University of the District of Columbia, Ingenuity Preparatory, & National Collegiate Prep PCS
4600 Livingston Rd SE Washington, DC
March 14, 2018
Submitted by:
3715 Martin Luther King Jr. Avenue, SE Washington, DC 20032
Submitted to: Mr. Stephen A. Campbell
Senior Planner, Planning Office Department of General Services – Construction Division
2000 14th Street NW, 5th Floor Washington, DC 20009
Hayat Brown LLC Page 2 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
T A B L E O F C O N T E N T S
Table of Contents ................................................................................................................ 2 Executive Summary ............................................................................................................. 3
1.1 General Description ..................................................................................................................... 3 1.2 Scope of Work ............................................................................................................................... 3 1.3 Definitions ....................................................................................................................................... 5 1.4 Limiting Conditions ..................................................................................................................... 7 1.5 Building Summary ........................................................................................................................ 8 1.6 Summary of Findings .................................................................................................................. 8 1.7 Facility Condition Index ............................................................................................................. 9 1.8 Expenditure Forecast .................................................................................................................11 1.9 Assets Observed .........................................................................................................................15 1.10 Planning Horizon Category Needs: Current Year to Year 10 ....................................16 1.11 Building System Needs: Immediate ....................................................................................18 1.12 Building System Needs: Year 2 - Year 10 ..........................................................................19 1.13 Building System Needs: 10 Year Forecast ........................................................................20
A SubStructure Systems................................................................................................ 21 A10 FOUNDATIONS .......................................................................................................................21
B Shell Systems .............................................................................................................. 24 B10 SUPERSTRUCTURE ..............................................................................................................24 B20 EXTERIOR ENCLOSURE .....................................................................................................25 B30 ROOFING ...................................................................................................................................40
C Interiors Systems ........................................................................................................ 45 C10 INTERIOR CONSTRUCTION ..............................................................................................45 C20 STAIRS ........................................................................................................................................53 C30 INTERIOR F INISHES .............................................................................................................61
D Services Systems ........................................................................................................ 74 D10 CONVEYING SYSTEMS ......................................................................................................74 D20 PLUMBING ................................................................................................................................76 D30 HVAC .........................................................................................................................................92 D40 F IRE PROTECTION SYSTEMS ..................................................................................... 131 D50 ELECTRICAL SYSTEMS ................................................................................................... 133
E Equipment & Furnishing Systems .......................................................................... 167 E10 EQUIPMENT ........................................................................................................................... 167
G Building Sitework Systems ..................................................................................... 173 G20 SITE IMPROVEMENTS ..................................................................................................... 173
Appendices Appendix A: Photographic Record Appendix B: Survey Information Resulting In Plant Adaptation Recommendations
C19
Hayat Brown LLC Page 3 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
E X E C U T I V E S U M M A R Y
1.1 GENERAL DESCRIPTION
Hayat Brown LLC was retained by the District of Columbia Department of General Services (DGS) to undertake Facility Condition Assessments (FCAs) for District of Columbia Public Schools (DCPS) facilities. The purpose of the FCAs are to inventory the elemental components in the buildings, identify key attributes of those components, determine estimated remaining useful lives (RULs) and replacement costs of those components for inclusion in DCPS’ 6-year capital plan. The FCA will also identify physical deficiencies needing immediate attention. The FCA data was collected by Hayat Brown LLC’s assessment teams into the iPlan™ Sustainable Facility Governance Solution (iPlan) platform and will function as the source for DGS’ development of a comprehensive repair, alteration, and improvement program for DCPS facilities. The FCA and analytical data will enable the District to plan, manage and analyze data utilizing a single platform. This will enhance the District's ability to develop short-, intermediate-, and long-term capital improvement strategies based on stakeholder needs and will provide for a cost-effective operation of the facility based upon the prioritization code for each identified element or component in the FCA. The iPlan platform calculated the RULs and estimated replacement costs, and generated this draft Facility Condition Assessment Report (FCA Report) for DGS review. The iPlan platform also allows the FCA data and the FCA Report to be accessible via a web-based dashboard.
1.2 SCOPE OF WORK
The FCAs were carried out by Hayat Brown LLC (Contractor) and included a complete and thorough visual, non-destructive assessment of each facility. The Contractor followed ASTM standards ("ASTM E2018-08") for conducting property condition assessments, as well as guidance from DGS regarding additional survey information and cost estimates for possible plant adaptations. The FCA Report summarizes the FCA process, which included the following: • Review of existing documentation provided by the District and interviews with DCPS personnel regarding
aspects of each facility. • Physical assessment to include a limited non-intrusive visual assessment of the buildings and their
components. • Identify and categorize each major component for predictive maintenance, testing and/or inspection,
preventative maintenance, emergency maintenance and/or routine maintenance needs. • Based on provided templates surveyed elements included:
o Core and shell: These elements include superstructure, floors, bearing walls, columns, beams, and exterior envelope components.
o Interiors: These elements include interior finishes of floors, walls, ceilings, stairways, etc. o Building equipment and systems: These elements include HVAC systems, and electrical systems, fire
protection systems, and conveyor systems. o Fixed equipment and non-movable furnishings: These elements include fixed equipment such as
kitchen equipment’s, audio equipment, public address systems, etc.
C19
Hayat Brown LLC Page 4 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
o Building site Improvements: These elements include paved surfaces, playground equipment, fencing, recreational elements, site lighting, general site drainage and landscaping.
• Evaluated additional elements based on questionnaires provided by DGS. These questionnaires were answered based on interviewing the facility staff and visual surveys:
o ADA accessibility: included questions relating to accessibility barriers of interior and exterior elements o Safety and security: included questions relating to safety and security of the facility such as fire
protection systems o Access control: included questions relating to controlled access to the facility such intrusion detection
systems and component hardware o Hazardous materials: included questions relating to the existence hazardous materials at each facility o LEED opportunities: included questions relating to existing components and improving LEED
certification points o Additional space considerations: included additional questions relating to space allocation and the
existence of special features
C19
Hayat Brown LLC Page 5 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
1.3 DEFINITIONS
Facility Condition Assessment Report (FCA Report) - The work product resulting from completing a FCA is a FCA Report. The FCA Report incorporates the information obtained during the Walk-Through Site Assessment Survey, the Document Review, and Interviews to support the iPlan cost estimates for components at their RUL.
Document Reviews and Interviews - Includes document reviews, research, and interviews to augment the walk-through survey so as to assist the consultant's understanding of the subject property and identification of physical deficiencies. Walk Through Site Assessment Survey - The walk-through survey identifies the subject property's elemental components, conditions, RULs, and replacement costs at RUL. Costing - Costing is reported following the ASTM 2018-08 Guidelines Section 9, “Opinions of Costs to Remedy Physical Deficiencies. As such, they include general-scope opinions of costs to assist the user in developing a general understanding of the physical condition of the subject property. As outlined in ASTM 2018-08, the opinion of probable costs should only be construed as preliminary, order of magnitude budgets. Actual costs will vary based on design, quality of materials, field conditions and several other factors as outlined in ASTM 2018-08. Generally, costing does not include project management, contingency, permits, hazardous material remediation (unless specifically stated on a case by case basis) and other overhead costs such as Architect and Engineering fees, profit, or other markups.
Replacement and repair costs herein are based on the two major North American Standards for facility cost estimating: Whitestone Facility Maintenance and Repair Cost Library (Costlabs); and RSMeans. Whitestone visualizes costing from a Facility Maintenance viewpoint while RSMeans approaches costing from a construction viewpoint. Using industry best practices, the relative strengths of each costing approach has been integrated into a unified costing guide for the condition assessment process. The quantities associated with each item have been estimated during a walk-through during the site assessment and do not represent exact measurements or quantities. Costs have been adjusted to the local Washington DC area and are stated in constant 2017 dollars. The cost guide has been utilized by the assessment team as a starting point for costing and supplemented by the assessors adjusting costs based upon experience and facility factors (such as installation design) to determine maintenance and replacement costs. Physical Deficiencies - In defining good commercial and customary practice for conducting a baseline FCAs, the goal is to identify and communicate physical deficiencies to a user. The term physical deficiencies mean the presence of conspicuous defects or material deferred maintenance of a subject property's material systems, components, or equipment as observed during the assessor’s walk-through survey. This definition specifically excludes deficiencies that may be remedied with routine maintenance, miscellaneous minor repairs, normal operating maintenance, etc., and excludes conditions that generally do not present material physical deficiencies of the subject property. Survey Information Resulting in Plant Adaptation Recommendations - These are methodical questions based upon defined industry or Owner standards resulting in a general costing amount that gives an Owner a cash expenditure to plan on within proformas.
C19
Hayat Brown LLC Page 6 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Life Cycle - There are various approaches for determining an elemental component’s service life such as a “modeling” approach where an industry standard expected useful life (EUL) is added to a component’s date of installation resulting in a modeled or calculated expectation of replacement for that item. The methodology used in Hayat Brown LLC’s reported value for the expected replacement of an elemental component is a field assessed opinion of remaining useful life (RUL). Observed RUL takes into account a field assessor’s observation of the elemental component along with other factors such as maintenance records or observed measurable parameters. Planning Horizon – Since the life cycles of many elemental components exceed industry standard cash flow proformas, Hayat Brown LLC’s FCA Report only includes a timeframe of importance to an Owner’s immediate cash flow planning. In the case of this report, DGS requested a planning horizon window of 10 years. The Planning Horizon years and remaining useful lives (RULs) as defined in this report’s approach are summarized in the table below:
Planning Horizon Remaining Useful Life (RUL)
Year 1 - “Immediate” or “Current” 0 Year 2 1 Year 3 2 Year 4 3 Year 5 4 Year 6 5 Year 7 6 Year 8 7 Year 9 8 Year 10 9
C19
Hayat Brown LLC Page 7 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
1.4 LIMITING CONDITIONS
This report has been prepared for the exclusive and sole use of the Department of General Services. The report may not be relied upon by any other person or entity without the express written consent of Hayat Brown LLC. Any reliance on this report by a third party, any decisions that a third party makes based on this report, or any use at all of this report by a third party is the responsibility of such third parties. Hayat Brown LLC accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made, or actions taken, based on this report. The assessment of the building/site components was performed using methods and procedures that are consistent with standard commercial and customary practice as outlined in ASTM Standard E 2018-08 for PCA assessments. As per this ASTM Standard, the assessment of the building/site components was based on a visual walk-through site visit, which captured the overall condition of the site at that specific point in time only. No legal surveys, soil tests, environmental assessments, geotechnical assessments, detailed barrier-free compliance assessments, seismic assessments, detailed engineering calculations, or quantity surveying compilations have been made. No responsibility, therefore, is assumed concerning these matters. Hayat Brown LLC did not design nor construct the building(s) or related structures and therefore will not be held responsible for the impact of any design or construction defects, whether or not described in this report. No guarantee or warranty, expressed or implied, with respect to the property, building components, building systems, property systems, or any other physical aspect of the property is made. The recommendations and cost estimates associated with these recommendations, as presented in this report, are based on walk-through non-invasive observations of the parts of the building which were readily accessible during our visual review. Conditions may exist that are not as per the general condition of the system being observed and reported in this report. Cost estimates presented in this report are also based on information received during interviews with operations and maintenance staff. In certain instances, Hayat Brown LLC has been required to assume that the information provided is accurate and cannot be held responsible for incorrect information received during the interview process. Should additional information become available with respect to the condition of the building and/or site elements, Hayat Brown LLC requests that this information be brought to our attention so that we may reassess the conclusions presented herein. The cost estimates are intended for global budgeting purposes only. The scope of work and the actual costs of the work recommended can only be determined after a detailed examination of the site element in question, understanding of the site restrictions, understanding of the effects on the ongoing operations of the site/building, definition of the construction schedule, and preparation of tender documents. We expressly waive any responsibilities for the effects of any action taken as a result of these endeavors unless we are specifically advised of prior to, and participate in the action, at which time, our responsibility will be negotiated. Our opinions and recommendations presented in our reports will be rendered in accordance with generally accepted professional standards and are not to be construed as a warranty or guarantee regarding existing or future physical conditions at the Site or regarding compliance of Site systems/components and procedures/operations with the various regulating codes, standards, regulations, ordinances, etc.
