TD t - . ' 2~(~;*L T REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC HIGHWAYS BICOL RIVER BASIN DEVELOPMENT PROJECT ROAD COMPONENT PACKAGE 4 g CERTEZA DEVELOPMENT CORP. 2ND FLOOR CULMAT BLD)G. E. RODRIGUEZ SR., AVE. NEAR CORNER T. MORATO AVE., OUEZON CITY TEL. NO. 77-35-72 pCo. BOX93 0.C-

Upload: lykhuong

Post on 28-Mar-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

TD t - 2~(~L T

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC HIGHWAYS

BICOL RIVER BASIN DEVELOPMENT PROJECT

ROAD COMPONENT

PACKAGE 4

g CERTEZA DEVELOPMENT CORP 2ND FLOOR CULMAT BLD)G E RODRIGUEZ SR AVE

NEAR CORNER T MORATO AVE OUEZON CITY TEL NO 77-35-72 pCo BOX93 0Cshy

PROGRESS REPORT

CONSTRUCTION OF PACKAGE IV

April 1981

1 3 deg

- i I

PACKAGE IJ

CONSTRUCTION REPORT

APRIL 1981

TABLE OF CONTENTS

Figure I ------- ----- Location map

PAGE CONTRACT I NABUA-TANDAAY SECTION SUB-PROJECT NO l1

Contractor SP DACER CONSTRUCTION CO INC

Project Status ----------------- I-1

CONTRACT II-A TANDAAY-SAN JUAN SECTION SUB-P[OGJECT NO 11

Contractor FF CRUZ amp CO INC

project Status -I------------ ----- II-A-1

CONTRACT II-B0 TANDAAY-SAN JUAN SECTION SUB-PROJECT NO 11

Contractor FF CRUZ amp CO INC

Project Status II-B-1

CONTRACT III LIBON-NUGPO SECTION SUB-PROJECT NO 11

Contractor DIMSON (MANILA) INC

Project Status---------------- III-1

Summary (Final Inventory) ------------ Annex III-A

CONTRACT IV SAN JUAN-NUGPO SECTION SUB-PROJECT NO 11

Contractor FF CRUZ amp CO INC

project Status----------------- - - - - IV-1

CONTRACT V A POLANGUI-NASISI SECTION SUB-PROJECT NO 14

Contractor BETTER BUILDERS CONST CORP

project Status---------------- V-A-1

Summary (Final Inventory- - ---------- V-A-A

CONTRACT V-B-AN ALNAY AND NAPO BRIDGE ALONG POLANGUI-NASItSI SECTION

Contractor RSW CONSTRUCTION CORP

Project Status---------------- V--AN-1

PAGE

CONTRACT V-B-Bq BALOGO BRIDGE ALONG POLANGUI-NASISI SECTION

Contractor OAS BUILDERS CONSTRUCTION INC

project status -------- ---------- V-B-B-1

CONTRACT V-B-BD BALINAD BRIDGE ALONG POLANGUI-NASISI SECTION

Contractor VIBER CONSTRUCTION

project Status ------------- ------ V-B-BD-i

CONTRACT V-B-M MATANGLAD BRIDGE ALONG SECONDARY ROAD

Contractor CIRCA CONSTRUCTION INC

porject Status V-B-M-1

CONTRACT VI-A NABUA-SAN AGUSTIN SECTIIOySUB-PROJECT NO 9

Contractor MD FORONDA amp ASSOCIATES CORP

progress Report---------------- VI-A-1

CONTRACT VI-B NABUA-SAN AGUSTIN SECTION SUB-PROJECT NO 9

Contractor G amp G CONSTRUCTION CORP

progress Report VI-B-1

CONTRACT VI-C NABUA-SAN AGUSTIN SECTION SUB-PROJECT NO 9

Contractor JM HERNANDEZ amp SONS CORP

project Status -------------- ----- VI-C-1

APPENDIX

Appendix A List of Consultants Field personnel - - 1 sheet

B Employment Generation Survey (SS3)

to I R GA SAgustin2

SAAO - ------- Bei o

Beg C tract VI Son Antonio

n Francisco

Santiago Salvacion-

Vicente

Matacon

gass

Pongoniban BrLAEBT

Son FobuW IBr Bug oalaga

San Rque 2 rX

A0 Ari---Br

A V -

1

Buluang Br

R AGAY GULF LOCATION M PACKAGF -

V~ 1 11111 on

I 1V

4~~~~ L ttni~go

R (ye22~ gt j

~ 2~2 ~ k~ 2=

- 0 j I1 ~ k

2 42

I 2LI

LI

~~CONAhACT IVNAW SecondaryI A -ADA SECTION SUBPROJECTAI

1)475 amp6~ 1496 km 12

~TOTAL 23-74 kmCOTAT 2ATNAY SAN JUAN (BATO) SECTION2 SUBPROJECT IISecondary Road 2 Ii 2Feeder~ Roads-7~89 1Ioampr II24m 2

~1 k 6~22 2j24 22

4 ~ 2TOTAL 2 1 56 k msr2 CNTRACTIE -BBRIbGES (TANDAAY- SAN sETION StBpROJECT hv-JUAN

SnRoq~ie J44 ofRoqe So 2(244om) rldges 7oMCONTRACT2 M ~LIB0N -NUGP0 SECTION SUBPROJECTI

2 k

2peeder Roads 1213I14 815 15 38 k

Paklas I(2920Jh)Pak~cs 2(2920m))K ~~~Paklos

g320t)Lsaa2 On 2229 2 0m )I B ri~J - 22ge22

COTAC2VI AN JUA SECTION SUBPROtJECT ]2 2 econdary Road 1

A2 8333 km2 2]Feder2IRo 2 ds12 676 920 22 2 2

1og m)km 22 TOTAL k292 38042 20 Mn)ampouiucirig2(~~~~~129 2 2222(shy~~A22jojing (310m 2 23 6040me

Fedr2Rod2 1r2 a2 3 939 km 12 22 2222 222TOTAL 2225 kmn-

CONTRACT2 P V-B~ BRIDGES2 LANGUI-NASISI SECTION) SUPOET141na m Nopo 00 40 m)24 22 2~22-2222 ~ 826Bainod -(22 40m)Balog (292Om)igt

3MatfIa (24n rdes-r 8 0 mt 2223 22~ CONTRACTV[A 98

NAU A GSI SECTION~UPOET9222SecqqdaryFRad (Stc O04000- 2+000) 200 KM 4CONTRCTtiA- S -AGUSTIN SECTION SUBPROJ ECt 9St2OO-4495010)25Orn-CONTT A 0

Balinoc~ BoooNbnton

Bat~

Z 8 11i d r rI 1 In

Maroyog~Q4C

Beg~ontrct~Sobarv~

At

A COTRampTI-A TOAF34kANAA AN~JA (AT) 4 SETIN UBROEC~I~Win oidr~oa~J 42km~~~7AFeedeRoos~7~8 9 Oamp I 11 k

San Rqe 244nm) Pa SnRue2(4mjBrPCKGE Oa ~

Pl33SCONTRACT I LDO-TNGo SECTION SUBPROJECT It S~Seconday Roidl 2~

7Faieed 8 78 inRoa012)31 5 851386 TOTAL 23634km

COTRC-= AN - JUASTOA SAN SBRECT S( JA AJE

gtFeeder Rods 77812 14 kmA i~ ~A(3120TOTAL 3804 k

qAAO TRC S SANJECTION- BRLINGES (- lA1 UBPRJE6Tj4~-cTsectltI

~1IIIAA ~~~~~a Sai6fi2I4 IFye Rod 2 Brde 76 0JA0AAAA

~A IA A CT V- RIG(POLANGUI-NAS SPoECT)SUPOJC11

A MtaiIa (2440 in)ABrijges 149880 0COTAC_ V AUAOSAN JUNSCIN SUBPRJEVV

Secndry Road(S OO 84500 ~50 k

21td229a2 29 I km TOTAL 38

REPUBLIC OF THE PIILIPPIiES MINISTRY OF PUBLIC HIL1WAYS

MA N I L A

MONTHLY CONSTRUCTIONJ REPORT

No 35

April 1981

For

Sub-project 11

Contract No I

NABUA-TANDAAY SECTION

Secondary Road

and

Feeder Roads

SAN ROQUE-STA [PARBARA NO 1

SAN ANTONIO-OGBON-SAN AGUSTIN NO 2

SAN VICENTE-SAI RQLUE NO 3

STA CRUZ-STA BAI2LiARA NO 4

STO DOMINGO--ADAON NO 5

INAPATAN-ANGUSTIA-DOLOROSA NO 6

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

SP DACER CONSTRUCION CO INC

(Contractor)

April 1981

PROGRESS REPORT NO 3b

April 1981

PROJECT bull NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT 10 11

(Nabua-Tandaay Section Contract I)

COMMENTS AND RECOUiIENDATIONS

PROJECT STATUS

Substantially completed February 24 1981

Final Inspection March 17 198L

Original Contract Cost - f167051OL O 0

Final Contract Cost P l1596bO94

Correction of minor defects and deficiencies5

is still in progress

Certified correct as verified in the field

-3E -VT MjUE V A

Project Manager

I-I

REPUBLIC OF THE PAILIPPIjES MINISTRY OF PUBLIC HIGHIWAYS

M A N I L A

MONTHLY CONS TRUCTIUN REPORT

April 1981

Sub-Project No 11

Contract fjo II-A

TANDAAY-SAN JUAN SECTION

Secondary Hoad

and

Feeder Roads

TANDAAY-SANGUMAY-LA PUPISIMA NO 7 DOLOROSA-ILIAP1Ai 1O 8

DOLOROSA-SAJ VICETE NO 9

MALAWAG-DURAN NO 10 MALAWAG-SAN FRAICiSCO dq 11

CERTEZA DEVELOPMIET CORIPORATION

(Consultant)

FF CRUZ amp CO INC

(Con tractor)

