sample bill of quantities

14
REPUBLIC OF THE PHILIPPINES PROJECT MANAGEMENT OFFICE - BUREAU OF DESIGN DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS VARIOUS DPWH PROPOSED PROJECTS OIC, BUILDINGS DIVISION, BOD REVIEWED: RECOMMENDING APPROVAL: APPROVED : MANILA, PHILIPPINES (DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES) STANDARD TWO-STOREY SCHOOL BUILDING (2, 4, & 6 - CLASSROOMS) MARIANO C. DEL CASTILLO DIRECTOR IV, BOD GILBERTO S. REYES UNDERSECRETARY RAUL C. ASIS SECRETARY ROGELIO L. SINGSON CONCURRED : SECRETARY  ARMIN A. LUISTRO DEPARTMENT OF EDUCATION

Upload: alzhammer-manupac

Post on 06-Jan-2016

146 views

Category:

Documents


2 download

DESCRIPTION

Sample Bill of Quantities

TRANSCRIPT

Page 1: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 1/14

REPUBLIC OF THE PHILIPPINES

PROJECT MANAGEMENT OFFICE - BUREAU OF DESIGN

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

VARIOUS DPWH PROPOSED PROJECTS

OIC, BUILDINGS DIVISION, BOD

REVIEWED: RECOMMENDING APPROVAL: APPROVED :

MANILA, PHILIPPINES

(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)

STANDARD TWO-STOREY

SCHOOL BUILDING(2, 4, & 6 - CLASSROOMS)

MARIANO C. DEL CASTILLO

DIRECTOR IV, BOD

GILBERTO S. REYES

UNDERSECRETARY

RAUL C. ASIS

SECRETARY

ROGELIO L. SINGSON

CONCURRED :

SECRETARY

 ARMIN A. LUISTRO

DEPARTMENT OF EDUCATION

Page 2: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 2/14

STANDARD TWO-STOREY

VARIOUS DPWH PROPOSED PROJECTS(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)

SCHOOL BUILDING(2, 4, & 6 - CLASSROOMS)

JOINT VENTURE OF

Page 3: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 3/14

I.

TWO-CLASSROOMS

Mobilization / Demobilization

 A.

II. Temporary Facilities

III. Safety and Health

IV. Earthworks

V. Termite Control Works

VI. Concrete Works

VII. Masonry Works

VIII. Fabricated Materials and Hardwares

B I L L O F Q U A N T I T I E S

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASISG-1BOD 1

41

(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )

STANDARD TWO-STOREYSCHOOL BUILDING( 2-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

BILL OF QUANTITIES

OIC, BUILDINGS DIVISIONPROJECT MANAGER

DOMICIANO B. LUSICA

Q UA NT IT Y E NG IN EE R C OS T E NG IN EE R

JOVEN T. SANTOS

Page 4: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 4/14

IX. Finishing Works

X. Carpentry Works

XI. Roof and Framing Works

XII. Painting Works

B I L L O F Q U A N T I T I E S

XIII. Electrical Works

XIV. Plumbing / Sanitary Works

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASISG-2BOD 2

41

(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )

BILL OF QUANTITIES

OIC, BUILDINGS DIVISION

STANDARD TWO-STOREYSCHOOL BUILDING( 2-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

PROJECT MANAGER

DOMICIANO B. LUSICA

Q UA NT IT Y E NG IN EE R C OS T E NG IN EE R

JOVEN T. SANTOS

Page 5: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 5/14

I.

FOUR-CLASSROOMS

Mobilization / Demobilization

 A.

I I. Temporary Faci li ti es

III. Safety and Health

IV. Earthworks

V. Termite Control Works

VI. Concrete Works

VII. Masonry Works

VIII. Fabricated Materials and Hardwares

B I L L O F Q U A N T I T I E S

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASISG-3BOD 3

41

(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )

STANDARD TWO-STOREYSCHOOL BUILDING( 4-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

BILL OF QUANTITIES

OIC, BUILDINGS DIVISIONPROJECT MANAGER

DOMICIANO B. LUSICA

Q UA NT IT Y E NG IN EE R C OS T E NG IN EE R

JOVEN T. SANTOS

Page 6: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 6/14

B I L L O F Q U A N T I T I E S

IX. Finishing Works

X. Carpentry Works

XI. Roof and Framing Works

XII. Painting Works

X II I. E lect ri ca l Works

XIV. Plumbing / Sanitary Works

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASISG-4BOD 4

41

(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )

BILL OF QUANTITIES

OIC, BUILDINGS DIVISION

STANDARD TWO-STOREYSCHOOL BUILDING( 4-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

PROJECT MANAGER

DOMICIANO B. LUSICA

Q UA NT IT Y E NG IN EE R C OS T E NG IN EE R

JOVEN T. SANTOS

Page 7: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 7/14

I.

