using e-class making adjustments after an approval

11
Using E-Class Making adjustments after an approval

Upload: lionel-poole

Post on 12-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Using E-Class Making adjustments after an approval

Using E-Class

Making adjustments after an approval

Page 2: Using E-Class Making adjustments after an approval

This is a PowerPoint presentation of about five minutes duration. It is intended for E-Class users having the APPROVER role.

This will explain when and how to make adjustments to a case file after it has received a classification approval.

You may exit the presentation at any time simply by closing the Window.

Where this arrow appears, click on it to advance the slides.

Page 3: Using E-Class Making adjustments after an approval

Typical Review Cycle

The right-hand column shows the typical stages of review, from initiation to approval notice.

Page 4: Using E-Class Making adjustments after an approval

Minor Post-Approval Edits

Sometimes relatively small corrections are necessary to “tidy up” a case file after a classification outcome has been approved.

These corrections should be made to the current Approval Notice row of the case diary by using the Update Current Diary Entry checkbox.

Page 5: Using E-Class Making adjustments after an approval

Minor Edits

However, it’s a good idea to insert a comment to record that minor edits were made.

Minor edits do not add diary rows. Such corrections are made on the Approval Notice row.

Page 6: Using E-Class Making adjustments after an approval

Examples of “Minor” Edits

• Grammatical, spelling or formatting corrections to a job description or rationale

• The addition of staffing criteria to the description or document library

• Edits to the language of a factor rating where no change in rating level is involved

• Changes to a minor factor (a factor other than 1, 2 or 5) that no effect on the outcome classification

Page 7: Using E-Class Making adjustments after an approval

Can’t update current diary entry?

Not all E-Class user roles have the power to update the current diary row. In these cases, minor corrections should be made by adding diary rows while keeping the Approval Notice action/reason unchanged.

Page 8: Using E-Class Making adjustments after an approval

Don’t “re-approve” approved case files!

Never insert a second Approved row after Approval Notice has been declared. This compromises the integrity of the review cycles and corrupts several performance reports!

No!

Page 9: Using E-Class Making adjustments after an approval

If the required edits are significant…

…then a second review cycle (albeit a much shorter one) should be declared and recorded.

Page 10: Using E-Class Making adjustments after an approval

Examples of “Significant” Post-approval Edits

• Substantive changes to the job description

• Changes to a rating on Factors 1, 2 or 5

• Changes to a minor factor that impacts the outcome classification

• Change in a reporting relationship or span of control

Page 11: Using E-Class Making adjustments after an approval

End

To return to the menu of presentations, simply close this window…