April 1981

PROGREOS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBONI ROAD SUB-PROJECT NO 11 (Tandaay-San Juan Section Contract No II-A)

PROJECT STATUS

Completed - - - ---------- July 9 1980

Turnover ------ 9 1980July

Original Contract Cost - 1727834400

Final Contract Cost i1440431242

2 E-E fiL-L-ARUE VA

Project Manager

II-A-I

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 2: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

PROGRESS REPORT

CONSTRUCTION OF PACKAGE IV

April 1981

1 3 deg

- i I

PACKAGE IJ

CONSTRUCTION REPORT

APRIL 1981

TABLE OF CONTENTS

Figure I ------- ----- Location map

PAGE CONTRACT I NABUA-TANDAAY SECTION SUB-PROJECT NO l1

Contractor SP DACER CONSTRUCTION CO INC

Project Status ----------------- I-1

CONTRACT II-A TANDAAY-SAN JUAN SECTION SUB-P[OGJECT NO 11

Contractor FF CRUZ amp CO INC

project Status -I------------ ----- II-A-1

CONTRACT II-B0 TANDAAY-SAN JUAN SECTION SUB-PROJECT NO 11

Contractor FF CRUZ amp CO INC

Project Status II-B-1

CONTRACT III LIBON-NUGPO SECTION SUB-PROJECT NO 11

Contractor DIMSON (MANILA) INC

Project Status---------------- III-1

Summary (Final Inventory) ------------ Annex III-A

CONTRACT IV SAN JUAN-NUGPO SECTION SUB-PROJECT NO 11

Contractor FF CRUZ amp CO INC

project Status----------------- - - - - IV-1

CONTRACT V A POLANGUI-NASISI SECTION SUB-PROJECT NO 14

Contractor BETTER BUILDERS CONST CORP

project Status---------------- V-A-1

Summary (Final Inventory- - ---------- V-A-A

CONTRACT V-B-AN ALNAY AND NAPO BRIDGE ALONG POLANGUI-NASItSI SECTION

Contractor RSW CONSTRUCTION CORP

Project Status---------------- V--AN-1

PAGE

CONTRACT V-B-Bq BALOGO BRIDGE ALONG POLANGUI-NASISI SECTION

Contractor OAS BUILDERS CONSTRUCTION INC

project status -------- ---------- V-B-B-1

CONTRACT V-B-BD BALINAD BRIDGE ALONG POLANGUI-NASISI SECTION

Contractor VIBER CONSTRUCTION

project Status ------------- ------ V-B-BD-i

CONTRACT V-B-M MATANGLAD BRIDGE ALONG SECONDARY ROAD

Contractor CIRCA CONSTRUCTION INC

porject Status V-B-M-1

CONTRACT VI-A NABUA-SAN AGUSTIN SECTIIOySUB-PROJECT NO 9

Contractor MD FORONDA amp ASSOCIATES CORP

progress Report---------------- VI-A-1

CONTRACT VI-B NABUA-SAN AGUSTIN SECTION SUB-PROJECT NO 9

Contractor G amp G CONSTRUCTION CORP

progress Report VI-B-1

CONTRACT VI-C NABUA-SAN AGUSTIN SECTION SUB-PROJECT NO 9

Contractor JM HERNANDEZ amp SONS CORP

project Status -------------- ----- VI-C-1

APPENDIX

Appendix A List of Consultants Field personnel - - 1 sheet

B Employment Generation Survey (SS3)

to I R GA SAgustin2

SAAO - ------- Bei o

Beg C tract VI Son Antonio

n Francisco

Santiago Salvacion-

Vicente

Matacon

gass

Pongoniban BrLAEBT

Son FobuW IBr Bug oalaga

San Rque 2 rX

A0 Ari---Br

A V -

1

Buluang Br

R AGAY GULF LOCATION M PACKAGF -

V~ 1 11111 on

I 1V

4~~~~ L ttni~go

R (ye22~ gt j

~ 2~2 ~ k~ 2=

- 0 j I1 ~ k

2 42

I 2LI

LI

~~CONAhACT IVNAW SecondaryI A -ADA SECTION SUBPROJECTAI

1)475 amp6~ 1496 km 12

~TOTAL 23-74 kmCOTAT 2ATNAY SAN JUAN (BATO) SECTION2 SUBPROJECT IISecondary Road 2 Ii 2Feeder~ Roads-7~89 1Ioampr II24m 2

~1 k 6~22 2j24 22

4 ~ 2TOTAL 2 1 56 k msr2 CNTRACTIE -BBRIbGES (TANDAAY- SAN sETION StBpROJECT hv-JUAN

SnRoq~ie J44 ofRoqe So 2(244om) rldges 7oMCONTRACT2 M ~LIB0N -NUGP0 SECTION SUBPROJECTI

2 k

2peeder Roads 1213I14 815 15 38 k

Paklas I(2920Jh)Pak~cs 2(2920m))K ~~~Paklos

g320t)Lsaa2 On 2229 2 0m )I B ri~J - 22ge22

COTAC2VI AN JUA SECTION SUBPROtJECT ]2 2 econdary Road 1

A2 8333 km2 2]Feder2IRo 2 ds12 676 920 22 2 2

1og m)km 22 TOTAL k292 38042 20 Mn)ampouiucirig2(~~~~~129 2 2222(shy~~A22jojing (310m 2 23 6040me

Fedr2Rod2 1r2 a2 3 939 km 12 22 2222 222TOTAL 2225 kmn-

CONTRACT2 P V-B~ BRIDGES2 LANGUI-NASISI SECTION) SUPOET141na m Nopo 00 40 m)24 22 2~22-2222 ~ 826Bainod -(22 40m)Balog (292Om)igt

3MatfIa (24n rdes-r 8 0 mt 2223 22~ CONTRACTV[A 98

NAU A GSI SECTION~UPOET9222SecqqdaryFRad (Stc O04000- 2+000) 200 KM 4CONTRCTtiA- S -AGUSTIN SECTION SUBPROJ ECt 9St2OO-4495010)25Orn-CONTT A 0

Balinoc~ BoooNbnton

Bat~

Z 8 11i d r rI 1 In

Maroyog~Q4C

Beg~ontrct~Sobarv~

At

A COTRampTI-A TOAF34kANAA AN~JA (AT) 4 SETIN UBROEC~I~Win oidr~oa~J 42km~~~7AFeedeRoos~7~8 9 Oamp I 11 k

San Rqe 244nm) Pa SnRue2(4mjBrPCKGE Oa ~

Pl33SCONTRACT I LDO-TNGo SECTION SUBPROJECT It S~Seconday Roidl 2~

7Faieed 8 78 inRoa012)31 5 851386 TOTAL 23634km

COTRC-= AN - JUASTOA SAN SBRECT S( JA AJE

gtFeeder Rods 77812 14 kmA i~ ~A(3120TOTAL 3804 k

qAAO TRC S SANJECTION- BRLINGES (- lA1 UBPRJE6Tj4~-cTsectltI

~1IIIAA ~~~~~a Sai6fi2I4 IFye Rod 2 Brde 76 0JA0AAAA

~A IA A CT V- RIG(POLANGUI-NAS SPoECT)SUPOJC11

A MtaiIa (2440 in)ABrijges 149880 0COTAC_ V AUAOSAN JUNSCIN SUBPRJEVV

Secndry Road(S OO 84500 ~50 k

21td229a2 29 I km TOTAL 38

REPUBLIC OF THE PIILIPPIiES MINISTRY OF PUBLIC HIL1WAYS

MA N I L A

MONTHLY CONSTRUCTIONJ REPORT

No 35

April 1981

For

Sub-project 11

Contract No I

NABUA-TANDAAY SECTION

Secondary Road

and

Feeder Roads

SAN ROQUE-STA [PARBARA NO 1

SAN ANTONIO-OGBON-SAN AGUSTIN NO 2

SAN VICENTE-SAI RQLUE NO 3

STA CRUZ-STA BAI2LiARA NO 4

STO DOMINGO--ADAON NO 5

INAPATAN-ANGUSTIA-DOLOROSA NO 6

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

SP DACER CONSTRUCION CO INC

(Contractor)

April 1981

PROGRESS REPORT NO 3b

April 1981

PROJECT bull NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT 10 11

(Nabua-Tandaay Section Contract I)

COMMENTS AND RECOUiIENDATIONS

PROJECT STATUS

Substantially completed February 24 1981

Final Inspection March 17 198L

Original Contract Cost - f167051OL O 0

Final Contract Cost P l1596bO94

Correction of minor defects and deficiencies5

is still in progress

Certified correct as verified in the field

-3E -VT MjUE V A

Project Manager

I-I

REPUBLIC OF THE PAILIPPIjES MINISTRY OF PUBLIC HIGHIWAYS

M A N I L A

MONTHLY CONS TRUCTIUN REPORT

April 1981

Sub-Project No 11

Contract fjo II-A

TANDAAY-SAN JUAN SECTION

Secondary Hoad

and

Feeder Roads

TANDAAY-SANGUMAY-LA PUPISIMA NO 7 DOLOROSA-ILIAP1Ai 1O 8

DOLOROSA-SAJ VICETE NO 9

MALAWAG-DURAN NO 10 MALAWAG-SAN FRAICiSCO dq 11

CERTEZA DEVELOPMIET CORIPORATION

(Consultant)

FF CRUZ amp CO INC

(Con tractor)

April 1981

PROGREOS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBONI ROAD SUB-PROJECT NO 11 (Tandaay-San Juan Section Contract No II-A)

PROJECT STATUS

Completed - - - ---------- July 9 1980

Turnover ------ 9 1980July

Original Contract Cost - 1727834400

Final Contract Cost i1440431242

2 E-E fiL-L-ARUE VA

Project Manager

II-A-I

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 3: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

