INTRODUCTION
We are pleased to introduce ourselves as a contracting company that
was established based on the high experience background of its
partners.
Our success has been soundly built on the reputation for
maintaining the quality and the reliability to meet the desired plans,
and you can rely on the management skills and standards to achieve
perfection.
Our new vision for contributing in the prestigious projects rising in
UAE in general and in Dubai hajrahS,namjA, and Um Quwain
emirates in particular lead us to establish a new form of partnership
with a highly experienced management with a relevant experience of
nearly twenty years in the middle east in the building and road
construction.
1 | P a g e
Quality Control
We at WLC Contracting Company, are committed to serve the
society by providing best quality constructions for ,sgnidliuB͞ Villas,
Houses, Shopping Centers, Industrial Buildings, Hospitals, Schools, Base
Camps, Road Constructions & infrastructures projects etc͟ at a
competitive price, bearing in mind stated & implied needs of the
CUSTOMER.
Our goal is to exceed customer expectations through costumer focus
and continual improvement by effective implementation of Quality
Management System and Control on all internal processes.
We believe in strict adherence of quality assurance to our valued clients
and ensure the same with quality control on each and every activity
of the company.
Our policy is not of financial consideration but to provide high quality
of workmanship.
2 | P a g e
Safety Policy:
The safety is of equal importance to other business objectives.
✓To create safe work place
✓To establish safe working practices
✓To ensure effective safety communications
✓To create interest and enthusiasm in safety
✓To develop personal responsibility for safety
✓To prevent all injuries that safety is a line management
responsibility
3 | P a g e
Organization Chart
General Manager
Adminstration
Secretary Accountant
BuildingConsturction
Manager
ProjectManager
QualityController
ProjectEngineer
SiteEngineer
Forrman
Workers
MEPCoordinator
InteriorDesigner
Estimation andContractManager
DraftsmanPlanningEngineer
QuantitySurveyor
RoadConstruction
Manager
ProjectManager
ProjectEngineer
SiteEngineer
Forman
Workers
MechanicalEngineer
Technician
QualityControllor Surveyor
PlantManager
MechanicalSupervisor
Operator
Iraq Branch Manager
4 | P a g e
Building Construction
5 | P a g e
Executed Projects: Dubai - UAE
1- Dubai Dolphinarium at Dubai Creek Park
Client
Consultant
Amount in AED
Royal Segrex
Architectural Design Unit
10.5millions
2 -Dubai Metro Station at Al Barsha
Client
Consultant
Contractor
Amount in AED
Roads & Transport Authority Dubai
Rapid Link Consortium/ JT
Yongnam Engineering & Construction
3 millions
3-Dubai Metro Station at IBN BATTUTA
Client
Consultant
Contractor
Amount in AED
Roads & Transport Authority Dubai
Rapid Link Consortium/ JT
Yongnam Engineering & Construction
3 millions
4- The Palm Jumeirah – Cantilever & Gantry
Client
Consultant Main
Contractor
Amount in AED
Nakheel –PB (Parsons Brinckerhoff)
ACE
Wide Horizon
3.5millions
6 | P a g e
5- The Palm Jumeirah Roads & Services (Infrastructure)
Client
Consultant
Main Contractor
Amount in AED
Nakheel
ACE
Wide Horizon
50million
SCOPE OF WORKS1. Sewerage Pipe2. Storm water pipe line
3. Storm water outfall
4. Drainage pipe line
5. Sweet water pipe line
6. Street lighting
7. Subgrade works
8. Asphalt works
9. Interlock & kerbstone works
6- Office Extension for Documentation Section - Sharjah
Client
Amount in AED
Sharjah Seaport & Customs Department
524,000.00
7- Supply and install interlock with Kerbstone - Sharjah
Client
Amount in AED
Sharjah Seaport and Customs Department
4.4 millions
7 | P a g e
8- The Palm Jumeirah Storm Water Outfalls
Client
Consultant
Main Contractor
Amount in AED
Nakheel
ACE
Spring Oasis Contracting
5.5million
