  • 8/14/2019 Water Banking-Greg Thomas

    1/38

    System-Wide Investigation of

    Central Valley Conjunctive Water

    Management Opportunities

  • 8/14/2019 Water Banking-Greg Thomas

    2/38

    2

    In Intensively Developed

    Water Systems

    Old Paradigm:

    Water for flow restoration vs. water forhuman uses = ZERO SUM GAME

    New Paradigm:

    No new water development without astrong environmental restoration component

    Environmental flow restorationembedded within water augmentation

  • 8/14/2019 Water Banking-Greg Thomas

    3/38

    3

    Mandates

    CVPIAdevelop and implement a least-cost program to supplement andreplace the CVP water dedicated to fish and wildlife restoration throughimprovements in reservoir operations, water banking, andconjunctive use. [3406(b)(3) and 3408(j)]

    CALFED Bay-Deltaimprove water supply reliability for all sectors

    Environmental Water Account

    Other Critical Unmet Needs Restore anadromous fishery of the San Joaquin River CVP contract deliveries AFRP program Dilution water to improve water quality

  • 8/14/2019 Water Banking-Greg Thomas

    4/38

  • 8/14/2019 Water Banking-Greg Thomas

    5/38

    5

    Components Reservoir operators would agree to re-operate the

    reservoir to generate source water* for banking for afee

    Local interests controlling a groundwater basin wouldagree to temporarily rent unused aquifer storagespace for a fee or share of the water

    Potential beneficiaries of the groundwater bankingprogram would purchase a specified amount of the

    banked groundwater

    * Water will be regarded as new water if it would otherwise have beenreleased for flood control purposes and flowed out to sea

  • 8/14/2019 Water Banking-Greg Thomas

    6/38

    6

    The Delta

    Shasta

    Oroville

    New Bullards Bar

    Folsom

    Camanche

    New Hogan

    New Melones

    6

  • 8/14/2019 Water Banking-Greg Thomas

    7/38

    7

    The Delta

    Camanche

    New Hogan

    New Melones

    New Don Pedro

    New Exchequer

    Millerton lake

    7

  • 8/14/2019 Water Banking-Greg Thomas

    8/38

    8

    Reservoirs, Ownership, and Capacity

  • 8/14/2019 Water Banking-Greg Thomas

    9/38

    Modes of Groundwater Banking

    0

    500000

    1000000

    1500000

    2000000

    2500000

    10/1/93

    4/1/94

    10/1/94

    4/1/95

    10/1/95

    month/day/year

    surface

    storage

    (ac-ft)

    0

    20000

    40000

    60000

    80000

    100000

    120000

    140000

    aquiferstorage

    (ac-ft)

    Measured New Don PedroAdjusted New Don PedroGroundwater Bank

    Pre-DeliveryReservoir Recovery

    NHI Approach

    9

  • 8/14/2019 Water Banking-Greg Thomas

    10/38

    10

    Average Annual Yield Estimates for Eleven

    Regulated Tributaries of the Central Valley

  • 8/14/2019 Water Banking-Greg Thomas

    11/38

    11

    Factors Taken Into Account inCalculating Re-operation Yield

    Pre-existing rights &entitlements

    AFRP flows Temperature regulation

  • 8/14/2019 Water Banking-Greg Thomas

    12/38

    12

    Next StepsReiterate reservoir yield analysis using

    CALSIM II

    Shasta (ongoing)Other 10 reservoirs (prospective)

  • 8/14/2019 Water Banking-Greg Thomas

    13/38

    13

  • 8/14/2019 Water Banking-Greg Thomas

    14/38

    Potential Groundwater Banking Sites

    Sacramento Valley

    San Joaquin Valley

    14

  • 8/14/2019 Water Banking-Greg Thomas

    15/38

    15

    Hydrogeologic Suitability of Central

    Valley Sites for Groundwater Banking

  • 8/14/2019 Water Banking-Greg Thomas

    16/38

    Hydrogeologic

    SuitabilitySub-index

    Sacramento Valley

    San Joaquin Valley

    16

  • 8/14/2019 Water Banking-Greg Thomas

    17/38

    17

  • 8/14/2019 Water Banking-Greg Thomas

    18/38

    18

    Evaluation Criteria

    Relative contribution of surface water &groundwater

    Proximity of groundwater-irrigated landsto surface water distribution networks

    Available aquifer storage space

  • 8/14/2019 Water Banking-Greg Thomas

    19/38

    Promising

    Central ValleyDAUs

    19

  • 8/14/2019 Water Banking-Greg Thomas

    20/38

    20

    What is an Environmental Flow: moving from

    minimum flow to variable flow

    This is the same volume!