PACKAGE IJ

CONSTRUCTION REPORT

APRIL 1981

TABLE OF CONTENTS

Figure I ------- ----- Location map

PAGE CONTRACT I NABUA-TANDAAY SECTION SUB-PROJECT NO l1

Contractor SP DACER CONSTRUCTION CO INC

Project Status ----------------- I-1

CONTRACT II-A TANDAAY-SAN JUAN SECTION SUB-P[OGJECT NO 11

Contractor FF CRUZ amp CO INC

project Status -I------------ ----- II-A-1

CONTRACT II-B0 TANDAAY-SAN JUAN SECTION SUB-PROJECT NO 11

Contractor FF CRUZ amp CO INC

Project Status II-B-1

CONTRACT III LIBON-NUGPO SECTION SUB-PROJECT NO 11

Contractor DIMSON (MANILA) INC

Project Status---------------- III-1

Summary (Final Inventory) ------------ Annex III-A

CONTRACT IV SAN JUAN-NUGPO SECTION SUB-PROJECT NO 11

Contractor FF CRUZ amp CO INC

project Status----------------- - - - - IV-1

CONTRACT V A POLANGUI-NASISI SECTION SUB-PROJECT NO 14

Contractor BETTER BUILDERS CONST CORP

project Status---------------- V-A-1

Summary (Final Inventory- - ---------- V-A-A

CONTRACT V-B-AN ALNAY AND NAPO BRIDGE ALONG POLANGUI-NASItSI SECTION

Contractor RSW CONSTRUCTION CORP

Project Status---------------- V--AN-1

PAGE

CONTRACT V-B-Bq BALOGO BRIDGE ALONG POLANGUI-NASISI SECTION

Contractor OAS BUILDERS CONSTRUCTION INC

project status -------- ---------- V-B-B-1

CONTRACT V-B-BD BALINAD BRIDGE ALONG POLANGUI-NASISI SECTION

Contractor VIBER CONSTRUCTION

project Status ------------- ------ V-B-BD-i

CONTRACT V-B-M MATANGLAD BRIDGE ALONG SECONDARY ROAD

Contractor CIRCA CONSTRUCTION INC

porject Status V-B-M-1

CONTRACT VI-A NABUA-SAN AGUSTIN SECTIIOySUB-PROJECT NO 9

Contractor MD FORONDA amp ASSOCIATES CORP

progress Report---------------- VI-A-1

CONTRACT VI-B NABUA-SAN AGUSTIN SECTION SUB-PROJECT NO 9

Contractor G amp G CONSTRUCTION CORP

progress Report VI-B-1

CONTRACT VI-C NABUA-SAN AGUSTIN SECTION SUB-PROJECT NO 9

Contractor JM HERNANDEZ amp SONS CORP

project Status -------------- ----- VI-C-1

APPENDIX

Appendix A List of Consultants Field personnel - - 1 sheet

B Employment Generation Survey (SS3)

to I R GA SAgustin2

SAAO - ------- Bei o

Beg C tract VI Son Antonio

n Francisco

Santiago Salvacion-

Vicente

Matacon

gass

Pongoniban BrLAEBT

Son FobuW IBr Bug oalaga

San Rque 2 rX

A0 Ari---Br

A V -

1

Buluang Br

R AGAY GULF LOCATION M PACKAGF -

V~ 1 11111 on

I 1V

4~~~~ L ttni~go

R (ye22~ gt j

~ 2~2 ~ k~ 2=

- 0 j I1 ~ k

2 42

I 2LI

LI

~~CONAhACT IVNAW SecondaryI A -ADA SECTION SUBPROJECTAI

1)475 amp6~ 1496 km 12

~TOTAL 23-74 kmCOTAT 2ATNAY SAN JUAN (BATO) SECTION2 SUBPROJECT IISecondary Road 2 Ii 2Feeder~ Roads-7~89 1Ioampr II24m 2

~1 k 6~22 2j24 22

4 ~ 2TOTAL 2 1 56 k msr2 CNTRACTIE -BBRIbGES (TANDAAY- SAN sETION StBpROJECT hv-JUAN

SnRoq~ie J44 ofRoqe So 2(244om) rldges 7oMCONTRACT2 M ~LIB0N -NUGP0 SECTION SUBPROJECTI

2 k

2peeder Roads 1213I14 815 15 38 k

Paklas I(2920Jh)Pak~cs 2(2920m))K ~~~Paklos

g320t)Lsaa2 On 2229 2 0m )I B ri~J - 22ge22

COTAC2VI AN JUA SECTION SUBPROtJECT ]2 2 econdary Road 1

A2 8333 km2 2]Feder2IRo 2 ds12 676 920 22 2 2

1og m)km 22 TOTAL k292 38042 20 Mn)ampouiucirig2(~~~~~129 2 2222(shy~~A22jojing (310m 2 23 6040me

Fedr2Rod2 1r2 a2 3 939 km 12 22 2222 222TOTAL 2225 kmn-

CONTRACT2 P V-B~ BRIDGES2 LANGUI-NASISI SECTION) SUPOET141na m Nopo 00 40 m)24 22 2~22-2222 ~ 826Bainod -(22 40m)Balog (292Om)igt

3MatfIa (24n rdes-r 8 0 mt 2223 22~ CONTRACTV[A 98

NAU A GSI SECTION~UPOET9222SecqqdaryFRad (Stc O04000- 2+000) 200 KM 4CONTRCTtiA- S -AGUSTIN SECTION SUBPROJ ECt 9St2OO-4495010)25Orn-CONTT A 0

Balinoc~ BoooNbnton

Bat~

Z 8 11i d r rI 1 In

Maroyog~Q4C

Beg~ontrct~Sobarv~

At

A COTRampTI-A TOAF34kANAA AN~JA (AT) 4 SETIN UBROEC~I~Win oidr~oa~J 42km~~~7AFeedeRoos~7~8 9 Oamp I 11 k

San Rqe 244nm) Pa SnRue2(4mjBrPCKGE Oa ~

Pl33SCONTRACT I LDO-TNGo SECTION SUBPROJECT It S~Seconday Roidl 2~

7Faieed 8 78 inRoa012)31 5 851386 TOTAL 23634km

COTRC-= AN - JUASTOA SAN SBRECT S( JA AJE

gtFeeder Rods 77812 14 kmA i~ ~A(3120TOTAL 3804 k

qAAO TRC S SANJECTION- BRLINGES (- lA1 UBPRJE6Tj4~-cTsectltI

~1IIIAA ~~~~~a Sai6fi2I4 IFye Rod 2 Brde 76 0JA0AAAA

~A IA A CT V- RIG(POLANGUI-NAS SPoECT)SUPOJC11

A MtaiIa (2440 in)ABrijges 149880 0COTAC_ V AUAOSAN JUNSCIN SUBPRJEVV

Secndry Road(S OO 84500 ~50 k

21td229a2 29 I km TOTAL 38

REPUBLIC OF THE PIILIPPIiES MINISTRY OF PUBLIC HIL1WAYS

MA N I L A

MONTHLY CONSTRUCTIONJ REPORT

No 35

April 1981

For

Sub-project 11

Contract No I

NABUA-TANDAAY SECTION

Secondary Road

and

Feeder Roads

SAN ROQUE-STA [PARBARA NO 1

SAN ANTONIO-OGBON-SAN AGUSTIN NO 2

SAN VICENTE-SAI RQLUE NO 3

STA CRUZ-STA BAI2LiARA NO 4

STO DOMINGO--ADAON NO 5

INAPATAN-ANGUSTIA-DOLOROSA NO 6

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

SP DACER CONSTRUCION CO INC

(Contractor)

April 1981

PROGRESS REPORT NO 3b

April 1981

PROJECT bull NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT 10 11

(Nabua-Tandaay Section Contract I)

COMMENTS AND RECOUiIENDATIONS

PROJECT STATUS

Substantially completed February 24 1981

Final Inspection March 17 198L

Original Contract Cost - f167051OL O 0

Final Contract Cost P l1596bO94

Correction of minor defects and deficiencies5

is still in progress

Certified correct as verified in the field

-3E -VT MjUE V A

Project Manager

I-I

REPUBLIC OF THE PAILIPPIjES MINISTRY OF PUBLIC HIGHIWAYS

M A N I L A

MONTHLY CONS TRUCTIUN REPORT

April 1981

Sub-Project No 11

Contract fjo II-A

TANDAAY-SAN JUAN SECTION

Secondary Hoad

and

Feeder Roads

TANDAAY-SANGUMAY-LA PUPISIMA NO 7 DOLOROSA-ILIAP1Ai 1O 8

DOLOROSA-SAJ VICETE NO 9

MALAWAG-DURAN NO 10 MALAWAG-SAN FRAICiSCO dq 11

CERTEZA DEVELOPMIET CORIPORATION

(Consultant)

FF CRUZ amp CO INC

(Con tractor)

April 1981

PROGREOS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBONI ROAD SUB-PROJECT NO 11 (Tandaay-San Juan Section Contract No II-A)

PROJECT STATUS

Completed - - - ---------- July 9 1980

Turnover ------ 9 1980July

Original Contract Cost - 1727834400

Final Contract Cost i1440431242

2 E-E fiL-L-ARUE VA

Project Manager

II-A-I

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 4: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