C19
Hayat Brown LLC Page 8 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
1.5 BUILDING SUMMARY
Item Description
Project Name University of the District of Columbia, Ingenuity Preparatory, & National Collegiate Prep PCS DCAM-17-NC-0058
Full Address 4600 Livingston Rd SE Washington, DC 20032
Year Built 1976
Gross Building Area (SF) 348,700
Current Replacement Value $ 84,137,823
CRV/GSF ($/Sq Ft) $241.29 / Sq Ft
1.6 SUMMARY OF FINDINGS
This report represents summary-level findings for the Facility Condition Assessment. The deficiencies identified in this assessment can be combined with potential new construction requirements to develop an overall Long-Term Capital Needs Plan that can be the basis for a facility wide capital improvement funding strategy. Key findings from the Assessment include:
Key Finding Metric Current Year Facility Condition Index 0.55%
Property Replacement Value (in Current Dollars) $84,137,823
Current Year Capital Needs (included in FCI) $465,068
Year 1 to Year 5 Capital Needs $25,411,710 5 Year FCI (Year 1-5 Needs/CRV) 30.20%
Year 1 to Year 10 Capital Needs $30,034,413 10 Year FCI (Year 1-10 Needs/CRV) 35.69%
C19
Hayat Brown LLC Page 9 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
1.7 FACILITY CONDITION INDEX
The Facility Condition Index (FCI) gives an indication of a building’s or portfolio’s overall state of condition. It is a widely recognized metric for benchmarking in the real estate industry. By definition, THE FCI is defined as the ratio of Deferred Maintenance Cost to the Current Building Replacement Value (CRV) of the property.
This CRV is based on the building type from the online Whitestone Facility Maintenance and Repair Cost Library (Costlabs) as of 1 September 2017 (a national recognized publication used in thousands on condition assessments throughout the country). Typically, the FCI is calculated using only the current condition values, not taking into account the future needs identified in the life cycle evaluation or building enhancements or programmatic upgrades that may be identified in a scoping or design process. Accounting principles indicate that a value of 65%, or the “rule of two-thirds”, be utilized for the FCI threshold for identifying potential replacement candidates. Once the current repair costs reach 65%, or roughly two-thirds of the full replacement value of the estimated cost to replace a facility, it may not be prudent to continue to fund repairs. In cases where aggressive facilities planning is expected to be necessary, this threshold may be adjusted to address more pressing need.
C19
Hayat Brown LLC Page 10 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
The Chart below indicates the cumulative effects of the FCI ratio over the study period assuming the required funds and expenditures are NOT provided to address the identified works and deferred maintenance each year.
Year Deferred Maint. (Carried Forward)
Current Year Cost (Anticipated)
Total Deferred Maint.
FCI
2018 $ 0 $465,068 $465,068 0.55%
2019 $ 465,068 $2,164,898 $2,629,966 3.13%
2020 $ 2,629,966 $8,010,743 $10,640,709 12.65%
2021 $ 10,640,709 $11,990,966 $22,631,675 26.90%
2022 $ 22,631,675 $2,777,034 $25,408,710 30.20%
2023 $ 25,408,710 $256,181 $25,664,890 30.50%
2024 $ 25,664,890 $645,154 $26,310,044 31.27%
2025 $ 26,310,044 $561,349 $26,871,393 31.94%
2026 $ 26,871,393 $51,266 $26,922,659 32.00%
2027 $ 26,922,659 $3,108,754 $30,031,413 35.69%
ElementNo.
ActionsLast
AssignedCondition
EUL*or
ReplacementCycle (Yrs)
RUL**(Yrs)
Qty. Units Unit Cost Plan Type 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Total***
$ 0 1 2 3 4 5 6 7 8 9
A10 FOUNDATIONS
A1011Repair Foundation Wall, Slab Edge or Suface, Parging (Per SF of Face)
Fair - Good 0 0 1,000.00 SF $11.07 Deferred Maintenance $11,070 $11,070
$11,070 $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,070
B20 EXTERIOR ENCLOSUREB20 Repair Soffit Ceiling Good 0 0 75.00 SF $7.32 Deferred Maintenance $549 $549B2011 Replace Exterior Block Wall Poor 50 2 75,270.00 SF $12.56 Capital Replacement $945,331 $945,331B2023 Replace Storefronts - Glazed Metal Framed Poor 33 2 2,000.00 SF $27.43 Capital Replacement $54,860 $54,860B2032 Replace Exterior Steel Doors Fair 40 5 19.00 Each $887.04 Capital Replacement $16,854 $16,854B2039 Replace Rolling Door, Steel Fair 40 6 2.00 EA $3,145.00 Capital Replacement $6,290 $6,290
B30 ROOFING
B3011Replace Roof Coverings, Metal Panels, Standing Seam
Poor - Fair 30 1 4,600.00 SF $36.58 Capital Replacement $168,268 $168,268
Repair metal trim / flashing at various locations throughout main roof
Fair - Good 0 0 1.00 LS $1,500.00 Deferred Maintenance $1,500 $1,500
Replace Roof Coverings, Modified Bitumen Fair - Good 25 9 123,100.00 SF $6.15 Capital Replacement $757,065 $757,065
$2,049 $168,268 $1,000,191 $0 $0 $16,854 $6,290 $0 $0 $757,065 $1,950,717
C10 INTERIOR CONSTRUCTIONC10 Replace Interior Construction Poor 60 1 1.00 LS ######### Plant Adaptation $1,200,000 $1,200,000
C20 STAIRSC2011 Replace worn out Vinyl Tile in stair areas Good 0 0 2,000.00 SF $3.42 Deferred Maintenance $6,840 $6,840
Repair Concrete, Exterior Stairs Fair - Good 0 0 1.00 LS $2,500.00 Deferred Maintenance $2,500 $2,500Replace Exterior Concrete Stairs Fair - Good 50 8 1,368.00 SF $37.48 Capital Replacement $51,266 $51,266
C30 INTERIOR FINISHESC3024 Replace Vinyl Tile Flooring Fair - Good 0 0 10,000.00 SF $3.42 Deferred Maintenance $34,200 $34,200C3025 Replace Carpet Flooring Poor 8 3 49,236.00 SF $5.98 Capital Replacement $294,333 $294,333
Repair Gypsum Board/Plaster, Ceiling Poor - Fair 0 0 2,000.00 SF $7.32 Deferred Maintenance $14,640 $14,640Replace Gypsum Board, Finished Ceilings Poor - Fair 75 5 24,132.00 SF $4.74 Capital Replacement $114,436 $114,436
C3032 Replace Acoustical Tile Ceiling Fair - Good 0 0 16,000.00 SF $3.10 Deferred Maintenance $49,600 $49,600
$107,780 $1,200,000 $0 $294,333 $0 $114,436 $0 $0 $51,266 $0 $1,767,815
D10 CONVEYING SYSTEMS
D1011 Replace Elevator, Geared, 3-5 Floor, 3,000 Lbs Fair - Good 25 9 1.00 Each ######### Capital Replacement $115,734 $115,734
D20 PLUMBINGD2010.0 Replace Typical Plumbing Fixtures Poor 25 2 348,700.00 SF $3.80 Capital Replacement $1,325,060 $1,325,060
D2016Replace Emergency Eye wash and Shower - Plumbed
Fair - Good 25 9 1.00 EA $3,438.05 Capital Replacement $3,438 $3,438
D2018Replace Plumbing Fix., Drinking Fountain, Various
Poor 15 2 348,700.00 SF $0.20 Capital Replacement $69,740 $69,740
D2021 Replace Domestic Water Distribution Piping Poor 40 2 348,700.00 SF $2.71 Capital Replacement $945,674 $945,674D2023 Replace Tank, Water Storage Poor 30 2 1.00 LS $80,000.00 Capital Replacement $80,000 $80,000D2031 Replace Waste Piping Poor 25 2 348,700.00 SF $3.26 Capital Replacement $1,135,019 $1,135,019D2034 Replace Pump, Sewage Ejector, Duplex Poor 30 2 1.00 EA $17,420.23 Capital Replacement $17,420 $17,420D2041 Replace Rainwater Drainage Piping Poor 25 2 348,700.00 SF $1.34 Capital Replacement $467,258 $467,258
D30 HVAC
C. INTERIORS SUB-TOTALSD. SERVICES
C. INTERIORS
C2011
C3031
A. SUBSTRUCTURE SUB-TOTALSB. SHELL
B3011
B. SHELL SUB-TOTALS
10 YEAR CAPITAL EXPENDITURE FORECAST
University of the District of Columbia, Ingenuity Preparatory, & National Collegiate Prep PCS4600 Livingston Rd SE, Washington, DC, 8
A. SUBSTRUCTURE
Powered by iPlan © 2013 4tell™ Solutions, LP.All Rights Reserved. 4tell, iPlan (patent pending) Building Blocks, and Innovation for the Built Environment are trademarks of 4tell™ Solutions, LP Run Date: March 14, 2018
D3021Replace Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH
Poor 25 3 3.00 EA ######### Capital Replacement $854,801 $854,801
D3031 Replace Chiller, Scroll, Water-Cooled, 400 Ton Fair 25 6 2.00 EA ######### Capital Replacement $492,133 $492,133Clean hardened scale from tower fill. Poor - Fair 0 0 1.00 EA $1,500.00 Deferred Maintenance $1,500 $1,500Replace Cooling Tower, Galv Steel / Avg, 501~1,000 Ton, 3-Cell Tower
Poor - Fair 20 4 1.00 EA ######### Capital Replacement $153,292 $153,292
D3032Replace DX Outdoor Unit, Ave. 2 Ton, Rooms 202, 204 Service
Poor 15 3 2.00 EA $9,655.63 Capital Replacement $19,311 $19,311
D3041Replace Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return
Poor 30 3 348,700.00 SF $23.17 Capital Replacement $8,078,507 $8,078,507
D3041 Replace DX Split Indoor Unit, 2 Ton, Ductless Poor 15 3 2.00 EA $2,717.51 Capital Replacement $5,435 $5,435D3041 Replace DX Split Indoor Unit, 1 Ton, Ductless Fair - Good 15 9 1.00 EA $1,978.84 Capital Replacement $1,979 $1,979D3042 Replace Exhaust System, Fume Hood Fair 25 6 1.00 EA $22,446.76 Capital Replacement $22,447 $22,447D3042 Replace Exhaust System, Fume Hood Fair - Good 25 9 1.00 EA $22,446.76 Capital Replacement $22,447 $22,447D3042 Replace Exhaust / Ventilation Poor 20 3 348,700.00 SF $0.97 Capital Replacement $338,239 $338,239D3042 Replace Exhaust System, Fume Hoods Fair 25 6 4.00 EA $22,446.76 Capital Replacement $89,787 $89,787D3044 Replace Heating, Hydronic, Baseboard, Large Poor 30 3 348,700.00 SF $1.85 Capital Replacement $645,444 $645,444
D3044Replace Heating, Hydronic, Convection, 2-Pipe, Cabinet Type
Poor 30 3 348,700.00 SF $1.53 Capital Replacement $531,768 $531,768
D3046 Replace Piping, HW/CHW, 4-Pipe Distribution Poor 35 2 348,700.00 SF $8.48 Capital Replacement $2,956,279 $2,956,279D3051 Replace Cabinet Unit Heater, Hydronic Poor 20 3 20.00 EA $1,119.31 Capital Replacement $22,386 $22,386D3051 Replace Unit Heater, Hydronic, 26 to 55 MBH Poor 20 3 25.00 EA $1,611.62 Capital Replacement $40,291 $40,291D3068 Replace Building Controls (SF), DDC, Average Poor 15 3 230,000.00 SF $2.70 Capital Replacement $621,000 $621,000
D3068Replace Building Controls (SF), Pneumatic, Average
Poor 20 3 97,374.00 SF $5.54 Capital Replacement $539,452 $539,452
D40 FIRE PROTECTION SYSTEMSReplace Fire Extinguisher Poor - Fair 20 5 348,700.00 SF $0.26 Capital Replacement $90,313 $90,313Replace/Install Fire Extinguishers Poor - Fair 0 0 1.00 LS $40,000.00 Deferred Maintenance $40,000 $40,000
D50 ELECTRICAL SYSTEMSD5012 Replace Main Service Switch, 3000 Amps Poor - Fair 20 4 2.00 EA ######### Capital Replacement $776,371 $776,371D5012 Replace Switchboard, 3000 Amps, 2 sections Poor - Fair 30 4 2.00 Each ######### Capital Replacement $776,371 $776,371
D5012Replace Motor Control Centers, 600 Amps, 3 Sections
Poor - Fair 20 4 8.00 EA $19,800.82 Capital Replacement $158,407 $158,407
D5012 Replace Motor Starter, 2.000 HP, 208 V Poor - Fair 18 4 6.00 EA $1,128.90 Capital Replacement $6,773 $6,773
D5012Replace Secondary Transformer, Dry, 112.5 kVA
Poor - Fair 30 4 7.00 EA $9,542.63 Capital Replacement $66,798 $66,798
D5012Replace Transfer Switch, Auto, 480 V, 150 Amps
Fair 18 7 1.00 EA $7,152.57 Capital Replacement $7,153 $7,153
D5012 Replace Secondary Transformer, Dry, 30 kVA Poor - Fair 30 4 1.00 EA $4,899.35 Capital Replacement $4,899 $4,899D5012 Replace Secondary Transformer, Dry, 15 kVA Poor - Fair 30 4 1.00 EA $4,226.26 Capital Replacement $4,226 $4,226D5012 Replace Panel Board Poor - Fair 30 4 69.00 Each $10,664.25 Capital Replacement $735,833 $735,833
D5012Replace Motor Control Center, 900 Amps, 8 sections
Poor - Fair 20 4 1.00 EA $19,800.82 Capital Replacement $19,801 $19,801
D5012 Replace Primary Transformer, Dry, 150kVA Poor - Fair 30 4 2.00 Each $37,131.05 Capital Replacement $74,262 $74,262D5021 Replace Occupancy Sensors, Indoor Lighting Fair - Good 15 9 20.00 EA $1,139.41 Capital Replacement $22,788 $22,788
D5022Lighting fixture not operational. Repair/Replace
Fair - Good 0 0 35.00 EA $1,038.18 Capital Replacement $36,336 $36,336
Lighting fixture not operational. Replace/Upgrade.
