0 TURKEY POINT PLANT UNIT 3 1997 REFUELING OUTAGE INSERVICE INSPECTION REPORT The required examinations scheduled during the Turkey Point Unit 3 refueling outage were completed. This completes the ISI requirements for the first refueling outage of the second period .of the third inspection interval. 100% of the A, B, and C steam generator tubes were eddy current tested. 14 tubes were plugged during this outage. The. NIS-2 forms discuss the repairs and replacements which took place since the previous Unit 3 submittal and during the 1997 refueling/ maintenance outage. Visual examination and functional testing of snubbers was completed in accordance with ASIDE Section XI and Technical Specifications. Visual examinations did not reveal any failures. There were no snubber failures in the, safety related functional test sample. The inservice inspection summary tables detail the examinations ~ ~ ~ ~ ~ ~ ~ ~ ~ performed during the first outage of the second period of the third ten-year interval. Selected Class 1 and 2 piping and supports were examined with surface, volumetric, and visual examination techniques in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and the Turkey Point Units 3 and 4 ISI Program. 0 9707fh0096 9707i0 PDR ADQCK 05000250 8 PDR

Upload: others

Post on 19-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0 TURKEY POINT PLANTUNIT 3

1997 REFUELING OUTAGE INSERVICE INSPECTION REPORT

The required examinations scheduled during the Turkey Point Unit3 refueling outage were completed. This completes the ISIrequirements for the first refueling outage of the second period.of the third inspection interval.100% of the A, B, and C steam generator tubes were eddy currenttested. 14 tubes were plugged during this outage.

The. NIS-2 forms discuss the repairs and replacements which tookplace since the previous Unit 3 submittal and during the 1997refueling/ maintenance outage.

Visual examination and functional testing of snubbers wascompleted in accordance with ASIDE Section XI and TechnicalSpecifications. Visual examinations did not reveal any failures.There were no snubber failures in the, safety related functionaltest sample.

The inservice inspection summary tables detail the examinations~

~ ~

~

~

~

~

~

~

performed during the first outage of the second period of thethird ten-year interval.Selected Class 1 and 2 piping and supports were examined withsurface, volumetric, and visual examination techniques inaccordance with Section XI of the ASME Boiler and Pressure VesselCode and the Turkey Point Units 3 and 4 ISI Program.

09707fh0096 9707i0PDR ADQCK 050002508 PDR

Page 2: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 3: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

TURKEY POINT UNIT 3

1997 REFUELING OUTAGE

Form NIS-1 Owners'ata Report-for Inservice Inspections

Page 4: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 5: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONSPage 1 of 6

1. Owner:

2. Plant:

Florida Power and Light Company, 700 UniverseBlvd. juno Beach, Florida 33408

Florida Power & Light Company, Turkey PointNuclear Power Plant, 9760 S.W. 344th Street,Florida City, Florida 33035

3 ~ Plant Unit:~Owner Certificate of Authorization (if recpxired)

Commercial Service Date

6 National Board Number for Unit:

7 ~ Components Inspected:

Component orAppurtenance

Manufactureror Installer

Manufacturer State o Nat'lor Installer Province BoardSerial No. No. No.

Reactor Pressure Vessel

Reactor Coolant Pump B

Regenerative HeatExchangerRHR Heat Exchan er A

Safety In'ection System

Residual Heat Removal

Main Feedwater System

Main Steam System

Babcock andWilcoxWestinghouseWestinghouse

AtlasBechtel-BechtelBechtel

Bechtel

3PSRV1

3P200B

3E200

3E206A

N/A

N/A

N/A

N/A

N/A N-160

N/A N/A

N/A N/A

N/A N/A

N/A N A

N/A N A

N/A N/A

N/A N/A

.8 ~ Examination Dates : From to

9 ~ Inspection Period Identification : Second Period—

10 'nspection Interval Identification: Third Interval, from

11. Applicable Edition of Section XI ~39 Addenda ~ug12. Date/Revision of Inspection Plan:

Page 6: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed
Page 7: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

NIS-1 Report (continued) Page 2 of 6

1.2e3 ~

4.5.6.

Owner: Florida Po~er 8 Light Company, 700 Universe Blvd. Juno Beach, Florida 33408Plant: Turkey Point Nuclear Power Plant, 9760 S.W. 344th Street, Florida City, Florida 33035Plant Unit:~Owner Certificate of Authorization (if required)ComInercial Service Date :National Board Number for Unit:

13. Abstract of examinations and test. Include a list ofexaminations and tests and a statement concerning status ofwork required for the inspection plan.

An Inservice Examination of selected Class 1 and 2 components andpiping systems of Florida Power and Light's Turkey Point Unit 3was performed during the 1997 Refueling Outage. This. outagebegan on March 3, 1997 and ended on April 16, 1997. This was thefirst outage of the second period of the third ten year interval.The components and piping systems examined were selected inaccordance with the Third Ten Year Inservice Inspection Program,which was prepared in accordance with the requirements of theASME Section XI, 1989 Edition.

Manual ultrasonic, visual, magnetic particle, and liquidpenetrant non-destructive techniques were used to examinecomponents, piping, and their supports. The examinations wereperformed'y FPL personnel, supported by examiners supplied byRaytheon Engineers & Constructors.

Eddy Current testing was conducted on the three Steam Generators.A total of 9574 tubes were examined. Fourteen tubes requiredplugging. See the NIS-BB for details of the examinations.

Several Class 1, 2, 3, MC, and CC areas were repl'aced or repairedsince the last Summary Report was submitted. See the attachedNIS-2 reports for a summary.

The Steam Generator Feedwater Nozzle piping augmentedexaminations were conducted during this outage on all threeloops. The entire area from the nozzle ramp to a point one pipediameter out on the far side of the elbow was examined withultrasonics. No reportable indications were noted.

Snubber functional testing and visual examinations were conductedin accordance with ASME Section XI and Turkey Point TechnicalSpecifications as allowed under Relief Request number 4.Examinations were performed by Raytheon, Inc. and testingservices were supplied by Basic-PSA, Inc.

System -Pressure testing was conducted by the plant to ASMESection XI and applicable Plant Procedures.. One thimble tube wasfound to have a through wall leak. It was replaced and retested.Several mechanical connections were found to have leaks. Thesewere all corrected. Leakage was detected at 2 RHR valve bonnets.

Page 8: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

0

Page 9: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

NIS-l Report .(continued) Page 3 of 6

e,,'4 ~

5.6.

Owner: Florida Power S Light Company, 700 Universe Blvd. Juno Beach, Florida 33408Plant: Turkey Point Nuclear Po~er Plant, 9760.S.M. 344th, Street, Florida City, Florida 33035Plant Unit:~O~ner Certificate of Authorization (if required)Comnercial'Service Date .:National Board Number for Unit:

The bolt nearest the source of leakage was VT-l examined'ndfound to be acceptable. During, the outage, the bolting on- thetwo valves;was removed,and examined. No other .leakage wasreported.

All Quality Group A, B, and C pressure tests required for the.first period of the third inservice inspection interval werecompleted.

A listing of examinations performed is attached to this summary.

The examinations performed during the outage meet therequirements of the Inspection Plan.

14. Abstract of Results of Examinations and Tests.

The seal surface on the Reactor Pressure Vessel head was examinedusing remote Visual techniques. No reportable indications werenoted.

Eddy Current testing was conducted on all three Steam Generators.See the 'NIS-BB for details.

A 'VT-3 examination was, performed near the beginning of the outageto look for accumulated, boron crystals and evidence of leakage.A VT-2 examination was,performed during the system pressure testat plant startup. These .examinations were performed to meet theapproved alternative requirements in Relief Request No. 3. Noreportable indications were detected.

t The "B" R'eactor Coolant Pump Flywheel was examined in accordancewith Technical Specifications. ,No reportable indications were.

Page 10: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

'f

Page 11: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

NIS-1 Report (continued) Page 4 of 6

4 ~

5.6.

Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408Plant: Turkey Point Nuclear Power Plant, 9760 S.W; 344th Street, Florida City, Florida 33035Plant Unit:~Owner Certificate of Authorization (if required)Comnercial Service Date :National Board. Number for Unit:

noted.

Residual Heat Exchanger A was examined using surface andvolumetric techniques. A round indication was found on the endof one of the integral attachments with Liquid Penetrant. Anengineering evaluation determined the indication to be amanufacturing process deficiency. The attachment has a partialpenetration weld on the front side, and a cover weld on the backside. The indication was a result of the two welds not beingjoined at the end of the attachment, and was an acceptablecondition. It was not a material or welding flaw, and is outsidethe scope of Section XI. No other indications were noted.

The support on RHR Pump 3P210A was examined .with visualtechniques. A bent bolt was found and accepted as-is byengineering evaluation. An engineering evaluation determined thesupport was outside the scope of Section XI. It is part of thebuilding structure, with the pump body allowed to slide on top ofan embedded plate. Both RHR pump supports have been removed fromthe ISI Program.

Residual Heat Removal piping welds and supports were examinedusing visual, surface and volumetric techniques. Acceptableround and geometric indications were noted. No reportableindications were. noted.

Safety Injection piping and .supports were examined using visual,surface and volumetric techniques. No reportable indicationswere noted.

During the outage, the Boron Injection Tank was bypassed and~

~

~

~ ~

~ ~

abandoned in place. The piping welds to the tank were removed

Page 12: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

ik

Page 13: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

NIS-1 Report (continued) Page- 5 of 6

4 ~

5.6.

Owner: Florida. Power S Light ComPany, 700'Universe Blvd. Juno Beach, Florida 33408Plant:. Turkey Point Nuclear Power Plant, 9760 S.M. 344th Street, Florida City, Florida 33035Plant Unit:~O~ner Certificate of Authorization (if required)Conmercial Service Date:National Board Number for Unit:

from service and several new welds were added to bypass the tank.See the examination tables for information on which-welds- andcomponents were affected.

Main Steam piping, was examined using surface and volumetrictechniques. Acceptable geometric indications were noted. Noreportable indications were noted.

Augmented volumetric examinations were performed on the feedwaterpiping out from the Steam Generator nozzle. Acceptable geometricand slag indications were found. No reportable indications werenoted.

15. Abstract of Corrective Measures

There were no corrective actions required as. a result of ISIexaminations. Several acceptable rounded indications wereremoved for maintenance reasons as part of additional, surfacepreparation.

Page 14: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

il

ib

Page 15: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

NIS-1 Report (continued) 'Page 6 of 6:4 ~

5 ~

6.

Owner: Florida Power 8 Light Company, 700 Universe Blvd.'uno Beach, Florida 33408Plant: Turkey Point Nuclear Power Plant, 9760 S.M. 344th Street, Florida City, Florida 33035Plant Unit:~Owner Certificate of Authorization (if required>Comnercial Service Date :National Board Number for Unit:

We certify that a) the statements made in this report arecorrect, b) the examinations and tests meet the Inspection Planas required by the ASME Code, Section XI, and c) correctivemeasures taken conform to the rules of the ASME Code, Section XI.

Certificate of Authorization No.

Expiration Date

Date: Signed:

By:

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by theNational Board of Boiler and Pressure Vessel Inspectors and theState or Province of Dade County, Florida, and employed byArkwright Mutual Insurance Company of Norwood, Massachusetts,have inspected the components described in this Owner's Reportduring the period 3/3/97 to 4/16/97, and state that to the bestof my knowledge and belief, the Owner has performed examinationsand tests and taken corrective measures described in the Owner'sData .Report in accordance with'he Inspection Plan and asrequired by the ASME Code, Section XI.

By signing this certificate, neither the inspector nor hisemployer makes any warranty, expressed or implied, concerning theexaminations, tests, and corrective measures described in thisOwner's Report. Furthermore, neither the Inspector nor hisemployer shall be liable in any manner for any personal injury orproperty damage or a loss of any kind arising from or connectedwith this inspection.

spect 's S'ature National Board, State,Province, and .Endorsements

Date: 8 r~

Page 16: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Eg

lt ~ii, 4

Page 17: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

TURKEY POINT UNIT 3

1997 REFUELING OUTAGE

Form NIS-2 Owners'ata Report of Repairs and Replacements

Page 18: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 19: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH NIS 2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 12 06 95

700 Universe Blvd. Juno Beach Fl'. 33408Address

Sheet 1 of 2

2. Plant Turke Point PlantName

Uni t 3PWO ¹:4229/63 WO ¹: 95032858

9700 S'W 344 Street Florida Cit Fl. 33034

Address Repair Organization P.O. 'No.,Job No.,etc

3. Work Performed by Florida Power & Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol Stamp N A

Authorization Ho. N A

Expiration Date N A

4. Identification of System:

5. (a) Applicable Construction Code 831.1'955 Edition, NA Addenda,~N A Code Case

INTAKE COOLING MATER System ¹: 19 Qual I ty Group: C

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name ofCocponent

Name ofHanufacturer

(Manufacturer) Nationalf Serial Ho.

JBoard

I I

I I

OtherIdentification

[Year J. RepairedJ

ASHE t[Built( Replaced or ) Code

J

f Reptacement JSterp (

I I /~Yes llo

[ INTAKE COOLING

IMATER PUHP

.IJONHSTOH

PUHP

[N/A )H/A iHOOEL 33 CHC I ST-5 /UNK~ (Replaced iNo3P9A

JINTAKE COOLING

CWATER PUHP

IBOLTS (40)

/ 1-1 4"-7-UN-2A

IJOHNSTOH

PUHP

iH/A

IH/A fH/A [MODEL 33 CHC IST-2 JUNK. ]Replacement ]Ho3P9A

IN/A ]H/A (R90-0831 ASHE SA-307 GR 8 fUNK. /Replacement )Ho3P9A

7.'Description of Mork: 3A INTAKE COOLING WATER PUHP IST-5 REPLACED WITH SPARE IST-2.

Pneunatict Hominal Operating Pressure X

Pressure 15 psig Test Temperature 76 ;F

95-064-3

Page 20: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORM NIS-2 (Back)4l

9. Remarks: HEcMAMIcAL coNNEGTIoM No 'WELDING REoUIRED.

CERTIFI~CATE OF COMPLIANCE

Me certify that the. statements made in the report are correct and this replacenmnt confonas to the r'ules of theASHE Code, Section XI.

Type Code Symbol Stamp

Certificate

Signed /

thori tion No„ M~A

.'+M~jPcl~~N~ix.'QP-'wner'or

Owner''Oesignee, Title

~ Expiration Date

Oate ~/I~~NA

19 '0CERTIFICATE OF INSLRVICE I',NSPECTIOM

I, the undersigned, holding a valid caanission issued by'hLI Na'tional Boar'd of Boiler and Pressure Vesselinspectors and the state or Province of, Onde County and.employed by Arkwright.Hutual Insurance Company ofNorwood, Ha. have inspected the components described'n this owners Report during the period 11/21/95 'o12/06/95 arid state that to the best of my knowledge and balief, t'e Owner has performed examihations'ndtaken corrective measures described in this Owners Report i'n adcordande with the requirements of the ASHE'ode,Section Xt.

By signing this certi'ficate neither the Inspector nor his enpioyer makes any warranty, expressed orimplied, concerning the examinations and corrective measurea doser'ibed in'hi's.Owner's Repo'rt.'Fur'thekmore,neither the Inspector nor his eeployen shall be liable in ariy amnnier for any personal injury or propertydamage or a loss of any kind arising from or connected with this inspection.

Inspector SignQa,ureComnissions ' MB'23~0II~I~

~ Nationhi Board, State, Providence, and Endorsements

'I9

95-064-3

Page 21: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM HIS ~ 2 OWNERS REPORT FOR REPAIRS OR REPLACEHEN'IS

As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 12 05 95

700 Universe Blvd. Juno Beach Fl. 33408

Address

Sheet 1 of 2

2. Plant Turke Point Plant Unit 3PWO ¹:63/4109 WO ¹: .95032545

9700 SW 344 Street 'Florida Cit .Fl. 33034

Address Repair Organization P.O. No.,Job Mo.,etc

3. Work Performed by Florida Power 8 Li htName

P.O. Box 4332 Princeton Fl. 33032

'Iype Code Symbol StampAuthorization Ho.Expiration Date

N A

M A

Address

4. Identification of System:

5. (a) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~M A Code Case

COMPONENT COOLING WATER System ¹: 30 Quality Group: C

(b) Applicable Edition of Section XI 'Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name ofComponent

)BOLTS (4)

Name ofManufacturer.

IH/A

/Manufacturer/ National )

JSerial'No. 'Board

Other.Identification

IH/A iH/A )UTC349851 R94-41853E207C HX SA 193 GR 87

]Year [ Repaired ] ASME f'JBui It] Replaced or

JCode /

f Replacement )Stamp f

I I ./Y~es No

CHUNK. [Replacement )No

7. Description of Work: FOUR 4 HX'ANWAY BOLTS REPLACED ON UMIT-3 'COMPONENT 'COOLING WATER HX 3C

3E207C .

t 8. Tests Conducted: Hydrostatic:

Other

Pneuaatic:

Pressure

Nominal Operating Pressure

psig Test Temperature 'F

95 '63.3

Page 22: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

'Sheet 2 of 2

FORH NIS-2', (Back)Ik

9. Remarks: MECHANICAL CONNECTION ~NO uELDING REQUIRED..

CERTIFICATE OF COHPLIANCE

lie certify that the stater<ents made iin the report are correct and thiis replacement conforms to the r&ies of theASHE Code, Section XI.

Type Code Symbol Stamp N A

Certific e f Autho ation No N~A Expiration Date N A

Signed 42 7z('0 i~sR'A~4<.g.O~ner or Owner+ Designee, Titl'.e 0

CERTIFICATE'OF INSERVICE INSPECTION

I, the undersigned, holding a valid cor<mission issued by the National Board of Boiler and pressure vessel'nspectorsand the state or Province of Dade.County. and employed by Arkwriight.Hutual Insurance Company of

'orwood,Ha. have inspected the co<nponents descriibed in this Owners Report during the period 12/05/95 ~ to~

12/05/95 and state that to the best of my knowledge and belle<I, the O~ner has perfdrmed examinati'ons'andtaken corrective measures described in this Owners Report in accordance wiith the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressedor'mplied,concerning, the examinations and correctiive measures described in this Owner's Report. Furthermore,

neither the Inspector nor his employer shall be i,iable in any mann<'.r for any peraonal injury or'raper'ty'amageor a loss of any kind arising from or connected with this inspection.

7

Inspect s Si atureC<x<missions NB 823~ON~I~ I

~ Nat<ionsi 8'oard, state, providence, and Endorsements

Date 19

4l95.063.3

Page 23: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS

As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 LI htName

Date 03 04 96

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant Unit 3PMO ¹:2579/63 MO ¹: 95024075

9700 SM 344 Street Florida Cit Fl. 33034Address Repair Organization P.O. No.,Job Ho.,etc

3. Mork Performed by Florida Po~er 8, Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization Ho.Expiration Date

N A

N A

4. Identification of System: SPENT FUEL COOLING System ¹: 33 Quality Group: C

5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~H A Addenda,~N A Code Case

6. Identificationt Hame ofComponent

(HINGE PIH PLUGS (2)

Name ofHanufacturer

[Hanufacturer( National], Serial No. Board

OtherIdentification

H/A iH/A IH/A IR91-5196

of Components Repaired or Replaced and-Replacement Components

]Year J Repaired ,] ASHE (

[Built) Replaced or ) CodeJ

( Replacement )Stamp f

I I /~res ue

IUHK I Replacement I Ho

7. Description of Mork: CHECK VALVE HINGE PIN PLUGS REPLACED.

t 8. Tests Conducted: Hydrostatic:

Other VT-1

Pneunatic: Hominal Operating Pressure

Pressure~sig Test iempereture 'F

96.001-3

Page 24: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2',

FORH NIS-2 (Back)

9.'.Remarks: THls Is A MEcHANIcAL coHHEcTIDN No.uELDING'REO IR D.

CERTIFICATE OF COHPI.IANCE

Me certify that the statements made in,.the. report are correct and this replacement conforms to the rules ~of the.ASHE Code, Section XI.

Type Code Symbol Stamp

'Certificate of Authorization No. ~H 'A Expiration Date N A

O~ner or-Owner's Designee, Title

CERT II'ICATE OF INSERVICI'. INSPECTION

I, the undersigne'd, holding a, valid comaission issued by "the Hatiional Board.of'Boiler and Prdssul''e'less'.L,inspectors and the state or Province of Dade'County ahd &rplbyed.by'Arkwrilbht.HutiiaL Insurance Coapany,'ofNorwood, Ha.:have inspected the caqmnents described in this Owners Report during. the period 09/l)5/95

to'3/04/96and.state that to the Imst of my knowledge and belief„ the (hner has performed examinations andtaken corrective measures described in this Owners Report in'accordance with,the requirements of .the ASHE Code,Section XI.

By signing this ceirtificate neither 'the Inspector nor~hisI~Loylr stakes any warranty,'xpressed orimpLied, concerning the examinations and corrective measures described in this Owner.'s Report. Furtheraere„n'either the.Inspector nor his erployer shaLL be Liable in any manner for any personal injury, or',propertydamage or a loss of any k,ind arising from,or connected with this inspection.

Inspectors S natureCcmmissi&s '',NB 8230~N'~I

National Board„ State, Providence, alnd PndcIrsMnth

Da

96-001-3

Page 25: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM HIS-2 OVNERS REPORT FOR 'REPAIRS OR REPLACEHEHTS

As Required by the Provisions of the ASHE Code Section XI

1. Ouner Fior ida Po22er & Li htName

Date 03 25 96

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant Unitlo ¹: 95031214PCH ¹: 95.103

9700 SV 3CC Street Florida Cit Fl. 3303C

Address Repair Organization P.O. Ho.,Job No.,etc

3. Vork Performed by Florida Power & Li htHame

P.O. Box 4332 Princeton Fl. 33032

Type Code Symbol StaapAuthorization Ho.Expiration Date

M A

Address

4. Identification. of 'System:

5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~M A Code Case

COMPONENT COOLING VATER System ¹: 30 Quality Group: C

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name ofCoaponent

Hame ofHanufacturer

)Hanufacturer) National )

) Serial Ho. BoardOther

Identification)year ) Repaired ) ASHE )

)Built) Replaced or ) Code )') Replacement )Staap )

I I I~PPP pp

)1" BLIHD FLANGE

) 6I IDEAL )N/A )H/A )UTC 390755, 3E207A,B,C )UHK. )Replacement ,)Mo

HX'S

)3" BLIND FLAMGE

)6)BOLTS (24) &r

)HUTS

)HUTS (46)

I

) IDEAL

H/A

)H/A

)N/A

IH/A

)H/A )UTC 390756, 3E207A,B,C )UNK. )Replacenent )HoHX'S

)H/A )R94-2667 BOLTS, R93-2122 )UMK. )Replacement )MoNUTS 3E207A B C HX'S

)H/A ')UTC351943 (15) UTC391981 )UHK. )Replacement )Ho31 3E207A B C

)STUDS (24)

I

)M/A )H/A )U93.2949, 3E207A,B,C )UHK. )Replacement )HoHX'S

7. Description of Vork: REHOVED PIPING AHERTAP PIPING FROH'UNIT 3 CCV HX'S.AND INSTALL BLIND FLANGES P

8. Tests Conducted: Hydrostatic: Pneunat ic: Nominal Operating Pressure X

Pressure~2 ig Test Temperature 72 ~F'I

96-002-3

Page 26: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORK NIS-2 (Back)

9. Remarks: MECHANICAL CONNECTION HO WELDIHB REQUIRED.

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this replacement conforms to 'the rules of theASKE Code, Section XI.

Type Code Syahoi Stamp ~HA

Certttioate Aothoritattoo No. ~N A Expiration Date M'IAA

Signed rtha .Jgl '9.Q/

CERTIFICATE OF IHSERVI'CE INSPECTION

I, the undersigned, holding a valid comnission issued by the Hational Board of Boileii and Pressure, Vessel,inspectors and the state or Province of Oade County and employ< by Arkwright Kutual Insurance Compan)I ofNorwood, Ka. have inspected the components described in'his OImerp Rapport during the, period 11/09/96 to03/24/96 and state that to the best of my knowledge and Qiief, the O~ner has performed examinations, andtaken corrective measures described in this Owners Report in accordance with the requirements of tl)e ASKE Cod'e,Section XI.

By signing this certificate neither the Inspector nor his eapioyer makes any warranty, express'ricy\led, concerning. the examinations and rorrective measures described in this Owner's Report. Furl'her~re,neither the Inspector nor hiis employer shall be liable in any manner for any personal injury or propertydamage or a loss of any kind arising from or conrected with this inspection.

Inspect rs S atureCommissions '

HB 8235~M~INational Board, Statet Providence, and Endorsements

„9z

96.002-3

Page 27: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS'As Required by the-Provisions of the ASME Code Section XI

1. Owner Florida Power & Li htName

Date 05 23 96

700,Universe Blvd. Juno,Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant UnitPWO ¹:6177/63 WO ¹: 96008678 CR ¹: 96-696

9700 SW 344 Street Florida Cit .Fl. 33034Address Repair Organization P.O. No.,Job No.,etc

3 ~ Work Performed by Florida Power S, Li htName

P.O. Box 4332 Princeton 'Fl. 33032Address

Type Code Symbol StampAuthorization No.Expiration Date

N A

N A

N A

4. Identification of System: CHEMICAL 8 VOLUME CONTROL System ¹: 47 Quality"Group:B'.

(a) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~N A Code Case

(b) Applicable. Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Components Repaired, or Replaced and Replacement Components

Name ofComponent

Name ofHanufacturer

'iHanufactureri National i,i Serial No. Board

OtherIdentification

iYearJ

Repaired f ASHE (

igui Iti Replaced or ] Code (

i Replacement igtampJ

iCharging-Pump "8" iUnion I N52216 I N/A J3P2108I IJUnk iReplacement

Yes No

No

7. Description of Work: REPLACED FLUID CYLINDER ASSEHBLY.

8. Tests Conducted: Hydrostatic:

Other VT-2

Pnewetic: Nominal Operating Pressure X

Pressure~gggg stg test temperature 114 ~ F

96.003.3

Page 28: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH NIS-2 (Back)

9. Remarks: No weldin r uired.

CERTIFICATE OF COHPLIANCE

Me certify that the statements made in t'e report aire correct and this replacement conforms to the rules of theASHE Code, Section XI.

Type Code Symbol Stamp N A

Certificate Authorization No. N~A

z.x..: jO~ner or Owner's Designee, Title

'Expiration Date, N

Date '. 1943>

gd'ERTIFICATE

OF INSERVICE INSPECTION

I, the undersigned, holdi,'ng,a valid cccmission issued by the National Board of Boiler and Pressure Vesselinspectors and the state or province of Dade county and empl'oyed by Arkwright'Hutual'Insurance Company'of

'orwood,Ha. have inspected the components described in thiS Owners'eport during the period 04/11/96'o'5/20/96and state that to the best of my knowlwige and beli6f, the Owner has performed examinlatilns and'(

taken corrective measures described in this Owners Report in accord'ance with the requirenents of the ASHE 'Code,Section XI.

By signing this certificate neither the Inspector nor his ef3pioyer makes any warranty, expressed oris@lied, concerning the examinations and corrective measures descri'bed'in this owner's Report. Furthermore,neither the Inspector nor his erpioyer shall be liable in any manner, for'ny personal injury or propertydamage or a loss of any Ikind arising from or connected with 'thiS inspertioh. I

s~ N tanoiasiorls NB s23h~s~tInspecto s Sig~n are Nattonslt Board, State, Providence, and Bndtrsetnnts

Date ~ 19~+4.C

96.003e3

Page 29: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS 2 OWNERS REPORT FOR REPAIRS OR'REPLACEMEHTS

As Required by the Provisions of the ASME Code SectIon XI

1. Owner Florida Power B Li htName

Date 07 01 96

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant 'Turke Point Plant UnitPWO ¹!5113/63 WO ¹: 96002325

9700 SW 344 Street Florida Cit Fl. 33034Address Repair Organization P.O. Ho.,Job No.,etc

3. Work Performed by Florida Power B Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol'tsapAuthorization Ho.Expiration Date

N A

N A

N A

4. Identification of System: Intake Coolin Water S stem System ¹: 19 Duality Group: C

5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case

(b)'pplicable Edition of'ection XI Utilized for Repairs or Replacements '1989 Edition,~HA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced and Replacement Cocponents

Name ofComponent

Name'fManufacturer

IManufacturerI'ational I

I Serial No. BoardOther

IdentificationIYear I Repaired I ASHE I

IBuiltI Replaced or I Code I

I Replacement ISterp I

it~et seIICW CHECK VALVE

IICW CHECK VALVE

IUNK

IUHK

I41195 IH/A I3-50-331 IH/A IReplaced IHo

I85223 'IH/A I3-50-331 IH/A 'IRepiacement

ISTUDS(20)' 1/8"IHUTS 40

IUNK IH/A IN/A IUTC 383150 IN/A IReplacement IHo

7. Description of Work: REPLACED ICW CHECK VALVE 3-50-331. REPLACED 20 STUDS AHD 40 NUTS .

8. Tests Conducted: Hydrostatic: Pnasast ic: Noainal Operating Pressure X

Sressure~tg ig Test teegereture 91 ~ F

96-004-3

Page 30: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORM NIS-2 (Back)Il

9. Remarks: MECHANICAL CONNECTION~NO llELDING REQUIRED,

CERTIFICATE OF COMPLIANCE

Ne certify that the statee!ents made in the ireport lire correct'nd th'is replacement conforms to the rules of theASME Code, Section XI.

Type Code Symbol StaaT! N A

Certificate of A thorizaticp No., N~A

Signed /gAn/,.-'~( ~~g~,wner o Owner'.s Des ignee, Title

Date i~lrExpiration Date N

CERTIFICATE OF INSERVI CE 'INSPIECT ION

I, the undersigned, holding a valid caanission issued by'he National Board of Boiler'nd Pressure 'Vesael'nspectorsand the state or Province of Dade County and .employed by Arkwright.Mutual..insurance.Ceqjany

of'orwood,Ma. have inspected the co!Txwents described in thi's Owners Report during the period 01/29/96 to06/27/96 and state that to the best of my knowledge and belief, the o~ner has performed examinati'ons'andtaken corrective measures described in this 0 rners Report iih accordance with the requirements of the ASME'ode,Section XI ~

By signing this certiificate'neither the Inspector nor hi's eepioyer 'makes any isarrant5i, expressed orimplied, concerning 'the examinations and corrective measurea descr'ibed in'hi's Owner's Report. Further'more,

.'eitherthe Inspector nor his employer shall be Liable in any a'mnner for any peraonal injury or'ropertydamage or a loss of any kind arising from or connected with'his inspection.

r

o' ——C(aaisslans ~HB 82 0 II~I!

Inspec r4 S nature National Board, State, Providence, and Endorse!!ents

Dat )y .7-4

96-004-3

Page 31: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASNE Code Section XI

Florida Power & Li ht Date 07 01 96

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1. of 2

2. Plant Turke Point Plant Unit 3PQO ¹:63/3C05 IO ¹: 95028392

9700 SM 34C Street Florida Cit Fl. 33034Address Repair Organization P.O. Mo.,Job No.,etc

3. Ilork Performed by Florida Power & Li htName

P.O. Box 4332 Princeton Fl. 33032

Type Code Symbol Stamp.Authorization No.Expiration Date

N A

M A

Address

4. Identification of System: Intake Coolin lister S stem System ¹: '19 Duality Group: C

5 ~ (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~H A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name ofComponent

Name ofNsnufacturer

iNanufactureri National )

] Serial Ho. Board,Other

IdentificationiYear i Repaired [ ASNE i/Builti Replaced or i Code /

'i Replacement (Stamp /

I I J~res ue

iNODEL 33 CNC IST-1 3P9C "iUNK. iRepiacement iHoIH/AIIHTAKE COOLING MATER"PUNP IJOHHSTOH PUMP IH/A

iIHTAKE COOLIHG MATER PUMP i JOHNSTON PUMP (H/A )MODEL 33 CNC IST-7 3P9C (UNK. iRepiaced iHoI

7. DescriPtion of Horkt INTAKE COOLING IIATER PUMP 3C 'IST-7 REPLACED IIITH REBUILT SPARE IST-1.

8. Tests Conducted: Hydrostatic: Pneusst ic: Nominal Operating Pressure X

rressure~tr sig test teegersture 86 ~F

96-005-3

Page 32: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH HIS-2 .(Back)I

9. Remarks: HECHAHICAL CONNElCTICIN NO MELOIING REOUIRED.

CERl'IFICAYE OIF CCHPLIAHCE

Me certify that the statenents made in the report are correc't aFrd this 'replacement conforms to the rules oF theASHE Code, Section XI ~

Type Code Symbol Stanp

Certificate of uthorization No. ~NA gaiorat Toogate ~ga/ t -X4,.„g~/

tamer or ter'a TIeaigoee, Title19

CERTIFICATE OF IHSIERVICE INSPECT IOH

I, the undersigned, hollding a valid conrnission issued by the Nhtidnal'Boa'rd 6f Boiler snd preshure'essel' (

inspectors and the state or Province of Oade County and entPLoged,bya A'rkuright.HutuaL, Insurance Co(rpany ofNorrrood, Ha. have inspected the conpcnents described in this OMners Report during the period 'FI/10'/95'l07/01/96 and state that to thte best of my knowledge and belief, the Ogner has performed examinat'Ion~ sndtaken corrective measures Tdescrib< in this thnM'.rs Report in accordance'with the requirements of the 'ASHE Code,Section XI. I

By signing this cert',ificate neither the Inspector nor, his employer makes any lrsrranty, expressed or, Iimplied, concerning the examinations snd corrective measurleS described in this Cnrnergs Report. FuI'thermor e,neither the Inspector rror his enployer shall be Liable 'in Sny manner for 'any'er'sorel 1'njury or propertydamage or a Loss of any kind arising from or connected Mith this inspection.

Inspect s Si ature Natiorurl Board, State, Providence, and Endorsements

Oats 19 +&~

96.005-3

Page 33: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACENENTS

As Required by the Provisions of the ASNE Code Section XI

Florida PoMer & .Li ht Date 08 27 96

700 Universe Blvd. Jwm Beach Fl-. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant UnitPlJO ¹:7951/63 MO ¹: 96018245

9700 SM 344 Street Flor ida Cit Fl. 33034Address Repair Organization P.O. Ho.,Job Ho.,etc

3. Hork Performed by Florida PoMer & Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol Staap- Authorization No.

Expiration Date

N A

N A

N A

4. Identification of System: 'CCM System ¹: 30 Quality Group: C

5 ~ (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~NA Code Case

(b) Applicable Edition of Section XI Utilized. for Repairs or Replacements 1989'Edition,~NA Addenda,~NA Code Case

6. Identification of Conponents Repaired or Replaced and Replacement Components

Hane ofConponent

Nane ofHanufacturer

13E207C HUTS, HEAVY HEX (8 IH/AI(3E207C BOLTS (85)

(Year (~ Repaired ( ASNE (

(Built( Replaced or ( Code (

( Replacement (Stanp (

I I /~Yes Mo

(Hanufacturer( National( Serial Ho. ~ Board

OtherIdent Ification

IN/A (H/A (UTC 398167 (N/A'Replacement (Ho. H 81990

(H/A (N/A (UTC.393249 R 35113048 (UHK (Replacement (HoASTN A-194 GR7

7. Description. of Mork: CLEAN DIRTY CONPONENT COOLING HEAT EXCHANGER TUBES REPLACED OUTLET DOOR iSTUDS

AND BOLTIHG

8. Testa.ConductedI .Hydrostatict Pneunat ic: Hominal Operating Pressure

Other Pressure~ig Test Telpereture ~ F

96-006-3

Page 34: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

I;"ORK HIS-2 (Back)0

9. Remarks: THIS IS A KECHANICAL CONNECTION HO 4'ELDING REOLIIRE6.

CERTIFICATE,OF C(NPLIAHCE

Me certify that the statements made in the report are co'rredt ahd t'his''epair conforms to the 'ru!Ls df theASKE Code, Section XI.

Type Code Symbol Stanp

Certificate of Authori atj< o. ~HA

Signed Q 1

Owner or Owner's De knee,, Title

Expiration Date H~A

l~oate S / 19~ p

CERTIF!CATIE OF IHSERVICE INSPECTION

I, the undersigned, holding a val!d cocmission issued by the Haticnal- Board of Boiler and PreshurdVeksel'nspectorsand the state or Province of Dade Catty and employed by hrkwright Kutual Insurance Cchpady of,

Norwood, Ka. have inspected the caqxxients c!escribed in this-Owners Report during the period O'/19/96''o !08/07/96 and state that to the best of my knowledge and belief, 'the'Owner has performed examinations andtaken corrective measures described in this Owxtrs Report 'in accordance with the requirements of the 'ASKL

.Co'de,'ection

XI.By signing this certificate neither the Insixmtor nor his ~lawyer'akes 'any warranty, expressed or

Implied, concerning the exam!nations and corrective measures described in this (!wner's Report. FuJ.thermo)a,neither the Inspector nor his esployer shall be liable in any 'manner 'for any persona'l Injury or propertydamage-or a loss of any kind arising from or corrected with this iinspectfon.