PAGE

CONTRACT V-B-Bq BALOGO BRIDGE ALONG POLANGUI-NASISI SECTION

Contractor OAS BUILDERS CONSTRUCTION INC

project status -------- ---------- V-B-B-1

CONTRACT V-B-BD BALINAD BRIDGE ALONG POLANGUI-NASISI SECTION

Contractor VIBER CONSTRUCTION

project Status ------------- ------ V-B-BD-i

CONTRACT V-B-M MATANGLAD BRIDGE ALONG SECONDARY ROAD

Contractor CIRCA CONSTRUCTION INC

porject Status V-B-M-1

CONTRACT VI-A NABUA-SAN AGUSTIN SECTIIOySUB-PROJECT NO 9

Contractor MD FORONDA amp ASSOCIATES CORP

progress Report---------------- VI-A-1

CONTRACT VI-B NABUA-SAN AGUSTIN SECTION SUB-PROJECT NO 9

Contractor G amp G CONSTRUCTION CORP

progress Report VI-B-1

CONTRACT VI-C NABUA-SAN AGUSTIN SECTION SUB-PROJECT NO 9

Contractor JM HERNANDEZ amp SONS CORP

project Status -------------- ----- VI-C-1

APPENDIX

Appendix A List of Consultants Field personnel - - 1 sheet

B Employment Generation Survey (SS3)

to I R GA SAgustin2

SAAO - ------- Bei o

Beg C tract VI Son Antonio

n Francisco

Santiago Salvacion-

Vicente

Matacon

gass

Pongoniban BrLAEBT

Son FobuW IBr Bug oalaga

San Rque 2 rX

A0 Ari---Br

A V -

1

Buluang Br

R AGAY GULF LOCATION M PACKAGF -

V~ 1 11111 on

I 1V

4~~~~ L ttni~go

R (ye22~ gt j

~ 2~2 ~ k~ 2=

- 0 j I1 ~ k

2 42

I 2LI

LI

~~CONAhACT IVNAW SecondaryI A -ADA SECTION SUBPROJECTAI

1)475 amp6~ 1496 km 12

~TOTAL 23-74 kmCOTAT 2ATNAY SAN JUAN (BATO) SECTION2 SUBPROJECT IISecondary Road 2 Ii 2Feeder~ Roads-7~89 1Ioampr II24m 2

~1 k 6~22 2j24 22

4 ~ 2TOTAL 2 1 56 k msr2 CNTRACTIE -BBRIbGES (TANDAAY- SAN sETION StBpROJECT hv-JUAN

SnRoq~ie J44 ofRoqe So 2(244om) rldges 7oMCONTRACT2 M ~LIB0N -NUGP0 SECTION SUBPROJECTI

2 k

2peeder Roads 1213I14 815 15 38 k

Paklas I(2920Jh)Pak~cs 2(2920m))K ~~~Paklos

g320t)Lsaa2 On 2229 2 0m )I B ri~J - 22ge22

COTAC2VI AN JUA SECTION SUBPROtJECT ]2 2 econdary Road 1

A2 8333 km2 2]Feder2IRo 2 ds12 676 920 22 2 2

1og m)km 22 TOTAL k292 38042 20 Mn)ampouiucirig2(~~~~~129 2 2222(shy~~A22jojing (310m 2 23 6040me

Fedr2Rod2 1r2 a2 3 939 km 12 22 2222 222TOTAL 2225 kmn-

CONTRACT2 P V-B~ BRIDGES2 LANGUI-NASISI SECTION) SUPOET141na m Nopo 00 40 m)24 22 2~22-2222 ~ 826Bainod -(22 40m)Balog (292Om)igt

3MatfIa (24n rdes-r 8 0 mt 2223 22~ CONTRACTV[A 98

NAU A GSI SECTION~UPOET9222SecqqdaryFRad (Stc O04000- 2+000) 200 KM 4CONTRCTtiA- S -AGUSTIN SECTION SUBPROJ ECt 9St2OO-4495010)25Orn-CONTT A 0

Balinoc~ BoooNbnton

Bat~

Z 8 11i d r rI 1 In

Maroyog~Q4C

Beg~ontrct~Sobarv~

At

A COTRampTI-A TOAF34kANAA AN~JA (AT) 4 SETIN UBROEC~I~Win oidr~oa~J 42km~~~7AFeedeRoos~7~8 9 Oamp I 11 k

San Rqe 244nm) Pa SnRue2(4mjBrPCKGE Oa ~

Pl33SCONTRACT I LDO-TNGo SECTION SUBPROJECT It S~Seconday Roidl 2~

7Faieed 8 78 inRoa012)31 5 851386 TOTAL 23634km

COTRC-= AN - JUASTOA SAN SBRECT S( JA AJE

gtFeeder Rods 77812 14 kmA i~ ~A(3120TOTAL 3804 k

qAAO TRC S SANJECTION- BRLINGES (- lA1 UBPRJE6Tj4~-cTsectltI

~1IIIAA ~~~~~a Sai6fi2I4 IFye Rod 2 Brde 76 0JA0AAAA

~A IA A CT V- RIG(POLANGUI-NAS SPoECT)SUPOJC11

A MtaiIa (2440 in)ABrijges 149880 0COTAC_ V AUAOSAN JUNSCIN SUBPRJEVV

Secndry Road(S OO 84500 ~50 k

21td229a2 29 I km TOTAL 38

REPUBLIC OF THE PIILIPPIiES MINISTRY OF PUBLIC HIL1WAYS

MA N I L A

MONTHLY CONSTRUCTIONJ REPORT

No 35

April 1981

For

Sub-project 11

Contract No I

NABUA-TANDAAY SECTION

Secondary Road

and

Feeder Roads

SAN ROQUE-STA [PARBARA NO 1

SAN ANTONIO-OGBON-SAN AGUSTIN NO 2

SAN VICENTE-SAI RQLUE NO 3

STA CRUZ-STA BAI2LiARA NO 4

STO DOMINGO--ADAON NO 5

INAPATAN-ANGUSTIA-DOLOROSA NO 6

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

SP DACER CONSTRUCION CO INC

(Contractor)

April 1981

PROGRESS REPORT NO 3b

April 1981

PROJECT bull NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT 10 11

(Nabua-Tandaay Section Contract I)

COMMENTS AND RECOUiIENDATIONS

PROJECT STATUS

Substantially completed February 24 1981

Final Inspection March 17 198L

Original Contract Cost - f167051OL O 0

Final Contract Cost P l1596bO94

Correction of minor defects and deficiencies5

is still in progress

Certified correct as verified in the field

-3E -VT MjUE V A

Project Manager

I-I

REPUBLIC OF THE PAILIPPIjES MINISTRY OF PUBLIC HIGHIWAYS

M A N I L A

MONTHLY CONS TRUCTIUN REPORT

April 1981

Sub-Project No 11

Contract fjo II-A

TANDAAY-SAN JUAN SECTION

Secondary Hoad

and

Feeder Roads

TANDAAY-SANGUMAY-LA PUPISIMA NO 7 DOLOROSA-ILIAP1Ai 1O 8

DOLOROSA-SAJ VICETE NO 9

MALAWAG-DURAN NO 10 MALAWAG-SAN FRAICiSCO dq 11

CERTEZA DEVELOPMIET CORIPORATION

(Consultant)

FF CRUZ amp CO INC

(Con tractor)

April 1981

PROGREOS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBONI ROAD SUB-PROJECT NO 11 (Tandaay-San Juan Section Contract No II-A)

PROJECT STATUS

Completed - - - ---------- July 9 1980

Turnover ------ 9 1980July

Original Contract Cost - 1727834400

Final Contract Cost i1440431242

2 E-E fiL-L-ARUE VA

Project Manager

II-A-I

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 5: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

to I R GA SAgustin2

SAAO - ------- Bei o

Beg C tract VI Son Antonio

n Francisco

Santiago Salvacion-

Vicente

Matacon

gass

Pongoniban BrLAEBT

Son FobuW IBr Bug oalaga

San Rque 2 rX

A0 Ari---Br

A V -

1

Buluang Br

R AGAY GULF LOCATION M PACKAGF -

V~ 1 11111 on

I 1V

4~~~~ L ttni~go

R (ye22~ gt j

~ 2~2 ~ k~ 2=

- 0 j I1 ~ k

2 42

I 2LI

LI

~~CONAhACT IVNAW SecondaryI A -ADA SECTION SUBPROJECTAI

1)475 amp6~ 1496 km 12

~TOTAL 23-74 kmCOTAT 2ATNAY SAN JUAN (BATO) SECTION2 SUBPROJECT IISecondary Road 2 Ii 2Feeder~ Roads-7~89 1Ioampr II24m 2

~1 k 6~22 2j24 22

4 ~ 2TOTAL 2 1 56 k msr2 CNTRACTIE -BBRIbGES (TANDAAY- SAN sETION StBpROJECT hv-JUAN

SnRoq~ie J44 ofRoqe So 2(244om) rldges 7oMCONTRACT2 M ~LIB0N -NUGP0 SECTION SUBPROJECTI

2 k

2peeder Roads 1213I14 815 15 38 k

Paklas I(2920Jh)Pak~cs 2(2920m))K ~~~Paklos

g320t)Lsaa2 On 2229 2 0m )I B ri~J - 22ge22

COTAC2VI AN JUA SECTION SUBPROtJECT ]2 2 econdary Road 1

A2 8333 km2 2]Feder2IRo 2 ds12 676 920 22 2 2

1og m)km 22 TOTAL k292 38042 20 Mn)ampouiucirig2(~~~~~129 2 2222(shy~~A22jojing (310m 2 23 6040me

Fedr2Rod2 1r2 a2 3 939 km 12 22 2222 222TOTAL 2225 kmn-

CONTRACT2 P V-B~ BRIDGES2 LANGUI-NASISI SECTION) SUPOET141na m Nopo 00 40 m)24 22 2~22-2222 ~ 826Bainod -(22 40m)Balog (292Om)igt

3MatfIa (24n rdes-r 8 0 mt 2223 22~ CONTRACTV[A 98

NAU A GSI SECTION~UPOET9222SecqqdaryFRad (Stc O04000- 2+000) 200 KM 4CONTRCTtiA- S -AGUSTIN SECTION SUBPROJ ECt 9St2OO-4495010)25Orn-CONTT A 0

Balinoc~ BoooNbnton

Bat~

Z 8 11i d r rI 1 In

Maroyog~Q4C

Beg~ontrct~Sobarv~

At

A COTRampTI-A TOAF34kANAA AN~JA (AT) 4 SETIN UBROEC~I~Win oidr~oa~J 42km~~~7AFeedeRoos~7~8 9 Oamp I 11 k

