Page 1: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009o

IBL per MarzioIBL per Marzio

G. Darbo - INFN / Genova

Agenda page:

Page 2: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 20092

IBL OrganizationIBL OrganizationThe IBL (Insertable B-Layer) is an ATLAS Upgrade project:

• It will deliver a fourth pixel layer, including a new beam-pipe, to the Inner Detector

• When delivered, it will become a part of the Pixel Detector and of the Inner Detector and the organization will be “absorbed” into the Pixel & ID

Module WG

Module WG

IBL MB(Management Board)

IBL MB(Management Board)

StaveWG

StaveWG

I&IWGI&IWG

Off-detWG

Off-detWG

IBL IB(Institute Board)

IBL IB(Institute Board)

Pixel Institutesin IBL

Pixel Institutesin IBL

New Institute

sin IBL

New Institute

sin IBL

ATLASUPO ATLASUPO

ATLAS UPGRADE

IBL

IBL PLIBL TC

Page 3: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 20093

Management Board (MB)Management Board (MB)

Module WG(2

coordinators)•FE-I4•Sensors•Bump-Bonding•Modules•Test & QC•Irradiation

Module WG(2

coordinators)•FE-I4•Sensors•Bump-Bonding•Modules•Test & QC•Irradiation

Stave WG(1 Phys + 1

Eng.)•Staves•Cooling Design & Stave Thermal Management•HDI•Internal Services•Loaded Stave•Test & QC

Stave WG(1 Phys + 1

Eng.)•Staves•Cooling Design & Stave Thermal Management•HDI•Internal Services•Loaded Stave•Test & QC

IBL Integr.-Install.(2 Eng.)

•Stave Integration•Global Sup.•Beam Pipe (BP)•Ext.services inst.•IBL+BP Installation•Cooling Plant•Test & QC

IBL Integr.-Install.(2 Eng.)

•Stave Integration•Global Sup.•Beam Pipe (BP)•Ext.services inst.•IBL+BP Installation•Cooling Plant•Test & QC

Off-detector(1 Phys + 1 E.Eng.)

•Power•DCS•ROD•Opto-link•Ext.serv.design/proc.•Test Beam•System Test

Off-detector(1 Phys + 1 E.Eng.)

•Power•DCS•ROD•Opto-link•Ext.serv.design/proc.•Test Beam•System Test

IBL Management BoardMembership:•IBL PL + IBL TC•2 coordinators from each WG•Plus “extra” members

IBL Management BoardMembership:•IBL PL + IBL TC•2 coordinators from each WG•Plus “extra” members

Ad-interim membershipIBL Project Leader: G. DarboIBL Technical Coordinator: H. Pernegger“Module” WG (2 Physicists): F. Hügging & M. Garcia-Sciveres“Stave” WG (1 Phy. + 1 M.E.): O. Rohne + D. Giugni“IBL Assembly & Installation” WG (2 M.E. initially, a Phy. Later): N. Hartman + R. Vuillermet“Off-detector” WG (1 Phy. + 1 E.E.): T. Flick + S. Débieux“Extra” members:Ex officio: Upgrade Coordinator (N. Hessey), PO Chair (M. Nessi), Pixel PL (B. Di Girolamo), ID PL (P. Wells), Pixel Chair (C. Gößling)Offline “liaison” Pixel Off-line coordinator: A. AndreazzaTDR editor (temporary): K. Einsweiler

Page 4: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 20094

Ref: N. Hartman:•http://indico.cern.ch/conferenceDisplay.py?confId=43496

Single Stave LayoutsSingle Stave Layouts

Several layouts under study: 14 staves at Rmin=~3.2 cm

Turbine Inverted

Rail Space

Sensor

Page 5: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 20095

Ref: N. Hartman:•http://indico.cern.ch/conferenceDisplay.py?confId=43496

BiStave LayoutsBiStave LayoutsBiStave LayoutsBiStave Layouts

Biturbine Castellated

Sensor

Page 6: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 20096

Frontend Chip - FE-I4Frontend Chip - FE-I4FE-I4 Status

• Prototype blocks in MPW (MOSIS) submitted 3/2008, measurements, irradiation

• Design review (3/2009): “Design Technical Issues” on full scale design• FE-I4 Collaboration meeting 1/7/2009• Foreseen complete design review after Summer and submission later

this year.

