    DESIGNPROJECT2013/2014

    Mohd Faizal Halim, Engr.(ext:6675)

    Dept of Manufacturing

    Engineering Technology

    Lecture 4

    Project Coordination& Control

  • 8/11/2019 Betd 4594 Design Project w5

    2/15

    Sub-topic

    Coordination Mechanism

    Project status and Corrective Action

    Percent compete Matrix (PCM)

  • 8/11/2019 Betd 4594 Design Project w5

    3/15

    Coordination

    The planning is pointless until the project isexecute.

    Project execution is the challenging phasewhere coordination is vital to ensure the

    project running smoothly. Product development project may involve

    various background of the team member toexecute the all task

    Changing is always happen to the project

    plan due to unanticipated events or newinformation.

  • 8/11/2019 Betd 4594 Design Project w5

    4/15

    Coordination Mechanisms

    The difficulty in coordination can be

    address using several mechanism;

    Informal communication- useful in breaking

    down individual and organization barrier. By

    locating the team member in same work

    space, enhance the communication- Allen

    (1997). Email or other IT mean also providethe effective way to communicate.

  • 8/11/2019 Betd 4594 Design Project w5

    5/15

    Coordination Mechanisms

    Meeting- is primary formal communication.

    The teams locate in same work space need

    fewer formal meeting than those whose in

    geographically separate. A good meeting is

    intend to be quick that consist of written

    agenda and someone to run the meeting

    (better at same place same time).

  • 8/11/2019 Betd 4594 Design Project w5

    6/15

    Coordination Mechanisms

    Schedule display- important information

    system in project execution (usually PERT or

    Gantt chart). Someone should responsible

    for monitoring the schedule

    Weekly updates the weekly status memo is

    written by the project leader and distribute

    on paper or email. Consist of the list of key

    accomplishment, decision and even of the

    past week.

  • 8/11/2019 Betd 4594 Design Project w5

    7/15

    Coordination Mechanisms

    Incentive - some of the organization form

    such as functional organization that use

    functional performance reviews may create

    incentives for team member to contribute

    more fully to project.

    Process document- associate with the

    information system to assist the project team

    in making decision and provide

    documentation

  • 8/11/2019 Betd 4594 Design Project w5

    8/15

    Coordination Mechanisms

  • 8/11/2019 Betd 4594 Design Project w5

    9/15

    Monitoring Project status and Corrective Action

  • 8/11/2019 Betd 4594 Design Project w5

    10/15

    Project leader need to be able to assess the

    project status to know whether corrective

    actions are warranted

    Project status may be assess during formalteam meeting, reviewing project schedule or

    by informal way.

    Sometime expert from outside may engaged

    to review the status of the project

    Project status and Corrective Action

  • 8/11/2019 Betd 4594 Design Project w5

    11/15

    After discovering an undesirable deviation from

    project plan, some action may taken such;

    Changing the timing or frequency of meeting

    Changing the project staff

    Locating the team together physically

    Soliciting more time and effort from the team

    Focusing more effort on critical task

    Engage outside resourceChanging the project scope or schedule

    Project status and Corrective Action

  • 8/11/2019 Betd 4594 Design Project w5

    12/15

    There various tool for monitoring project but

    for design project thePercentage complete

    matrix(PCM) is more practical.

    PCM use information in the WBS and budgetto determine the overall status of the project

    PCM -> cost of the respective item + total cost

    PCM -> % of the work on the task+ total task

    Monitoring tool

  • 8/11/2019 Betd 4594 Design Project w5

    13/15

    Example: the foundation work of the building

    constitute of 25% of the total cost of the

    project. If we only complete one-half of the

    work, the percent of complete is 12.5% For design project is more concerned with

    progress relative to allowed time.

    Monitoring tool

  • 8/11/2019 Betd 4594 Design Project w5

    14/15

    Monitoring tool

  • 8/11/2019 Betd 4594 Design Project w5

    15/15

    Activity# 5

    Using your WBS and Gantt chart, show your