facilities conditions assessments...fci - facility condition index: a numeric score between 0 and 1...
TRANSCRIPT
![Page 1: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/1.jpg)
1
FACILITIES CONDITIONS ASSESSMENTS
NORFOLK PUBLIC SCHOOLS
FACILITIES CONDITIONS ASSESSMENTS DRAFT REPORT
for
October 2, 2017
![Page 2: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/2.jpg)
2
FACILITIES CONDITIONS ASSESSMENTS
NORFOLK PUBLIC SCHOOLS
TABLE of CONTENTS
SCOPE of the WORK……………………………………………………………………………………………………. 3
FACILITIES ASSESSMENT DEFINITIONS…………………………………………………………………………… 3
FACILITY CONDITIONS ASSESSMENT PROCESS …………………….…………………………………………. 4
INTERPRETING the FACILITY CONDITIONS ASSESSMENT DATA …………………..………………………… 4
PRELIMINARY CAPITAL REPLACEMENT and CAPITAL RENEWAL BUDGETING……………………………. 5 - 7
SUMMARY :: FCI SCORES / CAPITAL REPLACEMENT & CAPITAL RENEWAL BUDGETING ANALYSIS… 8
SORTED BY FCI – HIGHEST TO LOWEST x GRADE LEVEL GROUP
SUMMARY :: FCI SCORES / CAPITAL REPLACEMENT & CAPITAL RENEWAL BUDGETING ANALYSIS… 9
SORTED BY FCI – HIGHEST TO LOWEST
SUMMARY ANALYSIS :: REPLACEMENT VERSUS CAPITAL RENEWAL + MODERNIZATION…………….. 10
SORTED BY FCI – HIGHEST TO LOWEST :: 16 SCHOOLS WITH GREATEST FACILITIES NEEDS
DETAILED FACILITY CONDITIONS ASSESSMENTS [BY SCHOOL FACILITY]………………………………… 11
![Page 3: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/3.jpg)
3
FACILITIES CONDITIONS ASSESSMENTS
NORFOLK PUBLIC SCHOOLS
SCOPE of the WORK
In late Spring of 2017, HBA Architecture & Interior Design was contracted by Norfolk Public Schools to perform Facilities Conditions
Assessments for all of its school facilities with the exception of those either recently constructed or those school facilities currently under construction.
The purpose of conducting Facilities Conditions Assessments is twofold:
1.) To develop Facility Condition Index [FCI] scores for each school facility so that this information can be used to support the Facilities Master Planning process and ultimately inform the decision making process as to whether school facilities should be replaced or modernized. School Board Staff grouped the schools in order of their perceived priority of need as follows:
• Category 1 – Original sixteen (16) School Facilities believed to have the most need in terms of facilities improvements
• Category 2 – All other School Facilities older than 21 years [new or modernization]
• Category 3 – School Facilities 20 years old or less [new or modernization]
2.) To develop Preliminary Capital Replacement Budgets and Capital Renewal Budgets for CIP planning.
Note: The scope of this study excluded Maury HS, Madison Alternative Center, Camp Young, Coronado Open Campus, and JJ Roberts.
FACILITIES ASSESSMENT DEFINITIONS
The following terms and abbreviations define the various types of facilities assessments and analysis that have been performed by HBA Architecture in the context of this study:
SCI - System Condition Index: A numeric score between 0 and 1 which quantifies the condition of building and/or site systems and components in the context of their anticipated useful life. 0 = new and 1.0 = exceeded useful life.
FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building facilities on the same site. FCI = Sum of all [SCls x relative value of each system or component as a percentage of the total value of the facility]. As with the SCI, 0 = new and 1.0 = exceeded useful life. This score allows us to compare the condition of facilities against other facilities in a school division and also against the average or median FCI conditions for the school division.
![Page 4: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/4.jpg)
4
FACILITIES CONDITIONS ASSESSMENTS
NORFOLK PUBLIC SCHOOLS
FACILITY CONDITIONS ASSESSMENT PROCESS
Over the span of approximately 8 weeks, HBA Architecture’s Educational K-12 Studio Director, Michael Ross, AIA, and our Senior K-12
Architect, Jack Hasten, Jr., AIA, visited each school site along with John Hazelette, a former NPS Director of School Planning and Transportation. For each visit, we were accompanied by a senior maintenance staff person from the Department of Facilities Management and also by each school’s head custodian.
During the course of our site visits, our team members visually observed the conditions of all site and building systems and components and each of us gave each system or component a SCI [System Condition Index] score based on its observed condition and/or supplementary information provided by our NPS representative guides. The average of our three separate SCI scores was then calculated. Each averaged SCI score was then weighted by a percentage factor that represents the cost value of each system or
component divided by the total cost value of all systems and components.
The sum of these weighted SCI scores equals the total Facility Condition Index [FCI] of each school campus.
INTERPRETING the FACILITY CONDITIONS ASSESSMENT DATA
Facilities Conditions:
The generally accepted standards for FCI – Facility Condition Index ratings are as follows:
POOR FCI > .6500
FAIR .4001 < FCI < .6499
GOOD .4000 > FCI
Three (3) of six (6) High Schools have an FCI greater than .6500 (Maury HS’ relative FCI is assumed).
One (1) of six (6) High Schools has an FCI less than .4000.
Three (3) of eight (8) Middle Schools have an FCI greater than .6500, and a 4th MS is very close with an FCI of .6474
One (1) of eight (8) Middle Schools has an FCI less than .4000.
Twenty-one (21) of thirty-six (36) Elementary Schools have an FCI greater than .6500.
Seven (7) of thirty-six (36) Elementary Schools have an FCI less than .4000.
