12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this section as an aid to interpretation of these Electric Service Requirements. The illustrations cover the majority of new services or changed services, and they show additional details that are necessary for clarification. In all cases the rules of the previous Sections of these Electric Service Requirements take precedence, and the Company should be consulted on questions of details not covered specifically in these illustrations. Illustrations

Upload: others

Post on 18-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

12. ILLUSTRATIONS

12.1 GENERAL Illustrations of typical service equipment and installations are shown in this section as an aid to interpretation of these Electric Service Requirements. The illustrations cover the majority of new services or changed services, and they show additional details that are necessary for clarification. In all cases the rules of the previous Sections of these Electric Service Requirements take precedence, and the Company should be consulted on questions of details not covered specifically in these illustrations.

Illustrationsrev-9 May 2018

1 of 52

Page 2: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

SE

RV

ICE

EN

TR

AN

CE

CO

ND

UC

TO

RS

SE

RV

ICE

EN

TR

AN

CE

CO

ND

UC

TO

RS

EXPLANATION OF TERMS USED IN TYPICAL

SERVICES TO SINGLE RESIDENTIAL PROPERTIES

UNDERGROUND OVERHEAD LINE STREET MAIN

COMPANY POLE

ATTACHMENT TO

BUILDING MAST,

POLE, ETC. OR

CONNECTION

OF SERVICE

ENTRANCE

CONDUCTORS

TO REAR BUS.

SERVICE

LATERAL

PROPERTY

LINE

SERVICE

DROP

POINT OF

DELIVERY

OUTDOOR

METER

LATERAL TERMINATES

AND SERVICE ENTRANCE

CONDUCTORS BEGIN AT

POINT OF DELIVERY 18”

INSIDE PROPERTY LINE

WHETHER CONDUCTORS

ARE SPLICED AT THIS

POINT OR CONTINUOUS

INTO BUILDING.

ON SERVICES INSTALLED

AFTER AUG. 1970 THE LAT-

ERAL TERMINATES AT AN

END BOX IF THE METER

IS INDOORS.

BUILDING

WALL

INDOOR

METER

SERVICE

EQUIPMENT

POINT OF DELIVERY

WHEN BUILDING IS

AT PROPERTY LINE.

END BOX

BASIC OVERHEAD SYSTEM BASIC UNDERGROUND SYSTEM

Figure 12.01

Illustrationsrev-9 May 2018

2 of 52

Page 3: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Please refer to NEC 2017 - 230.9 - Clearences on Buildings 230.24 - Clearences230.26 - Point of Attachment 230.27 - Means of Attachment

Illustrationsrev-9 May 2018

3 of 52

Page 4: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Please refer to NEC 2017 -230.28 - Service Masts as Supports (A + B)

Figure 12.03

Illustrationsrev-9 May 2018

4 of 52

Page 5: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.04

Illustrationsrev-9 May 2018

5 of 52

Page 6: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Illustrationsrev-9 May 2018

6 of 52

Page 7: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Illustrationsrev-9 May 2018

7 of 52

Page 8: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Illustrationsrev-9 May 2018

8 of 52

Page 9: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.08

Illustrationsrev-9 May 2018

9 of 52

Page 10: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.09

Illustrationsrev-9 May 2018

10 of 52

Page 11: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.10 Deleted THIS PAGE LEFT BLANK INTENTIONALLY

Figure 12.10

Illustrationsrev-9 May 2018

11 of 52

Page 12: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Illustrationsrev-9 May 2018

12 of 52

Page 13: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Illustrationsrev-9 May 2018

13 of 52

Page 14: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

USE3/8 B

2 PER TR

NEUTRAL #4BARESO

AROUND T

TO GROUN

ADE

TYPES OF

WAD BREAK ELBOWS

15KV 2STR

REQUIRED 1 PHASE TRANSFORMER

CONNECTIONS 4KV, 13 KV & 34 KV

LEAVE CONCENlRIC NEUTRAL WIRES LONG ENOUGH

TO PERMIT SWITCHING. CONNECTED TO THE# 2 COPPER

USING VISE TYPE OR SPLIT BOLT COPPER CONNECTORS.

