1 VRP VEHICLE ROUTING PROBLEM Readings: E&M 350-353 Topics: VRP versus TSP Solution methods Decision support systems for VRP Relationship between TSP and VRP Vehicle routing problem (VRP) is similar to the Traveling salesman problem (TSP) but with more constraints such as vehicle capacity. Consider a TSP problem: Suppose that the vehicle has a capacity of 10 and each customer has an order size as shown below, then the TSP solution is no longer feasible. Depot Depot 4 3 1 2 5 2 1 4 3 2 3

Upload: isaacnarendraakbar

Post on 05-Dec-2015

226 views

Category:

Documents


0 download

DESCRIPTION

Analisis Sistem

TRANSCRIPT

Page 1: VRP Dan TSP Analisis

1 VRP

VEHICLE ROUTING PROBLEM Readings: E&M 350-353 Topics:

• VRP versus TSP • Solution methods • Decision support systems for VRP

Relationship between TSP and VRP Vehicle routing problem (VRP) is similar to the Traveling salesman problem (TSP) but with more constraints such as vehicle capacity. Consider a TSP problem:

Suppose that the vehicle has a capacity of 10 and each customer has an order size as shown below, then the TSP solution is no longer feasible.

Depot

Depot

4

3

1

2

52

14

3

2

3

Page 2: VRP Dan TSP Analisis

2 VRP

Depot

4

3

1

2

5 2

1

4

3

2

3

Depot

4

3

1

2

5 2

1

4

3

2

3

A simple method : Use the TSP as usual When exceeding the vehicle capacity,

go back to the depot Start another tour with the nearest

customer as the first customer Repeat b. and c. until all customers are

served.

Can we use only three tours to serve all customers?

As a Decision Problem Decisions

– Assignment of orders to vehicles

– The sequence of orders to be served

Constraints

– Vehicle capacity (in terms of volume or weight normally)

Objectives

– Minimizing mileages or time Considerations

– Known demand

– Delivery or pick-up

Page 3: VRP Dan TSP Analisis

3 VRP

Solution Strategy Tour construction heuristics

• Insertion methods (e.g. nearest insertion, min cost insertion) • Savings methods (e.g. Clarke-Wright savings) • Generalized assignment methods (e.g Fisher-Jaikumar method)

Tour improvement

• Intra-route improvement methods (e.g. 2-Opt, 3-Opt) • Inter-route improvement methods (e.g. Relocate)

Tour construction method 1: Clarke-Wright savings method

1

43

45

43

29

3

43

72

57

52

25

Depot

2

5

4

360

40

45

35

Demand for customer 5

Given 1 depot 4 customers with known demand Vehicle capacity (100) Costs for traveling between customers

Basic Steps Identify the distance matrix Identify the savings matrix Combine routes

Page 4: VRP Dan TSP Analisis

4 VRP

Page 5: VRP Dan TSP Analisis

5 VRP

Page 6: VRP Dan TSP Analisis

6 VRP

s(2, 4) = c(1, 2) + c(4, 1) – c(2, 4) = 25 + 57 – 34 = 48

s(2, 5) = c(1, 2) + c(5, 1) – c(2, 5) = 25 + 43 – 43 = 25

s(3, 4) = c(1, 3) + c(4, 1) – c(3, 4) = 43 + 57 – 52 = 48

- 45 72 43 43 5

- - 52 34 57 4

- - 29 43 3

48 39 - 25 2

- - - - - 1

5 4 3 2 1

s(2, 3) = 25 + 43 – 29 = 39

25

48

- 45 72 43 43 5

55- 52 34 57 4

1448 - 29 43 3

2548 39 - 25 2

- - - - - 1

5 4 3 2 1

Begin combining tours: starting with the highest savings and (a) the combined tour cannot exceed vehicle capacity, (b) insertion cannot be in the interior of a tour.

