third + shoal waller creek flood diversion tunnel san ... · residences at east fifth and brazos...

5
DOWNTOWN AUSTIN EMERGING PROJECTS IndependenceTitle.com LEARN MORE Independence Title 4TH EDITION

Upload: others

Post on 11-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Third + Shoal Waller Creek Flood Diversion Tunnel San ... · residences at East Fifth and Brazos streets. The tower will include 333 hotel rooms, 329 apartments and 2 restaurants

Texas Association of Counties PlannedThe project is the construction of office space for the Texas Association of Counties.

Third + ShoalPlannedThe Austin Music hall is to be demolished to make way for a 29-story office building. Demolition of the 43,000-square-foot entertainment venue at 208 Nueces St. will occur in the next few months. Construction of the 345,000-square-foot building is scheduled to start in mid-2016 and deliver at the middle of 2018.

Travis County Ronnie Earle BuildingUnder ConstructionTravis County is building a 133,000 sq. ft., $40 million office builiding near the county criminal and civil courthouses downtown, which will include courtrooms, prosecutor's offices, retail space, a crime lab and underground tunnel connecting it to the main justic complex.

Trinity Place Tower On HoldWorld Class Capital Group, an Austin-based investment and asset management firm, has purchased a 1-acre tract across Trinity Street from the Four Seasons Residences. The applicant is proposing to construct a 39-story, 350-unit multifamily building with a ground floor restaurant.

Tyndall Condos at Robertson Hill PlannedThe project is a 182-unit condominium develop-ment on E. 9th St. overlooking downtown Austin.

UT System - Block 71PlannedOnce the new UT System Administration Building (UT5) is completed, the property housing Claudia Taylor Johnson Building and Ashbel Smith Hall will be ground leased, and therefore available for improvement or redevelopment.

Waller Creek Flood Diversion Tunnel Under ConstructionThe Waller Creek Tunnel Project is a stormwater bypass tunnel from Waterloo Park to Lady Bird Lake near Waller Beach. The tunnel is 20.5 - 26.5 feet in diameter and almost one mile long. The project will remove an estimated 1,243,000 square feet of land from the floodplain of the lower Waller Creek watershed, will allow denser development in a very desirable area of downtown, and divert floodwaters that create erosion problems and safety concerns. Construction started in 2010 and will be completed in 2016.

Waller Park Place PlannedThe 1.4 million square foot project, as envisioned, would have three towers with 300,000 sq. ft. of office, a 150-room hotel, 498 residential units and 60,000 sq. ft. of retail. Demolition was completed in February 2016, and construction is expected to begin in 2016.

Waterloo Tower HotelPlannedThis is a proposed 260 room hotel on the site of the former Brick Oven Pizza, east of Waterloo Park and south of UMC Brackenridge.

West Sixth Micro Project PlannedThe project is a 172-unit mid-rise apartment building with a ground floor restaurant.

DOWNTOWN AUSTINE M E R G I N G P R O J E C T S

SOURCE: City of Austin Economic Development Department

IndependenceTitle.comLEARNMORE

Sabine Street Promenade PlannedThe project, now in design, is the construction of the Sabine Street pedestrian and bike promenade from 4th Street to 6th Street. It will be designed in accordance with the Waller Creek District Master Plan.

Saltillo District RedevelopmentPlannedThe proposed project calls for redeveloping the six-block, 10-acre site into a mixed-use communi-ty. The project will feature approximately 800 apartments, with at least 15 percent being deeply affordable, 110,000 square feet of retail, 120,000 square feet of office space and more than 1.8 acres of public open space with public art. The Red Line tracks that bisected the site have been relocated to Fourth Street.

San Marcos Hotel PlannedThis is a proposed 30-room hotel on the northwest corner of E. 7th St. and San Marcos St.

Shoal Creek Walk, Building 1Under ConstructionSchlosser Development has begun construction of a substantial expansion of office space in the West End / Market District. The structure would be about 250,000 square feet and 15 stories tall.

Shoal Creek Walk, Building 2PlannedSchlosser Development is planning a structure would be about 184,000 square feet and 5 stories tall.

Spire PlannedSpire East Fifth LP plans to break ground this year on the project with more than 260 micro units — each about 400 square feet — at East Fifth and Waller streets. The five-story project will include below-ground parking, about 6,500 square feet of street-level retail and live-work space along Fifth Street, plus four floors of rental units with both market and below-market rents. About a quarter of the units will be set aside for people who earn 50 percent to 70 percent less than Austin s median family income.

Sutton Villas Site PlannedThe Sutton Co is planning a major mixed-use development. The tract housed on old condo project called the Villas on Town Lake.

IndependenceTitle.comLEARNMORE

Independence TitleIndependence Title

4TH EDIT ION

1STQTR2017

Page 2: Third + Shoal Waller Creek Flood Diversion Tunnel San ... · residences at East Fifth and Brazos streets. The tower will include 333 hotel rooms, 329 apartments and 2 restaurants

405 Colorado Office BuildingPlannedBrandywine Realty Trust is proposing to build an office project at the northeast corner of Fourth and Colorado streets.

422 (Broadstone) at the LakeUnder ConstructionConstruction is wrapping up on a multi-use development encompassing 353,000 square feet on a 1.53-acre parcel. The project will be composed of 212 apartments, 150,000 square feet of parking and 9,000 square feet of retail. The project required a zoning change to increase the height to a maximum of 79 feet.

48 East PlannedAustin developer Robert Lee is planning a $100 million, 31-story residential tower that will be built around the corner from SkyHouse Austin in the Rainey Street District.

5th & Brazos Hotel PlannedThis is a 37-story skyscraper with hotel rooms and residences at East Fifth and Brazos streets. The tower will include 333 hotel rooms, 329 apartments and 2 restaurants. Chicago-based Magellan Development Group is developing the project.

5th + West Under Construction

Construction has begun on this 162-unit high-rise condominium tower, being developed by Riverside Resources, developers of Crescent and Whitley.

6th and Nueces Hotel SitePlannedIBC is looking at developing this site on W. 6th street at Nueces as a 28-story hotel.

721 Congress / The AvenuePlannedA vacant retail space on Congress Avenue in downtown Austin will be replaced with a 30-story tower with 135 luxury apartments, office space, a restaurant and a bar, but will not include a parking garage. The development will also provide the adjacent State and Paramount Theaters with administrative space, dressing rooms, classrooms and other support facilities.

70 Rainey StreetUnder ConstructionNew York developer Sackman Enterprises has started construction of a 200 unit, 35-story condominium tower with a ground floor restaurant in the Rainey Street district.

8th & Nueces Under ConstructionThe project is a 22-story, 201-unit apartment building with 5 levels of parking and 16 levels of residential space. The 213,800 sq. ft. building will be 70% one bedroom and 30% two bedroom.