Cannissions LL 8250 H iInspec rs Si~ ure Hatiorml Board, State, Prov!derma, and Endorsemeats

Date 19 Q>

096.006.3

Page 35: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH HIS-2 ONMERS REPORT FOR REPAIRS OR REPLACEHEHTS

'As Required by the Provisions of the ASNE Code Section XI

1. OMner Florida Poser 8 Li ht Date 08 07 96

700 Universe Blvd. Jum Beach Fl. 33COS

AddressSheet 1 of 2

2. Plant Turks Point Plant UnitPNO ¹:5127/63 MO ¹: 96002326

9700 SM 34C Street Florida Cit Fl. 33034Address Repair Organization P.O. Ko.,Job Ko.,etc

3. 'llork,Performed by Florida Pc~sr 8 Li htKame

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Syshol SteepAuthorization Mo.

Expiration Date

N A

N A

N A

4. Identification of System: Intake-Coolin Mater S tern System,¹: 19 Quality Group: C

5. (a) Applicable Ccestruction Code B31.1 1955 Edition, NA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Coeponents»Repaired or Replaced snd Replacement Coeponents

Kame ofCoaponent

Kame ofManufacturer

IHsnufacturerI Mational I

,I Serial No. BoardOther

IdentificationI"ear I Repaired I ASKE I

IBuiltI Replaced or I Code I

Replacement I St8flp

I I [~res se

IBOLTS (20)I

IHUTS (20)

IK/A

IN/A

IK/A IN/A IR 87-5164, '1-1/C"x5" IUKK IReplacement IMo

UTC 351875 XJ-3-1COS

IH/A IH/A IR 87-5164s 1 1/4" IUHK I Replacement I Ho

UTC 351885 393251

7. Description of Nark: EXPANSION JOINT XJ-3-1408 REPLACED AT'3C ICM-PUMP DISCHARGE.

Pneusst 1 c: ,Nominal Operating Pressure X

Pressure~tr te test Teeeeersture 91 ~ F

96.007-3

Page 36: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH HIS1-2 (Back)

9. Remarka: THIS IS A HECHANICAIL CONNECTION HO NELDING REOUIREIDa

CERTIIF ICATE OF COHPLIANCE

He certify that the statements made in the report are correct and this replacement conforms to the rules of theASHE Code, Section XI.

Type Code Symbol StanTD N A

Certificate of Authoris i io jN 'A

9 7

Owner or OImer's Designees, Title

Expiration Date9'7 H A

CERI'IF I CATE CIF INSERVICE INSPECTION

I, the undersigned, holding a, valiid cNImission-issued by the National Board of Boiler and pressui e Vessel

inspectors and the state or province of Dade County and employed by Arkwright IKutual Insurance Company iof

Horwood, Ha. have inspected the caqDonents descrit»d in thisi OwnersiReport during the period 01/30/96 to08/07/96 and state that to the IDest of my knowledge and belief„ the 099ner has performed examinations and

taken corrective measures described in this Owners Report inI accordance with the requirements of the AsHE code,

Section XI.By signing this certificate neither the Inspector'nor'his'mployer makes any warranty, expressed or

implied, concerning the examinations and corrective measuresi described. in «his Ownercs Report. Furthersioresneither the Inspector nor his eeiployer shalll be liiable in any manner for any personal, injury or'ropertydamage or a loss of any kind arising from oreconnected wi'th this inspection. Il

ZA aHicetasissieas ss 8999 II

Inspecto s Si ndture National Beard, State„ providence, Snd Enddrsements

Date 8'DZ 7 19 ?C

96-007e3

Page 37: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORK NIS-2 OWNERS REPORT FOR'REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASKE Code Section XI

Florida Pogger & Li ht Date 08 22 96

700 Universe Slvd. Juno Seach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant UnitPMO ¹:63/8384 lO ¹: 96020299

.9700 SK 344 Street Florida Cit Fl. 33034Address Repair Organization P.O. No.,Job'Mo.,etc

3.'Mark Performed. by Florida Power & Li htName

P.O. Sox 4332 Princeton Fl. 33032Address

Type Code Syahol'tan@Authorization Mo.Expiration Date

N A

H A

4. Identification of System: COMPONENT COOLIMG MATER System ¹: 30 Guality Group: C

5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19S9 Edition,~NA Addenda,~NA Code Case

6. Identification of Components Repaired or. Replaced and Replacement Components

Kame ofComponent

Name ofKanufacturer

(Kanufacturer[ National )

( Serial No. 'BoardOther

.IdentificationlYear ) Repaired I ASKE I

(Guilt( Replaced orJ

CodeJ

) Replacement (St~ (

I I i Teereue

(NUTS (2) HX OUTLET DOOR iH/A

'I'STUDS (2) NX OUTLET DOOR IH/A

IH/A

(H/A

)H/A (3E207C UTC393249'STK

A-194 GR 7)H/A (3E207C UTC 398167

JUNK (Replacement [Ho

(UHK )Replacement [Mo

7. Description of 'Mork: 2 STUDS AND NUTS REPLACED OH 3C CCll HEAT EXCHANGER ACCESS DOOR.

8. Tests Conducted: Hydrostatic: Pneumat ic: Hominal Operating Pressure

0 Other Pressure~tg test turgereture '.F

96.008-3

Page 38: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORM NIS.2 (IIack)

9. Remarks: THIS IS A MECNNICAL CONN'ECTION. NO NELOING

REOUIRED'ERTIFICATE

OF COMPLIANCE

Me certify that the statements made in the report are correct an'd this replacement conforms to the kuieh of theASME Code, Section XI.

Type Code Symbol Ste~

~HACertificate of Authorlzeltie Ho.

SignedOwner or Owner .» Oessgnee, Title

'Iecol tetlee oete ~o'e I

tete ~2~ 19jCERTIFICATE OF INSERVICE IHSF'ECTIOH

I, the undersign9<, holding a valid ccemission issued by the National Board of Boiler and Pressurel'Vessellinspectors and 'the eetate or Province of Oade County and employ'ed by Airkwright'Mutual Insur~nce Coo@any,ofNorwood, Ma. have inspected the conponents described in this Owners Report during the period 08/07/96 to08/22/96 and state that to the best of my knowledg'e ahd b'eliaf, the Owner has performed examinations andtaken corrective measures ciescritxxl in this Owners Report in accordance with the rmiuirements bf the ASME Code,Section XI. I

By signing this certificate.neiither the Inspectoi ndr hiis elnpiayer'makes any warranty, expriessad ol.iayli'ed, concerning the examinaticxm and corrective mea'suras d'escribed in this owneros,Report.'urthermore,neither the Inspector nor his employer shall be liable 'in any inner for 'any personal injury o'r pr'operty

'amageor a loss of any kind arisiing from or connected with th'is .Inspactfon.

Inspe ors~SI natureComniissions NB 823~0~HI~

Naltiodal Boar'd, State, Providence, anci Endorsements

19~~+

096;008-3

Page 39: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM HIS-2 OVHERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li ht Date 09 26 96

700 Universe Blvd. J~o Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant UnitPlO'¹:63/7082 lO ¹: 96014602

9700 SM 344 Street Florida Cit Fl. 33034Address 'Repair Organization P.O'Ho.,dob Ho.,etc

3. Ilork Performed by Florida Power 8 Li ht .

Kame

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Synodal SterpAuthorization No.Expiration Date

N A

N A

N A

4. Identification of System: .'CHEMICAL 8 VOLUME CONTROL System ¹: 47 Quality Group: B

5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~NA Code Case

(b) Applicable Edition of Section XI Utilized.for Repairs or Replacements '1989 Edition,~HA Addenda,~NA Code Case

6.. Identification of Ccgponents Repaired or Replaced*and Replacement Cooponents

kame ofManufacturer

iHanufactureri National 'J'

Serial Ko. BoardOther

Identification/Year ( Repaired i ASHE (

)guilt/ Replaced or ( Code i

i Replacement JStsnp (

I I i~res siRELIF VALVE

l2ttX 3

iRELIEF VALVE

12tt X 3,(STUDS (8)I(HUTS (16)

ICROSBY VALVE T I51300'AGE

IH/A IRV-3-203 (UHK. (Replaced iKo

ICROSBY VALVE 8 IN82705-00- IH/AGAGE 0003

(UTC 371565, RV-3-203 '/UNK. (Replacement iKoUP.O¹C95677-90722 C 0

IH/A

iM/A N/A (UTC 391981, ASTM A-194 iUNK. iReplacement iHoGR 2H

iH/A JUTC 378831, 5/8" X 11 UHC iUNX. (Replacement iMo

7. Description of Uork: RELIEF VALVE RV-3-203 REPLACED UITH TESTEO SPARE. EIGHT 8 STUDS AHD sIXTEEN

16 HUTS REPLACED.

Pneumat ic: Hominal Operating Pressure X

Pressure~270 tp Test Temperature 137 F

96-009-3

Page 40: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet'2 of 2

FORH NIS-2 (Back)

9. Remarks: HECHAMICAL CONHECTION. MO llELDIMG REOliJIRED.

CERT IF I CA1'E OF COINPLIANCE

Me certify that the statements made in the report are correct and this replacement confome to the rules,,of theASHE Code, Section XI.

Type Code Symbol Stamp ~NA

Certificate of Authorizat on Ho. ~NA

SignedI 3'>yre~ss gee'-wM-

Ouner or-Owmr's Designee,, Title

Etpitettetl tete ~eetete 19

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a'valid cannission issued by,the Khtiohal 'Board of Boiler and Pressure Vessel.inspectors and the state or Province of Dadh Cunty and ~loyjed by Arkuright Hutual Insurance Caiman'y

of'oruood,Ha. have instated the compaeents d'escribed in this OMners R'epor t daring the period '6/05'/96''o09/26/96 and state that to the best of my knouledge and belief, the Ower has performed examiinat'ionf, andtaken corrective measures describ< in this OMners Report in a'ccordan'ce with'he requirements of the,hSHE Code,Section XI.

By signing this-certificate neither the Inspector nor h'is eaployer makes any werranty, expressed o'

IsT!I(ed, concerning the examinations and corrective measures described in this 0 eer's Reix!rt. Furthermore;neither the Inspector nor his employer shall be liable in any manr!er for any personal injury or

pkope'rty'amageor a loss of any kind arising from or coraected Mith this inspection.

Inspect rs SiM,'orAniss fons ,'',NB

823~0~HI~'ure

'a'tfohal Board, State, Provider!ce, and Endorsemeits

Date

9'6-009-3

Page 41: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM HIS-2 (NHERS REPORT- FOR REPAIRS OR REPLACEHEHTSAs Required'by the Provisions of the ASNE Code Section XI

1. Owner Florida Po~er S Li ht Date 10 28 96

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet of 2

2. Plant Turke Point Plant Unit,PMO ¹:63/0522 MO ¹: 96027062

9700 SN 344 Street Florida Cit Fl. 33034Address Repair Organization P.O. Mo.,Job.No.,etc

3. Nark Performed by Florida Power B Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Syshol StampAuthorization Ho.Expiration Date

N A

iH A

N A

4. Identification of System: COHPONENT COOLING llATER System ¹: 30 Quality Group: C

5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case

6. Identification of Components Repaired or Replaced and Replacement Coaponents

0 Mane ofCoaponent

Meme ofManufacturer

'[Manufacturer[ Mational( Serial Ho. Board

OtherIdentification

[Year [ Repaired [ ASNE [/Built/ Replaced or / Code /

/ Replacement (Stanp (

I I /~tes ueIHUTS (30) CCM HX

(OUTLET DOOR

(BOLTS (30)'CM HX

lOUTLET DOOR

JN/A

IN/A

iH/A ,i3E2078 UTC 393249ASTH A-194 GR 7

(N/A [3E2078 UTC 398167

(UMK )Replacement (Mo

JUNK [Replacement ]Ho

7. Description of Mork: CCM HX 3B ACCESS'DOOR'TUDS AMD HUTS REPLACED.

8. Tests Conducted: Hydrostatic: Pneunatfc: Hominal Operating Pressure

Other Pressure~sig test tesgersture oF

96.010.3

Page 42: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

PORN, HIS-2 (Back) 09. Remarks: THIS IS A NECNAHICAL CONNECTIOH. NO MELOIHG REOUIRED.

CERTIFICATE OF CONPLIAhlCE

Me certffy that the statements made fn the repor't are correct and,this replacement conforer to the rules of theASHE Code, Section XI.

Type Code Syrrhol Steep le A

N~ACertificate of Authorization,No.

Sfgnedowner or owr3IrF's Designee, Tftle

Expiration gate/

Date pl/ 4

N A

CERTIFICATE OF IHSERVICE I,NSPECTIOH

I, the unders3gned, holding s valid conraissfon issuer( by, the Haf:fonaL Board of'oiler and Pressure VesseLinspectors and.the state or Province of Oade County and ettThloyed by Arkwright Nutual, Insurance CtxtTpanyi ofNorwood, Na. have inspected the cortTxhnents de'scribed fri this Owners Report during che period 10/11/96 to10/28/96 and state that to the best of my krewlcdgp and belief, the Owner has performed examinations andtaken corrective measures described fn thiis Owners Report fn accordance wiith the requfreox.nts of the ASNE,Code,Section XI ~

By sfgn3ng this certificate neither the Inspector norI hiP eriployer Pmkgs any warranty, expressed or, Iimplied, concerning the examinations end corrective measures describedl in this Owner's Report. Furthermore, , (

neither the Inspector nor his eoployer shall be LiabLe in sny manner for any per..onal injury or prpperIty,damage or a Loss of,any kind arising from or connected fifth, th(s ipspectfpn.,

Inspectors'fgrwhr.ureCotrmfssions,, HB, 823~0M~I

,Hatfonpl EIoard, State, P'rovidence, and Endorsements

19

96-010-3

Page 43: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS-2 OWNERS REPORT 'FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASME Code Section XI

1 ~ Owner Florida Power & Li htName

Date 01 02 97

700:Universe Blvd. Juno Beach Fl. 33408Address

Sheet .1 of 2

2. Plant Turke Point Plant Unit,PHO ¹:1204/63 lJO ¹: 96031833

9700 SM 344 street Florida Cit Fl. 33034Address Repair Organization P.O. No.,Job Ho.,etc

3. Hork"Per formed by Florida Power &'Li ht.Name

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization Ho.Expiration Date

N A

N A

N A

4. Identification of System: COMPONENT COOLING HATER System ¹: 30 Quality Group: C

5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA'ode Case

6. fdentification of CoJJJponents Repaired or Replaced-and Replacement Components

Name ofComponent

Name ofManufacturer

(Manufacturers. National (

i Serial No. BoardOther

IdentificationiYear f Repaired [ ASME i(Builti Replaced or / Code (.

( Replacement .]Stamp i

I I J~Y*s u

IHUT (1) 'iH/A iN/A iH/A )HEAVY HEX ASTM A-194 (UNK (Replacement (HoUTC 393249 H CV333

7.,Description of Ilork: REPLACED ONE HUT ON COMPONENT COOLING HEAT EXCNANGER

8. Tests Conducted: Hydrostatic:

Other

Pnewetic: Hominal Operating Pressure

Pressure~rg Test Teegersture 4F

97-001-3

Page 44: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of'

FORH HIS 2 (Back)0

9. Remarks: THIS HAS A HECHNICAL CONHECTIOH. HO WELDIHG REOUIRED'.

CERTIFICATE OF COHPLIANCE

Me certify that the statnnents made in the report are correct and this repl,aceaent conforms «o the rule's of theASME Code, Section XI.

Type Code Symbol Stamp ~NA

Certificate of Authorizat3on Ho. ~NA Exp3ration Dater7/~, /ig 0 Q&gyr~"6"C. t4A..o.~. /6

Owner or Owner~s Designee, Tif le, 19',

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding,a valid cixrmission issued by the National Board of Boiler and Pressur'e Vesselinspectors and the state or Province of Dade County"and employed by"Arkwrigh» Hutual Insuran/e Con@any ofNorwood, Ha. have inspected the components described in this Owners Report during the period 12/11/96 to01/02/97 and state tha't to the best of my knowledge and belief, 'the Owner has performed examinations andtaken corrective measures descrlh< in this Owners Report in accordance with the reciuirements of the ASHE Code,Section XI.

By signing this, cert.ificate neither the inspector nor his employer makes any warranty, express&1 o3

implied, concerning the examinations and corrective measures describe3 in this Owner's,Report. Furthermore,ne3ther the Inspector nor his employer shall be liable in any manner for any personal i,njury or pdopel ty

'amageor a loss of any kind arising from or connected with this inspection.

+ ~r/~~)Comnissions HB 8230 N I

Inspector Si ture 'atiodal Board, .State, Prov3dence, and Endorsements

I

I'I

Date 19

P~'7-001-3

Page 45: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FDRH Nis-2 ouNERs REpoRT F0R REpAIRs 0R REpLAcEHENTs

As Required by the Provisions of the ASHE Code Section XI

Florida Power S Li ht Date 02 03 97

700 Universe Blvd. Jwa Beach Fl.33408'ddress

Sheet 1 of 2

'2. Plant Turke Point Plant UnitPQO ¹:63/1638 MO ¹: 97001635 CR ¹: 96-0070

'9700 SM 344 Street Florida Cit Fl. 33034Address Repair Organization P.O. No.,Job

No.,etc'.

Mork Performed by Florida Power S Li ht,Kame

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Syshol StampAuthorization No.Expiration Date

N A

N A

M A

4. Identification of System: COHPOMENT COOLING MATER System ¹: 30 Quality Group: C

5. (a) Applicable Construction Code B31.1 1955 Edition, NA AddendaP~M A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,NC16-1Code Case

6. Identification of'omponents Repaired or Replaced and Replacement Coaponents

Kame ofComponent

Name ofManufacturer

)Manufacturer Kational i

i Serial No. BoardOther

Ident ification,iYear.,l Repaired' ASHE I

iguiltl Replaced or I Code 'I

,i Replacement. JStaspYes No

3E2078 Mestinghouse JN/A 047 iComponent Cooling Mater i1968 iRepairedNeat Excha er »B»

Yes

7. Description of Mork: CUT 6» X 8» 'ACCESS MOLE FOR FORIEGM HATERIAL RETRACTION. CCOE CASE M-416-1 NAS

BEEN ENVIED FOR THIS REPAIR ACTIVITY.

8. Tests Conducted: Hydrostatic: Pneunat ic. Nominal Operating Pressure X

Other HT ROOT pressure~use is Test Tespereture MOH 'F

97.002-3

Page 46: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet ',2 oi 2

FORM NIS-2 (Back)Ik

B. Rnnerks: cede case gala-1 vas en oknl for this ~ra ifr a~etlvit A.ll veld~i~as rforaecf

in accordance with the FPL Weld Control Manual.

CERTIFICATE OF COHPLI ANCE

We certify that the statements made in the report are correct and this l repair 'onforms to the rules of theASHE Code, Section Xl ~ I

I

Type Code Symbol,Stamp N A

Certificate of Authorization No. 'NAS 1 gned

r or Ownerks Oekignee, Titi&

Expiration Bate ~B'AI

Oat. ~4:>~~ Y

)CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holtiing a valid cccmlssicn I sued by tha National.Board of Boiler and pressure'es'sel'nspectorsand the state or province iof Blade county and,~>loyed by Arkwright Mutual, Insurance'ompany

of'orwood,Ha. hive inspected the ccImpoients described. in this bkers Repoit during the period 01~/22/97 ~ tfkd

02/03/97 and state that to the best of my knowledge aQ bI.Iiif, khe Owner has performed exami'nations'ndtaken corrective measures ciescribcxi in thiis Owners Report in aecordanee with the requirements of the ASHE Code, '

Section XI.I

By signing this certificate neither the Inspector nor his enployer, makes any warranty, expressed orimplied, concerning the exeainat3cfns and corrective measures descr'ibed in'his OWnerks Report.'urthermore,neither the 'Inspector nor his employer shall be liable in any sender for any personal Injury or propertydamage or a loss of any kird arising-froaf or connected with th/s ins~tion.'

Inspector S Ig re Rational Board, Stateproviden, ce, and Enllorstnedts

Oat 19 9'7

I97-002-3

Page 47: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM HIS-2 OMNERS REPORT FOR 'REPAIRS OR REPL'ACEMEH'IS

As Required by the Provisions of the ASHE Code Section XI

O 1. Owner Florida Po~er 8 Li htName

Date 02 11 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point PlantName

Uni t 3puo ¹:63/8809 uo.¹: 96020605

9700 Su 344 Street Florida Cit Fl. 33034 ~

.Address Repair Organization P.O. Ho.,Job Ho.,etc

3 ~ Ilork Performed by Florida Power 8 Li htName

P.O. Box 4332 Princeton Fl.33032'ddress

Type Code Symbol StampAuthorization No.Expiration Date

H A

M A

N A

4. Identification of System: COMPONENT COOLING HATER System ¹: 30 Quality Group: C

5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~M A 'Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case

6. Identification of'Components Repaired or Replaced and Replacement Components

Name ofCoaponent

Name ofManufacturer

rIHanufacturerI NationalI Serial Ho. Board

OtherIdentification

IYear;I Repaired I ASME .I.'IBuiltI Replaced or I Code I

'I Replacement IStamp I

I I [~«s ue

I STUDS (160)I3 4" X 8 1 2"IHUTS (320)l3 4«g

IH/A'H/A

IH/A IN/A ITHREADED ROO JUNK IReplacement IHo'TC 406446-1 406518-1

IN/A IH/A INUTS, ASME SA-194 GR 7 JUNK IRepiacement INoUTC 393249-1 406514-1

ISTUDS (40)1 1 8" X 8

IH/A IN/A IH/A ,ITHREADED .ROOg IUNK IReplacement IHoUTC 400981-1

INUTS (80)11 1 Ba

IH/A IN/A «,IH/A INUTS, ASHE SA-194 GR 7 IUNK IReplacement IMoUTC 351807 398260 399264

I I I

7. Description of llorkt REPLACE 'BOLTING ON CCM HEAT 'EXCHANGER "8" CHANNEL HEAD ANO ELBOU.

t 8. Tests Conducted: 'Hydrostatic:

Other

Pneunatict Nominal Operating Pressure

Pressure~erg test Temperature 'F

97.003-3

Page 48: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH HIS-2 (Back)II

9. Remarks: NO MELDING REOUIRED.

CERTIFICATE OF COMPLIANCE

Me certify that the statements macle in the report are correct and ~thia re'placement conform to the rules of the'SIDECode, Section XI.

Type Code Synhol Steap I A

Certificate of Authorization Ho. ~N(A

Ouner or 99nerds IPesignee, Title

Expiration Date

D.te

~HA

99 7 ~CERTII ICATE OF IHSERVICIE INSPECTIOH

I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Prc':ssu're VessB'nl

inspectors and the state or Province of Dade County and Anplbyed by~Arkuright Mutual Insurance Carphny 'of'orgood,Ma. have inspected the coeimnents described in this'09dners'Rep'ort'dur'ing the period 01/09/97 to

02/10/97 and state that to the est of my knoMledge and belief„ the Ihdner has performed examinations andtaken corrective measures, described in this Ogners Report in~ accordance uith the requirements of the ASHE Code,Section XI ~ ,

By signing this certificate neither the Inspector nor~his~ eeglloykr makes any warranty, expressed orimplied, concerning tlhe examinations and corrective measures'es'cribed in this Omar's Report. Furthersoredneither the Inspector nor his erployer shalli be liable in an'y ma'nnet for any personal injury or ,'propertydamage or a loss of any kind arising from or connected with this inspection.

Inspect s QShatureCoomissiorls -NB 230 N'

Mationat Board, state araviden,oe, dnd Bnddraednnta

Dat

97-003.3

Page 49: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS

As Required by the Provisions of the ASHE Code Section,XI

1. Owner Fioridh Power & Li ht Date 02 11 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant Unit 3PNO ¹:63/8809 MO ¹: 96020605

9700 SM 344 Street Florida Cit Fl. 33034Address Repair Organization P.O. No.,Job No.,etc

3. Mork'Performed by Florida Power & Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization No.Expiration Date

N A'N A

N A

4. Identification of System: COHPONENT COOLING lJATER System ¹: 30 Quality Group: C

5. (a) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Coeponents Repaired or Replaced and Replacement CoJJTJonents

Name ofComponent

Name ofHanufacturer

(Hanufacturer( National (

( Serial No. BoardOther „

Identification(Year ( Repaired -( ASHE (

(Built( Replaced or '( Code (

( Replacement (Stamp (I' J~Ves me

(SQUARE HEAD BOLT

( 20 1 1 8" DIA

IN/A IN/A (H/A'UTC 406513 HEAT 54333 (UHK (Replacement (Ho

(HEAVY HEX NUTS

I20'1 1 8" DIA

IH/A (N/A (H/A (UTC,399624 (UHK ,(Replacement (No

7. Description of llork: REPLACED 20 SQUARE HEAD BOLTS & NUTS ON CDI HEAT EXCHANGER' CHANNEL HEAD.

8. Tests Conducted: Hydrostatic:

Other

Pneunatic: Hominal Operating Pressure

Pressure~stg Test Temperature ~ F

97-004-3

Page 50: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

.Sheet 2 of 2

FORH NIS-2 (Back)

9. Remarks: NO MELDING REOOIRED.

CERTIFICATE OF iCOHPLIANCE

Me certify that the statem>ants made in the report are correct and this replacement conforms to the rules of theASHE Code, Section XI.

Type Code Symbol Stamp

Certificate of uthorizatlon No. N~A Expiration Date

r~/ 8+Owner r Owne! 's 6esiignee, 4! t'le >d>

~NA

to9Z

CERTIIFICATE OF INSERVICE INSPECTICIN

I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vesselinspectors and the state or Provincie of Dade County and &rplbyed by'rkwright 'Hutual 'Insurance Company ofNorwood, Ha. have ins!pected the co>ponents 'descriimS in this'wr>ers'eport during the period 01/09/97 to02/11/97 and state .that to the best; of my, knowledge and bei,ief, thie 0>dner has perfo>oned examinations andtaken corrective measiures described in this Owners Report 16 ace>ord!»nce with the requirements of the ASHE Code,Section XI.

By signing this certificate rieither the Inspector nor'his'm'>>loyler >aakea any warranty,; expressed ori»plied, concerning the examinations ard corrective measdres'eslcribed 'in this'wner's Report. Furt'hera>oresneither the Inspector nor his ee>ployer shall be liable ir'> an'y awinneir for any, personal Injury or'pro'pertydamage or a loss of any kind arising from or connected with this inspection.

II

~ r+gcease>asians,aa > vd~s~t

Inspec s nature sat>anat Board„ state prov>den„ee, dnd'dnddrsedents

I

D.t. M. '7 10++

97-004-3

Page 51: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida'Power S Li ht Date 03 20 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of. 2

2. Plant Turke Point PlantName

UnitPMO ¹:63/2502 WO ¹: 97006743 CR ¹: 97-0432

9760 SW 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. No.,Job No.,etc

3. 'Mork Performed by Florida Power 8 Li htName

P;O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization No.Expiration Date

N A

H A

N A

4. Identification of System: RESIDUAL HEAT REHOVAL System ¹: 50 Quality Group: B

5. (a) Applicable Construction Code 831. 1 1955 Edition, NA Addendas~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case

6. Identification of Conponents Repaired or Replaced and Replacement Coaponents

Name ofComponent

IPIPE TO ELBOW MELD

Hame ofHanufacturer

IN/A

/Hanufacturer/ National (

/, Serial Ho. BoardOther

Identification

IN/A [H/A (14gg-RHR-2301-10

(Year ) Repaired (ASHE )

)guilt] Replaced or ( Code f

f Replacement [Stamp f

I I /~Yes se[UHK [Repaired ]Ho

7. Description. of Mark: INDICATION BUFFED OUT THAT MAS FOUND DURING ROUTINE ISI INSPECTION.

8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure

pressure~is rest Temperature ~F

97-005.3

Page 52: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH NIS-2 (Back)

9. Remarks« NO WELDING REaUIRED

CERTIFICATE OF COHPLIANCE

We certify that the statements made in the, rcport: are correct and «his repair conforms to the rules of theASME Code, Section XI.

Type Code Symbol Stamp

Certificate of A thorization No. ~NA

rSigned Qp)WQg~i6 cs~y

wner or wner" s Designee, TitleDate /WF/ZA 1ll ~ ~ 0

CERTIF,lCATE OF INSERVICE INSPECTION

I, thc undersigned, holding a valid comnission issued by the Iiatidnai Bohrd 'of Boiler and Pressure Vesselinspectors and the state or province, of Dade County and ecyloyed'by ArkWright Hutual Insurance-Company ofNorwood, Ha. have inspected the comp>nents descrilxxl in.this bwndrs kepdrt durihg the period '3/17/97 to03/20/97 and state that to the best of my knowledge and belief, the O~ner has perforated examinations andtaken corrective measures descriked in this Owners Report in 4ccdrdahcc with the requirements of the'SME

Cade,'ectionXI.By signing this certificate neither the-inspector nor. his ampl'oyer makes any warranty, expressed or

implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore,neither the Inspector nor his employer shall be liable in any~ manner~for any personal injury or propertydamage or a loss of any kind arising from or connected with this ~inspect~ion,,

Inspe ors gnatureCocmissions , NB 8230,~N I

Naticnai'Boa'rd,'State, proVidence, andEndorsements'ot~

A 19

97-005-:3'

Page 53: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS-2 OVNERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASME Code Section XI

1 ~ Owner Florida Power 8 Li ht Date 03 25 97

700 'Universe Blvd. 'Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point PlantName

UnitPNO ¹:63/2531 MO ¹: 97006917 CR ¹: 97-479

9760 SU 3CC Street Florida Cit FI. 33035Address Repair Organization P.O. No.,Job No.,etc

3. llork Performed by 'Florida Power 8'i htName,

P.O. Box 4332 Princeton FI. 33032Address

Type-Code Symbol StampAuthorization No.Expiration Date

N A

N A

4. Identification of System: RESIDUAL HEAT REMOVAL System ¹: 50 Duality Group: B

5. (a) Applicable Construction Code ASME SECTION III 1965 Edition,~N A Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name ofCoeponent

Name ofManufacturer

/Manufacturer('ationali Serial No. Board

Other'Identification

- Iyear I Repaired I ASME Iiguiiti Replaced or i Code i

( Replacement istaep (

I I Joyce ge

13A RHR HEAT EXCHANGER IATLAS INDUSTRIAL I877MANUFACTURING

I727 13E206A i1968 iRepaired iYes

7. Description of cwork:. GRIND OUT LIQUID PENETRANT INDICATION IDENTIFIED DURING ROUTINE 'INSERVICE

IHSPECT IOH.

8. Tests conducted: gydrostettc:

Other PT

Pneunatic: Nominal Operating Pressure

Pressure~sic test yeepcreture 4F

97-006-3

Page 54: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FOHN HIS-2 (Back)

9. Remarksi NO lIELDIHG REQUIRIED

CERTIFICATE OF COHPLIANCE

'Me certify that the statenents made in the report are cori ect and this repair conforms to the rules, of theASIDE Code, Section XI.

Type Code Symbol Stamp 'N

A'ertificateof Authorization No., IN~A Expiration Date ~N A

s;g,~ W6QÃOwner r Owner's Designee, Titlk

Date

CERTIFICATE OF IHSERVICE IHSPECTION

I, the undersigned,.holding a,valid ceiiaission issued by the National Board of Boiler and Pressure Vessel.inspectors and the state or province" of Dade County and"'employed by'Arkwright Hutual 'Insurance Corqpany ofNorwood, Ha. have inspected the cavponents described in(this owners Report during the period '03/19/97 'o03/21/97 and state that to the best of my knowledge and belief, the owner has performed examinati'ons'andtaken corrective measures descr3bed in .this owners Report ih accordance with the requirements af the AsNE~code,Section XI.

By signing this. certiificate neither the Inspector nor his ecpioyer makes any warranty, exprassed odimplied, concerning the examinations and corrective meakurels ddscr/bed in'this Oinieris Report. 'Furthermora,neither the Inspector nor his employer shall. be, liable i'n any manner for any personal injury od praperty ~

damage or a loss of any kind arising, from or connected with~ thiis iiispection.

'ate

Inspec ors Si ture

wag „P„-7

Cocmiasions,, HB, 823~ON~I,~,~ Hationhi B'oard, State, Providence, and Endorsanents

97-006-3

Page 55: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 03 25 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plantkame

UnitPWO ¹:63/8991 WO ¹: 96024216 CR ¹: 96-776

9760 SW 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. Ho.,Job Ho.,etc

3. Work Performed by Florida Power & Li htName

Type Code Symbol Stamp N A

Authorization No. N A

Expiration Date H A

P.O. Box 4332 Princeton 'Fl. 33032Address

4. Identification of System: MAIN STEAM System ¹: 72 Quality Group: B

5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name ofComponent

Name ofManufacturer

)LOAD STUD (1) FOR PSA-35 )H/AiSNUBBER TAG ¹ 3-1084[HUTS (4) FOR PSA-35 [N/A(SNUBBER TAG ¹ 3-1084

(Manufacturer[ Hational( Serial Ho. Board

lYear f Repaired I ASME I

]guilt] Replaced or f Code ]

f Replacement JStasp f

I I [r~es ue

OtherIdentification

IN/A )N/A )STOCK CODE ¹0197328 17-4 )UHK. [Replacement ]HoSS ASME SA-564

A-194 GRADE 8IH/A fH/A ]STOCK CODE ¹0209608 ASME fUHK. [Replacement [Ho

7. Description of Work: REPLACED LOAD PIN ON PACIFIC SCIENTIFIC MODEL PSA-35 'SHUBBER TAG ¹ 3-1084 WITH

LOAD STUD.

8. Tests Conducted: Hydrostatic:

Other VT-3

Pneuaatic: Hominal Operating Pressure

Pressure~sig Test teegereture

97-007-3

Page 56: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH HIS"2 (IBack)

9. Remarks: HECHANICAL COHHECTIOIN HIO M=LDIHG REOU'IREO.

CERTIFICATIE OF COHPLIANCI

Ne certify that the statements made in the report are correct and this replacement conforms to thc rule's of thIcASHE Code, Section XI.

Type Code Symbol Stamp

Certificate Authorization No.

SignedOwner r Owner'sVesignee,

~NA Expiration Date ~N 'A

Ip~ +»pn ~~4:,I Pi+.~~; Oate,+~iiX4~/ 2.9'; 19QTitle

I

CERTIFICATE OF INSERVICE IHSP'ECTIOH

I, the undersigned, Iholcling a valid coamission issued by thh Haltiohal Board of Boiler arxl Preslurc,'Ves'sel '

inspectors and the state or Province of Dade County and.employed-by Arkwright Hutual, Insurance'oalpanVof'orwood,Ha. have inspected the ccraponents described in this Oianers Report d<rring tire period 09/18/96 '6

03/24/97 and state that: to the best of my knowl.edge arkf &tieIf, thc O~ner has performed exami'nations'ndtaken corrective measures described in this Owners Report in abcor'danke with the requirements of t'e ASHE'ode, '(Section XI.

IBy signing this c'crtificate neither the Irtspector nor his employer makes any warranty, expressed or

implied, concerning the examinations and corrective measure's dLscr'ibad in'his Owner''s Repart. Fur'thelmor'c,neither the Inspector nor his employer shall be liable in alny 6rann'er for 'eny personal injury or propertydamage or a loss of any kfr»d arising from or connected wlthl this insgctibn. '

Inspec rs S atureCoaraissions NB 823~0M~I~

National Board, State, Providence, and Erx/orsIemedts '(

Date 19 QP

O97-007-3

Page 57: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASHE Code Section XI

1 ~ O~ner Florida Power & Li ht Date 03 24 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point PlantHame

UnitPWO ¹:63/7603 WO ¹: 96016980

9760 SW 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. No.,Job Ho.,etc

3. Work Performed by Florida Power & Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization Ho.Expiration Date

H A

N A

H A

4. Identification of System: AUX FEEDWATER System ¹: 75 Quality Group: C

5. (a) Applicable Construction. Code B31.1 1955 Edition, HA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name ofComponent

iHUTS (14)I

ICAP SCREWS (14)

Name ofHanufacturer

IN/A

IN/A

iManufactureri National i

i Serial No. BoardOther

Identification

IN/A

JH/A

fN/A iSTK CODE 00278361

JH/A iSTK CODE 00271201

iYear,i Repaired i ASHE (

iguilti Replaced or i CodeJ

i Replacement [Stamp iI

'I [~res seiUHK iReplacement iHo

iUNK )Replacement )Ho

7. Description of Work: DISASSEMBLE INSPECT REASSEMBLE 3-20-401

t 8. Tests Conducted: Hydrostatic:

Other

Pneunatic: Hominal Operating Pressure

pressure~tg test testsereture oF

97-008-3

Page 58: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORM HIS 2 (Back)

9. Remarks: MEcHANIcAL col<NEcTIDM~MO MELDING REOUIRED.

CERTIFICATE OF COMPLIANCE

Ile certify that the sicstements maCk in the report are correct and this replscecnent conforms to the cules of theASME Code, Section XI.

