City Development plan Gurh, Madhya Pradesh Submitted to: Urban Administration and Development Department, GoMP Palika Bhawan, Bhopal, Madhya Pradesh Project co-ordination: City Manager’s Association, Madhya Pradesh (CMAMP) Palika Bhawan, Bhopal, Madhya Pradesh Submitted by: DMG Consulting Pvt. Ltd. A-81, Sector 65, Noida, Uttar Pradesh

Upload: city-development-plan-madhya-pradesh

Post on 16-Nov-2015

52 views

Category:

Documents


6 download

DESCRIPTION

City Development Plan Madhya Pradesh

TRANSCRIPT

  • City Development plan

    Gurh, Madhya Pradesh

    Submitted to:

    Urban Administration and Development Department, GoMP Palika Bhawan, Bhopal, Madhya Pradesh

    Project co-ordination:

    City Managers Association, Madhya Pradesh (CMAMP) Palika Bhawan, Bhopal, Madhya Pradesh

    Submitted by:

    DMG Consulting Pvt. Ltd. A-81, Sector 65, Noida, Uttar Pradesh

  • `

    Gurh Town

    Gurh is a town and a Nagar Panchayat in Rewa district in

    the Indian state of Madhya Pradesh. It is 23 KM far from Rewa

    city, after Gurh a long Mountain range starts which divide the

    Rewa and Sidhi District's border. It is famous for Bhairav Baba

    statue. Gurh can be called as Fair and Festival Town.

    DISTRICT REWA

    POPULATION- 14590

  • CDP

    CDP

  • Latitude

    Longitude

    Average rainfall (annual) MM

    Height above mean sea level Mts

    Municipal area (1991) Sq kms

    Municipal area (2001) Sq kms

    Municipal area (2011) Sq kms

    Date of Constitution of ULB Date

    Historic importanceIn one or two

    sentences

    Population Year 1981 (under Municipal

    boundary only)

    Population Year 1991 (under Municipal

    boundary only)

    Population Year 2001 (under Municipal

    boundary only)

    Population Year 2011 (under Municipal

    boundary only)

    Name of Population projection Method

    Projected population adopted Year 2015

    Projected population adopted Year 2025

    Projected population adopted Year 2035

    Land Use% Standard (as per

    UDPFI)

    Land use (Tentative

    in Sq kms )

    Land use (Tentative

    in percentage)

    Residential 45-50% 0.75 49.7

    Commercial 2-3% 0.05 3.5

    Public - semi public 6-8% 0.05 3.5

    Industrial 8-10% - 0.0

    Roads 10-12% 0.16 10.8

    Recreational 12-14% - 0.0

    Sensitive rest - 0.0

    Water bodies rest 0.49 32.5

    Developed area 1.5 100

    Un- Developed area / Agriculture 7.0 82.2

    Total 8.5

    CompanyName

    ULB Name

    Whether the Sectoral Analysis report is as per UADD requisitesP

    op

    ula

    tio

    nT

    ow

    n B

    rief

    Geographical location (Town)

    -

    8.50 sqkm

    8.50 sqkm

    NA

    Lan

    d U

    se

    Town level

    1982

    City Profile

    18,212

    21,306

    DMG Consulting P. Ltd.

    Gurh

    Yes

    -

    10,782

    12,450

    14,590

    Geometric Projection Method

    15,561

    24

    30'

    80

    30'

    950-1050 mm

    405 m

    1

  • Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total

    Name of ward

    Ward Population 815 644 803 808 744 870 866 783 954 812 700 766 924 983 978 12,450

    Area (sq kms) 1 0 0 0 0 0 1 0 0 0 0 0 1 3 2 8

    Density (PPSqkm) 572 6,446 3,881 23,557 9,430 31,071 1,266 13,094 11,480 18,581 22,581 9,909 1,779 360 407 1,465

    Male 189 149 177 188 242 234 197 242 272 202 187 213 250 300 255 3,297

    Female 111 58 71 40 155 140 178 200 268 105 37 148 171 195 135 2,012

    SC NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 2,347

    ST NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1,203

    BPL NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Sex ratio 908 966 949 933 980 956 876 871 945 882 855 930 830 932 895 910

    Literacy rate (%) 54 62 66 69 60 64 45 51 36 63 68 64 59 49 42 56

    No. of Primary

    schools NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 4

    No. of Primary

    Health Centre NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Households NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 2,112

    Primary

    occupation

    (Majority)

    Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Agriculture Agriculture Manufacturing Manufacturing NA

    Seconday

    occupation Agriculture Commercial Agriculture NA Commercial NA Commercial Agriculture Agriculture Agriculture Commercial Manufacturing Manufacturing Agriculture Agriculture NA

    Tertiary Commercial Agriculture Commercial NA Agriculture NA Agriculture Commercial Commercial Commercial Agriculture Commercial NA Commercial NA NA

    No. of SS/LS

    industrial units NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of

    Commercial NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Slum * * * NA NA * * * * * NA NA * NA * NA

    Slum population NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1,965

    No. of Slum NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Individual

    water connections NA NA NA NA NA NA NA

    NA NA NA NA NA NA NA NA 100

    No. of Community

    water connections NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    6 hand

    pumps

    No. of

    Commercial NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Tubewells NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 9

    No. of NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 160

    No. of OHTs NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 2

    % Coverage of

    piped water NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 10 percent

    No. of Individual NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 303

    No. of Individual

    Septic tanks NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 243

    No. of Community

    Septic tanks NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Community

    toilets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3

    % of population -

    Open defecationNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA ~85 %

    No. of Dust bins NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 7

    City Profile (Ward Wise)

    2

  • Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total

    Name of ward

    City Profile (Ward Wise)

    Wardwise Waste

    generated (Kgs) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 0.1 mt/day

    Road sweeping (1

    time or 2 times) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Total no. of

    sanitary workers NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of Pucca

    road (Mts) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 11700 mts

    Length of Kuccha

    road (Mts) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of State

    Highway NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of

    National Highway NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3.77 km

    Length of Road

    side drains Pucca NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of Natural

    drains (Nallah)

    Pucca/Channelize

    2,500 1,000 1,000 1,200 900 1,200 1,000 500 1,000 950 1,100 1,000 1,000 1,500 4,000 19850 mts

    Length of Natural

    drains (Nallah) NA NA NA NA NA NA 200 NA NA 300 NA NA NA 500 300 1300 mts

    No. of Streetlights NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 242

    No. of Electricity

    connections NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1,635

    Name of Tourist

    site if any NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Kashtaharn

    ath temple

    & old fort of

    Gurh

    Name of Heritage

    site if any NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Old fort of

    Gurh

    Bus stop (No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Bus stand(No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Parks (No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Playground(No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Residential

    properties NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of

    Commercial NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Total Property tax

    collection (in Rs.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Property tax

    coverage(in %) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Available

    Government land NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Remarks

    Note * marks shows the ward with slums

    3

  • Source Tubewell Well River/Lake

    No. of Tubewell / River / Well 923 open

    wells River Bichhiya and Renuka

    Water Supplied by Tubewell /

    River / Well in MLDNA

    2.64 MLD

    21.20 lpcd

    NA

    NA

    No

    NA

    1.57 MLD

    no

    243

    NA

    NA

    NA

    NA

    NA

    NA

    River

    NA

    NA

    River

    NA

    250 Gram per Capita

    31.125 Tons

    In core areas, daily basis. In peripheral area

    once in a month.

    34%

    NA

    No

    NA

    No

    No

    NA

    Tractor-1 / Trolley-2

    Yes

    NH-75 (3.77 km)

    SW

    MR

    oa

    ds

    Ultimate disposal point of nallah

    If site for Scientific disposal is not allotted then whether

    formally requested by the ULB

    Total water supply in the town (MLD)

    Existing Supply rate (LPCD) considering distribution

    losses

    Water Charges per household per month (Rs.)