0

FRON?OF t!WISPORMER

FIBERGLASS BASE

15 KV 1/0 STR

35 KV PURPLE CUFF 1/0 STR

#2 BARE

SOLID COPPER

BE1WEEN CASE GROUNDS &

4" ABOVE FINISHED GR

INSTALL TRANSFORMER HOLD DOWN

CUPS (SUP PU ED WITH TRANSFORMER)

OLTS&WASHERS

ANSFORMER

FT DRAWN COPPER

RANSFORMER AND CONNECT

D ROD AND UP TO# 2 COPPER

APPROVED

15KV or 35KV

CONCENlRIC

NEUTRAL

JACKETED CABLE

LEAVE SLACK

FOR SWITCHING

COPPER CONNECTOR

COMPRESSION OR VISE TYPE Figure 12.13

III l \

GROUND ROD

518" X 10' cu

SEE THE ILLUSTRATION

SECTION, FIGURE 12.26

FOR PRIMARY CABLE

TERMINATION. (E.S.R MANUAL)

Illustrationsrev-9 May 2018

14 of 52

Page 15: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

~

~ GROUNDING BUSHING

TERMINATE

OUTER JACKET 4" ABOVE COVER #4BARE

I lf28ARE

SOLID COPPER

SOUDCOPPER

REQUIRED CONCRETE

MANHOLE COVER

7'x7' 4KV & 13KV

8"x8' 34KV REQUIRED CONCRETE

MANHOLE COVER

REQUIREDCONCRETE OPPER GROUND MANHOLE

ANHOLE

RIGID METAWC METERING CONDUIT ITH GROUNDING SUSHINO, ONLY IF METERING SEE THE ILLUSTRATION

SECTION, FIGURE 12 26

FOR PRIMARY CABLE

TERMINATION

PRI

APPROVED BREAK ELB

E

LEAVE CONCENlRIC NEUTRAL WIRES LONG ENOUGH

TO PERMIT SWITCHING. CONNECTED TO THE# 2 COPPER

USING VISE TYPE OR SPLIT BOLT COPPER CONNECTORS.

REQUIRED 3 PHASE TRANSFORl\tlER

CONNECTIONS 4KV, 13 KV & 34 KV

MARY SIDE

LOAD . . OWS [email protected]

SECONDARY SIDE A C

N B

TYPES OF

LOAD BREAK ELBOWS

15 KV 2 STR

15 KV 1/0 STR

35 KV PURPLE CUFF 110 ST

APPROVED

15KV or 35KV

CONCENTRIC

NEUTRAL

JACKETED CABL

LEAVE SLACK FORSWJTQHJNQ

114 BARE SOLID C

OUTSIDE OF

IF METERING EQUIPMENT WILL SE INSTALLED IN THE SECONDARY . SIDE OF THE TRANSFORMER SEE THE METERING SECTION. .

Illustrationsrev-9 May 2018

15 of 52

Page 16: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.15

Illustrationsrev-9 May 2018

16 of 52

Page 17: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.15 (Contd.)

Illustrationsrev-9 May 2018

17 of 52

Page 18: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.16

Illustrationsrev-9 May 2018

18 of 52

Page 19: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.16 (Contd.)

Illustrationsrev-9 May 2018

19 of 52

Page 20: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.17

Illustrationsrev-9 May 2018

20 of 52

Page 21: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.17 (Contd.)

Illustrationsrev-9 May 2018

21 of 52

Page 22: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.18

Illustrationsrev-9 May 2018

22 of 52

Page 23: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.18 (Contd.)

Illustrationsrev-9 May 2018

23 of 52

Page 24: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.19

Illustrationsrev-9 May 2018

24 of 52

Page 25: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.19 (Contd.)

Illustrationsrev-9 May 2018

25 of 52

Page 26: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.20

Illustrationsrev-9 May 2018

26 of 52

Page 27: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.20 (Contd.)

Illustrationsrev-9 May 2018

27 of 52

Page 28: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.21

Illustrationsrev-9 May 2018

28 of 52

Page 29: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.21 (Contd.)

Illustrationsrev-9 May 2018

29 of 52

Page 30: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.22

Illustrationsrev-9 May 2018

30 of 52

Page 31: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.23

Illustrationsrev-9 May 2018

31 of 52

Page 32: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.23 (Contd.)

Illustrationsrev-9 May 2018

32 of 52

Page 33: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.24

Illustrationsrev-9 May 2018

33 of 52

Page 34: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.24 (Contd.)