Type Code Symbol Stamp ~NA

Certificate of Authorization No. ~NA

S igned ~ l+A+Y~fi Si~ggJA~P

Owner or OwnelC/s Designee, Tit.le

Ex'piration Date '

A l

pace W~ ~+ ' 'sy'~~ I

iCERTIFICATE OF INSERVI CE INSPECTilOH

I, the undersign<4, holding s valid cccimission issued by the National Board of Boiler snd Piiessurc'Vesselinspectors and the state or province of.'D~sde'County'and employed by Arkwright Mutual', Insurance Company ofNorwood, Ma. have inspected the ccimponents described in'his owners Report-cfuring the period 07/01/96 to03/24/97 snd state that to thc; best of my knowLedge snd belief, the owner hss Ferformed elcsmi'nations'ndtaken corrective measures. described in thiis Owners Repo'rt .in secor'danre With'the'equirements of the ASME Cocle,Section

XI'y

signing this certificate neitheir,the Inspector nor his emplcyer makes any warranty, expressed. orimplied, concerning the exciminations and corrective measures described in this Owner's Report.'ur'thermor'e,neither the Inspector nor his employcir.shall be Liable 'in any manner for any personal injury or pr'opei ty i

damage or s loss of any kind arising from or connected with,thisiinspecti'on.'nspec

orsyS" natureCanmissions Hll 828~0I~IQ

i Hstiocial Board, State, Providence, snd Endorsements

Date + ~ ~ 19 7~~

97-008-3

Page 59: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS

As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power S Li htName

Date 03 24 97

700.Universe Blvd. Juno Beach Fl. 33408

AddressSheet 1 of 2

2. Plant Turke Point PlantName

UnitPWO ¹:0991/63 WO ¹: 96030528

'9760 SW 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. No.,Job No.,etc

3. Work Performed by Florida Power. S Li htName

P.O. Box 4332 Princeton 'Fl. 33032Address

Type Code Symbol StampAuthorization Ho.Expiration'Date

N A

N A

4 ~ Identification of System: CHEHICAL 8 VOLUHE CONTROL System ¹: 47 Quality, Group: C

5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case

6. Identification of Components 'Repaired or. Replaced and Replacement Components

Name ofComponent

Name ofHanufacturer

/Hanufacturer) National

) Serial Ho. BoardOther

Identification[Year ] Repaired i ASHE iiguilt) Replaced or i Code (

( f Replacement igtaap iI I James se

ITHREADED ROO iN/AI8 STUDS FABRICATED

iH/A iN/A [UTC 398161 ASHE SA-193 iUHK. iRepiacement (HoGRADE 87

IHEAVY HEX HUTS (16) iN/A iN/A iH/A iUTC 399723 ASME SA-194 iUHK. ]Replacement iNoGRADE 2H

7. Description of Work: REPLACED EIGHT 8 STUDS AND SIXTEEN 16 NUTS ON NON-REGENERATIVE HEAT

EXCHANGER 3E201 FABRICATED BY ATLAS-COPCO INC. HOOEL 0-1503-7.

t 8. Tests Conducted: Hydrostatic:

Other

Pneunatic: Hominal Operating Pressure

Pressure~erg Test Tempereture oF

97-009-3

Page 60: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 o,f 2

FiDRH NIS-2 (Back)

9. Remarks: HECNANICAL CONNECTION NO WELDING REOUIRED.

CERT IF ICATE OIF COHPL IANCE

Me certify that the statenents made in the report are,correc't and this ireplscement conforms to the rules of theASHE Code, Section XI.

Type Code Symbol Stamp

Certificate of Authorization No. ~N A Ekpiriation D'ate

siOwner' Owner'O'Designee„Title

~r 2. ~z

r

CERT IF ICATI-: OF INSERVICE INSIPECT ION

I, the undersigned, holding a valiid cnrmiSsion issued b'y thc National Board of Boiler and Presaurci Veaseliinspectors and the state or Province of Dade County and employed by Arkwright Hutual'nsurance Company ofNorwood, Ha. have inspected the components described in this Owners Report during the period 1'I/25/96 to03/24/97 and state that to the best of my Iknowicdge a'nd belief, 'the Owner has performed examlnat'iona an'dtaken corrective measures described in,.tlhis Owniers Report in accordance with the requirements 'of the.iASHF. Code, i

Section XI.By signing this certificate ncithcr tlhe Inspector nor hiis Cmplbyed makes 'any warranty, expressad or

implied, concerning thie examinations snd correc'tive measures desciribed in this Owner's Rcport. Furthcrmor''e,'eitherthc Inspector nor his employer slhall be liable in any manner for any personal injury or property

damage or a loss of any kind arising from or connected with this inspection.

,Corrrriirssiions, NB 8230 ~N~IInspector SigniitFre 'ational 'Board, State, Iprovidence, and Enkioraements

Date

97-009-3I

Page 61: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH HIS-2 OWERS REPORT FOR REPAIRS OR REPLACEHEHTS

As Required by the Provisions of the ASHE,Code Section XI

1. Owner Florida Power 8 Li ht Date 04 18 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant Unit,PNO ¹:63/0124 .WO ¹: 96025060PCH ¹: 96-012

9760 SM 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. Mo.,Job Ho.,etc

3. Nark Performed by Florida Power 8 Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Syahoi StampAuthorization Ho.Expiration Date

N A

4. Identification of System: Safet In ection S tern System ¹: 62 Quality Group: 8

5. (a) Applicable Construction Code 831.1 1955 Edi t ion,~MA Addenda,~NA Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,M416-1Code Case

6. Identification of Coaponents Repaired or Replaced and Replacement Components

Name ofComponent

I

I13T208 BOROH INJECTION I

ITAHK

Name ofHanufacturer

N/A IN/A (H/A

(Manufacturer[ Nationalf Serial Ho. Board

OtherIdentification

]Year f Repaired / ASHE )

(Built) Replaced or ( Code ]

] Replacement ')Stoep (

I I ]~res rre

)PC/H. 96-012 BORON IHJ TK )UHK [Replacement )MoHOD IF I CATION

7. Description of llork: PIPING HOOIFICATIONtOF SAFETY IMJECTIOM LINE TO BYPASS THE BORON INJECTION TANK.

THE FOLLOMING HATERIAL llAS USED: 2 90 DRG 4" SCH 80 ELBONS UTC 398779 4" SCH 316 'ASME SA 312 SCH

,80 UTC 398561 4 SOCKOLET 'SS ASHE 'SA182 UTC 406901 2 45 DRG 4" SCH 80 ELBONS UTC 406833

1 "4" SS TEE SCH 80 ASHE SA403 UTC 407413. FOR SUPPORTS 3-SIH-23 8 H IC-248B-1 THE FOLLONIMG

MATERIAL llAS USED: 2 4" PIPE CLAHPS UTC 405948 2 NELDLESS EYE 'NUTS UTC 405946 2 llELDED BEAN

ATTACHMENTS UTC 405945 2 MELDED EYE RODS UTC 405947 AHD 2 PLATES 1 2X6X7 UTC 390858.

Pneunatic: Hominal Operating Pressure X

tressure~1550 iu test Tsetsereture 83 4F

97-010-3

Page 62: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH NIS-2 (Back)

9. Rcmarkse SUPPORT 3-SIH-139 THE FOLLOWING HATERIAL 'MAS.USED' 4" PIPE L1-BOLT LITC 400433

1 4" PIPE SADDLE UTC'405949'. SUPPORT 8080-H-007-1 THE F I.LNIIN'ATER AL AS USED: 1 CHANNEL'Y

TEEL UTC 407359 2 CLAHP!» UTC 374568 !~2NUT SPRING UTC 3932C7 ANGLE C.S.ASTH A36 UTC 403958. TH

REOUIREHNTS OF CODE CASE NC16-1 HAVE BEEN HET FOR THIS R-PL CEH:NT ACT VITY.

iCERTIFICATE OF COHPLIANCE

lie certify that the statcneehts made in the report are, correct and this repiaccnent conforms to the rules of theASHE Code, Section XI.

Type Cade Symbol S'tamp N A

Certif icate Author)zation No„- I~!A Expireition Date ~NA/»i».~. u~PQ~M 5~+~~~~-, ~~~»s~e ,~gad, i A

Owner or OwnqPs Designed, Title 4

CERTIFICATE OF INSERVICE INSPIECTION

I, thc undersigned, holding a valicl connission issued by thc National Board o'f Boiler and Pressure Vesselinspectors and the state or province of Dade county and~cap~layed by Arkwright Hutual'nsurance company ofNorwood, Ha. have inspected the caqmnents described in thils OWnerd Report during the periad 04/07/96 ta04/18/97 and state that to the best of my knowledga and baiicf, t'e O~ner has performed examinations'ndtaken corrective measures dcscribeid in this owners Report ih adcordanc'e with 'the requirements.6f the ABHE~ code,Section XI.

By signing this certificate neither the Inspector nor hi!s employer 'makes any warranty, expressed orinpiied, concerning the exmninations aind correct!ive meaaures described .ln,this Owner's Report. Furthermore,neither the Inspectoir nor his eeyioyer shall be liable iin any sunnier far any personal injury ot pr~opci ty ~

damage or a loss of any kind arising from or connect'ed with this inspection.

Inspe ors'natureComni as 1 ons, NB 823~ON~I,~,

National Board, State, Proviidence, and Endorsements

Date .'I9

97-010-3

Page 63: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASHE Code Section XI

1. O~ner Florida Power & Li ht Date 03 30 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point PlantNsne

UnitPIIO ¹:3648/63 IIO ¹: .95028815

9760 SW 344 Street Florida Cit Fl. 33035Address Repair Organization'P.O. Ho.,Job Ho.,etc

3. llork Perforned by Florida Power & Ci htName

P.O. Box 4332 Princeton Fl. 33032Address

,Type Code Symbol StampAuthorization.Ho.Expiration.Date

N A

N A

N A

4. Identification of System: CHEMICAL AND VOLUME CONTROL System ¹: 47 Quality Group: C

5. (a) Applicable-Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case

(b) Applicable Edition of Section.XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case

6. Identification of Components Repaired-or Replaced snd'Replacement Components

Name ofComponent

(STUDS (24)

I

(HUTS (48)

Mane ofManufacturer

(H/A(H/A'N/A(H/A

IN/A I3E201

(H/A (3E201

(Manufacturer( National( Serial Ho. Board

OtherIdentification

(Year ( Repaired ( ASME (

(Built( Replaced or ( Code (

( Replacement (Stamp (

I I i~res ge(UHK. (Replacenent (Ho

(UMK. (Replacement (Ho

7. Description of Ilorkt REPLACED 24 STUDS AND 48tNUTS ON THE NON-REGENERATIVE HEAT EXCHANGER ENDBELL

ASSEHBLY.

t 8. Tests Conducted: Hydrostatic:

Other

Pneunatic: Nominal Operating Pressure

pressure~stg Test Tespersture 4F

97-011-3

Page 64: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH HIS-2 (Back)

9. Remarks: MECHANICAL CONNECTIOM MO MELOIMG REOUIRED.

CERTIFICATE OF COMPLIANCE

'Me certify that thc staterents made in the report are correct and ttais rcpiacenent conforms «o the rules of theASHE Code, Section XI'. I

Type Code Symbol Stamp

Certificate of+uthorization Ho. ~HA

s|gn~ 842~%~~M'wner

o Owner" s4'esigne'e, 'Tlf.le

Expiration Ilste ~NA19

0CERTIF ICAYE OF IHSERVICE IHSPECTIOH

I, thc undersigned, holding a valid caw>ission issued by the Hational Board of Boiler and Prepsure Vesselinspectors and the state or Province. of Oade County and employed by Arkwright Mutual Insurance Company ofNorwood, Ha. have inspect'ed the components described in this Owners,Rcp'ort'during the period '10/L3/95 'to

'3/27/97and state that to thc best of my knowledge and belief„ the Amer has perfo'rmed examinations andtaken corrective measure." described in this Owners Report in accordance with the requirenwnts of thc ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed'orII

implied, concerning the examinations and corrective measures described in this Owner's Rcport. Furthernere,,neither the Inspector nor his eayloyer shall be liable in any manner for any personal'nJury or;properiydamage or a loss of any kind arising from or connected with,thi;s inspection. 1

Inspec rs Si atureCceeissidns ' NB i823O~H~I~

,'Nat,'io~i Board, State, Providence, and Endorsenents

gate

97'01

Page 65: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORN NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASHE Code Section XI

~ .1.. Owner Florida Power 8 Li htName

Date 04 07 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point PlantName

UnitPWO ¹:63/7853 WO ¹: 96012069

9760 SW 344 Street 'Florida Cit Fl. 33035Address Repair Organization P.O. No.,Job Ho.,etc

3.,llork Performed by Florida Power & Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization No.Expiration Date

N A

H A

N A

4. Identification of, System: REACTOR COOLANT System ¹: 41 Quality Group: A

5. (a) Applicable Construction Code 831.1'955 Edition, NA Addenda,~H A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case

6. Identification. of Components Repaired or Replaced.and Replacement Components

Name ofComponent

Name ofHanufacturer

)Nanufacturerf National) Serial Ho. Board

OtherIdentification

)Year ) Repaired ( ASHE

[guilt) Replaced orJ

Code (

JReplacement (Stamp

J

I I JYesreue,IPRESSURIZER RELIEF VALVE ICROSBY IH51249-1580 IN/A IRV-3-551A )UNK. )Replaced (Ho

(PRESSURIZER RELIEF VALVE (CROSBY IH51249-1362 IN/A IRV 1A (UNK. (Replacement )Ho

7. Description of llork: REHOVE PRESSURIZER SAFETY VALVE RV-3-'551A AHD INSTALL SPARE.

Pneunatic: Hominal Operating Pressure X

pressure~2280 siu test Temperature 535 'F

97-012-3

Page 66: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH, HIS-2 (Back)

9. Remarks: HECHANICAL CONNECTION NO 'WELOIHG REOUIREO.

CERTIFICATE OF OOHPLIANCE

lie certify that the statements made in the report are correct and this'eplacement conforms to thol rulles of theASIDE 'Code, Section XI.

Type Code Symbol Stamp N A

-Certif icate of Authori".ation No. ~HAI

Signed cfar +ivw~~P(<~Own r or wner's Oesignee, T>tl'e

CERTIFICATE OF IHSERVICE INSPECTIOH

I, the undersigned,, holding a valid co>r»>issiion issued by the National Board of Boiler and Pressure Vesselinspectors and the state or F'rovince of Dadle County and employed by Arkwright Hutual Insure'nce Cempany.*fNorwood, Ha. lieve inspected the comF>onents described in this 'Owners 'Report during the period 07/14/96 to03/27/97 and state that to the best of my knowledge and belief, the Owner has perfors>ed examinations andtaken corrective measures described in this Owners Report'n 'accords'nce'with tHe requirements. of the ASHE Code,Section XI.

By signing this certificate neither the Inspector r>or his employer makes any warranty, expressed orimplied, concerning the examinations and corrective measui os 'described in this Owner's Report. Furthermore,neither the Inspector nor his e>qpioyer shall be liable in'ny manner for any personal injury or propertydamage or a loss of any kind ari:sing from or connected with this'ns'pection'.

Inspe tors >gnature National~ Board, State, Providence, ahd &do>>sMnts

Date

97-O12-3

Page 67: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS-2 OLINERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power B Li ht Date 04 16 97

700:Universe Blvd. Juno Beach Fl. 33408Address

Sheet of 2

2; .Plant Turke Point PlantName

UnitPNO ¹:63/2645 NO ¹: 97007310 CR ¹: 97-53l

9760 SW 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. No.,Job Ko.,etc

3'., llork Performed by Florida Power I Li htName

P.O. Box 4332 Princeton Fl. 33032

Type Code Symbol StampAuthorization Ho.Expiration, Date

N A

N A

N A

Address

4. Identification of System: C onent Coolin Hater S stem System ¹: 30 Quality Group: B

5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~H A Code Case

6. Identification of Components Repaired or Replaced,and Replacement Components

Name ofCoayonent

Name of, ')Manufacturer) National (

Manufacturer [ Serial Ho. BoardOther,

Identification(Year .( Repaired ) ASME ][Built( Replaced or ] Code

J

/ Replacement JStaap f

I I [~Yes No

ITRANSITION TUBE

IASSEMBLY

N/A iH/A [FOR MSA TAG ¹3-1096 [UHi( (Repaired )Ho

7. Description of llork: TRANSITION TUBE OH SNUBBER 3-1096 MAS SHORTENED BY REMOVING EXISTING HELD

AHD RENELDING.

8. Tests Conducted: Hydrostatic:

Other VT-3

Pneunatic: Hominal Operating Pressure

4F

97-013-3

Page 68: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH MIS.2 (Back)

9. Remarks: ALL MELDING PIERFORHED IN ACCORDANCE MITH APPROVED PLANT 'PROCEDURES.',

CERTIFICATE OF COHPLIAHCI

lie certify that the statements made in the report are cor'rect and this 'epair 'onfor'ms to the i;utels oP th'ASHE Code, Section Xl.

Type Code Symbol StrmTo

Certificate of Author'fzatfon Ho. ~NA Expiration Date

Owner or OwnerBdl/Designee/ Title p.

~NA

'9~

CERTIFICATE OF INSIERVICE INSPECTION

I, the undersigned, hoidling a valid comrrfssfon fssuk bg th2I. Ma'tfohai 'Board o'f Boiie'r andP'resdure'essel'nspectors

and the state or Province of Dade County,and empfoy2% by Arkwright Kutuai, Insurance'oripnnl/ ofNorwood, Ha. have inspectedl the corrponents described in this Owners Report during the, period 03/25/97 tio04/16/97 and staIte that to the best of my knowledge and belief, the owner has F2erformed ekamfnatfo& andtaken corrective measures dlescribed in this Owners Report in accordance with the requirements IOf the.ASME Code,Section XI.

By sigriing this certilficate neither the InspeICtcr nor his eccployer makes any warranty, expressed orimplied, concerning the examinations and corrective measure's drl.scribed fn'his Owner's Report. Furthermore,neither the Inspector nor his qaployer'hall be liable in any rtranner for,any personal injury or propertydamage or a loss of any kind arising from or connected with'hfs I'nspection.

I

I

I

BnmnIssInns MB 823~08~12Inspect rs Si ature 'affon'nl Board, State8 ProvidenIce, andi Endorsements

Date iP 19

97-01,3-3

Page 69: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH NIS-2 OHHERS REPORT FOR REPAIRS OR REPL'ACEHEHTS

As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 04 08 97

700 Universe. Blvd. Juno Beach Fl. 33COB

Address'Sheet 1 of 2

2. Plant Turke Point Plant UnitPQO ¹:63/2418 HO ¹: '97006494

9760 Su 3CC Street Florida.Cit Fl. 33035Address

3. Hork Performed by Florida-Power & Li htName

P.O. Box 4332 Princeton Fl. 33032Address

4. Identification of System: RHR

N A

System ¹: 50 Quality Group: 8

Repair Organization P.O. Ho.,Job No.,etc

Type Code Symbol Staap N A

Authorization Ho.Expiration Date N A

5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~M A Code Case

6. Identification of ConTxinents Repaired or Replaced and Replacement Conponents

Kame ofConponent

Name ofHanufacturer

iHanufacturer( Nationali Serial No. Board

I

OtherIdentification

iyear i Repaired i ASHE i/Built( Replaced or,/ Code i

/ Replacement /SteapJ

l I [~Yes ueIPLUGS (4) H/A iH/A iH/A PRO-3-1469 UTC 406038 ASHE iUNK. /Replacement /No

SA-182 F316 SS

7. Description of Ilork: REPLACED PLUGS ON RESTRICTING ORIFICE RO-3-1469'FLANGES.

8 . Tests Conducted: Hydrostatic:

Other

PneLInat 1 c I 'Hominal Operating Pressure

Pressure~g A ig Test teepereture

97.014-3

Page 70: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH NIS.2 (Back)

9. Remarks: HECKANICAL CONNECTION~NO MELDING REOUIRED.

CERTIFICATE OF COHPLIANCE

Me certify that the statements made in the report are carr'ect'and'his replacement conforms to the ru'les of theASHE Code, Section XI.

Type Code Symbol St~>

Certificate of Authorization No. N~A Expiration Date

ISigned . ~~+,) i ~~~ AAei~~ Data

Dune or O~rrk's Designee, Ti e

CERl'l I'ICATE OF INSERVICIE IIIISPECT ION

I, the undersigned, holding s valid c|xtmission issued by the National Beard of Boiler and pressure VesselJ

inspectors and the state. or Province. of Dade County and emp)<vyeai'by Arkuright l<utual 'Insurance C'cxrphny ofNorMOOd, Hs. have inspected the caqmnents descriked in this Owners Report during .the period i03/14/97 to04/08/97 snd state that «o the best of my knox)edge snd belief,, the Darner has performed examinations andtaken corrective messue es described .in this owaers Report in accordance Hith the. requirements of the ABHE code„,Section XI.

By signing this certificate neither the Inspectot nor his'esp)oyer makes sny Msrranty,.expressed orimplied, concerning the exsmiinations and corrective messu'res'descritied 'in t'his (Incr's Report. Furthermore,neither the Inspector nor his,employer shall be liablo in sn)~ manner for any personal injury or )~rcport)<damage or s loss of sny kind arising fries or connected Hith this inspection.

Comsissions NB 8230 ~N LIIInspectors'gnatlxhf National Board, State, Providence, snd Endorsements

Date 197 7

9?. CI14-3

Page 71: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASHE Code Section Xt

1 ~ Owner Florida Power & Li ht Date 04 01 97

700 Universe Blvd. Juno Beach Fl. 33408Address

2 ~ Plant Turke Point Plant

Sheet 1

UnitPWO ¹:63/6231

of 2

WO ¹: 96009195

9760 SW 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. Ho.,Job Ho.,etc

3. Work Performed by Florida Power & Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization Ho.Expiration Pate

M A

N A

4. Identification of System: CHEMICAL & VOLUME COMTROL System ¹: 47 Quality Group: B

5 ~ (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~M A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~MA Code Case

6. Idgntification of Components Repaired or Replaced and Replacement Components

Name ofComponent

Name ofManufacturer

iHanufactureri Serial No.

National iBoard

OtherIdentification

(Year i Repaired i ASHE (

JBuilti Replaced or i Code iJ

Replacement JStarp (

I I JYesreue

i4" BUTTERFLY VALVE

(STUDS (8)I

IHUTS (16)

I FISHER

,(N/A

,iN/A

IN/A

I H/JI

(H/A

IN/A 13-269 UTC 407522

)H/A i3-269 UTC 378831

IH/A I3-269 UTC 405142

iUNK. (Replacement iMo

iUNK. iReplacement iHo

iUNK. /Replacement /No

7. Description of Work: CHARGING PUMP 38 INLET ISOLATION VALVE 3-269 REPLACEHENT.

'e

8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure X

Pressure~20 te Test tespereture 89 'F

97-015-3

Page 72: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of',2

FORN NIS-2 (Back)

9. Remarks: NECKANICAL CONNECTION~NO MELDING RI=QUIRED,

CERTIFICATE OF COMPLIANCE

Me certify that the statements made in the report are correct andi.thiis replacement conforms to the r)iles of theASHE Code, Section XI.

Type Code Symbol Stamp ~NA

Certificate of Authorization No. N~A

SignedOwner or Owners Designee, Tsti.e

'ate ',19

Expirsiion Date ~ii A

IliCERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holdiing a valid conmission issued by the National Board of Boiler-and Pressure 'Vesselinspectors and the state or province of. Dade County„:andiempf.oyed by. Arkwright. Hutual Insurance. Company'f

')v g Norwood, Na. have inspected the conyonents described in thiis Owners Report during the period '4/07/96'o'jiXI/ I / 9q and state that to the best of my knowiixige and belief, the Owner has performed examinations and

taken corrective measures described in this Owners Report in accordance with the requirements of the ASKE 'Code,Section XI.

By signing this certificate, neither the Inspector nor his eciployer makes any warranty, expressed orimplied, concerning the examinations and corriective measures described in this Owner~s. Report. Furthermore,neither the Inspector nor hiis employer shall be liablie in any manner for any personali injury or propertydamage or a loss of any kind arising from or connected with this inspection.

Inspe ors Si

+i~'.nture National Boardl, State, Providence, and Endorsements

Date

97-01'I-3

Page 73: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS

As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li htName

Date 03 30 97

700 Universe Blvd.'uno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant UnitPWO ¹:2508/63 WO ¹: 97006766 CR ¹: 97-0466

9760 SW 344 Street Florida Cit Fl. 33035

Address Repair Organization P.O. No.,Job No.,etc

3. Work Performed by Florida. Power 8 Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization Ho.Expiration Date

N A

N A

4. Identification of System: SAFETY INJECTION System ¹: i62 Quality Group: 8

5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Coaponents Repaired or Replaced and Replacement Components

Name ofComponent

Name ofHanufacturer

(Hanufacturer] NationalJ

Serial Ho. BoardOther.

Identification(Year ( Repaired

JASHE (

,]guilt( Replaced orJ

Code f

JReplacement ]Stamp I

l I /t~es eeISUPPORT 8080-R-007-01 IN/A fN/A 'fN/A [DRWG ¹ 5613-H-823 SHT 17 ,(UNK. [Repaired (No

7. Description of Work: GROUND PT IHDICATIONS UNTIL INDICATIONS WERE AN ACCEPTABLE SIZE OR WERE

ACCEPTABLE AS-IS PER CONDITION REPORT CR97-0466.

8.,Tests, Conducted: Hydrostatic:I

Other PT

Pneunatic: Nominal Operating Pressure

eressure~ig test resgereture 4F

97-016-3

Page 74: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORM NIS-2 (Back)

9. Remarks:- NO MELDING IJAS PERFORMED.

CERTIFICATE OF COMPLIANCE

Me certify that the statements made in the report are correc't and this 'repair conforms to the hule's of th'ASME Code, Section XI.

Type Code Symbol Stamp

Certificate f Authorization No. ~NA Eilpiratldn Ohta ~NAs.g.~ cfD ~@A'.'~4~ ~~w~~gg~ n„„give zl

Owner' Owners Designee,&itic

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid cermission issued by the,Natio'nal Board of Boiler andPresaure'easel'nspectors

and the state or Provi:nce of Dade County and employed by Arkwright Mutual Insurance Cori@an'y ofNorwood, Ma. have inspected the components described in this Owners Report during the period 03/18'/97'b03/30/97 and state that to the best of my knowledge and belief, the O~ner has performed examiinat'Iona andtaken corrective measures described in this Owners Report in accoi danae with'hd r+uir'ements of, the 'ASME Code,Section XI.

By signing this certificate neither the Inspector nor his,employer makes any warranty, expressed orimplied, concerning the examinatiions and corrective measures d'escribed in this Owner's Report. Fukthermo/e,

1neither the Inspector nor,his employer shall 'be liable-in any 'manner 'for any personal injury or propertydamage or a loss of any kind arising from or connected with this inspection.

7P'.

Inspector Si iture

19

Comnissions NB 823~0 ~N INational Board, State, Providence, and Endorsements

097-0'I6-3

Page 75: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS-2 OWNERS REPORT'FOR REPAIRS OR REPLACEHEHTS

As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li htName

Date 03 30 97

700 Universe Blvd. Juno Beach Fl. 33C08 Sheet 1 of 2

2. Plant

Address

Turke Point PlantName

UnitPWO ¹:2507/63 WO ¹: 97006765 CR ¹: 97-0465

9760 SW 3C4 Street Florida Cit Fl. 33035Address Repair Organization P.O. No.,Job Ho.,etc

3. Work Performed by Florida Power 8 Li htName.

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization Ho.Expiration Date

N A

H A

N A

4. Identification of System: SAFETY INJECTION

5. (a) Applicable Construction Code B31.1

System ¹: 62 Quality Group: B

1955 Edition, NA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced and'Replacement Components

Name ofComponent

Name ofNanufacturer

,fHanufacturerf Nationalf Serial No. Board

OtherIdentification

fYear f Repaired f ASHE ffBuiltf Replaced or f Code f

f Replacement fsterp f

I I /~rs Ile .

fSUPPORT 8080-H-007-07 fN/A IH/A fH/A fDRWG ¹ 5613-H-823 SHT 11 fUNK. fRepaired fNo

7. Description of Work: GROUND PT INDICATIONS UNTIL THEY WERE AN'ACCEPTABLE SI2E'OR WERE ACCEPTABLE FOR

USE AS-IS IAW CONDITION REPORT CR97-0465.

t 8. Tests Conducted: Hydrostatic:

Other PT

Pneunatic: Nominal Operating Pressure

Pressure~sip test Temperature oF

'97-017-3

Page 76: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH NIS-2 (Back)

,9. Remarks: NO IIELDING llAS PERFORMEI).

CERTIFICATE OF COMPLI ANCIE

lre certify that the ststmrents made in the report are correct and this 'epai'r conforms to the rules of th'eASHE Code, Section XI.

Type Code Symbol Stamp

Certificate o Authorization No. ~H A

SignedO~ner. r Owrer/K Designee, Title

Expiration Date ~N A

Qc~ /fY~ ~ Date ~/~g~ aP/

CERTIFICATE OF IHSERVICE INSPECTION

I, the undersigned, holding s valid conmlssion issued by tHe Hatiohai Board of Boiler and.pres! ure.Vesselinspectors snd the state or province of-Dade County and employed by~Arkwright Hutual Insurance Coriipan'y ofNorwood, Ha. have inspected the components described in this owners R'eport during the period '3/18'/97'tb03/30/97 and state that to .the best of my knowledge and belief, the O~ner has perforaed exsmiinat'iong andtaken corrective measures describNI in this Owners Report in a'ccordan'ce With'he requirements of the-ASHE Code,Section XI.

By signing this certificate neither the Inspector nor h'is employer makes any warranty, expressed, orimplied, concerning the, examinations and corrective aeasures described in this Owner's Report. Furthermore,neither the Inspector.nor his empiloycr shall be liable in any manner for, any personal injury or pkopei ty ~

damage or a loss of any kind aris'ing frora or corrnected with this !inspection.

S

-;I..i....r B~r~oSCuIns pec rs iture Hatiorral Board, State, Providence, and Endorserrer)ts

Date

09'7-0'I7-3

Page 77: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li htName

Date 03 30 97

700'Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant UnitPWO ¹:2506/63 WO ¹: 97006764 CR ¹: 97-0464

9760 SW 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. No.,Job Mo.,etc

3. Work Performed by 'Florida. Power & Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization No.Expiration'Date

M A

N A

N A

4. Identification of System: SAFETY INJECTION System ¹: 62 Quality Group: B

5 ~ (a) Applicable Construction Code B31.1 1955 Edition, MA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name ofComponent

Name ofManufacturer

IHanufacturerI National I,

I Serial No. BoardOther

IdentificationI"ear I Repaired I ASHE IIBuiltI Replaced or I Code I

I Replacement IStamp I

I I /~res ue

ISUPPORT 8080-H-007-10 I H/A IN/A IN/A IDRWG ¹ 5613-H-823 SHT 15 IUMK. IRepaired INo

7. Description of Work: GROUND PT INDICATIONS UNTIL ACCEPTABLE SI2E OR WERE ACCEPTABLE FOR'USE AS-IS PER

CONDITION REPORT CR97-0464.

t 8. Tests Conducted: Hydrostatic:

Other PT

Pneunatic: Nominal Operating Pressure

Pressure~sig Test temperature 4F

97-018-3

Page 78: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORM NIS-2 (Back)0

9. Remarks: NO WELDINB WAS PERFORMED.

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and t'his repair conforms to the Irules df theASHE Code, Section

XI'ype

Code Symbol Stamp

Certificate o Authorization No. ~NA

cC~Omar r Orner'&Oesignee, Title7

N 'A

E'xpfration Date

~P Z/

jN~A

19 ~ ~ 0CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid comnission issued by the National Board of Boiler eind Predsurk Vesselinspectors and the state or pirovince of Dade County.and employed ~by Arkuright.Mutual Insurance Company afNorwood, Ha. have inspected the components described in this Owners Repo'rt during the period '3/18/97 fo,03/30/97 and state that to the best of my knowledge and beii'ef,'he'gner has perforced exadinakiods aQtaken corrective measures descrited in this ogners Report'in accordance with the requirements of ~the~AsHE,cade,Section XI. I

By signing this certifi,cate neither the Inspector nor his employer makes any warranty, expressed orimplied, concerning the examinations and corrective measures descriix< in this Owner's Reporti Furthermore,~neither the Inspector,nor his empioyer shall be tiabte in~any~ man'ner,~for any personal injury or propertydamage or a toss .of any ki'nd arising from or connected With this inspection.,

Inspec rs natur e

Camni ssions ~B80~30 II 'IN'atia'nai 'oard, State, Providence, arid Endor'semants

Date 19%2

97-018-,'3

Page 79: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH HIS-2 OWNERS REPORT FOR'REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li htName

Date OC 08 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant UnitPIS ¹:63/2528 IS ¹: 97006902

9760 SW 3C4 Street Florida Cit Fl. 33035Address Repair Organization P.O. Ho.,Job No.,etc

3 ~ Work Performed by Florida Power 8 Li htNsae

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization Mo.

Expiration Date

N A

N A

H A

4. Identification of System: CHEHICAL 8 VOLUHE CONTROL System ¹: 47 Quality Group: A

5. (a) Applicable. Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case

<b),Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced snd Replacement Components

Name ofComponent

Name ofHsnufscturcr

iHanufactureri National i

i Serial Ho. BoardOther

IdentificationiYear,i Repaired i ASHE iigui lti Replaced or i Code i

i Replacement iStsap iI I i~res se

iSTUDS (4)I

iNUTS <4)

I

IN/A

IH/A

iN/A

IN/A

iH/A iUTC 352606 ASHE SA-19,iUHK 'iReplacement iHoSTK CODE ¹28253 R95-0154

iN/A 'UTC 393252 ASTH A-19C iUNK iReplacement iHo. STK CODE

¹27963'VALVE

BONNET iVELAH iN/A iH/A i3-312A UTC¹ 331592 'iUNK. iReplacement iNoSTK CODE ¹52C97

7. Description of 'Work: REPLACED 4 STUDS AND 4 NUTS ON BODY TO BONNET. REMOVED BONNET FROM SPARE

VALVE IN STORES AND REPLACED EXISTIHG BONNET ON CHECK VALVE 3-312A.

Pneunst 1 c I Hominal Operating Pressure X

pressure~gggg sig rest Temperature 535 oF

97-019-3

Page 80: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet,2 of 2

FORH NIS 2 (Back)

9. Remarks: HECNANICAL CONNECTIOlk NO WELDINO REOUIRED.

CERTIFICATE OF COHPLIANCE

Ne certify that the statements made in the rcport are cor'rect and th'is replacement conforms to the rule., of theASHE Code, Section XI.

Type Code Symbol Stamp

Certificate of Author ization Ho,.

Signed

N~A Expiration Date ~HA

'19

O~ner or Owner's Designee, Title

CERTIFICATE OF IHSERVICE INSPECTION

I, the undersigned, holding a valid catmission issued by the National Board of Boiler and Pressure Vesselinspectors and the state or Province of Dade County and employe'd b)'I Arkwright Hutual Insurance C~ny ofNorwood, Ha. have inspected the conponents descri'bed inIthik OwInerk Report during the period, 03)19/97 to03/30/97 and state that to thc best of my knowledgeI and be'Iiei', the Owner has performed examinations 'andtaken corrective measures deScribof in thiis Owners Reposit id ac'cordanc'e with the requirements.of the ASHE Code,Section XI ~

By signing this certificate neither the Inspector nor'i."» emplo)e'er smokes any warranty, expressed orimplied, concerning the examinations and corrective measures described in this owner"s Report. Furthermore,neither the Inspector nor his employer shall be -Liable in any manner for any personal..injury or propertydamage or a loss of any kind arising from or connected with this inspection.

