12. ILLUSTRATIONS
12.1 GENERAL Illustrations of typical service equipment and installations are shown in this section as an aid to interpretation of these Electric Service Requirements. The illustrations cover the majority of new services or changed services, and they show additional details that are necessary for clarification. In all cases the rules of the previous Sections of these Electric Service Requirements take precedence, and the Company should be consulted on questions of details not covered specifically in these illustrations.
Illustrationsrev-9 May 2018
1 of 52
SE
RV
ICE
EN
TR
AN
CE
CO
ND
UC
TO
RS
SE
RV
ICE
EN
TR
AN
CE
CO
ND
UC
TO
RS
EXPLANATION OF TERMS USED IN TYPICAL
SERVICES TO SINGLE RESIDENTIAL PROPERTIES
UNDERGROUND OVERHEAD LINE STREET MAIN
COMPANY POLE
ATTACHMENT TO
BUILDING MAST,
POLE, ETC. OR
CONNECTION
OF SERVICE
ENTRANCE
CONDUCTORS
TO REAR BUS.
SERVICE
LATERAL
PROPERTY
LINE
SERVICE
DROP
POINT OF
DELIVERY
OUTDOOR
METER
LATERAL TERMINATES
AND SERVICE ENTRANCE
CONDUCTORS BEGIN AT
POINT OF DELIVERY 18”
INSIDE PROPERTY LINE
WHETHER CONDUCTORS
ARE SPLICED AT THIS
POINT OR CONTINUOUS
INTO BUILDING.
ON SERVICES INSTALLED
AFTER AUG. 1970 THE LAT-
ERAL TERMINATES AT AN
END BOX IF THE METER
IS INDOORS.
BUILDING
WALL
INDOOR
METER
SERVICE
EQUIPMENT
POINT OF DELIVERY
WHEN BUILDING IS
AT PROPERTY LINE.
END BOX
BASIC OVERHEAD SYSTEM BASIC UNDERGROUND SYSTEM
Figure 12.01
Illustrationsrev-9 May 2018
2 of 52
Please refer to NEC 2017 - 230.9 - Clearences on Buildings 230.24 - Clearences230.26 - Point of Attachment 230.27 - Means of Attachment
Illustrationsrev-9 May 2018
3 of 52
Please refer to NEC 2017 -230.28 - Service Masts as Supports (A + B)
Figure 12.03
Illustrationsrev-9 May 2018
4 of 52
Figure 12.04
Illustrationsrev-9 May 2018
5 of 52
Illustrationsrev-9 May 2018
6 of 52
Illustrationsrev-9 May 2018
7 of 52
Illustrationsrev-9 May 2018
8 of 52
Figure 12.08
Illustrationsrev-9 May 2018
9 of 52
Figure 12.09
Illustrationsrev-9 May 2018
10 of 52
Figure 12.10 Deleted THIS PAGE LEFT BLANK INTENTIONALLY
Figure 12.10
Illustrationsrev-9 May 2018
11 of 52
Illustrationsrev-9 May 2018
12 of 52
Illustrationsrev-9 May 2018
13 of 52
USE3/8 B
2 PER TR
NEUTRAL #4BARESO
AROUND T
TO GROUN
ADE
TYPES OF
WAD BREAK ELBOWS
15KV 2STR
REQUIRED 1 PHASE TRANSFORMER
CONNECTIONS 4KV, 13 KV & 34 KV
LEAVE CONCENlRIC NEUTRAL WIRES LONG ENOUGH
TO PERMIT SWITCHING. CONNECTED TO THE# 2 COPPER
USING VISE TYPE OR SPLIT BOLT COPPER CONNECTORS.
