7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 1/14
REPUBLIC OF THE PHILIPPINES
PROJECT MANAGEMENT OFFICE - BUREAU OF DESIGN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
VARIOUS DPWH PROPOSED PROJECTS
OIC, BUILDINGS DIVISION, BOD
REVIEWED: RECOMMENDING APPROVAL: APPROVED :
MANILA, PHILIPPINES
(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
STANDARD TWO-STOREY
SCHOOL BUILDING(2, 4, & 6 - CLASSROOMS)
MARIANO C. DEL CASTILLO
DIRECTOR IV, BOD
GILBERTO S. REYES
UNDERSECRETARY
RAUL C. ASIS
SECRETARY
ROGELIO L. SINGSON
CONCURRED :
SECRETARY
ARMIN A. LUISTRO
DEPARTMENT OF EDUCATION
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 2/14
STANDARD TWO-STOREY
VARIOUS DPWH PROPOSED PROJECTS(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
SCHOOL BUILDING(2, 4, & 6 - CLASSROOMS)
JOINT VENTURE OF
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 3/14
I.
TWO-CLASSROOMS
Mobilization / Demobilization
A.
II. Temporary Facilities
III. Safety and Health
IV. Earthworks
V. Termite Control Works
VI. Concrete Works
VII. Masonry Works
VIII. Fabricated Materials and Hardwares
B I L L O F Q U A N T I T I E S
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISG-1BOD 1
41
(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )
STANDARD TWO-STOREYSCHOOL BUILDING( 2-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
BILL OF QUANTITIES
OIC, BUILDINGS DIVISIONPROJECT MANAGER
DOMICIANO B. LUSICA
Q UA NT IT Y E NG IN EE R C OS T E NG IN EE R
JOVEN T. SANTOS
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 4/14
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
B I L L O F Q U A N T I T I E S
XIII. Electrical Works
XIV. Plumbing / Sanitary Works
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISG-2BOD 2
41
(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )
BILL OF QUANTITIES
OIC, BUILDINGS DIVISION
STANDARD TWO-STOREYSCHOOL BUILDING( 2-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
PROJECT MANAGER
DOMICIANO B. LUSICA
Q UA NT IT Y E NG IN EE R C OS T E NG IN EE R
JOVEN T. SANTOS
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 5/14
I.
FOUR-CLASSROOMS
Mobilization / Demobilization
A.
I I. Temporary Faci li ti es
III. Safety and Health
IV. Earthworks
V. Termite Control Works
VI. Concrete Works
VII. Masonry Works
VIII. Fabricated Materials and Hardwares
B I L L O F Q U A N T I T I E S
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISG-3BOD 3
41
(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )
STANDARD TWO-STOREYSCHOOL BUILDING( 4-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
BILL OF QUANTITIES
OIC, BUILDINGS DIVISIONPROJECT MANAGER
DOMICIANO B. LUSICA
Q UA NT IT Y E NG IN EE R C OS T E NG IN EE R
JOVEN T. SANTOS
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 6/14
B I L L O F Q U A N T I T I E S
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
X II I. E lect ri ca l Works
XIV. Plumbing / Sanitary Works
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISG-4BOD 4
41
(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )
BILL OF QUANTITIES
OIC, BUILDINGS DIVISION
STANDARD TWO-STOREYSCHOOL BUILDING( 4-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
PROJECT MANAGER
DOMICIANO B. LUSICA
Q UA NT IT Y E NG IN EE R C OS T E NG IN EE R
JOVEN T. SANTOS
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 7/14
I.
SIX-CLASSROOMS
Mobilization / Demobilization
A.
I I. Temporary Faci li ti es
III. Safety and Health
IV. Earthworks
V. Termite Control Works
VI. Concrete Works
VII. Masonry Works
VIII. Fabricated Materials and Hardwares
B I L L O F Q U A N T I T I E S
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISG-5BOD 5
41
(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )
STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
BILL OF QUANTITIES
OIC, BUILDINGS DIVISIONQ UA NT IT Y E NG IN EE R C OS T E NG IN EE R
JOVEN T. SANTOS
PROJECT MANAGER
DOMICIANO B. LUSICA
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 8/14
B I L L O F Q U A N T I T I E S
IX. Finishing Works
X. Carp entr y Work s
XI. Roof and Framing Works
XII. Painting Works
XIII. Electrical Works
XIV. Plumbing / Sanitary Works
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISG-6BOD 6
41
(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )
BILL OF QUANTITIES
OIC, BUILDINGS DIVISION
STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )
VARIOUS DPWHPROPOSED PROJECTS
PROJECT MANAGER
DOMICIANO B. LUSICA
Q UA NT IT Y E NG IN EE R C OS T E NG IN EE R
JOVEN T. SANTOS
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 9/14
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS A-1BOD 7
41
(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)
STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
T A B L E O F C O N T E N T S
STRUCTURAL PLUMBING ELECTRICAL
PERSPECTIVE
OIC, BUILDINGS DIVISION
G - 1 BILL OF QUANTITIES
ARCHITECTURAL
GENERAL
S - 1 GENERAL NOTES & STANDARD DETAILS
S - 2 STANDARD DETAILS
S - 3 STANDARD DETAILS
S - 4 FOUNDATION PLAN AND SECOND FLOOR FRAMING PLAN
S - 5 ROOF FRAMING PLAN, ELEV. OF END WALL FRAME, DET. SECTION OF LRB-1 AND PC-1,
CONNECTION OF PURLINS TO LRB-1, CONCRETE SUN BREAKER DETAIL & STIFFENER DETAIL
S - 6 SCHEDULE OF FOOTINGS & COLUMN, RAMP DETAIL,
DETAIL OF STAIR ON GRADE, DETAIL OF FOOTING,
WALL FOOTING & FOOTING TIE BEAM, TYPICAL DETAIL OF R.C. COLUMNS
S - 7 PLAN FOOTING F-1, F2 & F3 ELEV. FOOTING F-1,
F2 & F3 PLAN FOOTING CF-1 & TYPICAL ELEV. OF MICRO-PILE
S - 8 TRUSS DETAIL, CONNECTION DETAILS
S - 9 SCHEDULE OF BEAM & SLAB, TYPICAL BEAM & SLAB
ELEVATION, STAIR DETAILS
S - 10 FIRE ESCAPE ELEVATION
S - 11 FIRE ESCAPE DETAIL
P - 1 GROUND FLOOR AND SECOND FLOOR PLUMBING LAYOUT
P - 2 GROUND FLOOR AND SECOND FLOOR
WATER LINE LAYOUT
P - 3 ISOMETRIC WATER LINE LAYOUT AND
SEWER LINE LAYOUT
P - 4 ISOMETRIC DRAINAGE LINE LAYOUT ROOF DRAINAGE LAYOUT, DETAIL SECTION
OF DRAIN PIPE AND SPOT DETAIL
P - 5 PLAN OF SEPTIC TANK, LONGITUDINAL SECTION, CROSS SECTION DETAIL,
MANHOLE COVER DETAIL, CATCH BASIN DETAIL, LEGEND AND PLUMBING NOTES
EE - 1 GENERAL NOTES, LEGEND, LOAD SCHEDULE, SINGLE LINE DIAGRAM AND ELECTRICAL RISER DIAGRAM ( 2-CL )
EE - 2 POWER LAYOUT & LIGHTING LAYOUT ( 2-CL )
EE - 1 GENERAL NOTES, LEGEND, LOAD SCHEDULE, SINGLE LINE DIAGRAM AND ELECTRICAL RISER
DIAGRAM ( 4-CL )
EE - 2 POWER LAYOUT & LIGHTING LAYOUT ( 4-CL )
EE - 1 GENERAL NOTES, LEGEND, LOAD SCHEDULE, SINGLE LINE DIAGRAM AND ELECTRICAL RISER DIAGRAM ( 6-CL )
EE - 2 POWER LAYOUT ( 6-CL )
EE - 3 LIGHTING LAYOUT ( 6-CL )
A - 1 PERSPECTIVE, TABLE OF CONTENTS
A - 2 KEY PLAN
A - 3 GROUND FLOOR PLAN, SECOND FLOOR PLAN,
SCHEDULE OF FINISHES
A - 4 FRONT ELEVATION, REAR ELEVATION, LEFT & RIGHT SIDE ELEV.
A - 5 CROSS SECTION, LONGITUDINAL SECTION & GROUND FLOOR REFLECTED CEILING PLAN
A - 6 SECOND FLOOR REFLECTED CEILING PLAN & ROOF PLAN
A - 7 SCHEDULE OF DOORS & WINDOWS, DETAIL OF RAMP
A - 8 SECTION DETAIL OF EAVES, SPOT DETAIL CORNER CEILING, CONCRETE SUN BREAKER DETAIL, PERSPECTIVE, SECTION & SPOT DETAIL OF CEILING, PLAN & SECTION OF VENTILATION
A - 9 STAIR DETAIL
PERSPECTIVE,TABLE OF CONTENTS
G - 2 BILL OF QUANTITIES
NOTE :
G - 3 BILL OF QUANTITIES
G - 4 BILL OF QUANTITIES
G - 5 BILL OF QUANTITIES
G - 6 BILL OF QUANTITIES
A - 10 BAY SECTIONS, DOOR FRAME TYPICAL PLAN & SECTION, JALOUSIE DETAILS & FIRE ESCAPE DETAILS
A - 11 DETAIL PLAN OF TOILET & SECTION,
DETAIL OF COUNTER SINK, URINAL SECTION & DETAIL
A - 12 BLACKBOARD DETAIL
ARCHITECTURAL
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 10/14
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS A-2BOD 8
41
(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)
STANDARD TWO-STOREYSCHOOL BUILDING
( 2, 4 & 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
KEY PLANNOTE :
( 4-CLASSROOMS )
GROUND FLOOR PLAN
( 4-CLASSROOMS )
SECOND FLOOR PLAN
( 2-CLASSROOMS )
GROUND FLOOR PLAN
( 2-CLASSROOMS )
SECOND FLOOR PLAN
K E Y P L A N
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 11/14
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS A-3BOD 9
41
(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)
STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
GROUND FLOOR PLAN,SECOND FLOOR PLAN &SCHEDULE OF FINISHES
NOTE :
GROUND FLOOR PLAN
SECOND FLOOR PLAN
SCHEDULE OF FINISHES
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 12/14
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS A-4BOD 10
41
(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)
STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
FRONT ELEVATION,REAR ELEVATION,LEFT & RIGHT SIDE ELEVATION
NOTE :
FRONT ELEVATION
REAR ELEVATION
LEFT SIDE ELEVATION RIGHT SIDE ELEVATION
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 13/14
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS A-5BOD 11
41
(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)
STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
LONGITUDINAL SECTION,CROSS SECTION, & GROUND FLOORREFLECTED CEILING PLAN
NOTE :
LONGITUDINAL SECTION CROSS SECTION
GROUND FLOOR REFLECTED CEILING PLAN
7/17/2019 Sample Bill of Quantities
http://slidepdf.com/reader/full/sample-bill-of-quantities 14/14
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS A-6BOD 12
41
(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)
STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
SECOND FLOOR REFLECTEDCEILING PLAN & ROOF PLAN
NOTE :
SECOND FLOOR REFLECTED CEILING PLAN
R O O F P L A N