![Page 5: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/5.jpg)
5
FACILITIES CONDITIONS ASSESSMENTS
NORFOLK PUBLIC SCHOOLS
Facility Age:
The average age of NPS’ six (6) high school facilities is 57 years old.
The average age of NPS’s eight (8) middle school facilities is 49 years old.
The average age of NPS’s thirty-six (36) elementary school facilities is 46 years old.
The average age of all fifty (50) NPS school facilities is 48 years old.
According to the National Center for Educational Statistics (NCES), the national average age of all school facilities nationwide is 42 years, and the average age of school facilities in the US Southeast Region is 37 years. Therefore, NPS school facilities are, on average, 6 years older than the national average and 11 years older than the regional average.
PRELIMINARY CAPITAL REPLACEMENT and CAPITAL RENEWAL BUDGETING
Definitions:
Capital Improvement – A facilities project that adds building area or provides for extensive renovations to an existing facility.
Capital Replacement – A facilities project that replaces an older facility with a new facility.
Capital Renewal – A facilities project that replaces a school building system and component that has reached the end of its useful life.
Current Capital Replacement Value - The cost to totally replace a school facility of equal size and character to the existing school in today’s dollars, including soft costs such as design, testing and contingencies, based on the existing facility’s total gross building area.
Current Capital Renewal Value - The cost to totally replace a school building’s systems and components in today’s dollars, including soft costs such as design, testing and contingencies, based on the existing facility’s total gross building area. This renewal cost is less than replacement cost
because building structural elements and infrastructure are typically not included in renewal strategies. This value is usually equated to a full Renovation.
Capital Renewal Cost / SF - The cost per square foot of building area to totally replace a school building’s systems and components in today’s dollars, including soft costs such as design, testing and contingencies. This renewal cost is less than replacement cost because building structural elements and infrastructure are typically not included in renewal strategies.
21st Century Modernization - The estimated cost to modify and adapt existing facilities to provide modern learning environments that support current and future educational programming.
![Page 6: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/6.jpg)
6
FACILITIES CONDITIONS ASSESSMENTS
NORFOLK PUBLIC SCHOOLS
Findings and Analysis:
School Facilities Managers typically utilize one of the following two methodologies when developing projected annual budget expenditures for Capital Renewals [building system and building component replacements and/or renewals].
1.) Building a Capital Renewal Budget by Projects as prioritized by critical need, or
2.) Utilizing a school facilities industry standard of 2.00% of Total Current Capital Renewal Value per year to establish recommended overall levels of funding for Capital Renewal Budgets and then identifying specific renewal projects and recommended replacement timeframes based on critical need.
Norfolk Public Schools currently uses the first methodology of building a Capital Renewal Budget by projects as prioritized by critical need. This methodology is a good system for identifying critical building system and component renewal needs, but it typically tends to undershoot the big
picture needs of the school facility in the context of maintaining all building systems and components in good condition and replacing or renewing them promptly when they have exceeded their useful life. A typical result of this methodology is that some building systems and components tend to be neglected, and over time the FCI of the facility steadily increases such that a major renovation project is needed every 25 or 30 years to “catch up”
Methodology 2 is a more proactive approach to planning and budgeting for Capital Renewal Projects as it builds in a steady funding mechanism and timetable to replace facility systems and components as they wear out, and not after they have completely failed. This methodology has an added benefit of providing less stress on the quality of the learning environments and the people who work in them. For these reasons, we
recommend that the Methodology 2 be utilized to establish required annual Capital Renewal Budget allocations and replace facility systems and components as they reach the end of their useful life.
Summary Data:
Estimated Annual Expenditure (in 2018 dollars) necessary for Capital Renewal Replacements (Methodology 2)………………….….. $16 M
(Note - Should be escalated 5% per year for construction cost inflation)
Priority 1 Estimated Cost of Capital Renewals [SCI > .9] in 2018 dollars (4 to 5 years)…………………………………………………… $124 M
Please note that the estimated cost of Priority 1 Capital Renewal Replacements is more than 5 times the Estimated Annual Expenditure Necessary for Capital Renewal Replacements (5 x $16 M - $$80 M). This is an indication that Capital Renewals have been deferred due to a lack of available funding.
Priority 1 – 4 Estimated Cost of Capital Renewals [SCI > .6] in 2018 dollars (20 to 25 years)……………………………………………. $492 M
![Page 7: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/7.jpg)
7
FACILITIES CONDITIONS ASSESSMENTS
NORFOLK PUBLIC SCHOOLS
It is important to note that the Capital Renewal Budget planning scenario outlined in Methodology 2 essentially maintains the school division’s division-wide FCI score at its current level at the point time in which this funding level is initiated. If it is the desire of the school division and the community to lower the division-wide FCI score to the level of 0.4000 or below, which is generally considered “Good”, then a higher level of annual
funding for Capital Renewal will be required - at least until such point in time that the division-wide FCI reaches the target level. At this point funding can be reduced back to the 2.00% Total Current Capital Renewal Value per year recommended level for FCI maintenance.
It is also extremely important to note that the Capital Renewal Budget planning scenarios outlined above do very little to improve educational adequacy deficiencies which may be present in the division’s school facilities, as the focus of Capital Renewal is replacing and renewing building systems and components “in kind” along with code compliance and/or energy usage improvements. Additional funding in the form of Capital Improvement Projects will be required to adequately address deficiencies related to student capacity and utilization and/or to improve the capacity of learning environments to support the desired educational programs.