    Its not just a matter of water volume

  • 8/14/2019 Water Banking-Greg Thomas

    21/38

    21

  • 8/14/2019 Water Banking-Greg Thomas

    22/38

    22

    Making Rivers Function Like Rivers Again:

    Impact of River Development on Floodplains

  • 8/14/2019 Water Banking-Greg Thomas

    23/38

    23

    Problem: Flow characteristics should be linked

    to biological benefits

    Solution: Progressively develop applied

    biohydrology

    Link to CALFED Science ProgramConduct adaptive management of flow

    experiments

    Fluvial Restoration Concept

  • 8/14/2019 Water Banking-Greg Thomas

    24/38

    24

    Fluvial Restoration Concept

    Problem: Shaving hydrologic peaks reduces natural

    variability

    Solution: Convert from uncontrolled to controlledfloods

  • 8/14/2019 Water Banking-Greg Thomas

    25/38

    25

    Problem: Capturing pulse flows is an engineering

    challenge

    Solution: Coordinate & rotate reservoir operation

    for fluvial benefit

    Fluvial Restoration Concept

  • 8/14/2019 Water Banking-Greg Thomas

    26/38

    26

    Floodplain / fluvial process investigation

    Determine the available water for environmental flows Define environmental flow requirements (magnitude,

    frequency, duration) Identify the floodplain constraints that limit the

    magnitude parameter

    Assess the sediment needs and availability forgeomorphic restoration

    Next Steps

  • 8/14/2019 Water Banking-Greg Thomas

    27/38

    27

    Regionalized and System-Wide Configurations

    What we know How much water we have to play with Locations of 2 storage sites Ranking of tributaries by restoration potential

    What we need to learn Feasibility of linking particular reservoirs to particular

    2 storage sites through particular natural channels and

    artificial conveyance and reintegrating the supply into theexisting CV delivery system

    How to figure this out System-wide gaming and whole-system modeling with

    CALSIM II

    Next Steps

  • 8/14/2019 Water Banking-Greg Thomas

    28/38

    28

  • 8/14/2019 Water Banking-Greg Thomas

    29/38

    The Local Control Imperative

    29

  • 8/14/2019 Water Banking-Greg Thomas

    30/38

    30

    Risk Factors Analyzed

    Hydrogeologic Leaky aquifers Adverse effects on other groundwater pumpers Reduced natural infiltration Groundwater invasion of crop root zones / wetlands

    regulations

    Water Quality Degrading aquifer water Leaching soil contaminants

    Financial Delta pumping restrictions to delivery of banked water

  • 8/14/2019 Water Banking-Greg Thomas

    31/38

    31

    Risk Factors Analyzed Legal

    Injury to other groundwater users

    Limiting the rights of current / future groundwater users Legal action against other groundwater users

    Political Adverse community reactions

  • 8/14/2019 Water Banking-Greg Thomas

    32/38

  • 8/14/2019 Water Banking-Greg Thomas

    33/38

    33

    Factors for Success

    Overall Project Design Banked water imported Facilities sited in existing water district service area or

    AB-3030 planning area Operations performed by overlying water district /

    groundwater management authority

    Local benefits obligated in enforceable contracts For unincorporated areas, create local water management

    authority

    Issues, alternatives, mitigations routinely analyzed inNEPA / CEQA with public participation

  • 8/14/2019 Water Banking-Greg Thomas

    34/38

    34

    Constraints & Design Specificationsfor System-Wide Maximal ScaleConjunctive Use

    Groundwater banking projects will operate on thebasis of voluntary, compensated contractualarrangements among reservoir owners, localgroundwater management authorities, conveyanceoperators and end use beneficiaries.

    No changes in existing laws will be assumed,although the final report may identify legal reforms ormeasures to clarify existing laws that would facilitatethe program.

  • 8/14/2019 Water Banking-Greg Thomas

    35/38

    35

    Constraints & Design Specificationsfor System-Wide Maximal Scale

    Conjunctive Use

    Projects will cause no uncompensated adverseimpacts on other groundwater or surface water rightsholders.

    Projects will provide net environmental benefits.

  • 8/14/2019 Water Banking-Greg Thomas

    36/38

    36

    Constraints & Design Specifications

    for System-Wide Maximal Scale

    Conjunctive Use

    Projects will be operated in an economically optimalfashion (i.e., the volumes of water and scale ofoperations will be limited by the marginal cost ofsubstitute supplies).

    No new public subsidies will be assumed. That is tosay, the project will be designed to be self-financing.

  • 8/14/2019 Water Banking-Greg Thomas

    37/38

    www.conjunctiveuse.org37

  • 8/14/2019 Water Banking-Greg Thomas

    38/38

    38

    Prospective Workplan Reassess new water yield potential of 11 reservoirs Analyze and rank tributary restoration potential

    Define environmental flow prescriptions (with CALFEDScience Program)

    Identify floodplain constraints Assess sediment needs and availability

    Implement system-wide modeling Identify optimal regional configurations

    Analyze groundwater banking land use compatibility Formulate and implement pilot demonstration projects Conduct economic optimization analysis Prepare final report Conduct executive briefings