0
FRON?OF t!WISPORMER
FIBERGLASS BASE
15 KV 1/0 STR
35 KV PURPLE CUFF 1/0 STR
#2 BARE
SOLID COPPER
BE1WEEN CASE GROUNDS &
4" ABOVE FINISHED GR
INSTALL TRANSFORMER HOLD DOWN
CUPS (SUP PU ED WITH TRANSFORMER)
OLTS&WASHERS
ANSFORMER
FT DRAWN COPPER
RANSFORMER AND CONNECT
D ROD AND UP TO# 2 COPPER
APPROVED
15KV or 35KV
CONCENlRIC
NEUTRAL
JACKETED CABLE
LEAVE SLACK
FOR SWITCHING
COPPER CONNECTOR
COMPRESSION OR VISE TYPE Figure 12.13
III l \
GROUND ROD
518" X 10' cu
SEE THE ILLUSTRATION
SECTION, FIGURE 12.26
FOR PRIMARY CABLE
TERMINATION. (E.S.R MANUAL)
Illustrationsrev-9 May 2018
14 of 52
~
~ GROUNDING BUSHING
TERMINATE
OUTER JACKET 4" ABOVE COVER #4BARE
I lf28ARE
SOLID COPPER
SOUDCOPPER
REQUIRED CONCRETE
MANHOLE COVER
7'x7' 4KV & 13KV
8"x8' 34KV REQUIRED CONCRETE
MANHOLE COVER
REQUIREDCONCRETE OPPER GROUND MANHOLE
ANHOLE
RIGID METAWC METERING CONDUIT ITH GROUNDING SUSHINO, ONLY IF METERING SEE THE ILLUSTRATION
SECTION, FIGURE 12 26
FOR PRIMARY CABLE
TERMINATION
PRI
APPROVED BREAK ELB
E
LEAVE CONCENlRIC NEUTRAL WIRES LONG ENOUGH
TO PERMIT SWITCHING. CONNECTED TO THE# 2 COPPER
USING VISE TYPE OR SPLIT BOLT COPPER CONNECTORS.
REQUIRED 3 PHASE TRANSFORl\tlER
CONNECTIONS 4KV, 13 KV & 34 KV
MARY SIDE
LOAD . . OWS [email protected]
SECONDARY SIDE A C
N B
TYPES OF
LOAD BREAK ELBOWS
15 KV 2 STR
15 KV 1/0 STR
35 KV PURPLE CUFF 110 ST
APPROVED
15KV or 35KV
CONCENTRIC
NEUTRAL
JACKETED CABL
LEAVE SLACK FORSWJTQHJNQ
114 BARE SOLID C
OUTSIDE OF
IF METERING EQUIPMENT WILL SE INSTALLED IN THE SECONDARY . SIDE OF THE TRANSFORMER SEE THE METERING SECTION. .
Illustrationsrev-9 May 2018
15 of 52
Figure 12.15
Illustrationsrev-9 May 2018
16 of 52
Figure 12.15 (Contd.)
Illustrationsrev-9 May 2018
17 of 52
Figure 12.16
Illustrationsrev-9 May 2018
18 of 52
Figure 12.16 (Contd.)
Illustrationsrev-9 May 2018
19 of 52
Figure 12.17
Illustrationsrev-9 May 2018
20 of 52
Figure 12.17 (Contd.)
Illustrationsrev-9 May 2018
21 of 52
Figure 12.18
Illustrationsrev-9 May 2018
22 of 52
Figure 12.18 (Contd.)
Illustrationsrev-9 May 2018
23 of 52
Figure 12.19
Illustrationsrev-9 May 2018
24 of 52
Figure 12.19 (Contd.)
Illustrationsrev-9 May 2018
25 of 52
Figure 12.20
Illustrationsrev-9 May 2018
26 of 52
Figure 12.20 (Contd.)
Illustrationsrev-9 May 2018
27 of 52
Figure 12.21
Illustrationsrev-9 May 2018
28 of 52
Figure 12.21 (Contd.)
Illustrationsrev-9 May 2018
29 of 52
Figure 12.22
Illustrationsrev-9 May 2018
30 of 52
Figure 12.23
Illustrationsrev-9 May 2018
31 of 52
Figure 12.23 (Contd.)
Illustrationsrev-9 May 2018
32 of 52
Figure 12.24
Illustrationsrev-9 May 2018
33 of 52
Figure 12.24 (Contd.)
Illustrationsrev-9 May 2018
34 of 52
Figure 12.25A
Illustrationsrev-9 May 2018
35 of 52
Figure 12.25A (Contd.)