908 Nueces CondominiumsUnder ConstructionThe project replaces a 1-story bail bonds office with a 4-story (over 1 story of parking) condominium Aloft and Element Hotels Under ConstructionThe 7th and Congress project features two Starwood brand hotels, Aloft (278 rooms) and Element (144 rooms), with a 5,400-square-foot restaurant and bar with outdoor seating on Congress Avenue. The project is being developed by White Lodging of Indiana; HKS of Dallas is the architect, and DPR Construction is the lead contractor.Austin Energy Seaholm Substation Under ConstructionThis project is the reduction in size of the existing Austin Energy substation just east of the Seaholm Power Plant. The project includes an artist-designed perimter wall that is substantially complete.

Austin Proper Hotel & Residences PlannedTrammell Crow Company is working with hotel developer the Kor Group to build a 243-room hotel on Block 188 in the Green Water development,just south of the Austin Music Hall. The 32 story tower will also have 100 condominium units.

Austin American-StatesmanWaterfront PropertyPlannedThe owners of the property announced in February that they are soliciting mixed-use redevelopment proposals from qualified developers for the 18.9 acre South Congress Avenue site on the south shore of Lady Bird Lake.

Block 52 On HoldDevelopers are exploring options for this full-block site. Unencumbered by Capitol View Corridors, the site could have as much as 800,000 sq. ft. of office, residential and retail.

Central Health Brackenridge Campus Redevelopment PlannedCentral Health, Travis County's publicly funded health care district, is working with community partners and experts on the future reuse and redevelopment of its Brackenridge Campus, following the planned closing of University Medical Center Brackenridge in 2017. Central Health's Bracknridge Campus is a vital community asset that connects the new University of Texas Medical District, including Seton's new state-of-the-art teaching hospital that will replace UMC Bracken-ridge in 2017, with the Texas State Capitol Complex and Downtown Austin, including the city's envisioned Innovation Zone. The master plan was approved by the Central Health board of Managers on Jan. 27, 2016.

Dell Medical Health Discovery BuildingUnder ConstructionResearchers from all over campus, some of the world's best, will make their home in the wet and dry labs in the Health Discovery Building, where they'll also have access to advanced imaging equipment. A technology incubator will help bring their discoveries to market.

Dell Medical Health Transformation Building Under ConstructionConstruction is well underway on one of four buildings planned for the first phase of the Dell Medical School at UT Austin.

Dell Seton Medical Centerat The University of Texas Under ConstructionConstruction is underway on this 220-bed hospital, one of four buildings in the first phase of the Dell Medical School at UT Austin.

Downtown MetroRail Station ExpansionPlannedThe current downtown station on East Fourth Street has a single track and platform and room for one car lane in the block between Trinity and Neches streets. It could be expanded to two platforms and three tracks. The final design may move the station one block east of the current location.

East Austin Hotel PlannedPlans for The East Austin Hotel call for a roughly 29,000-square-foot complex with five buildings that each rise three stories. Plans also call for a swimming pool, courtyard, salon and restaurant.

East 9th Street MultifamilyPlannedThe project is a 147 unit apartment project with ground floor retail/restaurant.

Episcopal Church Block 87 PlannedThe block is made up of several components, intricately pieced together to maximize the usability of the site. These components are: an Archives builiding, two office builidings, under-ground parking, ground floor retail and the Residential tower. A Capitol View Corridor over most of the site, and surrounding sites, allows only a small corner to extend upwards beyond 5 floors. The project is planned to have 67,000 s.f. archives, 210,000 s.f. office space, 42,000 s.f. retail and 317,000 s.f. of residential.

Fairmont Hotel Under ConstructionManchester Texas Financial Group, a subsidiary of San Diego hotel developer Manchester Financial Group, is building a $370 million hotel with 37 stories and 1,066 rooms just east of the Austin Convention Center, at the northeast corner of Red River and Cesar Chavez streets, near Waller Creek. 125 of the rooms will be larger, high-end Fairmont Gold rooms with separate check-in, elevators and lounge. The hotel will have a direct connection to the Austin Convention Center through an elevated walkway.

Gables Republic Park / Hotel ZaZaUnder ConstructionSite excavation has started on this 24-story tower in downtown Austin that will have 221 luxury apartments atop a 159-room

Hotel ZaZa. The project, fronting on Republic Square Park, is expected to be completed in 2018.

Green Water Block 23 Under ConstructionConstruction started December of 2014 on this 29-story, 500,000 sq. ft. office tower that will have two ground-level restaurants. A major tenant of the building will be Google.

Green Water Block 185PlannedThe Green Water site consists of Blocks 1, 23, 185 and 188. Block 185 fronts Cesar Chavez and Shoal Creek.

Homewood Suites at East AvenueUnder ConstructionConstruction began in February on this 14-story, 150 room hotel, and is expected to wrap up in late 2017.

Hyatt House Hotel Under ConstructionConstruction has started on this 9-story, 192 room Hyatt House extended stay hotel.

The IndependentUnder ConstructionThe 58 story project, tallest in Austin, will have 370 residences (condos for sale) and 13,500 square feet of retail and restaurant space.

Intake and Utility BuildingsPlannedThe City of Austin wants to transform three former utility buildings located on prime land along Lady Bird Lake into public spaces. The City will issue a new project solicitation in the next few months.

Kline HotelPlannedThe site has been cleared for this 42-room boutique hotel with a small, 1,700 sq. ft. cafe.

Marriott Hotel at Cesar ChavezPlannedWhite Lodging Services Corp., downtown Austin s dominant hotel owner, has submitted plans to build another hotel just west of the Austin Conven-tion Center. The 27-story Marriott hotel will have 610 rooms and a high-turnover sit down restau-rant, and four levels of underground parking.

Mexic-Arte MuseumPlannedMexic-Arte is developing plans for a new 7-story (two underground) building to replace the current building on the southeast corner of Congress Avenue and E. 5th Street

New Central LibraryUnder ConstructionWork continues on the new central library, designed by the architectural team of Lake/Flato Architects and Shepley Bulfinch Richardson & Abbott. The new 198,000 sq. ft. central library will replace the 110,000 John Henry Faulk Central Library built in 1979. The new library site is on West Cesar Chavez Street, between Shoal Creek and the redeveloping Seaholm Power Plant. The Faulk library will be used for an expansion of the Austin History Center.

New Travis County Civil & Family CourthouseOn HoldTravis County purchased a full block just south of Republic Square, to construct a 500,000 sq. ft. civil and family courthouse. A bond election in November 2015 failed. The County is considering options.

