1

Pan Island Link 1 (PIL 1)

Summary of Affected

Buildings and Lots

6th August 2018

2

Summary of Affected Buildings and Lots

Section 1

Section 2

Section 3

Section 4

Section 5

Summary of Affected Buildings and Lots

Section

No.Description

Length

(km)

Nos. of Affected BuildingsNos. of

Affected

LotsResidential Commercial Religious

Minor

Structures(Shed, stalls, stores

etc.)

Squatters

1

Gurney I/C

To Jln Bagan

Jermal/ Jln

Gottlieb

1.8 81

(Single storey

building)

1(Hindu

Temple)

3 0 67

2

Jln Gottlieb

To Paya

Terubong

6.8

+ 0.9 (Utama I/C)

7(4 nos within

tunnel

section)

0 0 3 078

(57 lots within

tunnel section)

3

Paya

Terubong

Link

0.8

+ 3.2 (Paya

Terubong Link)

1129

(All single storey

buildings)

1(Chinese

Temple)

26 3 119

4

Paya

Terubong To

Relau4.0

13(8 nos within

tunnel

section)

0 0 0 027

(15 nos within

tunnel section)

5Relau To Tun

Dr LCE I/C6.1 23 0

2(Chinese

Temple & Kafa

Religious

School)

16 79 85

Total

19.5

+ 4.1 (Utama I/C &

Paya Terubong

Link)

62(12 nos

within tunnel

section)

30(Single storey

buildings)

4 48 82376

(74 nos within

tunnel section)

Grand Total 226 376

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the

detailed design stage

3

SECTION 1 –

GURNEY I/C TO JLN BAGAN

JERMAL / JLN GOTTLIEB

4

N

Section 1 - Gurney I/C To Jln Bagan Jermal / Jln Gottlieb

Youth Park

Sect 1A

Sect 1B

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

1A 2 0 0 2 0 48

1B 6 1 1 (Hindu Temple)

1 0 19

Total 8 1 1 3 0 67

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

5

Section 1A - Jalan Bagan JermalSummary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

1A 2 0 0 2 0 48

Tun Dr LCE I/C

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

Phor Tay School

Indian

Association

St Nicholas

Home

6

Phor Tay School

• Phor Tay School not affected.

• PIL 1 does not encroach into Phor Tay School’s Lot Boundary

Phor Tay School

7

Overall width

24.5m

SJK (C) Phor Tay School

Fen

cin

g

Lo

t bo

un

dary

ROWROW

Lo

t bo

un

dary

1.5mWalkway

20.1m

To be relocated

MS

2x3.25m

Carriageway

0.5m

3.6m

1.5mWalkway

Median

1.6m

Carriageway

3x3.5m

Carriageway

3x3.5m

MSMS

0.5m

1.8m

0.5m

1.0m

7.2m

Well Known Souvenir &

Batik Centre

Phor Tay School

8

Indian

Association

Indian Association• Indian Association not affected.

• PIL 1 not encroaches into Indian Association’s Lot Boundary

9

0.5m

ROW

Overall width 24.5m

Median

1.6m

Carriageway

3x3.5m

Carriageway

3x3.5mMSMS

0.5m 0.5mROW

GILL’S VETRINARY

CLINIC GILL’S VETRINARY

CLINIC

Lo

t Bo

un

da

ry

Lo

t Bo

un

da

ry

Fe

nc

ing

PERSATUAN INDIA

PULAU PINANG (FIELD)

1.5m

Walkway

2x3.25m

CarriagewayMS

19.4m7.6m 1.8m

2x3.25m

Carriageway

0.5mMS

0.25m 0.25m0.5m

1.44m1m

To be relocated: 5.08m

Indian Association

10

St Nicholas Home

St Nicholas

Home

4.1m

• St Nicholas Home’s Buildings not affected.

• PIL 1 only encroaches into the edge of St Nicholas

Home’s compound

11

St Nicholas Home

Overall width

24.5m

1.6m 0.5m3.5m

Median MS

3.5m 3.5m3.5m3.5m3.5m0.5m

MS

0.5m

MS

3.25m3.25m0.25m

MS

3.25m3.25m3.25m0.5m

MS

1.5m

Walkway

1.5m

Walkway

JERMAL COURT

APARTMENT COMPOUND

ST NICHOLAS HOME

COMPOUND

22m4.1m

2.6m

0.25m

MS

12

Section 1B - Jalan Gottlieb

Gurney

I/C

Tun Dr LCE I/C

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

1B 6(Quarters of Jabatan

Taman Botani)

1 1(Hindu Temple)

1 0 19

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

Penang

Chinese Girl

School

13

PENANG CHINESE GIRLS HIGH SCHOOL

Penang Chinese Girl

School

• Penang Chinese Girl School not affected.