    Flat/Metered

    Whether any treatment plant exists (Y/N),If yes mention

    capacity (MLD)

    Proposed source (Surface)

    Total sewage generation (MLD)

    Whether any treatment plant exists (Y/N),If yes mention

    capacity

    Total no. of individual septic tanks

    Wate

    r S

    up

    ply

    Sew

    era

    ge

    Dra

    ina

    ge

    Sectoral Analysis

    Frequency of SW collection by the ULB (1 time per day/2

    times per day)

    Collection efficiency of the ULB (%)

    Any initiative for DTDC (Yes /No)

    Any initiative for scientific disposal of waste

    Name of dumping/ landfill site

    Distance of the Dumping site/landfill site from main

    settlement area (Kms)

    Length of road side drain (Kms)

    Coverage of road side drainage w.r.t roads (%)

    Ultimate disposal point of Road side drains

    Any treatment plant/procedure adopted

    Per capita Solid waste generation (Considering

    Standards) (in gms)

    Total SW generation (in Tons)

    Existing Source

    Frequency of Cleaning Individual Septic tanks

    Name of National Highway passing from or nearby from

    the town (NH-XYZ)

    % Coverage under paid water supply

    Is the existing site Dumping site or allotted site for

    Scientific disposal

    Area of allotted landfill site for Scientific disposal

    No. of Tractor trolleys/vehicles available with the ULB

    for carrying Solid waste to the LF site

    Total no. of community septic tanks

    Total no. of Sewage/Mud pumps available with the ULB

    Frequency of Cleaning Community Septic tanks

    Name of natural nallah (Storm water drain)

    Length of natural nallah (Storm water drain) Kms

    Ph

    ysi

    cal

    Infr

    ast

    ruct

    ure

    Ph

    ysi

    cal

    Infr

    ast

    ruct

    ure

    4

  • Sectoral Analysis

    NA

    NA

    NA

    CC NA

    WBM NA

    Total (kms) 19.850 Kms

    (kms) 1.3 Kms

    (kms) 33.24 kms

    60 buses & 30 jeeps

    yes

    no

    1 NA

    2 NA

    3 NA

    NA

    242

    242

    NA

    210

    32

    NA

    NA

    33/11KV NA

    132 kv 1

    NA

    NA

    NA

    NA

    Road

    sT

    raff

    ic &

    tra

    nsp

    ort

    ati

    on

    Str

    eet

    lig

    hti

    ng

    Pow

    er

    Distance of State Highway if nearby from the town (SH-

    XYZ) in Kms

    Total length of Pucca roads (Kms)

    Total length of Kuccha roads (kms)

    Gap w.r.t Standards

    Total no. of vehicles in the town

    No. of Streetlights having LPS

    Location of Substation

    http://www.mptransco.nic.in

    Total no. of residential connections

    Total no. of Commercial connections

    Total no. of street lights

    Any intracity mass transport mode (yes/no)

    Name of locations facing major traffic

    issues

    Name of the street beautified as per the

    instructions of UADD

    Bus stand (yes/No)

    Distance of National Highway if nearby from the town

    (NH-XYZ) in Kms

    Name of State Highway passing from or nearby from the

    town (SH-XYZ)

    No. of Streetlights under working condition

    No. of Streetlights having Tubes

    No. of Streetlights having CFL

    No. of Streetlights having Incandescent bulbs

    No. of Streetlights having LED

    Any subsidy for BPL (Y/N)

    Ph

    ysi

    cal

    Infr

    ast

    ruct

    ure

    Duration of Electricity supply per day (in Hrs)

    5

  • Sectoral AnalysisGurh Fort

    NA

    NA

    NA

    NA

    NA

    NA

    NA

    NA

    NA

    Government NA

    Beds NA

    Private NA

    Beds NA

    No

    Name of

    townReva

    Distance

    (Kms)25-30 km

    4

    2 middle & 1 higher secondary schools

    NA

    NA

    NA

    NA

    NA

    NA

    NA

    The social security pension scheme for old

    age, physically challenged and widows etc.

    Her

    itage

    & t

    ou

    rism

    Her

    itage

    & t

    ou

    rism

    En

    vir

    on

    men

    tH

    ealt

    hE

    du

    cati

    on

    No. of Beneficiaries under SJSRY (Street Vendor)

    No. of Beneficiaries under Haath thela/Rickshaw chalak

    yojna

    So

    cia

    l In

    fra

    stru

    ctu

    re

    Soci

    al

    secu

    rity

    sch

    emes

    No. of Rain Basera/Night Shelter

    No. of Beneficiaries under Gharelu Kamkaji Mahila

    Yojana

    Ownership of Rain Basera (with ULB/Rental)

    Name of other Social security schemes

    Name of Heritage site/s

    Ownership/agency

    Prevailing Heritage Act/s

    Name of Tourist site/s

    No. of ITI

    No. of Hospitals

    Multispeciality hospital if any (Y/N)

    Name of Nearby town reffered for

    Treatment

    No. of Primary schools

    No. of Secondary/High schools

    No. of Colleges

    Ownership/agency

    Total no. of Pilgrims/ Tourists visiting town per day

    Name of River/Lake/Forest range/Any specific species

    Prevailing Environmental Act/s

    Areas facing threats

    No. of Primary Health centres/Dispensary

    6

  • Ward

    No

    Name of

    Slum pocket/

    reference

    name

    Notified/ Un-

    notified

    Ward

    population

    Slum

    population

    Individual

    water

    connections

    No. of

    Community

    taps

    No. of

    Handpump

    s

    No. of

    Individual

    toilets

    No. of

    Community

    toilets

    No. of

    Pucca

    houses

    No. of Semi

    pucca

    houses

    No. of

    Kuccha

    houses

    No. of

    Permanent

    pattas

    distributed

    No. of

    Temporary

    pattas

    distributed

    No. of

    Primary

    school in

    the slum

    pocket

    No. of

    Primary

    Health

    centres in

    the slum

    pocket

    Beneficiarie

    s under

    social

    security

    schemes

    Any

    interventio

    ns under

    IHSDP

    (Y/N)

    1 * Un-Notified 815 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    2 * Un-Notified 644 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    3 * Un-Notified 803 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    4 NA - 808 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    5 NA - 744 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    6 * Un-Notified 870 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    7 * Notified 866 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    8 * Un-Notified 783 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    9 * Notified 954 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    10 * Un-Notified 812 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    11 NA - 700 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    12 NA - 766 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    13 * Un-Notified 924 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    14 NA - 983 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    15 * Notified 978 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Total 12450 1955

    Note:

    Slums & Urban Poor

    Sectoral Analysis

    * mark means, corresponding ward is having slum population.

    7

  • Components 2015 2025 2035 City specific StrategiesPreliminary

    estimateImplementing agency

    Mode of Implementation (PPP

    etc.)

    Network coverage to households 40% 100% 100% GNP, UADD, Govt. of M.P. Contract basis

    Per capita supply as per norms (135

    lpcd)135 135 135 GNP, UADD, Govt. of M.P.

    24/7 water supply 40% 100% 100% GNP, UADD, Govt. of M.P.

    Quality of waterAs per WHO

    Standards

    As per WHO

    Standards

    As per WHO

    StandardsGNP, UADD, Govt. of M.P.

    Non revenue water 25% 15% 5% GNP, UADD, Govt. of M.P.

    Consumer metering 80% 100% 100% GNP, UADD, Govt. of M.P. Contract basis

    Cost recovery 100% 100% 100% GNP, UADD, Govt. of M.P.

    Roof water harvesting 40% 80% 100% GNP, UADD, Govt. of M.P.Private sector participation 10% 70% 100% Yes

    Storm water drainage network

    coverage80% 100% 100% GNP, UADD, Govt. of M.P. PPP

    Rehabilitation of existing pucca drains 100% 100% 100% GNP, UADD, Govt. of M.P. PPP

    Rehabilitation of existing primary

    nallahs and water bodies100% 100% 100% GNP, UADD, Govt. of M.P. PPP

    Flood prone areas 100% 100% 100% GNP, UADD, Govt. of M.P.