7.6mm

8mm active

2.8mm

FE-I374%

active 16.8mm

20.2mm

~2mm

~200μm

FE-I4~89%

Chartered reticule (24 x 32)

IBM reticule

~19 mm

New FE-I4

Pixel size = 250 x 50 µm2

Pixels = 80 x 336Technology = 0.13µmPower = 0.5 W/cm2

FE-I3

Page 7: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 20097

FE-I4 Review & CollaborationFE-I4 Review & Collaboration

FE-I4 – “Design Technical Issue” Review March 2nd , 2009 - Review agenda page:http://indico.cern.ch/conferenceDisplay.py?confId=52403

Page 8: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 20098

Modules & Stave ArrangementModules & Stave ArrangementTwo module options:

• Single chip modules abut one against the next

• Small sensor type: like 3D, active edge

• Multi chip modules: chip look the same if using multi-chip modules

• As present sensor size (~2xFE-I4) : like planar n-on-n

• assuming no Z-shingling, no space.

W-bond pads

Page 9: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 20099

Requirements - FluenceRequirements - FluenceRequirements discussed in previous meetings

• New simulation of n fluences as input for the IBL design (see box)

• Other requirements are:• IBL design Peak Luminosity = 3x1034,

• Integrated Luminosity seen by IBL = 550 fb-1

Φ(r) =493

r2+

25

r

⎝ ⎜

⎠ ⎟×1014

• Fit made for 2 < r < 20 cm for L=1000fb-1

• Gives for IBL @ 3.7 cm (550 fb-1):

Φ1MeV=2.4x1015 (1.2 MGy)

• Safety factors not included in the computation (pp event generator: 30%, damage factor for 1 MeV fluences: 50%)Ref. Ian Dawson - AUW

Page 10: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 200910

Sensors - Time lineSensors - Time lineIBL project started now:

• TDR March 2010 – sensor option not decided before

FE-I4.v1 prototyping• FE-I4.v1 submitted (earliest) 15/10/2009 – Wafer back 31/4/2010

• FE-I4.v1 prototype modules and testing – second half 2010

Sensor decision on FE-I3 and FE-I4.v1 prototypes• End of 2010

Sensor production and testing• 8 months production assumed. Testing could last 4 months after end

production.

• Production starts beginning 2011.

Page 11: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 200911

How Many 3D Sensor WafersHow Many 3D Sensor WafersFor IBL we need:

• 14 staves (+6 spares)

• 32 FE-I4 (3D sensors)

• Total need = 640 single FE-I4 tiles = 54 Wafer

• If we consider yields:

• Sensor (0.5)

• Bump Bonding

• Module

• ~ 150÷200 wafer for whole IBL

4” Wafer – Fits 12 FE-I4

Page 12: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 200912

Beam-pipe - LayoutBeam-pipe - LayoutBeam-pipe radius can be reduced by at least 4mm

• On-site survey has shown that cavern floor is stable (~1mm respect 9.8mm foreseen)

• See LEB (LHC Experimental Beam-pipes) WG – 5/3/2009:http://indico.cern.ch/conferenceDisplay.py?confId=53606

Smaller beam-pipe Layout options• Better physics performance obtained with “reverse turbine” layout -

sensor facing beam-pipe – cooling redundancy (two cooling pipes) for beam-pipe bake-out

1 mm

Page 13: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 200913

Material BudgetMaterial BudgetPhysics performance low material budget

• Strategy for reducing X0: carbon foam, carbon fiber (CF) cooling pipe, CO2 cooling,…

Omega 0.00165Carbon foam 0.00179Epoxy 0.00030Sensor 0.00434R/O chips 0.00382Flex 0.00144Cooling pipe (Al) 0.00266Cooling fluid (C3F8) 0.00133

General total 0.01730

Total structure 0.00640Structure+cool. Fluid0.00773

Omega 0.00165Carbon foam 0.00179Epoxy 0.00030Sensor 0.00434R/O chips 0.00382Flex 0.00144Cooling pipe (CF) 0.00083Cooling fluid 0.00133

General total 0.01550

Total structure 0.00457Structure + cool. Fluid0.00590

X0 - Ti cooling pipe option

X0 - CF cooling pipe option

Page 14: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 200914

Inner Tracker R&DInner Tracker R&DStatus – November 2008

Approved by Executive Board

EoI, Proposal presented to USG

Pixel

Strips

Inner Detector

Page 15: 3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:

3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 200915

Calorimeter, Muon & Other R&D

Calorimeter, Muon & Other R&D

Status – November 2008

Approved by Executive Board

EoI, Proposal presented to USG

Calorimeter

Muon

Trigger, Elec,