defect control
DESCRIPTION
Defect Controlon siteTRANSCRIPT
LOG SHEET FOR DEFECT CONTROL
REGION : CONTRACT CODE :
PROJECT SITE : DATE :
PROJECT IN CHARGE :
Note : Log sheet shall be maintained since commencement of the project till the completion
Total cumulative Defects till date :
Total cumulative Defects closed till date :
Status of NCR
For the month of :
Defects Pending for previous month :
Defects for Current month :
Total Defects to be attended :
Clause & Area of Activity
1 Reinforcement Laying
2 Housekeeping & Safety
3 Concrete - Mixing
4 Concrete - Placing
5 Concrete - Vibration
6 Concrete - Honeycombing
7 Shuttering
8 Mobilisation
9 Excavation & Backfilling
10 Brick / Block Masonry
11 Curing
12 Plastering, Flooring & Tiling
13 Quality of Materials Supplied
14 Construction Joint
15 Wood work,Sliding Windows etc.
16 Waterproofing
17 Surveying
18 Record Keeping
19 Calibration & Testing
20 Planning
21 Stores
22 Structural Steel Works
23 Electrification & Plumbing
24 Any Other
TOTAL
Monthly report sheet attached (tick)
Signature of Project Manager / Incharge Reviewed by QA/QC Manager
FOR THE PERIOD OF (to be specified clearly) :
Sl. No.
Total No.of cumulative
Defects
Total No.of Defects (for
current month)
MONTHLY REPORT ON CORRECTIVE & PREVENTIVE ACTION
REGION CONTRACT CODE
PROJECT SITE DATE
PROJECT IN CHARGE
DEFECT CONTROL
Correction (Specify Details)
1
2
3
Signature of Site QA / QC In -charge Signature of the Project Incharge
FOR THE PERIOD OF (to be specified clearly)
Sl. No.
Nature of the problem (Please Specify Dtails,
Location & Department)
Causes of problem / Root Cause
Corrective Action taken for Customer Complaints
Long - term Preventive Action
recommended / taken
Date: 06/02/2012 Location: B5 - 10th Floor Sub: Concrete rejection
Water added to concrete by pump operator due to lack of
supervision.
Concrete is remixed and checked for workability and achieved required
slump.
PMC had strictly rejected the concrete and as per their instruction we have not used the concrete and unloaded on the ground (though there was no front for
PCC to use this concrete).
Date: 23/02/2012 Location: D1 - 9th to 10th Floor column and 11th to 12th Floor column Sub: Setting of column concrete
Due to early stripping of column formwork.
Though the column concrete was not set, it was been instructed to dismantle
these columns.
Date: 23/02/2012 Location: 8th to 9th Floor Sub: Column casted is not as per the structural drawing (dimension).
Due to lack of supervision and improper studying of structural
drawings.
The excess portion of the column has been chipped out manually to line and
level and rectified with GP-2 to the required dimension as per drawing.
REGION CONTRACT CODE
PROJECT SITE DATE
PROJECT IN CHARGE
DEFECT CONTROL
Correction (Specify Details)
1
2
3
Signature of Site QA / QC In -charge Signature of the Project Incharge
FOR THE PERIOD OF (to be specified clearly)
Sl. No.
Nature of the problem (Please Specify Dtails,
Location & Department)
Causes of problem / Root Cause
Corrective Action taken for Customer Complaints
Long - term Preventive Action
recommended / taken
Date: 25/04/2012 Location: D1 - 9th Floor, Staircase - 7 Sub: Non providing of reinforcement dowels for midlanding beam.