New UT System Administration BuildingUnder ConstructionConstruction began in early 2015 and is scheduled to be complete the summer of 2017. The building will be eleven stories above eight levels of parking and will provide more than 300,000 square feet of office space, with over 200,000 square feet for immediate use by UT System and the remaining square footage avialable for lease. The System space will be designed to more efficient space standards than are feasible in the existing structures. The building will include a 760-car above and below ground parking garage.

Osten Hall PlannedThe project is a 4-story, mixed-use office building with retail and restaurant space and a robotic parking garage.

Rainey St. Hotel (formerly Kimber Modern)PlannedThis is a proposed 31 room hotel in the Rainey Street neighborhood, on the I-35 frontage road.

Republic Square, Phase IIPlannedConstruction started in May on the next phase of improvements to the 1 3/4 acre Republic Square Park. Phase II is a continuation of a design process in partnership with the Austin Parks Foundation. The scope of Phase II includes, but is not limited to, the design for site regrading, demolition and removal of pavement and obsolete water feature, tree protection and removel where recommended, pedestrian circulation and use areas, informal and flexible children's play area, site furnishings, signage, lighting, irrigation and ladscape improvements.

The RileyUnder ConstructionThe project will separate the existing loft from new office space with a firewall. A remodel of the first floor with an additional second floor will house office space. There will be a small pavilion and roof terrace at the third story. The residential loft will remain and be renovated. Below the office will be a basement parking area to be accessed by a ramp from the alley.

Rise (formerly Aspen Heights) Under ConstructionThe project is a 22-story, 201-unit apartment building with 5 levels of parking and 16 levels of residential space. The 213,800 sq. ft. building will be 70% one bedroom and 30% two bedroom.

Sabine Street Promenade PlannedThe project, now in design, is the construction of the Sabine Street pedestrian and bike promenade from 4th Street to 6th Street. It will be designed in accordance with the Waller Creek District Master Plan.

Saltillo District RedevelopmentPlannedThe proposed project calls for redeveloping the six-block, 10-acre site into a mixed-use communi-ty. The project will feature approximately 800 apartments, with at least 15 percent being deeply affordable, 110,000 square feet of retail, 120,000 square feet of office space and more than 1.8 acres of public open space with public art. The Red LIne tracks that bisected the site have been relocated to Fourth Street.

San Marcos Hotel PlannedThis is a proposed 30-room hotel on the northwest corner of E. 7th St. and San Marcos St.

Shoal Creek Walk, Building 1Under ConstructionSchlosser Development has begun construction of a substantial expansion of office space in the West End / Market District. The structure would be about 250,000 square feet and 15 stories tall.

Shoal Creek Walk, Building 2PlannedSchlosser Development is planning a structure would be about 184,000 square feet and 5 stories tall.

Spire PlannedSpire East Fifth LP plans to break ground this year on the project with more than 260 micro units — each about 400 square feet — at East Fifth and Waller streets. The five-story project will include below-ground parking, about 6,500 square feet of street-level retail and live-work space along Fifth Street, plus four floors of rental units with both market and below-market rents. About a quarter of the units will be set aside for people who earn 50 percent to 70 percent less than Austin s median family income.

Sutton Villas Site PlannedThe Sutton Co is planning a major mixed-use development. The tract housed on old condo project called the Villas on Town Lake.

Texas Association of Counties PlannedThe project is the construction of office space for the Texas Association of Counties.

Third + ShoalPlannedThe Austin Music hall is to be demolished to make way for a 29-story office building. Demolition of the 43,000-square-foot entertainment venue at 208 Nueces St. will occur in the next few months. Construction of the 345,000-square-foot building is scheduled to start in mid-2016 and deliver at the middle of 2018.

Travis County Ronnie Earle Building

Under ConstructionTravis County is building a 133,000 sq. ft., $40 million office builiding near the county criminal and civil courthouses downtown, which will include courtrooms, prosecutor's offices, retail space, a crime lab and underground tunnel connecting it to the main justic complex.

Trinity Place Tower On Hold World Class Capital Group, an Austin-based investment and asset management firm, has purchased a 1-acre tract across Trinity Street from the Four Seasons Residences. The applicant is proposing to construct a 39-story, 350-unit multifamily building with a ground floor restaurant.

Tyndall Condos at Robertson Hill PlannedThe project is a 182-unit condominium develop-ment on E. 9th St. overlooking downtown Austin.

UT System - Block 71PlannedOnce the new UT System Administration Building (UT5) is completed, the property housing Claudia Taylor Johnson Building and Ashbel Smith Hall will be ground leased, and therefore available for improvement or redevelopment.

Waller Creek Flood Diversion Tunnel Under ConstructionThe Waller Creek Tunnel Project is a stormwater bypass tunnel from Waterloo Park to Lady Bird Lake near Waller Beach. The tunnel is 20.5 26.5 feet in diameter and almost one mile long. The project will remove an estimated 1,243,000 square feet of land from the floodplain of the lower Waller Creek watershed, will allow denser development in a very desirable area of downtown, and divert floodwaters that create erosion problems and safety concerns. Construction started in 2010 and will be completed in 2016.

Waller Park Place Planned The 1.4 million square foot project, as envisioned, would have three towers with 300,000 sq. ft. of office, a 150-room hotel, 498 residential units and 60,000 sq. ft. of retail. Demolition was completed in February 2016, and construction is expected to begin in 2016.

Waterloo Tower HotelPlannedThis is a proposed 260 room hotel on the site of the former Brick Oven Pizza, east of Waterloo Park and south of UMC Brackenridge.

West Sixth Micro Project PlannedThe project is a 172-unit mid-rise apartment building with a ground floor restaurant.

Page 3: Third + Shoal Waller Creek Flood Diversion Tunnel San ... · residences at East Fifth and Brazos streets. The tower will include 333 hotel rooms, 329 apartments and 2 restaurants

405 Colorado Office BuildingPlannedBrandywine Realty Trust is proposing to build an office project at the northeast corner of Fourth and Colorado streets.

422 (Broadstone) at the LakeUnder ConstructionConstruction is wrapping up on a multi-use development encompassing 353,000 square feet on a 1.53-acre parcel. The project will be composed of 212 apartments, 150,000 square feet of parking and 9,000 square feet of retail. The project required a zoning change to increase the height to a maximum of 79 feet.

48 East PlannedAustin developer Robert Lee is planning a $100 million, 31-story residential tower that will be built around the corner from SkyHouse Austin in the Rainey Street District.

5th & Brazos Hotel PlannedThis is a 37-story skyscraper with hotel rooms and residences at East Fifth and Brazos streets. The tower will include 333 hotel rooms, 329 apartments and 2 restaurants. Chicago-based Magellan Development Group is developing the project.