![Page 8: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/8.jpg)
NORFOLK PUBLIC SCHOOLS :: LONG RANGE FACILITIES MASTER PLAN HBA Architecture & Interior Design
SUMMARY :: FACILITY CONDITION INDEX [FCI] SCORES / CAPITAL REPLACEMENT & CAPITAL RENEWAL BUDGETING ANALYSIS
SORTED BY FCI - HIGHEST to LOWEST x GRADE LEVEL GROUP
Draft :: September 22, 2017
FCI Replace Renovate Capital Renewal
Gross
Building
Area
[SF]
Age of
Original
Building
Facility
Condition
Index
[FCI]
Current
Capital
Replacement
Value
2018 $$$
Current
Capital
Renewal
Value
2018 $$$
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
Priority 1+2+3+4
Estimated Cost of
Capital Renewals
[SCI > .6]
2018 $$$
Capital
Renewal
Cost / SF
2018 $$$
Cost of
SCI > .6
Capital
Renewals
/ Cost to
Replace
Cost of SCI > .6
Capital
Renewals
/ Cost to
Renovate
Lake Taylor High School 261,000 50 0.6896 79,245,416$ 54,278,198$ 24,424,218$ 8,694,950$ $ 10,276,503 $ 5,583,962 48,979,634$ 188$ 61.81% 90.24%
Booker T. Washington High School 265,000 43 0.6508 80,459,905$ 55,110,047$ 19,116,222$ 15,528,737$ $ 281,014 $ 9,585,483 44,511,456$ 168$ 55.32% 80.77%
Norfolk Technical Center 125,938 49 0.6224 38,237,583$ 26,190,374$ 1,867,941$ 466,552$ $ 11,948,233 $ 2,014,497 16,297,223$ 129$ 42.62% 62.23%
Granby High School [Modernization] 292,294 78 0.5377 88,746,972$ 60,786,174$ -$ -$ $ - $ 11,528,787 11,528,787$ 39$ 12.99% 18.97%
Norview High School 282,272 13 0.2698 85,704,069$ 58,701,975$ -$ 690,790$ $ - $ - 690,790$ 2$ 0.81% 1.18%
Azalea Gardens Middle School 120,374 56 0.7239 34,732,580$ 23,292,616$ 8,621,215$ 4,124,523$ $ 2,553,126 $ 3,061,895 18,360,760$ 153$ 52.86% 78.83%
Rosemont Middle School 126,028 58 0.7062 36,363,978$ 24,386,677$ 3,306,380$ 9,453,990$ $ 4,955,231 $ 4,048,536 21,764,136$ 173$ 59.85% 89.25%
Lake Taylor Middle School 118,926 52 0.6822 34,314,775$ 23,012,425$ 8,970,368$ 3,275,650$ $ 3,544,253 $ 2,711,419 18,501,691$ 156$ 53.92% 80.40%
Northside Middle School 122,675 61 0.6474 35,396,508$ 23,737,864$ 2,877,143$ 3,790,294$ $ 8,146,724 $ 3,551,236 18,365,396$ 150$ 51.88% 77.37%
Ruffner Middle School 146,000 23 0.5105 42,126,677$ 28,251,300$ -$ -$ $ 11,068,809 $ 3,168,836 14,237,645$ 98$ 33.80% 50.40%
Discovery Academy at Lakewood 3 - 8 140,000 26 0.5035 40,395,444$ 27,090,287$ -$ -$ $ 7,085,591 $ 10,108,777 17,194,368$ 123$ 42.57% 63.47%
Norview Middle School 152,000 22 0.4918 43,857,910$ 29,412,312$ -$ -$ $ 9,499,457 $ 7,971,338 17,470,795$ 115$ 39.83% 59.40%
Blair Middle School [Modernization] 241,597 95 0.3487 69,710,129$ 46,749,516$ -$ -$ $ - $ - -$ -$ 0.00% 0.00%
Larrymore Elementary School 77,325 60 0.8076 20,992,816$ 13,684,661$ 6,775,987$ 2,187,953$ $ 3,362,968 $ 931,791 13,258,699$ 171$ 63.16% 96.89%
Calcott Elementary School 65,100 65 0.7993 17,673,874$ 11,521,131$ 2,534,530$ 3,695,196$ $ 4,731,064 $ 515,513 11,476,303$ 176$ 64.93% 99.61%
Willard Elementary School - 1952 65,100 65 0.7787 17,673,874$ 11,521,131$ 2,808,873$ 2,432,324$ $ 6,060,280 $ - 11,301,477$ 174$ 63.94% 98.09%
P.B. Young Elementary School 55,325 63 0.7759 15,020,078$ 9,791,191$ 3,352,469$ 4,152,109$ $ 1,105,629 $ 586,682 9,196,890$ 166$ 61.23% 93.93%
Ingleside Elementary School 58,500 63 0.7717 15,882,053$ 10,353,090$ 1,957,730$ 5,231,571$ $ 1,455,810 $ 1,047,345 9,692,456$ 166$ 61.03% 93.62%
Jacox Elementary School 79,200 68 0.7705 21,501,856$ 14,016,491$ 1,966,580$ 6,955,563$ $ 3,267,380 $ 872,581 13,062,105$ 165$ 60.75% 93.19%
Willoughby Elementary School 58,400 50 0.7560 15,854,904$ 10,335,392$ 4,407,417$ 2,326,762$ $ 1,329,866 $ 1,185,579 9,249,623$ 158$ 58.34% 89.49%
Easton Preschool 37,500 58 0.7443 10,180,803$ 6,636,596$ 2,394,744$ 2,275,446$ $ 1,140,563 $ 800,021 6,610,774$ 176$ 64.93% 99.61%