9- Boundary wall for the service tunnel shaft @ Frond D & M Tip (Palm Jumeirah)
Client
Consultant
Main Contractor
Amount in AED
Nakheel
ACE Consultant
Spring Oasis Contracting
1.75 Million
10 -Impact wall (Palm Jumeirah)
Client
Consultant
Main Contractor
Amount in AED
Nakheel
ACE Consultant
Spring Oasis Contracting
967,500.00
11- Cooling Station (UNO) @ Discovery Garden
Client
Consultant
Main Contractor
Amount in AED
Nakheel
ACE
Shinryo Corporation Middle East
5.6millions
8 | P a g e
12- Sharjah Port Sheds
Client
Amount in AED
Sharjah Seaport and Customs Department
10.9 millions
13- Mohd Zaid Tariq Raslan Abdulla Abuyounus Villa (Plot 366-439, Umm Suqeim, Dubai)
Client
Consultant
Amount in AED
Mohd Zaid Tariq Raslan Abdulla Abuyounus
Dr. Samir Abdulla Consulting Engineering
11,280,000.00
14- Mohd Zaid Tariq Raslan Abdulla Abuyounus Villa (Plot 366-406, Umm Suqeim, Dubai)
Client
Consultant
Amount in AED
Mohd Zaid Tariq Raslan Abdulla Abuyounus
Dr. Samir Abdulla Consulting Engineering
10,920,000.00
15- Mohd Zaid Tariq Raslan Abdulla Abuyounus Villa (Plot 214-257, Al Garhoud, Dubai)
Client
Consultant
Amount in AED
Mohd Zaid Tariq Raslan Abdulla Abuyounus
Dr. Samir Abdulla Consulting Engineering
6,100,000.00
9 | P a g e
16 Plot SU2 – Sewerage Treatment Plant – Palm Jumeirah
- (G+1) Building
- Boundary Wall
ClientPB (Parsons Brinckerhoff Middle East Ltd.)
Nakheel
ACE
17.5million
Consultant
Amount in AED
17- Inner Paving to the crescent Palm Jumeirah
Client PB (Parsons Brinckerhoff Middle East
Ltd.) Nakheel
ACE
4.0million
Consultant
Amount in AED
18- Maintenance & re-building work for Shaeik Rashid Mosque Umm Al Qwain
Client
Amount in AED
Islamic Affairs & Charitable Activities Department
555,638.00
19- Sir Bani Yas Island Priority Projects – Al Sahel
Client
Main Contractor
Tourism Development & Investment Company (TDIC)
Parkway International Contracting LLC
10 | P a g e
20-Rashid Hospital (Design and Buil)
Client
Amount in AED
Location
Built up Area
Construction Complete
Ministry of Health
119 Millions
Musafa, Abu Dhabi
32,000 sqm
2008
21- Salem Obaid Salem Villa, Al Warqa’a 4th Dubai
Client
Consultant
Amount in AED
Salem, Onaid Salem Busamra
Spectrum Engineering Consultants
2 millions
22- Ismail Mohammad Ghanem Fattalah Villa Al Warqa’a Third, Dubai
Client
Consultant
Amount in AED
Ismail Mohammad Ghanem Fathalla
AMCON Architectural Engineering Consultant
500,000.00
23- Deerfields Town Square (Substructure Works)
Deerfields Town Square Plot No. C 1,
Al Bahya Old Abu Dhabi
11 | P a g e
24- Ahmed Saif Abdulrahman Alnasseri Villa Abu Hail, Dubai
Client
Consultant
Amount in AED
Ahmed Saif Abdulrahman Alnasseri
SAFEER Engineering Consultant
1,220,000.00
25- Extension of Villa G+1 Umm Suqeim Third, Dubai
Client
Consultant
Amount in AED
H.H. Dr. Sheikh Sultan Bin Khalifa Al Nahyan
Architectural Design Unit
490,765.00
26- Jumeirah Park -118 Villas – Package 5/5A2 Jumeirah Park, Dubai
Client
Main Contractor
NAKHEEL
Parkway International Contracting LLC
27- Seih Al Bana Camp- Ras Al Khaima
G+ 5-3 Buildings G+ 4-2 Buildings
G+ 3-2 Buildings
UAE Armed Forces H.Q. Military works
Al Falah Constructions LLC
Client
Main Contractor
12 | P a g e
13 | P a g e
28- G+M Factory Warehouse cum Office
Client Al Laith Scaffoldings
Consultant Agate Consultancy
Main Contractor World Legend Cont L.L.C
Amount AED 22.5 Million
Location Saih Shuaib 3, D.I.C, Dubai
Scope of Work Mobilization to Commissioning
1. G+1 Office Building (Concrete Structure)
2. G – Staff Dining (Concrete Structure)
3. G – Model Workshop (Concrete Structure)
4. Warehouse (Steel Structure)
5. Workshop (Steel Structure)
6. Electrical Workshop (Steel Structure)
7. Washing Bay (Steel Structure)
8. Diesel tank (Steel Structure)
9. Sub station, Fire Fighting Pump room, Security room (concrete)
10. Infrastructure works 50,000 m² (Include water supply
drainage, rain water, telecommunication, Street Light, cables and Fire fighting)