Illustrationsrev-9 May 2018
36 of 52
S-1644-EPAGE 1 OF 2
S-1644-EPAGE 1 OF 2
REV.NO. EC# DATE DESCRIPTION
171926 7
An Exelon Company
600A. HORIZ. MOUNT INTEGRAL STYLE[STEEL BASE]
GANG OPERATED LOAD BREAK SW.[S&C] 34KV
REVISED DETAIL ON PG # 1
14 2’-
0"
10’-
0" P
IPE
20
14
15
15
20
NOTE: SEE GROUNDING DETAIL
SHEET 2
TO NEUTRAL AND
GROUND PER S-1131 14
NOTE(d)
NOTE(d)
8’-
0"
20
LINE
WIRE
6
44
’ M
AT
’L S
UP
PL
IED
WIT
H S
WIT
CH
TAKE NOTE
14
11 11
9 5
9
3
10
08/19/13
Illus
tratio
nsre
v-9
May
201
837
of 5
2
S-1644-EPAGE 2 OF 2
S-1644-EPAGE 2 OF 2
14 14
20
15
20
BILL OF MATERIAL
NOTES
REFERENCES
SPARE MATERIAL
6
6
6
12
*
*
*
6
6
GROUNDING DETAIL
POLE DOWN LEAD
TO GROUND
(CENTER PHASE ONLY)
21
20
18 17
15
22 23
TO PHASE COND.
TO PHASE COND.
(d) OPERATING ROD INSULATORS SUPPLIED WITH SWITCH
137-37035 18-3/4" 3
CLAMP
S-0252
S-0251
S-0130
19
14 138-00906 ARRESTER, LIGHTNING
15 132-05955 BRACKET, OFFSET, 18"
16
17 132-00114 STUD CONNECTOR
18 132-76017 1/2 " ROUND WASHER
19 135-76855 #4 SOL COPPER SD BARE
20 135-79839 #4 SOL COPPER SD COV’D
21 PER S-0251 VICE TYPE TAP CONNECTOR
22 132-05429 5/8 " X 2" MACHINE BOLT
23 132-76012 5/8 " LOCKWASHER
137-37038 OPERATING ROD INSULATOR ASSEMBLY
138-35110 HANDLE ASSY.
138-15819 UNIVERSAL COUPLING
2
Illus
tratio
nsre
v-9
May
201
8
38 of 52
LO
AD
BR
EA
K E
LB
OW
S 3
5 &
15
KV
SE
MI-
CO
ND
UC
TIN
G
INS
UL
AT
ION
CONDUCTOR
INSTALLATION OF ELBOW
UNWRAP SUFFICIENT AMOUNT OF CONCENTRIC
NEUTRAL WIRES SO THE OPERATION OF THE
ELBOW WILL NOT BE RESTRICTED.
TAPE CONCENTRIC WIRES TO CABLE.
INSTALL ELBOW PER. MANUFACTURES
SPECIFICATIONS.
INSTALL (1) STRAND OF CONCENTRIC NEUTRAL
WIRE THROUGH MOLDED HOLE IN ELBOW.
CONTINUE WRAPPING UP AROUND ELBOW AND
BACK THROUGH OTHER MOLDED HOLE. WRAP
AROUND OTHER WIRES TO TERMINATE.
FIBERGLASS
BASE
TERMINATE
OUTER JACKET
TERMINATE OUTER JACKET
1” PLASTIC TAPE
OVER 8 LAYERS OF
1” HIGH VOLTAGE
. BONDING
CEMENT
2 LAYERS 1/2 LAP
1” PLASTIC TAPE
2 LAYERS 1/2 LAP
1” HIGH VOLTAGE
1/4”
1”
2”
1/4”
TO BE CONNECTED TO THE
THE TRANSFORMER.