5th + West Under Construction

Construction has begun on this 162-unit high-rise condominium tower, being developed by Riverside Resources, developers of Crescent and Whitley.

6th and Nueces Hotel SitePlannedIBC is looking at developing this site on W. 6th street at Nueces as a 28-story hotel.

721 Congress / The AvenuePlannedA vacant retail space on Congress Avenue in downtown Austin will be replaced with a 30-story tower with 135 luxury apartments, office space, a restaurant and a bar, but will not include a parking garage. The development will also provide the adjacent State and Paramount Theaters with administrative space, dressing rooms, classrooms and other support facilities.

70 Rainey StreetUnder ConstructionNew York developer Sackman Enterprises has started construction of a 200 unit, 35-story condominium tower with a ground floor restaurant in the Rainey Street district.

8th & Nueces Under ConstructionThe project is a 22-story, 201-unit apartment building with 5 levels of parking and 16 levels of residential space. The 213,800 sq. ft. building will be 70% one bedroom and 30% two bedroom.

908 Nueces CondominiumsUnder ConstructionThe project replaces a 1-story bail bonds office with a 4-story (over 1 story of parking) condominium Aloft and Element Hotels Under ConstructionThe 7th and Congress project features two Starwood brand hotels, Aloft (278 rooms) and Element (144 rooms), with a 5,400-square-foot restaurant and bar with outdoor seating on Congress Avenue. The project is being developed by White Lodging of Indiana; HKS of Dallas is the architect, and DPR Construction is the lead contractor.Austin Energy Seaholm Substation Under ConstructionThis project is the reduction in size of the existing Austin Energy substation just east of the Seaholm Power Plant. The project includes an artist-designed perimter wall that is substantially complete.

Austin Proper Hotel & Residences PlannedTrammell Crow Company is working with hotel developer the Kor Group to build a 243-room hotel on Block 188 in the Green Water development,just south of the Austin Music Hall. The 32 story tower will also have 100 condominium units.

Austin American-StatesmanWaterfront PropertyPlannedThe owners of the property announced in February that they are soliciting mixed-use redevelopment proposals from qualified developers for the 18.9 acre South Congress Avenue site on the south shore of Lady Bird Lake.

Block 52 On HoldDevelopers are exploring options for this full-block site. Unencumbered by Capitol View Corridors, the site could have as much as 800,000 sq. ft. of office, residential and retail.

Central Health Brackenridge Campus Redevelopment PlannedCentral Health, Travis County's publicly funded health care district, is working with community partners and experts on the future reuse and redevelopment of its Brackenridge Campus, following the planned closing of University Medical Center Brackenridge in 2017. Central Health's Bracknridge Campus is a vital community asset that connects the new University of Texas Medical District, including Seton's new state-of-the-art teaching hospital that will replace UMC Bracken-ridge in 2017, with the Texas State Capitol Complex and Downtown Austin, including the city's envisioned Innovation Zone. The master plan was approved by the Central Health board of Managers on Jan. 27, 2016.

Dell Medical Health Discovery BuildingUnder ConstructionResearchers from all over campus, some of the world's best, will make their home in the wet and dry labs in the Health Discovery Building, where they'll also have access to advanced imaging equipment. A technology incubator will help bring their discoveries to market.

Dell Medical Health Transformation Building Under ConstructionConstruction is well underway on one of four buildings planned for the first phase of the Dell Medical School at UT Austin.

Dell Seton Medical Centerat The University of Texas Under ConstructionConstruction is underway on this 220-bed hospital, one of four buildings in the first phase of the Dell Medical School at UT Austin.

Downtown MetroRail Station ExpansionPlannedThe current downtown station on East Fourth Street has a single track and platform and room for one car lane in the block between Trinity and Neches streets. It could be expanded to two platforms and three tracks. The final design may move the station one block east of the current location.

East Austin Hotel PlannedPlans for The East Austin Hotel call for a roughly 29,000-square-foot complex with five buildings that each rise three stories. Plans also call for a swimming pool, courtyard, salon and restaurant.

East 9th Street MultifamilyPlannedThe project is a 147 unit apartment project with ground floor retail/restaurant.

Episcopal Church Block 87 PlannedThe block is made up of several components, intricately pieced together to maximize the usability of the site. These components are: an Archives builiding, two office builidings, under-ground parking, ground floor retail and the Residential tower. A Capitol View Corridor over most of the site, and surrounding sites, allows only a small corner to extend upwards beyond 5 floors. The project is planned to have 67,000 s.f. archives, 210,000 s.f. office space, 42,000 s.f. retail and 317,000 s.f. of residential.

Fairmont Hotel Under ConstructionManchester Texas Financial Group, a subsidiary of San Diego hotel developer Manchester Financial Group, is building a $370 million hotel with 37 stories and 1,066 rooms just east of the Austin Convention Center, at the northeast corner of Red River and Cesar Chavez streets, near Waller Creek. 125 of the rooms will be larger, high-end Fairmont Gold rooms with separate check-in, elevators and lounge. The hotel will have a direct connection to the Austin Convention Center through an elevated walkway.

Gables Republic Park / Hotel ZaZaUnder ConstructionSite excavation has started on this 24-story tower in downtown Austin that will have 221 luxury apartments atop a 159-room

Hotel ZaZa. The project, fronting on Republic Square Park, is expected to be completed in 2018.

Green Water Block 23 Under ConstructionConstruction started December of 2014 on this 29-story, 500,000 sq. ft. office tower that will have two ground-level restaurants. A major tenant of the building will be Google.

Green Water Block 185PlannedThe Green Water site consists of Blocks 1, 23, 185 and 188. Block 185 fronts Cesar Chavez and Shoal Creek.

Homewood Suites at East AvenueUnder ConstructionConstruction began in February on this 14-story, 150 room hotel, and is expected to wrap up in late 2017.

Hyatt House Hotel Under ConstructionConstruction has started on this 9-story, 192 room Hyatt House extended stay hotel.

The IndependentUnder ConstructionThe 58 story project, tallest in Austin, will have 370 residences (condos for sale) and 13,500 square feet of retail and restaurant space.

Intake and Utility BuildingsPlannedThe City of Austin wants to transform three former utility buildings located on prime land along Lady Bird Lake into public spaces. The City will issue a new project solicitation in the next few months.

Kline HotelPlannedThe site has been cleared for this 42-room boutique hotel with a small, 1,700 sq. ft. cafe.

Marriott Hotel at Cesar ChavezPlannedWhite Lodging Services Corp., downtown Austin s dominant hotel owner, has submitted plans to build another hotel just west of the Austin Conven-tion Center. The 27-story Marriott hotel will have 610 rooms and a high-turnover sit down restau-rant, and four levels of underground parking.