    Sewer network coverage to

    households 60% 100% 100% GNP, UADD, Govt. of M.P. PPP

    Sewage Treatment and disposal

    arrangements 80% 100% 100% GNP, UADD, Govt. of M.P. PPP

    Sewage Recycling and reuse GNP, UADD, Govt. of M.P. PPP

    Cost recovery (as a % of O&M )As per WHO

    Standards

    As per WHO

    Standards

    As per WHO

    StandardsGNP PPP

    Safe sanitation facilities (with focus

    on Urban poor)80% 100% 100% GNP, UADD, Govt. of M.P. PPP

    Door-to-door collection system 80% 100% 100% GNP

    Source segregation 100% 100% 100% GNP

    Improve waste collection efficiency 100% 100% 100% GNP

    Mechanized waste handling Partial Full Full GNP

    Scientific waste disposal Partial Full Full GNP

    Landfill site adequacy Partial Full Full GNP

    Cost recovery of O&M 80% 100% 100% GNP

    Private sector participation 70% 100% 100% GNP, PWD

    1725 Lakhs

    190 Lakhs

    305 Lakhs

    241 Lakhs PPP

    SECTORIAL GOALSYEAR

    PH

    YSI

    CA

    L IN

    FRA

    STR

    UC

    TUR

    E

    WA

    TER

    SU

    PP

    LYD

    RA

    INA

    GE

    SEW

    ERA

    GE

    & S

    AN

    ITA

    TIO

    NSW

    M

    By 2035, 24x7 hours

    water supply as per

    the standard and full

    network coverage,

    water harvesting,

    consumer metering

    and low cost water

    treatment plant (Rapid

    Sand filteration).

    Preparation of master

    plan, rehabilitation and

    improvement

    programmes.

    To provide 100%

    sewerage system with

    low cost sanitation

    projects, proper

    treatment before

    disposal with Root

    zone treatment system

    and DEWATS.

    Implementation of

    Integrated waste

    management system.

    8

  • New road formations - 100% 100% GNP, PWD BOOT

    Road upgradations (Widening/

    strengthening)50% 100% 100% GNP, PWD PPP

    ROBs/flyovers - - - GNP, PWD -

    Development of bus terminus 60% 100% 100% GNP, PWD BOOT

    Development of truck terminus 70% 100% 100% GNP, PWD BOOT

    Junctions and traffic signal

    improvements100% 100% 100% GNP, PWD PPP

    Mass transit system 30% 60% 100% GNP, PWD BOOT

    Parking facilities 100% 100% 100% GNP, PWD Contract

    New Installation 30% 70% 100% GNP Contract

    Upgradation 100% 100% 100% GNP Contract

    Underground cabling - 70% 100% GNP Contract

    Energy savings 70% 100% 100% GNP Contract

    24/7 electricity supply 100% 100% 100% GNP

    100 % electricity supply 100% 100% 100% GNP

    Development of alternative energy

    sources100% 100% 100% GNP PPP

    100% Fire safety coverage 100% 100% 100% GNP

    Fully equipped fire station 100% 100% 100% GNP

    Identify archaeological resources in

    the city (Heritage listing)GNP, State tourism Dept., GNP & State Tourism Dept.

    Development of green areas as per

    normsGNP, State tourism Dept., PPP

    Water bodies

    preservation/ConservationGNP, State tourism Dept., PPP

    Tourist accommodation adequacy GNP, State tourism Dept.,

    Tourist attraction and circuits

    regional and city levelGNP, State tourism Dept., PPP

    Clean and healthy environment GNP

    Conserved natural environment -

    water bodiesPPP

    Eco-friendly vehicles GNP, GoMP PPP

    Disposal of treated sewage in nallahs GNP

    Desilting of nallahs GNP PPP

    Incineration of bio-medical waste GNP PPP

    Implementation of norms/standards

    for pollution controlGNP GNP

    830 Lakhs

    State dovt.

    GNP

    340 Lakhs

    200 Lakhs

    -

    Development of

    Govindgarh as transit

    point for surrounding

    tourist points,

    development of water

    fronts, improvement

    of connectivity of

    tourist places.

    Development of water

    bodies, plantation,

    checking of pollution

    level, use of eco-

    friendly vehicles,

    treatment facilities for

    wastes etc.

    Installation of solar

    street lights with CFL &

    LED lights to save

    energy.

    Development of

    underground cabling.

    provision of well

    equipped fire station.

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    PH

    YSI

    CA

    L IN

    FRA

    STR

    UC

    TUR

    E

    RO

    AD

    S &

    TR

    AFF

    IC M

    AN

    AG

    EMEN

    TST

    REE

    T

    LIG

    HTN

    ING

    PO

    WER

    100% *

    100% *

    Road upgradation and

    development,

    development of bus &

    truck terminal,

    signalised junctions,

    provision of parking

    facilities and

    strenthening Public

    transport.

    FIR

    E

    FIG

    HTI

    N

    G

    HER

    EITA

    GE

    & T

    OU

    RIS

    M

    HER

    ITA

    GE

    &TO

    UR

    ISM

    ENV

    IRO

    NM

    ENT

    9

  • 100% doctor-patient ratio GNP, health dept. Recruitment

    100% patient-bed ratio GNP, health dept. Contract

    Effective implementation of health

    programmes and related services in

    the slum areas of the city

    GNP, health dept. Contract

    Regular checks for water

    contamination in all water bodies of

    the city

    GNP, health dept. Contract

    Literacy rates

    Ensure 100% enrollment in primary

    schoolsEdu. Dept of M.P. and GNP

    100% Teacher student ratio Edu. Dept of M.P. and GNP Recruitment

    Technical, engineering & medical

    education in the cityEdu. Dept of M.P. and GNP PPP

    Developed existing parks GNP Contract / PPP

    Area coverage under recreational

    facilitiesGNP

    Playing facilities GNP

    Provision for green-belts in future

    development plansGNP

    Sufficient infrastructure at

    mela/exhibition groundGNP contract

    Security of tenure for urban poor MPHB, GNP

    Inclusion of 100% urban poor

    population under various central and

    state govts social sectors schemes like

    old-age pension schemes, Scheme for

    handicapped persons, deen-dayal

    antyoday yojana, mid-day meals

    schemes, etc

    - -

    Pucca housing for urban poor 1250 lakhs PPP

    Access to water connection GNP

    Access to public toilets and urinal

    facilities for all slum householdsGNP Contract / PPP

    Access to dustbins and secondary

    storage pointsGNP Contract / PPP

    Upgradation of kutcha roads to PCC

    roads in slumsGNP PPP

    Improved drainage systems GNP PPP

    Adequate street lighting facilities GNP PPP

    Education facilities GNP PPP

    Community halls etc. GNP PPP

    Adequate health facilities GNP PPP

    Security of tenure for urban poor MPHB, GNP

    Note:

    Provision of Land

    ownership,

    improvement

    schemes, relocation of

    hazardous slums,

    pucca drain network,

    financial support for

    the construction of

    houses.

    200 Lakhs

    940 Lakhs

    Included in

    tourism

    Regarding slum

    development,

    investment has

    been done in

    other sectors.

    Strenthening

    infrastructures in

    health centers and to

    run health initiative

    programs.

    Provision of co-

    education,

    strengthning of

    education

    infrastructures and

    opening of vocational

    training centres.

    Development of water

    bodies, mini-stadium,

    exibition ground,

    community halls,

    public library etc.

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    * Marks - project has to be done till year 2035 by GNP, depending upon city need and available resources.

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    SOC

    IAL

    INFR

    AST

    RU

    CTU

    RE

    HEA

    LTH

    EDU

    CA

    TIO

    NR

    ECR

    EATI

    ON

    AL

    Soci

    al s

    ecu

    rity

    sch

    emes

    100% *

    100% *

    10

  • 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11

    Rates and Tax Revenue - - - - - -

    Assigned Revenues & Compensation - - - - - -

    Rental Income from Municipal Properties - - - - - -

    Fees & User Charges - - - - - -

    Sale & Hire Charges - - - - - -

    Revenue Grants, Contribution and Subsidies - - - 107063 3597479 8517391

    Income from Investments - - - - - -

    Interest Earned - - - - - -

    Tax - - - 147291 194513 236235

    Non-Tax - - - 10547622 14640901 15683221

    Other Income - - - - - -

    - - - 10801976 18432893 24436847

    Grants, Contribution for specific purposes - - - - - -

    Secured Loans - - - - - -

    Unsecured Loans - - - - - -

    Deposits - - - - - -

    Deposit works - - - - - -

    - - - - - -

    Establishment Expenses - - - 3787212 3467401 4598405

    Administrative Expenses - - - - - -

    Operations & Maintenance - - - 4753489 8580527 10607626

    Interest & Finance Charges - - - 89470 1281420 1620504

    Programme Expenses - - - - - -

    Revenue Grants, Contribution and Subsidies - - - - - -

    Miscellaneous Expenses - - - - - -

    Transfer to Fund - - - - - -

    Other - - - 5248290 6390359 4729821

    - - - 13878461 19719707 21556356

    Fixed Assets - - - - - -

    Capital Work-in-Progress - - - - - -

    Investments -General Fund - - - - - -

    Investments-Other Funds - - - - - -

    Stocks/Inventory - - - - - -

    Loans, Advances and Deposits - - - - - -

    Other Assets - - - - - -

    Miscellaneous Expenditure - - - - - -

    - - - - - -

    - - - - - -

    - - - - - -

    Note: Refer Madhya Pradesh Municipal Accounting Manual for further details. Can be downloaded from "Download" Section of www.mpurban.gov.in.