P

Conmisslons NB 8230 H IInspe ors Sii ture National Board, State, Providence, and Endorsements

Date «9 )

97 019'-3

Page 81: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS'As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 03 0 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2., Plant Turke Point Plant UnitPWO ¹:63/7857 WO ¹: 96014466

9760 SW 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. Ho.,Job Ho.,etc

3. Work Performed by Florida Power & Li htName

P.O. Box 4332 Princeton Fl.33032'ddress

Type Code Symbol StampAuthorization Ho.Expiration Date

N A

N A

4. Identification of System: MAIN STEAM System ¹: 72 Quality Group: 8

5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of CoJJponents Repaired or Replaced and Replacement Conponents

Hame ofComponent

I

I

)STUDS (4)I

IHUTS (24)

Name ofManufacturer

fN/A

IH/A

) Serial Ho. Board

i N/A

(N/A

|Manufacturer[ National Other,Identification

iUTC 393207STK CODE ¹28047

IUTC 408254STK CODE ¹27869 R87-6134

]Year ] Repaired ( ASME ](Built/ Replaced or / Code (

/ Replacement /Steep /

I I J~Ys ue(UHK [Replacement (No

(UHK 'J Replacement ]No

7. Description of Work: REPLACEMEHT OF 4 STUDS AHD 24 HUTS ON BODY TO BONNET VALVE POV-3-2606.

8. Tests Conducted: Hydrostatic:

Other

Pneunatic: Hominal Operating Pressure

Pressure~pig Test Temperature DF

97-020-3

Page 82: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORM NIS-2 (Back)

9. Remarks: THIS IS HECHANICAL CONMECTIOM MO WELDINB REOUIREDz

CIERT IF I CATE OF COHPLIAh1CE

Type Code Symbol Stamp M A

Certificate f Authorization No. M~A Expiration Date M A

We certify that the statements made in thc report are correct and this replacement conforms to the rules ofASHE Code, Section XI.

I

the

I'

I

I

Signed n sr~. 4k~~ «Date pn~i5 Zl,, 119 f2Owner r Ctwner'Vbesignee, Title

CERTIFICATE OF INSERVICE IHSPECT ION

I, the undersigned, holding s valid commis! ion issued by the National Boarcl of Boiler andi Pressure Vesselinspectors snd the state or Province of Dade County and enpboyed by'Arkwright*Hutual Insurance Company ofNorwood, Ha. hive inspected the corponcnts descrilbed in this Owners: Report during the period 07/'IB/96, to03/30/97 and state tlhat to the best of my knowledge: and beltief,, the Owner has performed exhminlatibns

land'aken

corrective measures dcscribecl in this Owners Report in accordance with the requirements of the ASHE Code,

Section XI.By signing this certificate neither the Inspector nor his employer.makes any warranty, expressed or

implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore,neither the Inspe'ctor nor his enploycr shall be liabi,e in any manner for sny personal injury ori propertydamage or s loss of any kincl arising from or connected with this inspection.

conmissioins NB 8230 N I

Inspec ors ~ nature National Board, State, Providence,. and Endorscmcnts

Date 119++

97-020-3

Page 83: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR'REPLACEHEHTS

As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li htName

Date 04 02 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant Unit 3PIN ¹:63/7086 QO ¹: 96014408

'9760 SM 344 Street Florida Cit Fl. 33035Address Repair Organization-P.O., No.,Job Ho.,etc

3. llork Performed by Florida Power 8 Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization,No.Expiration. Date

H A

N A

N A

4. Identification of System: SAFETY INJECTION

5. (a) Applicable Construction Code B31.1

System ¹: 62 Quality Group: A

1955 Edition, HA Addenda,~H A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Idgntification of Components Repaired or Replaced'and Replacement 'Components

I:I

IPSA-3'JSMUBBER

IPSA-3iSHUBBER

Name ofComponent

Name ofNanufacturer

IPACIFICSCIENT I F I C

IPACIFICSCIENT I F IC

(Hanufacturer( NationalJ

[ Serial No. BoardOther

Identification

[2889

117425

IN/A !3-1019, 3-PRWH-I

.I3-1019, 3.PRWHu1

[Year ) RepairedJ

ASNEJ

[guilt] Replaced. or ( Code ']

f, Replacement JStanp J

I I ~Ves ue(UHK (Replaced Yes

)UHK [Replacement )Yes

7. Description of Mork: SNUBBER REPL CED DUE TO'LCO ON UNIT 4

8. Tests Conducted: Hydrostatic:

Other VT-3

Pneuaatic: Hominal Operating Pressure

pressure~u S is test Temperature S S 'F

97-021.3

Page 84: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORK HIS-2 (Back)

09. Remarks: HECHAMICAL COHNECTIOM, MO WELDINB REOUIIRED.

CERTIFICATE OF COHPLIAHCE

Me certify that the statements mode in the report src correct iandi this rcplalcemcnt conforms to the rules of theASHE,Code, Section XI ~

Type Code Symbol Stamp N A

Certificate of Authorization No. N~A

;z rSigned giWgrf'+i'~di~A n.c:>

Owner Ownerr+Designee, 'title

i Expiration Date

~l~~ ~ OnCe "0CI.=RT IF I CATE OF I'NSERVICE IMSPECTIOM

I, the undersigned, holding a valid crxrmission issued by the Mstlio&l Board of Boiler and Pressure Vesselinspectors snd thc state or province of Dade County snd employed by Arkwright Hutusl Insurance ComFrsny'f

'orwood,Hs. have inspected thc crxrponcnts de! cribed .in thia Ownera Report dur'ing'ha pe'riod '9/18/96 i toi04/01/97 and state tibet to 'the best of my knowledge and belief, the Owner has performed examinations sndtaken corrective measures described 'in this Orrners Report .in sccordlancc with the requirerrrents of this ASHE iCode,Section XI. I

By signing this certificate neither the In, pector nor hiS emfrioyer rlrskes sny warranty, expressed orlimplied, concerning the examinations and corrective measurea deacri'bed'.in 'thia Owner's Report. Furtherraord,neither the Inspector nor his errpioyer shall be liabl.e in any manner for sny personal, injury or propertydamage or a loss of any Ikincl arising from or connects with 'thiS irispct;Cion. I

Inspe ors:S natureCoerrrissions, HB 8230~M~I

-iNstionell Bayard, State, Providcnc'e, snd Endorsements

Date i4'9~$0

97-021-3

Page 85: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMEH'IS

As Required by .the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li htName

Date 04 07 97

700 Universe Blvd. Juno Beach Fl. 33408Address

2. Plant Turke Point Plant

Sheet .1

Unit

of 2

Name PNO ¹:63/7855 lO ¹ 96012072

9760 SM 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. Ho.,Job No.,etc

3 ~ Nork Performed by Florida Power 8 Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization No.Expiration Date

N A

N A

H A

4. Identification of System: REACTOR COOLANT System ¹: 41 Quality Group: 'A

5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name ofComponent

Name ofManufacturer

/Manufacturer/ National (

J'Serial Ho. BoardOther

Identification[Year J

RepairedJ

ASME ])guilt) Replaced or ) Code ]

] Replacement [Stamp [

I I J~res ue

IPRESSURIZER RELIEF VALVE I CROSBY

IIPRESSURIZER RELIEF VALVE ICROSBY (

N51249e 1361 I H/A I RV 551C JUNK. )Replacement ]Ho

IH69877-01 IN/A IRV-3-551C /UHK. /Replaced /Ho-0009

7. Description, of Mark: REMOVE PRESSURIZER SAFETY VALVE RV-3-551C AHD INSTALL SPARE.

Pneunatic: Hominal Operating, Pressure X

Pressure~22SD sig Test Tesuereture 535 'F

97.022-3

Page 86: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORM NIS-2 (Back)

09. Remarks: MECHANICAL CONNECTION HO MELDING REOOIREO.

CERTIFICATE OF COMPLIANCE

lie certify that the statements made in the report are correct and-,this replacement conforms to the rules of theASNE Code, Section XI.

Type Code Symbol Stamp H A

Certificate of Authorization Ho. ~M A

SignedOwn r or wner's Designee, Tiitie

Expi,ration Date H A

Date 19

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, ho'lding a valid comnlsslon issued by the Hationai, Board of Boiler and Pressure Vesselinspectors and.the state or Province of Dade County and enpioyed by Arkwright Mutual Insurance Company ofNorwood, Na. have inspected the components described in this Owners Report during the period 07/14/96 to04/07/97 and state that to the best of my knowledge and belief, the Owner has performed examinations.andtaken corrective measures descril)ed in this Owners Report in accordance with the requirements of the ASl{E Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed orimplied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore,neither the Inspector nor his em!cloyer: hall be liable ini any manners for any personal injury or prop'ert)~damage or a loss of any kind arising from or connected with this'ins'pection.

/y7Commissiona NB 8230 N I

Inspect s Sigr ture National Board, State, Providence, ahd Ehdoi'seaknts

Datego

97-022.3

Page 87: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS-2" OWNERS REPORT FOR" REPAIRS OR TREPLACEMENTS

As Required by the Provisions of the ASME Code Section XI

1. O~ner Florida Power & Li htName

Dote 04 08 97

700'Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turks Point PlantName.

UnitPNO.¹:63/7854 MO ¹ 96012071

9760 SM 344 Street Florida Cit Fl..33035Address .Repair Organization P.O. No.,Job No.,etc

3. Work Performed by Florida Power & Li htName

P."O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization No.Expiration,Date

H A

N A

N A

4. Identification of System: REACTOR COOLANT System ¹: 41 Quality Group: A

5. (s) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~N A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Nameof'omponent

Name ofManufacturer

)Manufacturer) National )

JSerial Ho. Board

OtherIdentification

]Year ) Repaired / ASME []guilt] Replaced or / Code /

/ Replacement (Stamp /'I I /~res ue

IPRESSURIZER RELIEF VALVE I CROSBY

I

IPRESSURIZER RELIEF VALVE ICROSBY

i N69877-01- i N/A ( RV-3-5518 /UHK. (Replaced (Ho0008

i 51249-1360 ( H/A f RV-3-5518 fUNK. (Replacement ]Ho

7. Description of Mork: REMOVE PRESSURIZER SAFETY VALVE RV-3-5518 AND INSTALL SPARE.

t 8'. Tests Conducted: Hydrostatic:

Other VT-2

Pneunatic: Hominal'perating Pressure X

Pressure~2280 sig Test Temgereture 535 DF

97.023-3

Page 88: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORM NIS-2 (Back)

9. Remarks: MECHANICAL CONHECTIiO~NHO IAELDING REQUIRED.

CERT I IF I CATE OF COMPLIANCE

Ne certify. that the statements made in the report are correct and this replacement conforms to the rul,es of theASME Code, Section Xl.

Type Code Symbol Steep H A

Certificate of Authorization Iko.. ~N'AJ., ~'

SignedOwn or wner's Designee, fitle~

Expiiration,Date

Date Yi

N A

19

CERT I IF ICATE OF'HSERVICI.=INSPECTION

I , thc undersigned, holding a valid conrnission issued by the National Board of Boiler and Pressure Vesselinspectors and the state or Province of. Dade County.and anpboycd by Arkwright. Mutual Insurance Company iofNorwood, Ma. have inspected the components described in this Owners Report during the period 07/14/96 to04/07/97 and state that to the best of my knowledge and belief,, thc Owner has performed'examinations andtaken corrective measures dcscrIibed in this Owners Rcport ini accordance with the requircnmnts of the ASME Code,Section XI.

Il

By signing this certificaitc neither thc Inspector nor his employer makes any warranty, expressed orimplied, concerning the examinations and corrective measures described in «his Owner's Report. Furtlhcrnere,neither the Inspector noir his employer shall be liable in any manner fair any personal in)ury or propertydamage or a loss of enny Ikindl arising from or connected with ithis inspeotion.

g ~r/7

Inspcc ors SITfnature iHationaii Board'state, Providence, and Endorsemcnts

Date 1I9

97-023-3

Page 89: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FDRH Nls-2 ouMERs REP0RT F0R REPAIRs 0R REPLAcEHENTsAs Required by the Provisions of the ASHE-Code Section XI

1. Oner Florida Power 8 Lf t Date 04 09 97

700 Universe Blvd. Jwm Beech Fl. 33408Address

Sheet 1 of 2

2. Plant Turks Point'Plant UnitQO ¹: 96023455

9760 SM 344 Street Florida Cit Fl. 33035Address Repair Orgsnfzation P.O. No.,Job No.,etc

3. Mork Performed by VSL Cor rationName

1671 Dell Ave. C ll CA 95008Address

Type Code Symbol Steep'Authorization Ko.Expiration Date.

N A

N A

N A

4. Ident ification of System: Contsfrrnent Buildi System ¹: 51 Ouslfty Croup: B

5. (a) Applicable Construction Code ACI 318-63 ACI 301-66 19-- Edition,~MA Addenda,~NA Code Case

(b) Applicable Edition of Section XI Utilized for Repsfrs or Replacements 1992 Edfticn, 92 Addenda,~MA Code Case

6. Identification of Cosponents Repaired'or Replaced snd Repiscesent Ccmponents

Kameof'oqxnent

(Donut Shine(2 14N

Other 'dent ificst Ion

N~ of (Hsnufscturer('ationsl (Hsnufscturer ('erial No. Board

I

I

(Year,( Repaired ( ASHE (

(Built( Replaced or ( Code (

( Replacement (Stanp (

I I iYe~leuo(Kova Hschining (N/AProducts Cor . LOT¹ 35284004

(N/A (ASTH A576-86 Cr. 1045. ,( 1996 (Replacement (No

7. Descriptfon of„lbrkt Added tMo 1 4> thick donut shims st Unit 3 tendon 61V27 to obtsfn orf inal \ift-off force after detensioni . Tendcn Surveillance rformed under P.O. 000f6055.

Pneumat fc: Nominal Operating Pressure

~ F

97-024-3

Page 90: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS-2 (Back)

9. Remarks: Mo weldi r ired.

CERTIFICATE OF CCHPI.IANCE

Ne certify that the statements medic in the ri~rt are correct and 'this re'placement conforms to, the rulles of theASHE Code, Section XI.

Type Code Symbol Staap

Certificate of Authorization No. Expiration aate ~VASigned &I ~Date

Owner or Owner's Dksignee, Title 0CEIRTIF ICATE OF INSERVICE INSPECTION

I, the undersigned, hoidirMI a valid coaeission issued by. the National" Board of Boiler and'Pressure Vesselinspectors and the state or Province of Dade Cixnty and eapihyed by'Arkkright Hutual Insurance. Company ofNorwood, Ha. have inspected the c~enents described in this'Own'ers'Report during the period 09/01/96 'to

'4/08/97and state that to the hest 'of my knowiaige and'bel'ief,'his Owner'has performed'examinations andtaken corrective measures described in 'this (hairs Report in accordance with the requirements of the ASHE Code,',

Section XI.By signing this certificate neither the Inspector nor his'esp'loyer makes any warranty, expressed or

Ieylied, concerning thi exminations ard corrective measures 'deslcr ibed in this'Owner's Report.Furthermbre,'e3ther

the Inspector nor. his espioyer shall, be l3able in any mesmer for any personal injury or propert/damage:or a loss of any kind arising: from or c<xnected with this inspection.

~t/,Commissions 'B 8230'~M~I

I'nspects Sig I, e National'oard, State, Providence, and Endo)'s~tk

Date 19K.Z

-097.024-3

Page 91: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH NIS-2 QQERS REPORT FOR REPAIRS OR REPLACEMENTSAs Requfred by the Provfsions of the ASHE Code Section XI,

1. Qner Florida P~r B Lf ht Date

700 Universe Blvd. Jtmo Beach F l. 33408Address

2. Plant Turks Point Plant

'Sheet 1

UnitQO M'6023455

of 2

9760 Su'344 Street Florida Cit Fl. 33035Address Repair Orgsnfzatfon P.O. No.,Job No.,etc

3. Mork Perforaed by VSL Cor rationNsae

1671 Dell Ave. C ll CA. 95008

Type Code Symbol StsapAuthorization NoExpiration Date

N A

N A

N A

4. Identification, of Systea: Contsfrment Buildi Systea 0: 51 Quality Croup: 8

5. (s) Applicable Construction Code ACI 318-63 ACI 301-66 19-- Edf tfon,~NA Addenda(~NA Code Case

(b) APPlicable Edftfon of Section XI Utilized for RePafrs or RePIaceaents 1992 Edftion, 92 Addenda,~NA Code Case

6. Identificstfon of Ccwponents Repaired or Replaced snd Repisceaent Coeponents

'sae ofCoaponent

M~ ofHsrmfacturer

(Hsnuficturer( National (

( Serfsl No. Board

I

I

OtherIdent fffcation.

(Year 'epaired,( ASHE (

(Built Replaced or ( Code (

( Replsceaent (Starp (

I I ivesleuo(Donut. Shia(1 12s(Donut Shia

1 14m

(Nova Hschining (N/AProducts Co

(Nova Hsctdning 'I N/AProducts Cor

(N/A '(ASTH A576-86 Gr., 1045 (1996 (Repiscenent (NoLOT B 35284002

(N/A (ASTH A576-86 .Gr. 1045 (1996 (Replsceaent (MoLOT M 35284004

7. Description of iJorkt Added 1 2e-snd 1 4< shia.st Unit 3 tendon 42H40 to obtain orf fnsl lift-offforce after detensionf . Tendon Survefl lance rformed under P.O. 0001605.

Pneuoet 1 c t .Moainsl Operating Pressure

~ F

97-025.3

Page 92: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH NIS 2 (Back)

9. Remarks: Ko ueidi r ired.

CERT IF ICATE OF COHPLIANCE

Me certify that the statements eefe in, the report are correct and this rigiacesxmt conforms to the rules of 'theASHE Code, Section XI.

Type Code Symbol Staap

Cer'tificate of Authorization No. K~A Exp'iration Date '

~K A

ISigned S <~WV '+ 'a~a 4~

thinner or Omer<s Desi~e, Title

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid ccmnission issued by the Katicnai Board of Boiler and Pressure Vesselinspectors and the state or Province of Dade County and eaplbyed by'rkuright 'Hutual Insurance Coapany ofKorwxd, Ha. have inspected the ceqmxnts described. in this Owners Regort during the period '09/01/9'6 'o

'4/08/97and state that to the best of my knowledge and belief, the Oav.'r has perfonaed. examinations andtaken corrective measures described in this Wners Report in'ccord'anca Mith t'e requirements of the ASHE Bode,Section XI.

By signing this certificate neither the Inspector nor his erployer wakes any warranty, expressed'or'mplied,concerning the examinations and corrective measures described in this Orner's Report. Furthermore,l

neither the Inspector nor his employer shall be Liable in aQ mlrnelr fear ahy personal'njury'r propert'ydamage or a loss of any kind arising from or cheated with this irkpec'tion.

Inspector S IgnatdreConmiss iona,','HB

8230~K~I'atl'onalt

Bo'ard,, State, Providence, and Endorseeents

Date

097.'025 3

Page 93: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH NIS-2 OWNERS REPORT'OR REPAIRS OR REPLACEHENTSAs Required by the Provisfons of the ASHE Code Section XI

1. Ouner Florida Po»er B Lf ht Date 04 09 97

700 Universe Blvd. Jwm Beach Fl. 33408Address

Sheet 1 of2'.

Plant Turke Pofnt PlantHaec

9760 SW 344 Street Florida Cft Fl. 33035Address

Uni tWO ¹ 96023455

Repair Organization P.O.'No.,lob Ko.,etc

3. Work Pcrfors»d by VSL Cor rationHowe

1671 Dell Ave. C ll CA. 95008Address

Type Code Symbol StampAuthorization Ko.Expfratfon Date

N A

N A

N A

4. Idcntiffca't'fon of Systcll'ontofrn»nt Bufldi System ¹: 51 Guai fty Group: B

5. (a) Applicable Construction Code Acl 318-63 ACI 301-66 19-- Edition,~NA. Addenda,~NA Code Case

'(b) Applicable Edition of Section XI Utilized for Repairs or.Replaces»nts 1992 Edition, 92 Addenda,~NA Code Case,

6. Identiffcation of Coeponents Repaired.or Replaced and Replaces»nt Coeponents

Noee ofCoeponent

(Donut shim(1 14»

(Harufacturer( Serial No.

Kational (

BoardKam of

Hanufactur er

(Kova Nachining (N/A IProducts Cor .

(Year ( Repaired ( ASHE (

(guilt( Replaced or ( Code (

( Rcpfoceaent (Stoep (

I I iY~es Xo

Otherldentiffcatfon

N/A (ASTH A576-86 Gr. 1045 (1996 (Replaceeent (NoLOT ¹ 35284004

7. Description of Work: Added 1 4" donut shia at Unit 3 tendon 3016 to obtain orf fnal lift-offforce

after detensioni . Tendon surveillance rfors»d under P.O. 00016055.

Pnaaetfct Nosfnal Operating Pressure

'F

97-026-3

Page 94: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

4lFORH NIS-2 (Back)

9. Remarks: No weldi r Ired.

CERTIFICATE OF COHPLIANCE

Ile certify that the statemiwts axle in the report are correct 'and'hi's replacemeint conforms to the rules of theASHE Code, Section XI.

Type Code Symbol Starp

Certificate of Authorization No. Exp'irat,ion DateN~A

Signed /A 't ~~~~i~~~+~D~ '

ateOwner or Owner's Designee, Title "-~ lO

il

CERT I FI CATE OF IKSERVICE IIISPECT IONg

I, the undersigned, holding a valid comslsslon issued by the National Board of Boiler and Pressure Vesselinspectors and the state or Province of Dade Catty and eapL'oyed by'rkwright Hutual Insurance Carpany ofNorwood, Ha. have 3nspected the components descril~ in this'wners'eltort'ue"ing'he per'3od '09/01/96 'o

'4/08/97and state that to the 'best of my kntwledge and bel,ief', the Owner has performed examinations andtaken corrective measures described in thiis Seers Report in accordance with the requirements of the ASHE Code',Section XI.

By signing this certificate neltiher the Inspector nor h3s employer makes any. warranty, expressed'r'mplied,concerning the examinations arxi corrective measures'escribed 'in (his Owner's Report., Furthermore,,

neither the Inspector nor his esployer shall bie Liable in any manneir fair any personal .3njiury or prolpe'rtydamage or a Loss of any kind arising from or c~.'cted with this Inspectiexo.

+7 —~seissions - NB 8230~K'~IInspectors Signatt e National Baarde State„ Provlclence, and Endorsecflents

Dote

97-026-3

Page 95: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORM NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEKENTSAs Required by the Provisions of the ASHE Code Section XI

1. (haM,r Florida Poaer 8 Li ht Date 04 09 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant Uni tPMO ¹:63/2949 MO ¹: 97008380

9760 SU 344 'Street Florida Cit Fl. 33035Address Repair Organization P.O. No.,Job No.,etc

3. llork Performed by Florida Power 8 Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization Mo.Expiration'Date

N A

M A

N A

4. Identification of System: C nent Coolin Mater System ¹: 30 Quality Group:

5. (a) Applicable Construction Code B31.1 1955 Edition, MA Addenda,~MA Code Case

(b> Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edftion,~MA Addenda,~MA Code Case*

6. Identification of Coaponents Repaired or Replaced and Replacement Canponents

Name ofComponent

IRELIEF VALVE

IRELIEF VALVE

Name ofManufacturer

IORESSER

INDUSTRIES

IDRESSER

INDUSTRIES

iHanufactureri Nationali Serial No. Board

iYear,[, Repaired i ASHE )

iguiit( Replaced or i Code f

,i Replacement,iStaap iI I J~res se

OtherIdentification

1TH 18073 IM/A Il 1/2" RELIEF VLV iUNK iReplacement iNoSTK CODE 53514

ITH 18076 IN/A 11 1/2" RELIEF VLV iUMK 'iReplaced )Mo

7. DescriPtion of Mork: REPLACED RV-3-1424 FOR CCM TO "Ca ECC.

t 8. Tests Conducted: Hydrostatic:

Other VT-2

Pneuaatic: Nominal Operating Pressure X

gressure~rg ig test Tesuersture 88 ~ F

97.027-3

Page 96: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORH,"HIS-2 (Back)

09. Remarks: THIS Is A NECNANICAL CONNECTION NO uELDINC REDUIRED„

CERTIFICATE OF COHPLIANCE

INe certify that the statements madh in the report are correct and this replacement confonas to the kulak of'hai

ASNE Code, Section XI.

Type Code Sytrbol Staay

Certificate of Authorization No.- ~HA Expiration Date

Signed CV I . "QJ'~ c~ nay ~4~~@~ Date/

Own r or er's Designee, tie19 7 - ~

CERTIFICATE OF IHSERVICE INSPECTION

I, the undersigned, holding a valid camnission issued by the National Board of Boiler and Pressure Vesselinspectors and the state or Province of Dade County and eeployed by Arkwright NutuaL In urance Compariy ofNorwood, Ha. have inspected the coaponents described in thi's 0&or's Rapport during th'e period '4706/97

'o'4/09/97and state that'to'he best of my knowledge and belief, the Owner has perf<}rmed examinations andtaken corrective measures described in this Cheers Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Irepector nor hid ~Lo)er makes any >carrantli, expressedor'mplied,concerning the examinations and corrective measure's ddscribed in this Owner's Report. Further'morc,

neither the Inspector nor his enployer shall be Liable iin any manner for any per. onal injury or propertydamage or a Loss of any kind arising from or connected with'his ihspection.

~ f

Cocmissions NB 823~ON~I~Inspec rs S~iture National Board, State, Providence, and Endorsments

Date

97-027-3

Page 97: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH NIS 2 OMHERS REPORT FOR REPAIRS OR REPLACEKENTSAs Required by the Provisions of the ASKE Code Section XI

1. Owner'lorida Power 8 Li ht Date 04 14 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant, Kame

Uni tPMO ¹:63/5765 MO ¹:. 96005866

9760 SM 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. No.,Job Mo.,etc

3. Mock Performed by Florida Power Z Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Synhol StampAuthorization Ko.Expiration Date

N A

N A

N A

4. Identification. of System: FEED'MATER

5 ~ (a) Applicable Construction Code 831.1

System ¹: 74 aualfty Croup:'

1955 Edition, NA Addenda,~NA Code Case

(b) Applicable Edition of Section Xl Utilized for Repairs or Replacenents 1989 Edftfon,~HA Addenda,~MA Code Case

6. Identification of Conyonents Repaired, or Replaced snd Replacement Components

Name ofHsnufacturer

)Manufacturers Kationsli Serial No. Board

I

OtherIdentification

,(Year ) Repaired ) ASHE (

,igufiti Replaced or .i Code ii Replacement istanp )I. I J~Yes Ho

ISTUDS (14)I

(NUTS (14)

IiBOLT (1)

(H/A

'IN/A

iH/A i FCV-3-498, UTC 407914 (UMK iReplacement iKoASTH A-193

H/A N/A FCV-3-498, UTC 397774 iH/A iRepiacement iMoI I I

HEAVY KEX ASTH A193

iM/A, /H/A iFCV-3-498, Ul'C 408129 JH/A [Replacement /MoASKE SA-194

7. Description of Mork: REPLACED FOURTEEN 14 STUDS AHD HUTS AHD OME 1 BOLT OM FCV-3-498 S C wC"

KAIN FM FLOM CONTROL 'VALVE.

8. Tests Conducted: Hydrostatic:

Other VT-1

Pneunatic: Nominal Operating Pressure

NA 4F

97-028-3

Page 98: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORN NIS-2 (Back)

9. Remarks: THls ts A NEcHANtcAI. cohrHEGTIow No llELGING REQUIRED.I

CERTIF ICATE OF COMPLIANCE

Me certify that the statenents made in the report are correct arxf this replacement conforms to the rules of theASNE Code, Section XI.

Type Code Symbol Steep ~HA

Signed +i/FS 'gA~~~~m~~ OSta +r or Owrrer's Oesfgir~re, Tft4P

Certificate of Authorization No. ~NA Expiration Date NrrA

19 +g

CERTIFICATE OF IHSERVICE INSPECT IOH

I, the undersigned, holding a 'valid cicrrrnfssion issued by the Nstisnal'oard of Boiler snd Pres'surdVe!sseL'nspectorsand the state or. Province of l)ade County and errrployed by Arkwrfght Mutual'nsurance Corpany of

Horwood, Na. have inspected 'the components described in this Owners Report during the period 03/13/96 to04/10/97 and state that to the best of my knowledge and belief, the Owner has performed examinations sndtaken corrective measures described .in this Owners Report 'in accordance with the requirements of the 'ASNF Code,Section XI.