Illustrationsrev-9 May 2018

34 of 52

Page 35: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.25A

Illustrationsrev-9 May 2018

35 of 52

Page 36: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.25A (Contd.)

Illustrationsrev-9 May 2018

36 of 52

Page 37: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

S-1644-EPAGE 1 OF 2

S-1644-EPAGE 1 OF 2

REV.NO. EC# DATE DESCRIPTION

171926 7

An Exelon Company

600A. HORIZ. MOUNT INTEGRAL STYLE[STEEL BASE]

GANG OPERATED LOAD BREAK SW.[S&C] 34KV

REVISED DETAIL ON PG # 1

14 2’-

0"

10’-

0" P

IPE

20

14

15

15

20

NOTE: SEE GROUNDING DETAIL

SHEET 2

TO NEUTRAL AND

GROUND PER S-1131 14

NOTE(d)

NOTE(d)

8’-

0"

20

LINE

WIRE

6

44

’ M

AT

’L S

UP

PL

IED

WIT

H S

WIT

CH

TAKE NOTE

14

11 11

9 5

9

3

10

08/19/13

Illus

tratio

nsre

v-9

May

201

837

of 5

2

Page 38: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

S-1644-EPAGE 2 OF 2

S-1644-EPAGE 2 OF 2

14 14

20

15

20

BILL OF MATERIAL

NOTES

REFERENCES

SPARE MATERIAL

6

6

6

12

*

*

*

6

6

GROUNDING DETAIL

POLE DOWN LEAD

TO GROUND

(CENTER PHASE ONLY)

21

20

18 17

15

22 23

TO PHASE COND.

TO PHASE COND.

(d) OPERATING ROD INSULATORS SUPPLIED WITH SWITCH

137-37035 18-3/4" 3

CLAMP

S-0252

S-0251

S-0130

19

14 138-00906 ARRESTER, LIGHTNING

15 132-05955 BRACKET, OFFSET, 18"

16

17 132-00114 STUD CONNECTOR

18 132-76017 1/2 " ROUND WASHER

19 135-76855 #4 SOL COPPER SD BARE

20 135-79839 #4 SOL COPPER SD COV’D

21 PER S-0251 VICE TYPE TAP CONNECTOR

22 132-05429 5/8 " X 2" MACHINE BOLT

23 132-76012 5/8 " LOCKWASHER

137-37038 OPERATING ROD INSULATOR ASSEMBLY

138-35110 HANDLE ASSY.

138-15819 UNIVERSAL COUPLING

2

Illus

tratio

nsre

v-9

May

201

8

38 of 52

Page 39: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

LO

AD

BR

EA

K E

LB

OW

S 3

5 &

15

KV

SE

MI-

CO

ND

UC

TIN

G

INS

UL

AT

ION

CONDUCTOR

INSTALLATION OF ELBOW

UNWRAP SUFFICIENT AMOUNT OF CONCENTRIC

NEUTRAL WIRES SO THE OPERATION OF THE

ELBOW WILL NOT BE RESTRICTED.

TAPE CONCENTRIC WIRES TO CABLE.

INSTALL ELBOW PER. MANUFACTURES

SPECIFICATIONS.

INSTALL (1) STRAND OF CONCENTRIC NEUTRAL

WIRE THROUGH MOLDED HOLE IN ELBOW.

CONTINUE WRAPPING UP AROUND ELBOW AND

BACK THROUGH OTHER MOLDED HOLE. WRAP

AROUND OTHER WIRES TO TERMINATE.

FIBERGLASS

BASE

TERMINATE

OUTER JACKET

TERMINATE OUTER JACKET

1” PLASTIC TAPE

OVER 8 LAYERS OF

1” HIGH VOLTAGE

. BONDING

CEMENT

2 LAYERS 1/2 LAP

1” PLASTIC TAPE

2 LAYERS 1/2 LAP

1” HIGH VOLTAGE

1/4”

1”

2”

1/4”

TO BE CONNECTED TO THE

THE TRANSFORMER.