    Year

    Municipal Finance (Should be filled carefully and it should be checked whether the capital income is factual or based on assumption

    Rev

    enu

    e In

    com

    e

    Total - Revenue Income

    Total Income

    Total Expenditure

    Ca

    pit

    al

    Rec

    eip

    ts

    Total Capital Receipts

    Rev

    enu

    e E

    xp

    end

    itu

    re

    Total - Revenue Expenditure

    Cap

    ital

    Exp

    end

    itu

    res

    Total Capital Expenditure

    11

  • Reforms Achieved (Y/N)

    Any City specific

    Strategies

    adopted

    Preliminary

    estimate (if any)

    for

    implementation

    Implementing

    agency

    2012-13 2013-14 2014-15 2015-16

    Full migration of double accounting

    System

    N25% 50% 75% 100% No Not Available UADD

    Property tax reforms, 85% coverage

    ratio and 90% collection ratio

    N25% 50% 75% 100% No Not Available Nagar Parishad

    Levy of user charges : full recovery of O

    & M charges for sewerage, water supply

    and SWM

    N

    25% 50% 75% 100% No Not Available Nagar Parishad

    Internal earmarking of basic services to

    urban poor

    N25% 50% 75% 100% No Not Available

    Nagar Parishad &

    UADD

    E-governance N - 67% 33% 100% No 40 lakh UADD

    Provision of basic services to urban poor

    including security of tenure at affordable

    prices, improved housing, water supply,

    sanitation

    N

    25% 50% 75% 100% No Not AvailableNagar Parishad &

    UADD

    Reforms Action Plan

    Timeline to achieve reforms till 2015

    12

  • City Development Plan

    Gurh, Madhya Pradesh

    SUBMITTED TO:-

    Urban Administration and Development

    Department, GoMP

    PROJECT CO-ORDINATION:-

    City Managers' Association Madhya Pradesh

    CONSULTANT:-

    DMG Consulting Pvt. Ltd.

    A-81, Sector- 65, NOIDA (UP)

    Chief Municipal Officer Sub Engineer

    Gurh Gurh

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page ii

    Table of Contents

    LIST OF TABLES ------------------------------------------------------------------------------------------------------------------------ VIII

    LIST OF FIGURES ------------------------------------------------------------------------------------------------------------------------ XI

    EXECUTIVE SUMMARY ----------------------------------------------------------------------------------------------------------------- 1

    1. INTRODUCTION ------------------------------------------------------------------------------------------------------- 11

    1.1 BACKGROUND ------------------------------------------------------------------------------------------------------------ 11

    1.2 CONCEPT AND PRINCIPLE OF CITY DEVELOPMENT PLAN -------------------------------------------------------------- 11

    1.3 OBJECTIVE OF THE ASSIGNMENT ---------------------------------------------------------------------------------------- 12

    1.4 UNDERSTANDING OF TERMS OF REFERENCE VIS A VIS METHODOLOGY OF THE STUDY ----------------------------- 12

    1.5 APPROACH AND METHODOLOGY FOR PREPARATION OF CDP -------------------------------------------------------- 13

    1.6 SCOPE OF WORK --------------------------------------------------------------------------------------------------------- 15

    2. INTRODUCTION TO GURH ----------------------------------------------------------------------------------------- 23

    2.1 INTRODUCTION TO REWA ------------------------------------------------------------------------------------------------ 23

    2.2 ADMINISTRATIVE BOUNDARY -------------------------------------------------------------------------------------------- 23

    2.3 LOCATION AND CONNECTIVITY ------------------------------------------------------------------------------------------ 23

    2.4 STUDY AREA -------------------------------------------------------------------------------------------------------------- 26

    2.5 PHYSICAL CHARACTERISTICS --------------------------------------------------------------------------------------------- 27

    2.5.1 TOPOGRAPHY & GEOLOGY ---------------------------------------------------------------------------------------------- 27

    2.5.2 CLIMATE ------------------------------------------------------------------------------------------------------------------ 27

    2.6 AGRICULTURE, INDUSTRY, MINERALS & FLORA FAUNA --------------------------------------------------------------- 28

    3. DEMOGRAPHIC PROFILE OF THE TOWN ----------------------------------------------------------------------- 30

    3.1 BACKGROUND ------------------------------------------------------------------------------------------------------------ 30

    3.2 POPULATION TREND AND URBANIZTION ------------------------------------------------------------------------------- 30

    3.3 POPULATION DENSITY --------------------------------------------------------------------------------------------------- 31

    3.4 POPULATION PROJECTIONS ---------------------------------------------------------------------------------------------- 33

    3.5 METHODOLOGY ADOPTED TO ESTIMATE POPULATION ---------------------------------------------------------------- 33

    3.5.1 ARITHMETIC PROGRESSION METHOD ----------------------------------------------------------------------------------- 33

    3.5.2 GEOMETRICAL PROGRESSION METHOD -------------------------------------------------------------------------------- 34

    3.5.3 INCREMENTAL INCREASE METHOD -------------------------------------------------------------------------------------- 34

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page iii

    3.6 SUMMARY OF POPULATION PROJECTION THROUGH VARIOUS METHODS -------------------------------------------- 34

    3.7 SCHEDULE CASTE & SCHEDULE TRIBE POPULATION ------------------------------------------------------------------- 35

    3.8 LITERACY RATE ----------------------------------------------------------------------------------------------------------- 35

    3.9 SEX RATIO ---------------------------------------------------------------------------------------------------------------- 37

    3.10 SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 38

    4. SOCIO-ECONOMIC PROFILE OF THE TOWN ------------------------------------------------------------------- 40

    4.1 BACKGROUND ------------------------------------------------------------------------------------------------------------ 40

    4.2 SEX RATIO ---------------------------------------------------------------------------------------------------------------- 40

    4.3 LITERACY RATE ----------------------------------------------------------------------------------------------------------- 40

    4.4 AVERAGE HOUSEHOLD SIZE --------------------------------------------------------------------------------------------- 40

    4.5 WORKFORCE PARTICIPATION -------------------------------------------------------------------------------------------- 40

    4.6 WORKFORCE DISTRIBUTION --------------------------------------------------------------------------------------------- 41

    4.7 DEPENDENCY RATIO------------------------------------------------------------------------------------------------------ 42

    4.8 INDUSTRIAL ACTIVITIES -------------------------------------------------------------------------------------------------- 43

    4.8.1 INFORMAL BUSINESS AND LOCAL ECONOMY (TRADE & COMMERCE) ------------------------------------------------ 44

    4.8.2 WHOLESALE TRADE ------------------------------------------------------------------------------------------------------ 44

    4.9 HERITAGE AND TOURISM ------------------------------------------------------------------------------------------------ 45

    4.10 SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 46

    4.11 ISSUES --------------------------------------------------------------------------------------------------------------------- 47

    4.12 PROPOSED PROJECTS, THEIR COST AND IMPLEMENTING AGENCIES: --------------------------------------------------- 47

    5. PHYSICAL PLANNING AND GROWTH MANAGEMENT ------------------------------------------------------ 50

    5.1 BACKGROUND ------------------------------------------------------------------------------------------------------------ 50

    5.2 SPATIAL GROWTH TRENDS ---------------------------------------------------------------------------------------------- 50

    5.3 SPATIAL DISTRIBUTION OF POPULATION -------------------------------------------------------------------------------- 50

    5.4 LANDUSE ANALYSIS ------------------------------------------------------------------------------------------------------ 51

    5.5 HOUSING SCENARIO ----------------------------------------------------------------------------------------------------- 53

    5.5.1 INTRODUCTION ----------------------------------------------------------------------------------------------------------- 53

    5.5.2 HOUSING STOCK---------------------------------------------------------------------------------------------------------- 53