Poplar Halls Elementary School 44,400 58 0.7308 12,054,071$ 7,857,730$ 4,118,236$ 1,024,209$ $ 823,342 $ 573,007 6,538,793$ 147$ 54.25% 83.21%
Berkley Early Childhood Center 46,453 64 0.7290 12,611,436$ 8,221,061$ 1,411,270$ 2,800,788$ $ 1,638,762 $ 1,058,772 6,909,591$ 149$ 54.79% 84.05%
Oceanair Elementary School 62,470 61 0.7244 16,959,861$ 11,055,684$ 2,090,588$ 950,658$ $ 6,057,974 $ 665,977 9,765,198$ 156$ 57.58% 88.33%
Granby Elementary School 82,081 69 0.7193 22,284,013$ 14,526,358$ 3,932,672$ 2,738,402$ $ 5,855,488 $ 1,999,796 14,526,358$ 177$ 65.19% 100.00%
Suburban Park Elementary School 61,980 62 0.7117 16,826,831$ 10,968,966$ 1,393,890$ 809,190$ $ 6,269,944 $ 1,531,401 10,004,425$ 161$ 59.46% 91.21%
Chesterfield Academy 58,750 64 0.7087 15,949,925$ 10,397,334$ 3,500,137$ 712,002$ $ 3,113,795 $ 1,437,031 8,762,965$ 149$ 54.94% 84.28%
Sherwood Forest Elementary School 66,340 60 0.7040 18,010,519$ 11,740,581$ 2,329,734$ 618,522$ $ 6,424,128 $ 335,390 9,707,774$ 146$ 53.90% 82.69%
Norview Elementary School 57,640 65 0.6974 15,648,573$ 10,200,890$ 1,366,935$ 912,878$ $ 5,590,859 $ 564,000 8,434,671$ 146$ 53.90% 82.69%
Lindenwood Elementary School 54,900 64 0.6899 14,904,696$ 9,715,977$ 1,329,174$ 575,749$ $ 4,562,893 $ 1,943,936 8,411,753$ 153$ 56.44% 86.58%
Tidewater Park Elementary School 39,675 53 0.6808 10,771,290$ 7,021,519$ 642,562$ 384,718$ $ 2,638,547 $ 2,615,325 6,281,152$ 158$ 58.31% 89.46%
St. Helena Elementary School 36,074 51 0.6571 9,793,661$ 6,384,228$ 2,173,517$ 323,916$ $ 2,182,956 $ 154,258 4,834,647$ 134$ 49.37% 75.73%
Little Creek Elementary School - Tarpon 56,795 63 0.6542 15,419,166$ 10,051,346$ 377,006$ 1,054,364$ $ 4,699,665 $ 2,086,124 8,217,159$ 145$ 53.29% 81.75%
Little Creek Elementary School - Nancy 44,500 60 0.6522 12,081,220$ 7,875,427$ 295,391$ 1,009,969$ $ 3,498,426 $ 1,496,629 6,300,415$ 142$ 52.15% 80.00%
Fairlawn Elementary School 58,500 58 0.6485 15,882,053$ 10,353,090$ 742,810$ 3,828,450$ $ 2,196,606 $ 483,471 7,251,336$ 124$ 45.66% 70.04%
Tarrallton Elementary School 46,300 53 0.6305 12,569,898$ 8,193,984$ 510,107$ 2,390,172$ $ 1,587,710 $ 527,961 5,015,951$ 108$ 39.90% 61.22%
Sewells Point Elementary School 60,900 51 0.6196 16,533,624$ 10,777,832$ 1,218,635$ 812,703$ $ 2,696,848 $ 1,986,970 6,715,156$ 110$ 40.62% 62.31%
Tanners Creek Elementary School 83,000 27 0.5942 22,533,511$ 14,688,999$ 631,540$ 5,398,670$ $ 2,831,358 $ 2,912,515 11,774,083$ 142$ 52.25% 80.16%
Willard Elementary School - 1990 Add. 15,825 27 0.5632 4,296,299$ 2,800,644$ 1,019,953$ -$ $ - $ 326,254 1,346,208$ 85$ 31.33% 48.07%
Bayview Elementary School [Modernization] 83,095 95 0.5471 22,559,302$ 14,705,812$ -$ -$ $ 688,909 $ 4,287,374 4,976,283$ 60$ 22.06% 33.84%
Ghent K - 8 School 60,800 39 0.5344 16,506,476$ 10,760,134$ -$ 674,047$ $ 3,225,378 $ 1,917,475 5,816,900$ 96$ 35.24% 54.06%
Monroe Elementary School 64,000 27 0.4867 17,375,237$ 11,326,457$ -$ -$ $ 3,388,083 $ 3,965,838 7,353,921$ 115$ 42.32% 64.93%
Taylor Elementary School 54,786 19 0.4711 14,873,746$ 9,695,801$ -$ -$ $ 215,788 $ 202,961 418,749$ 8$ 2.82% 4.32%
Coleman Place Elementary School 96,818 10 0.2382 26,284,933$ 17,134,452$ -$ -$ $ - $ 102,669 102,669$ 1$ 0.39% 0.60%
4,226,636 SF 1,206,802,548$ 805,313,753$ 124,465,977$ 102,301,816$ $ 161,999,959 $ 102,449,413 491,217,166$
x 2.00% (note 1)
Estimated Annual Expenditure Necessary for Capital Renewal Replacements 16,106,275$ ( in 2018 $$$ - Should be escalated 5% per year for construction cost inflation)
note 1: The Industry Standard for budgeting of Capital Renewal Replacements is 2% of Total Current Capital Renewal Value per year.
This factor assumes that Capital Renewal Replacements have not been significantly deferred.