• PIL 1 does not encroach into Penang Chinese Girl

School’s Lot Boundary

14

Overall width

24.5mROWROW

Median

1.6m

Carriageway

3x3.5m

Carriageway

3x3.5m

MSMS

0.5m

1.0m

0.5m

1.13m

Lo

t bo

un

dary

Lo

t bo

un

dary

Fen

cin

g

MS

0.25m2x3.25m 0.5m

Carriageway

3x3.25m

MS

0.25m

MS

0.25m

MS

0.88m

Carriageway

1.0m

Walkway

1.5m

Walkway

1.8m30.0m

6.12m

Service Road +

Road Side Car

Park

3-STOREY SHOPS

PENANG CHINESE GIRLS

HIGH SCHOOL (Field)

PENANG CHINESE GIRLS HIGH SCHOOL

15

110m 120m250m

40m40m

20m31m

Youth Park (Cable Stayed Bridge)

Jln Kebun

Bunga

Hindu Temple

AMPHITHEATRE

TNB

110m 250m 120m40m

AMPHITHEATRE

16

SECTION 2 –

JLN GOTTLIEB TO PAYA TERUBONG

17

Section 2 – Jalan Gottlieb to Paya Terubong

N

Youth Park

Penang Hill Special Area Plan (SAP)

Kek Lok Si

Temple

Ayer Itam Dam

Tu

nn

el T

2

Sect 2A

Sect 2B

Sect 2C

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

2A 0 0 0 2 08

(2 lots within

tunnel section)

2B3

(2 nos within tunnel

section)

0 0 1 049

(42 lots within

tunnel section)

2C 4(2 nos within tunnel

section)

0 0 0 021

(13 lots within

tunnel section)

Total7

(4 nos within tunnel

section)

0 0 3 078

(57 lots within

tunnel section)

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

18

Section 2A - Youth Park / Utama I/C

Christian Cemetery

Youth ParkN

Pusat

Information

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

2A 0 0 0 2 08

(2 lots within

tunnel section)

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

19

Section 2B - Ayer Itam

N

Tun Dr LCE I/C

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

2B3

(2 nos within tunnel

section)

0 0 1 049

(42 lots within

tunnel section)

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

20

Section 2C - Paya Terubong

N

MA

INL

INE

Gurney

I/C

Tun Dr LCE I/C

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

2C 4(2 nos within tunnel

section)

0 0 0 021

(13 lots within

tunnel section)

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

21

SECTION 3 –

PAYA TERUBONG LINK

22

N

Sect 3A

Sect 3BSect 3C

Section 3 - Paya Terubong Link

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

3A 11 29 1 (Chinese Temple)

12 0 98

3B 0 0 0 3 3 13

3C 0 0 0 11 0 8

Total 11 29 1 26 3 119

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

23

Section 3A - Paya Terubong Interchange

Gurney

I/C

Tun Dr LCE I/C

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

3A 11 29 1(Chinese Temple)

12 0 98

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

24

Section 3B - Paya Terubong Interchange

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

3B 0 0 0 3 3 13

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

25

Section 3C - Paya Terubong Interchange

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

3C 0 0 0 11 0 8

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

26

SECTION 4 –

PAYA TERUBONG TO RELAU

27

Section 4 - Paya Terubong to Relau

Sect 4B

Sect 4A

N

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

4A 4(All within tunnel

section)

0 0 0 08

(All within

tunnel section)

4B 9 (4 nos within tunnel

section)

0 0 0 019

(7 nos within

tunnel section)

Total 13(8 nos within tunnel

section)

0 0 0 027

(15 nos within

tunnel section)

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

28

Section 4A – Paya Terubong

NGurney

I/C

Tun Dr LCE I/C

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

4A4

(All within tunnel

section)

0 0 0 08

(All within tunnel

section)

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

29

Section 4B – Jalan Tun Sardon

N

Tun Dr LCE I/C

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

4B9

(4 within tunnel

section)

0 0 0 019

(7 nos within

tunnel section)

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

30

SECTION 5 –

RELAU TO TUN DR LCE I/C

31

N

Section 5 - Relau to Tun Dr LCE I/C

Sect 5A

Sect 5B

Sect 5C

Sect 5D

Sect 5E

Penang

Airport

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

5A 6 0 0 0 0 31

5B 15 02

(Chinese Temple & Kafa

Religious School)

3 0 34

5C 2 0 0 0 48 12

5D 0 0 0 12 0 4

5E 0 0 0 1 31 4

Total 23 0 2 16 79 85

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

32

Section 5A - Relau to Sg Ara

Tun Dr LCE I/C

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

5A 6 0 0 0 0 31

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

33

Section 5B - Sg Ara to Jalan Dato Ismail Hashim

Linear Park

Gurney

I/C

Tun Dr LCE

I/C

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

5B15 0

2(Chinese Temple & Kafa

Religious School)

3 0 34

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

34

Awang I/C

Section 5C - Jalan Dato Ismail Hashim to Jalan Tun Dr Awang

Gurney

I/C

Tun Dr LCE I/C

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

5C 2 0 0 0 48 12

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

35

Gurney

I/C

Section 5D - Jalan Mayang Pasir

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

5D 0 0 0 12 0 4

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

36

Section 5E - Fisherman Huts (LCE Interchange)

Gurney

I/C

Summary of Affected Buildings and Lots

Sec

No.

Nos. of Affected Buildings Nos. of

Affected

LotsResidential Commercial ReligiousMinor

StructuresSquatters

5E 0 0 0 1 31 4

Note:

The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage

Legend

ROW

37

THANK YOU