Autonomous Surface Vehicle
ME 435: Stanton Coffey, Pat Gray, Jack Nagle, Sam Riahi, Matt ClineME 434: Jeff Roper, Brian Skoog, Stephanie McCarthy, Bobby LeeME Grad: Justin SelfridgeECE: Alex, Bibek, Kouassi, Nimish, Shikha, Khakal, SushilECE Grad: LocECSU: George Harris, John Hayes
Previous Work
Electrical box has been rewired and de-cluttered
Boat Cart is finished
A new motor has been purchased
Current WorkBlade Shields
Blade shields are being ordered from Norva Plastics Original cost $500 Our cost $250 and they will be putting their logo on
it
Current WorkWaterproofing/Camera Mounting
There will be a plastic lid to go over the current electrical box and will extend down past any exposed holes
All wires will be re-routed up under this lid and nothing will be coming out the side of the electrical box
Camera’s will be mounted inside this waterproof shield
Current WorkLogic
Code has been modified so that it no longer knows the order to proceed through the buoys
Next steps The code uses a viewing angle of 180º, and we
found out that with two camera’s we will have 80º total. So code must be modified to work with a smaller viewing angle
Incorporate Yellow buoys as obstacles.
Current WorkFrame/Pontoons
New potential Aluminum perforated hollow square tube framing Can drop 13.9 lbs if necessary
ECSU are building our pontoons We expect they will be done in 3 weeks The new pontoons are hollow and have a drain plug The new pontoons are 5 feet long (1 foot longer than
our current pontoons)
Questions?