By signing this certificate neither the Inspector,nor his r|eployer makes any warranty, expressed arimplied, concerning the examfrratfons and corrective measures tiescribcd in this Owner's Reports, Furthermore,neither the Inspector rror his errployer shall be Liable in sny'manner'for'any personal Injury or propertydamage or s Loss of sny kind arising from or connected wfth this fnspection.

~~~c~ / 'omrrfssfons HB 8230 ~H~IInspector Sigrqgcfre National Board, State, Providence, and

Endoraements'ate

1.~Z

97-028-3

Page 99: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

As Required by the Provisions of the ASHE Code Section XI

e 1. Owner Florida Power 8 Li ht Date 04 16 97

700'Universe Bl'vd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant Uni tPWO ¹:63/0472 WO ¹: 96026892PCH ¹: 96-070

9760 SW 344 Street Florida Cit Fl. 33035

Address Repair Organization P.O. No.,Job No.,etc

3. llork Performed by Florida Power 8 Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization No.Expiration Date

M A

N A

M A

4. Identification of System: Primar Water Hakeu S tern System ¹: 20 Quality Group: '8

5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addendas~NA Code Case

(b) Applicable Edition of Section XI Utilized'or Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced and Replacement Coeponents

Meme ofCoeponent

Name ofHanufacturer

)Manufacturer),National .J'

Serial No. Board'Other

Identification]Year

JRepaired ] ASHE f

'/Built/ Replaced or / Code /

/ Replacement )Stamp f

I I /~tes ueCV-3-519A IN/A'M/A IM/A 'I5610-P-900S (UNK ,]Repaired /Mo

7. Description of Work:,CUT RE WELD THE DOWMSTREAH PORTIOM OF CV-3 519A VERTICAL RUN.

8. Tests Conducted: Hydrostatic:

Other VT-2

Pneunatic: Nominal Operating Pressure

pressure~220 im test Temperature 80 F

97-029.3

Page 100: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheer: 2 of 2

FORH NIS-2 (Back)Cl

9. Remarks:

CERTIIF ICATE OF COHPLIANCE

Me certify that the statements made in the report are correct rind this repair conforms to the rul,es of theASHE Code, Section XI.

Type Code Symbol Stamp N A

Signed

Certificate of Authori'!atjon No. - ~N'A>I

'i . gfc~,Owner or Owner'sg4signcc, Title

Fxpi'ration Oatc

4Q/NYi+~~rgc/ gate Qg~r/44'~A

CENTI F, I CATE OF INSERVI CE INSPEC'T IOII

I, the undersigned, holding a valid comriissiion issued Iby the National Board of Boiler and Pressure Vesselinspectors and the state or Province of Dadle County and crriployed by Arkwright Hutual Insurance C~ny bfNorwood, Ha. have inspected the compionents described in this 'owners 'Report during the period IO/09/96 to04/16/97 and state that to the hest of my knowledge and belief, the Owner has performed examinaitiofrs andtaken corrective measures described in this Owners Report'n 'accbrda'nce'with the requiirements of the ASHE Code;,Section XI.

By signing this certificate neither ithe Inspector nor his emplloyer makes any warranty, expressed orimplied, concerning thee examinations and corrective measures 'described in this'wner's Report. Furtherrrore,neither the Inspector nor his, cm!cloyer . hall be-liable ini any mahner for any. personal injury or jprogrtj/damage or a loss of any kind arisingi from or connected with t'hfs'ns'pcchion'.

/>Inspec rs Sjgg ture

ComrriSSionS NB 8230 N INational Board, State, Providence, arnd Endorsements

Date

97-029.3

Page 101: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORK NIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEMENTSAs Required by the Provisions of the ASKE Code Section XI

1 ~ Owner Florida Power 8, Li ht Date 06 04 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point PlantName

Uni tPMO ¹:63/8810 MO ¹: 96022773

9760 SM 344 Street Florida Cit Fl. 33035Address Repair Organization P.O. No.,Job No.,etc

3 ~ Mark Performed by Florida Power 8 Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StampAuthorization Ho.Expiration Oate

N A

N A

N A

4. Identification of System: COKPOMEHT COOLING MATER System ¹: 30 Qual I ty Group: C

5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addendag~NA Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name ofComponent

Name ofManufacturer

(Manufacturer) Nationalf Serial No. Board

I

I

OtherIdentification

]Year J Repaired / ASKE /)guilt[ Replaced or f Code /

/ Replacement (Stamp J

I I ]~res se(CCM HX VALVE

IISTUOS (160)ISTUOS 40

iBOLTS (40)I

IHUTS (320)

I

INUTS (120)

I

IN/A

IN/A

iN/A

IH/A

(N/A

(UTC 409288UTC 409357

IUTC 409330

(UMK [Replacement [No

(UHK (Replacement (Ho

[H/A

JUTC 409358, ASTK A-194 )UHK (Replacement (HoHEAVY HEX

(UTC 409356, ASTM SA-194 JUNK )Replacement (NoEAVY HEX

[H/A [H/A f3-50-377 1-1/2" GATE /UMK ]Replacement /MoUTC 407835 R62776

7. Oescription of Mork: REPLACE BOLTIHG OM 3E207A COMPONENT COOLING MATER HEAT EXCMAHGER AHO THE

REPLACEKEHT OF VALVE 3-50-331.

8. Tests Conducted: Hydrostatic: Pneunatict Nominal Operating Pressure X

Other VT-2 eressure~stu tg Test Testrereture MOK 4F

97-030-3

Page 102: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FOHN NIS-2 (Back)

9. Remarks: THIS IS A HECHANICAL CONNECTION NO MELDING MAS REOUIRED.

CERTIFICATE OF COHPLIANCE

Me certify that the statements made in the report are correct'nd this replacement conforms to the rules'f'the'SHE

Code, Section XI.

Type Code Sychol Stamp H A

Certif icate of Authorization No„N~A/7

Signed >~4/~0 or er'4 Designee, Tit~le

CERTIFICATE, OF INSLRVICE INSPECTION

I, the undersigned, holcling a valid comnission issued by the Hational Board of Boiler and Pressure 'Vessel',

inspectors and the state or Province of Dade County and employed by Arkwright Nutual In urance Companyof,'orwood,Na. have inspected the ccaponents described in this Oanerls Raport during the period 04/IS/97 to

06/04/97 and state that to the best of my knowledge and belie'f, the Owner has performed examinations, 'and

taken corrective measures described in this Owners Report i'n accordance with the requirements of the ASHE'ode,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed orimplied, concerning the examinations and corrective measures described in'his Owner,'s Report. Furthermore,neither the Inspector nor his employer shall be liable in any manner for any'personal injury or property

'amageor a loss of'ny kirxi arising from or connected with this ilnsgcti'on.',

z7Conmi ssions

,

''Ng 8230 N

Inspect s SLEDa re National Board, State, Providence, and Endorsements

I

I'I

Date 19 II97-030-3

Page 103: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FORK HIS-2 OWHERS REPORT FOR REPAIRS OR REPLACEMENTSAs Required by the Provisions of the ASKE Code Section XI

1. OMner Florida Power & Li ht Date 06 04 97

700 Universe Blvd. Juno Beach Fl. 33408Address

Sheet 1 of 2

2. Plant Turke Point Plant ;Uni tPWO" ¹:63/1859 WO ¹: 97002428 CR ¹: 97-0070

9760 SW 344 Street Fior ida Cit Fl. 33035Address Repair Organization P.O. No.,Job No.,etc

3. Work Performed by Florida-Po«er & Li htName

P.O. Box 4332 Princeton Fl. 33032Address

Type Code Symbol StaapAuthorization No.Expiration Date

N A

N A

4 Identification of System'OMPONENT COOLING WATER System ¹: 30 Duality Group: C

5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addendas~HA Code Case

)Year ( Repaired ) ASHEJ

iguiit/ Replaced or ( Code /

/ Replacement istaap J

I I )~tes ue

[Manufacturers.'National i

i Serial No. BoardOther

IdentificationName of

ComponentHaec of

Manufacturer

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~MA Addenda,~NA Code Caset 6. Identification of Coaponents Repaired or Replaced and Replacement Components.

3E207A i WESTINGHOUSE (N/A (047 (Component Cooling Water i1968 (Repaired i YesHeat Exchan er «A«

7., Description. of Work: CUT 6«X 9" ACCESS'HOLE 'FOR FORIEGM HATERIAL RETRACTIOH. CODE'CASE M-416 1'AS

BEEN ENVOKED FOR THIS REPAIR ACTIVITY.

Pneunatic: Hominal Operating Pressure

Other VT-2 Pressure~Yes sis Test Tsssersture 91 oF

97-031-3

Page 104: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Sheet 2 of 2

FORM NIS-2 (Back)

9. Remarkst Code Case NC16-1 was envod'ed for this~reEair activl~t., Al,l weldIndI was

rfornod tn accordanca otth tt roc t td c trot~anno

CERTliFICATE OF COMPLIANCE

Ne certify that'the statements made in the report are correct and 'this repair conferms to the'ul'es of theASME Code, Section Xl.

Type Code Symbol Steap N A

Certificate f Authori cation (o. ~N'A

Signed ra Ac . cd pd oh . toOwner or Owner's Desi'IInee, Title

Fxpiration Date

Date~~~ /'~

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid cemsission issued by the',National Board of BoiLer and Preksur'e Vksse'Iinspectors and the state or Province of Datie County and dnplbyed by~Arkuright Mutual Insurance Company bfNorwood, Ha. have inspected the ceq~ents described in this'Own'ers 'Repbrt 'during the period 01/29/9/ to06/04/97 and state that to the best of my knowledge and belief, the Owner.has performed examinations andtaken corrective measures, described in this O~ners Report in'acc'ordance with the requiirements of the ASME Code,Section Xl..

By signing this certificate neither the Inspector nor his eayloyer makes any warranty, expressed orimplied, concerning the examinations and corrective measures'described in this'wner's Report. Furtherax>re,neither the Inspector nor his employer shai,l. be Liable In'i any ma'nner'oir ady personal injury or property,damage or a loss of any kind arising from or connected with thisi inspection.

d'oemissionsi NB 8230~N ~I

lnspec rs~SI tore Nati'onal'oard, State, 'Providence, and Endorsements

Date

97-031-3

Page 105: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

TURKEY POINT UNIT 3

1997 REFUELING OUTAGE

Form NIS-BB Owners'ata Report of Eddy Current Examinations

Page 106: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

L

0

Page 107: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~ ~

~ ~ i

~ s

g@Qgg=W

ggggg

~ ~ ~ ~ ~

~ ~

~ a geog@/Q~Q~ REW R5

s s s ~

e ~ ~

I '. ~ ~

~ ~ ~ J

4 ~ t C ~

~ ~ ~ ~ ~ r ~ ~

I ~ ~ ~ ~ ~

~ t

Page 108: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

II

Page 109: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

eCOMPONENT : S/G A

CUMULATIVE DISTRXBUTION SUMMARYTURKEY POINT UNIT g .3

03/97

Page:1'ate

: 05/12/97

Examination .Dates : 03/13/97 thru 03/19/97

Total Number of Tubes Xnspected 3197

Total Indicati'onsBetween 20% and 39%Greater than or equal to 40%

Total Corrosion. type Indications "VOL"

Total Tubes Plugged as Preventive MaintTotal Tubes Plugged

6 (1)'

2

13

Location Of Xndications, 20% to, 100% & "VOL"

Hot. Leg

TSH —.5 to 01H -2.1

01H -'2.0 to 06H'2.0

06H i2.1 to AVl -3.1 0

Cold Leg

TSC —.'5 to 01C -2.1 '.

01C'2.0 to 06C +F 0

06C +2.1 to AV4 -3,.1

0

0

0

AV1 -3.0 to AV4 -3.0 : 6 (1)

Page 110: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed
Page 111: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

INDICATIONS/TRENDING REPORT

PTN 3

OUI'AGE : 03/97

t

CONPONENT : S/G A

DESCRIPTION : ALL 40% to 100%, VOI.' PTP INDICATIONS

Page : 1

Date : 5/12/97Time : 10:00:00

+ ~ ~

I Extent 03/97(Row(Col(Leg(***(Tst/Note( Reel I Probe I Location Ivoltsl'---I---I---I---I---

I. --I -.-- .-.- I---- "-I--

I

13( I H ICNRIBAHTSHPLIAH002 (HRPC680.3C ITSH 3.8 I 1.4(

( 31( 18(. H I (06H SCIAH039 IMPRC720-3C '(06H 1. 1 ( 1.0(I 44I 36( c I I (AH037 IHPRc720.3c I I I

( ( C (CHR(TSH GY(AH037 'INPRC720.3C (TSH .7 ( 1.2('- -'I---I---I---I--------I-

I- I. I

.--INumber of RECORDS Selected .from Current Outage : 4

Naker of,TUBES Selected .from Current Outage : 3

I I N/A I

oeg(CI I % (Diff( Location (voltslocg(CI I x I

I I I- I--.-.--------I--".I- I".

I--'19(

1 IP'IP I I I I I I

,64 I 1(VOL ( ( I I I I I

I IPTPI I I I I I I

14( 1(VOI I ( I I I '( I-I---l--.l.--.l--------.----l-----l-.-l---l--+

Page 112: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

II

0

Ik

Page 113: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

CNIPONENT : S/G A

DESCRIPTION : ALL 20K TO 39K IHDICATIONS

INDICATIONS/TRENDING REPORT

PTN-3

OUTAGE : 03/97Page : 1

Date : 5/12/97Time : 10:00:00

I Extent(Row(Col(Leg(*~*(Tst/Note( Reel ( Probe'---I-- I---I---I- I I

I 33( 41( C ( ITEH PS(AC006 (A-720-M/ULC

I I I C I ITEH P (AC006 IA-720-M/ULC

I 38( 45( C I ITEH PSIAC007 IA-720-M/ULC

( 37( 47( C I (TEH PS(AC012 IA-720.M/ULC'( 30( 52( H ( (TEC PC(AH034 IA-720 M/ULC

( 28( 59( H ( ITEC PS(AH021 (A-720 M/ULC'---I---I---I---I--------I-

I

Number of RECORDS Selected .from Current OutageNumber of TUBES Selected .from Current Outage :

+

03/97 I I'/A

I

( I.ocation (Volts(Deg(Ch ( X fDiff( Location fVolts(Deg(ch ( X (

I- -I-----I---I---I-"I--- I-- --- --- - I---- l.--l---l---+

IAY1 .0 I .9(. IP 2( 24( I I I I I

IAV3 .0 f'9( (P 2( 25( I I I I I

(AvZ .0 (. 1.5( IP 2( 30( I I I I I

(AV3 .0 ( .8( fP 2( 22( ( I I I I I

IAv3 .0 ( ~ 4( (P 2('0( I I I I I

IAY2 .0 I .6( IP 2(,26( I I I I I

I I. I I I I- I".--".--.-.I"" I---I--- I---+

'6

5

Page 114: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Page 115: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

COMPONENT : S/G B

CUMULATIVE DISTRIBUTION SUMMARYTURKEY POINT UNIT g 3

03/97

Page : 1Date : 05/12/97

Examination Dates : 03/13/97 thru 03/19/97

Total Number of Tubes Inspected .....: 3196

Total IndicationsBetween 20% and'9%Greater than or equal to 40%

Total Corrosion type Indications "VOL"

Total Tubes Plugged as Preventive MaintTotal Tubes Plugged

(1)19 (2)

29 (2)

Location Of Indications 20~ to 100~ 6 "VOL"

Hot Leg

TSH —.5 to 01H -2.1

06H +2.1 to AV1

AV1 -3.0 to AV4

-3. 1

-3 0

01H -2.0 to 06H +2.0

0

Cold Leg

TSC —.5 to 01C -2.1

01C -2.0 to 06C +2.0

06C +2.1 to AV4 -3.1

Page 116: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 117: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

INDICATIONS/'TRENDING REPOR IPTN 3

OUTAGE : '03/97

Page : 1

'Date : 5/12/97Time : 10:00:00

COMPONENT : S/G 8

DESCRIPTION : ALL

+

40% to 100%, VOL & PTP INDICATIONS

~ ~ +

I Extent ( 03/97 N/A I

(Rou(col(Lcg(***(Tst/Note( Reel I probe ,( Location (volts(oeg(Ch ( % '(Diff( Location (volts(oeg(Ch I / I

I- -I---l---l------.-l--------l------------l-------------l-----l---l---l--I----I-- ---."----I--- -I-- I---I---+I I I H'cMRITsH'LIBH002 IHRPc680 c ITsH ~ 4 I 1 (10 I 1(voL( I I I I I

( 42( 38( H ICHR(01HTSKPLIBH004 IMRPC680-3C '(TSH 1.5 ,( 1.2( 87( 1(VOL( I I I I I

I 39( 39( c IcMR(osK PLIBH043 IMRPc680 3c (05H .8 I 2.3(125( l(voLI I I I I- I

( 44( 40(. C,(CMR(TSH PI. (BH043 (MRPC680-3C (TSH .3 ( 1.3( 46( 1(VOL,( I I I I I

( c (PITITsH PL'(BH043 IHRPc680-3c (TsH 1.8 ( .4( 6o( P1( 82( ( I I I I I

( 23( 41( C (CMR(03C PCfBC031 (MRPC680-3C (03C .'5( .4( 93( 1(VOL( I I I I

( 44( 41( c (cMRITsH',PLIBK043 (HRPc680-3c ITsK .2 ( 1'.5(122( 1(vol.( I I I I I

I I I'C IcHRITsK PL(BH043 IHRPC680 3C ITsH .4 I \ 1( 90( llvoLI I I I I I

I c (cMRITsK ILIBK043 (MRPc680 3c ITsK .5 I .9( 83( .1(voLI I I I I I

I 45( 41(' ILPHITEH PL(BC009 (A-720-M/ULC (TsK .6 I I I II TPI I I I I I I

( 45( 42( c ILPM(TEK PL(gc009 (A-720.M/ULc ITsK 1.3 I .( I (PT I II'

I I

I 41( 44 I C ICMR ITEH GY IBH043 (HRPC680-3C ITSH .6,( .3 I 52( 1(YOL I I I I I I I'- I."I.-.I---I- I I -I. -I

--"I. -I-.-I.-.I- -I- .-- .--- I.-- -I-- I.--I---Number of RECORDS Selected from Current Outage : 12

,Number of TUBES Selected from Current Outage : 9

Page 118: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0'

Page 119: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

t

COHPONENT : S/0 8

DESCRIPTlON : ALL 20% TO 39% IHDlCATIONS

IHDlCATlOHS/TREHDlNG REPORT

PTH-3

OUTAGE : 03/97Page : 1

Date : 5/12/97Time : 10:00:00

+ +

I I Extent 03/97 .I I N/A 'I

IR "I [Leg[***[Tst/Hotel Reel I Probe I Location IVolts[Deglch I % [Diff[ l.ocation ,IVolts[Deg[Ch I % I+---I---I---I-

I---

I- -.-I"----------I------.-----I --I I I I I I I I I

I 32[ 34[ C f,[TEH PSIBC019 [A-720-N/ULC IAV1 .0 I .7[ IP 2[ 23[ I I I I I

I I' C I ITEH .Ps[BC019 [A 720 H/ULC IAV3 -.1I 1.3[ [P 2[ 31f f I I I I I

I c I ITEH Ps[Bc019 IA-720-H/ULC IAv4 -.2 I .7[. [r 2[ 22[ I I I I I

I 34f 46[ C I ITEH PCIBC009 '[A-720-N/ULC fAV2 .0 I 1.0[ fP Zf 28f, f ,I I I I'I' I C 'I ITEH PCIBc009 IA-720-N/ULc IAv3 ~ 0 I 1.5[ IP Zl 35[ 'I I I I I [

I 34f 51[ C I ITEN PSIBC011 IA-720-N/ULC IAV2 .0 f 1.2f IP 2[ 29f I I I I I

I 42[ 55[ c I: ITEH PCIBC012 'IA 720 H/ULC IAv3 -.3 I 1.7[ .IP Zl 31[ I I I I I+--- I--- I- I---I--------I--------I---------. I--- --I-----I-- I---I---I----I- "---.----I--"-I"-l.--[--.+Number of RECORDS Selected from Current Outage : 7

Number of, TUBES Selected from Current Outage : 4

Page 120: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 121: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

COMPONENT : S/G C

CUMULATIVE DISTRIBUTION SUMMARYTURKEY POINT UNIT ¹ 3

03/97r

Page : 1Date : 05/12/97

Examination Dates: 03/13/97 thru 03/19/97

Total Number of Tubes Inspected 31'81

Total IndicationsBetween 20> and 39%Greater than or equal to 40%

Total Corrosion type Indications "VOL"

'Total Tubes Plugged, as Preventive MaintTotal Tubes Plugged

20 (1)10

12

Location Of Indications 20~ to 100: & "VOL"

Hot Leg

TSH —~ 5 to 01H -2.1

01H -2..0 to 06H +2.0

Cold Leg

1 TSC —.5 to 01C -2.1 : 0

0 01C -2.0 to 06C +2.0 : 0

06H +2.1 to AV1 -3.1 0 06C +2.1 to AV4 -3.1 : 0

AV1 -3.0 to AV4 -3.0 20 '(1)

Page 122: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Page 123: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

INDICATIONS/TRENDING REPORT

PTH-3

OUTACE : 03/97~

~

COHPONEHT S/0 C

DESCRIPTION : ALL 40/ to 100/, VOL 8 PTP INDICATIONS

Page : 1

Oat e: 5/12/97Time: 10:00:00

I Extent I

(Row(CoI(Leg(***(Tst/Note( Reei ( Probe ( Location'-I-I .-I- -I---- ---I -- . I- - - ---'I-

( 30( 48( N ('TEC PL(CH009 (A 720 H/ULC (AV3 -0

I 33( 66( C IPITITSH PLICH047 IHRPC680-3C ITSH .6---I---I- -I---I--.-----I-----".I-

IHumber of RECOROS Seiected from Current Outage : 2

,Number of TUBES Selected from.Current Outage : 2

03/97 I I H/A I

(Voits(oeg(Ch,f 7.'(oiff( Location (Volts(oeg(cb ( X (

I I -I -I. I. I I I I--I---'

I I IPTP( ( ( (

.4(103(P 1( 58( I I I I I

( I I I(' - --(

( ( I

Page 124: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 125: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

COMPONENT : S/G C

DESCRIPTION : ALL 20/ TO 39/i INDICATIONS

INDICATIONS/TRENDING REPORT

PTN-3

OUTAGE : 03/97Page : 1

Date : 5/12/97Time : 10:00:00

I 34(31( H I

I I I H I

I 43( 33( H I

I 35( 36( H I

(34(41f H I

I I IHII 33( 43( H (

I 35J 43J H I

I I (H(I I IHJ( 35( 4CJ H (

I 301 48I H I

ITEC PS(CH027 IA-7?O.M/ULC IAV2 .0(TEC PS(CH027 IA-720-M/ULC IAV3 .0JTEC PSiCH026 iA 720-M/ULC IAV3 .0iTEC PSiCH028 .IA-720.H/ULC iAV2 .0fTEC PS(CH029 (A 7ZO.M/ULC (AVI .0JTEC PSiCH029 JA 720-M/ULC,JAV3 .0ITEC PSICH029 :IA-720-M/ULC IAV4 ~ 0

JTEC PC(CH030 (A-720 M/ULC IAV3 .0ITEC PCICH030 IA.720-M/ULC IAVZ .0

.ITEC PC(CH030 IA-720 M/ULC IAV3 .0ITEC PCICH030 IA-720-M/ULC IAV4 .0

IT C PCICH 'A 720 M/ULC (AV

ITEC PCICHO IA ?0 M/ULC IAV

i'IEC (CH009 iA.720-M/ULC (AV2 .0

I I I H I JTEC PCICH009 JA-720 M/ULC 'JAV3 .0

I 35( 49( C( ITEN PSJCC009 (A-720-M/ULC JAVC .0

I 26( 48( H( ITEC (CH009 JA.720-M/ULC IAVZ .0

(30(61f H f

(38(71J C((TEC PS(CH009 (A.720.M/ULC JAV2 .0iTEN PS(CCOll JA 720-H/ULC JAVC ..2

Number of RECORDS Selected from Current Outage : 20

Number of TUBES Selected from Current Outage : 13

+

I Extent I

(Row(col(Leg(**"JTst/Note( Reel I Probe I Location+-- I-- I---I---I----.--I- I -I-I 30( '17( H I ITEC Ps(CH006 IA.720 M/ULC IAvl .0

03/97(Volts(DI -II -5(

I -5II -5lI Cl

I .5(I 6(

.6(I .71

( 6(

J .8(I.C(

I "9(1.5(1.6(

1.5 f

.6(

I ~ 5II 5lI ~ 6(

-I- I

I I

eg(Ch (.X (Diff(-(-.-I-.-I- I

JP 2( 20(

IP 2( 21(

l»l 20( I

I»I ZZI,II»I »I I

(P 2( 22(

JP Zf 22(

I»l Zcl I

iP Zl 27iJ»I »I I

IP Zl 32( I

l»l »I I

I»l 34( I

-(P 2( 35( I

fi 2( 32f f

I»l 37lI»( 25( I

I»I 20( I

(P 2( 20(

I»I »I I

I I I-I"

N/A ILocation (Voltsfgeg(Ch ( X f

( I I I +

I I I I I

i I I I I

I I I I I

I I I I I

I I I I I

I I I

I I I I I

I I I I I

I I I I I

I I I I I

I I I I I

I I I I

I I I I I

I I I I I

I ( I I I

( I I I I

I I I I I

I I I I

I I I I I

I I I I I

Page 126: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Il

Page 127: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

TURKEY POINT UNIT 3

1997 REFUELING OUTAGE

Summary of Visual Examinations and Functional Testing of Snubbers

Page 128: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Page 129: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

MECHANICAL SHOCK ARRESTORFINAL REPORT

TURKEY POINTUNIT 3'1997

SPRING REFUELING'UTAGE

'Commercial Service Date: December 14, 1972

Prepared By:

Inservice Inspection GroupFlorida Power & LightTurkey Point Nuclear

9760'.'W. 344 St.Florida City, Fl

33035

Originated by: M. Campbell D te

Reviewed by: A. Pauleuc~z1 97Date

M. Blew Date

Page 130: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 131: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Mechanical shock arrestors (snubbers) were visuallyinspected/handstroked under purchase order B94536-40012 by Ratheoninspectors in accordance with the following plant procedures:

0-CMM-105 'O-OSP-105.1

Implementing plant work orders were as follows:PWO WO 96014408 — SNUBBER VISUAL/HANDSTROKE INSPECTION

3-1032,3-1041,3-1052,3-1072/3-1081,3-1096/3-1106,

3-1033,3-1043,3-1054/3-1073,3-1082,3-1099,3-1110,

3-1034,3-1044,3-1057,3-1074,3-1083,3-1100,3-1111,

3-1035,3-1045,3-1058,3-1075/3-1091,3-1101,3-1112,

3-1036,3-1046,3-1060,3-1077,3-1092,3-1102,3-1121,

3-1037/3-1048/3-1069,3-1078,3-1093,3-1103,3-1136

3-1038/3-1050/3-1070/3-1079,3-1094,3-1104,

& 3-1137

3-1039/3-1051/3-1071/3-1080/3-1095/3-1105,

PWO WO 96014408 — VISUAL INSPECTION (NO HANDSTROKE) FORFUNCTIONAL TESTING;3 1009/ 3 1011/ 3 1019/ 3 1023/ 3 1026/ 3 1031/ 3 1040/ 3 1042/3 1047/ 3 1049/ 3 1053/ 3 1055/ 3 1076/ 3 1084/ 3 1097/ 3 1098& .3-1120

PWO WO 96024188 — REPLACE LOAD PIN WITH LOAD STUD;

3 1007/ 3 1008/ 3 1009 & 3 1012

PWO WO 96024216 — REPLACE LOAD PIN WITH LOAD STUD;

3-1084

PWO WO 96016705 - DISLODGED BEARING & LOAD STUD REPLACEMENT/

3-1005, 3-1006 & 3-1010

PWO WO 97006613 — REMOVE SNUBBER 3-1009 / 3-MSHX-15IMPLEMENTATION OF CR 97-399/

3-1005, 3-1006, 3-1009 & 3-1010

Mechanical shock arrestors (snubbers) were functionally testedunder purchase order B95691-50102 by Basic — PSA personnel inaccordance with the following plant/vendor procedures:

0-CMM-105.1

O-OSP-105.2

Page 132: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

Page 133: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Implementing plant work orders were as follows:PWO WO'6024408 — FUNCTIONALLY TEST SNUBBERS LISTED BY ISI3 1009'g 3 101 1 ' 1019' 1023 ' 1026' 1031 g 3 1040' 1042'

1047. g 3 1049 g 3 1053 ~ 3 1055 / 3 1076 g 3 1084 g 3 1097 ( 3 1098& 3-1120

PWO WO'6024412 — REBUILD 10 SNUBBERS

10172 J 10174 ~ 1 1 1 10 '2377 ( 12392 ~ 16232 g 16238'g 16242 g 16252 &16253

Page 134: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

il

Page 135: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

MECHANICAL SHOCK ARRESTORFINAL REPORT

SECTION I

Page 136: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 137: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 1

05/22/97Turkey Point

Outage SurmaryReport

Unit 3/4

S Date S S

Visual T of T I T

Tag Serial Inspection A Fmctional A 4L4 A

Number Number Date T Test T Dimension T Visual Sunnary Ftmctional Sunnary

3-1005 10035 03/10/97 P 03/20/97 P 26.5000 P Visual inspection - sat, "L4 diemsnion acceptable,handstroke - sat, replaced load pins with load studsper IO 96016705, lubricated load studs and sphericalbearings on both ends with neolube - 24982-3.

A factional test was performed with the followingacceptable results under NO 97006613 and CR 97-399:

Pre Rebuild - S/N 10035

Replaced snubber S/N 10035 with snubber S/N 10579 perCR 97-399. Snubber S/N 10035 was rebuilt under NO

97006613 by Basic-PSA and NRH back into stores. Test 1)Test 2)Test 3)Test 4)

164.88223.57

0.001182.49

74.26165.57

0.012149.63

2500.002500.00

0.02g's2500.00

Tension Compression Criteria

The Pre Rebuild fextionai test was performed atEngineering direction per CR 97-399.

Post Rebuild - S/N 10035

Tension Ccepression Criteria

Test 1)Test 2)Test 3)Test 4)

161.38232.46

0.004224.31

138.78452.13

0.008397.34

2500.002500.00

0,02gls2500.00

The following parts were installed as part of therebuild of snubber S/N 10035:

(4) Drive Screws - 0015673-3

(1) Clutch Spring - 0015346-1

(1) Torque Carrier - 0015343-1

(1) Capstan Spring - 0015729-1

Page 138: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed
Page 139: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE KO. 2

05/22/97Turkey Point

Outage SmasryReport

Unit 3/4

S Date S S

Visual T of T I T

Tag Serial Inspection A Fmctional A "i." ANwher Kumber Date T Test T Dimension T Visual Suanary

Functional

Swmary

After rebuild and successful post rebuild factionaltest, snubber S/H 10035 uas KRH back into stores.

3-1006 6521 03/08/97 P 03/20/97 P 26.7500 P Visual inspection - sat, "l." dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends.

Installed Load studs in place of load pins perlO 96016705.

A fwetionaL test Mas performed uith the foLLouingacceptable results under lO 97006613 and CR 97-399:

Pre Rebuild - S/H 6521

Tension Cocpression Criteria

Replaced snubber S/H 6521 with snubber S/N 6494 perCR 97-399. Snubber 6521 Mas rebuilt under lO 97006613

by Basic PSA and NRH back into stores.

Test 1)Test 2)Test 3)Test 4)

152.21131.37

0.005127.82

195.31224.07

0.039207.67

2500.002500.00

0.02g's2500.00

This test Mas performed at Engineering directionper CR 97-399.

Post Rebuild - S/H 6521

Tension Coapression Criteria

Test 1) 250.32Test 2) '50.32Test 3) 0.002Test 4) 234.70

172.07317.51

0.007291.81

2500.002500.00

0.02g's2500.00

The foLLcwing parts uere used during the rebuildof snubber S/K 6521 under LO 97006613:

(4) Drive Screws 0015673-3

Page 140: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed
Page 141: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 305/22/97

Turkey PointOutage Slscsry

ReportUnit 3/4

S Date S S

Visual T of T T

Tag Serial inspection A Fumtional A "L" ANwher Number Date T Test T Dimension T Visual Summary Factional Soanary

(1) inertia Hass 0015344-1(1) Capstan Spring 0015729.1(1) Thrust Bearing Assembly - 0215049-1

Upon rebuild and successful fmctional testing thesnubber was HRH back into stores.

3-1007 4590 03/10/97 P / / 28.0000 P Visual inspection - sat, 4L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends with neolube - 24982-3 underMO 96016705.

Replaced load pins with load studs per MO 96016705.

3-.1008 8084 03/08/97 P / / 27.7500 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends with neolube - 24982-3 underMO 96016705.

Replaced load pins with load studs per lN 96016705.

3-1009 1203 03/10/97 P 03/16/97 F 26.5000 P Visual inspection - sat, 4L4 dimension acceptable,no handstroke performed, snubber is part of theinitial OR sample.

The snubber could not be unpinned. CR 97-399 waswritten for this snubber to determine the method ofremoval. A hydraulic ram was utilized to move themain steam pipe to facilitate snubber removal.

~~

~ I ~

Pre Rebuild - S/N 1203

Tension Coapression Criteria

Test 1) 7390.62 0.00Test 2) 7390.62 0.00Test 3) 0.00 0.00

2500.002500.00

0.02g's

A fuetional test was performed with the followingunacceptable results under NO 96024408:

Page 142: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 143: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 405/22/97

Turkey PointOutage Scenery

ReportUnit 3/4

S Date S S

Visual T of T I T

Tag Serial Inspection A F~tional A ".i." A

Naker Nether Date T Test T Dimension T Visual granary Fact iona( Summary

Test 4) 0.00 7836.54 2500.00

This QR snubber was tested as part of the initialsaapie. CR 97-399 was initiated for a QR fmctionaitest failure and per engineering disposition, snubbers3-1005, 3-1006 and 3-1010 sere fmtionally tested,no saapte expansion is required for a OR failed snubber;

Snubber S/N 1203 was rebuilt Mith the follouingacceptable test results under MO 97006613 and CR

97.399:

Post Rebuild - S/N 1203

Tension Coapress ion Cri teria

Test 1)I'est 2)Test 3)Test 4)

244.85244.85

0.005455.77

308.48707.74

0.008615.54

2500.002500.00

0.02g's2500.00

The foiiouing parts Mere replaced during rebuildof snubber S/N 1203 under UO 97006613:

(4) Drive Scram(1) Inertia Ness

(1) Torque Carrier(1) Capstan Spring

0015673-30015344-1

0015343.10015729-1

Upon rebuild and successful fmctionai testing thesnubber was HRN back into stores.

~ / ~ I ~

Page 144: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

/Qi

I~

4

Page 145: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 5

05/22/97Turkey Point

Outage StellaryReport

Unit 3/4

S Date S S

Visual T of T i T

Tag Serial Inspection A FLmctional A "L" ANunber Kosher Date T Test T Dimension T Visual Smmary Fuetional Suansry

3-1010 11931 03/08/97 P 03/14/97 P 25.5000 F Visual inspection - sat, aL" dimension unacceptable, .

condition report 97-0398 uas Mritten to address the"L" dimension uhich uas .5000" under the miniszzaalloued. Snubber 3-1009 uas found frozen and percondition report 97-399, Engineering directed thatsnubber 3-1010 be removed, fmctionally tested,disassembled for Engineering revieM. Upon disasseahlyof snubber 3-1010, Engineering directed that the subjectsnubber be rebuilt, as uell as snubbers 3-1005 & 3-1006.

Replaced load pins Kith load studs (2) 0214245-3 perlO 96016705, lubricated load studs and sphericalbearings with neolube - 024982-3. installed neM nuts(8) 0209608-3, installed (4) spacer Mashers 197329-3and torqued to 125 ft lbs, torque urench 85188,cal due 03/30/97. Restaked spherical bearing.

Pre rebuild - S/N 11931

Test 1)Test 2)Test 3)Test 4)

Tension105.93160.27

0.002148.42

Coapressi on

286.57307.04

0.0'i422e.47

Criteria2500.002500.00

0.02g's2500.00

This test uas performed at Engineering directionper CR 97-399 in place of snubber 3-1009.

Post Rebuild - S/N 11931

Tension Coapression Criteria

A fuetional test uas performed uith the folloMingacceptable results under N 97006613 & CR97-399;

Test 1)Test 2)Test 3)Test 4)

212.70388.96

0.00224e.57

161.34245.62

0.007403.70

2500.002500.00

0.02g's2500.00

The follouing parts Vere used during the rebuildof sakber S/N 11931 under ll 97006613:

(4) Drive ScreMs

(1) Clutch Spring(1) Capstan Spring(1) Torque Carrier(1) Thrust Bearing Asseahly

0015673-30015346.10015729-1

0015343-1

0215049.1

~~ i ~

Page 146: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

IO

it

Page 147: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE KO. 605/22/97

Turkey PointOutage Story

ReportUnit 3/4

S Date S S

Visual T of T i T

Tag Serial Inspection A Fisictional A »L" ANisnber Number Date T Test T Dimension T Visual Smeary Fisictional Surmsry

After rebuild and successful fisictionai testing, thesnubber Mas NRH back into stores.

3-1011 12376 03/10/97 P 03/13/97 P 20.2500 P Visual inspection - sat. "L» dimension acceptable,no handstroke performed, lubricated spherical bearingsand load pins Mith neolube - 24982-3 under M0 960241M.

A fwctional test was performed uith the fotlouingacceptable results under N0 96024408;

Snubber S/N - 12376

Tension Coapression Criteria

Test 1)Test 2)Test 3)Test 4)

99.74138.07

0.004146.98

56.1853.350.004

51.57

750.00750.00

0.02g<s750.00

This OR snubber seas tested as part of the initialsample.

3-1012 8086 03/10/97 P / / 27.0000 P Visual inspection - sat, »L» dimension acceptable,Handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube' 24982-'3.

Load pin on building attachment (rear bracket) uasnot replaced uith a load stud due to a 2" horizontalpipe risi 1» above the rear bracket, not enough roomfor the stud to fit and be double nutted per lO96024188. Replaced 3 nuts on the coaponent pipe clampside.

3-1019 2889 03/14/97 P 03/14/97 P 17.2500 P Visual inspection sat, »L» dimension acceptable,~ i I ~

A fwetionai test was performed Mith the folioiiing

Page 148: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

0

0

Page 149: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

GE NO. 7/22/97

Turkey PointOutage Srmmsry

ReportUnit 3/4

S Date S S

Visual T of T I T

ag Serial inspection A Frarctional A ~ . "L" A

r Number Date T Test T Dimension T Visual SrlrrMrry Frnctional SrmrrMrry

no handstroke performed, lubricated sphericalbearings and load studse

No iD tag installed. Snubber was changed out with S/N17425 due to unit 4 LCO. Mork was performed underIN 96014408.

acceptable results under IN 96024408rr

Snubber S/N - 2889

Tension Ccapression Criteria

Test 1)Test 2)Test 3)Test 4)

29.9230.87

0.00725.00

13.0622.910.0'17

27.36

300.00300.00

0.02g's300.00

This SR snubber was tested as part of th6 initialsaaple.

1023 23273 03/13/97 P 03/13/97 P 12.7500 P Visual inspection - sat, "L4 dimension acceptable,no handstroke, lubricated spherical bearings andload studs with neolube - 24982-3 under MO 96014408.

A frarctional test was performed witli the followingacceptable results under MO 96024408;

Snubber S/N - 23273

Tesnion Coapressi on Criteria

Test 1)Test 2)Test 3)Test 4)

11.8716.580.007

13.94

8.239.610.007

17.01

75.0075.000.02grs

75.00

This SR snubber was tested as part of the initialsaaple.

1026 12394 03/13/97 P 03/13/97 P 19.5000 P Visual inspection - sat, "L" dimension acceptable,~ r 1

~

A frarctional testing was performed with the following

Page 150: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

0

Page 151: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 805/22/97

Turkey PointOutage Suaaary

ReportUnit 3/4

S Date S S

Visual T of T I T

Tag Serial inspection A fmctionaL A "L" A

Number Nwher Date T Test T Dimension T Visual Sumery fmctionaL Swmsry

handstroke - sat, lubricated spherical bearings andload pins on both ends Nith neolube - 24982-3 underMO 96014408.

acceptable results under NO 960244M:

Snubber S/N - 12394

Torqued TTA bolts to 450 ft lbs - 8-4706 - 07/07/97Lock uired the TTA bolts.

Tension Ccapression Criteria

Test 1)Test 2)Test 3)Test 4)

57.5871.830.014

68.12

37.5239.95

0.00960.49

750.00750.00

0.02g's750.00

This SR snubber uas tested as a previous rebuild.

3-1031 27M6 03/13/97 P 03/15/97 P 17.8750 P Visual inspection - sat, «L« dimension acceptable,no handstroke, Lubricated spherical bearings andload pins uith neolube - 24982-3 under NO 96014408.

No LD tag installed.

A fuetionaL test Mas performed uith the foLLouingacceptable results under LN 96024408;

Snubber S/N - 27086

Tension Coapression Criteria

Test 1)Test 2)Test 3)Test 4)

18.3520.330.006

21.24

14.0621.070.006

20.08

300.00300.00

0.02g's300.00

This SR snubber uas tested as part of the initialsaaple.

3-1032 24410 03/12/97 P / / 14.0625 P Visual inspection - sat, "L«dimension acceptable,handstroke - sat, Lubricated spherical bearings and

~ i f ~'

Page 152: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 153: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE KO. 905/22/97

Turkey PointOutage Sumery

ReportUnit 3/4

S Oate S S

Visual T of T I T

Tag Serial inspection A Fmctfonal A 4L" A

Kunber Number Oate T Test T Dimension T Visual Smeary Flax:tional Suanary

load pins on both ends with neolube - 24982-3 underIJO 96014408.

3-1033 19328 03/13/97 P / / 16.3750 P Visual inspection - sat, "i." dimension acceptable,handstroke; sat, lubricated spherical bearings andLoad pins on both ends with neolube -. 24982-3 underiJO 96014408.

No LD tag installed.

3-1034 24429A 03/16/97 P / / 13.8750 P Visual inspection = sat, 4L4 dimension acceptable,handstroke - sat, lubricated spherical bearings andLoad pins on both ends with neolube - 24982-3 underlO 96014408.

3-1035 19330 03/15/97 P / / 16.6250 P Visual inspection - sat, "L'! dimension acceptable,handstroke - sat, lubricated spherical bearings andLoad pins on both ends with neolube - 24982-3 underMO 96014408.

Ko LD tag fnstallede

3.1036 27100 03/15/97 P / / 16.3750 P Visual inspection - sat, "L" dimension acceptable, ~

handstroke -, sat, lubricated spherical bearings andLoad pins on both ends with neolube - 24982-3 underQO 96014408.

No LO tag lnstalfedr

~ / f ~

Page 154: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed
Page 155: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 10

05/22/97Turkey Point

Outage SuanaryReport

Unit 3/4

S Date S S

Visual T of T I T

Tag Serial inspection A Fuetional A 4L4 ANumber Neer Date T Test T Dimension T Visual Suanary Fmetional Sunnary

3-1037 11922 03i14/97 P / / 26.6250 P Visual inspection - sat, 4L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends with neolube - 24982-3 underIQ 96014408.

3-1038 11934 03/14/97 P / / 26.7500 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underIQ 96014408.

3-1039 16241 03/14/97 P / / 20.0625 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underIQ 96014408.

3-1040 16239 03/13/97 P 03/15/97 P 20.5000 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underIQ 96014408.

A fwetional test was performed with the followingacceptable results under IQ 96024408;

Snubber S/N - 16329

Tension Compression Cr iteria

Test 1)Test 2)Test 3)Test 4)

73.67113.91

0.012122.59

79.6752.080.010

202.88

750.00750.00

0.02g's750.00

~~ i ~

This SR snubber was tested as a previous rebuild.

Page 156: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

ll

Page 157: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 11

05/22/97Turkey Point

Outage SunnaryReport

Unit 3/4

S Date S S

Visual T of T I T

Tag Serial Inspection A Fuetional A "L" ANumber NLNScr Date T Test T Dimension T Visual Suanary Fweti ona I Suanary

3-1041 16234 03/11/97 P / / 20.3750 P Visual inspection - sat, "L" dimension acceptable,handstroke sat, light rust on spherical bearings andload pins on both ends. Cleaned spherical bearings andload pins Nlth scotch bright and lubricated sphericalbearings and load pins on both ends Mith neolube24982-3 under NO 96014408.

Installed black ID tag to snubber TTA.

3-1042 12365 03/12/97 P 03/15/97 P 20.7500 P Visual inspection - sat, "L4 dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Nith neolube - 24982-3 underNO 96014408.

A fwxtional test uas performed Mith the foiioMingacceptable results under NO 96024408;

Snubber S/N - 12365

No ID tag installed. Tension Coepression Criteria

Test 1)Test 2)Test 3)Test 4)

158.38162.40

0.009358.28

59.09120.08

0.002146.08

750.00750.00

0.02g's750.00

This SR snubber Nas tested as a previous rebuild.

3-1043 17899 03/14/97 P / / 22.2500 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends Mith neolube - 24982-3 underlJO 96014408.

~ [ ~ I ~

Page 158: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

ll

Page 159: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

AGE NO. 12

5/22/97Turkey Point

Outage SuaaaryReport

Unit 3/4

S Date S S

Visual T of T I T

Tag Serial inspection A Fwetlonal A "L4 A

r Number Date T Test T Dimension T Visual Suanary Fuetional Suanary

-1044 17900 03/14/97 P / / 21.5000 P Visual inspection - sat, "La dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends with neolube - 24982-3 underIO 96014408.

1045 17189 03/14/97 P / / 21.5000 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends with neolube - 24982-3 underlQ 96014408.

1046 17903 03/14/97 P / / 20.7500 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends with neolube - 24982-3 under10 96014408.

1047 17902 03/14/97 P 03/15/97 P 20.5000 P Visual inspection - sat, "L" dimension acceptable,no handstroke performed (initial sac@le), lubricatedspherical bearings and load pins on both ends withneolube - 24982-3 under N 96014408.

A factional test was performed with the followingacceptable results under lS 96024408;

Snubber S/N - 17902

Drilled load pin per STD-C-011 for installation ofcotter pin (M29146-3) installed lock wire on TTA boltsand torqued to 450 in lbs, 8-4701 - Cal Due Date: 07/07/97.

Tension

Test 1) 60.77Test 2) 100.32Test 3) 0.007Test 4) 87.42

19.3426.59

0.002115.18

750.00750.M

0.02g's750.M

Compression Criteria

This SR snubber was tested as part of the initialsaaple.

Page 160: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Page 161: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 13

05/22/97

S Date S S

Visual T of T I T

Tag Serial Inspection A Fmctional A "L" A

Nuaber Kumber Date T Test T Dimension T

Turkey PointOutage Suaaary

ReportUnit 3/4

Visual Suanary Fuetional Suanary

3-1048 17904 03/14/97 P / / 19.5000 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underIJO 96014408.

3-1049 16245 03/14/97 P 03/15/97 P 20.5000 P Visual inspection - sat, 4L4 dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Kith neolube - 24982-3 underiO 96014408.

A fmctional test uas performed with the follcwingacceptable results under MO 96024408;

Snubber S/K - 16245

Tension Ccepression Criteria

Test 1)Test 2)Test 3)Test 4)

79.24128.31

0.013125.92

50 ~ 53

166.940.007

151.03

300.00300;00

0.02g's300.00

This SR snubber Nas tested as a previous rebuild.

3-1050 17906 03/14/97 P / / 22.0000 P Visual inspection - sat, 4L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends Kith neolube - 24982-3 underMO 96014408.

3.1051 16249 03/12/97 P / / 21.5000 P Visual inspection - sat, 4L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underlO 96014408.

~~

~ I ~

Page 162: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 163: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 14

05/22/97Turkey Point

Outage SuanaryReport

Unit 3/4

S Date S S

Visual T of T I T

Tag Serial inspection A Ftsx:tional A "La.ANeer Number Date T Test T Dimension T Visual Spermary factional Sunnary

3-1052 16233 03/12/97 P / / 21.7500 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bear ings andload pins on both ends with neolube - 24982-3 underMO 96014408.

No ID tag installed.

3-1053 2462 03/14/97 P 03/15/97 P 20.0000 P Visual inspection - sat, 4L" dimension acceptable,no handstroke (previous rebuild), lubricatedspherical bearfngs and load studs on both endswith neolube - 24982-3 under MO 96014408.

A fmctfonal test was performed with the followingacceptable results under NO 96024408;

Snubber S/K - 2462

Tension Compression Criteria

Test 1)Test 2)Test 3)Test 4)

32.1168.78

0.010106.53

56.2577.390.010

90.31

750.00750.00

0.02g's750.00

This OR snubber was tested as a previous rebuild.

3-1054 16248 03/12/97 P / / 20.2500 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982.3 underMO 96014408.

3-1055 13697 03/14/97 P 03/15/97 P 20.7500 P Visual inspection - sat, "Lw dimension acceptable,no handstroke (initial san@le), lubricatedspherical bearings and load studs on both ends

~~ 1

~

A functional test was performed with the followingacceptable results under lN 96024408;

Page 164: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

0

Page 165: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 15

05/22/97Turkey Point

Outage SmearyReport

Unit 3/4

0

S Date S S

Visual T of T T

Tag Serial inspection A Fuetional A "L" A

Nunber Number Date T Test T Dimension T Visual Smeary Functional Suaaary

with neolube - 24982-3 under N 96014408. Snubber S/N - 13697

Tension Compression Criteria

Test 1)Test 2)Test 3)Test 4)

69.0088.540.012

87.91

62.6485.69

0.01385.73

750.00750.00

0.02g's750.00

This QR snubber was tested as pert of the initialsample.

3-1057 27106 03/15/97 P / / 16.2500 P Visual inspection - sat, 4L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underlO 960144M.

3.1058 27102 03/16/97 P / / 16.2500 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends with neolube . 24982-3 underlO 96014408.

3-1060 19329 03/14/97 P / / 18.5000 P Visual inspection - sat, 4L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends Mith neolube - 24982-3 underlQ 96014408.

3-1069 27072 03/13/97 P / / 16.7500 P Visual inspection - sat, "L" dimension acceptable,~ ( i ~

Page 166: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Ib

Ik

Page 167: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 16

05/22/97Turkey Point

Outage SLINNryReport

Unit 3/4

S Date S S

Visual T of T I T

Tag Serial inspection A Fmctional A "La A

Number Number Date T Test T Dimension T Visual Smeary Fwetional Sumery

handstroke - sat, lubricated spherical bearings andload studs on both ends kith neolube - 24982-3 underlO 96014408.

Condition report 97-398 Mas Mritten to address boricacid on the snubber. The inspector found no boric aciduhen the snubber Mas inspected. Condition report 97-398directed that herculite be put over the snubber beforereload and removed prior to startup. The herculite Mas

removed on 03/29/97.

3-1070 27079 03/13/97 P / / 17.6250 P Visual inspection - sat, 4L4 dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underlO 960144M.

3-1071 27069 03/13/97 P / / 15.8125 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Nith neolube - 24982-3 underIQ 96014408.

No 10 tag installed. Load pin Nas ssmhroomed, filedpin for reinstallation in accrodance Nith STD-C-011.

3-1072 27073 03/15/97 P / / 16.0625 P Visual inspection - sat, "L4 dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underMO 96014408.

Page 168: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

I~

0

0

Page 169: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 17

05/22/97Turkey Point

Outage SenaryReport

Unit 3/4

S Date S S

Visual T of T i T

Tag Serial inspection A Fuetional A 4La A

ether Naker Date T Test T Dimension T Visual Suanary Fact iona l Stsmary

No iD tag installed. Removed paint and rust on housingand indicator tube Mith scotch brite.

-1073 27090 03/15/97 P / / 17.0000 P Visual inspection - sat, "L4 dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underlO 96014408.