SIX-CLASSROOMS

Mobilization / Demobilization

 A.

I I. Temporary Faci li ti es

III. Safety and Health

IV. Earthworks

V. Termite Control Works

VI. Concrete Works

VII. Masonry Works

VIII. Fabricated Materials and Hardwares

B I L L O F Q U A N T I T I E S

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASISG-5BOD 5

41

(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )

STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

BILL OF QUANTITIES

OIC, BUILDINGS DIVISIONQ UA NT IT Y E NG IN EE R C OS T E NG IN EE R

JOVEN T. SANTOS

PROJECT MANAGER

DOMICIANO B. LUSICA

Page 8: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 8/14

B I L L O F Q U A N T I T I E S

IX. Finishing Works

X. Carp entr y Work s

XI. Roof and Framing Works

XII. Painting Works

XIII. Electrical Works

XIV. Plumbing / Sanitary Works

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASISG-6BOD 6

41

(SE E C OV ER SH EE T) (SE E C OV ER S HE ET ) (SE E C OV ER S HE ET )

BILL OF QUANTITIES

OIC, BUILDINGS DIVISION

STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )

VARIOUS DPWHPROPOSED PROJECTS

PROJECT MANAGER

DOMICIANO B. LUSICA

Q UA NT IT Y E NG IN EE R C OS T E NG IN EE R

JOVEN T. SANTOS

Page 9: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 9/14

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASIS A-1BOD 7

41

(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)

STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )

VARIOUS DPWH

PROPOSED PROJECTS

T A B L E O F C O N T E N T S

STRUCTURAL PLUMBING ELECTRICAL

PERSPECTIVE

OIC, BUILDINGS DIVISION

G - 1 BILL OF QUANTITIES

ARCHITECTURAL

GENERAL

S - 1 GENERAL NOTES & STANDARD DETAILS

S - 2 STANDARD DETAILS

S - 3 STANDARD DETAILS

S - 4 FOUNDATION PLAN AND SECOND FLOOR FRAMING  PLAN

S - 5 ROOF FRAMING PLAN, ELEV. OF END WALL  FRAME, DET. SECTION OF LRB-1 AND PC-1,

  CONNECTION OF PURLINS TO LRB-1, CONCRETE  SUN BREAKER DETAIL & STIFFENER DETAIL

S - 6 SCHEDULE OF FOOTINGS & COLUMN, RAMP DETAIL,

  DETAIL OF STAIR ON GRADE, DETAIL OF FOOTING,

WALL FOOTING & FOOTING TIE BEAM,  TYPICAL DETAIL OF R.C. COLUMNS

S - 7 PLAN FOOTING F-1, F2 & F3 ELEV. FOOTING F-1,

  F2 & F3 PLAN FOOTING CF-1 & TYPICAL ELEV. OF  MICRO-PILE

S - 8 TRUSS DETAIL, CONNECTION DETAILS

S - 9 SCHEDULE OF BEAM & SLAB, TYPICAL BEAM & SLAB

  ELEVATION, STAIR DETAILS

S - 10 FIRE ESCAPE ELEVATION

S - 11 FIRE ESCAPE DETAIL

P - 1 GROUND FLOOR AND SECOND FLOOR  PLUMBING LAYOUT

P - 2 GROUND FLOOR AND SECOND FLOOR

  WATER LINE LAYOUT

P - 3 ISOMETRIC WATER LINE LAYOUT AND

  SEWER LINE LAYOUT

P - 4 ISOMETRIC DRAINAGE LINE LAYOUT  ROOF DRAINAGE LAYOUT, DETAIL SECTION

  OF DRAIN PIPE AND SPOT DETAIL

P - 5 PLAN OF SEPTIC TANK, LONGITUDINAL  SECTION, CROSS SECTION DETAIL,

  MANHOLE COVER DETAIL,  CATCH BASIN DETAIL, LEGEND AND  PLUMBING NOTES

EE - 1 GENERAL NOTES, LEGEND, LOAD SCHEDULE,  SINGLE LINE DIAGRAM AND ELECTRICAL RISER  DIAGRAM ( 2-CL )

EE - 2 POWER LAYOUT & LIGHTING LAYOUT ( 2-CL )

EE - 1 GENERAL NOTES, LEGEND, LOAD SCHEDULE,  SINGLE LINE DIAGRAM AND ELECTRICAL RISER

  DIAGRAM ( 4-CL )

EE - 2 POWER LAYOUT & LIGHTING LAYOUT ( 4-CL )

EE - 1 GENERAL NOTES, LEGEND, LOAD SCHEDULE,  SINGLE LINE DIAGRAM AND ELECTRICAL RISER  DIAGRAM ( 6-CL )

EE - 2 POWER LAYOUT ( 6-CL )

EE - 3 LIGHTING LAYOUT ( 6-CL )

 A - 1 PERSPECTIVE, TABLE OF CONTENTS

 A - 2 KEY PLAN

 A - 3 GROUND FLOOR PLAN, SECOND FLOOR PLAN,

  SCHEDULE OF FINISHES

 A - 4 FRONT ELEVATION, REAR ELEVATION, LEFT & RIGHT SIDE ELEV.