Mexic-Arte MuseumPlannedMexic-Arte is developing plans for a new 7-story (two underground) building to replace the current building on the southeast corner of Congress Avenue and E. 5th Street

New Central LibraryUnder ConstructionWork continues on the new central library, designed by the architectural team of Lake/Flato Architects and Shepley Bulfinch Richardson & Abbott. The new 198,000 sq. ft. central library will replace the 110,000 John Henry Faulk Central Library built in 1979. The new library site is on West Cesar Chavez Street, between Shoal Creek and the redeveloping Seaholm Power Plant. The Faulk library will be used for an expansion of the Austin History Center.

New Travis County Civil & Family CourthouseOn HoldTravis County purchased a full block just south of Republic Square, to construct a 500,000 sq. ft. civil and family courthouse. A bond election in November 2015 failed. The County is considering options.

New UT System Administration BuildingUnder ConstructionConstruction began in early 2015 and is scheduled to be complete the summer of 2017. The building will be eleven stories above eight levels of parking and will provide more than 300,000 square feet of office space, with over 200,000 square feet for immediate use by UT System and the remaining square footage avialable for lease. The System space will be designed to more efficient space standards than are feasible in the existing structures. The building will include a 760-car above and below ground parking garage.

Osten Hall PlannedThe project is a 4-story, mixed-use office building with retail and restaurant space and a robotic parking garage.

Rainey St. Hotel (formerly Kimber Modern)PlannedThis is a proposed 31 room hotel in the Rainey Street neighborhood, on the I-35 frontage road.

Republic Square, Phase IIPlannedConstruction started in May on the next phase of improvements to the 1 3/4 acre Republic Square Park. Phase II is a continuation of a design process in partnership with the Austin Parks Foundation. The scope of Phase II includes, but is not limited to, the design for site regrading, demolition and removal of pavement and obsolete water feature, tree protection and removel where recommended, pedestrian circulation and use areas, informal and flexible children's play area, site furnishings, signage, lighting, irrigation and ladscape improvements.

The RileyUnder ConstructionThe project will separate the existing loft from new office space with a firewall. A remodel of the first floor with an additional second floor will house office space. There will be a small pavilion and roof terrace at the third story. The residential loft will remain and be renovated. Below the office will be a basement parking area to be accessed by a ramp from the alley.

Rise (formerly Aspen Heights) Under ConstructionThe project is a 22-story, 201-unit apartment building with 5 levels of parking and 16 levels of residential space. The 213,800 sq. ft. building will be 70% one bedroom and 30% two bedroom.

Sabine Street Promenade PlannedThe project, now in design, is the construction of the Sabine Street pedestrian and bike promenade from 4th Street to 6th Street. It will be designed in accordance with the Waller Creek District Master Plan.

Saltillo District RedevelopmentPlannedThe proposed project calls for redeveloping the six-block, 10-acre site into a mixed-use communi-ty. The project will feature approximately 800 apartments, with at least 15 percent being deeply affordable, 110,000 square feet of retail, 120,000 square feet of office space and more than 1.8 acres of public open space with public art. The Red LIne tracks that bisected the site have been relocated to Fourth Street.

San Marcos Hotel PlannedThis is a proposed 30-room hotel on the northwest corner of E. 7th St. and San Marcos St.

Shoal Creek Walk, Building 1Under ConstructionSchlosser Development has begun construction of a substantial expansion of office space in the West End / Market District. The structure would be about 250,000 square feet and 15 stories tall.

Shoal Creek Walk, Building 2PlannedSchlosser Development is planning a structure would be about 184,000 square feet and 5 stories tall.

Spire PlannedSpire East Fifth LP plans to break ground this year on the project with more than 260 micro units — each about 400 square feet — at East Fifth and Waller streets. The five-story project will include below-ground parking, about 6,500 square feet of street-level retail and live-work space along Fifth Street, plus four floors of rental units with both market and below-market rents. About a quarter of the units will be set aside for people who earn 50 percent to 70 percent less than Austin s median family income.

Sutton Villas Site PlannedThe Sutton Co is planning a major mixed-use development. The tract housed on old condo project called the Villas on Town Lake.

Texas Association of Counties PlannedThe project is the construction of office space for the Texas Association of Counties.

Third + ShoalPlannedThe Austin Music hall is to be demolished to make way for a 29-story office building. Demolition of the 43,000-square-foot entertainment venue at 208 Nueces St. will occur in the next few months. Construction of the 345,000-square-foot building is scheduled to start in mid-2016 and deliver at the middle of 2018.

Travis County Ronnie Earle Building

Under ConstructionTravis County is building a 133,000 sq. ft., $40 million office builiding near the county criminal and civil courthouses downtown, which will include courtrooms, prosecutor's offices, retail space, a crime lab and underground tunnel connecting it to the main justic complex.

Trinity Place Tower On Hold World Class Capital Group, an Austin-based investment and asset management firm, has purchased a 1-acre tract across Trinity Street from the Four Seasons Residences. The applicant is proposing to construct a 39-story, 350-unit multifamily building with a ground floor restaurant.

Tyndall Condos at Robertson Hill PlannedThe project is a 182-unit condominium develop-ment on E. 9th St. overlooking downtown Austin.

UT System - Block 71PlannedOnce the new UT System Administration Building (UT5) is completed, the property housing Claudia Taylor Johnson Building and Ashbel Smith Hall will be ground leased, and therefore available for improvement or redevelopment.

Waller Creek Flood Diversion Tunnel Under ConstructionThe Waller Creek Tunnel Project is a stormwater bypass tunnel from Waterloo Park to Lady Bird Lake near Waller Beach. The tunnel is 20.5 26.5 feet in diameter and almost one mile long. The project will remove an estimated 1,243,000 square feet of land from the floodplain of the lower Waller Creek watershed, will allow denser development in a very desirable area of downtown, and divert floodwaters that create erosion problems and safety concerns. Construction started in 2010 and will be completed in 2016.

Waller Park Place Planned The 1.4 million square foot project, as envisioned, would have three towers with 300,000 sq. ft. of office, a 150-room hotel, 498 residential units and 60,000 sq. ft. of retail. Demolition was completed in February 2016, and construction is expected to begin in 2016.

Waterloo Tower HotelPlannedThis is a proposed 260 room hotel on the site of the former Brick Oven Pizza, east of Waterloo Park and south of UMC Brackenridge.

West Sixth Micro Project PlannedThe project is a 172-unit mid-rise apartment building with a ground floor restaurant.