11. Boundary Wall – 1000 L.M.
12. Total Built up area 23,500 ft²
14 | P a g e
29- Construction & Completion of Villa Complex
Client Mr. Ali Hassan Habib Sajwani
Scope of Work Mobilization to Superstructure
Location Al Fayah, Sharja, U.A.E
Main Contractor Al Rifa’a Bldg Cont Co L.L.C
Amount AED 918,000.00
30. Maintenance Works at Atlantic Building
Client M/s Gulf Shores INC
Location (G+6) and (G+17), Plot no. 392-485
Dubai Marina, Dubai, UAE
Amount Aed 1,200,000.00
31. Mohammed Bin Rashid Al Maktoum City-District 1
Concrete & Structural Frame Works for 5 Villas
Main Contractor M/s Meydan Sobha LLC FZ
Amount Aed 1,362,512.72
18 | P a g e
32. Construction & Completion of Twin Villa (G+1+BW)
Client Mr. Ismail El Marzoki
Scope of Work Finishing Works & MEP Works
Location Plot No. 580 MULK/601GOV
Sharjah, U.A.E
Consultant Al Rawaq Engineering Consultancy
Amount AED 925,000.00
33. Construction & Completion of Twin Villa (G+1+BW)
Client Mr. Faisal Abd Allah
Scope of Work Finishing Works & MEP Works
Location Plot No. 2796 MULK, Sharjah, U.A.E
Consultant Al Rawaq Engineering Consultancy
Amount AED 925,000.00
34. Construction & Completion of Twin Villa (G+1+BW)
Client Mr. Manea Abdullah Al Marzoqi
Scope of Work Finishing Works & MEP Works
Location Plot No. 1762 MULK/3092 GOV
Sharjah, U.A.E
Consultant Al Rawaq Engineering Consultancy
Amount AED 925,000.00
35. Sanctuary Falls Villa Complex (Custom Villa Type 1)
Main Contractor China State Construction Engineering
Corporation (Middle East) LLC
Scope of Work Structural, Architectural, Interior Fit-Out
and Joinery Works
Location Jumeirah Golf Estate (Plot 1)
Amount AED 2,660,390.00
36. Sanctuary Falls Villa Complex (Custom Villa Type 8)
Main Contractor China State Construction Engineering
Corporation (Middle East) LLC
Scope of Work Structural, Architectural, Interior Fit-Out
and Joinery Works
Location Jumeirah Golf Estate (Plots 35 & 55)
Amount AED 5,926,409.20
37. 2B + G +3P + 18 Floors, Waves Tower
Main Contractor Sumer Contracting Co. LLC
Location Plot No. BB.Bo3.007, Business Bay, Dubai
Amount AED 60,000,000.00
Client Mr. Moufaq M.M. Al Kaissi and Mr.
Ahmad Salman Abdul Rahman
Consultant : Arab Experts Engineering Consultants
20 | P a g e
UNDER OUR SUPERVISION
1- Sport Hall for Islamic Forum in Sharjah
Client
Consultant
Main Contractor
Amount in AED
Sharjah Government CAB
Consultant
Ali Mosa & Sons Contracting
9 millions
2- Integrated & Learning Center for Higher College Of Technology in Sharjah
Client
Consultant
Main Contractor
Amount in AED
Sharjah Government
Horizon Consultant Engineering
Ali Mosa & Sons Contracting
8millions
15 | P a g e
3- Girls Dormitories for AUS (C,D,E,F)
Client Sharjah Government
Consultant Horizon Consultant Engineering
Main Contractor Ali Mosa & Sons Contracting
Amount in AED 48 millions
4- LLC & BITW for Higher College of Technology in Sharjah
Client
Consultant
Main Contractor
Amount in AED
Sharjah Government
Horizon Consultant Engineering
Ali Mosa & Sons Contracting
16millions
5- 416 Villas in Jumeirah Island Project
Client
Consultant