-1074 27104 03/15/97 P / / 17.7500 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends uith neolube - 24982-3 under1JO 96014408.

-1075 18074 03/15/97 P / / 8.1250 F Visual inspection - sat, "L" dimension macceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underlO 96014408.

CR 97-0478 Mas issued for rusted rear plate and "L"dimension bale+ miniaua by .254. NO 97006948 Nas

implemented to correct the conditions.

-1076 19725 03/13/97 P 03/15/97 P 17.5000 P Visual inspection - sat, "L" dimension acceptable,no handstroke (initial sample), lubricatedspherical bearings and load pins on both endsMith neolube - 24982-3 under NO 96014408.

A fuetional test Nas performed Mith the follmingacceptable results under lO 96024408;

Snubber S/N - 19725

~~

~ i ~

'Tension Coopression Criteria

Page 170: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Ib

Page 171: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE MO. 18

05/22/97Turkey Point

Outage SulNlaryReport

Unit 3/4

S Date S S

Visual T of T I T

Tag Serial inspection A Flmctfonal A "L" AMmher Mumber Date T Test T Dimension T Visual Sundry Factional Stannary

Test 1)Test 2)Test 3)Test 4)

16 4416.790.012

17.19

32 ~ 15

32.210.009

31.28

300.00300.00

0.02g's300.00

This QR snubber was tested as part of the'initialsaaple.

3-1077 16230 03/13/97 P / / 20.2500 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underIN 96014408.

installed black ID tag on TTA end.

3-1078 16244 03/12/97 P / / 20.5000 P Visual inspection - sat, "L4 dimension acceptable,handstroke - sat, lubricated spherfcal bearfngs andload pins on both ends with neolube - 24982-3 underIN 96014408.

3-1079 10176 03/12/97 P / / 22.0000 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends vfth neo' 24982-3 underIN 96014408.

3-1080 12396 03/11/97 P / / 21.2500 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings and

~ i ~ f ~'

Page 172: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

IS

IS

0

0

Page 173: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 19

05/22/97Turkey Point

Outage SmearyReport

Unit 3/4

S Date S S

Visual T of T i T

Tag Serial inspection A Fmctional A "L" ANumber Number Date T Test T Dimension T Visual Smeary Fwetional Suaasry

load pins on both ends with neolube - 24982-3 underlO 96014408.

3-1081 11921 03/12/97 P / / 25.5000 P Visual inspection - sat, "L4 dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underMO 96014408.

No iD tag installed.

Replaced 1 spacer washer - 0197329-3Replaced 1 cotter pin - 0029146.3

3.1082 11932 03/12/97 P / / 26.5000 P Visual inspection - sat, 4La dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underQO 96014408.

No ID tag 'installedo

3-1083 11925 03/15/97 P / / 25.1250 P Visual inspection - sat, aL" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underQO 96014408.

3-1084 7000 03/14/97 P 03/16/97 P 24.7500 P Visual inspection - sat, "L" dimension acceptable,no handstroke (initial saaple), lubricatedspherical bearings and load pins on both ends

~ ) ~ i ~

A fmctional test Mas performed Mith the folloMingacceptable results under MO 96024408;

Page 174: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

Il

il

Page 175: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 2005/22/97

Turkey PointOutage Suanary

ReportUnit 3/4

S Date S S

Visual T of T i T

Tag Serial inspection A Fmctional A "L'l A

Naker Kumber Date T Test T Dimension T Visual Suanary Functional Suanary

ui th neolube 24982-3 under KO 96024216. Snubber S/N - 7000

Ko ID tag installed. installed 4 spacer Mashers-197329-3, installed neu load stud - 15329-1 and4 nuts - 209608-3 and torqued to 125 ft lbs onsnubber end under lJO 96024216.

Test 1)Test 2)Test 3)Test 4)

504.13504.13

0.002217.05

154.54407.02

0.009225.69

2500.002500 F 00

0.02g's2500.00

Tension Coapressi on Criteria

This SR snubber Nas tested as part of the initialsearle.

3-1091 27087 03/13/97 P / / 19.0000 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Kith neolube - 24982-3 underMO 96014408.

3-1092 27105 03/13/97 P / / 18.0000 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Kith neolube - 24982-3 underlO 96014408.

No iD tag installed.

3-1093 27091 03/15/97 P / / 18.1250 P Visual inspection . sat, 4L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload studs on both ends with neolube - 24982-3 underQO 96014408.

~~ 1

~

Page 176: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

II

0

Page 177: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 21

05/22/97Turkey Point

Outage SLINNryReport

Unit 3/4

S Date S S

Visual T of T I T

Tag Serial Inspection A Fuetional A «L« ANumber Number Date T Test T Dimension T Visual Summary Fact ione l Sumery

3.1094 4388 03/16/97 P / / 15.2500 P Visual inspection - sat, «L«dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underlO 96014408.

3-1095 16733 03/14/97 P / / 8.5000 P Visual inspection - sat, «L«dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underIQ 96014408.

3-1096 11993 03/18/97 P / / 8.5000 F Visual inspection - sat, «L«dimension macceptable,condition report 97-531 written to address the «L«

dimension which is -.3750« below minim!a, handstroke- sat, lubricated spherical bearings and load studson both ends with neolube - 24982-3 under NO 96014408.

Snubber 3-1096 was swapped with tag 3-1097 from aprevious installation. Reinstalled in the correct taglocation.

3-1097 16724 03/13/97 P 03/15/97 P 9.0000 P Visual inspection - sat, "L" dimension acceptable,no handstroke, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underlQ 96014408.

A factional test was performed with the followingacceptable results under NO 960244M;

Snubber S/N - 16724

Snubber was previously installed in the sister(3-1096) location. Reinstalled in the proper location.

~ / 1~

Tension Compression Criteria

Page 178: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

IO

il

il

Page 179: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 22

05/22/97Turkey Point

Outage SmearyReport

Unit 3/4

S Date S S

Visual T of T I T

Tag Serial Inspection A Functional A "L" A

Naker Number Date T Test T Dimension T Visual Suanary Fuetional Smmary

Test 1)Test 2)Test 3)Test 4)

1.983.280.0103.03

2.633.760.0113.75

32.5032.500.02g's

32.50

This SR snubber vas tested as part of the initialsample.

-1098 33628 03/16/97 P 03/15/97 P 10.3750 P Visual inspection - sat, "L" dimension acceptable,no handstroke (lnitaL sample), lubricated sphericalbearings and load pins arith neolube - 24982-3 onbuilding end only under 1JO 96014408.

A fmctionaL test was performed with the foLLouingacceptable results under NO 96024408;

Snubber S/N - 33628

No ID tag installed. Tension Conpression Criteria

Test 1)Test 2)Test 3)Test 4)

2.104.800.0116.52

5.215.210.0108.60

17.5017.500.02g's

17.50

This SR snubber was tested as part of the initialsaspleo

-1099 38481 03/16/97 P / / 11.7500 P Visual inspection - sat, 4L" dimension acceptable,handstroke - sat, Lubricated spherical bearings andLoad pins on both ends with neolube - 24982-3 underMO 96014408.

No ID tag installed.

Page 180: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

II

IJ

il

Page 181: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 2305/22/97

Turkey PointOutage Sunnary

ReportUnit 3/4

S Date S S

Visual T of T i T

Tag Serial Inspection A Flmctfonal A "L" A

Naker Nwhtr Date T Test T Dimension T Visual Suansry Fuctfonal Summary

3-1100 17819 03/16/97 P / / 8.3125 P Visual inspection - sat, 4L4 dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underlO 96014408.

No ID tag installed.

3-1101 33626 03/16/97 P / / 11.5625 P Visual inspection - sat, 4L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underlO 96014408.

No ID tag installed.

3-1102 29451 03/16/97 P / / 11.2500 P Visual inspection - sat, "La dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends sfth neolube - 24982-3 underIO 96014408.

Ko ID tag installed.

3-1103 '11996 03/17/97 P / / 8.5000 P Visual inspectfon - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pfns on both ends elth neolube - 24982-3 underIO 96014408.

3-1104 24412 03/17/97 P / / 13.5000 P Visual inspection - sat, "L" dimension acceptable,~ / I ~

Page 182: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 183: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 2405/22/97

Turkey PointOutage Suansry

ReportUnit 3/4

S Date S S

Visual T of T T

Tag Serial inspection A fmctional A "L4 A

Number Nmher Date T Test T Dimension T Visual Suanary fuctionai Suanary

Handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neoide - 24982-3 underIO 96014408.

3-1105 16134 03/15/97 P / / 13.1250 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on ccmponent end due to piping and scaffoldlimitations on building end Mith neolube - 24982-3under lO 96014408.

No ID tag installed.

3-1106 38479 03/15/97 P / / 11.3125 P Visual inspection - sat, "L" dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underIO 96014408.

No ID tag installed.

3-1110 16136 03/15/97 P / / 12.7500 P Visual inspection - sat, "La dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underlO 96014408.

No ID tag installed.

3-1111 2875 03/15/97 P / / 17.0000 P Visual inspection - sat, "L4 dimension acceptable,handstroke - sat, lubricated spherical bearings and

~ i ~ I ~~

Page 184: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

I~

Page 185: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 25

05/22/97Turkey Point

Ou'tage SISllllbryReport

Unit 3/4

S Date S S

Visual T of T I T

Tag Serial Inspection A Fmctional A "i" ANumber Nmher Date T Test T Dimension T Visual Suanary Factional Suanary

load studs on both ends with neolube - 24982-3 underlO 96014408.

3-1112 27083 03/16/97 P / / 16.2500 P Visual inspection - sat, "L4 dimension acceptable,handstroke - sat, Lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underlJO 96014408.

3-'1120 18325 03/16/97 P 03/15/97 P 8.6250 P Visual inspection - sat, "L4 dimension acceptable,no handstroke (initiaL sample), Lubricated sphericalbearings and Load pins on both ends with neolube24982-3 under NO 960144M.

A fmctionaL test Mas performed with the foLLouingacceptable results under NO 96024408;

Snubber S/N - 18325

No ID tag Installedo Tension Coapress ion Criteria

Test 1)Test 2)Test 3)Test 4)

5.918.310.0178.07

11.9023.940.015

5.54

32.5032.500.02g's

32.50

This SR snubber vas tested as part of the initialsea@le.

3-1121 24430 03/16/97 P / / 12.7500 P Visual inspection - sat, "l." dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neolube - 24982-3 underQO 96014408.

~~ I ~

Page 186: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

~~

Page 187: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 2605/22/97

Turkey PointOutage Suaaary

ReportUnit 3/4

S Date S S

Visual T of T I T

Tag Serial Inspection A Fwetional A «L« ANeer Naker Date T Test T Dimension T Visual Suanary Fmctional Suaaary

No ID tag installed.

3-1136 19M4 03/16/97 P / / 9.0000 P Visual inspection - sat, «L«dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends Mith neotube - 24982-3 underNO 96014408.

3-1137 19885 03/15/97 P / / 9.0000 P Visual inspection - sat, «L«dimension acceptable,handstroke - sat, lubricated spherical bearings andload pins on both ends with neolube - 24982-3 underNO 96014408.

3-1005 10579 03/21/97 P 03/20/97 P 26.5000 P Visual inspection - sat, «L«dimension acceptable,no handstroke, lubricated spherical bearings andload studs on both ends with neolube - 24982-3 underQO 97006613.

A fmctional test Mas performed Mith the followingacceptable results under NO 97006613:

Snubber S/N 10579

Snubber S/N 10579 is a replacement per CR 97-399.Snubber S/N 10035 was rebuilt under NO 97006613 and

HRN back into stores. Test 1)Test 2)Test 3)Test 4)

93.16171.37

0.005153.93

56.9592.160.007

135.11

2500.002500.00

0.02g's2500.00

Tension Coapression Criteria

This OR snubber was tested as a replacement snubber.

3-1006 6494 03/21/97 P 03/20/97 P 26.7500 P Snubber S/N 6494 is the replacement snubber for snubberS/N 6521 per CR 97-399. Load studs and spherical bearingsuere lubricated with neolube 24982-3 under NO 97006613.

~ / ~ I ~

A fmctional test was performed Mith the follouingacceptable results under NO 97006613 and CR 97-399:

Page 188: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 189: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 2705/22/97

Turkey PointOutage Smeary

ReportUnit 3/4

S Date S S

Visual T of T i T

Tag Serial inspection A Fmctional A "La A

Neer Nmher Date T Test T Dimension T Visual Summary Factional Showery

installed 2 square washers 30263-3 and 8 spacer washers197329-3.

Snubber S/N - 6494

Tension Cospression Criteria

Test 1) 132.16Test 2) 190.20Test 3) 0.016Test 4) 220.84

65.10102.84

0.02087.87

2500.002500.00

0.02g's2500.00

This test was performed as a replacement test.

3-1009 10542 03/17/97 P 03/14/97 P 26.8750 P Snubber S/N 10542 is a replacement snubber forsnubber S/N 1203. The as left inspection was sat.under MO 97024188.

A fmctional test was performed with the followingacceptable results;

Tension Coepression CriteriaLoad studs and spherical bearings were lubricatedwith neolube 24982-3. 'Test 1) 41.56

Test 2) 90.30Test 3) 0.006Test 4) 86.96

128.27146.42

0.008115.11

2500.002500.00

0.02g's2500.00

This factional test was performed on snubber 10542which is a replacement snubber for srabber 1203.

3-1010 6530 03/21/97 P 03/20/97 P 26.5000 P An as-left visuaL inspection was performed underlO 97006613 on replacement snubber 6530. Visualinspection was sat. Snubber 11931 was taken to theBasic-PSA trailer for tear down, Engineeringinspection and subsequent rebuild. The rebuiltsnubber tested sat and was HRH into stores.

~~

~ i ~

Tension Coepression Criteria

Test 1)Test 2)

132.54 . 90.78198.87 119.78

2500.002500.00

A fuetional test was performed with the followingacceptable results under IO 97006613 and CR 97-399:

Page 190: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

it

Page 191: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

PAGE NO. 2805/22/97

Turkey PointOutage Sumsry

ReportUnit 3/4

S Date S S

Visual T of T I T

Tag Serial Inspection A Fuetional A 4L" A

Number Nwher Date T Test T Dimension T Visual Sunnary Fuetional Sunnary

Test 3) 0.004 0.008 0.02g'sTest 4) 220.20 104.52 2500.00

This test uas performed as a replacement test.

3-1019 17425 03/14/97 P 03/14/97 P 17.2500 P Visual inspection - sat, "L4 dimension acceptable,no handstroke performed, lubricated spherical bearingsand load pins with neolube - 24982-3 under MO 960144M.

Snubber S/N 2889 uas changed out with snubber S/N19425 due to a LCO condition on unit 4.

A factional test Mas performed with the follouingacceptable results under NO 96024408;

Snubber S/N - 17425

Tension Ccepresion Criteria

Test 1)Test 2)Test 3)Test 4)

29.9230.87

0.00725.00

13.0622.910.017

27.36

300.00300.00

Oe02g~s

300.00

This SR snubber Mas tested as as a r'eplacement forsnubber S/N 2M9 due to a LCO on unit 4.

~~

~ I ~

Page 192: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 193: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

TURKEY'OINT UNIT 3

1997 REFUELING OUTAGE

Summary of Inservice Inspection Examinations

Page 194: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed
Page 195: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3IHSERVICE INSPECTION SUMNARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 1'CBEAR,'STATUS Components

Page: 1

Zone Number,: 3-001

Summary-Examination AreaNumber Identification

ASNESEC. XICatgy Exam:Item Ho Hethod , Procedure

.Nil, 0S ON'G TT RSEHA. 'E I 0 E RemarksT, C G M R «* Calibration Block **

003200 VESSEL TO CLOSURE HEAD HATING B-N-1 VT-3SURFACE OH .HEAD B13.10

NDE 4.3-28 X - - - 03/22/97 - VT-'3. complete, examinationperformed with remote camera

Page 196: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

-J

Page 197: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY POINT NUCLEAR,PLANT UNIT 3IHSERVICE INSPECTION SUMMARY

THIRD'NTERVAL, SECOND 'PERIOD, FIRST OUTAGE (97RF)Class 1 CBEAR STATUS Components

:Page: 2

Zone Number: 3-057

Sunnary, Examination AreaNumber Identification

,ASMESEC. XICatgy ExamItem No Method Procedure

N I 0S ONGTT RSEHA' I O,E RemarksT C G M R «* Calibration Block **

202700 3-RCP-8-FLYWHEEL

FlywheelRG 1.14UT NDE 5.15-1 X- 03/27/97 - UT complete, examined from

the periphery surface, examinationsperformed in accordance with TechnicalSpecifications** FLYWHEEL *»

Page 198: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

II

~(

J

Page 199: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 ,TURKEY POINT NUCLEAR'PLANT UNIT 3INSERVICE INSPECTIOH SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class '2 CBEAR STATUS Components

Page 3

Zone Number:,3-063

'Smeary Examination AreaNumber Identification

ASMESEC., XICatgy ,ExamItem No'Method'rocedure

.N I 0S ONGTT 'R:SE H

A E I,O,E RemarksT C G M.,R ** Calibration Block **

214900'R-252SPRING, HANGER

F-A VT-3F,1.20C

.HDE 4.3-9' X - - - 03/12/97 - VT-3 complete, light rustfound inside of spring can

'21500014"-RHR-2301-9'IPE.

TO ELBOM

C-F-1 PTC5.11'T 45

UT 60UT 70

,HDE3.3-20'DE

5.4-2X-X---

- X'---X-3/12/97 - PT complete, two acceptableround indications, 3/14/97 - UTcomplete, root. geometry, limitedvoiunetric examination from the elbowside due to 'its configuration, limitedexamination from the pipe side due tosupport 'interference**.UT 33 **

215050 14"-RHR-2301-9LD ILOHG SEAM 'DOHHSTREAM. INSIDERADIUS

C-F-1'TC5.',12 UT 45

HDE 3;3-'20.HDE'5.4'-2

X - - - 3/12/97 - PT complete, 3/14/97 - UT'- X - complete, beam redirection due to

,dendretics, inside surface geometry

** UT 33 **

215100 14"-RHR-2301-9LDO C-F-1 PTLONG. SEAM. DOHHSTREAM OUTSIDE C5 ~ 12 UT'5RADIUS

HDE 3.3-20'DE'.4-2

X - - - 3/12/97 - PT complete, 3/14/97'- UT- - X - complete, beam redirection due to

dendretics, inside surface geometry

UT 33 4*

215180 .14a-.RHR-2301-10LUI,LOHG SEAM UPSTREAM INSIDERADIUS

C-F-1 PTC5 ~ 12 'UT 45

HDE 3.3-1HDE 5.4-2

X - - - 03/12/97 - PT complete, 3/14/97 - UT- - X - complete, beam redirection due to

dendretics, inside surface geometry.

~*:UT-33 **

215190 14a-RHR-2301-10LUO C-F-1 PT

LONG SEAM UPSTREAM OUTSIDE C5.12 U'I 45RADIUS

NDE3.3-1'HDE

5.4-2X - - - 03/13/97 - PT,complete, 3/14/97 - UT-. - X.- 'complete, beam redirection due to

dendretics, inside:surface geometry

*'T-33 **

Page 200: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

=J

Page 201: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3IHSERVICE INSPECTION SUMMARY

.THIRD INTERVAL, SECOND PERIOD, FIRST'OUTAGE (97RF)Class 2 CBEAR STATUS Components

Page 4

Zone Heber:,3-063

Swmary Examination. Area- Number Identification

ASMESEC. XICatgy ExamItem No Method Procedure

N I 0S ONGTT'SEHA E 'I O,E RemarksT C G M R ** Calibration Block **

215200 14» RHR 230'I '10

ELBOW TO PIPEC-.F-1 PTC5 ~ 11 PT

CRWO

UT 45UT 60UT

NDE 3.3-1

PTH-97-04329706743NDE'.4-2

; NDE 5'. 18-1

---XX---

X-X-X-

3/13/97 - PT,complete, cresecent shapedindication at toe of weld, determined,to,be a surface anomoly,'3/14/97 - UTcomplete, root geometry,'3/17/97 - PTcompleted after .weld. cleanup** UT-33 **

215250 14"-RHR-2301-25Pipe to Pipe

C-F-1 SUR

C5 ~ 11'OLNDE.3.3NDE 5.4

06/09/97 - weld found during 1997outage, no examination required duringthis outage** UT-33 «»

215300 14«-RHR-2301-11PIPE TO ELBOW

C-F-1 PTC5.11 UT 45

UT 60

NDE 3.3-13HDE 5.4-3

X - - - 03/14/97 - PT and.UT complete, rootX - - - geometry- - X-

** UT 33 «*

215400 14"-RHR-2301-11LSLONG SEAM DOWNSTREAM INSIDERADIUS

C-F-1 PTC5 ~ 12 UT 45

HDE 3.3-13NDE 5.4-3

X - - - 03/14/97 -,PT and UT completeX---

«* UT-33 *»

215410 14"-RHR-2301-.11LDO C-'F-1 PT

LONG SEAM DOWNSTREAM OUTSIDE C5.12'T 45RADIUS

NDE„'3.3-.13,,NDE 5.4-3

X'- - - 03/14'/97 - PT and:UT completeX---

«» UT-33 »*

Page 202: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Page 203: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97t ,TURKEY POINT NUCLEAR PLANT'UNIT 3INSERVICE .INSPECTION SUHHARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Corryonents

Page: 5

'Zone Number:3-063'cenery

Examination AreaNumber Identification

ASHESEC. XICatgy ExamItem Ho Nethod Procedure

N I 0S- ONGTT RSEHA E I 0 E RemarksT .C G N R *» Calibration Block **

215480 14"-RHR-2301-12LUI'OHG

SEAN'.UPSTREAN INSIDERADIUS

C-F-1 PTC5.12 UT 45

NDE3.3-13'DE

5.4-3X - - - 03/14/97 - PT and UT, completeX'-

** UT-33 **

215490 14"-RHR-2301-12LUOLONG SEAN UPSTREAH'OUTSIDERADIUS

C-F-1 PTC5 ~ 12 UT 45

NDE 3.3-13NDE 5.4-3

X - - - 03/14/97 - PT and UT coapleteX-

»* O'I 33 **

215500 14"-RHR-2301.-12ELBOM TO PIPE

e215520 14"-RHR-2301-12LD

Long i tudinal.'Seam HeldDownstream

C- F- 'I P.T

CS ~ 11 UT 45UT 60

C-F-1 PTC5.12 UT 45

NDE 3.3-13NDE 5.4-3

NDE 3.3-13NDE 5.4-3

X - - - 03/14/97 - PT;and UT complete, rootX - - - geometry- - X-

«» UT-33 **

X - - - 03/14/97 - PT and UT completeX---

** UT-33 **

216500 14"-RHR-2301-18VALVE 3-752A TO PIPE

C-F-1 PTC5'.'I1 UT 45

UT 60UT 70

NDE 3.3-12NDE 5.4-11

---XX-----X---X-03/12/97, - PT coeplete, 2 acceptableround indications, 3/13/97 - UTcomplete, root geometry, no volunntricexamination from,the weld crown and fromvalve side due to their configuration** UT-33 **

216520,, 14"-RHR-2301-'18LD'Long Seam Downstream

C- F-.1 'TC5.12 UT 45

NDE 3.3-12NDE"5.4-11

X - - - 03/12/97 - PT complete, 3/13/97 - UT

X - - - complete

** UT 33 *»

Page 204: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ll

Page 205: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97. TURKEY POINT NUCLEAR PLANT UNIT 3INSERVICE INSPECTION SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components

Page: 6

Zone Number: 3-063

Sumery Examination AreaNunber Ident ification

ASME

SEC. XICatgy ExamItem No Method Procedure

N I 0S ONGTT RSEHA E I 0 E RemarksT C G M R ** Calibration Block **

, 216580 14"-RHR-2301-19LULong Seam Upstream

C-F-1 PTCS ~ 12 UT 45

NDE 3.3-19HDE 5.4-11

X - - - 03/12/97 - PT cceplete, 3/13/97 - UTX - - - conplete

** UT-33 **

216600 14"-RHR-2301-19PIPE TO .TEE

C-F-1 PTC5.11'T 45

UT 60UT 70

HDE 3.3-19HDE 5.4-11

X-X--X---X---03/12/97 - PT complete, 3/13/97 - UTcoaplete, root geometry

** UT 33 *0

216620 14"-RHR-2301-19LD1 C-F-1 PTLong Seam Meld, Inside of Tee CS ~ 12 UT 45

HDE 3.3-.19HDE 5.4-11

X - - - 03/12/97 - PT complete, 3/13/97 - UTX - - - coaplete

** UT-33 **

0 14"-RHR-2301-19LD2 C-F-1 PT

Long Seam'Weld Outside of Tee C5.12 Ul'5HDE 3.3-19HOE 5.4-11

X - - - 03/12/97 - PT cceplete, 3/13/97 - UTX - - - complete

++ UT-33 **

217480 14"-RHR-2301-24LULong Seam Upstream

C-F-1 PTC5 ~ 12 UT 45

HDE 3.3-11NDE 5.4-10

X - - - 3/14/97 - PT complete, 3/15/97 - UTX - - - coaplete

** UT-33 **

217500 14"-RHR-2301-24PIPE TO PUMP CASING

C-F-1 PT

C5.11 UT 45UT 60UT 70

HOE 3.3-11HDE 5.4 10

X--- 3/12/97. - PT complete, 3/15/97 - UTcoaplete, root geometry, no volunetricexamination from the pump side and onthe weld due to their configuration** UT-33 **

217550 RHR PUMP 3P210APUMP SUPPORT

VT-3CR

HOE 4.3-597-0431

X 03/12/97 - VT-3 coaplete, bent bolt onsupport plate, accepted as-is byengineering evaluation, support is partof building structure and is outside thescope of Secion XI

Page 206: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ll

!I

0

Page 207: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3INSERV ICE INSPECT ION'UMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Coaponents

Page: 7

Zone Number: 3-064

Showery Examination AreaNumber Identification

ASMESEC. XICatgy Exam'Item No Method Procedure

N I. 0S ONGTT RSEHA E 'I 0;E RemarksT C G M R ** Calibration Block **

217800 14!'-RHR-2303-1TEE TO TEE

C-F-1 PTC5.11 UT 45

UT 60

NDE 3.3-10NDE 5.4-4

X' - - 03/14/97 - PT complete, 3/15/97 - UTX - - - coapiete, root geometry--X-

*« UT-33 **

217900 14"-RHR-2303-1LD1 C-F-1 PTLong Seam-Downstream Inside of C5.12 UT 45Tee

NDE 3.3-10HDE 5.4-4

X - - - 03/14/97 - PT. complete, 3/15/97 -.UTX -, - - complete

** UT'3 **

217920 14"-RHR-2303-1LD2 C-F-1 PTLong Seam DoMnstream.Outside C5.12 UT 45of Tee

NDE 3.3-10HDE 5.4-4

X - - - 03/'19/97 - PT complete, 3/15/97 - UTX - - - complete

** UT 33 **

217980 14a-RHR-2303-2LU1Long Seam Upstream Inside ofTee

C-F-1 'PT'C5 ~ 12 UT 45

NDE 3.3-10HDE 5.4-4

X -"- - 03/14/97 - PT complete, 3/15/97 - UTX - - - complete

«* UT-33 «*

217990 '14"-RHR-2303-2LU2 C-F-1PT'ong

Seam Upstream Outside. of C5.12 UT 45Tee

HDE 3.3'-'10:NDE 5.4-4

X - - - 03/14/97 -.PT complete, 3/15/97 - UTX - - - complete

*« UT-33 ««

218000 14"-RHR-2303-2TEE TO PIPE

C-F-1 PTC5.11 UT

45'T

60UT 70

NDE 3.3-10:NDE 5.4-4

- - - X 03/14/97 - PT cot|piete, 3/15/97 - UTX - - - coeplete, root geometry--X---X-

** UT 33 **

Page 208: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Page 209: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY POINT "NUCLEAR PLANT UNIT 3INSERVICE INSPECTION SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components

Page: 8

Zone Heber: 3-064

Swmary Examination AreaNunber Identification

ASMESEC. XICatgy ExamItem No Method

STA

Procedure T

N I 0ONGTR.SE H

E I 0 E RemarksC G M'R «» Calibration Block **

'218020 14»-RHR-2303-'2LDLong Seam Downstream

C- F-'1 PTC5.12 UT

45'DE 3.3-10NDE 5.4-4

X' - - '03/14/97 - PT complete, 3/15/97 - UT'X - - - complete

*» UT-33 **

218080 14"-RHR-2303-2ALULong Seam Upstream

C-F-1, PT'C5.12 UT 45

NDE 3.3-10NDE 5.4-4

X - - - 03/14/97 - PT complete, 3/15/97 - UTX - - - complete

** UT 33 **

.218100 14"-RHR-2303;2A,PIPE TO PIPE

C-F-1 PT.

C5.11 UT 45UT 60

NDE 3.3-10NDE 5.4-4

---XX-----X-03/14/97 - 'PT complete, one acceptableround indication, 3/15/97 - UT coaplete,root geometry** UT 33 **

0 14»-RHR-2303-2ALDLong Seam Downstream

C-F-1 PTC5.12'T 45

NDE 3.3-10NDE 5.4-4

X - - - 03/14/97 - PT complete, 3/15/97 - UTX - - - complete

** UT-33 **

218380 14"-RHR-2303-4LUI.LONG SEAM UPSTREAM~ INSIDERADIUS

C-F-1 PTC5;12 UT, 45

NDE. 3.3-5NDE'5;4-5

X'- - - 3/12/97 - PT complete, 3/13/97 - UTX - - - complete

** UT 33 **

218390 14"-RHR-2303-4LUOLong Seam Upstream OutsideRadius

C-F-1 PTC5.12 UT 45

,NDE 3.3-5NDE 5.4-5

X - - - 3/12/97 - PT complete, 3/13/97 - UTX - - - complete

UT 33 *».

218400 14"-RHR-2303-4ELBOM TO:VALVE 3-7528

C-F-1 PTC5.11 UT 45

UT 60,UT 70

NDE 3.3-5NDE 5.4-5

- - - X 03/12/97 -.PT complete, one. acceptableX - - - round indication, 3/13/97 - UT- -.X - ccepiete, .root geometry,, no voiunctricX - - - examination from the valve side due to

its configuration*»'UT-33 «»

Page 210: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Page 211: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97r TURKEY POINT 'NUCLEAR PLANT UNIT 3INSERVICE INSPECTION SUMMARY

THIRD 'INTERVAL, SECOND PERIOD, FIRST OUTAGE,(97RF)Class 2 CBEAR STATUS Components

'Page: 9

,2one. Number: 3-064

Sunnary„Examination AreaNumber Identification

.ASME'SEC. XICatgy Exam'Item No Method Procedure

N I 0S 0 N'G,TT RSEHA E I 0 E RemarksT C G M.R '** Calibration Block **-

210550 14"-RHR-2303-12PIPE TO TEE

06/13/97 -;Neid does not'xist,removed'ode,

category and item number, from.database*4 UT 33 **

219400 PS-54DUAL SPRING HANGERS

F-A VT-3F1.20C

NDE 4.3-13 X - - - 03/12/97 - VT-3 complete, light rustnoted on the inside of both spring, cans

219550 RHR PUMP 3P210BPUHP SUPPORT

3/12/97 - support is part of buildingstructure and is outside the scope ofSection XI

e

Page 212: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Cl

Page 213: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY POINT'NUCLEAR PLANT UNIT 3'INSERVICE 'INSPECTION SUHHARY

THIRD INTERVAL, SECOND,PERIOD, FIRST OUTAGE '(9?RF).Class. 2.CBEAR STATUS Coaponents

'Page: 10

Zone Heber: 3-066

Surmary Examination AreaNumber Identification

ASHESEC. 'XICatgy Exam.Item No Hethod Procedure

N I 0'OHGT

T RS'EHA E I O'E. RemarksT C G H'R «» Cal3bration Block **

222080 14"-RKR-2305-3LULongitudinal Weld

C-F-1 PTC5.12;UT 45

HDE 3.3-4HDE 5.4 1

X - - - 03/12/97 - PT complete,, 3/13/97 - UTX - - - coaplete

«*UT-33'**'222100

14»-RHR-2305-3PIPE TO VALVE HOV-3-860A

C-F,-1 PTC5 ~ 11 UT 45

UT, 60'UT 70

'DE'.3-4HDE 5.4 1

---XX-----X---X-03/12/97 - PT complete, one acceptableround indication, 3/13/97. - UT complete„root geometry, no voiunetric examinationfrom the valve side due to 3tsconfiguration** UT-33 *»

222860 .14»-RKR-2305-10LUILong:Seam Ins3de Radius ofElbow

C-F-1 PTC5 ~ 12 UT 45

NDE 3.'3-2HDE 5.4-9

X - - - 03/12/97 - PT complete, 3/13/9? - UTX - - - complete

UT 33 **

222880 ,14"-RHR-2305-10LUOLong Seam Outside Radius of

-Elbow

-C-F-1 PTC5.12 UT 45

HDE';3..2HDE 5'.4-9

'X - - - 03/12/97 -. PT complete, 3/13/97 - 'UT'X - - - coaplete

** UT 33 **

222900 14"-RHR-2305-10ELBOM TO PIPE

C-F-1 PTC5.1'1 UT 45

UT'60UT 70

NDE,3.3.-2'DE

5.4-9X---X-----X---X-

03/12/97 - PT coaplete, 3/13/97 - UTcomplete, root geometry, limitedvolunetric examination due to the weldcrown configuration«* UT-33 *»

222920 14«-RKR-2305-10LDLong Seam Downstream

C-F-1 .PTC5.12 UT 45

NDE 3.3.2'NDE 5.4-9

X - - - 03/12/97 - PT coaplete, 3/13/97 - UT

X - - - complete

** UT 33

Page 214: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Page 215: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3INSERVICE INSPECTION SUNNARY

THIRD INTERVAL, SECOND'PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components

Page: 11

Zone Number: 3-066

Suanary Examination AreaNumber Identification

. ASHESEC. XICatgy ExamItem,No Nethod Procedure

N I '0S ONGTT RS'EHA E I 0 E .RemarksT C G N R ** Calibration Block **

222980 14"-RHR-2305-11LULong Seam Upstream

C-F-1 PTC5.12 UT 45

'NDE 3.3-2NDE 5.4-9

X - - - 03/12/97 - PT complete, 3/13/97 - UT.- - X - complete, beam redirection due to

dendretics, inside surface geometry** UT-33 *~

.223000 14"-RHR-2305-'llPIPE TO VALVE NOV-3-861A

C- F.-1'PT'5.11

UT 45UT 60UT

70'DE3.3'-2

HDE 5.4-9X-----X---X---X-

,03/12/97 - PT complete, 3/13/97 - UT

complete, root geometry, limitedvolwetric examination due to the valveand,weld crown. configuration, lleld ID'tag in examination area. at .top of pipe*+ UT-33 **

Page 216: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

il

Page 217: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97- TURKEY.POINT NUCLEAR PLANT UNIT 3.INSERVICE INSPECTION SUHHARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components

Page: 12

Zone 'Number: 3-090

SumMry Examination AreaNumber Identification

ASHESEC. XI

'Catgy Exam.Item No Hethod Procedure

N I 0S 'ONGTT R S:E N

,A E I O.E RemarksT C G H R ** Calibration Block **

274100. 8"-SI-.2308-19ELBOW TO PENETRATION P-11

C-F-1 PTC5.11 iUT 45

UT60'DE 3.3-14

NDE 5.4-6X - - - 03/14/97 - PT and UT complete, rootX - - - geometry- - X-

**'UT-41 **

Page 218: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

II

II

Page 219: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY'POINT NUCLEAR PLANT UNIT 3IHSERVI CE 'NSPECTION SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components

Page: 13

Zone Heber: 3-095

Sumery Examination AreaNumber Identification

ASMESEC. XICatgy ExamItem No.Method P,rocedure

N I 0S ONGTT R'SEH

,A E I 0 E RemarksT C G M R «* Calibration Block **

288506 3-SIN-139 IAINTEGRAL'TTACHMENT

,05/13/97 - pipe saddle cut back to 1"and abondoned 'in place,,removed codecategory.and Item number from database

288519 4"-SI-2303-31 thru 49 06/05/97 - Existing Molds removed 'fromservice during 1997, outage per PC/M96-012

288520 6"-S1-2306-1 thru 2 06/05/97 - 'Welds removed-from serviceduring '1997 outage per PC/M 96-012

06/05/97 - Boron Injection Tank andsupport abandoned in place and removed,from:service during '1997 outage per PC/M96-012

288522 6"-SI-2307-1 thru 2 06/05/97 - Netds removed from serviceduring 1997 outage per.PC/M 96-012

288523 4"-SI-2305-1 thru 11 '06/05/97 - Nelds removed, from serviceduring 1997 outage per PC/M 96-012

288524 4"-SI.-2303-31PIPE TO PIPE

C-F-1C5.21

HDE 3.3HDE 5.4

,03/24/97 - neM veld installed per PC/M'.96-012, FW7

** TO BE DETERMINED *»

Page 220: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Page 221: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY''POINT NUCLEAR'PL'AHT UNIT 3'INSERVICE INSPECTION SUMMARY

THIRD'NTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)Cl'ass 2 CBEAR STATUS Components

Page:. '14

Zone Number: 3-095

Sunnnry Examination AreaNumber Identification

ASHESEC; XICatgy ExamItem Ho Hethod Procedure

.H. I 0S ONGTT RSEHA E I 0 E RemarksT C'G H R ** Calibration Block «*

288525 4"-S1-2303-32'IPE

TO ELBOW

'C-F-1C5.2'I

,'HDE 3'.3NDE 5.4

03/24/97 - new weld installed'pcr PC/H96-012, FW8

** TO BE OETERHIHED **

288533 4"-S1-2303-35Elbow 'to Valve 3-867

C-F-1C5.21

NDE 3.3NDE 5.4

.03/24/97 - ncw weld installed pcr PC/H96-012

*«TO BE DETERHIHED *»

288536 4«SI 2303 36Valve 3-867 to Elbow,

C-F-1C5.21

NDE'.3HDE 5.4

03/24/97 - ncw weld installed pcr PC/H96'-012(

FW9'*

TO BE DETERHINED **

9 4"-S1-2303-37ELBOW TO PIPE

C-F-1C5.21

NDE 3.3:NDE 5.4

03/24/97 - new weld installed:per PC/M96-012, FW10

««TO'BE DETERHIHEO **

288542 4"-S1-2303-38'IPE

TO ELBOW:

C-F-'1C5.21

'NDE 3.3NDE'5.4

03/24/97 - new weld installed per PC/M96-012( FW11

««TO BE DETERHIHEO **

288545 4"-SI-2303-39ELBOW TO PIPE

C-F-1C5.21

NDE 3.3'NDE 5.4

03/24/97, - new. weld installed per PC/H96-012, FW12

** TO BE DETERHIHED **

288548 4"-SI-2303-40Pipe to Tee

C-F-1C5.21

,HDE'3.3'NDE

5.403/24/97 - ncw weld.installed per.'PC/H96-012, FW14

** TO BE DETERMINED,**

Page 222: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Page 223: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e:. 06/.13/97 'TURKEY POINT NUCLEAR PLANT UNIT 3INSERVICE INSPECTION SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE(97RF)'lass

2 CBEAR STATUS Cocponcnts,

Page: 15

Zone 'Number 3-095

Stannary Examination AreaNumber Identification

ASHESEC. XICatgy ExamItem No Method Procedure

N I 0S 'ONGTT RSEHA E I 0 E RemarksT C G H R ** Calibration, Block, **

288551 4"-SI-2303-41'ee

to PipeC-F-1C5.21

NDE'.3NDE 5 4

03/24/97 - new weld installed per PC/H96-012, FM31

** TO BE DETERHINED **

288554 4«SI-2303-42'ipe

to,valve MOV-3-843AC-F-1c5.21

NDE 3.3NDE 5;4

03/24/97 - new weld installed per PC/N96-012, FU30

** TO-BE DETERHINED *»

288578 4"-SI-2303-46TEE TO PIPE

C-F-1 SUR

C5.21. VOLNDE 3.3NDE: 5'.4

03/24/97 - ncw weld installed per PC/H96-012, FW15

** TO BE DETERNINED **

'I 4"-Sl-2303-47PIPE TO,ELB(N

C- F-1'URC5.21 VOL

HDE3.3'DE

5.403/24/97 - new weld'nstalled per PC/M,96-012, FN16

«* TO BE DETERNINED «»

.288584 4"-Sl -2303-48ELBSI TO'IPE'-F-1 SUR

C5.21 VOLNDE 3.3NDE 5.4

03/24/97 - new weld installed per PC/H96-012, FW17

** TO BE DETERNIHED'**

28S586 8080-H-007-01 IAINTEGRAL ATTACHHENTS

05/13/97 - Removed from pipe pcr PC/H96-012, no longer, performs a supportfunction, removed code category and itemneer from database

288587, 4"-SI-2303-49Pipe to Valve HOV-3-843B

C-F-1 PTC5.21 UT

NDE 3.3NDE .5.'4

03/24/97 - new, weld installed'per PC/H'96-012, FM25

«»'O BE DETERHINED **

Page 224: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 225: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3'IHSERVICE INSPECTION SUNNARY

THIRD'INTERVALED SECOND PERIOD, FIRST OUTAGE,(97RF)~Class 2 CBEAR STATUS Components

Page:

16'one

Number.: 3-095

Stannary Examination AreaNumber Identification

ASNESEC. XICatgy ExamItem Ho,'Hethod Procedure

N.I 0ONGTRS EHE I 0 E RemarksC 0 N R ** Calibration Block "~

288604 8080-R-007-01DOUBLE 'ACT ING 'ESTRAINT

F-A PTF1.20B

HDE 4'.3-20'X - - - 03/15/97 - VT-3 complete

288820'080-H-004-01'OUBLE

ACTING RESTRAINTF-A VT-3F1.20B

'NDE 4.3-18 X - - - 03/14/97 - VT-3 complete

288865 8080-H-007-07DOUBLE,ACTING RESTRAINT

'F-A 'VT-3F1.208

HDE 4.3-17 ,X - - - 03/15/97 - VT-3 complete

8 8080-H-007-10DOUBLE ACTING RESTRAINT

F-A'VT-3F1.208

HDE 4.3-16 X - - - 03/15/97 - VT-3 complete

288896 8080-H-005-02DOUBLE .ACTING,RESTRAINT

F-.A, VT-3F1.208 CR

PMAI

HDE 4.3-1597-0485

'PH97-03-210

X 03/15/97, - VT-3'complete, bottom lug is,missing, welds, possible drawingdiscrepancy, accepted as-is byengineering evaluation, drawing will berev'ised,to show as built condition

288911 8080-H-005-01.DOUBLE ACTING.RESTRAINT

'F-A VT-3.F1'.208

HDE 4.3-19 X - - - 03/15/97 -'T-3 complete

Page 226: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0'

il

Page 227: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3INSERVICE INSPECTION'UMMARY

THIRD

'NTERVALED

SECOND PERIOD ~ F IRST OUTAGE (97RF ) ~

Class 2'CBEAR STATUS Components

a Page: '17

,Zone Number: 3-096

'Sugary Examination AreaNumber Identification

'ASME

SEC.'ICatgy 'ExamItem No:Method Procedure

N I 0S ONG,TT'S*EHA 'E I 0 E RemarksT C G.M R ** Calibration Block ~*

289298 SR-123SINGLE AHD DOUBLE ACTINGRESTRAINT

F-A VT-3F1.20ABCR

HDE 4.3-497-0433

---X 03/12/97 - VT-3 complete, chippedconcrete,. accepted as-is by engineeringevaluation, drawing will be updated toshow.spelled concrete

289301 SR-123 IAINTEGRAL ATTACHMENTS

C-C PTC3.20

NDE 3.3-3 X - - - 03/12/97 - PT complete

Page 228: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 229: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY, POINT NUCLEAR PLANT UNIT 3INSERVICE INSPECTION SUMMARY

THIRD INTERVAL', SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 'CBEAR STATUS Components

Page: 18

Zone Number: 3-100

Sumury Examination. AreaNaker Identification

ASMESEC. XICatgy ExamItem No Hethod

S

TA

-Procedure -T

N I 0ONGTR S, E 'N

E I 0 E RemarksC G M R ** Calibration'Block **

301700 26"-HSA-2304-17PIPE TO VALVE POV-3-2604

C-F-2 HT,

C5 F 51: UT 45UT 60UT 70

NDE 2.2-3NDE 5.2-2

X-----X---X---X-03/14/97 - HT complete, 3/16/97 - UTcomplete, root geometry, limitedvolunetric examination from the. valveside due to its configuration«* UT-2'I **

301800 26"-MSA-2304-17LUPIPE LONG SEAH UPSTREAH

C-F-2 HTC5.52 UT 45

NDE 2.2-3NDE 5.2-2

X - - - 03/14/97 - HT complete, 3/16/97 - UTX - - - complete

** UT-21 **

Page 230: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

4I

Page 231: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97r TURKEY POINT NUCLEAR. PLANT UNIT 3INSERVICE'INSPECTION''SUMHARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components

.Page: 19

Zone Number: 3-109

Swmary ExaminationArear'wherIdentification

ASHESEC. XICatgy ExamItem No Method Procedure

N I. 0S 0 N.G,TT RS-EM'

E I 0 E RemarksT C G H.R ** Calibration 'Block **

330500 AUGHENTED EXAMINATION AUG UTFROH NOZZLE.RAHP TO 1 DIAHETERON ELBOW

NDE 5.16-1' - X X 03/13/97 -.UT complete, root and chillring geometry, acceptable"slag'indication at weld FW1

** UT-20( UT-29'~*

Page 232: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

II

Page 233: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY POINT NUCLEAR PLAHT UNIT 3INSERVICE,IHSPECTION SUMMARY

THIRD INTERVAL, SECOND PERIOD, 'FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components

Page: 20

Zone Number: 3-110

Sugary'Examination AreaNunber Identification

ASMESEC. XICatgy ExamItem.'Ho Method Procedure

N I 0S O.NGTT RSEHA E I 0 E RemarksT C G M:R ** Calibration Block **

330700 14"-FWB-2304-1VALVE CV-3-2901 TO PIPE

C-F-2 MT

C5.51 UT 45UT 60UT 70

NDE2.2-1'DE'5.2-1

X---X-----X-X---:03/10/97 - MT and UT coeplete, rootgeometry, limited volunetric-examinationon the veld and the valve side due totheir configuration** UT 20 **

331100 14"-FWB-2304-3PIPE TO ELBOW

C-F-2 MT

C5.51 UT 45UT 60

NDE 2.2-2NDE 5.2-1

- - -'X 03/10/97 - MT complete, acceptableX - - - linear indication, UT complete, backing,- - X - ring geometry** UT-20 **

333800 AUGMEHTED EXAMINATION AUG UTFROM NOZZLE RAMP .TO 1 DIAMETERON'LBOW

NDE 5.16-2 - - X - 03/12/97 - UT complete, root andbacking ring geometry

** UT-20,'UT-29 «~

Page 234: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 235: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY POINT NUCLEAR PLAHT UNIT 3INSERVICE INSPECTION SUMMARY

THIRD ilNTERVAL, SECOND PERIOD, .FIRST OUTAGE '(97RF)Class. 2 CBEAR STATUS Components

Page:,21

Zone Nwher: 3-111

Swmary Examination AreaNumber Identification

ASMESEC. XICatgy ExamItem Ho Method Procedure

N I~ 0S ONGTT RSEKA E I 0 E RemarksT C G,M R ** Calibration Block *»

338200 'AUGMENTED EXAMINATION AUG UTFROM'NOZZLE RAMP TO .1 DIAMETEROH ELBOW

HDE '5.16-3 - - X'X 03/12/97 - UT complete, root andbacking, ring geometry, acceptable slaginclusion and Internali undercut

«* UT-20( UT-29 «»

Page 236: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

~ '

Page 237: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: 06/13/97 TURKEY'POINT NUCLEAR PLANT UNIT 3INSERVICE INSPECT IOH SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)Class 2 CBEAR STATUS Components

Page: 22

Zone Nwher:3-115'ugary

Examination. AreaNunber Identification

ASME

SEC. XICatgy Exam'Item No Method Procedure

N I 0'S ONGTT RS'EHA 'E I 0 E RemarksT C G M R»» Calibration Block **

341200 3-RHE-A1HEAD TO SHELL'-A UT, 45

'C1.20 UT 60NDE 5.4-7 X - - - 03/15/97 - UT complete, limited

X - - - examination due to nozzles andreinforcement plates** UT 55 **

341300 3-RHE-A2SHELL TO FLANGE

C-A UT 45C1.10 UT 60

NDE 5.4-7 X - - - 03/15/97 - UT complete, limitedX - - - examination due to nozzles and

reinforcement plates*» UT;55 **

341800 3-RHE.-A7 C-B PTREINFORCEMENT PLATE TO SHELL C2.31

'NDE 3.3.1B X - - - 03/15/97 - PT complete

0 3-RHE-AB C-B PT.

REINFORCEMENT PL'ATE TO NOZZLE C2;31NDE 3.3-18 X - - - 03/15/97 - PT complete

342000'-RHE-A9 C-B PTREINFORCEMENTi PLATE TO SHELL C2.31

NDE 3.3-.17 X, - - - 03/15/97 -"PT complete

342100 '3-RHE-A10 C-B PTREINFORCEMENT PLATE TO NOZZLE C2.31'DE 3.3-17 X - - - 03/15/97 - PT complete

342400 3-RHE-SPA-1 SUPPORT

Heat Exchanger Lo~er SupportF-A VT-3F1.40H

NDE 4.3.,11',X - - - 03/12/97 -,VT-3 complete

342500 3-RHE-SPA-2,IAIntegral Attachment

C-C PT.

C3.10 CR

VT-1

NDE 3.3-997-0479NDE 4.1-6

---XX - --

03/15/97 - PT complete, one rejectabieround indication, engineering evaluationdetermined cover weld on partialpenetration weld was not conpietelyaround end.of lug', 3/19/97 -

VT-1'omplete,examination performed todocunent final condition

Page 238: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed
Page 239: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e: .06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3INSERVICE,INSPECTION SUMMARY

THIRD'NTERVAL, SECOND PERIOD; FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components

Page 23

Zone Number:, 3-115

Suwery Examination AreaNumber Identification

.ASMESEC. XICatgy ExamItem'No Method Procedure

N I0''NGT

T RSEHA E,I 0 E RemarksT O'G M R ** Calibration Block **

342600 3-RHE-SPA-2 'SUPPORT

Heat Exchanger. Lower SupportF-A VT-3F1.40H,

,NDE 4.3-10 X - - - 03/12/97 - VT-3 complete

Page 240: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~~~

i5~

il

0

Page 241: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

TUR I NT

;p'J

NRC / FPL ENGINEERING INTERFACE MEETING

JULY 15, 1SS7

Page 242: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il~

il~

il~

Page 243: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

@PLENGINEERING DEPARTMENT

AGENDA

INTRODUCTION

- PLANT INDICATORS- ENGINEERlNG ORGANIZATION

R.S. KUNDALKAR

TURKEY POlNT

ENGINEERING ORGANIZATIONSAFETY SYSTEM PERFORMANCE

SYSTEM ENGINEERINGROD CONTROL SYSTEM ENHANCEMENTSCCW HEAT EXCHANGERSEFFECTIVE USE OF PSAOUTAGE SUPPORT

E.A. THOMPSON

D.J. TOMASZEWSKI

PLANT ENGINEERING50.54(f} RESPONSEDRAFT NUREG '1 606SOFTWARE CONTROLSAFETY / RELIABILITYUPGRADES

W.A. SKELLEY

ST. LUC|E

ENGINEERING ORGANIZATIONSAFETY SYSTEM PERFORMANCESOFTWARE CONTROL

C.R., BIBLE

REACTIVITYMANAGEMENTCONTROL ROD PERFORMANCE

SAFETY / RELIABILITY,IMPROVEMENTS50.54(f} RESPONSE

C.A. PELL

J.R. 'HOFFMAN

'R.S. iKUNDALKAR

rrcl.wpd Page 1

Page 244: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

~ i

IS)

Page 245: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~ ~ g 0

~ ~ F ~ ~

~ 1

C Cg C

C''CC C C '

C r

C C

C C

~ C

~ C'

~ C ~

P ~ ' ~ ~

~ C

~ 0 C P C

~ ~

Page 246: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

ili

Page 247: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

FPLENGINEERING DEPARTMENT

U%7 CAPABIUTYFACTORTURKEYPOINT

P YR RUNNING AVERAGE+ 1997 AVG-THROUGH MAYJ

90;

80a

75

:-'',:,;34

+i3~~4+5~

70

1994 1995 1996 1997

02GIG UNITS~'UNIT4 INDUSTRYAVG WANOYR2000GOAL

90 —-"

UNITCAPABILITYFACTORST. LUCIE

(S YR RUNNINQ AVERAGE '+ 1997 AVQ1HROUQH MAY)

W H W % W % W & W 0 Q ~

~4i

75 —' (Qk'j'g

70

1994 1995

wg~yge'll

1996 1997 G

322--.G UNIT l~ UNIT2 INDUSl1lYAVG WANOYR2000GOAI

Page 3

Page 248: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~ ~

Oi

Page 249: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

APLENGINEERING DEPARTMENT

1.75

1.5

1.25

UNPLANNED'AUTO TRIPS PER 7000 HOURS CRITICALTURKEYPOINT

YR RUNNING AVERAGE+ 1997 AVGTHROUGH MA

0.75

0.5

0.25

0'. ':

ke?@

1994 1995 1996 1997

UNIT3~ UNIT4 INDUSTRYAVG ~ WANDYR 2000 GOAL

1.75

1.5

1.25

0.75

0.5

4k',:gg

UNPLANNEDAUTO TRIPS PER 7000 HOURS CRITICALST. LUCIE

YR RUNNING AVERAGE+1997AVGTHROUGHMA

RGB)322)+$ ~ ~ ~~ '33( 2423I;fi ~ aN4%~~9

k%~N+I"'c'! I2

Awe

; 5?$4<,

1994 1995 1997

'SS.UNIT4~SS UNIT2 INDUSTRYAVG WANOYR2000GOAL

Page 4

Page 250: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ik

i

il~

Page 251: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

EPLENGINEERING DEPARTMENT

101

j'O';'Aj,Qjh@jgh

g~+>

p

(jPQk,.'00

——"'9

——SiIl

98 --—'

1

97 .I

THERMALPERFORMANCE. TVRKEY-POINT

It12 MONTH RUNNING AVERAGE)

1~>, %'4~%»

95

1994 1995 1996 1997

~

~~AS UNITS ~mc UNIT4 .INOUSTRYAVG WANQ YR 2000 GOAL

101

THERMALPERFORMANCEST. LVCIE

(12 MONTHRUNNINQ AVERAGE)

100 ————99

I98—I1

97 "---'

96: .

95:1994

, m".11