    5.5.3 PRESENT AND FUTURE HOUSING DEMAND ----------------------------------------------------------------------------- 56

    5.6 FUTURE GROWTH POSSIBILITIES ---------------------------------------------------------------------------------------- 57

    5.7 SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 58

    5.8 CITY SPECIFIC STRATEGIES AND ACTION PLAN-------------------------------------------------------------------------- 58

    6. URBAN INFRASTRUCUTRE SERVICES ---------------------------------------------------------------------------- 61

    6.1 INTRODUCTION ----------------------------------------------------------------------------------------------------------- 61

    6.2 PHYSICAL INFRASTRUCUTRE --------------------------------------------------------------------------------------------- 61

    6.2.1 WATER SUPPLY ----------------------------------------------------------------------------------------------------------- 61

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page iv

    PROJECT IDENTIFICATION & COSTING--------------------------------------------------------------------------------------------------- 72

    6.2.2 SEWERAGE AND SANITATION -------------------------------------------------------------------------------------------- 72

    PROJECT IDENTIFICATION & COSTING--------------------------------------------------------------------------------------------------- 78

    PROJECT IDENTIFICATION & COSTING--------------------------------------------------------------------------------------------------- 88

    6.2.3 SOLID WASTE MANAGEMENT ------------------------------------------------------------------------------------------- 88

    PROJECT IDENTIFICATION & COSTING--------------------------------------------------------------------------------------------------- 96

    6.2.4 TRAFFIC AND TRANSPORTATION ----------------------------------------------------------------------------------------- 97

    PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 104

    6.2.5 STREET LIGHTING AND FIRE FIGHTING -------------------------------------------------------------------------------- 104

    PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 108

    6.2.6 URBAN POOR AND THEIT ACCESSIBILITY TO BASIS SERVICES -------------------------------------------------------- 109

    PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 114

    6.3 SOCIAL INFRASTRUCUTRE ---------------------------------------------------------------------------------------------- 115

    6.3.1 HEALTH ----------------------------------------------------------------------------------------------------------------- 115

    6.3.2 EDUCATION ------------------------------------------------------------------------------------------------------------- 116

    6.3.3 RECREATION AND ENTERTAINMENT ----------------------------------------------------------------------------------- 117

    6.3.4 FIRE FIGHTING SERVICES ----------------------------------------------------------------------------------------------- 117

    6.3.5 COMPARATIVE ANALYSIS WITH THE UDPFI GUIDELINES ------------------------------------------------------------ 117

    6.3.6 SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 121

    6.3.7 ISSUES ------------------------------------------------------------------------------------------------------------------- 122

    6.3.8 CITY SPECIFIC STRATEGIES AND ACTION PLAN------------------------------------------------------------------------ 122

    PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 123

    6.4 ENVIRONMENT --------------------------------------------------------------------------------------------------------- 124

    6.4.1 FLORA AND FAUNA ----------------------------------------------------------------------------------------------------- 124

    6.4.2 POLLUTION LEVELS (AIR, WATER AND SOIL) ------------------------------------------------------------------------- 124

    6.4.3 CITY GREEN SPACES ---------------------------------------------------------------------------------------------------- 124

    6.4.4 WATER FRONT DEVELOPMENT AND CONSERVATION ---------------------------------------------------------------- 125

    6.4.5 ISSUES ------------------------------------------------------------------------------------------------------------------- 125

    6.4.6 CITY SPECIFIC STRATEGIES AND ACTION PLAN------------------------------------------------------------------------ 125

    6.5 HERITAGE AND CONSERVATION --------------------------------------------------------------------------------------- 126

    6.5.1 IDENTIFICATION OF TOURIST SPOTS AT LOCAL LEVEL ---------------------------------------------------------------- 126

    6.5.2 IDENTIFICATION OF TOURIST SPOTS AT REGIONAL LEVEL ------------------------------------------------------------ 127

    6.5.3 IDENTIFICATION OF TOURIST SPOTS AT LOCAL LEVEL ---------------------------------------------------------------- 129

    6.5.4 EXISTING REGULATIONS/HERITAGE GUIDELINES AT THE ULB AND STATE LEVEL ---------------------------------- 129

    6.5.5 HERITAGE ISSUES ------------------------------------------------------------------------------------------------------- 130

    6.5.6 TOURISM POTENTIAL OF THE TOWN ---------------------------------------------------------------------------------- 130

    6.5.7 COMPARATIVE ANALYSIS WITH THE UDPFI & UNESCO GUIDELINES --------------------------------------------- 130

    6.5.8 SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 130

    6.5.9 ISSUES ------------------------------------------------------------------------------------------------------------------- 131

    6.5.10 CITY SPECIFIC STRATEGIES AND ACTION PLAN------------------------------------------------------------------------ 131

    PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 131

    7. PHYSICAL INFRASTRUCTURE: WATER SUPPLY ------------------------------------------------------------- 133

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page v

    7.1 INTRODUCTION --------------------------------------------------------------------------------------------------------- 133

    7.2 SOURCES OF WATER SUPPLY ------------------------------------------------------------------------------------------ 133

    7.3 WATER DISTRIBUTION SYSTEM ---------------------------------------------------------------------------------------- 133

    7.4 WATER DISTRIBUTION ARRANGEMENTS ------------------------------------------------------------------------------ 134

    7.5 PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ----------------------------------------------------------------- 136

    7.6 COMPARATIVE ANALYSIS WITH UDPFI, CPHEEO GUIDELINES ----------------------------------------------------- 137

    7.7 SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 138

    7.8 ISSUES ------------------------------------------------------------------------------------------------------------------- 138

    7.9 CITY SPECIFIC STRATEGIES AND ACTION PLAN------------------------------------------------------------------------ 138

    7.10 LOW COST WATER TREATMENT OPTION ----------------------------------------------------------------------------- 140

    PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 140

    8. EXISTING INSTITUTIONAL FRAMEWORK FOR DEVELOPMENT ----------------------------------------- 143

    8.1 URBAN LOCAL BODY STRUCTURE ------------------------------------------------------------------------------------- 143

    8.2 TOWN AND COUNTRY PLANNING DEPARTMENT --------------------------------------------------------------------- 144

    8.3 DEVELOPMENT AUTHORITY -------------------------------------------------------------------------------------------- 145

    8.4 PUBLIC HEALTH ENGINEERING DEPARTMENT ------------------------------------------------------------------------ 145

    8.5 MADHYA PRADESH HOUSING BOARD -------------------------------------------------------------------------------- 145

    8.6 MADHYA PRADESH POLLUTION CONTROL BOARD ------------------------------------------------------------------- 146

    8.7 ROLE OF PRIVATE SECTOR IN INFRASTRUCUTRE SERVICE PROVISION ----------------------------------------------- 146

    8.8 ISSUES ------------------------------------------------------------------------------------------------------------------- 146

    8.9 CITY SPECIFIC STRATEGIES AND ACTION PLAN------------------------------------------------------------------------ 146

    9. INVESTMENT PLAN AND FINANCING STRATEGIES -------------------------------------------------------- 149

    9.1 REVENUE ACCOUNT ---------------------------------------------------------------------------------------------------- 149

    9.1.1 KEY ASSUMPTIONS ----------------------------------------------------------------------------------------------------- 149

    9.1.2 NON TAX SOURCES ----------------------------------------------------------------------------------------------------- 149

    9.2 REVENUE INCOME ------------------------------------------------------------------------------------------------------ 149

    9.3 GROWTH IN INCOME --------------------------------------------------------------------------------------------------- 150

    9.4 OBSERVATIONS --------------------------------------------------------------------------------------------------------- 151

    9.5 REVENUE EXPENDITURE ------------------------------------------------------------------------------------------------ 151

    9.6 CAPITAL ACCOUNT ----------------------------------------------------------------------------------------------------- 151

    9.6.1 CAPITAL INCOME ------------------------------------------------------------------------------------------------------- 151

    9.6.2 CAPITAL EXPENDITURE ------------------------------------------------------------------------------------------------- 152

    9.7 KEY FINANCIAL INDICATORS -------------------------------------------------------------------------------------------- 153

    9.7.1 REVENUE INDICATORS ------------------------------------------------------------------------------------------------- 153

    9.7.2 EXPENDITURE INDICATORS --------------------------------------------------------------------------------------------- 153