Page 4: Third + Shoal Waller Creek Flood Diversion Tunnel San ... · residences at East Fifth and Brazos streets. The tower will include 333 hotel rooms, 329 apartments and 2 restaurants

Saltillo District RedevelopmentPlannedThe Capital Metro Board has selected Endeavor Real Estate and Columbus Realty to redevelop the 10-acre space. The project, as proposed, will have approximately 800 residential units (200 of which will be affordable housing, and a portion of which will be set aside for senior housing), over 100,000-square-feet of retail, and a grocery store along the I-35 frontage road. There will be a 1.7-acre park and 1.8 acres of private open space.

San Marcos Hotel PlannedThis is a proposed 30-room hotel on the northwest corner of E. 7th St. and San Marcos St.

Seaholm Power Plant RedevelopmentUnder ConstructionSeaholm Power, LLC, led by Southwest Strategies Group, is redeveloping the circa 1950 Art Deco Seaholm Power Plant and adjacent property, into a high quality, mixed-use attraction. The project will feature a mix of office space, a Trader Joe’s grocery store, local retail shops, contemporary condos, special event space and an outdoor terrace that overlooks Lady Bird Lake.

Shoal Creek Walk, Building 1Under ConstructionSchlosser Development has begun construction of a substantial expansion of office space in the West End / Market District. The structure would be about 250,000 square feet and 15 stories tall.

Shoal Creek Walk, Building 2PlannedSchlosser Development is planning a structure would be about 184,000 square feet and 5 stories tall.

Spire PlannedSpire East Fifth LP plans to break ground next year on the project with more than 260 micro units - each about 400 square feet - at East Fifth and Waller streets. The five-story project will include below-ground parking, about 6,500 square feet of street-level retail and live-work space along Fifth Street, plus four floors of rental units with both market and below-market rents. About a quarter of the units will be set aside for people who earn 50 percent to 70 percent less than Austin s median family income.

Third + ShoalPlannedThe Austin Music Hall is to be demolished to make way for a 29-story office building. Demolition of the 43,000-square-foot entertainment venue at 208 Nueces St. will occur in the next few months. Construction of the 345,000-square-foot building is scheduled to start in mid-2016 and deliver at the end of 2017.

Travis County Ronnie Earle BuildingPlannedTravis County plans to build a 133,000 sq. ft., $40 million office building near the county criminal and civil courthouses downtown, which would include courtrooms, prosecutors’ offices, retail space, a crime lab and underground tunnel connecting it to the main justice complex.

Trinity Place Tower PlannedWorld Class Capital Group, an Austin-based investment and asset management firm, has purchased a 1-acre tract across Trinity Street from the Four Seasons Residences. The applicant is proposing to construct a 39-story, 360-unit multifamily building with a ground floor restaurant.

UT System - Block 71PlannedOnce the new UT System Administration Building (UT5) is completed, the property housing Claudia Taylor Johnson Building and Ashbel Smith Hall will be ground leased, and therefore available for improvement or redevelopment.

Waller Creek Flood Diversion Tunnel Under ConstructionThe Waller Creek Tunnel Project is a stormwater bypass tunnel from Waterloo Park to Lady Bird Lake near Waller Beach. The tunnel is 20.5 - 26.5 feet in diameter and almost one mile long. The project will remove an estimated 1,243,000 square feet of land from the floodplain of the lower Waller Creek watershed, will allow denser development in a very desirable area of downtown, and divert floodwaters that create erosion problems and safety concerns. Construction started in 2010 and will be completed in 2016.

Waller Park Place PlannedThe 1.4 million square foot project, as envisioned, would have three towers with 300,000 sq. ft. of office, a 150- room hotel, 498 residential units and 60,000 sq. ft. of retail. Demolition was completed in February 2016, and construction is expected to begin in Spring 2016.

Waterloo Tower HotelPlannedThis is a proposed 260 room hotel on the site of the former Brick Oven Pizza, east of Waterloo Park and south of UMC Brackenridge.

DOWNTOWN AUSTIN

Independence Title

E M E R G I N G P R O J E C T S

Osten Hall PlannedThe project is a 4-story, mixed-use office building with retail and restaurant space and a robotic parking garage.

Rainey St. Hotel (formerly Kimber Modern)PlannedThis is a proposed 31 room hotel in the Rainey Street neighborhood, on the I-35 frontage road.

Republic Square, Phase IIPlannedThe City of Austin has contracted with a design team for the next phase of improvements to the existing 1 ¾ acre Republic Square Park. Phase 2 is a continuation of a design process in partnership with the Austin Parks Foundation. The scope of Phase 2 includes, but is not limited to, the design for site regrading, demolition and removal of pavement and obsolete water feature, tree protection and removal where recommended, pedestrian circulation and use areas, informal and flexible children’s play area, site furnishings, signage, lighting, irrigation and landscape improvements.

The RileyUnder ConstructionThe project will separate the existing loft from new office space with a firewall. A remodel of the first floor with an additional second floor will house office space. There will be a small pavilion and roof terrace at the third story. The residential loft will remain and be renovated. Below the office will be a basement parking area to be accessed by a ramp from the alley.

Rise (formerly Aspen Heights) Under ConstructionThe project is a 22-story, 201-unit apartment building with 5 levels of parking and 16 levels of residential space. The 213,800 sq. ft. building will be 70% one bedroom and 30% two bedroom.

Sabine Street Promenade PlannedThe project, now in design, is the construction of the Sabine Street pedestrian and bike promenade from 4th Street to 6th Street. It will be designed in accordance with the Waller Creek District Master Plan.

SOURCE: City of Austin Economic Development Department

Independence TitleIndependenceTitle.comLEARN

MORE

IndependenceTitle.comLEARNMORE

Page 5: Third + Shoal Waller Creek Flood Diversion Tunnel San ... · residences at East Fifth and Brazos streets. The tower will include 333 hotel rooms, 329 apartments and 2 restaurants

Lady Bird Lake

Lady Bird Lake

Lady Bird Lake

Auditorium Shores

Butler Park

Palm Park

WaterlooPark

Eastwoods Park& Wading Pool

W DEAN KEATON ST

E 26th St24TH STREET

W 7TH STREET

W 6TH STREET

W 5TH ST

E 2ND STREET

W CESAR CHAVEZ

CONG

RESS

AVE

GUAD

ALPE

STR

EET

LAVA

CA S

TREE

T

N LA

MAR

BLV

D

N LA

MAR

BLV

D

N L

AMAR

BL

VD

W 15TH STREET

MARTIN LUTHER KING W

MARTIN LUTHER KING E

GUAD

ALUP

E ST

W 6TH STREETW 5TH STREET

ENFIELD RD

ENFIELD RD

E 7TH STREETE 6TH STREET

E 5TH STREET

BARTON SPRINGS RD

W RIVERSIDE DR

S 1S

T ST

REET

SABIN

E ST

W RIVERSIDE DRS

1ST

STRE

ET

CONG

RESS

AVE

WINDSOR RD.