SCHOOL FACILITIES EXCLUDED from the SCOPE of this ASSESSMENT STUDY CATEGORY DEFINITIONS
265,000 107 [1988 Modernization] Category 1 Original sixteen (16) School Facilities believed to have the most need in terms of facilities improvements
75,501 98 Category 2 All other School Facilities older than 21 years [new or modernization]
27,398 71 Category 3 School Facilities 20 years old or less [new or modernization]
13,280 58
40,355 53
146,923 5
1
1
-
-
(1)
SUPPORT FACILITIES EXCLUDED from the SCOPE of this ASSESSMENT STUDY
77,028 49
24,689 22
Improvements Cost Model (include 20% Soft Costs for Design, FF&E, Technology, and Contingency)
High School - Current Capital Replacement Cost/SF in 2018 $$$ 303.62$
Middle School - Current Capital Replacement Cost/SF in 2018 $$$ 288.54$
Elementary School - Current Capital Replacement Cost/SF in 2018 $$$ 271.49$
High School - Current Capital Renewal Cost/SF in 2018 $$$ 207.96$
Middle School - Current Capital Renewal Cost/SF in 2018 $$$ 193.50$
Elementary School - Current Capital Renewal Cost/SF in 2018 $$$ 176.98$
Estimated Cost of Capital Renewal Replacements by Priority
School Name
Red = Category 1 [See definitions below]
Black = Category 2
Blue = Category 3
Maury High School
Madison Alternative Center
Camp Young
Transportation Facility
Coronado Open Campus
JJ Roberts
Bellmore Complex
Crossroads PK-9
Richard Bowling Elementary School
Southside Stem Academy @ Campostella
Camp Allen Elementary
Larchmont Elementary School
Ocean View Elementary School
8
![Page 9: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/9.jpg)
NORFOLK PUBLIC SCHOOLS :: LONG RANGE FACILITIES MASTER PLAN HBA Architecture & Interior Design
SUMMARY :: FACILITY CONDITION INDEX [FCI] SCORES / CAPITAL REPLACEMENT & CAPITAL RENEWAL BUDGETING ANALYSIS
SORTED BY FCI - HIGHEST to LOWEST
Draft :: September 22, 2017
FCI Replace Renovate Capital Renewal
Gross
Building
Area
[SF]
Age of
Original
Building
Facility
Condition
Index
[FCI]
Current
Capital
Replacement
Value
2018 $$$
Current
Capital
Renewal
Value
2018 $$$
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
Priority 1+2+3+4
Estimated Cost of
Capital Renewals
[SCI > .6]
2018 $$$
Capital
Renewal
Cost / SF
2018 $$$
Cost of
SCI > .6
Capital
Renewals
/ Cost to
Replace
Cost of SCI > .6
Capital
Renewals
/ Cost to
Renovate
Larrymore Elementary School 77,325 60 0.8076 20,992,816$ 13,684,661$ 6,775,987$ 2,187,953$ $ 3,362,968 $ 931,791 13,258,699$ 171$ 63.16% 96.89%
Calcott Elementary School 65,100 65 0.7993 17,673,874$ 11,521,131$ 2,534,530$ 3,695,196$ $ 4,731,064 $ 515,513 11,476,303$ 176$ 64.93% 99.61%
Willard Elementary School - 1952 65,100 65 0.7787 17,673,874$ 11,521,131$ 2,808,873$ 2,432,324$ $ 6,060,280 $ - 11,301,477$ 174$ 63.94% 98.09%
P.B. Young Elementary School 55,325 63 0.7759 15,020,078$ 9,791,191$ 3,352,469$ 4,152,109$ $ 1,105,629 $ 586,682 9,196,890$ 166$ 61.23% 93.93%
Ingleside Elementary School 58,500 63 0.7717 15,882,053$ 10,353,090$ 1,957,730$ 5,231,571$ $ 1,455,810 $ 1,047,345 9,692,456$ 166$ 61.03% 93.62%
Jacox Elementary School 79,200 68 0.7705 21,501,856$ 14,016,491$ 1,966,580$ 6,955,563$ $ 3,267,380 $ 872,581 13,062,105$ 165$ 60.75% 93.19%
Willoughby Elementary School 58,400 50 0.7560 15,854,904$ 10,335,392$ 4,407,417$ 2,326,762$ $ 1,329,866 $ 1,185,579 9,249,623$ 158$ 58.34% 89.49%
Easton Preschool 37,500 58 0.7443 10,180,803$ 6,636,596$ 2,394,744$ 2,275,446$ $ 1,140,563 $ 800,021 6,610,774$ 176$ 64.93% 99.61%
Poplar Halls Elementary School 44,400 58 0.7308 12,054,071$ 7,857,730$ 4,118,236$ 1,024,209$ $ 823,342 $ 573,007 6,538,793$ 147$ 54.25% 83.21%
Berkley Early Childhood Center 46,453 64 0.7290 12,611,436$ 8,221,061$ 1,411,270$ 2,800,788$ $ 1,638,762 $ 1,058,772 6,909,591$ 149$ 54.79% 84.05%
Oceanair Elementary School 62,470 61 0.7244 16,959,861$ 11,055,684$ 2,090,588$ 950,658$ $ 6,057,974 $ 665,977 9,765,198$ 156$ 57.58% 88.33%
Azalea Gardens Middle School 120,374 56 0.7239 34,732,580$ 23,292,616$ 8,621,215$ 4,124,523$ $ 2,553,126 $ 3,061,895 18,360,760$ 153$ 52.86% 78.83%
Granby Elementary School 82,081 69 0.7193 22,284,013$ 14,526,358$ 3,932,672$ 2,738,402$ $ 5,855,488 $ 1,999,796 14,526,358$ 177$ 65.19% 100.00%
Suburban Park Elementary School 61,980 62 0.7117 16,826,831$ 10,968,966$ 1,393,890$ 809,190$ $ 6,269,944 $ 1,531,401 10,004,425$ 161$ 59.46% 91.21%
Chesterfield Academy 58,750 64 0.7087 15,949,925$ 10,397,334$ 3,500,137$ 712,002$ $ 3,113,795 $ 1,437,031 8,762,965$ 149$ 54.94% 84.28%