 A - 5 CROSS SECTION, LONGITUDINAL SECTION & GROUND FLOOR  REFLECTED CEILING PLAN

 A - 6 SECOND FLOOR REFLECTED CEILING PLAN & ROOF PLAN

 A - 7 SCHEDULE OF DOORS & WINDOWS, DETAIL OF RAMP

 A - 8 SECTION DETAIL OF EAVES, SPOT DETAIL CORNER CEILING,  CONCRETE SUN BREAKER DETAIL, PERSPECTIVE, SECTION  & SPOT DETAIL OF CEILING, PLAN & SECTION OF VENTILATION

 A - 9 STAIR DETAIL

PERSPECTIVE,TABLE OF CONTENTS

G - 2 BILL OF QUANTITIES

NOTE :

G - 3 BILL OF QUANTITIES

G - 4 BILL OF QUANTITIES

G - 5 BILL OF QUANTITIES

G - 6 BILL OF QUANTITIES

 A - 10 BAY SECTIONS, DOOR FRAME TYPICAL PLAN & SECTION,  JALOUSIE DETAILS & FIRE ESCAPE DETAILS

 A - 11 DETAIL PLAN OF TOILET & SECTION,

  DETAIL OF COUNTER SINK, URINAL SECTION & DETAIL

 A - 12 BLACKBOARD DETAIL

ARCHITECTURAL

Page 10: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 10/14

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASIS A-2BOD 8

41

(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)

STANDARD TWO-STOREYSCHOOL BUILDING

( 2, 4 & 6-CLASSROOMS )

VARIOUS DPWH

PROPOSED PROJECTS

OIC, BUILDINGS DIVISION

KEY PLANNOTE :

( 4-CLASSROOMS )

GROUND FLOOR PLAN

( 4-CLASSROOMS )

SECOND FLOOR PLAN

( 2-CLASSROOMS )

GROUND FLOOR PLAN

( 2-CLASSROOMS )

SECOND FLOOR PLAN

K E Y P L A N

Page 11: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 11/14

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASIS A-3BOD 9

41

(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)

STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )

VARIOUS DPWH

PROPOSED PROJECTS

OIC, BUILDINGS DIVISION

GROUND FLOOR PLAN,SECOND FLOOR PLAN &SCHEDULE OF FINISHES

NOTE :

GROUND FLOOR PLAN

SECOND FLOOR PLAN

SCHEDULE OF FINISHES

Page 12: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 12/14

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASIS A-4BOD 10

41

(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)

STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )

VARIOUS DPWH

PROPOSED PROJECTS

OIC, BUILDINGS DIVISION

FRONT ELEVATION,REAR ELEVATION,LEFT & RIGHT SIDE ELEVATION

NOTE :

FRONT ELEVATION

REAR ELEVATION

LEFT SIDE ELEVATION RIGHT SIDE ELEVATION

Page 13: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 13/14

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASIS A-5BOD 11

41

(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)

STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )

VARIOUS DPWH

PROPOSED PROJECTS

OIC, BUILDINGS DIVISION

LONGITUDINAL SECTION,CROSS SECTION, & GROUND FLOORREFLECTED CEILING PLAN

NOTE :

LONGITUDINAL SECTION CROSS SECTION

GROUND FLOOR REFLECTED CEILING PLAN

Page 14: Sample Bill of Quantities

7/17/2019 Sample Bill of Quantities

http://slidepdf.com/reader/full/sample-bill-of-quantities 14/14

SECRETARYDIRECTOR IV, BOD

GILBERTO S. REYES ROGELIO L. SINGSON

UNDERSECRETARY

RAUL C. ASIS A-6BOD 12

41

(SE E C OV ER S HE ET ) (SE E C OV ER S HE ET ) (SE E C OV ER SH EE T)

STANDARD TWO-STOREYSCHOOL BUILDING( 6-CLASSROOMS )

VARIOUS DPWH

PROPOSED PROJECTS

OIC, BUILDINGS DIVISION

SECOND FLOOR REFLECTEDCEILING PLAN & ROOF PLAN

NOTE :

SECOND FLOOR REFLECTED CEILING PLAN

R O O F P L A N