E Cesar Chavez

1

NFrankErwinCenter

Medical Centerat Breckenridge

W 9TH STREET

W 4TH STREET

W 3RD STREET

RED R

IVER

ST

SAN

JACIN

TO B

LVD

WES

T AV

E

W 11TH STREET

E 9TH STREET

E 3RD STREET

TRIN

ITY

ST

W 7TH ST

TOOMEY RD

B

ARTO

N DR

NUEC

ES ST

SAN

ANTO

NIO

ST

E 8TH STREET

BRAZ

OS ST

COLO

RADO

RAIN

EY ST

RIVER ST

HEND

ERSO

NWOO

D ST.

DAVIS ST

DRISKELL ST

BRUS

HY

BOW

IE ST.

E 10TH STREET

E 11TH STREET

E 12TH STREET

NAVA

SOTA

ST

NAVA

SOTA

ST

COMA

L ST

W 3RD ST

HOLLY ST

HOLLY ST

NAVA

SOTA

ST

WALL

ER S

T

HASKELL ST

LAMBIE ST

CLERMONT AVE

FLORES ST

CANA

DIAN

ST

SAYE

RS ST

W 27TH STREET

HARR

IS PA

RK

SPEE

DWAY

SPEE

DWAY

W 25TH ST

W 22 1/2 ST

W 22ND ST

W 21ST STREET

W 18TH STREETW 17TH STREET

W 16TH STREETW 14TH STREET

W 13TH STW 12TH STREET

W 11TH STREET

W 10TH STREET

W 8TH STREET

RIO G

RAND

E ST

WES

T AVE

TRIN

ITY ST

COLO

RADO

ST

PEAR

L ST

JESTER CIRCLE

W 22ND STREET

LEON

ST

RIO

GRAN

DE S

T

E 32ND STREET

RED R

IVER

ST

RED R

IVER

ST

ROBE

RT

E 21ST STREET

HIGHL

AND A

VE BLAN

CO S

T

ELM

PALMA PLAZA

OAKL

AND A

VE W 10TH ST

W 9TH ST

W 13TH ST

W 10TH ST

W LY

NN S

T

NILES RD

POLO

WINDSOR RD

W 12TH STW

EST

AVE

PEAR

L ST

W 25 1/2 ST GRAHAM

W 26TH ST

SAN

GABR

IEL S

T

SAN

JACI

NTO

BLV

D

NUEC

ES S

TREE

T

WINFLO

DRPRES

SLER

ST

NUEC

ES S

TREE

T

SAN

ANTO

NIO

ST

PARK PL

MetroRail

AMTRAK STATION

WINDSOR RD

WINDSOR RD E

PEMBE

RTON P

KWY

PEAS

E RDWOO

DLAW

N BLV

D

NORTHUMBERLAND RD

24TH STREET

DEDM

AN

TRINITY ST

E 4TH STREET

COMA

L STNA

VASO

TA S

T

WALL

ER S

T

E 2ND STREET

E 3RD STREET

CHAL

MERS

AVE

W 12TH STREET

E 13TH ST

E 14TH STREET

WAL

LER

ST

OakwoodCementary

DISCH-FALKFIELD

DARRELL KROYAL

MEMORIALSTAIDUM

West AustinPark

DuncanPark

PeaseDistrict

Park

HousePark

CharlesForest

W 9TH ST

LORR

AIN S

TSH

ELLE

Y AVE

MAUFR

AIS S

T

RIO

GRAN

DE S

T

W 23RD ST

W 23RD ST

W 22 1/2 ST

SAN

ANTO

NIO

STE 15TH STREET

BARTON SPRINGS RD

CONG

RESS

AVE

BAYL

OR ST

BAYL

OR ST

CAST

LE C

T

KINGSBURY ST

PARK

WAY

MARSH

ALL L

N

WOO

DLAW

N BL

VD

Shoal Beach

EAST

AVE

SAN

MARC

OS S

T

NUEC

ES ST

NUEC

ES ST

RIO G

RAND

E ST

SAN

JACIN

TO B

LVD

RED R

IVER

ST

TRIN

ITY

STSAN

JACIN

TO B

LVD

BRAZ

OS STCO

LORA

DO

NECH

ES

ST

NECH

ES S

T

JUNIPER STREET

Copyright©2017-IndependenceTitleCompany

17

LYDI

A ST

58

1

1819

Medical Center

E 15TH STREET16

20

3

2

5

CONG

RESS

AVE RED R

IVER

ST

W CESAR CHAVEZ31

32

TRIN

ITY

ST

33

34W CESAR CHAVEZ

W CESAR CHAVEZ

35

36

37

E 6TH STREET38

EAST

AVE

39

40

W 3RD STREET

COLO

RADO

41

42

43

E 7TH STREET

44

45

46

47

48

DAVIS STDAVIS STDAVIS ST

DRISKELL STDRISKELL ST

57

49

NUEC

ES ST

NUEC

ES ST

51

52

53

54

55

SABIN

E ST

56

59

CONG

RESS

AVE50

405 Colorado Office BuildingPlanned]

422 (Broadstone) at the LakeUnder Construction

48 East Planned

5th & Brazos Hotel Planned

5th + West Under Construction

6th and Nueces Hotel SitePlanned

721 Congress / The AvenuePlanned

70 Rainey StreetPlanned

8th & Nueces Under Construction

908 Nueces CondominiumsUnder Construction Aloft and Element Hotels Under Construction Austin Energy Seaholm Substation Under Construction Austin Proper Hotel & ResidencesPlanned

Austin American-StatesmanWaterfront PropertyPlanned

Block 52 On Hold

Central Health Brackenridge Campus Redevelopment Planned

Dell Medical Health Discovery BuildingUnder Construction

Dell Medical HealthTransformation Building Under Construction

Dell Seton Medical Centerat The University of Texas Under Construction

Downtown MetroRail Station ExpansionPlanned

East Austin Hotel Planned

East 9th Street MultifamilyPlanned

Episcopal Church Block 87 Planned

Fairmont Hotel Under Construction

Gables Republic Park / Hotel ZaZaUnder Construction

Green Water Block 23 Under Construction

Green Water Block 185Planned

Homewood Suites at East AveUnder Construction

Hyatt House Hotel Under Construction

The IndependentUnder Construction

Intake and Utility BuildingsPlanned

Kline HotelPlanned

Marriott Hotel at Cesar ChavezPlanned

Mexic-Arte MuseumPlanned

New Central LibraryUnder Construction

New Travis County Civil & Family CourthouseOn Hold

New UT System Administration BuildingUnder Construction

Osten Hall Planned

Rainey St. Hotel (formerly Kimber Modern)Planned

Republic Square, Phase IIPlanned

The RileyUnder Construction

Sabine Street Promenade Planned

Saltillo District RedevelopmentPlanned

San Marcos Hotel Planned

Shoal Creek Walk, Building 1Under Construction

Shoal Creek Walk, Building 2Planned

Spire Planned

Sutton Villas Site Planned

Texas Association of Counties Planned

The Contemporary Austin-Jones Center Renovation Under Construction

Third + ShoalPlanned

Travis County Ronnie Earle BuildingUnder Construction

Trinity Place Tower On Hold

Tyndall Condos at Robertson Hill Planned

UT System - Block 71Planned

Waller Creek Flood Diversion Tunnel Under Construction

Waller Park Place Planned

Waterloo Tower HotelPlanned

West Sixth Micro Project Planned

SOURCE: City of Austin Economic Development Department

2nd StreetA shopper's paradise under construction — the Second Street Retail District is a specially designed haven located in the heart of high-rises and casual living. Sidewalk cafés and distinctly Austin shops will join with major retailers for a truly unique shopping experience.