~~~'~~4l!

1995

%4m, S

1996

V.(i'c

'ii&piki4h

1997

~»:" UNIT I ~ UNIT2 INOUSTNYAVG i WANQYR 2000 GOAL

Page 5

Page 252: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Oi

Page 253: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

'~ ~ g 0

.4,a~ h~.g~.oy f,y.

ah+( i4gltlp i+,.-.a

. f,()i \ III

Page 254: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

0

Oi

Page 255: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

+op

TURKEY POINTENGINEERING DEPARTMENT

P(P+T Q

TURKEY POINT'ENGINEERING ORGANIZATIONp

KA.THOMPSON

J.BALAGUEROPLANTOPS SUPPORT

E. LYONSADIIINIYTRAYIVE

W. SKELLEYPIANTENOWEERWO

D. TQMASZEWSIQSYSTEMS ENOWEERWQ

K;REMINQTON

, SYS PERFORMANCE

D. BAKER

DESKIN BASS SUPV

P. BANASZAKELB4SC SYSTEMS

RX ENOB. OUNN

MECH SYSIENS

J. CAOOOAN

llECH DESKN

Q. KUHN

PROC ENGR

T. SWEENEY

MC DESKN

+ FIRST LINE SUPERVISORS HAVE OVER 12 YEARS EXPERIENCE

+ SYSTEM AND COMPONENT SUPERVISORS ARE SRO CERTIFIED

AfCp'th.Wpd Page 7

Page 256: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ii

<I~

Page 257: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Pop

+ oiOgGSSr +

TURKEY POINTENGINEERING DEPARTMENT

UNIT3 SAFETY INJECTION AVAILABILITY,(18 MONTH CUMULATIVEAVERAGE)

~ SASI~.SSSI PERFORMANCECRITERIA WANOYRS000GOAIS

AVAILABIUTY(4/e)

100%

SS%

S&%

97%

96%

95%

12-95 02-96 04-96 06-96 0&-96 10-96 1248'2-97 04.97

UNITa SAFETY INJECTION AVAILABILITY(18 MONTH CUMULATIVEAVERAGE)

4A Sl~ 40 Sl—PERFORLIANCE CRITERIA 'ANGYR 0000 GOALS

AVAILABlLAY(44()

100%I

99%

98%

S7%

96%

950/i

12-S5 '2-S6 04-96 06-96 08-96 10-S6 12-S6 02-97

M'NSPTILWPG

Page 8

Page 258: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

lli

Page 259: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Dog

+ ao~o>ear e

TURKEY POINTENGINEERING DEPARTMENT

UNIT,3 EDG AVAILABILITY(18 MONTH CUMULATIVEAVERAGE)~ BA EOG ~, 88 EOG —PERFORMANCE CRITERIA WANG YR 2000 GOALS

AVAILABIIJTY

100%

'99%

88%

97%

96%

S5%

94%

S3%

92%

91%

90%

01-96 03-96 05-96 07-96 09-96 11-96 01-97 03-97 05-97

Note: SB EDG placed In a(1) 2@6; returned to a(2) 11/86.

UNIT4 EDG AVAILABILITY(18 MONTH CUMULATIVEAVERAGE)~ 4A EOG ~ 48 EM PERFORMANCE CRITERIA WANG YR 8000 GOALS

AVAILABILITY

100%

9S%

SS%

97%

96%

85%

94%

93%

82%

91%

808le. I

01-96 03-86 05-86 07-96 09-M 11-96 01-97'3-97 05-97

LVCOLn.WOd Page 9

Page 260: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ili

Page 261: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

O~ r~

4'URKEYPOINTENGINEERING DEPARTMENT

EMERGENCY FEEDWATER AVAILABILITY(1 8 MONTH CUMULATIVEAVERAGE)

AVAlLABlUTY

100%ss/88%87%,86%

85%84/.93%820/i

81%80%

('/0)

KRRHI U3 TRAINA ~ USTRAINS—PERFORMANCE CRITERIA WANG YR 2000 GOALS

01-96'3-96 05.96 07~ SH}6 1146 01~ 0347 0$47

EMERGENCY FEEDWATER AVAILABILITY(16 MONTHCUMULATIVEAVERAGE)

AVAILABIUlY100%

99%

S8'/0

97%

960/i

950/0

S4%

93%

820/0

91%

80%

~ U4TRAINA ~ U4TRAIN8—PERFORMANCE CRITERIA: WANOYR2000GOALS

01-96 03-96 05-96 07-96 09-96 1'1-97 084'5-97

Page 10

Page 262: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

ill

Page 263: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Q~r

>opOp

TURKEY POINTENGINEERING DEPARTMENT

+a aoclear ~

ROD CONTROL SYSTEM ENHANCEMENTS.

+ - SYSTEM EVENT SUMMARY.,

OCTOBER 1995 TO MARCH 1997

7 UNIT 3 EVENTS4 FORCED OUTAGES3 EVENTS INITIATEDBY DROPPED RODS

NO UNIT 4 EVENTS

MAY 1995 THROUGH DECEMBER 1995

UNIT 3 ROD CONTROL ROOM A/C DEGRADEDAIR HANDLER OBSOLETE AND INACCESSIBLE

~ EXTENSIVE INVESTIGATIONFOLLOWING EVENTS

SYSTEM TESTING CONDUCTEDNO COMMON PROBLEMS IDENTIFIED

+ CAUSE

PRINTED CIRCUIT CARD FAILURES DUE TO HIGHER AMBIENT ROOMTEMPERATURES DURING 1995

nrcptn.wpd Page 11

Page 264: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

i

ii)

Page 265: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

~ ~ g P

~ ~ ~ ~ ~ ~

~ ~

Page 266: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

iN

i

~~

Page 267: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~lee Pyg

+o oo~+o(Jgg g

TURKEY POINTENGINEERING DEPARTMENT.

ROD CONTROL SYSTEM ENHANCEMENTS

+ CORRECTIVE ACTIONS

~ RESET ROOM TEMPERATURE ALARM FROM 102 F TO 75 F

ROOM AIR HANDLER REPLACED

0 VERIFICATION OF THE ROD CONTROL SYSTEM OPERATION:

POWER SUPPLIESLOGIC CABINETTIMINGDYNAMICTESTING

~ REPLACED EXISTING FIRING CARDS

FORCED COOLING ADDED TO POWER CABINETS

DYNAMIC'TESTINGAT EXPECTED ELEVATED TEMPERATURES

REPLACED SELECTED COMPONENTS

DC HOLD CABINET

+ CORRECTIVE ACTIONS COMPLETED ON UNIT 3 IN SPRING, 1997 REFUELINGOUTAGE

~ NO EVENTS SINCE RESTART

+ CORRECTIVE ACTIONS PLANNED FOR UNIT 4 1997 FALL OUTAGE

Page 13

Page 268: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

~i

Page 269: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

"II

T

(((

0I

I'$

' I

jj,><(i((,j«il(iii::<

4 I((I

fI

. «+64 I

~ - .(i'<1

,I

< ~

!

(

III.

II

gl

I

II

;;441LN ..

~ 4J

IIIII."'!,

II'R

(Iig'Ig

~ (<

it

cI

Ni(f~jh

(((4

l

gt

I, 'll,

(~1;l

I

g3 '..

(

'4 *

~I

~<

jg:I I~"

~I

f<

I4

~ <

(

~ < ~ '(

~v«!IW~~

~ ~

wiL;j<'. f'

( (

4

II II

V

l~,

j( ~

Wf!Ii i( ( PQ

~ I ' ' (e

~ II

I

I'

I

gi

<Q((

tA

4f'v,

~teakf4'!PP!++

. ~j

,=~~A~

Vi'jI!444(

~ Il

gii)II|

j r."«3

(II

Ti I(l

g pI

« i II<I I

S

I'(p',< (

4 I

Page 270: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

iS~

il~

Page 271: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~ <

*

IW'1

1

I ~ ~

11

~ '(( ~

~"r

IIC

5

~ ~(rrr 'I j~I ~ I

~ 'I ~

C~ C

$ 1

* ( r 1It I s (, )~Lgd6((«<~ ~I

( j'

Page 272: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ill

Page 273: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

UNIT 3

~drf.;

~'~

Tip

UNIT 4

=x

F ~ F

Page 274: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

~ ~

Page 275: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e~co~ >op

Op

+ o~

TURKEY POINTENGINEERING DEPARTMENT

CCW HEAT EXCHANGER IMPROVEMENTS

CCW HEAT EXCHANGER FOULING FACTOR IMPROVEMENT

+ COMPREHENSIVE PERFORMANCE TESTING PROGRAM TO ENSURECAPABILITYOF REMOVING DESIGN BASIS HEAT LOAD

+ FREQUENT TESTING, TRENDING AND CLEANING OF CCW HEATEXCHANGERS WAS REQUIRED

: ~ TESTING AT LEAST WEEKLY~ CLEANING AT LEAST ONE HEAT EXCHANGER/UNITWEEKLY~ CLEANING SIGNIFICANTLYMORE OFTEN DURING SUMMER

+ UPRATING,EFFORT TARGETED IMPROVING THE MAXIMUMALLOWABLEFOULING FACTOR OF CCW HEAT EXCHANGERS

0 ~ IVIASS &. ENERGY RELEASES RECALCULATEDCONTAINMENTRESPONSE RECALCULATED

~ CCW THERMAL HYDRAULICCASES RECALCULATED, HIGHERALLOWABLEFOULING FACTOR ASSUMED'PIPING STRESSES AND SUPPORT LOADS ASSESSED

~ MODIFICATIONS IMPLEMENTEDECC AUTO-START MODIFICATIONCCW PIPE SUPPORTS UPGRADE ON UNIT 4

+ CHANGES RESULTED'IN SIGNIFICANTLYREDUCED FREQUENCY FOR HEATEXCHANGER CLEANING

~ REDUCED CLEANING FREQUENCY FROM ONCE PER WEEK TO ONCE'EVERY 6 WEEKS

~ REDUCES "WEAR" ON TUBES DUE TO CLEANING

+ OTHER RELATED INITIATIVES

~ IMPROVED TESTING METHOD

~ 'RETUBED UNIT 3 CCW HEAT EXCHANGERS

Page 17

Page 276: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

45~

~i

Page 277: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

iso/0

+o eoofotrr +

TURKEY POINTENGINEERING DEPARTMENT

PSA AND ON LINE ACTIVITIES

+ PSA TECHNOLOGY USED IN PLANT ON LINE MAINTENANCE

~ RISK SIGNIFICANT EQUIPMENT/COMPONENT LIST,

~ MULTIPLE COMPONENT MATRIX

~ GUIDELINES FOR WHEN PSA SHOULD BE USED

~ ON LINE MONITOR IN TRIAL USE

0 ADM-210 On-Une Malntcnaneei WorttCoordination

ATI'ACHhfENT Sfpagc l of3)

RISK SIGNIFICANTEQUIPMENT ILST

'Dte foliowinexceeding PSAthc following tt

sted as flatduration of up to

ABowed OOSTllne

Accumulator A

Accumulator B

Accumulator C

g Tce)micd Spccificatitm components have each been cvdurisk limits when mnovcd from service individually for a

mes for Mode I oecautions.