Poor 0 0 8.00 EA $1,007.30 Deferred Maintenance $8,058 $8,058
Replace HID Lighting - Older Poor 20 2 20.00 EA $705.11 Capital Replacement $14,102 $14,102D5022 Replace Lighting Equipment - Fluorescent Fair - Good 20 9 262,300.00 SF $6.12 Capital Replacement $1,605,276 $1,605,276D5022 Replace Flood Light, Exterior, Older Poor 20 1 62.00 Each $844.04 Capital Replacement $52,330 $52,330D5031 Replace Sound System Poor 15 0 1.00 EA $2,067.60 Deferred Maintenance $2,068 $2,068D5038 Replace Card Reader Fair 10 6 30.00 Each $1,149.90 Capital Replacement $34,497 $34,497
D5038Replace Intrusion Detection - University Section
Fair - Good 15 9 262,300.00 SF $1.15 Capital Replacement $301,645 $301,645
D5038Replace Intrusion Detection - Charter School Section
Fair - Good 15 9 86,400.00 SF $1.15 Capital Replacement $99,360 $99,360
D5038 Replace Vehicle Control Bollard Poor 15 0 2.00 EA $9,145.76 Deferred Maintenance $18,292 $18,292D5091 Replace Lightning Protection System Fair - Good 25 9 1.00 Each $3,261.74 Capital Replacement $3,262 $3,262D5092 Replace Generator, Natural Gas, 90 kW Fair - Good 25 9 1.00 EA $71,929.70 Capital Replacement $71,930 $71,930
D5092Exit Light fixture not operational. Repair/Replace.
Fair - Good 0 0 16.00 EA $279.08 Deferred Maintenance $4,465 $4,465
$110,719 $52,330 $7,010,552 ######### $2,777,034 $90,313 $638,864 $7,153 $0 $2,247,858 $24,631,457
E10 EQUIPMENTE1027 Replace Sink, Epoxy Resin, Laboratory Fair - Good 15 7 8.00 EA $528.23 Capital Replacement $4,226 $4,226
D4031
D5022
D. SERVICES SUB-TOTALSE. EQUIPMENT & FURNISHING
D3031
Powered by iPlan © 2013 4tell™ Solutions, LP.All Rights Reserved. 4tell, iPlan (patent pending) Building Blocks, and Innovation for the Built Environment are trademarks of 4tell™ Solutions, LP Run Date: March 14, 2018
E1093Replace Kitchen Food Service Equipment, Abandoned
Poor 20 0 1.00 LS $75,000.00 Plant Adaptation $75,000 $75,000
$75,000 $0 $0 $0 $0 $0 $0 $4,226 $0 $0 $79,226
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
G20 SITE IMPROVEMENTSG2022 Replace Concrete, Driveways Poor 40 1 1,880.00 SF $8.48 Capital Replacement $15,942 $15,942G2022 Replace Parking Lot, Asphalt Paved Poor 20 1 67,800.00 SF $4.05 Capital Replacement $274,590 $274,590
Repair Concrete Walkways Fair 0 0 5,000.00 SF $28.94 Deferred Maintenance $144,700 $144,700Replace Pedestrian Paving, Concrete Fair 25 7 49,400.00 SF $11.13 Capital Replacement $549,970 $549,970
G2031 Replace Pedestrian Paving, Asphalt Poor 20 1 16,900.00 SF $4.65 Capital Replacement $78,585 $78,585G2041 Replace Chain Link Fence 4’ Poor 20 1 850.00 LF $17.93 Capital Replacement $15,241 $15,241G2041 Replace Chain Link Fence- Tall Fair 20 5 798.00 LF $43.33 Capital Replacement $34,577 $34,577G2042 Repair expansion joints at retaining wall Good 0 0 1.00 LS $10,000.00 Deferred Maintenance $10,000 $10,000
G2047Replace Playing Fields, Resilient Playground Surface - New
Fair - Good 15 9 9,100.00 SF $11.41 Capital Replacement $103,831 $103,831
G2047 Replace Play Equipment - Midsize Poor 20 1 2.00 EA $28,050.00 Capital Replacement $56,100 $56,100
G2047Replace Playing Fields, Basketball Court, Complete
Poor 25 1 2.00 EA $28,000.00 Capital Replacement $56,000 $56,000
G2047Replace Playing Fields, Resilient Playground Surface - Older
Poor 15 1 2,121.00 SF $11.41 Capital Replacement $24,201 $24,201
G2056Replace Landscaping, Planters, Precast Concrete
Poor 20 1 2,700.00 SF $82.83 Deferred Maintenance $223,641 $223,641
$154,700 $744,300 $0 $0 $0 $34,577 $0 $549,970 $0 $103,831 $1,587,378
Z10 GENERAL REQUIREMENTSZ1010.2 Replace Consider: ADA Investments Poor 99 0 1.00 $3,750.00 Plant Adaptation $3,750 $3,750
$3,750 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,750
$465,068 $2,164,898 $8,010,743 ######### $2,777,034 $256,181 $645,154 $561,349 $51,266 $3,108,754 $30,031,4130.55% 2.57% 9.52% 14.25% 3.30% 0.30% 0.77% 0.67% 0.06% 3.69%
$84,137,823Notes
*
**
***
- EUL is the Estimated Useful Life of an Asset- RUL is the Remaining Useful Life of an Asset- Non-Escalated and Non-Inflated Adusted Dollars
† - FCI Formula (As Currently Programmed):
FCI† By Year
CRV***
(Deferred Maintenance + Plant Adaptation + Capital Replacement)/(Building Replacement Value)
G. BUILDING SITEWORK SUB-TOTALSZ. GENERAL
Z. GENERAL SUB-TOTALSExpenditure Totals per Year
E. EQUIPMENT & FURNISHING SUB-TOTALSF. SPECIAL CONSTRUCTION AND DEMOLITIONF. SPECIAL CONSTRUCTION AND DEMOLITION SUB-TOTALSG. BUILDING SITEWORK
G2031
Powered by iPlan © 2013 4tell™ Solutions, LP.All Rights Reserved. 4tell, iPlan (patent pending) Building Blocks, and Innovation for the Built Environment are trademarks of 4tell™ Solutions, LP Run Date: March 14, 2018
ElementNo.
ActionsLast
AssignedCondition
EUL*or
ReplacementCycle (Yrs)
RUL**(Yrs)
Qty. Units Unit Cost Priority Plan Type 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Total***
$ 0 1 2 3 4 5 6 7 8 9
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
D40 FIRE PROTECTION SYSTEMS
D4031Perform inspection and provide certification of operation of fire extinguishers
Poor - Fair 0 0 1.00 LS $3,000.00 Priority 2Predictive Maint Test
Inspec$3,000 $3,000
$3,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,000
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$3,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,000$84,137,823
Notes
*
**
***
- EUL is the Estimated Useful Life of an Asset- RUL is the Remaining Useful Life of an Asset- Non-Escalated and Non-Inflated Adusted Dollars
G. BUILDING SITEWORK SUB-TOTALSZ. GENERALZ. GENERAL SUB-TOTALS
Expenditure Totals per Year
CRV***
D. SERVICES SUB-TOTALSE. EQUIPMENT & FURNISHINGE. EQUIPMENT & FURNISHING SUB-TOTALSF. SPECIAL CONSTRUCTION AND DEMOLITIONF. SPECIAL CONSTRUCTION AND DEMOLITION SUB-TOTALSG. BUILDING SITEWORK
B. SHELLB. SHELL SUB-TOTALSC. INTERIORSC. INTERIORS SUB-TOTALSD. SERVICES
10 YEAR ROUTINE MAINTENANCE EXPENDITURE FORECAST
University of the District of Columbia, Ingenuity Preparatory, & National Collegiate Prep PCS4600 Livingston Rd SE, Washington, DC, 8
A. SUBSTRUCTUREA. SUBSTRUCTURE SUB-TOTALS
Powered by iPlan © 2013 4tell™ Solutions, LP.All Rights Reserved. 4tell, iPlan (patent pending) Building Blocks, and Innovation for the Built Environment are trademarks of 4tell™ Solutions, LP Run Date: March 14, 2018
C19
Hayat Brown LLC Page 15 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
1.9 ASSETS OBSERVED
Assets observed at the site are provided in this Section and sorted by the modified Uniformat II coding indexed as applicable. See the listing below for the sequence.