1

2

5

4

3

44

5 2

Depo

4

Demand (5) = 60 Demand (4) = 35 Vehicle capacity = 100 Decision: combine the tour

Page 7: VRP Dan TSP Analisis

7 VRP

- 45 72 43 43 5

55- 52 34 57 4

1448 - 29 43 3

2548 39 - 25 2

- - - - - 1

5 4 3 2 1

Next highest savings:

1

2

5

4

3

443

5 25

Depot

45

34

Demand (2) = 40 Demand (4+5) = 95 Vehicle capacity = 100 Decision: cannot combine the

Page 8: VRP Dan TSP Analisis

8 VRP

All nodes are visited once and the total cost is 242. How to speed up the Clarke-Wright Savings Method? We can use Heap to store the savings (from the largest to the smallest). The use of Heap can speed up the operations. Tour construction method 2: Generalized assignment method (also called Fisher – Jaikumar Method) Assign seed points for each route Evaluate insertion cost for each customer Assign customers to routes

Parameters di : demand of customer i uk : capacity of vehicle k

Page 9: VRP Dan TSP Analisis

9 VRP

Decision variables

1 if customer is assigned to route 0 otherwiseik

i ky

=

1 if is visited followed by visiting on route 0 otherwiseijk

i j kx

=

Define: N(yk) = all nodes on route k f(yk) = the cost of route k Our objective is to minimize the route cost while satisfying the demand. Therefore, we can write the problem as follows:

min ( )

subject to

01 1,...,

{0,1}

kk

i ik ki

ikk

ik

f y

d y u

k iy

i ny

== =∈

The cost of route f (yk) is defined as follows:

Example

0

1

3

42

5

6

Vehicle 1

Vehicle 2

01

51

41

==

yy

10

52

42

==

yy

{ }4,3,1)( 1 =yN

{ }6,5,2)( 2 =yN

Page 10: VRP Dan TSP Analisis

10 VRP

( ) min

subject to 0,...,

1, ( )

k ij ijkij

ijk iki

ijk ikj

ijk ki Q j Q

f y c x

x y j n

x y

x Q N y∈ ∉

=

= =

=

≥ ⊂

∑ ∑

A big problem: f (yk) is a complex, nonlinear function. Solution idea: Approximate f (yk) by some linear function:

f (yk) ~ ik iki

c y∑

The coefficient, ikc , represents the approximated cost of putting customer i on route k. How do we get ikc ? Idea 1: cheapest insertion cost Idea 2: use the concept of opportunity cost Steps of the generalized assignment Step 1: Assign a seed to each vehicle (or route) where the seeds are farthest away from each other (Suppose that we have 3 vehicles)

D

Page 11: VRP Dan TSP Analisis

11 VRP

Step 2: Evaluate the cost of inserting the customers into the existing routes.

Option 1: Approximate by the cheapest insertion cost

D

a

c

b

Customer 1

79

Customer 2

1314

12

Best choice for customer 1: c cost = 7 Best choice for customer 2: b cost = 12 Best choice for customer 3: b not availableSecond best for customer 3: a cost = 19 Total cost: 38

13

19

Customer 3

22

D

Customer 1

a

c

b

Customer 2

79

1314

1213

19

Customer 3

Opportunity cost for customer 1: 2Opportunity cost for customer 2: 1Opportunity cost for customer 3: 6

22

Option 2: Approximate by Opportunity cost or Regret

Regret = Cost for second best choice – cost for the best choice Customer with the highest opportunity cost should be inserted first

Opportunity cost for customer 1: 2 Opportunity cost for customer 2: 1

customer 3 to b: 13 customer 1 to c: 7 customer 2 to a: 14 Total: 34

Page 12: VRP Dan TSP Analisis

12 VRP

Step 3: Rank customers from highest to lowest regret.