Rosemont Middle School 126,028 58 0.7062 36,363,978$ 24,386,677$ 3,306,380$ 9,453,990$ $ 4,955,231 $ 4,048,536 21,764,136$ 173$ 59.85% 89.25%
Sherwood Forest Elementary School 66,340 60 0.7040 18,010,519$ 11,740,581$ 2,329,734$ 618,522$ $ 6,424,128 $ 335,390 9,707,774$ 146$ 53.90% 82.69%
Norview Elementary School 57,640 65 0.6974 15,648,573$ 10,200,890$ 1,366,935$ 912,878$ $ 5,590,859 $ 564,000 8,434,671$ 146$ 53.90% 82.69%
Lindenwood Elementary School 54,900 64 0.6899 14,904,696$ 9,715,977$ 1,329,174$ 575,749$ $ 4,562,893 $ 1,943,936 8,411,753$ 153$ 56.44% 86.58%
Lake Taylor High School 261,000 50 0.6896 79,245,416$ 54,278,198$ 24,424,218$ 8,694,950$ $ 10,276,503 $ 5,583,962 48,979,634$ 188$ 61.81% 90.24%
Lake Taylor Middle School 118,926 52 0.6822 34,314,775$ 23,012,425$ 8,970,368$ 3,275,650$ $ 3,544,253 $ 2,711,419 18,501,691$ 156$ 53.92% 80.40%
Tidewater Park Elementary School 39,675 53 0.6808 10,771,290$ 7,021,519$ 642,562$ 384,718$ $ 2,638,547 $ 2,615,325 6,281,152$ 158$ 58.31% 89.46%
St. Helena Elementary School 36,074 51 0.6571 9,793,661$ 6,384,228$ 2,173,517$ 323,916$ $ 2,182,956 $ 154,258 4,834,647$ 134$ 49.37% 75.73%
Little Creek Elementary School - Tarpon 56,795 63 0.6542 15,419,166$ 10,051,346$ 377,006$ 1,054,364$ $ 4,699,665 $ 2,086,124 8,217,159$ 145$ 53.29% 81.75%
Little Creek Elementary School - Nancy 44,500 60 0.6522 12,081,220$ 7,875,427$ 295,391$ 1,009,969$ $ 3,498,426 $ 1,496,629 6,300,415$ 142$ 52.15% 80.00%
Booker T. Washington High School 265,000 43 0.6508 80,459,905$ 55,110,047$ 19,116,222$ 15,528,737$ $ 281,014 $ 9,585,483 44,511,456$ 168$ 55.32% 80.77%
Fairlawn Elementary School 58,500 58 0.6485 15,882,053$ 10,353,090$ 742,810$ 3,828,450$ $ 2,196,606 $ 483,471 7,251,336$ 124$ 45.66% 70.04%
Northside Middle School 122,675 61 0.6474 35,396,508$ 23,737,864$ 2,877,143$ 3,790,294$ $ 8,146,724 $ 3,551,236 18,365,396$ 150$ 51.88% 77.37%
Tarrallton Elementary School 46,300 53 0.6305 12,569,898$ 8,193,984$ 510,107$ 2,390,172$ $ 1,587,710 $ 527,961 5,015,951$ 108$ 39.90% 61.22%
Norfolk Technical Center 125,938 49 0.6224 38,237,583$ 26,190,374$ 1,867,941$ 466,552$ $ 11,948,233 $ 2,014,497 16,297,223$ 129$ 42.62% 62.23%
Sewells Point Elementary School 60,900 51 0.6196 16,533,624$ 10,777,832$ 1,218,635$ 812,703$ $ 2,696,848 $ 1,986,970 6,715,156$ 110$ 40.62% 62.31%
Tanners Creek Elementary School 83,000 27 0.5942 22,533,511$ 14,688,999$ 631,540$ 5,398,670$ $ 2,831,358 $ 2,912,515 11,774,083$ 142$ 52.25% 80.16%
Willard Elementary School - 1990 Add. 15,825 27 0.5632 4,296,299$ 2,800,644$ 1,019,953$ -$ $ - $ 326,254 1,346,208$ 85$ 31.33% 48.07%
Bayview Elementary School [Modernization] 83,095 95 0.5471 22,559,302$ 14,705,812$ -$ -$ $ 688,909 $ 4,287,374 4,976,283$ 60$ 22.06% 33.84%
Granby High School [Modernization] 292,294 78 0.5377 88,746,972$ 60,786,174$ -$ -$ $ - $ 11,528,787 11,528,787$ 39$ 12.99% 18.97%
Ghent K - 8 School 60,800 39 0.5344 16,506,476$ 10,760,134$ -$ 674,047$ $ 3,225,378 $ 1,917,475 5,816,900$ 96$ 35.24% 54.06%
Ruffner Middle School 146,000 23 0.5105 42,126,677$ 28,251,300$ -$ -$ $ 11,068,809 $ 3,168,836 14,237,645$ 98$ 33.80% 50.40%
Discovery Academy at Lakewood 3 - 8 140,000 26 0.5035 40,395,444$ 27,090,287$ -$ -$ $ 7,085,591 $ 10,108,777 17,194,368$ 123$ 42.57% 63.47%
Norview Middle School 152,000 22 0.4918 43,857,910$ 29,412,312$ -$ -$ $ 9,499,457 $ 7,971,338 17,470,795$ 115$ 39.83% 59.40%
Monroe Elementary School 64,000 27 0.4867 17,375,237$ 11,326,457$ -$ -$ $ 3,388,083 $ 3,965,838 7,353,921$ 115$ 42.32% 64.93%
Taylor Elementary School 54,786 19 0.4711 14,873,746$ 9,695,801$ -$ -$ $ 215,788 $ 202,961 418,749$ 8$ 2.82% 4.32%
Blair Middle School [Modernization] 241,597 95 0.3487 69,710,129$ 46,749,516$ -$ -$ $ - $ - -$ -$ 0.00% 0.00%
Norview High School 282,272 13 0.2698 85,704,069$ 58,701,975$ -$ 690,790$ $ - $ - 690,790$ 2$ 0.81% 1.18%
Coleman Place Elementary School 96,818 10 0.2382 26,284,933$ 17,134,452$ -$ -$ $ - $ 102,669 102,669$ 1$ 0.39% 0.60%
4,226,636 SF 1,206,802,548$ 805,313,753$ 124,465,977$ 102,301,816$ $ 161,999,959 $ 102,449,413 491,217,166$
x 2.00% (note 1)
Estimated Annual Expenditure Necessary for Capital Renewal Replacements 16,106,275$ ( in 2018 $$$ - Should be escalated 5% per year for construction cost inflation)
note 1: The Industry Standard for budgeting of Capital Renewal Replacements is 2% of Total Current Capital Renewal Value per year.
