section Item

Amount  of  Ceiling  Finishesto  Block  B  Summary $

Page 40: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/40

Page 41: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/41

Page 42: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/42

Page 43: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/43

FITTINGS  AND  FIXTURES

Science  Laboratory/Home  Management

Base  units  2'0"  wide  x  3'0"  high  with  doors  oneside  and  intermediate  shelf,  solid  surface  top  with2"  deep  fascia,  include  for  all  hardware  and  decoration

A          31'6"  long  with  6"  backsplash 1 No.

B          23'0"  long  with  ditto 1 No.

C          16'0"  long  with  ditto 1 No.

D          13'6"  long  with  ditto 2 No.

E          12'0"  long  with  ditto 1 No.

F          8'0"  long  with  ditto 1 No.

G          11'0"  long  free  standing  unit  with  back  panel 12 No.

H          6'0"  long,  ditto 1 No.

I        Extra  over  for  cutting  hole  in  worktop  for  sink 25 No.

High  level  cupboard  1'0"  wide  x  3'0"  high,  includefor  2No.  Intermediate  adjustable  shelves,  all  hardware  and  decoration

J          16'0"  long,  8No.  doors 1 No.

K          12'0"  long,  6No.  doors 1 No.

L Include  a  Provisional  Sum  for  science  laboratoryraised  teaching  platform PROV SUM

M Include  a  Provisional  Sum  for  2No.  white  boards PROV SUM

Toilets

Refer  to  Drawing  BA13

N Solid  surface  vanity  tops  with  8"  deep  fascia  frontand  one  end  and  6"  high  backsplash  returned  oneend,  include  for  all  support  framework  and  cut  out  for  3No.  wash  basins 2 No.

Mirrors  with  ¼"  ply  backing  set  in  2"  x  1"  hardwoodframe,  include  for  decoration

O          2'6"  x  3'0" 6 No.

P          2'2"  x  3'0" 3 No.

To  Collection $

Page 44: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/44

Fittings  &  Fixtures  (Cont'd)

Supply,  fit  and  fix:

A Toilet  roll  holders 9 No.

B Counter  top  mounted  soap  dispenser,  include  forhole  in  solid  surfacing 6 No.

Balustrades

The  following  in  typical  corridor  balustrades

C 1½"  dia  galvanise  post  3'6"  long  having  5"  x  5"  x  ⅜"thick  ms  plate  4  times  drilled  for  and  including  ⅜"dia  rawl  bolts  to  concrete  slab,  welded  one  end  andwelded  joint  to  top  rail  other  end 12 No.

D 1½"  dia  top  rail 165 LF

E 1½"  dia  intermediate  rails 258 LF

F Welded  joints  of  intermediate  rails  to  posts 132 No.

G 5"  x  5"  x  ⅜"  thick  ms  plate  welded  to  rails  4  timesdrilled  for  and  including  ⅜"  dia  rawl  bolts  to  concretecolumns 24 No.

H 1½"  dia  galvanise  rails  in  panel  7'0"  wide  x  8'0"  high  having  3No.  Vertical  rails  and  7No.  horizontal  railsall  welded  together  and  bolted  to  concrete  with8No.  ⅜"  dia  rawl  bolts 2 No.

Decoration

Grind  smooth  all  welded  joints,  prepare  and  paint2  coats  zinc  chromate  primer  and  2  coats  gloss  oil  paint  on:

I 1½"  dia  galvanise  pipe  rails 204 LY

Protection

J Allow  for  the  protection  of  all  of  the  work  containedin  this  section Item

To  Collection $

Collection

Amount  of  Page  No.  BQ/14Amount  of  Page  No.  BQ/15

Page 45: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/45

Amount  of  Fittings  and  FixturesTo  Block  B  Summary $

Page 46: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/46

1,200.00

2,000.00

Page 47: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/47

Page 48: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/48

Page 49: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/49

BUILDERS  WORK  IN  CONNECTION  WITHSERVICES

All  Provisional

Electrical  Installation

Cut  and  pin  the  following  to  blockwork  or  concreteand  afterwards  make  good

A Distribution  panel 4 No.

B Power  outlets 40 No.

C Ditto  floor  mounted 7 No.

D Telephone/computer  points 2 No.

E Equipment  points 6 No.

F Fire  alarm  panel 1 No.

G Smoke/heat  detection  points 9 No.

H Pull  or  break  glass  boxes 3 No.

I Lighting  points 10 No.

J Switch  points 9 No.

Cut  gypsum/concrete  board  ceilings  for  and  afterwards  make  good:

K Ceiling  lights 6 No.

L Ditto  -­  2'0"  x  4'0" 28 No.

M Ditto  in  suspended  ceiling  system 17 No.

Plumbing  and  Gas  Installation

N Allow  a  provisional  sum  for  BWIC PROV SUM

Protection

O Allow  for  the  protection  of  all  of  the  work  containedin  this  section Item

Amount  of  Builders  Works  in  Connection  with  Services  to  Block  B  Summary $

Page 50: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/50

Page 51: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/51

2,000.00

Page 52: ST.$MARY'SSECONDARYSCHOOL BLOCKB SUBSTRUCTUREmoest-antigua.org/wp-content/uploads/2019/06/3.-Measured... · 2019-06-06 · I Reinforcement+in+ditto 95 Lbs. J Sawn+formworkto+sidesand+soffit+of+ditto

ST.  MARY'S  SECONDARY  SCHOOLBLOCK  BOCTOBER  2016 BQ/52