A SUBSTRUCTURE A10 Foundations A20 Basement Construction
B SHELL B10 SuperStructure B20 Exterior Enclosure B30 Roofing
C INTERIORS C10 Interior Construction C20 Stairs C30 Interior Finishes
D SERVICES D10 Conveying Systems D20 Plumbing D30 HVAC D40 Fire Protection Systems D50 Electrical Systems
E EQUIPMENT & FURNISHING E10 Equipment E20 Furnishings
F SPECIAL CONSTRUCTION AND DEMOLITION F10 Special Construction F20 Selective Demolition
G BUILDING SITEWORK G10 Site Preparation G20 Site Improvements G30 Site Civil/Mechanical Utilities G40 Site Electrical Utilities G90 Other Site Construction
Z GENERAL Z10 General Requirements Z20 Bidding Requirements, Contract Forms, Conditions Z90 Project Cost Estimate
C19
Hayat Brown LLC Page 16 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
1.10 PLANNING HORIZON CATEGORY NEEDS: CURRENT YEAR TO YEAR 10
The deficiencies are sorted by categories which define briefly the reason the need exists. A requirement may have more than one applicable category. The category is selected based on the need priority, the most heavily impacted building system and the category with the greatest life safety significance.
Plan Types Total Cost
Deferred Maintenance $573,623
Plant Adaptation $1,278,750
Capital Replacement $28,179,040
Predictive Maint Test Inspec $3,000
Total $30,034,413
The following is a list of the Plan Types with a brief description: Capital Replacement Indicates the need for replacement or major refurbishment of an asset, typically based on age and use but required in the future within a reasonable planning horizon. Deferred Maintenance Indicates a deficiency or a conditional, performance, or failure related issue with an elemental component that has persisted past a reasonable time frame and should have been remedied prior to the time of assessment.
C19
Hayat Brown LLC Page 17 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Routine Maint. Minor Repairs Indicates the need for normal or ongoing minor component renewal or repair, generally required to sustain the anticipated life cycle of the asset. Plant Adaptation Indicates the need for alterations to the property for improvement in safety and security, ADA, hazardous materials abatement, green roof and LEED requirements. Note that the Category selected is the primary factor understood to be the cause for the recommendation. However, there may be more than one driver of the need for repair, replacement, or upgrade.
C19
Hayat Brown LLC Page 18 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
1.11 BUILDING SYSTEM NEEDS: IMMEDIATE
Building Systems Estimated Costs Percentage of Total Cost
A SubStructure $11,070 2.4%
B Shell $2,049 0.4%
C Interiors $107,780 23.0%
D Services $113,719 24.3%
E Equipment & Furnishing $75,000 16.0%
G Building Sitework $154,700 33.1%
Z General $3,750 0.8%
Total $468,068 100.0%
C19
Hayat Brown LLC Page 19 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
1.12 BUILDING SYSTEM NEEDS: YEAR 2 - YEAR 10
Building Systems Estimated Costs Percentage of Total Cost
B Shell $1,948,668 6.6%
C Interiors $1,660,035 5.6%
D Services $24,520,738 82.9%
E Equipment & Furnishing $4,226 0.0%
G Building Sitework $1,432,678 4.9%
Total $29,566,345 100.0%
C19
Hayat Brown LLC Page 20 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
1.13 BUILDING SYSTEM NEEDS: 10 YEAR FORECAST
Building Systems Estimated Costs Percentage of Total Cost
A SubStructure $11,070 0.0%
B Shell $1,950,717 6.5%
C Interiors $1,767,815 5.9%
D Services $24,634,457 82.0%
E Equipment & Furnishing $79,226 0.3%
G Building Sitework $1,587,378 5.3%
Z General $3,750 0.0%
Total $30,034,413 100.0%
C19
Hayat Brown LLC Page 21 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
A S U B S T R U C T U R E S Y S T E M S
A10 FOUNDATIONS
Item Description
A1011 Wall Foundations Wall Foundations, Footings, CMU Walls -Existing Building
Condition Fair - Good
RUL 14
Location Existing Building
Plan Type Capital Replacement
Quantity 107374
Unit of Measure SF
Unit Cost $10.60
Comments
C19
Hayat Brown LLC Page 22 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
A1011 Repair Foundation Wall, Slab Edge or Suface, Parging (Per SF of Face)
Deferred Maintenance 2018 $11,070
C19
Hayat Brown LLC Page 23 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
A1032 Structural Slab on Grade Slab on Grade
Condition Good
RUL 33
Plan Type Capital Replacement
Quantity 107374
Unit of Measure SF
Unit Cost $6.47
C19
Hayat Brown LLC Page 24 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
B S H E L L S Y S T E M S
B10 SUPERSTRUCTURE
Item Description
B10 SuperStructure SuperStructure
Condition Good
RUL 28
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $13.40
C19
Hayat Brown LLC Page 25 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
B20 EXTERIOR ENCLOSURE
Item Description
B20 Exterior Enclosure Cementitious Soffits
Condition Good
RUL 34
Plan Type Capital Replacement
Quantity 2100
Unit of Measure SF
Unit Cost $7.87
C19
Hayat Brown LLC Page 26 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
B20 Repair Soffit Ceiling Deferred Maintenance 2018 $549
C19
Hayat Brown LLC Page 27 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
B2011 Exterior Wall Construction Concrete Mechanical Screening
Condition Good
RUL 33
Plan Type Capital Replacement
Quantity 3000
Unit of Measure SF
Unit Cost $17.23
C19
Hayat Brown LLC Page 28 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
B2011 Exterior Wall Construction Concrete Exterior Walls
Condition Good
RUL 33
Plan Type Capital Replacement
Quantity 1780
Unit of Measure SF
Unit Cost $8.61
Comments Budget for engineering study and partial repairs of deteriorated concrete cracks.
C19
Hayat Brown LLC Page 30 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
B2011 Exterior Wall Construction Exterior Block Wall
Condition Poor
RUL 2
Plan Type Capital Replacement
Quantity 75270
Unit of Measure SF
Unit Cost $12.56
Comments Budget for engineering study and partial replacement of deteriorated brick joints and minor cracks throughout.
C19
Hayat Brown LLC Page 31 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
B2011 Replace Exterior Block Wall Capital Replacement 2020 $945,331
C19
Hayat Brown LLC Page 32 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
B2013 Exterior Louvers, Screens, and Fencing Aluminum Louvers - Large Units
Condition Fair - Good
RUL 12
Plan Type Capital Replacement
Quantity 19
Unit of Measure Each
Unit Cost $2,500
C19
Hayat Brown LLC Page 33 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
B2021 Windows Glass Block
Condition Fair - Good
RUL 11
Plan Type Capital Replacement
Quantity 400
Unit of Measure SF
Unit Cost $35.71
C19
Hayat Brown LLC Page 35 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
B2023 Storefronts Storefronts - Glazed Metal Framed
Condition Poor
RUL 2
Plan Type Capital Replacement
Quantity 2000
Unit of Measure SF
Unit Cost $27.43
Comments
C19
Hayat Brown LLC Page 36 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
B2023 Replace Storefronts - Glazed Metal Framed Capital Replacement 2020 $54,860
C19
Hayat Brown LLC Page 37 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
B2032 Solid Exterior Doors Exterior Steel Doors
Condition Fair
RUL 5
Plan Type Capital Replacement
Quantity 19
Unit of Measure Each
Unit Cost $887.04
Type Component Description Plan Type Year Expenditures ($)
B2032 Replace Exterior Steel Doors Capital Replacement 2023 $16,854
C19
Hayat Brown LLC Page 38 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
B2032 Solid Exterior Doors Exterior Aluminum Clad Doors
Condition Fair - Good
RUL 14
Plan Type Capital Replacement
Quantity 34
Unit of Measure EA
Unit Cost $1,598
C19
Hayat Brown LLC Page 39 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
B2039 Other Doors & Entrances Rolling Door, Steel
Condition Fair
RUL 6
Plan Type Capital Replacement
Quantity 2
Unit of Measure EA
Unit Cost $3,145
Type Component Description Plan Type Year Expenditures ($)
B2039 Replace Rolling Door, Steel Capital Replacement 2024 $6,290
C19
Hayat Brown LLC Page 40 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
B30 ROOFING
Item Description
B3011 Roof Finishes Roof Coverings, Metal Panels, Standing Seam
Condition Poor - Fair
RUL 1
Plan Type Capital Replacement
Quantity 4600
Unit of Measure SF
Unit Cost $36.58
Comments Roofs are leaking into the stairways
C19
Hayat Brown LLC Page 41 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
B3011 Replace Roof Coverings, Metal Panels, Standing Seam
Capital Replacement 2019 $168,268
C19
Hayat Brown LLC Page 42 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
B3011 Roof Finishes Roof Coverings, Modified Bitumen
Condition Fair - Good
RUL 9
Plan Type Capital Replacement
Quantity 123100
Unit of Measure SF
Unit Cost $6.15
C19
Hayat Brown LLC Page 43 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
B3011 Repair metal trim / flashing at various locations throughout main roof
Deferred Maintenance 2018 $1,500
B3011 Replace Roof Coverings, Modified Bitumen Capital Replacement 2027 $757,065
C19
Hayat Brown LLC Page 44 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
B3011 Roof Finishes Roof Coverings, Adhered Membrane, EPDM
Condition Good
RUL 19
Plan Type Capital Replacement
Quantity 10255
Unit of Measure SF
Unit Cost $14.84
C19
Hayat Brown LLC Page 45 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
C I N T E R I O R S S Y S T E M S
C10 INTERIOR CONSTRUCTION
Item Description
C10 Interior Construction Interior Construction
Condition Poor
RUL 1
Plan Type Plant Adaptation
Quantity 1
Unit of Measure LS
Unit Cost $1,200,000
Comments Budget is for renovation of ground floor. Currently the floor is primarily used for storage and requires a full upgrade to be useable.