This factor assumes that Capital Renewal Replacements have not been significantly deferred.
SCHOOL FACILITIES EXCLUDED from the SCOPE of this ASSESSMENT STUDY CATEGORY DEFINITIONS
265,000 107 [1988 Modernization] Category 1 Original sixteen (16) School Facilities believed to have the most need in terms of facilities improvements
75,501 98 Category 2 All other School Facilities older than 21 years [new or modernization]
27,398 71 Category 3 School Facilities 20 years old or less [new or modernization]
13,280 58
40,355 53
146,923 5
1
1
-
-
(1)
SUPPORT FACILITIES EXCLUDED from the SCOPE of this ASSESSMENT STUDY
77,028 49
24,689 22
Improvements Cost Model (include 20% Soft Costs for Design, FF&E, Technology, and Contingency)
High School - Current Capital Replacement Cost/SF in 2018 $$$ 303.62$
Middle School - Current Capital Replacement Cost/SF in 2018 $$$ 288.54$
Elementary School - Current Capital Replacement Cost/SF in 2018 $$$ 271.49$
High School - Current Capital Renewal Cost/SF in 2018 $$$ 207.96$
Middle School - Current Capital Renewal Cost/SF in 2018 $$$ 193.50$
Elementary School - Current Capital Renewal Cost/SF in 2018 $$$ 176.98$
Transportation Facility
Coronado Open Campus
JJ Roberts
Bellmore Complex
Crossroads PK-9
Richard Bowling Elementary School
Southside Stem Academy @ Campostella
Camp Allen Elementary
Larchmont Elementary School
Ocean View Elementary School
Estimated Cost of Capital Renewal Replacements by Priority
School Name
Red = Category 1 [See definitions below]
Black = Category 2
Blue = Category 3
Maury High School
Madison Alternative Center
Camp Young
9
![Page 10: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/10.jpg)
NORFOLK PUBLIC SCHOOLS :: LONG RANGE FACILITIES MASTER PLAN HBA Architecture & Interior Design
SUMMARY ANALYSIS :: REPLACEMENT VERSUS CAPITAL RENEWAL + MODERNIZAITON
SORTED BY FCI - HIGHEST to LOWEST :: 16 SCHOOLS WITH GREATEST FACILITIES NEEDS [BY FCI]
Draft :: October 2, 2017
FCI Replace Renovate
Capital Renewal
(from previous
summaries)
21st Century
Modernization
Gross
Building
Area
[SF]
Age of
Original
Building
Facility
Condition
Index
[FCI]
Current
Capital
Replacement
Value
2018 $$$
Current
Capital
Renewal
Value
2018 $$$
Priority 1+2+3+4
Estimated Cost of
Capital Renewals
[SCI > .6]
2018 $$$
+
Modernization to
Achieve 21st
Century Learning
Environments **
2018 $$$
=
Capital Renewal
+
21st Century
Modernization
Cost of
Capital Renewal
+ Modernization
/ Cost to
Replace ***
1 Larrymore Elementary School 77,325 60 0.8076 20,992,816$ 13,684,661$ 13,258,699$ + 2,736,932$ = 15,995,631$ 76.20%
2 Calcott Elementary School 65,100 65 0.7993 17,673,874$ 11,521,131$ 11,476,303$ + 2,304,226$ = 13,780,530$ 77.97%
3 Willard Elementary School - 1952 65,100 65 0.7787 17,673,874$ 11,521,131$ 11,301,477$ + 2,304,226$ = 13,605,703$ 76.98%
4 P.B. Young Elementary School 55,325 63 0.7759 15,020,078$ 9,791,191$ 9,196,890$ + 1,958,238$ = 11,155,128$ 74.27%
5 Ingleside Elementary School 58,500 63 0.7717 15,882,053$ 10,353,090$ 9,692,456$ + 2,070,618$ = 11,763,074$ 74.07%
6 Jacox Elementary School 79,200 68 0.7705 21,501,856$ 14,016,491$ 13,062,105$ + 2,803,298$ = 15,865,403$ 73.79%
7 Willoughby Elementary School 58,400 50 0.7560 15,854,904$ 10,335,392$ 9,249,623$ + 2,067,078$ = 11,316,702$ 71.38%
8 Easton Preschool 37,500 58 0.7443 10,180,803$ 6,636,596$ 6,610,774$ + 1,327,319$ = 7,938,093$ 77.97%
9 Poplar Halls Elementary School 44,400 58 0.7308 12,054,071$ 7,857,730$ 6,538,793$ + 1,571,546$ = 8,110,339$ 67.28%
10 Berkley Early Childhood Center 46,453 64 0.7290 12,611,436$ 8,221,061$ 6,909,591$ + 1,644,212$ = 8,553,803$ 67.83%
11 Oceanair Elementary School 62,470 61 0.7244 16,959,861$ 11,055,684$ 9,765,198$ + 2,211,137$ = 11,976,334$ 70.62%
12 Azalea Gardens Middle School 120,374 56 0.7239 34,732,580$ 23,292,616$ 18,360,760$ + 4,658,523$ = 23,019,284$ 66.28%
13 Granby Elementary School 82,081 69 0.7193 22,284,013$ 14,526,358$ 14,526,358$ + 2,905,272$ = 17,431,630$ 78.22%
14 Suburban Park Elementary School 61,980 62 0.7117 16,826,831$ 10,968,966$ 10,004,425$ + 2,193,793$ = 12,198,218$ 72.49%
15 Chesterfield Academy 58,750 64 0.7087 15,949,925$ 10,397,334$ 8,762,965$ + 2,079,467$ = 10,842,432$ 67.98%
16 Rosemont Middle School 126,028 58 0.7062 36,363,978$ 24,386,677$ 21,764,136$ + 4,877,335$ = 26,641,472$ 73.26%
** Modernizations to Achieve 21st Century Learning Environments are estimated to be 20% of the cost of Total Replacement.