    9.8 INCOME, EXPENDITURE AND SURPLUS DEFICIT: ANALYSIS ---------------------------------------------------------- 153

    9.8.1 FINANCIAL STATUS AT A GLANCE -------------------------------------------------------------------------------------- 153

    9.8.2 KEY ISSUES AND CONCLUSION ----------------------------------------------------------------------------------------- 154

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page vi

    9.9 CITY SPECIFIC STRATEGIES AND ACTION PLAN------------------------------------------------------------------------ 155

    10. INVESTMENT PRIORITIZATION PLAN ------------------------------------------------------------------------- 157

    10.1 PROJECT IDENTIFICATION ---------------------------------------------------------------------------------------------- 157

    10.2 PHYSICAL INFRASTRUCTURE ------------------------------------------------------------------------------------------- 157

    10.2.1 WATER SUPPLY --------------------------------------------------------------------------------------------------------- 157

    10.2.2 DRAINAGE -------------------------------------------------------------------------------------------------------------- 157

    10.2.3 SEWERAGE AND SANITATION ------------------------------------------------------------------------------------------ 157

    10.2.4 SOLID WASTE MANAEMENT ------------------------------------------------------------------------------------------- 158

    10.2.5 TRAFFIC AND TRANSPORTATION --------------------------------------------------------------------------------------- 158

    10.2.6 URBAN POOR ----------------------------------------------------------------------------------------------------------- 159

    10.3 SOCIAL INFRASTRUCTURE ---------------------------------------------------------------------------------------------- 160

    10.3.1 HEALTH FACILITES ------------------------------------------------------------------------------------------------------ 160

    10.3.2 EDUCATIONAL FACILITES ----------------------------------------------------------------------------------------------- 160

    10.3.3 RECREATION AND ENTERTAINMENT ----------------------------------------------------------------------------------- 160

    10.3.2 HERITAGE AND TOURISM ---------------------------------------------------------------------------------------------- 161

    10.4 BASIS FOR PROJECT IDENTIFICATION ---------------------------------------------------------------------------------- 161

    10.5 PROJECTS FOR SYSTEM AND INFRASTRUCTURE AUGMENTATION --------------------------------------------------- 162

    10.6 PROJECTS FOR SYSTEM AND INFRASTRUCTURE REFURBISHMENT --------------------------------------------------- 163

    10.7 OTHER DEVELOPMENT PROJECT -------------------------------------------------------------------------------------- 163

    10.8 SECTOR WISE PROJECT IDENTIFICATION AND COSTING -------------------------------------------------------------- 164

    10.8.1 PHYSICAL INFRASTRUCTURE ------------------------------------------------------------------------------------------- 164

    10.8.2 URBAN POOR ----------------------------------------------------------------------------------------------------------- 167

    10.8.3 SOCIAL INFRASTRUCTURE ---------------------------------------------------------------------------------------------- 167

    10.8.4 TOURISM ---------------------------------------------------------------------------------------------------------------- 168

    10.8.5 OTHER COMPONENTS -------------------------------------------------------------------------------------------------- 169

    10.8.6 URBAN REFORMS & CAPACITY BUILDING ---------------------------------------------------------------------------- 169

    10.8.7 SECTOR WISE TOTAL COST -------------------------------------------------------------------------------------------- 170

    10.9. CITY INVESTMENT PLAN ----------------------------------------------------------------------------------------------- 170

    10.9.1 CITY INVESTMENT PLAN FOR 2012- 2015 (PHASE I) --------------------------------------------------------------- 170

    10.9.2 CITY INVESTMENT PLAN FOR 2016- 2020 (PHASE II) --------------------------------------------------------------- 172

    10.9.3 CITY INVESTMENT PLAN FOR 2021- 2025 (PHASE III) -------------------------------------------------------------- 173

    10.9.4 CITY INVESTMENT PLAN FOR 2026- 2030 (PHASE IV) -------------------------------------------------------------- 174

    10.9.5 CITY INVESTMENT PLAN FOR 2031- 2035 (PHASE V) -------------------------------------------------------------- 175

    10.9.6 FINANCING PLAN: ------------------------------------------------------------------------------------------------------ 175

    11. URBAN REFORMS -------------------------------------------------------------------------------------------------- 184

    11.1 BACKGROUND ---------------------------------------------------------------------------------------------------------- 184

    11.2 OBJECTIVES OF REFORMS: --------------------------------------------------------------------------------------------- 184

    11.3 NEED FOR REFORM INITIATIVES ---------------------------------------------------------------------------------------- 184

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page vii

    11.4 STRUCTURE OF REFORMS ---------------------------------------------------------------------------------------------- 185

    11.5 MANDATORY REFORMS: ------------------------------------------------------------------------------------------ 185

    11.6 OPTIONAL REFORMS (STATE AND ULB/PARA-STATAL LEVEL) -------------------------------------------------- 186

    11.7 STATUS OF MANDATORY & OPTIONAL REFORMS: ------------------------------------------------------------------- 186

    11.8 ISSUES ------------------------------------------------------------------------------------------------------------------- 188

    11.9 TOWN SPECIFIC STRATEGIES AND ACTION PLAN --------------------------------------------------------------------- 189

    12. TOWN VISION ------------------------------------------------------------------------------------------------------- 191

    12.1 SUMMARY OF SECTORAL STRATEGIES: -------------------------------------------------------------------------------- 191

    12.2 TOWN VISION: --------------------------------------------------------------------------------------------------------- 202

    12.3 TOWN POSITIONING: -------------------------------------------------------------------------------------------------- 202

    ANNEXURES.-------------------------------------------------------------------------------------------------------------------------- 205

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page viii

    List of Tables

    Table 2-1: Study Area ----------------------------------------------------------------------------------------------------------------- 26

    Table 3-1: Comparative Assessment of Urban Population ------------------------------------------------------------------ 30

    Table 3-2: Population Growth Trends -------------------------------------------------------------------------------------------- 31

    Table 3-3: Population Density Trends -------------------------------------------------------------------------------------------- 31

    Table 3-4: Demographics of the Town - Gurh ---------------------------------------------------------------------------------- 32

    Table 3-5: Projected Population Arithmetic Progression Method ------------------------------------------------------ 33

    Table 3-6: Projected Population Geometrical Progression Method ---------------------------------------------------- 34

    Table 3-7: Projected Population Incremental Increase Method --------------------------------------------------------- 34

    Table 3-8: Comparative Assessment of Urban SC & ST Population ------------------------------------------------------- 35

    Table 3-9: Comparative Assessment of Literacy Rate Gurh, M.P. ------------------------------------------------------- 35

    Table 3-10: Ward Wise Comparative Assessment of Literacy Rate Gurh, M.P. -------------------------------------- 36

    Table 3-11: Comparative Assessment of Sex Ratio ---------------------------------------------------------------------------- 37

    Table 3-12: Ward Wise Comparative Assessment of Sex Ratio Gurh, M.P. ------------------------------------------- 38

    Table 4-1: Comparative Assessment of Household Size --------------------------------------------------------------------- 40

    Table 4-2: Comparative Assessment of WFPR ---------------------------------------------------------------------------------- 41

    Table 4-3: Ward Wise Comparative Assessment of WFPR & Work Force Distribution ------------------------------- 42

    Table 4-4: Comparative Assessment of Non-working Population --------------------------------------------------------- 42

    Table 4-5: List of Important Industries in Rewa District and in its surrounding Districts---------------------------- 43

    Table 4-6: List of Important Centers/Spots for Tourists in Town and in its Proximity -------------------------------- 45

    Table 4-7: Proposed works, Costing and concerning Department -------------------------------------------------------- 47

    Table 4-8: Proposed works, Costing and concerning Department -------------------------------------------------------- 48

    Table 5-1: Ward Wise Distribution of Population Density as per 2011. -------------------------------------------------- 50

    Table 5-2: Existing Landuse Distribution; 2011 Gurh ------------------------------------------------------------------------ 51

    Table 5-3: Comparative Assessment of Household Size --------------------------------------------------------------------- 53

    Table 5-4: Ward Wise Present Housing Demand and Gap ------------------------------------------------------------------ 56

    Table 6-1: Silent Feature of Water Supply System in Gurh ------------------------------------------------------------------ 62

    Table 6-2: Projected Future demand Water Supply ------------------------------------------------------------------------ 64