C19
Hayat Brown LLC Page 46 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
C10 Replace Interior Construction Plant Adaptation 2019 $1,200,000
C19
Hayat Brown LLC Page 47 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C1011 Fixed Partitions Interior Partitions Concrete Block (CMU) Existing Building
Condition Good
RUL 15
Location Existing Building
Plan Type Capital Replacement
Quantity 48698
Unit of Measure SF
Unit Cost $9.23
C19
Hayat Brown LLC Page 48 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C1017 Interior Windows & Storefronts Interior Windows & Storefronts
Condition Good
RUL 24
Plan Type Capital Replacement
Quantity 533
Unit of Measure SF
Unit Cost $82.29
Comments
C19
Hayat Brown LLC Page 49 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C1021 Interior Doors Wood, Solid Interior Doors
Condition Good
RUL 34
Plan Type Capital Replacement
Quantity 238
Unit of Measure EA
Unit Cost $1,343.55
C19
Hayat Brown LLC Page 50 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C1021 Interior Doors Wood Fully Glazed Doors
Condition Good
RUL 44
Plan Type Capital Replacement
Quantity 4
Unit of Measure EA
Unit Cost $1,876.30
Comments
C19
Hayat Brown LLC Page 51 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C1021 Interior Doors Steel, Interior Doors
Condition Good
RUL 34
Location Existing Building
Plan Type Capital Replacement
Quantity 62
Unit of Measure EA
Unit Cost $857.53
C19
Hayat Brown LLC Page 52 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C1021 Interior Doors Fire Doors
Condition Good
RUL 34
Plan Type Capital Replacement
Quantity 145
Unit of Measure EA
Unit Cost $1,382.34
C19
Hayat Brown LLC Page 53 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
C20 STAIRS
Item Description
C2011 Regular Stairs Interior Utility Metal Stairs
Condition Good
RUL 34
Plan Type Capital Replacement
Quantity 14
Unit of Measure Riser
Unit Cost $703.60
Comments
C19
Hayat Brown LLC Page 54 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C2011 Regular Stairs Metal, Exterior Stairs
Condition Fair - Good
RUL 14
Plan Type Capital Replacement
Quantity 240
Unit of Measure SF
Unit Cost $35.88
Comments Metal Stairs inaccessible
C19
Hayat Brown LLC Page 55 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C2011 Regular Stairs Exterior Concrete Stairs
Condition Fair - Good
RUL 8
Plan Type Capital Replacement
Quantity 1368
Unit of Measure SF
Unit Cost $37.48
C19
Hayat Brown LLC Page 56 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
C2011 Repair Concrete, Exterior Stairs Deferred Maintenance 2018 $2,500
C2011 Replace Exterior Concrete Stairs Capital Replacement 2026 $51,266
C19
Hayat Brown LLC Page 57 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C2011 Regular Stairs Concrete, Bleacher at Playground
Condition Good
RUL 44
Plan Type Capital Replacement
Quantity 350
Unit of Measure SF
Unit Cost $137.48
C19
Hayat Brown LLC Page 58 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C2011 Regular Stairs Concrete, Interior Stairs
Condition Good
RUL 34
Plan Type Capital Replacement
Quantity 12408
Unit of Measure SF
Unit Cost $33.25
C19
Hayat Brown LLC Page 59 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
C2011 Replace worn out Vinyl Tile in stair areas Deferred Maintenance 2018 $6,840
C19
Hayat Brown LLC Page 60 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C2014 Stair Handrails and Balustrades Metal, Painted, Exterior Railing
Condition Fair - Good
RUL 14
Plan Type Capital Replacement
Quantity 175
Unit of Measure LF
Unit Cost $46.40
C19
Hayat Brown LLC Page 61 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
C30 INTERIOR FINISHES
Item Description
C3012 Wall Finishes to Interior Walls Ceramic Tile, Interior Wall Finish
Condition Good
RUL 24
Plan Type Capital Replacement
Quantity 14885
Unit of Measure SF
Unit Cost $12.70
Comments
C19
Hayat Brown LLC Page 62 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C3024 Flooring Ceramic Tile Flooring
Condition Good
RUL 24
Plan Type Capital Replacement
Quantity 11389
Unit of Measure SF
Unit Cost $13.49
C19
Hayat Brown LLC Page 63 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C3024 Flooring Concrete Flooring
Condition Good
RUL 69
Plan Type Capital Replacement
Quantity 11679
Unit of Measure SF
Unit Cost $7.53
C19
Hayat Brown LLC Page 64 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C3024 Flooring Metal Floor Grating
Condition Fair - Good
RUL 10
Plan Type Capital Replacement
Quantity 500
Unit of Measure SF
Unit Cost $14.21
C19
Hayat Brown LLC Page 65 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C3024 Flooring Vinyl Tile Flooring
Condition Fair - Good
RUL 12
Plan Type Capital Replacement
Quantity 110949
Unit of Measure SF
Unit Cost $3.04
C19
Hayat Brown LLC Page 66 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
C3024 Replace Vinyl Tile Flooring Deferred Maintenance 2018 $34,200
C19
Hayat Brown LLC Page 67 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C3024 Flooring Wood Flooring
Condition Fair - Good
RUL 14
Plan Type Capital Replacement
Quantity 3425
Unit of Measure SF
Unit Cost $12.11
Comments
C19
Hayat Brown LLC Page 68 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C3025 Carpeting Carpet Flooring
Condition Poor
RUL 3
Plan Type Capital Replacement
Quantity 49236
Unit of Measure SF
Unit Cost $5.98
C19
Hayat Brown LLC Page 69 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
C3025 Replace Carpet Flooring Capital Replacement 2021 $294,333
C19
Hayat Brown LLC Page 70 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C3031 Ceiling Finishes Gypsum Board, Finished Ceilings
Condition Poor - Fair
RUL 5
Plan Type Capital Replacement
Quantity 24132
Unit of Measure SF
Unit Cost $4.74
C19
Hayat Brown LLC Page 71 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
C3031 Repair Gypsum Board/Plaster, Ceiling Deferred Maintenance 2018 $14,640
C3031 Replace Gypsum Board, Finished Ceilings Capital Replacement 2023 $114,436
C19
Hayat Brown LLC Page 72 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
C3032 Suspended Ceilings Acoustical Tile Ceiling
Condition Fair - Good
RUL 12
Plan Type Capital Replacement
Quantity 166586
Unit of Measure SF
Unit Cost $2.83
C19
Hayat Brown LLC Page 73 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
C3032 Replace Acoustical Tile Ceiling Deferred Maintenance 2018 $49,600
C19
Hayat Brown LLC Page 74 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
D S E R V I C E S S Y S T E M S
D10 CONVEYING SYSTEMS
Item Description
D1011 Passenger Elevators Elevator, Geared, 3-5 Floor, 3,000 Lbs
Condition Fair - Good
RUL 9
Location Building
Plan Type Capital Replacement
Quantity 1
Unit of Measure Each
Unit Cost $115,733.68
Elevator Elevator
C19
Hayat Brown LLC Page 75 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Elevator Elevator
Type Component Description Plan Type Year Expenditures ($)
D1011 Replace Elevator, Geared, 3-5 Floor, 3,000 Lbs Capital Replacement 2027 $115,734
C19
Hayat Brown LLC Page 76 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
D20 PLUMBING
Item Description
D2010.0 Water_Fixtures Typical Plumbing Fixtures
Condition Poor
RUL 2
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $3.80
Lavatories Lavatories
Urinals Urinals
C19
Hayat Brown LLC Page 77 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Toilet
Type Component Description Plan Type Year Expenditures ($)
D2010 Replace Typical Plumbing Fixtures Capital Replacement 2020 $1,325,060
C19
Hayat Brown LLC Page 78 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D2014 Sinks Commercial Grade Kitchen Sinks, multiple compartments
Condition Good
RUL 34
Location Warming Kitchen
Plan Type Capital Replacement
Quantity 3
Unit of Measure EA
Unit Cost $3,190
Kitchen Sink
C19
Hayat Brown LLC Page 79 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D2016 Wash Fountains Emergency Eye wash and Shower - Plumbed
Condition Fair - Good
RUL 9
Location Science Lab 336
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $3,438.05
Comments Unit not in use. Engineering Lab does not handle any chemical solutions. All services, gas and water, are shutoff.
Eye Wash
Type Component Description Plan Type Year Expenditures ($)
D2016 Replace Emergency Eye wash and Shower - Plumbed Capital Replacement 2027 $3,438
C19
Hayat Brown LLC Page 80 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D2018 Drinking Fountains and Coolers Plumbing Fix., Drinking Fountain, Various
Condition Poor
RUL 2
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $0.20
Drinking Fountain Drinking Fountain
Drinking Fountain
C19
Hayat Brown LLC Page 81 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
D2018 Replace Plumbing Fix., Drinking Fountain, Various Capital Replacement 2020 $69,740
C19
Hayat Brown LLC Page 82 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D2021 Cold Water Service Domestic Water Distribution Piping
Condition Poor
RUL 2
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $2.71
Comments Original piping with few branch sections upgraded. A fire sprinkler line branch was observed at water service in boiler room and building operations staff was unable to provide locations of associated sprinkler heads. No sprinkler heads were observed during inspection walkthrough. Budget for engineering study and partial repalcement as required.
Water service in Boiler Room Sprinkler branch line
at water main.
C19
Hayat Brown LLC Page 83 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Typical domestic water piping above ceiling
Type Component Description Plan Type Year Expenditures ($)
D2021 Replace Domestic Water Distribution Piping Capital Replacement 2020 $945,674
C19
Hayat Brown LLC Page 84 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D2023 Domestic Water Supply Equipment Tank, Water Storage
Condition Poor
RUL 2
Location Boiler Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure LS
Unit Cost $80,000
Comments Original domestic hot water storage tank/steam heat exchanger with abandoned tank coil and associated dedicated steam boiler, steam piping and auxiliaries. Tank is in use, connected to a newly installed gas fired water heater. Budget to reconfigure and remove abandoned equipment. Replace tank and remove associated steam system components (Boiler #4, steam piping and feed water system)
Original domestic hot water storage tank/steam heat exchanger with abandoned tank coil.
Abandoned steam boiler (Boiler #4) used to generate domestic hot water.
C19
Hayat Brown LLC Page 85 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Abandoned feed water system of abandoned steam domestic hot water system.
Type Component Description Plan Type Year Expenditures ($)
D2023 Replace Tank, Water Storage Capital Replacement 2020 $80,000
C19
Hayat Brown LLC Page 86 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D2023 Domestic Water Supply Equipment Water Heater (Boiler), Gas, 801~1,400 MBH
Condition Good
RUL 22
Location Boiler Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $42,853.38
Boiler Boiler
C19
Hayat Brown LLC Page 87 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D2023 Domestic Water Supply Equipment Water Flow Meter, 6.00 In
Condition Good
RUL 24
Location Boiler Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure Each
Unit Cost $6,164.03
Water Meter
C19
Hayat Brown LLC Page 88 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D2031 Waste Piping Waste Piping
Condition Poor
RUL 2
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $3.26
Comments Original piping with few branch sections upgraded. Budget to conduct engineering study and replacement of piping as required.
Upgraded piping section connected to old piping. Upgraded piping section connected to old piping.
Typical waste piping
C19
Hayat Brown LLC Page 89 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
D2031 Replace Waste Piping Capital Replacement 2020 $1,135,019
C19
Hayat Brown LLC Page 90 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D2034 Sanitary Waste Equipment Pump, Sewage Ejector, Duplex
Condition Poor
RUL 2
Location Boiler Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $17,420.23
Ejector Pump Shut Off Switches
Type Component Description Plan Type Year Expenditures ($)
D2034 Replace Pump, Sewage Ejector, Duplex Capital Replacement 2020 $17,420
C19
Hayat Brown LLC Page 91 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D2041 Pipe & Fittings Rainwater Drainage Piping
Condition Poor
RUL 2
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $1.34
Comments Budget to conduct engineering study and replacement of piping as required.
Storm Piping
Type Component Description Plan Type Year Expenditures ($)
D2041 Replace Rainwater Drainage Piping Capital Replacement 2020 $467,258
C19
Hayat Brown LLC Page 92 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
D30 HVAC
Item Description
D3012 Gas Supply System Gas Supply and Distribution, Laboratory
Condition Fair - Good
RUL 14
Location Science Lab 336
Plan Type Capital Replacement
Quantity 1
Unit of Measure LS
Unit Cost $25,000
Comments System not in use. Engineering Lab does not handle any chemical solutions. All services, gas and water, are shutoff.
Gas bibs at Laboratory Table
C19
Hayat Brown LLC Page 93 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3012 Gas Supply System Gas Distribution Piping, Boilers and Domestic Water Heaters Service
Condition Fair - Good
RUL 14
Location Boiler Room
Plan Type Capital Replacement
Quantity 109124
Unit of Measure SF
Unit Cost $1.18
Gas piping at Domestic Water Heater Gas train at Boiler
C19
Hayat Brown LLC Page 94 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3021 Boilers Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH
Condition Poor
RUL 3
Location Boiler Room
Plan Type Capital Replacement
Quantity 3
Unit of Measure EA
Unit Cost $284,933.75
Comments Firebox Hot Water Boilers, gas fired, original to the building. Boiler #1 and #3 are operational, Boiler #2 is offline. An additional abandoned steam boiler exist (#4) which was exclusively used for domestic hot water generation via heat exchanger. Cost of the removal of this boiler has been accounted under Domestic Water Distribution. Working conditions except Boiler #2. Boilers are beyond their useful life. Replace boilers.