TERMINATION OF OUTER JACKET

REMOVE OUTER JACKET, ROUGHEN 2” OF JACKET

WITH AL. OXIDE CLOTH AND APPLY 2” WIDE STRIP

OF WATER SEALING COMPOUND TO BE USED AS A

SEAL FOR THE DRAIN WIRES. BEND DRAIN WIRES

BACK ALONG THE CABLE AND EMBED EACH WIRE

INTO THE WATER SEALING COMPOUND. (MAKE

SURE WIRES DO NOT TOUCH EACH OTHER). COAT

WITH BONDING CEMENT AND INSTALL HIGH

TRANSFORMER PAD

TERMINATE

OUTER JACKET

INSULATING, WATER-

PROOFING COMPOUND AND TREAT AS UNJACKETED CONCENTRIC CABLE.

Figure 12.26

TRANSFORMER VAULT

NOT DRAWN TO SCALE

Illustrations rev-9 May 2018

39 of 52

Page 40: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Illustrationsrev-9 May 2018

40 of 52

Page 41: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

[See Figure 12.33 for Notes and Bill of Material]

Illustrations rev-9 May 2018

41 of 52

Page 42: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

[See Figure 12.33 for Notes and Bill of Material]

Illustrationsrev-9 May 2018

42 of 52

Page 43: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

[See Figure 12.33 for Notes and Bill of Material]

Illustrationsrev-9 May 2018

43 of 52

Page 44: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

[See Figure 12.33 for Notes and Bill of Material]

Illustrationsrev-9 May 2018

44 of 52

Page 45: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

[See Figure 12.33 for Notes and Bill of Material]

Illustrationsrev-9 May 2018

45 of 52

Page 46: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Illustrationsrev-9 May 2018

46 of 52

Page 47: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Illustrationsrev-9 May 2018

47 of 52

Page 48: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

SINGLE PHASE FIBERGLASS

TRANSFORMER PAD 43” x 37.5”

4” ABOVE FINISHED GRADE

28” 30” PRIMARY

24” SECONDARY

12”MIN

18”MAX 30” PRIMARY

24” SECONDARY

CABLES OR DUCTS NOT TO ENTER PAD FROM THE BOTTOM

PROPOSED

DUCT 2’

BACK

PROPOSED

CABLE

37-1/2”

2’ 43” GROUND ROD

5/8” x 10’ cu. 2’

NOTE

THE FRONT HAS

(2) EXTRA

ENCAPULATED

NUTS, FOR 6’

HOLD DOWNS

FRONT

#4 BARE COPPER

SOFT DRAWN

COPPER CONNECTOR

COMPRESSION OR

VICE TYPE.

TRANSFORMER PAD TO BE INSTALLED BETWEEN 4’ AND 10’ FROM FACE OF CURB.

TO BE INSTALLED ON VIRGIN SOIL AND QUARRY SCREENINGS,

WHEN LEVELING, LEAVE THE BACK 1/2 BUBBLE HIGH.

(USE CAUTION WHEN BACKFILLING AROUND PAD) NOT DRAWN TO SCALE

Figure 12.36

Illustrationsrev-9 May 2018

48 of 52

Page 49: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

3 PHASE FIBERGLASS JUNCTION MODULE 65 x 69 1/2”4” ABOVE FINISHED GRADE

28”

12”MIN

18”MAX

30” 30”

CABLES OR DUCTS NOT TO ENTER PAD FROM THE BOTTOM

PROPOSED

PRIMARY

DUCT THIS AREA TO BE CLEAR 6’ OF OBSTRUCTIONS

PROPOSED

PRIMARY

CABLE

2’ 2’ 69-1/2”

65"GROUND ROD

5/8” x 10’ cu.

THIS AREA TO

6’ BE CLEAR OF

OBSTRUCTIONS

#4 BARE COPPER

SOFT DRAWN

COPPER CONNECTOR

COMPRESSION OR

VICE TYPE.

MODULE PAD TO BE INSTALLED BETWEEN 4’ AND 10’ FROM FACE OF CURB.

TO BE INSTALLED ON VIRGIN SOIL AND QUARRY SCREENINGS,

(USE CAUTION WHEN BACKFILLING AROUND PAD) NOT DRAWN TO SCALE

Figure 12.37

Illustrationsrev-9 May 2018

49 of 52

Page 50: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.38

Illustrationsrev-9 May 2018

50 of 52

Page 51: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.39

Illustrationsrev-9 May 2018

51 of 52

Page 52: 12. ILLUSTRATIONS 12.1 GENERAL - PECO Energy Company · 2019-06-03 · 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this

Figure 12.40

Illustrationsrev-9 May 2018

52 of 52