    Table 6-3: Present and Future Requirement/Demand and Gap Assessment Water Supply ---------------------- 65

    Table 6-4: Performance Indicators Water Supply --------------------------------------------------------------------------- 65

    Table 6-5: Goals & Services Outcomes for different Horizon Years ------------------------------------------------------- 68

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page ix

    Table 6-6: Present and Future Demand and Supply Gaps Sewerage System ----------------------------------------- 74

    Table 6-7: Performance Indicators Sewerage System ---------------------------------------------------------------------- 75

    Table 6-8: Goals & Services Outcomes for different Horizon Years ------------------------------------------------------- 77

    Table 6-9: Length of Drains in Town ---------------------------------------------------------------------------------------------- 84

    Table 6-10: Present and Future Demand and Supply Gaps for Drainage System -------------------------------------- 86

    Table 6-11: Goals & Services Outcomes for different Horizon Years ----------------------------------------------------- 87

    Table 6-12: Ward Wise Municipal Solid Waste Generation Gurh Town ----------------------------------------------- 89

    Table 6-13: List of Vehicles and Equipments available with GNP for Solid Waste Collection & Transportation 90

    Table 6-14: Present and Future Demand and Supply Gaps of Waste Collection Gurh Town --------------------- 91

    Table 6-15: Performance Indicators Solid Waste Management --------------------------------------------------------- 91

    Table 6-16: Goals & Services Outcomes for different Horizon Years ----------------------------------------------------- 93

    Table 6-17: Space Standards of Roads ----------------------------------------------------------------------------------------- 101

    Table 6-18: Desirable of Footpaths --------------------------------------------------------------------------------------------- 101

    Table 6-19: Goals & Services Outcomes for Different Horizon Years --------------------------------------------------- 102

    Table 6-20: Present and Future Demand of Equipment (vehicles) and Man Power for Street Lighting and Fire

    Fighting --------------------------------------------------------------------------------------------------------------------------------- 105

    Table 6-21: Performance Indicators Street Lighting ---------------------------------------------------------------------- 106

    Table 6-22: Sources of Lighting at Household Level in Gurh -------------------------------------------------------------- 106

    Table 6-23: Goals & Services Outcomes for Different Horizon Years --------------------------------------------------- 107

    Table 6-24: Comparative Assessment of Literacy Rate --------------------------------------------------------------------- 116

    Table 6-25: Comparative Analysis with UDPFI Guidelines Social Infrastructure ----------------------------------- 118

    Table 6-26: Present and Future Demand and Supply Gaps Social Infrastructure --------------------------------- 118

    Table 6-27: List of Important Tourist/Destination Spots at Regional Level ------------------------------------------- 127

    Table 7-1: Silent Feature of Water Supply System in Gurh ---------------------------------------------------------------- 134

    Table 7-2: Projected Future demand Water Supply ---------------------------------------------------------------------- 136

    Table 7-3: Present and Future Requirement/Demand and Gap Assessment Water Supply -------------------- 137

    Table 7-4: Performance Indicators Water Supply ------------------------------------------------------------------------- 137

    Table 7-5: Goals & Services Outcomes for different Horizon Years ----------------------------------------------------- 139

    Table 8-1: Power and Functions of Gurh Nagar Parishad ------------------------------------------------------------------ 144

    Table 9-1- Year wise Expenditure of Gurh ------------------------------------------------------------------------------------- 152

    Table 9-2-: Income and Expenditure Status of Gurh ------------------------------------------------------------------------ 154

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page x

    Table 10-1: Proposed work, Project cost and Implementing Agencies for Water Supply ------------------------- 164

    Table 10-2: Proposed Project, Project Cost and Implementing Agencies for Sewerage and Sanitation ------- 165

    Table 10-3: Proposed Project, Project Cost and Implementing Agencies for Solid Waste Management ------ 165

    Table 10-4: Proposed Project, Project Cost and Implementing Agencies for Storm Water Drainage ---------- 166

    Table 10-5: Proposed Project, Project Cost and Implementing Agencies for Traffic and Transportation ----- 166

    Table 10-6: Proposed Project, Project Cost and Implementing Agencies for Street Lighting and Fire Fighting

    ------------------------------------------------------------------------------------------------------------------------------------------- 167

    Table 10-7: Proposed Project, Project Cost and Implementing Agencies for Urban Poor ------------------------- 167

    Table 10-8: Proposed Project, Project Cost and Implementing Agencies for Health Facilities ------------------- 167

    Table 10-9: Proposed Project, Project Cost and Implementing Agencies for Education Facilities --------------- 168

    Table 10-10: Proposed Project, Project Cost and Implementing Agencies for Tourism ---------------------------- 168

    Table 10-11: Proposed Project, Project Cost and Implementing Agencies for Other Development works --- 169

    Table 10-12: Proposed Project, Project Cost and Implementing Agencies for Urban Reforms and Capacity

    Buildings ------------------------------------------------------------------------------------------------------------------------------- 169

    Table 10-13: Sector wise Proposed Project and their Cost ---------------------------------------------------------------- 170

    Table 10-14: Sector wise Project cost and Yearly Schedule of Expenditure (Phase I) ------------------------------ 170

    Table 10-15: Sector wise Project cost and Yearly Schedule of Expenditure (Phase II) ----------------------------- 172

    Table 10-16: Sector wise Project cost and Yearly Schedule of Expenditure (Phase III) ----------------------------- 173

    Table 10-17: Sector wise Project cost and Yearly Schedule of Expenditure (Phase IV) ---------------------------- 174

    Table 10-18: Sector wise Project cost and Yearly Schedule of Expenditure (Phase V) ----------------------------- 175

    Table 10-19: Overall financing plan of investment plans: ----------------------------------------------------------------- 180

    Table 10-20: Revenue Collection from 2008-2035 at Normal Growth rate of 12% ------------------------------------- 1

    Table 10-21: Revenue Collection from 2008-2035 at Performing Growth rate of 14% -------------------------------- 1

    file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103427file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103428

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page xi

    List of Figures

    Figure 1-1: Schematic Diagram for Methodology of City Development Plan Preparation ................................ 14

    Figure 1-2: Specific Objectives of CDP ................................................................................................................ 15

    Figure 1-3: Stage 1: Inception ............................................................................................................................. 17

    Figure 1-4: Stage 2: Sector Assessment and City Profile .................................................................................... 18

    Figure 1-5: Stage 3: City Vision and Development Objectives ........................................................................... 19

    Figure 1-6: Stage 4: Draft CDP ............................................................................................................................ 20

    Figure 4-1: Shops constructed and non-funtional near Bus stands ................................................................... 45

    Figure 4-2: Commercial outlets along the road .................................................................................................. 45

    Figure 6-1: Over Head Tank in ward 13 .............................................................................................................. 61

    Figure 6-2: Municipal water supply .................................................................................................................... 61

    Figure 6-3: A typical rapid sand filter water treatment with its components. The filter is contained within a

    filter box, usually made of concrete. Inside the filter box are layers of filter media and gravel. ...................... 71

    Figure 6-4 Main DEWATS modules for physical and biological wastewater treatment: ................................... 80

    Figure 6-5 Use of the biogas genmerated from the DEWAT .............................................................................. 81

    Figure 6-6: Pour flush single pit and twin pit toilet ............................................................................................ 82

    Figure 6-7: Scematic diagram of septic tank ...................................................................................................... 83

    Figure 6-8: Open and choked drain .................................................................................................................... 84

    Figure 6-9: Bus Stand in Gurh ............................................................................................................................. 97

    Figure 6-10 Katcha houses of urban poor ..............................................................Error! Bookmark not defined.

    Figure 6-11 Community Health Centre in Gurh ................................................................................................ 115

    Figure 6-12 Secondary School in gurh .............................................................................................................. 116

    Figure 6-13 A view of the old Fort lying in dilapidated consition ..................................................................... 125

    Figure 6-14 Toilet complex in the compond of the old Fort in Gurh ......................Error! Bookmark not defined.