Heating Hot Water Boiler, Firebox Boiler #1
C19
Hayat Brown LLC Page 95 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Equipment Tag: Boiler #1 Boiler #2
Equipment Tag: Boiler #2 Equipment Tag: Boiler #3
Boiler #3 Surface rust at boiler casing, no leaks
C19
Hayat Brown LLC Page 96 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Boiler Control Panel
Type Component Description Plan Type Year Expenditures ($)
D3021 Replace Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH
Capital Replacement 2021 $854,801
C19
Hayat Brown LLC Page 97 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3031 Chilled Water Systems Cooling Tower, Galv Steel / Avg, 501~1,000 Ton, 3-Cell Tower
Condition Poor - Fair
RUL 4
Location Main Roof
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $153,291.72
3-Cell Cooling Tower Cooling Tower Label
Tower fill with abundant scale buildup Tower frame with evidence of past algae growth
C19
Hayat Brown LLC Page 98 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
D3031 Clean hardened scale from tower fill. Deferred Maintenance 2018 $1,500
D3031 Replace Cooling Tower, Galv Steel / Avg, 501~1,000 Ton, 3-Cell Tower
Capital Replacement 2022 $153,292
C19
Hayat Brown LLC Page 99 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3031 Chilled Water Systems Chiller, Scroll, Water-Cooled, 400 Ton
Condition Fair
RUL 6
Location Boiler Room
Plan Type Capital Replacement
Quantity 2
Unit of Measure EA
Unit Cost $246,066.55
Comments Modular water-cooled chillers using refrigerant R22. Working condition. Replace units on or before refrigerant R22's phaseout year 2020.
Two modular water-cooled scroll chillers Inside view of chiller
C19
Hayat Brown LLC Page 100 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Chiller Label
Type Component Description Plan Type Year Expenditures ($)
D3031 Replace Chiller, Scroll, Water-Cooled, 400 Ton Capital Replacement 2024 $492,133
C19
Hayat Brown LLC Page 101 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3032 Direct Expansion Systems DX Outdoor Unit, Ave. 2 Ton, Rooms 202, 204 Service
Condition Poor
RUL 3
Location Building Exterior - UDC Side
Plan Type Capital Replacement
Quantity 2
Unit of Measure EA
Unit Cost $9,655.63
Comments
HVAC Unit HVAC Unit
Type Component Description Plan Type Year Expenditures ($)
D3032 Replace DX Outdoor Unit, Ave. 2 Ton, Rooms 202, 204 Service
Capital Replacement 2021 $19,311
C19
Hayat Brown LLC Page 102 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3032 Direct Expansion Systems DX Outdoor Unit, Ave. 1 Ton, Elevator Machine Room Service
Condition Fair - Good
RUL 10
Location Main Roof
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $5,967.18
HVAC Unit HVAC Unit
C19
Hayat Brown LLC Page 103 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3041 Air Distribution Systems DX Split Indoor Unit, 1 Ton, Ductless
Condition Fair - Good
RUL 9
Location Elevator Machine Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $1,978.84
Fan Coil Unit Fan Coil Unit
Type Component Description Plan Type Year Expenditures ($)
D3041 Replace DX Split Indoor Unit, 1 Ton, Ductless Capital Replacement 2027 $1,979
C19
Hayat Brown LLC Page 104 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3041 Air Distribution Systems Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return
Condition Poor
RUL 3
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $23.17
Comments Air Handling Units with Return fans distributes conditioned air throughout via VAV boxes in various locations. Recent renovation in 2012 only included the replacement of ceiling diffusers and performed testing and balancing of charter school areas. Budget to conduct engineering study and replacement of system as required. System is beyond its useful life and with deficiencies. Replace system.
Typical flexible duct connection to lighting/diffuser fixture
VAV box (unfinished installation)
C19
Hayat Brown LLC Page 105 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
New diffuser in renovated classroom (ductwork original)
Diffuser
Typical AHU in Stair MER Broken flexible connection at AHU
Heating/Cooling 4-pipe Coil in ductwork, Girls Locker Room
Typical Return Fan in Stair MER
C19
Hayat Brown LLC Page 106 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
AHU in 1st Floor Gymnasium, UDC Side
Type Component Description Plan Type Year Expenditures ($)
D3041 Replace Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return
Capital Replacement 2021 $8,078,507
C19
Hayat Brown LLC Page 107 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3041 Air Distribution Systems DX Split Indoor Unit, 2 Ton, Ductless
Condition Poor
RUL 3
Location UDC Side - Rooms 202 and 204
Plan Type Capital Replacement
Quantity 2
Unit of Measure EA
Unit Cost $2,717.51
Unit in Room 202 Unit in Room 204
Type Component Description Plan Type Year Expenditures ($)
D3041 Replace DX Split Indoor Unit, 2 Ton, Ductless Capital Replacement 2021 $5,435
C19
Hayat Brown LLC Page 108 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3042 Exhaust Ventilation Systems Exhaust System, Fume Hoods
Condition Fair
RUL 6
Location UDC Side - Old culinary classroom
Plan Type Capital Replacement
Quantity 4
Unit of Measure EA
Unit Cost $22,446.76
Comments
Old culinary classroom
Type Component Description Plan Type Year Expenditures ($)
D3042 Replace Exhaust System, Fume Hoods Capital Replacement 2024 $89,787
C19
Hayat Brown LLC Page 109 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3042 Exhaust Ventilation Systems Exhaust System, Fume Hood
Condition Fair - Good
RUL 9
Location Science Lab 336
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $22,446.76
Comments Unit not in use. Engineering Lab does not handle any chemical solutions. All services, gas and water, are shutoff.
Exhaust Hood
Type Component Description Plan Type Year Expenditures ($)
D3042 Replace Exhaust System, Fume Hood Capital Replacement 2027 $22,447
C19
Hayat Brown LLC Page 110 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3042 Exhaust Ventilation Systems Exhaust System, Fume Hood
Condition Fair
RUL 6
Location UDC Side - Classroom 1 (EMC SKILLS LAB)
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $22,446.76
Comments
Exhaust Hood
Type Component Description Plan Type Year Expenditures ($)
D3042 Replace Exhaust System, Fume Hood Capital Replacement 2024 $22,447
C19
Hayat Brown LLC Page 111 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3042 Exhaust Ventilation Systems Exhaust / Ventilation
Condition Poor
RUL 3
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $0.97
Comments Majority of exhaust fans are old and not operational. Very few fans were replaced in the recent years. Poor. Replace exhaust fans.
Exhaust Fan Exhaust Fan
C19
Hayat Brown LLC Page 112 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Exhaust Fan
Type Component Description Plan Type Year Expenditures ($)
D3042 Replace Exhaust / Ventilation Capital Replacement 2021 $338,239
C19
Hayat Brown LLC Page 113 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3044 Hot Water Distribution Heating, Hydronic, Convection, 2-Pipe, Cabinet Type
Condition Poor
RUL 3
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $1.53
Heaters Heaters
Type Component Description Plan Type Year Expenditures ($)
D3044 Replace Heating, Hydronic, Convection, 2-Pipe, Cabinet Type
Capital Replacement 2021 $531,768
C19
Hayat Brown LLC Page 114 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3044 Hot Water Distribution Heating, Hydronic, Baseboard, Large
Condition Poor
RUL 3
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $1.85
Heaters Heaters
Heater
C19
Hayat Brown LLC Page 115 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
D3044 Replace Heating, Hydronic, Baseboard, Large Capital Replacement 2021 $645,444
C19
Hayat Brown LLC Page 116 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3045 Chilled Water Distribution Piping, Condenser Water Supply and Return
Condition Fair - Good
RUL 14
Location From Boiler Room to Main Roof
Plan Type Capital Replacement
Quantity 109125
Unit of Measure SF
Unit Cost $2.74
Condenser water piping on Roof Condenser water filtration system in Boiler Room
Chemical treatment system for tower in Boiler Room
Condenser water pumps in Boiler Room
C19
Hayat Brown LLC Page 117 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Condenser water piping in Boiler Room
C19
Hayat Brown LLC Page 118 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3046 Change-over Distribution System Piping, HW/CHW, 4-Pipe Distribution
Condition Poor
RUL 2
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $8.48
Comments Budget to conduct engineering study and replacement of system as required.
Chilled Water Pumps in Boiler Room Expansion Tanks in Boiler Room
Typical chilled water piping and hot water piping above ceiling
Chilled and hot water piping in Boiler Room
C19
Hayat Brown LLC Page 119 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Chilled and Hot Water Pumps in each lower Stair MER
Chilled and Hot Water Piping in each lower Stair MER
Type Component Description Plan Type Year Expenditures ($)
D3046 Replace Piping, HW/CHW, 4-Pipe Distribution Capital Replacement 2020 $2,956,279
C19
Hayat Brown LLC Page 120 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3051 Terminal Self-Contained Units Unit Heater, Hydronic, 26 to 55 MBH
Condition Poor
RUL 3
Location Stairs MERs and Elevator Machine Room
Plan Type Capital Replacement
Quantity 25
Unit of Measure EA
Unit Cost $1,611.62
Typical Unit Heater in a Stair MER Unit in Elevator
Machine Room, pipes disconnected
Type Component Description Plan Type Year Expenditures ($)
D3051 Replace Unit Heater, Hydronic, 26 to 55 MBH Capital Replacement 2021 $40,291
C19
Hayat Brown LLC Page 121 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3051 Terminal Self-Contained Units Unit Heater, Electric, 10 kW
Condition Fair - Good
RUL 10
Location Ground Floor Gymnasium
Plan Type Capital Replacement
Quantity 2
Unit of Measure EA
Unit Cost $2,017.36
Unit Heater Unit Heater
C19
Hayat Brown LLC Page 122 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3051 Terminal Self-Contained Units Cabinet Unit Heater, Hydronic
Condition Poor
RUL 3
Location Various Entrances/Exits
Plan Type Capital Replacement
Quantity 20
Unit of Measure EA
Unit Cost $1,119.31
Typical Cabinet Heater Typical Cabinet Heater
Type Component Description Plan Type Year Expenditures ($)
D3051 Replace Cabinet Unit Heater, Hydronic Capital Replacement 2021 $22,386
C19
Hayat Brown LLC Page 123 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3052 Package Units A/C Package, Heat Pump, Air Source, 30 Ton
Condition Fair - Good
RUL 12
Location Lower Roof
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $35,650
HVAC Unit HVAC Unit
C19
Hayat Brown LLC Page 124 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3052 Package Units A/C Package, Heat Pump, Air Source, 7.0~10.0 Ton Cooling, 35~45 MBH Heat
Condition Fair - Good
RUL 12
Location Lower Roof
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $12,687.50
HVAC Unit HVAC Unit
C19
Hayat Brown LLC Page 125 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3067 Energy Monitoring & Control Meter, Natural Gas
Condition Good
RUL 24
Location Boiler Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure Each
Unit Cost $4,817.83
Gas Meter Gas Meter
Gas Meter
C19
Hayat Brown LLC Page 126 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3068 Building Automation Systems Building Controls (SF), DDC, Average
Condition Poor
RUL 3
Location Various locations
Plan Type Capital Replacement
Quantity 230000
Unit of Measure SF
Unit Cost $2.70
Comments
Typical DDC control panel at AHU Typical control valve at AHU
Typical thermostat BMS Computer Screen: AHU and RF readings
C19
Hayat Brown LLC Page 127 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
BMS Computer Screen: All AHUs table readings BMS Computer Screen: AHUs 1st Floor Layout
BMS Computer Screen: AHUs 2nd Floor Layout Deteriorated control valve at AHU
Typical VAV DDC controller above ceiling
Type Component Description Plan Type Year Expenditures ($)
D3068 Replace Building Controls (SF), DDC, Average Capital Replacement 2021 $621,000
C19
Hayat Brown LLC Page 129 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D3068 Building Automation Systems Building Controls (SF), Pneumatic, Average
Condition Poor
RUL 3
Location Various locations
Plan Type Capital Replacement
Quantity 97374
Unit of Measure SF
Unit Cost $5.54
Comments Pneumatic system serves various locations in the building. There are system wide air leaks and various broken thermostats preventing using main compressor station in boiler room. A temporary air compressor was installed in a Stair MER to feed air to some rooms. Poor Upgrade system along with existing BMS upgrade.