Step 4: Insert the customers according to the rank of regrets one at a time. Notice that the regrets may need to be updated. Tour improvement Methods There are general types of methods: 1. Intra-route improvement (changing the sequence of customers within a route) Examples: 2-Opt 3-Opt

2. Inter-route improvement Exchanging customers between routes Exchanging segments of routes between routes Example of Intra-route improvement: 2-opt algorithm Do a swap of arc pairs in a route if it can reduce the cost (or time). Below we consider a case

where customers may impose delivery time-windows.

Example: Regret (3) > Regret (2)

D

Customer 2

a

c

b

Customer 3

From 3 to c route: 11 From 3 to b route: 17 From 3 to a route: 18 Regret(3) = 6

From 2 to c route: 10 From 2 to a route: 11 From 2 to b route: 12 Regret(2) = 1

Page 13: VRP Dan TSP Analisis

13 VRP

2-opt

Note: the indices i and j are in the order of the nodes being visited in a given tour. For simplicity,

we represent the route as a chain and ignore the physical shape of the route

i j

i j 2-opt

2-opt swapping illustration

i+1 j+1

i+1 j+1

Page 14: VRP Dan TSP Analisis

14 VRP

o Flow chart:

We can continue the swapping until the two cost savings of two consecutive swaps is smaller than

some small values or the number of swapping has reached a pre-defined maximum number of

swaps. In implementing 2-Opt algorithm, there are several possible ways to select which pairs of

arcs to be considered for swapping.

• Select the pair of arcs with the best cost savings and then make swap;

• Select several pair of arcs with the best cost savings and swap the best pair. From the

second swap on, this method will check the feasibility before making it since the route has

been changed after the first swap.

For the node pairs of i, j, consider swapping?

d(i,j)+d(i+1, j+1)< d(i, i+1) +d(j, j+1) ?

Y

Return new solution

N

N

Y

Swap the arcs (Note that the arcs from i+1 to j are reversed

After the swap, is the resulting tour feasible?

Stop? N

Y

Y

Page 15: VRP Dan TSP Analisis

15 VRP

• Randomly consider a pair of arcs and makes swap if it is feasible and can produce cost

savings;

• Traverse the route from the starting point and make the swap once an eligible pair of arcs

(feasible and cost savings) is found.

Example of Inter-route improvement: Relocate Consider the swapping between two existing routes. One way is to “relocate” a node in a route

(say route B) to another route (say route A)

j

Depot

j+1

i

i-1

i+1

Route A

Route B

We need to choose the route from which one node will be removed (route B) and the route to

which the node will be inserted (route A). Then, we can follow the procedure below:

Page 16: VRP Dan TSP Analisis

16 VRP

For each node i in B

d(j,i)+d(i, j+1) +d(i-1, i+1)< d(i, i+1) +d(j, j+1) +d(i-1, i)?

Insert i between (j, j+1) & Connect i-1, i+1

N

Y

Find a new feasible position for i in Route A, say between j and j+1

Expanding route A, Shrinking route B

Y

Y

Return

Finish expanding/shrinking

YN

In implementing the relocate algorithm, we have several options:

For each node in the shrinking route, find the first position in the expanding route after

which the node can be inserted and the relocation of the node results in cost saving.

Similar to the above, except that for each node in the shrinking route, it will find the

position in the expanding route that the relocation will result in the largest saving.

For each node in the shrinking route, find the best position as well as the best expanding

route

Other Implementation issues

– Time window constraints Each customer has a specified time period during which the vehicle can visit

Page 17: VRP Dan TSP Analisis

17 VRP

– Backhaul (pickup and delivery)

Not just delivery goods from the depot, but also pick up goods from customers

– Multiple depots

Vehicles can be coming from different depots

– Split orders

May have more than one delivery to a customer

The case of a chemical product manufacturer:

Production unit

Fleet unit

Warehouse

Customer service

Information system

orders

delivery

Sites – Multiple factories in Pearl River Delta – Supply petrol chemical products to customers in PRD