    Figure 7-1 Over Head Tank in ward 13 ............................................................................................................. 133

    Figure 7-2 Municipal water supply ................................................................................................................... 133

    Figure 7-3 Handpump ....................................................................................................................................... 134

    Figure 8-1: Institutional Setup Gurh Nagar Parishad ..................................................................................... 143

    Figure 10-1: Involvement of Different Stakeholders in the Consultation Proccess Gurh ............................. 162

    file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103443file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103444file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103445file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103446file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103452file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103453file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103454file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103455file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103456file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103457file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103458file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103459file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103460file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103461file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Gurh%20CDP\Gurh_Draft%20Report%20_edited_AH_27-08-2012%20-%20Copy.docx%23_Toc341103462

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page xii

    List of Graphs

    Graph 3.1: Population Gurh, M.P 28

    Graph: 4-1 Workforce Distibution Gurh, M.P.............................................................................................. 39

    Graph 4.2: Gender Wise Work Force Distribution in Differrent Sectors of Economy. 39

    Chart: 4-3 Gender Wise Dependency Ratio Gurh, M.P................................................................................ 41

    Graph: 5-1 Developed and Undeveloped Area in Gurh.................................................................................. 50

    Graph: 5-2 Landuse Distribution Developed Area.. 50

    Graph: 5-3 Distribution of Houses by Predominant Material of Wall 52

    Graph: 5-4 Distribution of Houses by Predominant Material of Roof 53

    Graph: 5-5 Distribution of Houses by Predominant Material of Floor.. 53

    Graph: 5-6 Housing Ownership Status Gurh Nagar Parishad.. 54

    Graph: 6-1 Distribution of Houses by Sources of Water (as per Census 2001).. 61

    Graph: 6 2 Distribution of Houses by Location.. 61

    Graph: 6-3 Distribution of Houses as per availability of toilets...................................................................... 70

    Graph: 6-4 Facility and Types of Latrines....................................................................................................... 71

    Graph: 7-1 Distribution of Houses by Sources of Water (as per Census 2001).............................................. 128

    Graph 9-1: Year wise Total Income, Gurh ..................................................................................................... 142

    Graph 9-2: Growths in Income, Gurh............................................................................................................. 142

    Graph 9-3: Total Expenditure, Gurh............................................................................................................... 143

    Graph 9-4: Incomes from Various Sources, Gurh.......................................................................................... 144

    Graph 9-5: Status of Municipal Finance, Gurh . 146

    Graph 10-1: Financing Option- Water Supply................................................................................................ 166

    Graph 10-2: Financing Option- Sewerage & Sanitation................................................................................. 167

    Graph 10-3: Financing Option- Solid Waste .. 167

    Graph 10-4: Financing Option- Strom water Drainage.................................................................................. 167

    Graph 10-5: Financing Option-Traffic & Transportation............................................................................... 168

    Graph 10-6: Financing Option: Street Lighting & Fire 168

    Graph 10.7: Financing Option- Urban Poor Fighting..................................................................................... 168

    Graph 10-8: Financing Option- Health facility............................................................................................... 169

    Graph 10-9: Financing Option- Education Sector.......................................................................................... 169

    Graph 10-10: Financing Option- Tourism...................................................................................................... 169

    Graph 10-11: Financing Option- Other Components..................................................................................... 170

    Graph 10-12: Financing Option- Urban Reforms & Capacity Building............................................................ 170

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page xiii

    List of Maps

    Map: 2-1 Location of Gurh ................................................................................................................................. 25

    Map: 2-2 Regional Connectivity Gurh, M.P. .................................................................................................... 26

    Map: 2-3 Study Area Gurh Nagar Parishad ...................................................................................................... 27

    Map: 3-1 Ward Wise Population Density Gurh, M.P. ...................................................................................... 33

    Map: 3-2 Ward Wise Literacy Rate Gurh, M.P................................................................................................. 36

    Map: 3-3 Ward Wise Sex Ratio Gurh, M.P. ...................................................................................................... 37

    Map: 4-1 Major Markets/Commercial and Wholesale Trading Areas of the Town ........................................... 44

    Map: 4-2 Tourism in and Around Gurh Town .................................................................................................... 46

    Map: 5-1 Urban Growth Scenario Gurh, M.P. ................................................................................................. 51

    Map: 5-2 Existing Landuse Map; 2011 Gurh Nagar Parishad .......................................................................... 53

    Map: 6-1 Existing and Proposed Water Supply Lines - Gurh .............................................................................. 64

    Map: 6-2 Existing and Proposed Drainage Map - Gurh ...................................................................................... 85

    Map: 6-3 Road Network of Gurh Town .............................................................................................................. 99

    Map: 6-4 Existing and Proposed Social Infrastructure Map of Gurh ................................................................ 117

    Map: 6-5 Tourism in and around Gurh Town ................................................................................................... 127

    Map: 6-6 Regional Tourism Destination around Gurh Town ........................................................................... 129

    Map: 7-1 Water Supply Lines - Gurh ................................................................................................................ 136

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page 1

    Executive Summary

    Introduction

    Government of India (GoI) and Government of Madhya Pradesh (GoMP) have made several initiatives through various programmes to meet the growing demands of infrastructure and service delivery. Subsequently, the GoI and GoMP executed various program such as City Development (a) Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) (b) Integrated Housing and Slum Development Programme (IHSDP) (c) the GoMP initiated DFID funded MPUSP which links reform with investment in infrastructure for the poor, etc. Other than this, there are several programmes that have been initiated by the GoI and GoMP.

    This is the Phase-II assignment of GoMP where they are preparing City Development plans (CDP) for 258

    towns. In the phase-I stage they already done CDPs for 258 towns. In this Phase DMG Consulting Pvt. Ltd

    did CDPs for 7 towns out of the 258 towns.

    Based on this programme, GoMP launched Mukhyamantri Sahari Adhusanrachna Bikas Yojana, which is

    going to be, funded all the projects proposed in the CDPs to the respective ULB.

    Objectives and scope of the Assignment

    The objective of the assignment is to prepare a City Development plan (CDP) with the vision of a desired future perspective for the city and formulate a strategic framework and interventions through sectoral plans translated into actions that define on how the ULB, together with other stakeholders, intends to work towards achieving their long-term vision in the next five years. The above foremost objective is to achieve and translate into developmental outputs in the form of projects, programme and implementation process which intend to cover the following:

    The CDP will scale up existing urban development and poverty alleviation schemes within a comprehensive and coherent strategic planning framework in order to ensure optimal benefit from available resources for the citizens of the Urban Local Body.

    The CDP should aim to catalyze new thinking and provoke debate through a consultative stakeholder driven process and vision.

    Strategic thrusts of the CDP will be built around the lessons and findings of a comprehensive and rigorous stakeholder consultation and documentation process.

    It is expected that the CDP will serve the requirements of the UIDSSMT and IHSDP programmes as well as JNNURM and other development schemes.

    The CDP will generate specific priority actions and projects that can be the basis for mobilizing funding from diverse sources.

    The scope of work include: (a) Inception Report covering Current status, systems and procedures, reconnaissance and kick off workshop, b) Sector Analysis Report on the economic opportunity and potential for local/regional economic development with special reference to the poor, transport study with emphasis on low cost public transport and livelihoods, heritage conservation and tourism,

  • City Development Plan, Gurh, M.P.

    DMG Consulting Pvt. Ltd., Noida Page 2

    environmental sustainability, access to housing, employment and social and environmental services by the poor, health and education services gap in the town, sectoral issues addressed under the Master Plan. C) City Profile covering assessment of the existing situation in all the sectors identified, emerging issues, SWOT analysis and projection of the present gaps and future requirements. This will be done within the framework of parameters relating to demography, economic base, finance, physical and environmental issues, infrastructure, institutions and universalisation of services especially for the poor, d) Evolving City Objectives and formulate sectoral strategies based on the stakeholders consultation f) Development strategy and Action Plan g) Evaluation of Sectoral vision and Action Plan in consultation with the stakeholders h) Analysis of Governance Framework & Reform Action Plans, i) Preparation of a City Investment Plan (CIP) and a Financing Strategy (Financial Operating Plan):

    The Draft Final Report provided (a) Introduction including scope of work, methodology adopted and consultation process of Stakeholders in project identification process b) Physical feature of the town contains location, physiographic and landform, municipal area and planning area c) Demographic profile including population projection along with other demographic indicators d) Socio - Economic profile of the town including sex ratio, literacy, WFPR, industrial activities, trade and commerce, tourism and issues, e) Physical planning and Growth management including spatial distribution, growth trends, municipal wards, status of housing and demand, study of Master Plan provisions, future growth possibilities f) status of Infrastructure including wate