Main Contractor
Amount in AED
Nakheel
Diar Consults
Ali Mosa & Sons Contracting
170 millions
6- Petroleum Department Building in Sharjah
Client
Consultant
Amount in AED
Sharjah Government
Academic Architectural Office
12 millions
7- Sport Hall for Child Center in Halwan/Sharjah
Client
Consultant
Main Contractor
Amount in AED
Sharjah Government
Horizon Consultant Engineering
Ali Mosa & Sons Contracting
6millions
16 | P a g e
8- New Academic Building for AUS
Client
Consultant
Main Contractor
Amount in AED
Sharjah Government
Horizon Consultant Engineering
Ali Mosa & Sons Contracting
13millions
9- Discovery Gardens Project (27 N0s. G+5 Buildings)
Client
Consultant
Main Contractor
Amount in AED
Nakheel
Diar Consults
Ali Mosa & Sons Contracting
230 millions
17 | P a g e
Company Assets
Category
Manpower:
Quantity
Machineries:
Materials:
External Scaffolding 2000 m²
21 | P a g e
Carpenter 100
Steel Fixer 80
Mason 50
Helper 100
Pick-up 1.5 Tons 1
Pick-up 3.0 Tons 2
81Seats Bus 1
34Seats Bus 1
15Seats Bus 1
Light Vehicles 3
Steel Bending Machines 3
Steel Cutter Machines 3
Core Drill Machines 2
Wood Stand Cutters 3
Concrete & Asphalt Cutters 2
Air Compressor 1
Generator 40&50 KVA 4
Jack Hammer 3
Water pump 2
Caravans 4
Company Assests:
Sub-contractors:
22| P a g e
M/s Alsour Al Waqi Building M/s Modern Art
Contracting
M/s Al Khubara Concrete Carpenter Contracting
M/s Experts Transport
M/s Al Derbash Gen. Maintenance Cont. M/s
Ali Al Khalidi Contracting
M/s Al Jawahar Building Contracting M/s Al
Mawakib Central A/C
Du
bai
Met
roSt
atio
n
Sale
mO
bai
dSa
lem
Bu
sam
raV
illa
23| P a g e
Mo
hd
Zaid
Tari
qR
asla
n
Ab
du
llaA
bu
you
nu
s
(AlG
arh
ou
d,D
ub
ai)
Ism
ailM
oh
amm
ad
Gh
ane
mFa
thal
laA
hli
24 | P a g e
Al
Waƌ
Ƌa’
a Th
iƌd
D
ub
ai
Ah
me
dSa
ifA
bd
ulr
ahm
an
Aln
asse
ri-A
bu
hai
l,D
ub
ai
H.H
Dr.
She
ikh
Sult
anB
in
Kh
alif
aA
lNah
yan
–U
mm
Suq
iem
thir
d,D
ub
ai
25 | P a g e
Mo
hd
Zaid
Tari
qR
asla
nA
bd
ulla
Ab
uyo
un
us
(Plo
t#3
66
-43
9,U
mm
Suq
eim
,Du
bai
)
Mo
hd
Zaid
Tari
qR
asla
nA
bd
ulla
Ab
uyo
un
us(
Plo
t#3
66
-40
6,U
mm
Suq
eim
,Du
bai
)
26 | P a g e
Al Laith ProjectPlot No. 5320161, Saih Shuaib ThirdDubai Industrial CityDubia, UAE
27 | P a g e
28 | P a g e
29 | P a g e
30| P a g e
31| P a g e
Do
lph
inar
ium
32| P a g e
Do
lph
inar
ium
33 | P a g e
Can
tile
ver
&G
antr
y–
Pal
mJu
me
irah
Ap
pro
ach
Slab
–P
alm
Jum
eir
ah
34 | P a g e
Du
bai
Met
roSt
atio
n(A
lBar
sha)
35| P a g e
Du
bai
Met
roSt
atio
n(A
lBar
sha)
Du
bai
Met
roSt
atio
n(I
BN
36 | P a g e
Bat
uta
)
Du
bai
Met
roSt
atio
n(I
BN
37 | P a g e
Bat
uta
)
L
38 | P a g e
Ba
L
39| P a g e
Ba
L
40| P a g e
Ba
Rashid Hospital (G + 5F) - Musafa, Abu Dhabi, U.A.E
Al Laith Project-Dubai Industrial City
Al Laith Project-Dubai Industrial City
Al Laith Project-Dubai Industrial City
Al Laith Project-Dubai Industrial City
Al Laith Project-Dubai Industrial City
Al Laith Project-Dubai Industrial City
Al Laith Project-Dubai Industrial City
41| P a g e
42| P a g e
43 | P a g e
44| P a g e
45| P a g e
46| P a g e
47| P a g e
48 | P a g e
49 | P a g e
50| P a g e