6th Street DistrictThis National Register Historic District has an international reputation as a great entertainment area. Live music runs the gamut from jazz, blues, and country to rock, hip-hop, and derivations of these and other genres. You'll find every kind of food throughout the area, including such regional staples as chili, ribs, and Tex-Mex plus steak, seafood, cajun-cooking, and deli delights.

Arts DistrictLocated near the Bob Bullock Texas State History Museum, this district is home to many small galleries and artist's studios.

Congress DistrictAffectionately referred to as "the Main Street of Texas," Congress Avenue provides one of the most beautiful vistas northwards towards the State Capitol. In addition to shops, galleries and restaurants, Congress Avenue is home to the Austin Museum of Art, Mexic-Arte Museum, ArtHouse at the Jones Center, and the Paramount and State Theaters.

Downtown Districts Convention AreaThe Austin Convention Center is 881,400 gross square feet and covers six city blocks. Located on six city blocks in the heart of Austin’s downtown business district alongside Waller Creek. Metrorail’s station is conveniently located right next to the convention center.

The DragThis area is full of stores, coffee shops, bookstores and is located across from the University of Texas on Guadalupe Street.

East EndCross to the east of IH-35 for wonderful scenes from Austin and Texas history such as the Texas State Cemetery and the French Legation. You'll also find unique restaurants, galleries and entertainment venues as well as a view to Austin's future with progressive new redevelopment projects such as the East End project.

Market DistrictNamed after the Whole Foods corporate headquarters and mega-grocery store, the Market District is one of Downtown's newest emerging districts to live, work and play. Chic urban living, shopping and dining in the heart of Downtown make this the perfect location of a modern, healthy lifestyle for all ages.

Red RiverHome for years to the famous Stubb's BBQ and Symphony Square, this emerging district is fast becoming one of Austin's hottest live music scenes. If punk, rock or alternative country music is your thing, then this is the place for you.

Warehouse DistrictLocated between Guadalupe Street and Congress Avenue from 3rd to 6th Street. The Warehouse district is the upscale cousin to 6th street. A bit trendier, it caters to a slightly older crowd than the other downtown entertainment areas. True to its name, the restaurants and clubs in this district have been renovated from former warehouses into trendy restaurants, top-notch concert halls, and distinctive bars. with live music is everywhere.

West CampusWest Campus is home to students, young families, and professors. The area’s architecture is diverse, with 80-year-old buildings are often found next door to modern condos and apartments. Craftsman homes, bungalows, historic mansions, duplexes, and apartments can all be found in this area despite its small geographic size.

West EndIf you cast designing eyes west, you'll see Austin's West End or, what some people think of as the design district. This quaint neighborhood features shopping, restaurants, galleries, and antique stores.

University of TexasA campus of more than 50,000 students, the University of Texas is one of the largest public universities in the nation. Also located on the University grounds you will find the UT Tower, the LBJ Library and Museum, the Frank Erwin Center, the Jack S. Blanton Museum of Art, the Harry Ransom Center for the Humanities, the University of Texas Performing Arts Center and the Darryl K. Royal Memorial Stadium.

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

405 Colorado Office BuildingPlanned]

422 (Broadstone) at the LakeUnder Construction

48 East Planned

5th & Brazos Hotel Planned

5th + West Under Construction

6th and Nueces Hotel SitePlanned

721 Congress / The AvenuePlanned

70 Rainey StreetPlanned

8th & Nueces Under Construction

908 Nueces CondominiumsUnder Construction

Aloft and Element Hotels Under Construction

Austin Energy Seaholm Substation Under Construction

Austin Proper Hotel & ResidencesPlanned

Austin American-StatesmanWaterfront PropertyPlanned

Block 52 On Hold

Central Health Brackenridge Campus Redevelopment Planned

Dell Medical Health Discovery BuildingUnder Construction

Dell Medical HealthTransformation Building Under Construction

Dell Seton Medical Centerat The University of Texas Under Construction

Downtown MetroRail Station ExpansionPlanned

East Austin Hotel Planned

East 9th Street MultifamilyPlanned

Episcopal Church Block 87 Planned

Fairmont HotelUnder Construction

Gables Republic Park / Hotel ZaZaUnder Construction

Green Water Block 23 Under Construction

Green Water Block 185Planned

Homewood Suites at East AveUnder Construction

Hyatt House Hotel Under Construction

The IndependentUnder Construction

Intake and Utility BuildingsPlanned

Kline HotelPlanned

Marriott Hotel at Cesar ChavezPlanned

Mexic-Arte MuseumPlanned

New Central LibraryUnder Construction

New Travis County Civil & Family CourthouseOn Hold

New UT System Administration BuildingUnder Construction

Osten Hall Planned

Rainey St. Hotel (formerly Kimber Modern)Planned

Republic Square, Phase IIPlanned

The RileyUnder Construction

Sabine Street Promenade Planned

Saltillo District RedevelopmentPlanned

San Marcos Hotel Planned

Shoal Creek Walk, Building 1Under Construction

Shoal Creek Walk, Building 2Planned

Spire Planned

Sutton Villas Site Planned

Texas Association of Counties Planned

The Contemporary Austin-Jones Center Renovation Under Construction

Third + ShoalPlanned

Travis County Ronnie Earle BuildingUnder Construction

Trinity Place Tower On Hold

Tyndall Condos at Robertson Hill Planned

UT System - Block 71Planned

Waller Creek Flood Diversion Tunnel Under Construction

Waller Park Place Planned

Waterloo Tower HotelPlanned

West Sixth Micro Project Planned

SOURCE: City of Austin Economic Development Department

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

31

32

DOWNTOWNAUSTIN

EMERGING PROJECTS

Independence TitleIndependenceTitle.comLEARNMORE

59