TERMINATION OF OUTER JACKET
REMOVE OUTER JACKET, ROUGHEN 2” OF JACKET
WITH AL. OXIDE CLOTH AND APPLY 2” WIDE STRIP
OF WATER SEALING COMPOUND TO BE USED AS A
SEAL FOR THE DRAIN WIRES. BEND DRAIN WIRES
BACK ALONG THE CABLE AND EMBED EACH WIRE
INTO THE WATER SEALING COMPOUND. (MAKE
SURE WIRES DO NOT TOUCH EACH OTHER). COAT
WITH BONDING CEMENT AND INSTALL HIGH
TRANSFORMER PAD
TERMINATE
OUTER JACKET
INSULATING, WATER-
PROOFING COMPOUND AND TREAT AS UNJACKETED CONCENTRIC CABLE.
Figure 12.26
TRANSFORMER VAULT
NOT DRAWN TO SCALE
Illustrations rev-9 May 2018
39 of 52
Illustrationsrev-9 May 2018
40 of 52
[See Figure 12.33 for Notes and Bill of Material]
Illustrations rev-9 May 2018
41 of 52
[See Figure 12.33 for Notes and Bill of Material]
Illustrationsrev-9 May 2018
42 of 52
[See Figure 12.33 for Notes and Bill of Material]
Illustrationsrev-9 May 2018
43 of 52
[See Figure 12.33 for Notes and Bill of Material]
Illustrationsrev-9 May 2018
44 of 52
[See Figure 12.33 for Notes and Bill of Material]
Illustrationsrev-9 May 2018
45 of 52
Illustrationsrev-9 May 2018
46 of 52
Illustrationsrev-9 May 2018
47 of 52
SINGLE PHASE FIBERGLASS
TRANSFORMER PAD 43” x 37.5”
4” ABOVE FINISHED GRADE
28” 30” PRIMARY
24” SECONDARY
12”MIN
18”MAX 30” PRIMARY
24” SECONDARY
CABLES OR DUCTS NOT TO ENTER PAD FROM THE BOTTOM
PROPOSED
DUCT 2’
BACK
PROPOSED
CABLE
37-1/2”
2’ 43” GROUND ROD
5/8” x 10’ cu. 2’
NOTE
THE FRONT HAS
(2) EXTRA
ENCAPULATED
NUTS, FOR 6’
HOLD DOWNS
FRONT
#4 BARE COPPER
SOFT DRAWN
COPPER CONNECTOR
COMPRESSION OR
VICE TYPE.
TRANSFORMER PAD TO BE INSTALLED BETWEEN 4’ AND 10’ FROM FACE OF CURB.
TO BE INSTALLED ON VIRGIN SOIL AND QUARRY SCREENINGS,
WHEN LEVELING, LEAVE THE BACK 1/2 BUBBLE HIGH.
(USE CAUTION WHEN BACKFILLING AROUND PAD) NOT DRAWN TO SCALE
Figure 12.36
Illustrationsrev-9 May 2018
48 of 52
3 PHASE FIBERGLASS JUNCTION MODULE 65 x 69 1/2”4” ABOVE FINISHED GRADE
28”
12”MIN
18”MAX
30” 30”
CABLES OR DUCTS NOT TO ENTER PAD FROM THE BOTTOM
PROPOSED
PRIMARY
DUCT THIS AREA TO BE CLEAR 6’ OF OBSTRUCTIONS
PROPOSED
PRIMARY
CABLE
2’ 2’ 69-1/2”
65"GROUND ROD
5/8” x 10’ cu.
THIS AREA TO
6’ BE CLEAR OF
OBSTRUCTIONS
#4 BARE COPPER
SOFT DRAWN
COPPER CONNECTOR
COMPRESSION OR
VICE TYPE.
MODULE PAD TO BE INSTALLED BETWEEN 4’ AND 10’ FROM FACE OF CURB.
TO BE INSTALLED ON VIRGIN SOIL AND QUARRY SCREENINGS,
(USE CAUTION WHEN BACKFILLING AROUND PAD) NOT DRAWN TO SCALE
Figure 12.37
Illustrationsrev-9 May 2018
49 of 52
Figure 12.38
Illustrationsrev-9 May 2018
50 of 52
Figure 12.39
Illustrationsrev-9 May 2018
51 of 52
Figure 12.40
Illustrationsrev-9 May 2018
52 of 52