San Rqe 244nm) Pa SnRue2(4mjBrPCKGE Oa ~

Pl33SCONTRACT I LDO-TNGo SECTION SUBPROJECT It S~Seconday Roidl 2~

7Faieed 8 78 inRoa012)31 5 851386 TOTAL 23634km

COTRC-= AN - JUASTOA SAN SBRECT S( JA AJE

gtFeeder Rods 77812 14 kmA i~ ~A(3120TOTAL 3804 k

qAAO TRC S SANJECTION- BRLINGES (- lA1 UBPRJE6Tj4~-cTsectltI

~1IIIAA ~~~~~a Sai6fi2I4 IFye Rod 2 Brde 76 0JA0AAAA

~A IA A CT V- RIG(POLANGUI-NAS SPoECT)SUPOJC11

A MtaiIa (2440 in)ABrijges 149880 0COTAC_ V AUAOSAN JUNSCIN SUBPRJEVV

Secndry Road(S OO 84500 ~50 k

21td229a2 29 I km TOTAL 38

REPUBLIC OF THE PIILIPPIiES MINISTRY OF PUBLIC HIL1WAYS

MA N I L A

MONTHLY CONSTRUCTIONJ REPORT

No 35

April 1981

For

Sub-project 11

Contract No I

NABUA-TANDAAY SECTION

Secondary Road

and

Feeder Roads

SAN ROQUE-STA [PARBARA NO 1

SAN ANTONIO-OGBON-SAN AGUSTIN NO 2

SAN VICENTE-SAI RQLUE NO 3

STA CRUZ-STA BAI2LiARA NO 4

STO DOMINGO--ADAON NO 5

INAPATAN-ANGUSTIA-DOLOROSA NO 6

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

SP DACER CONSTRUCION CO INC

(Contractor)

April 1981

PROGRESS REPORT NO 3b

April 1981

PROJECT bull NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT 10 11

(Nabua-Tandaay Section Contract I)

COMMENTS AND RECOUiIENDATIONS

PROJECT STATUS

Substantially completed February 24 1981

Final Inspection March 17 198L

Original Contract Cost - f167051OL O 0

Final Contract Cost P l1596bO94

Correction of minor defects and deficiencies5

is still in progress

Certified correct as verified in the field

-3E -VT MjUE V A

Project Manager

I-I

REPUBLIC OF THE PAILIPPIjES MINISTRY OF PUBLIC HIGHIWAYS

M A N I L A

MONTHLY CONS TRUCTIUN REPORT

April 1981

Sub-Project No 11

Contract fjo II-A

TANDAAY-SAN JUAN SECTION

Secondary Hoad

and

Feeder Roads

TANDAAY-SANGUMAY-LA PUPISIMA NO 7 DOLOROSA-ILIAP1Ai 1O 8

DOLOROSA-SAJ VICETE NO 9

MALAWAG-DURAN NO 10 MALAWAG-SAN FRAICiSCO dq 11

CERTEZA DEVELOPMIET CORIPORATION

(Consultant)

FF CRUZ amp CO INC

(Con tractor)

April 1981

PROGREOS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBONI ROAD SUB-PROJECT NO 11 (Tandaay-San Juan Section Contract No II-A)

PROJECT STATUS

Completed - - - ---------- July 9 1980

Turnover ------ 9 1980July

Original Contract Cost - 1727834400

Final Contract Cost i1440431242

2 E-E fiL-L-ARUE VA

Project Manager

II-A-I

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 6: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

V~ 1 11111 on

I 1V

4~~~~ L ttni~go

R (ye22~ gt j

~ 2~2 ~ k~ 2=

- 0 j I1 ~ k

2 42

I 2LI

LI

~~CONAhACT IVNAW SecondaryI A -ADA SECTION SUBPROJECTAI

1)475 amp6~ 1496 km 12

~TOTAL 23-74 kmCOTAT 2ATNAY SAN JUAN (BATO) SECTION2 SUBPROJECT IISecondary Road 2 Ii 2Feeder~ Roads-7~89 1Ioampr II24m 2

~1 k 6~22 2j24 22

4 ~ 2TOTAL 2 1 56 k msr2 CNTRACTIE -BBRIbGES (TANDAAY- SAN sETION StBpROJECT hv-JUAN

SnRoq~ie J44 ofRoqe So 2(244om) rldges 7oMCONTRACT2 M ~LIB0N -NUGP0 SECTION SUBPROJECTI

2 k

2peeder Roads 1213I14 815 15 38 k

Paklas I(2920Jh)Pak~cs 2(2920m))K ~~~Paklos

g320t)Lsaa2 On 2229 2 0m )I B ri~J - 22ge22

COTAC2VI AN JUA SECTION SUBPROtJECT ]2 2 econdary Road 1

A2 8333 km2 2]Feder2IRo 2 ds12 676 920 22 2 2

1og m)km 22 TOTAL k292 38042 20 Mn)ampouiucirig2(~~~~~129 2 2222(shy~~A22jojing (310m 2 23 6040me

Fedr2Rod2 1r2 a2 3 939 km 12 22 2222 222TOTAL 2225 kmn-

CONTRACT2 P V-B~ BRIDGES2 LANGUI-NASISI SECTION) SUPOET141na m Nopo 00 40 m)24 22 2~22-2222 ~ 826Bainod -(22 40m)Balog (292Om)igt

3MatfIa (24n rdes-r 8 0 mt 2223 22~ CONTRACTV[A 98

NAU A GSI SECTION~UPOET9222SecqqdaryFRad (Stc O04000- 2+000) 200 KM 4CONTRCTtiA- S -AGUSTIN SECTION SUBPROJ ECt 9St2OO-4495010)25Orn-CONTT A 0

Balinoc~ BoooNbnton

Bat~

Z 8 11i d r rI 1 In

Maroyog~Q4C

Beg~ontrct~Sobarv~

At

A COTRampTI-A TOAF34kANAA AN~JA (AT) 4 SETIN UBROEC~I~Win oidr~oa~J 42km~~~7AFeedeRoos~7~8 9 Oamp I 11 k

San Rqe 244nm) Pa SnRue2(4mjBrPCKGE Oa ~

Pl33SCONTRACT I LDO-TNGo SECTION SUBPROJECT It S~Seconday Roidl 2~

7Faieed 8 78 inRoa012)31 5 851386 TOTAL 23634km

COTRC-= AN - JUASTOA SAN SBRECT S( JA AJE

gtFeeder Rods 77812 14 kmA i~ ~A(3120TOTAL 3804 k

qAAO TRC S SANJECTION- BRLINGES (- lA1 UBPRJE6Tj4~-cTsectltI

~1IIIAA ~~~~~a Sai6fi2I4 IFye Rod 2 Brde 76 0JA0AAAA

~A IA A CT V- RIG(POLANGUI-NAS SPoECT)SUPOJC11

A MtaiIa (2440 in)ABrijges 149880 0COTAC_ V AUAOSAN JUNSCIN SUBPRJEVV

Secndry Road(S OO 84500 ~50 k

21td229a2 29 I km TOTAL 38

REPUBLIC OF THE PIILIPPIiES MINISTRY OF PUBLIC HIL1WAYS

MA N I L A

MONTHLY CONSTRUCTIONJ REPORT

No 35

April 1981

For

Sub-project 11

Contract No I

NABUA-TANDAAY SECTION

Secondary Road

and

Feeder Roads

SAN ROQUE-STA [PARBARA NO 1

SAN ANTONIO-OGBON-SAN AGUSTIN NO 2

SAN VICENTE-SAI RQLUE NO 3

STA CRUZ-STA BAI2LiARA NO 4

STO DOMINGO--ADAON NO 5

INAPATAN-ANGUSTIA-DOLOROSA NO 6

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

SP DACER CONSTRUCION CO INC

(Contractor)

April 1981

PROGRESS REPORT NO 3b

April 1981

PROJECT bull NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT 10 11

(Nabua-Tandaay Section Contract I)

COMMENTS AND RECOUiIENDATIONS

PROJECT STATUS

Substantially completed February 24 1981

Final Inspection March 17 198L

Original Contract Cost - f167051OL O 0

Final Contract Cost P l1596bO94

Correction of minor defects and deficiencies5

is still in progress

Certified correct as verified in the field

-3E -VT MjUE V A

Project Manager

I-I

REPUBLIC OF THE PAILIPPIjES MINISTRY OF PUBLIC HIGHIWAYS

M A N I L A

MONTHLY CONS TRUCTIUN REPORT

April 1981

Sub-Project No 11

Contract fjo II-A

TANDAAY-SAN JUAN SECTION

Secondary Hoad

and

Feeder Roads

TANDAAY-SANGUMAY-LA PUPISIMA NO 7 DOLOROSA-ILIAP1Ai 1O 8

DOLOROSA-SAJ VICETE NO 9

MALAWAG-DURAN NO 10 MALAWAG-SAN FRAICiSCO dq 11

CERTEZA DEVELOPMIET CORIPORATION

(Consultant)

FF CRUZ amp CO INC

(Con tractor)

April 1981

PROGREOS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBONI ROAD SUB-PROJECT NO 11 (Tandaay-San Juan Section Contract No II-A)

PROJECT STATUS

Completed - - - ---------- July 9 1980

Turnover ------ 9 1980July

Original Contract Cost - 1727834400

Final Contract Cost i1440431242

2 E-E fiL-L-ARUE VA

Project Manager

II-A-I

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 7: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

Balinoc~ BoooNbnton

Bat~

Z 8 11i d r rI 1 In

Maroyog~Q4C

Beg~ontrct~Sobarv~

At

A COTRampTI-A TOAF34kANAA AN~JA (AT) 4 SETIN UBROEC~I~Win oidr~oa~J 42km~~~7AFeedeRoos~7~8 9 Oamp I 11 k