Page 18: VRP Dan TSP Analisis

18 VRP

Production – Just-in-time production Distribution – 20 - 50 trucks per factory – Order cut-off at 4 pm – More than 1 trip per vehicle – Divide region in zones and one route per zone Process – Receive an order – Estimate the order finishing time – Sort the orders to be finished on tomorrow – Estimate the delivery schedules – According to the delivery schedules, re-estimate the production schedules – When the orders are ready, ask warehouse people prepare for the loading – Ask fleet unit to send trucks to warehouse for loading Operation Issues – Information is not synchronized – Paper work between units – Spend 3 hours in determining initial delivery schedules – Low truck utilization – Difficult to entertain customer’s request on exact/approximate delivery time – Urgent orders (some trucks are reserved to handle urgent order) DECISION SUPPORT SYSTEMS FOR VRP What is a decision support system? What are the differences between Databases, Enterprise systems, Decision support systems?

Database – Organized storage of data – Minimize data redundancy and inconsistency – Data retrieval, search, and sort

Enterprise system – Minimize inconsistency across databases – Real-time data – Integrating databases

Decision support system – A system to support decision making – Extract data and process data intelligently

Page 19: VRP Dan TSP Analisis

19 VRP

The Components of DSS:

1. Database 2. Model-base 3. User interface

Decision support system development

• Analyzing the needs o Focus on causes, not symptoms o What will be the reasonable expectation?

• Data Development o Data administration is a critical requirement for long-term success o DSS requires their own database to produce effective results o Is historical data available? Is the data telling the truth?

• Model-base

o Model contents should be consistent with its goals: strategic, tactical, or operational?

o What class of models do you want? Descriptive? Prescriptive?

• Performance – how to measure?

• What assumptions do you make? Are we assuming: o Perfect data o Dispatchers follow instruction exactly o Drivers follow instruction exactly o Shippers with perfectly predictable demands o Personnel from different department have the same goal

Page 20: VRP Dan TSP Analisis

20 VRP

Source: P.72, Mazza, Faircloug, Melton, de Pablo, Scheffer, Stevens, Software Engineering Standards, Prentice Hall Major phases in DSS development (and examples of activities) User Requirement Definition Capture, determine, specify and verify user requirements Software Requirement Definition Construct logical model Specify functional, performance, documentation, acceptance testing requirements, etc. Architectural Design Decompose software into components Define data input and output requirement, data structure, etc. Select programming languages Detailed Design and Production Detailed design of lower-level components Coding Integrating components Testing Transfer Installation Acceptance tests Operations and Maintenance Final acceptance

Page 21: VRP Dan TSP Analisis

21 VRP

Data Preparation for DSS: Static Dynamic

Customer independent

Raw location data: Road, speed limit, tolls, major intersections, landmarks, etc. Processed data: Distances, costs, times, … etc. between points of interests (via shortest path methods on raw location data)

Travel flow pattern Road restriction

Customer dependent

Locations Trucks’ Details (e.g. capacity, loading and unloading time, running cost) Drivers’ Details (e.g. salary, overtime) Products’ Details (e.g. size, weight, price)

Demand data: Orders’ Details (e.g. daily demand, amount) Items’ Details (e.g. product to be ordered, quantity)

Processing on preliminary static data: Use shortest path engine to compute the distance, cost, or time, etc. between customers or between depot and customers.

Page 22: VRP Dan TSP Analisis

22 VRP

VRP Engine for the DSS A combination of Saving Heuristics, Generalized assignment (Fisher-Jaikumar method), tour improvement (2-Opt, Or-Opt), and different insertion methods. Resulting handling and tools for analysis

• Visualizing results o Gantt charts o Static route display o Animation

• Allow users to make changes • Measure performance • Compare scenarios • What-if analysis

Typical decision support

• What are some good suggested solutions? • What is the impact of changing the sequence of orders being served? • What orders should be outsourced? • Can an urgent pickup order be accepted? By what vehicle? At what time? • What are the costs if different numbers of vehicles are used?