Basic facts
Area: 505 957 km2
Population: 46 439 864 (2015)
Number of TSOs: 1
Number of DSOs: 336
(source: MINETUR)
28 Mio. consumers
(source: CNMC)
Peak load: approx. 41 GW (2015) ; 46 GW (2007)
(source: REE)
Average interruption of electricity: 5,3 min (2014)
(source: REE)
Spanish Power System 3
Spain in the European meshed grid
Interconnectors with:
France
Portugal
Morocco
Andorra
Source : ENTSO-E
Spanish Power System 4
Up to 2.800
Up to 2.800
1.800-4.000
1.800-3.300
600
900
Grid facts and characteristicsMainly 400 and 220 kV assets.
Highly meshed transmission grid. High Psc.
Limited exchange capability with other systems.
Diversification of power generation technologies.
Important contribution of renewable technologies.
Values in MW.
Spanish Power System 5
Structure of electrical power systemGenerators International Exchanges · REE
Daily and IntradailyMarket
Demand bids
Energy flows
Communication
Transmission network· REE System Operator· REE
Market Operator· OMIE
TSO (foreign)
Distribution companies
R ed de dis tribuc ión< 132 kV
S ubes tac iónde dis tribuc ión
Qualified consumers
Outages
Ancillary Services
Ancilliary services bids
Consumers with/without last resort tariff
Suppliers Last resort suppliersDemand bids
Demand offers
Source : REE
Spanish Power System 6
Structure of electrical power supply. Interface T-D [MVA transformation]
TSO
400 kV
220 kV
132 kV
20/10 kV
220-380 V IndustryHouseholdsComercial Companies
TS
O-G
rid
DS
O-G
rid
Bulk-Industry &
Singular Consumers
(High-Speed Train)
Dispersed
Generation
Conventional
and
Renewable
Generation
6
220 - 400 kV
Spanish Power System 7
Map of the high voltage grid
Source : REE
Spanish Power System 8
Information on TSO
Name: REE
Network length (km) : 39 905
Served area (km²) : 505 957
Annual energy consumption (TWh) : 243,5
(source: REE)
Website: http://www.ree.es
Spanish Power System 9
Information on TSO1985 2010 2011 2012 2013 2014
km of 400 kV circuit Red Eléctrica 9,860 18,792 19,671 20,109 20,639 21,094
Other companies 899 0 0 0 0 0
Total 10,759 18,792 19,671 20,109 20,639 21,094
km of < 220 kV circuit Red Eléctrica 4,069 17,291 17,891 18,260 18,558 18,702
Other companies 10,258 109 109 109 109 109
Total 14,327 17,401 18,001 18,370 18,667 18,811
Total km of the transmission grid
Red Eléctrica 13,929 36,084 37,563 38,369 39,197 39,795
Other companies 11,157 109 109 109 109 109
Total 25,086 36,193 37,672 38,478 39,306 39,905
Busbars Red Eléctrica 373 3,762 3,961 4,150 4,295 4,360
Other companies 1,099 113 113 113 113 113
Total 1,472 3,875 4,074 4,263 4,408 4,473
Transformer capacity
(MVA)
Red Eléctrica 2,311 66,596 68,996 74,596 76,871 79,871
Other companies 26,616 0 0 0 0 0
Total 28,927 66,596 68,996 74,596 76,871 79,871
Source : REE
Spanish Power System 10
Cooperation of TSO and DSOsActive power
TSOs and DSOs calculate limits that apply to generatorsthat contribute to a constraint.
With this limits and the units involved, the TSO calculatesthe individual set-points according to regulation.
Real time measurements
Set points
RESCC1 RESCCn…
TSOGeneration
management
TSONetwork
management
DSOs
Limits
Limits
Measurements
Measurements
Spanish Power System 11
Cooperation of TSO and DSOsPower factor regulation
TSOGeneration
management
TSONetwork
management
DSOs
RESCC1
RESCCn
TSOSettlement
Set points
Power factor set points
Transmission
Power factor set points
Distribution
Settlement
…
Scheme similar to active power.
Spanish Power System 12
Installed capacity with reference to primary resources (2014)
Technology MW %
Hydroelectric (1) 19,897 19.5
Nuclear 7,866 7.7
Coal 10,972 10.7
Fuel + gas 520 0.5
Combined cycle 25,348 24.8
Wind 22,845 22.3
Solar photovoltaic 4,428 4.3
Solar thermoelectric 2,300 2.2
Renewable thermal 1,012 1.0
Cogeneration and other non-renewable
7,075 7.0
Total 102,262
Hydroelectric (1)19,5%
Nuclear7,7%
Coal10,7%
Fuel + gas0,5%
Combined cycle24,8%
Cogeneration and other non-
renewable7,0%
Wind22,3%
Solar photovoltaic
4,3%
Solar thermoelectric
2,2%Renewable
thermal1,0%
Source : REE
Spanish Power System 13
Energy production withreference to primary ressources (2014)
Technology GWh %
Hydroelectric (1) 38,790 15.5
Nuclear 54,925 22.0
Coal 41,139 16.5
Combined cycle 21,328 8.5
Cogeneration and other non-renewable
25,596 10.2
Wind 50,630 20.3
Solar photovoltaic 7,794 3.1
Solar thermoelectric 4,959 2.0
Renewable thermal 4,718 1.9
Total 249,880
Hydroelectric (1)15,5%
Nuclear22,0%
Coal16,5%
Combined cycle8,5%
Cogeneration and other non-
renewable10,2%
Wind20,3%
Solar photovoltaic
3,1%
Solar thermoelectric
2,0% Renewable thermal
1,9%
Source : REE
Spanish Power System 14
Development of generation capacity since 2005
0
20 000
40 000
60 000
80 000
100 000
120 000
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Hydroelectric (1) Nuclear
Coal Combined cycle
Cogeneration and other non-renewable Wind
Fuel+gas Solar photovoltaic
Solar thermoelectric Renewable thermal
Source : REE
Spanish Power System 15
Location of renewable energy sources
WindPhotovoltaic
Thermoelectric
Spanish Power System 16
Development of wind power
9 654
11 290
13 529
15 977
18 72319 569
21 026
22 617 22 84522 845
0
5 000
10 000
15 000
20 000
25 000
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
+13191 MW
Spanish Power System 17
Development of photovoltaic power
43 119
612
3 207 3 250
3 6544 057
4 3204 422 4 428
0
500
1 000
1 500
2 000
2 500
3 000
3 500
4 000
4 500
5 000
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
+4385 MW
Spanish Power System 18
Development of thermoelectric power
0 11 1161
232
532
999
1 950
2 300 2 300
0
500
1 000
1 500
2 000
2 5002005
2006
2007
2008
2009
2010
2011
2012
2013
2014
+2300 MW
Spanish Power System 19
Development of mini-hydro power
1 6951 796
1 871
1 9812 022
2 0362 042
2 042
2 1052 105
0
500
1 000
1 500
2 000
2 500
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
Spanish Power System 20
Power balance in 2014 Generation (TWh): 253.6
Consumption (TWh): 243.5
International Imports (TWh): 3.6
International Exports (TWh): 7.0
Generation253.6 TWh
Comsumption243.5 TWh
Spanish Power System 21
Market coupling
Day-ahead market: MIBEL
E
P
Eb
Pm
Uv E+P
Uc E+P
No congestion Spain-Portugal
Spanish Power System 22
Market splitting
Day-ahead market: MIBEL
E
P
EcE
PmE
UvE
UcE
E
P
EcP
PmP UvP
UcP
Market Splitting: Congestion (i.e. Spain→Portugal)
NTC
PmE*NTC
PmP*