San Rqe 244nm) Pa SnRue2(4mjBrPCKGE Oa ~

Pl33SCONTRACT I LDO-TNGo SECTION SUBPROJECT It S~Seconday Roidl 2~

7Faieed 8 78 inRoa012)31 5 851386 TOTAL 23634km

COTRC-= AN - JUASTOA SAN SBRECT S( JA AJE

gtFeeder Rods 77812 14 kmA i~ ~A(3120TOTAL 3804 k

qAAO TRC S SANJECTION- BRLINGES (- lA1 UBPRJE6Tj4~-cTsectltI

~1IIIAA ~~~~~a Sai6fi2I4 IFye Rod 2 Brde 76 0JA0AAAA

~A IA A CT V- RIG(POLANGUI-NAS SPoECT)SUPOJC11

A MtaiIa (2440 in)ABrijges 149880 0COTAC_ V AUAOSAN JUNSCIN SUBPRJEVV

Secndry Road(S OO 84500 ~50 k

21td229a2 29 I km TOTAL 38

REPUBLIC OF THE PIILIPPIiES MINISTRY OF PUBLIC HIL1WAYS

MA N I L A

MONTHLY CONSTRUCTIONJ REPORT

No 35

April 1981

For

Sub-project 11

Contract No I

NABUA-TANDAAY SECTION

Secondary Road

and

Feeder Roads

SAN ROQUE-STA [PARBARA NO 1

SAN ANTONIO-OGBON-SAN AGUSTIN NO 2

SAN VICENTE-SAI RQLUE NO 3

STA CRUZ-STA BAI2LiARA NO 4

STO DOMINGO--ADAON NO 5

INAPATAN-ANGUSTIA-DOLOROSA NO 6

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

SP DACER CONSTRUCION CO INC

(Contractor)

April 1981

PROGRESS REPORT NO 3b

April 1981

PROJECT bull NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT 10 11

(Nabua-Tandaay Section Contract I)

COMMENTS AND RECOUiIENDATIONS

PROJECT STATUS

Substantially completed February 24 1981

Final Inspection March 17 198L

Original Contract Cost - f167051OL O 0

Final Contract Cost P l1596bO94

Correction of minor defects and deficiencies5

is still in progress

Certified correct as verified in the field

-3E -VT MjUE V A

Project Manager

I-I

REPUBLIC OF THE PAILIPPIjES MINISTRY OF PUBLIC HIGHIWAYS

M A N I L A

MONTHLY CONS TRUCTIUN REPORT

April 1981

Sub-Project No 11

Contract fjo II-A

TANDAAY-SAN JUAN SECTION

Secondary Hoad

and

Feeder Roads

TANDAAY-SANGUMAY-LA PUPISIMA NO 7 DOLOROSA-ILIAP1Ai 1O 8

DOLOROSA-SAJ VICETE NO 9

MALAWAG-DURAN NO 10 MALAWAG-SAN FRAICiSCO dq 11

CERTEZA DEVELOPMIET CORIPORATION

(Consultant)

FF CRUZ amp CO INC

(Con tractor)

April 1981

PROGREOS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBONI ROAD SUB-PROJECT NO 11 (Tandaay-San Juan Section Contract No II-A)

PROJECT STATUS

Completed - - - ---------- July 9 1980

Turnover ------ 9 1980July

Original Contract Cost - 1727834400

Final Contract Cost i1440431242

2 E-E fiL-L-ARUE VA

Project Manager

II-A-I

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 8: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PIILIPPIiES MINISTRY OF PUBLIC HIL1WAYS

MA N I L A

MONTHLY CONSTRUCTIONJ REPORT

No 35

April 1981

For

Sub-project 11

Contract No I

NABUA-TANDAAY SECTION

Secondary Road

and

Feeder Roads

SAN ROQUE-STA [PARBARA NO 1

SAN ANTONIO-OGBON-SAN AGUSTIN NO 2

SAN VICENTE-SAI RQLUE NO 3

STA CRUZ-STA BAI2LiARA NO 4

STO DOMINGO--ADAON NO 5

INAPATAN-ANGUSTIA-DOLOROSA NO 6

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

SP DACER CONSTRUCION CO INC

(Contractor)

April 1981

PROGRESS REPORT NO 3b

April 1981

PROJECT bull NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT 10 11

(Nabua-Tandaay Section Contract I)

COMMENTS AND RECOUiIENDATIONS

PROJECT STATUS

Substantially completed February 24 1981

Final Inspection March 17 198L

Original Contract Cost - f167051OL O 0

Final Contract Cost P l1596bO94

Correction of minor defects and deficiencies5

is still in progress

Certified correct as verified in the field

-3E -VT MjUE V A

Project Manager

I-I

REPUBLIC OF THE PAILIPPIjES MINISTRY OF PUBLIC HIGHIWAYS

M A N I L A

MONTHLY CONS TRUCTIUN REPORT

April 1981

Sub-Project No 11

Contract fjo II-A

TANDAAY-SAN JUAN SECTION

Secondary Hoad

and

Feeder Roads

TANDAAY-SANGUMAY-LA PUPISIMA NO 7 DOLOROSA-ILIAP1Ai 1O 8

DOLOROSA-SAJ VICETE NO 9

MALAWAG-DURAN NO 10 MALAWAG-SAN FRAICiSCO dq 11

CERTEZA DEVELOPMIET CORIPORATION

(Consultant)

FF CRUZ amp CO INC

(Con tractor)

April 1981

PROGREOS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBONI ROAD SUB-PROJECT NO 11 (Tandaay-San Juan Section Contract No II-A)

PROJECT STATUS

Completed - - - ---------- July 9 1980

Turnover ------ 9 1980July

Original Contract Cost - 1727834400

Final Contract Cost i1440431242

2 E-E fiL-L-ARUE VA

Project Manager

II-A-I

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 9: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PROGRESS REPORT NO 3b

April 1981

PROJECT bull NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT 10 11

(Nabua-Tandaay Section Contract I)

COMMENTS AND RECOUiIENDATIONS

PROJECT STATUS

Substantially completed February 24 1981

Final Inspection March 17 198L

Original Contract Cost - f167051OL O 0

Final Contract Cost P l1596bO94

Correction of minor defects and deficiencies5

is still in progress

Certified correct as verified in the field

-3E -VT MjUE V A

Project Manager

I-I

REPUBLIC OF THE PAILIPPIjES MINISTRY OF PUBLIC HIGHIWAYS

M A N I L A

MONTHLY CONS TRUCTIUN REPORT

April 1981

Sub-Project No 11

Contract fjo II-A

TANDAAY-SAN JUAN SECTION

Secondary Hoad

and

Feeder Roads

TANDAAY-SANGUMAY-LA PUPISIMA NO 7 DOLOROSA-ILIAP1Ai 1O 8

DOLOROSA-SAJ VICETE NO 9

MALAWAG-DURAN NO 10 MALAWAG-SAN FRAICiSCO dq 11

CERTEZA DEVELOPMIET CORIPORATION

(Consultant)

FF CRUZ amp CO INC

(Con tractor)

April 1981

PROGREOS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBONI ROAD SUB-PROJECT NO 11 (Tandaay-San Juan Section Contract No II-A)

PROJECT STATUS

Completed - - - ---------- July 9 1980

Turnover ------ 9 1980July

Original Contract Cost - 1727834400

Final Contract Cost i1440431242

2 E-E fiL-L-ARUE VA

Project Manager

II-A-I

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 10: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PAILIPPIjES MINISTRY OF PUBLIC HIGHIWAYS

M A N I L A

MONTHLY CONS TRUCTIUN REPORT

April 1981

Sub-Project No 11

Contract fjo II-A

TANDAAY-SAN JUAN SECTION

Secondary Hoad

and

Feeder Roads

TANDAAY-SANGUMAY-LA PUPISIMA NO 7 DOLOROSA-ILIAP1Ai 1O 8

DOLOROSA-SAJ VICETE NO 9

MALAWAG-DURAN NO 10 MALAWAG-SAN FRAICiSCO dq 11

CERTEZA DEVELOPMIET CORIPORATION

(Consultant)

FF CRUZ amp CO INC

(Con tractor)

April 1981

PROGREOS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBONI ROAD SUB-PROJECT NO 11 (Tandaay-San Juan Section Contract No II-A)

PROJECT STATUS

Completed - - - ---------- July 9 1980

Turnover ------ 9 1980July

Original Contract Cost - 1727834400

Final Contract Cost i1440431242

2 E-E fiL-L-ARUE VA

Project Manager

II-A-I

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 11: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PROGREOS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBONI ROAD SUB-PROJECT NO 11 (Tandaay-San Juan Section Contract No II-A)

PROJECT STATUS

Completed - - - ---------- July 9 1980

Turnover ------ 9 1980July

Original Contract Cost - 1727834400

Final Contract Cost i1440431242

2 E-E fiL-L-ARUE VA

Project Manager

II-A-I

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 12: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IGIHJAYS

M A N I L A

MONTHLY CONSTRUCTIONNRIEPORT

April 981

Sub-project No 11

Contract No IIHJ

TANDAAY-SAN JUAN SECTION

Secondary Road

and

Feeder Roads

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp COq INC (Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 13: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PROGRESS REPORT

April 1981

PROJECT JABUA-SAIJ JUAN-LIBON ROAD SUB-PROJECT NO 11

(randaay-san Juan Section Contract No II-B)

PROJECT STATUS

Completed- May 30 1980

Turnover ------- ---- July 9 1980

Original Contract Cost - - - p 148744000

Final Contract Cost - - - - P 148744000

-2lS E VhYAUEVJA

project Manager

II-B-1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 14: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MA N I L A

MONTHLY CONSTRUCTION REP2ORT

April 1981

Sub-project 1i

Contract No III

LIBON-NUGPO SECTION

Secondary Roads

DEL ROSARIO-INOGNAC 0O 12

BULUSANj-LAKE SA-U NO 13

LA MEDALLA-LAKE CATO NO III

NUGPO-BARIW-MOLOSBOLO5 CU 15

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

DIMSON (MANILA)q INCORPORATED

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 15: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT NO 11

(Libon-Nugpo Section Contract III)