AFWPump A I2 Ttshts digaed)

AFWPump B I2 Trsias aligaed)

AFW Pump C f2Trains aligned)

AFWTrain I

AFWTrdn 2

Botic Acid-BASTto Charging

CCW Pump ACCW Pump B

CCW Pump C

Containment Spray Pump A

Containment Spay Pump B

ECC A

ECC B

ECC C

EDG B

Opposuc Unit EDG A

0 ite Unit EDG 8

30 days

30 days

30 days

72 hts

30 days

30 days

30 days

72 hrs

72 hrs

mcptn.wpd Page 18

Page 278: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

O~

IS~

Page 279: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e~c>o f'o/

Ots

O 44OJ4C T

TURKEY POINTENGINEERING DEPARTMENT

PSA AND ON LINE ACTIVITIES

0-ADM-210

IOCCCXXO TC4l

On-Line Maintenance/ Work

Coordination POOL'7APpvovtr Oxloc

I/14/97

DUALCOMP8lHNS IN-KEhVh5k5NNCE MATRIXTae Tall teaewss owwwwa el t eeeavws ossa ao soaewa ow wwe ~ awasawr sa ewwww la tt oaN aeaaa cess oaoetvte xxxx wt oalsaatw essa oaal eeet waotN oNI saws ateasaav slap os ew aellalee ael leave stilt aw NNAAN or IvIAC cela elva~e easer Isetosw seasasas er t etarwtaee aoaa ease aea laewee oaa wws~ oe so so tt aaeo ete sswsteae os oa AN scatwwaa eo lw taws lwsN etatwwa Tls aoatw ase d es NN4 oll ol w ttNA

QCtatto

TVta ACUel St4

ATW FCVolWI lit4W

C TTITLt

ATTVIIWAOAQ Tlsw

AOOAet)

AFW tvaO~ n TNew

ATWT4enp ATWC C Tloes TNII

Axttwxr I

AtxVTlaat

Ataaawa 4tsataava C

Aow scvatealTWH, tASW saw A IT 'I vs A

AIWOtas 4 rtvsCar~

XXXX

ASW lvs ttsaws sat voatallset sel 'ltw

~eetatwaaor vCtw I ~ A

CCW V1 ~

CCW V'I CCCW A

CCw ww4CCW Iaset C

Cw lots ~Cw law as ~Oaw OIN ItOOATOO O

~ IWA tOO~ vv 4 eoo

l sow cesw A

tw CAWCwa 4

1 1XX

~ Ios A teal eoowov s Itv ~ INNIcw aICW ~

~cwccwovw a wasICwCCWOvw 4 awavtsvws st CtverIACattetsl lot CO

sxa Ia ~ CO la~arv lassasov.lassvovaaslvovealo

xxxx

xxxx

XXXX

XXXXXXXX

atavess~OAVVs~claws~sas svN awa svw o

~ s «av ss o lava

a 4 avastlwvasw

~vwIsa oeasav Isle A

'lI~BATVdVbvC)IXXX

XXXXXXX1

IVCOTIIAVOd Page 19

Page 280: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

ill

Page 281: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~cICo >oI4p

L3 rr

TURKEY POINTENGINEERING DEPARTMENT

OUTAGE SUPPORT

PREPLANNING

EARLYMODIFICATIONIDENTIFICATIONAND ISSUANCE

SAFE ON-LINE MAINTENANCEEFFECTIVE PSA USAGEHIGH EQUIPLIENTAVAILABILIIYJOB COVERAGE/PAOBLELIRESOLUTION

SAFEIYANDAEUABIUTYFOCUSED SCOPE

SAFETY

RLSK ASSESSMENT OF SCHEDULE

CONSERVATiVESHUTDOWNOPERATIONSFULLCORE OFFLOADHO REDVCED INVENTORYREUABLEONCffEiOFFCITEPOWER IMPROVED

OUTAGEERFOR

. ACTIVEPARllCIPATION

BREAKER TO BAEAKEACOVERAGE

DESIGN ENGINEER INVOLVEMENTSYSTEM ENGINEERS LIANAGETASKENGINEERS ROTATETO OTHERDEPARTMENTSRESPONSIVE MAINTENANCESUPPORTEFFECTIVE STEALI GENERATORINSPECTION/LWNTENANCE

auALnY ELIABI

SELF ASSESSMENT

INPUT TO OVTAGE MAHAGELIENT

IMPROVEMENT TEAMSSYSTEM WINDOWREVIEW

REACTOR ENGINEERING INIATIVESRELOAD SEQUENCE 70 MINIMIZEFUELHANDUNQ

OPTIMIZEDLOW POWEA PHYSICS TESTINGADDmONALBORON CHANGE CUAVESITABLESBEITER PREDICTED AODWORTHS(AFD DATAIMPROVED FLUXMAP PERFORMANCE

CONSISTENTERFORMANCE

wCCth.WDd Page 20

Page 282: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ik~

ili

Page 283: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~cWe >opOp

TURKEY POINTENGINEERING DEPARTMENT

50.54(f) RESPONSE, DESIGN BASIS AND FSAR REVIEW

+ 50.'54(f) REQUESTED

0 ADEQUACY OF DESIGN BASIS INFORMATION

~ AVAILABILITYAND CONTROL OF DESIGN BASIS INFORMATION

+ OVERVIEW OF PTN 50.54(f) RESPONSE

0

~ DESCRIBED THE FPL/PTN CONFIGURATION MANAGEMENTPROCESSES

~ DESCRIBED FPL PROGRAMS AND INITIATIVES

~ FOCUSED ON MAJOR PROGRAMS AND PLANT BETTERMENTPROJECTS SINCE 1985

IMPROVED CONTROL PROCEDURES FOR DESIGN BASISINFORMATIONIMPROVED. QUALITYOF DESIGN BASIS INFORMATION

Page 21

Page 284: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Ik

0

Page 285: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

>opOp

TURKEY POINTENGINEERING DEPARTMENT

50.54(f) RESPONSE, DESiGN. BASIS FSAR REVIEW

RPS SYSTEMUPGRADE

1001

IMPROVED

TECHNICALSPECIPICATIONS

1001

PROCEDURE

ENHANCEMENTPROJECTS

STANDSY APW

UPGRADE

1005

'AJORPROGRAMSANDBETTERMENT PROJECTS

REQUIRING

DESIGN BASISREVIEWAND RECONSTITlmON

ELECTRIC POWER

SYSTEM UPGRADE

1091

INSTRUMENTAIR, UPGRADE

1095

THERLIALPOWER

UPRATE PROJECT

1009

DESIGN BASIS RECONSTITUTION PROGRAM- FIRST PLANTTO COMPLETE MAJOR PROGRAM- 18 PLANTSYSTEMS REVIEWED- 19 DESIGN BASIS DOCUMENTS (DBD) CREATED- DBD's REVISED ON FSAR REVISION CYCLE- WORKINGON NEW ACCIDENTANALYSISDBD

Page 22

Page 286: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 287: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~cW~ >opOp

+~ ~o~+ogear

TURKEY POINTENGINEERING DEPARTMENT

50.54(f) RESPONSE, DESIGN BASIS FSAR REVIEW

50.54(f) FSAR REVIEW COMMITMENT

+ FSAR SELF ASSESSMENTS AND NEI 96-06 REVIEW COMPLETED AT PTN

~ SELF ASSESSMENT (3/96)

~ FSAR OPERATIONAL REVIEW (1994 - 1996)

~ NEI REVIEW (3/97)

+ RESULTS

~ NO SAFETY SIGNIFICANT DESIGN BASIS ISSUES IDENTIFIED

~ FSAR ADMINISTRATIVEAND INCONSISTENCY CHANGES IDENTIFIEDAND RESOLVED BY RECENT FSAR REVISIONS

+ COMPLETE A "GRADED" FSAR REVIEW

~ REVIEW PRIORITIZED RISK SIGNIFICANCE

~ LEVEL OF REVIEW GRADED TO CONSIDER COMPLETED PROGRAMSCOMPLETED DESIGN BASIS PROGRAMSRECENT PLANT BETTERMENT PROJECTS

~ WILL USE FPL INHOUSE RESOURCESDESIGN AND SYSTEM ENGINEERSOTHER PLANT DEPARTMENTS AS REQUIRED

8 COMPLETE REVIEW BY 10/98

~ COMPUTER. NETWORK FOR USERSIMPROVED SEARCH CAPABILITYPLANT PROCEDURES ON LAN

Page 23

Page 288: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il~

Page 289: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e>op

Op

++>oar +~O

TURKEY POINTENGINEERING DEPARTMENT

FPL COMMENTS ON DRAFT NUREG - 1606,

PROPOSED REGULATORY GUIDANCE RELATED TO IMPLEMENTATIONOF10CFR50.59

+ GENERAL COMMENTS AND CONCERNSN

8 NEED TO WORK WITH INDUSTRY TO DEFINE COMPLIANCE VIA NEI 96-07

~ IMPORTANTTHAT NRC/INDUSTRY RESOLVE ISSUES PRIOR TOIMPLEMENTING NEW REQUIREMENTS'AND PROCEDURES

+ DEFINITION OF "CHANGE." TO INCLUDE ANY INFORMAT~ION IN THE FSAR

~ WOULD REQUIRE ADDITIONAL50.59 SAFETY EVA'LUATIONS~ NOT CONSISTENT WITH PAST PRACTICE

+ COMPONENT REPLACEMENT DURING ROUTINE MAINTENANCE

~ EQUIVALENTBUT NOT IDENTICALCOMPONENT VS DRAFT NUREG1606 EXPANDED DEFINITION OF "MALFUNCTIONOF A DIFFERENTTYPE"

~ NEED TO DEFINE NEW FAILURE MODES AT THE SYSTEM ORFUNCTIONAL LEVEL

~ ROUTINE COMPONENT REPLACEMENTS COULD INVOLVE USQs

+ USE OF MANUALACTIONS

~ COULD RESULT IN ADDITIONALPLANT SHUT DOWN TRANSIENTS~ NOT CONSISTENT WITH PAST INDUSTRY PRACTICE

+ APPLICATION OF 50.59 TO DEGRADED AND NONCONFORMINGCONDITIONS I

~ TS AND OPERABILITY EVALUATIONSADDRESS DEGRADEDCONDITIONS

~ PLANT RESTARTS COULD BE PROHIBITED

0Page 24

Page 290: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

4l

0

Page 291: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~C+ +O/~

+q ~OO>ear >

TURKEY POINTENGINEERING DEPARTMENT

NEW AND REVISED SOFTWARE ISSUED BY DESIGN ENGINEERING(QUALITYINSTRUCTION 3.7 COMPUTER SOFTWARE CONTROL)

NON-PROCESS SOFTWAREPROCESS SOFTWARE

PROCESS SOFTWARE

(NEW)

PROCESS'SOFTWARE(PRE-EXISTING)

- IMPLEMENTEDBY FORMALPLANTCHANGE PROCESS

- REQUIREMENTS SPECIFICATION PREPARED~ SOFTWARE DESIGN DESCRIPTlON- VIVIVPLAN PREPARED

~ USE GUIDANCE OF IEEE STD 1012- VERIFICATlONREQUIREMENTS~ TEST PLAN- PERIODIC VAUDATIONREQUIREMENTS

-- SOFTWARE VERIFICATIONREPORT- INDEPENDENT REVIEW

- 'MPLEMENTED BY FORMALPLANTCHANGE PROCESS

~ ORIGINALVIVREQUIREMENT AS MINIMUM- 'ADDmONALVILVREQUIREMENTS ON VENDOR- ADDITIONALBLACKBOX TESTING ON

RECEIPT FROM VENDOR- USE OF TRAININGSIMULATOR

- INDEPENDENT REVIEW

PROCESS SOFTWARE

IMPLEMENTATIONTESTING- CONTROL ANDSTORAGE PROCEDURES

nrcptn.wpd Page 25

Page 292: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

4k

0

~,

Page 293: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~c+ +OIOp

+~ ~o~+Ogp~p Q4

TURKEY POINTENGINEERING DEPARTMENT

DDPS / ERDADS SOFTWARE CONTROL(NON-PROCESS SOFTWARE)

0-ADM401

SOFlWARE CHANGEREQUEST

SOFTWARE CHANGEPRODUCTION

SOFTWARE CHANGE COORD

ASSIGN SOFlWARECHANGE TRACKING0

OPERATIONS SUPPORTSUPERVISOR APPROVAL

ACCEPTANCE TESTINGOF SOFTWARE

CHANGE

COMPUTER ENGINEER

- SPECIFY PRETESTBENCHMARKREQM'TS

IMPLEMENTATIONCHECKUST

- VENDOR MANUALS

- I&CCAUBRATIONPROC

- DATAPOINT UBRARY

~ SPECIFY SOFlWARECHANGE

~ SPECIFYV&V ACCEPTANCECRITERIA CONTROL RM

DISPLAYCHANGE?SIMUIATORCHANGES?

INDEPENDENTVERIFICATIONOF PROPOSED CHANGE

TRANSMITDOCUMENTATIONTO

DOCUMENTCONTROL

wcplh.wpd Page 26

Page 294: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

i

Page 295: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

+ eo~+egecr P%o

TURKEY POINTENGINEERING DEPARTMENT

PLANT SAFETY / RELIABILITYIMPROVEMENTS

CONTINUE TO IMPLEMENTMODIFICATIONSTO IMPROVE EQUIPMENT RELIABILITY

AGGRESSIVE ROOT CAUSE ANALYSIS

AGGRESSIVE MANAGEMENTCONTROLOF MODIFICATIONPROCESS

INDICATIONSOF SUCCESS

- REDUCED OPERATOR WORK AROUNDS- LOW NUMBER OF CONTROL ROOM, DEFICIENCIES- REDUCED NUMBER OF SECONDARY LEAKS- EXCELLENTPLANTAVAILABILITY

SPECIFIC IMPROVEMENTS

REACTOR PROTECTION RELAYDESIGNIMPROVEMENTS

ROD CONTROL IMPROVEMENTS- POWER SUPPUES

FORCED COOUNG- BRING CARDS- ROOM HVAC

- SMAlLBORE PIPING MODIFICATIONS

SAFEGUARDS RACK IMPROVEMENTS

C BUS MODIRCATIONS

~ BITBYPASS MODIFICATlONS

- REACTOR HEADGUIDE FUNNEL MODIFICATIONS

REACTOR HEAD GUIDE

FUNNEL MODIRCATIONS

- CRDM CANOPY SEAL PREVENTATIVECIAMPING

- SOURCE RANGE NUCLEAR INSTRUMENTS

- FEEDWATER PUMP RECIRCULATIONPIPING

SUPPORT UPGRADES

Page 27

Page 296: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 297: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

e~cV+ >op

Op

+ ~a~+Off~~ p%

TURKEY POINTENGINEERING DEPARTMENT

REACTOR HEAD GUIDE FUNNEL lVIODIFICATIONS

+ INDUSTRY FAILURE FOR REACTOR VESSEL GUIDE FUNNELS

FUNNEL FAILURE AT ZION (1984)

SEVERAL PLANTS REPORT PIN AND FUNNEL FAILURES (1994)

~ WESTINGHOUSE ISSUES NSAL 94-002

~ NO FAILURE HISTORY AT TURKEY POINT

+ FAILURE MODE

~ VIBRATION INDUCED FAILURE OF RETAINING PIN

~ POTENTIAL TO BLOCK/JAM CRDM

+ PLANT, RELIABILITYAND POTENTIAL SAFETY ISSUE

+ TURKEY POINT CORRECTIVE ACTION

,REPAIR OF 45 CRDM GUIDE TUBES

~ REPAIRS COMPLETE ON BOTH UNITS 3 AND 4

~ - LEAD PLANT FOR PLANTS WITHOUT PREVIOUS FAILURES

~ NO INDICATIONOF FAILURE ONSET NOTED DURING REPAIR

Page 28

Page 298: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 299: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

'Io

TURKEY POINTENGINEERING DEPARTMENT

Control RodDrive ShaF tPenetr a tlon

ThernocoupleColunnPene tro tion

REACTOR MEAD GUIDE FUNNEL MODIFICATIONSI

I I

I

ReoctorVesselHeoa

ThernolSleeve

T/C ColunnHousingGuide

ThernalSleeveGuide

Page 29

Page 300: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

Page 301: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~tl~o >o(4p

oo(oo

TURKEY POINTiENGINEERING DEPARTMENT

REACTOR HEAD GUIDE FUNNEL MODIFICATIONS

Fillet Weld

VIEW A-A

lttcpttLttttpd Page 30

Page 302: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

4l

0

il~

Page 303: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENGINEERING DEPARTMENT

Ivc ps l.wpd Page 31

Page 304: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0'l~

Page 305: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

+v |c>i,c/

ST..LUCIEENGINEERING DEPARTMENT

ENGINEERING ORGANIZATION

+ ORGANIZATIONALSTRENGTHS

~ AVERAGE NUMBER OF YEARS OF NUCLEAR EXPERIENCE (PER ENGINEER)IS 17 YEARS

DIRECT SUPPORT TO OPERATIONS AND MAINTENANCECONTINUES TOBE A STRENGTH

~ 23 ENGINEERS HAVE OPERATIONS TRAINING

+ IMPROVEMENT / GROWTH PLANS

DEVELOPMENT OF SYSTEMS ENGINEERING PROGRAM

~ STRENGTHENING OF SYSTEM HEALTH MONITORING AND TRENDING OFEQUIPMENT DATA

~ SYSTEM ENGINEERS TRAINING

rvcpsl.w pd Page 32

Page 306: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

il~

Page 307: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

1

feST. LUCIE

ENGINEERING DEPARTMENT

AVABABILllY

SAFETY )HJECTION5.YEAR RUNNING AVERAGE

100%

SS'/0 I+ i I I1 i I P1 ~ ~ SIf

98%- ~0 I

j1

~0 0»M»

i'~ 0 00 OJ 00

('I !Ii li

97% .

I

96%-

95% II

I

94%

9/96 11/96 1/97 0/97 EI97

OMITI UMII'2 PERFORMANCE CRCERIA 'AMOYR2000GOALS

AVAIIABILIIV

100%

99%

I

98% ,.

I

liiI

EMERGENGY DIESEL GENERATORS2 YEAR RUNNING AVERAGE

I

I II

I (0 ~ IDM

»

I

I

Ii

Ik»

JA

II

~ I

ij

. I

I'7~xi

7IIll

96%

5/96 7/96 9/96 11/96 1/97 3/97 5/97

UNIT I UNIT2 PERFORMANCECRffERIA " WANG YR 20M GOALS

IMCPSI.WPC Page 33

Page 308: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

i

Page 309: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

NR y„.',

0

~Xiii"'~ ~ ~ g ~

~ ~

ll

,"g

N gx a>

g

~

~

S

Y

.~a

jj'4

Pj

5

g ~

@0

~ i~ ~ e ~ .

Q

Page 310: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

Ik

~ i

Page 311: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENGINEERING DEPARTMENT

UNIT 1 DDPS SOFTWARE ERROR

+ A 1994 SOFTWARE ERROR RESULTED IN UNIT ¹1 OPERATION WITH A 0.63%NONCONSERVATIVE REACT'OR POWER CALORIMETRIC ERROR

Vendor deaspwd sonttwechange lorDeacon was assedon late a copy mainunad hy

vendor

InveattgstinnResults

The new scasng onscaraswere nct permanency savedItao iho naster pmgrsm or

~ella lo aontmro vendor

tt revision et gN eolhtate weelaassed Ihat dld fwtIndedoBN now FW flowconnsras

Chsnnologyleal PWCy ctnnged span ofFw now Itsnsmalers ltom

0 ~ T00.0'0

0. 00IP

IHew FVfliowscawtg conaant t

vahws were swered Sao OOFccnstwa IocetavN

PCIM 0020 f00 provided thedeapn fot ltleie'Ietten ofBeacon syaem ant nsccntNctka to DOFS

The Ipse ctangea lo ONfeodtmwr aow connancs were

ovwwrtswc

TINBeeoen PCat scope wssttsttad Io 0N INtottwo snd DO

HOT Incktse SN ecossacyChang ee Io BN OOPS eonewe

InvsstlgationResults

Forts Oio HOT Ptevidopost modncacon Iecgng

teovtrsnwtcs ler tae OOPSsensate

cancskwl dal dNBoo sea!no cnnststas were lerBN¹I 0 ~ fetes'Ssnttntecr

ChronologyThe sothtwe Vay s perfntd hy

sothmre vender natengedsw BoNa ostpas hca teredIo ctwrksitar asperse of IINDops soteewe sech os IIN

secondary plate caatnrtNcnc.I

Reader wallop Iel tttdt dlCycle SIS

DNOO tspotts lo a FW BatIteontsnn', Ical towtd Iha

0 c¹ssaed reactorlevel wac lower teen ocntef

poww ey Odats.

Shy tong TeraI

Devaaa genena Vaynenwnenks Io cnasenpo as

icnand eeraacee wltttnsechVnlot srd ttrkst DOPSlet l

~ taonaseaNnHS1

7-2M 2-2l 97

tvcpsI.vvpd Page 35

Page 312: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

Page 313: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

/4

I

ST. LUCIEENGINEERING DEPARTMENT

'UNIT 2 DDPS SOFTWARE ERROR

+ A 1997 SOFTWARE'ERROR.WAS DISCOVERED DURING UNIT ¹2 REACTORPOWER CALORIMETRIC VERIFICATION 6 VALIDATIONTESTING

PDrM reterence4 pen»la V 5 v planeveloped as ooneccrve eccl»l lo Irnu

~I evsnL Dvanap between ponionc eflest fran ares nadectuete.

Invusti0stion'estdts

Inactoctuste I@croute DDP5oobrare exporuce to oatccc

verldv vrul'.

pDfII4ld not pruvtfs edoduarepent~ tecttn0 fvDDP5

ochwwe chcnden

pc/at eoo 1 c T. supplemonc1provtfcd deride foc rarcaans

ofpw pow crsnsnvuv span from

0 ~600'O

0 ~

000'DP5vendor oorcraccod lo

revtre software.FW now Beuavetrs ValueProcasev scarard wes nol

roe!red.

New 0enerlo V5VofatitcalDDP5 ettctatos was

pedonaed.Did not detect Ihoonert PW

Crow scaaad cnctants Ined 'ovstce Value Procecav.

AlSdta power oaoenclonptaroou DDp5~ uec

Oetntlnkned tO Pe 0% IOwerpwn rnenual onnatrtoffÃs npaatssmwesa

~padded pert of V5Vptaa)

5-17-97

rvcpst.wod 'Page 36

Page 314: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

0

0

Page 315: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENGlNEERING, DEPARTMENT

SOFTWARE VERIFICATION 6 VALIDATIONPROGRAM IMPROVEMENTS

+ DEVELOPED PROCEDURE '"MAINTENANCE'DEPARTMENTALCONTROL OFCOMPUTER SOFTWARE" IN FEBRUARY 1996

+ CONVEYED "LESSONS LEARNED" FROM THE RECENT SOFTWARE EVENTSTO ENGINEERING AND MAINTENANCEPERSONNEL

+ MADE ORGANIZATIONALCHANGES TO PROVIDE MORE INTERACTIONBETWEEN SOFTWARE ENGINEERS AND DESIGN / SYSTEM ENGINEERS

+ IDENTIFIED ADDITIONALPROCEDURE / PROGRAM ENHANCEMENTS IN THEFOLLOWING AREAS:

~ IN-DEPTH TRAINING IN VERIFICATION AND VALIDATIONFORENGINEERING / IS.C MAINTENANCE

~ UPGRADE OF EXISTING SOFTWARE CONTROL PROCEDURES (MASTER&. BACKUP COPIES)

DEVELOPMENT OF DETAILED SOFTWARE VERIFICATION 5VALIDATIONON SELECTED COMPUTER SYSTEMS

Page 37

Page 316: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

45

Ik

Page 317: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENGINEERING DEPARTMENT

REACTIVITYMANAGEMENT

REACTOR ENGINEERING PROGRAIVIS

+ INSTRUCTIONS PROVIDED. FOR POWER MANEUVERING

+, ENGINEERS ON SHIFT,DURING POWER:MANEUVERS

+ BEACON REAL TIME MONITOR MODE

+ CORE OPERATING HISTORY ASSESSMENT

+ ECC VERIFICATIONS

+ REACTIVITYMANAGEMENTASSESSMENTS

+ REACTIVITY MANAGEMENTTRAINING PROVIDED TO OPERATIONS DURINGREQUAL

+ RE PROCEDURE REVIEW PROGRAM

'RE PROCEDURE REVIEW PROGRAM

+ PERFORMED A TECHNICAL REVIEW OF 26 PROCEDURES

+ REVIEW TEAM CONSISTED OF 2 ENGINEERS EACH FROM:

REACTOR ENGINEERING (ON SITE)NUCLEAR FUELS (JUNO)

~ ABB/CE (NSSS VENDOR)

PROCEDURE REVIEW RESULTS

+ THE REACTOR ENGINEERING PROCEDURES WERE FOUND TO BE TECHNICALLYACCURATE AND CONSISTENT WITH TECHN)CAL SPECIFICATIONS ANDDESIGN ANALYSIS.

+ THE MOST SIGNIFICANTPROCEDURE CHANGES FOCUSED ON CLARITYINTHEAREA OF SHUTDOWN MARGINVERIFICATIONENSURING COMPLI'ANCEWITHT.S., AND 'PROVIDING CONSISTENCY WITH OFF-NORMAL CEA PROCEDUREGUIDANCE.

Page 38

Page 318: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 319: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

w 0 ~ Wv& wa~. peQr. e

ST. LUCIEENGINEERING DEPARTMENT

REACTIVITYMANAGEMENT

14

12

EquipmentGR

DesignE3

HumanH

10

XX~~K

Events

CEA's.(U1) 66.6%

12.5%

Equip.(U2) 6.3% Design 12.5%

OVERVIEW

+ NEARLY ALL EVENTS WERE ON UNIT 1(15 OF '16)

+ MOST WERE CEA EVENTS (11 OF 16)

+ HIGHER POWER THAN EXPECTED FOR PLANT CONDITIONS (2 OF 16)

Page 39

Page 320: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 321: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENGINEERING DEPARTMENT

CONTROL ROD ELEMENT DRIVE SYSTEM

ANALYSIS

+ DROPS RELATED TO:

~ MECHANICALSLUGGISH GRIPPERS

~ TIMING MODUL'E FAILURE

SYSTEM ASSESSMENT (ONE YEAR REVIEW)

+ OTHER FAILURES

REED SWITCH POSITION INDICATIONS

~ DDPS POSITION INDICATIONS

CEA FAILURES TO MOVE DURING FLCEA

CEA Drops

@~ Unit 1

QUnit2

S.

i'>

7/96 8/96 9/96 10/96 11/96 12/96 1/97 2/97 3/97 4/97 5/97 6/97 7/97

IvcDsl.wpd 'Page 40

Page 322: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il~ '

Page 323: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENG!NEERING DEPARTMENT

CONTROL .ROD ELEMENT DRIVE SYSTEM

SYSTEM ANALYSIS

+ DROPSiSLIPS ON UNIT 1 CAN BE ATTRIBUTED TO'LUGGISH CEDMGRIPPER ENGAGEMENTS, INADEQUATE DESIGN OF TIMING MODULES (NOCEA GRIPPER ENGAGEMENT FEEDBACK) AND POWER SWITCH FAILURES

+ ACTMS ON UNIT 2 PREVENT MOST PROBLEMS FROM MANIFESTINGTHEMSELVES AS DROPPED CEAS

CORRECTIVE ACTIONS TAKEN

+ PERFORM CEDM COIL RESISTANCE TESTS EACH OUTAGE AND TRENDDATA WITH PREVIOUS OUTAGES TO DETERMINE IF DETERIORATING COILSCAN BE IDENTIFIED

0 + IDENTIFIED SLUGGISH GRIPPERS, TIMING MODULE AND POWER SWITCHFAILURES AS PRIMARY CAUSE OF UNIT 1 CEA DROPS AND SLIPS

+ CEA REED SWITCH REPLACEMENTS SCHEDULED EACH'OUTAGE

CORRECTIVE ACTIONS PLANNED

+ IN-HOUSE REFURBISHMENT OF UNIT 1 COIL POWER SWITCH MODULES

+ IMPLEMENTATIONOF UNIT 1 ACTM MODIFICATION (REFUELING 1997)

+ ENHANCE SCHEDULE FOR REPLACEMENT OF REED SWITCH ASSEMBLES INUNIT 2

Page 41

Page 324: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

O~

Page 325: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

(p". ST. LUCIE

ENGINEERlNG DEPARTMENT

CONTROL ROD ELEMENT DRIVE SYSTEM

UNIT 1 CONTROL ELEMENT DRIVE.NIECHANISNI

REED SWITCHASSEMBLY

REED SWITCHACTUATINGMAGNET

UPPER PRESSUREHOUSING ASSEMBLY

OMEGA,SEAL

OPERAT|NG RCD

ANTI.EJECTIONGRIPPER

ELECTRICALCONDUIT

LIFT COll.

LlFTANDPUL'LDOWNMAGNETASSEMBLY

UPPER GRIPPER

DRIVE SHAFTCOIL WIRE TROUGH

PULLDOWN COIL

L.OAD TRANSFERMAGNETASSEMBLY

LOAD TRANSFER COIL

LOWER GRIPPER COiL

LOWER GRIPPER

MOTOR HOUSING ASSEMBLY

REACTOR NOZZLECONNECTION

OMEGA SEAL.

THERMAI.SLEEVE

(PAQQPTI l40$.FhAtf

Ivcpsl.wpd Page 42

Page 326: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 327: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENGINEERING DEPARTlVIENT

CONTROL ROD ELEMENT DRIVE SYSTEM

UNIT 1 ACTIVI UPGRADE

AUTOMATICCEDM TIMER MODULE (ACTM)

+ MICRO PROCESSOR BASED CONTROL ROD DRIVE SYSTEM CONTROLLER

+ REPLACES THE CPP TIMER DURING THE UPCOMING UNIT 1 REFUELINGOUTAGE

+ CURRENTLY INSTALLED ON UNIT 2 (AND OTHER CE PLANTS)

+ CONTROLS CEA MOTION UTILIZINGPOSITIVE FEEDBACK VIA CURRENTSENSORS

+ EXPECTED TO REDUCE OR MITIGATE UNIT 1 CEA DROP EVENTS

CONTROL ELEMENTDRIVE SYSTEM

NSSS MG SET 240 VAC

RPS TRIP BREAKERS

CEAPDS(ADS)

RSPT INHIBIT

REACTORREG.

CEDSCEDMCS)

CPPMAGJACK

CEDM

OPERATOR EQRJHDPlANT

COMPUTER

RSTP

Page 43

Page 328: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

i

Page 329: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENGINEERING DEPARTMENT

CONTROL ROD ELEMENT.DRIVE'SYSTEM

L(FTfNG 3/4"

ANTlEJECT/ONGRIPPER

(Not In Unit 2)

UPPERGRIPPER

LC

P0

LOWERGRIPPER

fFAIOOOtl>ASJ'Pelt)

rvcpal.wpd Page 44

Page 330: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 331: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

>4'r.>c

ST. LUCIEENGINEERING 'DEPARTMENT

PLANT SAFETY / RELlABILlTYlMPROVEMENTS

ENGINEERING EMPHASIS FOCUSED ONSAFETY AND RELIABILITYMODIFICATIONS

NEW MANAGEMENTREVIEW PROCESS

ADOPTED

INDICATIONSOF SUCCESS

- REDUCED OPERATOR WORK AROUNDS- LOW NUMBER OF CONTROL ROOM DEFICIENCIES- EXCELLENTPLANTAVAILABILITY

SPECIFIC IMPROVEMENTS-

199T UNIT20

- PRESSURIZER SAFETY VALVESCUD BLOCKY DESIGN

-'EACTOR VESSEL (HUNG REPLACEMENT

DIESEL GENERATOR RELAYREPLACEMENT

- QUICKLOCINCORE INSTRUMENTFLANGE

DESIGN

- 2C AFW PUMP WARMUP UNE MATERIAL

CHANGE DUT

- SIT FILLVALVEACTUATORUPGRADE

PRESSURIZER SAFETY VALVE

SOLID BLOCKBODYDESIGN

- TCW PUMP DISCHARGE CHECK VALVE

ENHANCEMENT

IvccsLwcd Page 45

Page 332: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

4I

Page 333: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

/~fss .

(o".'T.LUCIE

ENGINEERING DEPARTMENT

OPERATOR WORKAROUNDS

caus ts) OPEN

Is

40I

I

35, "I Walked down plantto Identify nevr

30" 'WAs25"

I20

II

15l

10" "'

Operator Work Around: . A problem thatImpedes an operator ln performing dutieswlthln the approved procedures or lnaccordance with the Intended design.

last Updated:

July S, 1SS7

0

Year End Target 4

12/95 9/96 10/96 11/96 12/I 1/97 2/97 3/97 4/97 5/97 6/97 7/97 8/97 9/97 10/97 11/97 12/97

Time (Month)

OPEN

nrcpsl.wpd Page 46

Page 334: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

Page 335: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

i~~

$4-

r vp

'I

v ~

8Ya

)v~si'*.

v'~~<j~

<nggg~

I

cc.~)~wqgPi-.

Cv

a)g

~ v. M~P~ 'c-.-.

t.

I

I

Page 336: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 337: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

I

g

F ~

r

I,A

0C

1

4

eJW

w~

Page 338: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

O~

Page 339: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENGINEERING DEPARTMENT

PLANT SAFETY AND RELIABILITYIMPROVEMENTS

SPECIFIC UNIT 2 OUTAGE ACCOMPLISHMENTS

+ REVISED INTEGRATED SAFEGUARDS TEST PROCEDURE

~ NEW 'PROCEDURE TESTS EACH TRAIN INDEPENDENTLY

~ ENSURES ONE COMPLETE TRAIN AVA'ILABLEFOR CORE COOLING

+ ON-LINE TESTING OF MSSVs

+ FULL CORE OFFLOAD ANALYSIS

+ VALVEOVERHAUL SUPPORT

+ AGGRESSIVE FLOW ACCELERATED CORROSION INSPECTION PROGRAM

+ MSIV REFURBISHMENT SUPPORT

+ COATINGS PROGRAMS

nrepal.wpd P.age 49

Page 340: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

il

Page 341: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENGINEERING DEPARTMENT

PLANT SAFETY AND RELIABILITYIMPROVEMENTS

MODIFICATIONS PLANNED FOR UPCOMING 1997 UNIT I OUTAGE

+ STEAM GENERATOR REPLACEMENT

+ PRESSURIZER HEATER SLEEVE NICKEL PLATING

+ QUICKLOC INCORE INSTRUMENT FLANGE DESIGN

+ CEDMCS ACTM UPGRADE

+ SIT FILL VALVEACTUATOR UPGRADE

+ TCW PUMP DISCHARGE CHECK VAIVE ENHANCEMENT

+ REFUELING TRANSFER TUBE VALVEOPERATOR TORQUE LIMITER

nrcpal.wpd Page 50

Page 342: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

0

Page 343: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENGINEERING. DEPARTMENT

Pressurizer Heater NozzleNickel Plated Region{4"Long, 0.008" Thick)

Weld

Lower HeadinternalCfadding

.$ 25" PressurizerLower Head

Typical Heater Nozzle

.S05"

Typical Nickel Plated t4ozzte

Page 51

Page 344: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ik

Page 345: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST. LUCIEENGINEERING DEPARTMENT

HEATER,SLEEVE END EFFECTOR

VPP=R SEAL

vPPEP. gEA0

N ICKEL ANOOE

LOWER SEAL

SOLuT!0~ OVTLET

nr col.wpd Page 52

Page 346: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed
Page 347: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

ST.. LUCIEENGINEERlNG DEPARTMENT

DESIGN BASIS 50.54.(f) RESPONSE SUMMARYAND ACTIONS

CURRENT AND FUTURE ACTIONS

+ FSAR/OPERATING CONSISTENCY REVIEW

~ FINDINGS TO BE RESOLVED OVER NEXT TWO YEARS

+ NEI INITIATIVE

+ ANNUNCIATORSUMMARYREVIEW

COMPLETION DATE OF DECEMBER 1998

+ NRC A/E INSPECTION

~ NRC INSPECTION REPORT ISSUED 3/25/97

~ DESIGN OF INSPECTED SYSTEMS GOOD WITH ADEQUATE DESIGNMARGINS. IMPLEMENTATIONOF DESIGN ADEQUATE.

~ FPL RESPONDED TO INSPECTION REPORT ON 5/27/97 AND PROVIDEDACTIONS PLANNED FOR FOLLOW-UP AND UNRESOLVED ITEMS

rvCpol.wpd Page 53

Page 348: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

iS~

0

Page 349: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

cv <0

ST. LUClEENGINEERlNG DEPARTMENT

~ VOLUNTARYFSAR REVIEW INITIATIVE

+ ST. LUCIE HAS COMMITTED.TO A GRADED REVIEW OF THE UNIT 1 Bc 2 FSAR

+ REVIEW PRIORITIZED TO RISK SIGNIFICANT SYSTEMS

+ CREDIT TAKEN FOR PREVIOUSLY INSPECTED SYSTEMS

+ FOUR PRIORITY LEVELS ESTABLISHED

+ PLANT FIRE PROTECTION SECTIONS INCLUDED WITH PRIORITY 2 REVIEW

+ DISCOVERY PHASE FOR PRIORITY 1, 2, 5 3 TO BE COMPLETE BY OCTOBER18,1998

+ SELECTED CHAPTER 15 ACCIDENT ANALYSES TO BE UPDATED

nrcpsl.wpd Page 54

Page 350: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

~ ~

il

Page 351: Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.'building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed

@PLENGINEERING DEPARTMENT

CHALLENGES

+ MAINTAININGAND IMPROVING CURRENT LEVEL OF PERFORMANCE

+ RETAINING TALENTED PERSONNEL

+ DEVELOPMENT OF ST. LUCIE SYSTEM ENGINEERING PROGRAM

+ IMPROV)NG EQUIPMENT PERFORMANCE MONITORING AND TRENDING

SUMMARY

+ STRONG DIRECT OPERATIONS AND MAINTENANCE.SUPPORT

~ RESPONSIVE TO OPERATIONS PRIORITIES AND REQUESTS

GOOD TEAMWORK AND COMMUNICATION

+ GOOD FOCUS ON PLANT SAFETY AND EQUIPMENT,PERFORMANCE

Page 55