Typical pneumatic thermostat Pneumatic control panels for AHU serving Locker Room
C19
Hayat Brown LLC Page 130 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Air compressor station in Boiler Room Typical pneumatic thermostat
Temporary air compressors used to feed thermostats in various rooms.
Type Component Description Plan Type Year Expenditures ($)
D3068 Replace Building Controls (SF), Pneumatic, Average Capital Replacement 2021 $539,452
C19
Hayat Brown LLC Page 131 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
D40 FIRE PROTECTION SYSTEMS
Item Description
D4031 Fire Extinguishers Fire Extinguisher
Condition Poor - Fair
RUL 5
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $0.26
Comments
Fire extinguisher with expired inspection tag
Fire extinguisher with expired inspection tag, various locations
C19
Hayat Brown LLC Page 132 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Missing Fire Extinguisher: Ground Floor
Missing Fire Extinguisher: UDC Side - In front of Room 320
Type Component Description Plan Type Year Expenditures ($)
D4031 Perform inspection and provide certification of operation of fire extinguishers
Predictive Maint Test
Inspec 2018 $3,000
D4031 Replace/Install Fire Extinguishers Deferred Maintenance 2018 $40,000
D4031 Replace Fire Extinguisher Capital Replacement 2023 $90,313
C19
Hayat Brown LLC Page 133 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
D50 ELECTRICAL SYSTEMS
Item Description
D5012 Low Tension Service & Dist. Secondary Transformer, Dry, 112.5 kVA
Condition Poor - Fair
RUL 4
Location Mechanical Rooms
Plan Type Capital Replacement
Quantity 7
Unit of Measure EA
Unit Cost $9,542.63
Transformer Transformer
Type Component Description Plan Type Year Expenditures ($)
D5012 Replace Secondary Transformer, Dry, 112.5 kVA Capital Replacement 2022 $66,798
C19
Hayat Brown LLC Page 134 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5012 Low Tension Service & Dist. Secondary Transformer, Dry, 15 kVA
Condition Poor - Fair
RUL 4
Location Main Electrical Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $4,226.26
Transformer
Type Component Description Plan Type Year Expenditures ($)
D5012 Replace Secondary Transformer, Dry, 15 kVA Capital Replacement 2022 $4,226
C19
Hayat Brown LLC Page 135 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5012 Low Tension Service & Dist. Motor Control Center, 900 Amps, 8 sections
Condition Poor - Fair
RUL 4
Location Boiler Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $19,800.82
Motor Control Center
Type Component Description Plan Type Year Expenditures ($)
D5012 Replace Motor Control Center, 900 Amps, 8 sections Capital Replacement 2022 $19,801
C19
Hayat Brown LLC Page 136 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5012 Low Tension Service & Dist. Motor Control Centers, 600 Amps, 3 Sections
Condition Poor - Fair
RUL 4
Location Mechanical Rooms
Plan Type Capital Replacement
Quantity 8
Unit of Measure EA
Unit Cost $19,800.82
Motor Control Center
Type Component Description Plan Type Year Expenditures ($)
D5012 Replace Motor Control Centers, 600 Amps, 3 Sections
Capital Replacement 2022 $158,407
C19
Hayat Brown LLC Page 137 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5012 Low Tension Service & Dist. Panel Board
Condition Poor - Fair
RUL 4
Location Throughout
Plan Type Capital Replacement
Quantity 69
Unit of Measure Each
Unit Cost $10,664.25
Panelboards Panelboards
Panelboards
C19
Hayat Brown LLC Page 138 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
D5012 Replace Panel Board Capital Replacement 2022 $735,833
C19
Hayat Brown LLC Page 139 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5012 Low Tension Service & Dist. Motor Starter, 2.000 HP, 208 V
Condition Poor - Fair
RUL 4
Location Boiler Room and Kitchen
Plan Type Capital Replacement
Quantity 6
Unit of Measure EA
Unit Cost $1,128.90
Motor Starters
Type Component Description Plan Type Year Expenditures ($)
D5012 Replace Motor Starter, 2.000 HP, 208 V Capital Replacement 2022 $6,773
C19
Hayat Brown LLC Page 140 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5012 Low Tension Service & Dist. Primary Transformer, Dry, 150kVA
Condition Poor - Fair
RUL 4
Location Mechanical Room 4 and Main Electrical Room
Plan Type Capital Replacement
Quantity 2
Unit of Measure Each
Unit Cost $37,131.05
Transformers Transformers
Type Component Description Plan Type Year Expenditures ($)
D5012 Replace Primary Transformer, Dry, 150kVA Capital Replacement 2022 $74,262
C19
Hayat Brown LLC Page 141 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5012 Low Tension Service & Dist. Transfer Switch, Auto, 480 V, 150 Amps
Condition Fair
RUL 7
Location Main Electrical Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $7,152.57
Automatic Transfer Switch
Type Component Description Plan Type Year Expenditures ($)
D5012 Replace Transfer Switch, Auto, 480 V, 150 Amps Capital Replacement 2025 $7,153
C19
Hayat Brown LLC Page 142 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5012 Low Tension Service & Dist. Switchboard, 3000 Amps, 2 sections
Condition Poor - Fair
RUL 4
Location Main Electrical Room
Plan Type Capital Replacement
Quantity 2
Unit of Measure Each
Unit Cost $388,185.54
Main Switchboard Main Switchboard
Type Component Description Plan Type Year Expenditures ($)
D5012 Replace Switchboard, 3000 Amps, 2 sections Capital Replacement 2022 $776,371
C19
Hayat Brown LLC Page 143 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5012 Low Tension Service & Dist. Secondary Transformer, Dry, 30 kVA
Condition Poor - Fair
RUL 4
Location Boiler Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $4,899.35
Transformer Transformer
Type Component Description Plan Type Year Expenditures ($)
D5012 Replace Secondary Transformer, Dry, 30 kVA Capital Replacement 2022 $4,899
C19
Hayat Brown LLC Page 144 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5012 Low Tension Service & Dist. Main Service Switch, 3000 Amps
Condition Poor - Fair
RUL 4
Location Main Electrical Room
Plan Type Capital Replacement
Quantity 2
Unit of Measure EA
Unit Cost $388,185.53
Main Service Switch Main Service Switch
Type Component Description Plan Type Year Expenditures ($)
D5012 Replace Main Service Switch, 3000 Amps Capital Replacement 2022 $776,371
C19
Hayat Brown LLC Page 145 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5012 Low Tension Service & Dist. Disconnect Switches for Chillers
Condition Good
RUL 34
Location Boiler Room
Plan Type Capital Replacement
Quantity 4
Unit of Measure EA
Unit Cost $4,112.51
Disconnect Switches for Chillers Disconnect Switches for Chillers
C19
Hayat Brown LLC Page 146 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5021 Branch Wiring Devices Branch Wiring Peripheral Devices
Condition Fair - Good
RUL 14
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $3.75
Comments
C19
Hayat Brown LLC Page 147 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5021 Branch Wiring Devices Occupancy Sensors, Indoor Lighting
Condition Fair - Good
RUL 9
Location Throughout
Plan Type Capital Replacement
Quantity 20
Unit of Measure EA
Unit Cost $1,139.41
Occupancy Sensors
Type Component Description Plan Type Year Expenditures ($)
D5021 Replace Occupancy Sensors, Indoor Lighting Capital Replacement 2027 $22,788
C19
Hayat Brown LLC Page 148 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5022 Lighting Equipment HID Lighting - Older
Condition Poor
RUL 2
Location Ground Floor Gymnasium
Plan Type Capital Replacement
Quantity 20
Unit of Measure EA
Unit Cost $705.11
HID Lighting HID Lighting
Type Component Description Plan Type Year Expenditures ($)
D5022 Lighting fixture not operational. Replace/Upgrade. Deferred Maintenance 2018 $8,058
D5022 Replace HID Lighting - Older Capital Replacement 2020 $14,102
C19
Hayat Brown LLC Page 149 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5022 Lighting Equipment HID Lighting
Condition Fair - Good
RUL 14
Location Boiler Room
Plan Type Capital Replacement
Quantity 20
Unit of Measure EA
Unit Cost $1,007.30
HID Lighting HID Lighting
C19
Hayat Brown LLC Page 150 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5022 Lighting Equipment Lighting, Exterior Fixture, High Output Flood, Various
Condition Fair - Good
RUL 14
Location Roof and Building Perimeter
Plan Type Capital Replacement
Quantity 152
Unit of Measure EA
Unit Cost $1,349.63
Exterior Security Lights
Exterior Security Lights
Exterior Security Lights
Exterior Security Lights
C19
Hayat Brown LLC Page 151 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
D5022 Lighting fixture not operational. Repair/Replace Capital Replacement 2018 $36,336
C19
Hayat Brown LLC Page 152 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5022 Lighting Equipment Lighting Equipment - Fluorescent
Condition Fair - Good
RUL 9
Location UDC Spaces
Plan Type Capital Replacement
Quantity 262300
Unit of Measure SF
Unit Cost $6.12
Comments
Fluorescent Lighting Older
Type Component Description Plan Type Year Expenditures ($)
D5022 Replace Lighting Equipment - Fluorescent Capital Replacement 2027 $1,605,276
C19
Hayat Brown LLC Page 153 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5022 Lighting Equipment Flood Light, Exterior, Older
Condition Poor
RUL 1
Location Building Perimeter
Plan Type Capital Replacement
Quantity 62
Unit of Measure Each
Unit Cost $844.04
Exterior Security Lights
Type Component Description Plan Type Year Expenditures ($)
D5022 Replace Flood Light, Exterior, Older Capital Replacement 2019 $52,330
C19
Hayat Brown LLC Page 154 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5022 Lighting Equipment Lighting, Interior, Fluorescent,
Condition Fair - Good
RUL 14
Location Ingenuity Prep and National Collegiate Prep
Plan Type Capital Replacement
Quantity 86400
Unit of Measure SF
Unit Cost $4.54
Comments
Newer Fluorescent Lighting
Newer Fluorescent Lighting
C19
Hayat Brown LLC Page 155 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5031 Public Address & Music Systems Sound System
Condition Poor
RUL 0
Location Ground Floor Gymnasium
Plan Type Deferred Maintenance
Quantity 1
Unit of Measure EA
Unit Cost $2,067.60
Local Sound System
Type Component Description Plan Type Year Expenditures ($)
D5031 Replace Sound System Deferred Maintenance 2018 $2,068
C19
Hayat Brown LLC Page 156 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5037 Fire Alarm Systems Fire Alarm Systems
Condition Fair - Good
RUL 14
Location Mechanical Room 4 - Upper Level and IDF Closet 201 in Ingenuity Prep
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $4.02
Fire Alarm System Fire Alarm System
Fire Alarm System
C19
Hayat Brown LLC Page 157 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5038 Security and Detection Systems Security and Detection Systems - CCTV
Condition Fair - Good
RUL 11
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $1.92
CCTV System CCTV System
C19
Hayat Brown LLC Page 158 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5038 Security and Detection Systems Card Reader
Condition Fair
RUL 6
Location Throughout
Plan Type Capital Replacement
Quantity 30
Unit of Measure Each
Unit Cost $1,149.90
Card Reader Card Reader
Card Reader
C19