PROJECT STATUS

Terminated November 24 1980

Final Inventory- -- February 2 1981

percent of Work Accomplished - 740amp

percent of Work Unaccomplished 2560

For the remaining works to be undertaken under a now contract pay quantities price

analyses end program of work have been preshypared and submitted Bids for the completion

works are scheduled to be received at the Miip

Metro fManila on May 5 1981

Certified correct as verified in the field

AOci E A (project Manager

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 16: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981 Annex III-A

Con ract III Libon-Nugpo Road Section Sub-Project No 11 Package IV Contractor Dimson (Manila) Inc

S U M M A R Y

FINAL INVENTORY 2 FEBRUARY 1981

9 E C T 1 0 N ACCOMPLIS MENT T OFT 0 ATO DATE oAL IC OF UC(K T 0 T A L

ELqiGDi RY ROAD - 703848570 540379000 124422770 FEEDEiK ROAD NO 12 6101300 7885000 7598630 FCLJER ROAD NO i3 100912265 i3019125 113931390 FF DER ROAD NO 14 77307350 7730730 FEEDER ROAD NO 15 350773100 704000 351577100 PmiAS BRIDGE NO 1 72969620 - 72969020 PiJ3JLAS BRIDGE NO 2 69598420 - 69599842-PA LAS BRIDGE NO 3 68468620 - 68468C20 LASTAKT BRIDGE 66175060 shy 66175060

uO 55694620 - 55b94620ERIDGE

GFAND TOTAL p 1633848925 P 5620987125 p 2195936050

ACCOMPLISHMENT 1633894802 7440 2 15 97

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 17: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF TE ILiPPjINES MINISTRY OF PUBLIC iiIGIAYS

M A J I L A

MONTHLY CONSTRUCTION REPORT

April 1981

Sub-project 11

Contract fjo Iv

SAN JUAN (BATO) - NUGPO SECTION

Secondary Road

and

Feeder Roads

BUGA-PINAGBARILAN NO 16

DIVISORIO-LAKE BATO NO 17

DIVISORIO-HALONIKOGJ1gt--fIALADUCO 5 NO 18

SALVACION-DEL ROSARIO NO 19

GUYODAN-IAYAK NOo0 20

PAYAK-PAGATPATAN NO 21

GUY0DAN-LAKE BATO NO 22

SAN JUAN-CATMOlJ NO 23

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

FF CRUZ amp CO9 INC

(Contractor)

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 18: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PROGRESS REPORT

April 1983

PROJECT NABUA-SAN JUAN-LIBON ROAD SUB-PROJECT iiOo 11 (Nugpo-san Juan section Contract IV)

PROJECT STATUS

Terminated ---------- February 10 1981

Final Inventory February 18 1981

percent of Work Accomplished - 7418

percent of Work Unaccomplished - 25820

A Memorandum of Agreiinent for the complalion of the project by the ilitary is being finalized

between the Ministry of 1ational Defense and

Ministry of public Highways

Proect A-UE VAIrL

Project Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 19: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

M A N I L A

MONTHLY CONSTRUCTION REPORT

Apfil 1981

Sub-Project 14

Contract No V-A

POLANGUI-NASIS1 SECTION

Secondary Road

and

Feeder Roads

PONSO-SAN AGUSTIN NO 1 BALOGO-SAN RAMON-TAOOG NO 2

BARAYONG-LIGAO INo 3

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

BETTER BUILDERS CONSTRLICTION CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 20: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PROGRESS REPORT

April 1981

PROJECT POLANGUI-NASISI SECTIONq SUB-PROJECT NO 14

(Secondary and Feeder Road Contract V-A

Bridges along Secondary Road excluded)

PROJECT STATUS

Terminated November 24 1980

Final Inventory ------- January 28 i981

percent of Work Accomplished - 3569

percent of Work Unaccomplished - 6431

Bids for the completion works are scheduled

to be received at the MPH FNletro Manila on Nay

5 1981

r o Vjett AnUE VA -Project Manager

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 21: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

Apr1i 1981 Annex V-A-A

Contract V-A Polangui-Nasisi Section sub-project No 14 package IV Contractor Better Builders Const Corp

S U MiM~ A R Y

FINAL INIVENTORY 28 JAIUARY 1981

ACCOMPLISHMENTSE(TI0N TO DATE ALArCE WO RK T 0 T A L

2JDf5RY ROAD 216340200 3237795400 i 594035600

FEEDER ROAD NO 1 50573749 93540651 144114400

FFDER ROAD NO 2 46575500 40798800 87374300

F1EOER ROAD NO 3 24654535 84189465 108844000

338143984 P 596224316 934368300

+ SPL 3 (FR 1) 12997800

o 947366100

39381943984 ACCOMPLISHMENT = 314398 35699 t7Ul 0

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 22: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIGIHWAYS

M A N I L A

MONTHLY CONSTRUCTI0K REPORT

April 1981

Sub-project 14

Contract No V-B-AN

POLANGUI-NASISI SECTION (Bridgos)

ALNAY AND NAPO BRIDGES

CERTEZA DEVELOPMEINT CORPORATION

(Consultant)

RSW CONSTRUCTION CORPORATION

(Contractor)

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 23: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PLGRESS REPORT April 1981

PROJECT CONTRACT V-B-AN SUB-PROJECT NO 14 (Alnay amp Napo Bridge along Polangui-Nasisi Section)

PROJECT STATUS

Completed --------- --- November 25 1980

Final Inspection November 28 1980

Original Contract Cost 15808000

Final Contract Cost - 15807916

J3t E -IELt-NUEV n (project Manager

SL-o-Athshy

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 24: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUOLIC IGWAY5

MANILA

MONTHLY CONSTRUCTIOIN EPORT

No 6

April 1981

Sub-project 14

Contract No V--B-0t-

POLANGUI-NASISI SECTION

(Bridges)

BALOGO BRIDGE

CERTEZA DEVELOPMENT CORPOkATION (Consultan~t)

OAS BUILDERS CONST 11C

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 25: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-B (Completion of Balogo Bridge)

along Polangui-Nasisi Section)

PROJECT STATUS

Completed ----------- January 25 1981

Final Inspection April 14 1981

Original Contract Cost - 46640150

Final Contract Cost 42050759

As per Work order No 1

roject Manager

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 26: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC IIkGiWYS

M A N I L A

MONTHLY CONSTRUCTION NEPORT

No 6

April 1901

Sub-project 14

Contract No VB-[D

POLANGUI-NASISI SECTION

(Bridges)

BALINAD OR IDGE)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

VIBER CONSTRUCTION

(Contractor)

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 27: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PROGRESS REPORT NO 6

April 1981

PROJECT CONTRACT V-B-BD (Completion of Dalinad Bridge

Along polangui-Nasisi Section)

PROJECT STATUS

Completed-------- - - - March 4 plusmn81

Final inspection------- March 26 1981

Original Contract Cost - - - i 31714840

Final Contract Cost - - - - 28767698

piANE ULE VA pfaject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 28: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC HIGIQAYS

M A N I L A~

MONTHLY CO[hSTRUCTION REPORT

April 1901

Sub-project 14

Contract wo V-B-M

POLANGUI-NASIS SECTION

(Bridges)

MATANGIAD BRIDGE

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

CIRCA CONSTRUCTIOI INC

(Contractor)

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 29: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PROGRESS REPO[IT

April 1983

PROJECT CONTRACT V-B-M (Completion of Natanglad Bridge

Along Polangui-iNasisi Section)

PROJECT STATUS

Completed ------- ---- January 21 1981

Final Inspection January 28 198

Original Contract Cost 41421665

Final Contract Cost - 40397065

b oject Panager

I-f-M 1

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 30: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS

MANILA

MONTHLY CONSTRUCTION REPORT

April 19B

Sub-project 9

Contract No VI-A

NABUA-SAN AGUSTIN SECTION

Secondary Road

(Sta 0 + 000 - Sta 2 + 000)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

P1D FORONDA AND ASSOCIATES CORPORATION

(Contractor)

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 31: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PROGRESS REPORT

April 1981

PROJECT NABUA-SAW AGUSTIN SECTION SUB-PROJECT 9

(Sta 0+000 to Sta 2+000 Contract VI-A)

COMMENTS AND RECOMMENDATIONS

Progress

Actual Accomplishment ----- 9029

project was recommended for termination Comshy

pletion of the project has beon recommended to be

undertaken thru a negotiated contract should termishy

nation be approved

[VianAJ VI LL A oject Manager

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 32: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC iIGHiWAYS

11 A~ N I L A

MONTHLY CONSTRUCTIO0 REPORT ~~~ ~~-I-~ _ 1 1-deg

April 1901

Sub-project 9

Contract No VI-B

NABUA-SAN AGUSTIN SECTIlN

Secondary Road

(Sta 2 + 000 - SL 4 + 49b68)

CERTEZA DEVELOPMENT CORPORATION

(Consultant)

G amp G CONSTRUCTION CORPORATION

(Contractor)

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 33: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

K (4 1 -~ -

K

Apr~il 198l~ ~ 2~ -~K 2 ~~J$ 2A~ A- ~ -K--~T h~

f

shy2-~~~ 2 A 2 ~ A- k2-~~~2~ - -j~~ 2 29 ~ 72 ~42

9

~PROGRESS~xREPORT~ ~ ~ ~ - ~

2 ~

2 - ~-A -~ ~ ~~~ ~ RprJ71~ 1981 2 - ~ l-r~C2 lt -~-~- 2~gt ~

-- 22

2L ~ - 24 ( 4 2~gtlt ~iK222 L ~ 2222222924-)2) 2 2- 2222 -~

~lt( 2222 22-V

~~gtlt2d22 ~lt22~lt -v gt2- 22 222~2 2~[22222 ~ 9gt2lt4222~22 ~ ~ r ~ ~jlt2-lt )-~4222-222~~ 2QJ4 ~~$(~~ 22 lt22-222

lt 2 2 22 ~ 2~22(~2 2gtlt-~ 322 2

24 2 ~ ~~~gt22amp 2222222 ~ -~ SEOT4ON - SUB PROJECT 29 1~ 222~22224422222224-~4gt2222v2~~I~ROJEC-T NABUA StNltAGUSTIN

22lt4 2(22~ 2 22 3~2 2-~~ 4 - 222

22~222~ - ~ ~ 2 222222lt

~22~2 - ~ 22- - -k- 4-

)2-~lt (econdary 2 Road Sta 2+OOO~to Sta----24+500 lt

CDntr~iC

222242-

A- -t -i - vlt gt 2gt222lt

2 2- 2 2- 22 ~222122~2~2~22-g~

~------ 4 ~4 -2 amp

222~lt ~44 gtd~~-~~-4 2 -~ ~ -r shy4lt22-22 COMMEI~ [S AND RELO~II1E1JDATIONS

-424222 - 4tflt~ frs

-22~ 2 222 2-C 2 - - 2 2gt 4 - ~gt - shy

_ 2 - 2

- flTnr~1~QQ ~ 2

22

- ~~22 -2 ~222 gt2 w gt21 22 2 -22

2 22 ~~ ~ 2

12-2222 ~2 Actual - --~ - -- -~ ~- 82~22 2~~~~ ~lt~

2 2 222gt

gt~ 2

Accomplishment 4

2- - 2~ 32~of the~ project was

Termination -ltU lt2- of public Highways on (1a~ch 17 L9BL The222~44 lt2

42 - 2 2 2Ctt be

~ 2 2

22~A ~2 - 22 - 2224

~(2 4 - -- 4-4 -2-4

42 2 22 22-2-lt-- 2 2 2 2 i~i~~ lt22~ $2 222 - 2 ~ - - ~-K~-T~r~ 2- lt~~2 22 2 42~4~ (2- 22222- gt2~ - - 2

22- 2 2 ~ 2 IIA~J2-~2gt -- ~ITI4fibJLIfl~If1 2

Sgt2 2 22 2 shy222-2-2224 2 lt2

2V2242~ - 1 2 2 222 ~ ~(2 222 2 ~2 2

2

2 2lt - 22 - 2 2 project Manager ~~3A~ 2-222A222 ~22 2 - 2~ - 2 22 2 - - 2 - 2 2

2 22 ~2 22242 - 22222~

22 22222~2 2 22222222222 2V222222gt2222 2 2 2 2 4 2

222 2lt22-2 2 2 2 2 lt2 2 shy22( 22 22 22~2-2222422224lt2 2 2 2 2 2 2 222 2 222 2 A 2 22 2- 2lt)2~21424222222 lt2 22 222 2~2 - 2 2 22

2 2 22222 2 2 2 lt2 2 2222222222gt 223222 2 22 - 22 2242 22 2 2 ~ lt 22 2 2 22 2 2 2 2

22 lt~lt 2 lt22

2 2~22 222 2 2 - 2 2 lt 2 2 2222 2lt 22 22 lt24 22 22 2 22 2 - 2 22 22 2 2 2~

2-22242 2 222lt22 22 2222 222 22 22 22 22 2 2 2- 2 2 2 ~22lt 2~ 222~ 242-2 2222222A22 222- gt2 24 2 222 - 2 (2 22222~2lt2 - 2 222 - 22~

222- 2 2 2 2 22 22 22 222 22

22lt2 2 2 224 2 lt2 2-~ 222 2 2222 2222 222

222~2222 2222 2 22 2 - 22 2 22 22 ~2 22 2 222 2 2 2 2 -t 22lt2~ 22224222-2 22 2 4 2 2222222222 2 222 lt 2 2 2 2(2 2 222 2 2$2 2 2 22292lt 2 2gt 22 4 ~22 22 2 22 22 2 2 22 22 lt222 22 2222222 22(22222222 222 2 2 22 2lt 2 2222222222-22 22 42222242222222 22222 - 2222 22-22-22 22 lt222lt lt2 22 22222222222

2 2222~22 4lt2-24 222 22222lt24 222 22222 4 -~ 2 gt2~2~22 ((222 2

42 22lt2 2~ (2~ 2p 2- 4- - - 2~~2 -4lt 222i22~2 2222 -- 24- - - 22lt24- - - - ~~-lt-shy22 22 22~222+2 2 - ~lt 44444 - X22~ 22 2lt2 2-222lt 2y2 2 222 22 2 2222 3lt(22 42-222~2222222222 2 2222- 2223 2232222 22 22 22 2----ltgt 4222222-gt 22229222214 22-2~2~-2

2 p2~2p222~2(~2222222lt22lt222~222 22222 2---~ 4-2- 2-22222 2 -224~2222222lt~2A22~222222gt2 -lt-222222 22222- 222~-22 2 222222~242~2222222~2 -lt~22 22 - 222222222222 - 22 gt2222 2222 22222- 22- - - - - - -4422222p~232222422 2-22222222~22222- 224 22~ 22222

2gt222222 2 22 222222~2422~422lt2222 222 22222- - - - - - - - - - 2222-- - - - - 222222gt22222lt432gt22 22 2 2lt222 22(2222222222 22442242gt22 242242222222 2222 ~2~ lt 2 - 2224 22i222-~ 2 42-2lt24 2(2- -2-- 22 2~2222 2222 2-3 222222222222~22 222 2222222~ 222~2232222222222

22 242 222 lt2gt 22222 lt2 - -22-3lt4~2 22ltgt242-2 22 ~22gt222222222amp22 - 22 42-242422222~d2ltlt 2 - - 2lt 2~ lt2 322gt422gt gt42gt 2 - 22222~gt 2 222lt 222222gt2~222422~42(222242222222924---2- 22222222lt

22 222422gt222 32lt-2A4lt~(2 2 2442lt 224K24 j gt3 22 2lt222222 24

~-2222 ~2~2222 2~222~22222 lt2 -2 222222 42~4 2lt22242 -lt22222 2222222222- 22222 f2223 2222 4~

2 2 2 2 2 2 2 2 2 4 2 2 ~ 2 2

2 222222 2222-gt 224 224422222222gt4- ~ 22 - - - - - - - 2 2-22222 2222222222222lt2222242222-22 22 2222222224442222242222222222~42 lt-22222222222 22222222222242222lt~ -22-2242-2222lt22222- 22lt222- 2 ~4gtk2 22222 2gt4424 2 ~ A~ 2~ 22242-t24222224227244 222222222 2gt2~4

2 ~4 ~gtlt2-2lt

22 2 - 2f~224244lt24242422422- 222 (24 2 2 -4 2 22 2 22-laquolt2

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 34: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

REPUBLIC OF THE PIILIPPINES MINISTRY OF PUBLIC IX(i~IWAYS

M A N I A

MONTHLY CONSTRUCTION RLPORT

April 1981

Sub-projocL 9

Contract 11o VI-C

NABUA-SAN AGUSTI11 SECTION

Feeder Roads

Sta Lucia-San AnLonio No 1

Baras-San Jose No 2

CERTEZA DEVELOPIENT CORPORATIOil

(Consul tant)

JM HERNANDEZ amp SO[NS CORPORATION

(ConLractor)

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 35: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981

PROGRESS REPORT

March 1981

PROJECT NABUA-SAN AGUSTIN SECTION SUB-PROJECT 9

(Feeder Road No 1 amp 2 Contract VI-C)

PROJECT STATUS

substantially completed - - May 25 1980

Turnover Decembr 12 1930

Original Contract Cost - - - - 17864010

Final Contract Cost 19192989536

IJI project Manager

Vi-C-i

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 36: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

CERTEZA DEVELOPMENT CORPORATION

LIST OF FIELD IV-RFSONiEL

AS OF APRIL 1901

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 37: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

April 1981 Appendix A

Sheet 1 of 1

CERTEZA DEVELOPMENT CORPORATION SPC COMPOUND PULAGUI

LIST OF

As of

N A0E

1 Jose E Villanueva

2 Dominador Soloria

3 Iluminado Cabanit

4 Manuel 1ipolito

5 Gregorio Amanbe

6 Rodolfo Sabater

7 Eleazar Regondola 8 Jose Revilla

9 Miguelito Espinar 10 Bernardo Turingan

11 Fidel Iturrios

12 Ricardo Macalino

13 Pablo S dela Peha

14 Avelino G Bactol

15 Rosalina Realubit

16 Araceli Aumentado

17 Eduardo Samarista

18 Cirilo Tiamson

19 Ramon Aquino

20 Nicasio Fornaliza

21 Bernardo Sartorio

22 Abelardo Rapadas

ALBA

CDC FIELD PERSONNEL

April 25 1981

DES I4G ATION

project Manager

Sr Highway Engineer

Sr BridgeDrainage Engr

Sr SoilsMatlis Engr

Sr Quantitycost Engr

Surveyor Engineer

Asst Highway Enginner Asst Surveyor Engr

BridgeDrainage insp Earthworkpavemet Insp

Laboratory Technician Draftsman

Administrative Officer

Asst Adm Officer

project Accountant

SecTypist

janitor

D r i v e r

-do-

Security Guard

-doshy

-doshy

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr

Page 38: CERTEZA DEVELOPMENT CORP.pdf.usaid.gov/pdf_docs/PDAAI875.pdf · certeza development corp. ... san roque-sta. [parbara no. 1 san antonio-ogbon'-san agustin no. 2 ... turnover -----*july

Apri 1981 Appendix B Sheet 1 of 1

BICOL RIVER BASIN DEVELOPMENT PROGRAM

San Jose Pili Cam Sur

EMPLOYMENT GENERATION SURVEY (SS$

Name of Consultant

For the month of

CERTEZA DEVELOP1ENT CORPORATION

April 1981

Manilplusmn 3Esed

Loca3 rI d sub-onrctor

TOTAL

l

2

3shy

ADMINISTRATIVE

FINANCE

4

3

7

ENGINEERING

TECHNICAL

8

4-

12

SKltILLED

2

2

UNSKILLED U

1

1

l

2

3

Includes permanent employees

Employees residing within the basin area

Local hired only Submitted by

VI L 1--AUU EV A -Prdject Managr