Hayat Brown LLC Page 159 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
D5038 Replace Card Reader Capital Replacement 2024 $34,497
C19
Hayat Brown LLC Page 160 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5038 Security and Detection Systems Intrusion Detection - Charter School Section
Condition Fair - Good
RUL 9
Location Server Room 332 National Coll. Prep
Plan Type Capital Replacement
Quantity 86400
Unit of Measure SF
Unit Cost $1.15
Intrusion Alarm System
Type Component Description Plan Type Year Expenditures ($)
D5038 Replace Intrusion Detection - Charter School Section Capital Replacement 2027 $99,360
C19
Hayat Brown LLC Page 161 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5038 Security and Detection Systems Intrusion Detection - University Section
Condition Fair - Good
RUL 9
Location Room 209-10 UDC
Plan Type Capital Replacement
Quantity 262300
Unit of Measure SF
Unit Cost $1.15
Intrusion Alarm System
Intrusion Alarm System
Type Component Description Plan Type Year Expenditures ($)
D5038 Replace Intrusion Detection - University Section Capital Replacement 2027 $301,645
C19
Hayat Brown LLC Page 162 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5038 Security and Detection Systems Vehicle Control Bollard
Condition Poor
RUL 0
Plan Type Deferred Maintenance
Quantity 2
Unit of Measure EA
Unit Cost $9,145.76
Comments
Type Component Description Plan Type Year Expenditures ($)
D5038 Replace Vehicle Control Bollard Deferred Maintenance 2018 $18,292
C19
Hayat Brown LLC Page 163 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5091 Grounding Systems Lightning Protection System
Condition Fair - Good
RUL 9
Location Chimney Stack
Plan Type Capital Replacement
Quantity 1
Unit of Measure Each
Unit Cost $3,261.74
Lightning Protection
Type Component Description Plan Type Year Expenditures ($)
D5091 Replace Lightning Protection System Capital Replacement 2027 $3,262
C19
Hayat Brown LLC Page 164 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5092 Emergency Light & Power Systems Emergency Lights
Condition Fair - Good
RUL 14
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $1.06
Emergency Lighting
C19
Hayat Brown LLC Page 165 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5092 Emergency Light & Power Systems Generator, Natural Gas, 90 kW
Condition Fair - Good
RUL 9
Location Main Electrical Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $71,929.70
Emergency Generator
Emergency Generator
Type Component Description Plan Type Year Expenditures ($)
D5092 Replace Generator, Natural Gas, 90 kW Capital Replacement 2027 $71,930
C19
Hayat Brown LLC Page 166 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
D5092 Emergency Light & Power Systems Exit Lighting Fixture
Condition Fair - Good
RUL 14
Location Throughout
Plan Type Capital Replacement
Quantity 348700
Unit of Measure SF
Unit Cost $0.66
Exit Lighting Exit Lighting
Type Component Description Plan Type Year Expenditures ($)
D5092 Exit Light fixture not operational. Repair/Replace. Deferred Maintenance 2018 $4,465
C19
Hayat Brown LLC Page 167 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
E E Q U I P M E N T & F U R N I S H I N G S Y S T E M S
E10 EQUIPMENT
Item Description
E1027 Laboratory Equipment Sink, Epoxy Resin, Laboratory
Condition Fair - Good
RUL 7
Location Science Lab 336
Plan Type Capital Replacement
Quantity 8
Unit of Measure EA
Unit Cost $528.23
Comments Units not in use. Engineering Lab does not handle any chemical solutions. All services, gas and water, are shutoff.
Laboratory sink basin blocked, no water/gas used. Science Lab Sink
C19
Hayat Brown LLC Page 168 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Laboratory Sinks with acid waste lines, neutralization tank inaccessible
Type Component Description Plan Type Year Expenditures ($)
E1027 Replace Sink, Epoxy Resin, Laboratory Capital Replacement 2025 $4,226
C19
Hayat Brown LLC Page 169 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
E1093 Food Service Equipment Kitchen Food Service Equipment, various types
Condition Fair - Good
RUL 14
Location Warming Kitchen
Plan Type Capital Replacement
Quantity 1
Unit of Measure LS
Unit Cost $50,000
Comments L
Warmers Dish Washer
Refrigerator Convection Ovens
C19
Hayat Brown LLC Page 171 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
E1093 Food Service Equipment Kitchen Food Service Equipment, Abandoned
Condition Poor
RUL 0
Location Warming Kitchen
Plan Type Plant Adaptation
Quantity 1
Unit of Measure LS
Unit Cost $75,000
Comments Abandoned kitchen equipment. Budget is to remove equipment and reuse space. Poor. Remove abandoned equipment in kitchen, including hood exhaust fan on roof.
Fryers Exhaust Hood
C19
Hayat Brown LLC Page 172 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Kitchen Sink Exhaust Fan
Type Component Description Plan Type Year Expenditures ($)
E1093 Replace Kitchen Food Service Equipment, Abandoned
Plant Adaptation 2018 $75,000
C19
Hayat Brown LLC Page 173 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
G B U I L D I N G S I T E W O R K S Y S T E M S
G20 SITE IMPROVEMENTS
Item Description
G2022 Paving & Surfacing Parking Lot, Asphalt Paved
Condition Poor
RUL 1
Location Exterior
Plan Type Capital Replacement
Quantity 67800
Unit of Measure SF
Unit Cost $4.05
C19
Hayat Brown LLC Page 174 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
G2022 Replace Parking Lot, Asphalt Paved Capital Replacement 2019 $274,590
C19
Hayat Brown LLC Page 175 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2022 Paving & Surfacing Concrete, Driveways
Condition Poor
RUL 1
Plan Type Capital Replacement
Quantity 1880
Unit of Measure SF
Unit Cost $8.48
Type Component Description Plan Type Year Expenditures ($)
G2022 Replace Concrete, Driveways Capital Replacement 2019 $15,942
C19
Hayat Brown LLC Page 176 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2031 Paving & Surfacing Pedestrian Paving, Asphalt
Condition Poor
RUL 1
Plan Type Capital Replacement
Quantity 16900
Unit of Measure SF
Unit Cost $4.65
Type Component Description Plan Type Year Expenditures ($)
G2031 Replace Pedestrian Paving, Asphalt Capital Replacement 2019 $78,585
C19
Hayat Brown LLC Page 178 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2031 Paving & Surfacing Pedestrian Paving, Concrete
Condition Fair
RUL 7
Plan Type Capital Replacement
Quantity 49400
Unit of Measure SF
Unit Cost $11.13
Comments
C19
Hayat Brown LLC Page 179 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
G2031 Repair Concrete Walkways Deferred Maintenance 2018 $144,700
G2031 Replace Pedestrian Paving, Concrete Capital Replacement 2025 $549,970
C19
Hayat Brown LLC Page 181 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2031 Paving & Surfacing Pedestrian Paving, Pavers, Concrete
Condition Fair - Good
RUL 12
Plan Type Capital Replacement
Quantity 2790
Unit of Measure SF
Unit Cost $14.24
C19
Hayat Brown LLC Page 182 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2033 Exterior Steps Pedestrian Paving, Exterior Ramp, Wood
Condition Good
RUL 34
Location Existing Building
Plan Type Capital Replacement
Quantity 12
Unit of Measure LF
Unit Cost $353
C19
Hayat Brown LLC Page 183 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2041 Fences & Gates Sliding Gate, Motor Operated
Condition Fair - Good
RUL 14
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $5,041.36
C19
Hayat Brown LLC Page 184 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2041 Fences & Gates Chain Link Fence - New
Condition Fair - Good
RUL 14
Plan Type Capital Replacement
Quantity 216
Unit of Measure LF
Unit Cost $43.33
C19
Hayat Brown LLC Page 185 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2041 Fences & Gates Chain Link Fence- Tall
Condition Fair
RUL 5
Plan Type Capital Replacement
Quantity 798
Unit of Measure LF
Unit Cost $43.33
Type Component Description Plan Type Year Expenditures ($)
G2041 Replace Chain Link Fence- Tall Capital Replacement 2023 $34,577
C19
Hayat Brown LLC Page 187 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2041 Fences & Gates Chain Link Fence 4’
Condition Poor
RUL 1
Plan Type Capital Replacement
Quantity 850
Unit of Measure LF
Unit Cost $17.93
Type Component Description Plan Type Year Expenditures ($)
G2041 Replace Chain Link Fence 4’ Capital Replacement 2019 $15,241
C19
Hayat Brown LLC Page 189 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2042 Retaining Walls Retaining Wall, Cast in Place Concrete
Condition Good
RUL 24
Plan Type Capital Replacement
Quantity 750
Unit of Measure LF
Unit Cost $142.34
Type Component Description Plan Type Year Expenditures ($)
G2042 Repair expansion joints at retaining wall Deferred Maintenance 2018 $10,000
C19
Hayat Brown LLC Page 191 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2047 Playing Fields Play Equipment - Large
Condition Fair - Good
RUL 14
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $42,840
C19
Hayat Brown LLC Page 192 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2047 Playing Fields Playing Fields, Basketball Court, Complete
Condition Poor
RUL 1
Plan Type Capital Replacement
Quantity 2
Unit of Measure EA
Unit Cost $28,000
Type Component Description Plan Type Year Expenditures ($)
G2047 Replace Playing Fields, Basketball Court, Complete Capital Replacement 2019 $56,000
C19
Hayat Brown LLC Page 193 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2047 Playing Fields Play Equipment - Midsize
Condition Poor
RUL 1
Plan Type Capital Replacement
Quantity 2
Unit of Measure EA
Unit Cost $28,050
C19
Hayat Brown LLC Page 194 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
G2047 Replace Play Equipment - Midsize Capital Replacement 2019 $56,100
C19
Hayat Brown LLC Page 195 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2047 Playing Fields Playing Fields, Resilient Playground Surface - New
Condition Fair - Good
RUL 9
Plan Type Capital Replacement
Quantity 9100
Unit of Measure SF
Unit Cost $11.41
Type Component Description Plan Type Year Expenditures ($)
G2047 Replace Playing Fields, Resilient Playground Surface - New
Capital Replacement 2027 $103,831
C19
Hayat Brown LLC Page 196 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2047 Playing Fields Playing Fields, Resilient Playground Surface - Older
Condition Poor
RUL 1
Plan Type Capital Replacement
Quantity 2121
Unit of Measure SF
Unit Cost $11.41
Type Component Description Plan Type Year Expenditures ($)
G2047 Replace Playing Fields, Resilient Playground Surface - Older
Capital Replacement 2019 $24,201
C19
Hayat Brown LLC Page 198 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2054 Seeding and Sodding Landscaping
Condition Fair - Good
RUL 11
Location Exterior
Plan Type Capital Replacement
Quantity 329800
Unit of Measure SF
Unit Cost $1.20
C19
Hayat Brown LLC Page 199 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Item Description
G2056 Planters Landscaping, Planters, Precast Concrete
Condition Poor
RUL 1
Plan Type Deferred Maintenance
Quantity 2700
Unit of Measure SF
Unit Cost $82.83
C19
Hayat Brown LLC Page 200 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Type Component Description Plan Type Year Expenditures ($)
G2056 Replace Landscaping, Planters, Precast Concrete Deferred Maintenance 2019 $223,641