A more refined cost estimate may be calculated if an Educational Adequacy Assessment is performed and a Conceptual Modernization Design is developed for each facility being considered.
*** When this factor exceeds 67%, it is generally assumed that Total Replacement is a better long-term value than Capital Renewal + Modernization Improvements.
School Name
Red = Category 1
Black = Category 2
Blue = Category 3
10
![Page 11: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/11.jpg)
School Site:
School Building Date: 1967 Assessment Date: 261,000 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[HS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 5 5 5 0.500 0.0518 0.0259 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 5 5 5 0.500 0.1067 0.0534 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 5 5 5 0.500 0.0549 0.0274 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 5 5 5 0.500 0.0778 0.0389 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 8 7 8 0.767 0.0477 0.0366 15.22$ -$ -$ 3,971,856$ -$
DOOR SYSTEMS 9 9 9 0.900 0.0120 0.0108 3.81$ 995,660$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0346 0.0346 11.02$ 2,875,552$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 7 7 8 0.733 0.0260 0.0191 8.29$ -$ -$ 2,163,853$ -$
INTERIOR WALL SYSTEMS 6 6 6 0.600 0.0231 0.0139 0.74$ -$ -$ -$ 192,303$
INTERIOR WALL FINISH SYSTEMS 7 8 8 0.767 0.0033 0.0026 1.06$ -$ -$ 276,772$ -$
INTERIOR CEILING SYSTEMS 9 9 9 0.900 0.0046 0.0041 1.46$ 381,011$ -$ -$ -$
SPECIALTIES COMPONENTS 8 8 9 0.833 0.0203 0.0169 6.46$ -$ 1,685,792$ -$ -$
EQUIPMENT COMPONENTS 7 7 7 0.700 0.0171 0.0119 5.44$ -$ -$ 1,419,804$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 9 9 9 0.900 0.0335 0.0302 10.69$ 2,789,285$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 8 8 8 0.800 0.0518 0.0415 16.53$ -$ 4,313,328$ -$ -$
ELEVATOR SYSTEMS 10 10 9 0.967 0.0022 0.0021 0.69$ 179,722$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0097 3.10$ 808,749$ -$ -$ -$
PLUMBING SYSTEMS 9 9 9 0.900 0.0350 0.0315 11.17$ 2,915,091$ -$ -$ -$
HVAC SYSTEMS 9 9 9 0.900 0.1296 0.1166 41.32$ 10,783,319$ -$ -$ -$
ELECTRICAL SYSTEMS 8 9 9 0.867 0.0648 0.0562 1/2 20.66$ 2,695,830$ 2,695,830$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 6 8 7 0.700 0.0294 0.0206 9.36$ -$ -$ 2,444,219$ -$
SITE SYSTEMS & COMPONENTS 6 6 6 0.600 0.1296 0.0778 20.66$ -$ -$ -$ 5,391,660$
SITE PLAYGROUNDS & ATHLETICS 5 5 5 0.500 0.0346 0.0173 11.02$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.6896 24,424,218$ 8,694,950$ 10,276,503$ 5,583,962$
Remarks: 48,979,634$
1
2
3
4
5
6
7
8 11
9 12
10 13
2015 - Cooling Tower Replacement
No Mechanical Fresh Air Ventilation in Classrooms
Does not include 30% Roof Replacement scheduled for 2018
Lake Taylor High School
2000 - Chiller Replacement
2001 - Athletic Track Restoration
2012 - Partial Roof Replacement
2013 - Gym Bleacher Replacement
2001 - Electrical Upgrades
2002 - Exterior Masonry Repairs
2003 - Partial Foam Roof Replacement
2006 - Auditorium Asbestos Abatement
2009 - Stadium Lights
2011 - CCTV & Media Communications Upgrades
6/12/2017
11
![Page 12: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/12.jpg)
School Site:
School Building Date: 1974 Assessment Date: 265,000 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[HS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 5 4 4 0.433 0.0518 0.0225 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 5 4 4 0.433 0.1067 0.0463 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 5 4 4 0.433 0.0549 0.0238 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 5 6 5 0.533 0.0778 0.0415 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 9 9 9.5 0.917 0.0477 0.0438 15.22$ 4,032,727$ -$ -$ -$
DOOR SYSTEMS 9 10 8 0.900 0.0120 0.0108 3.81$ 1,010,919$ -$ -$ -$
WINDOW SYSTEMS 9 7 9 0.833 0.0346 0.0288 11.02$ -$ 2,919,622$ -$ -$
INTERIOR FLOORING SYSTEMS 7 6 7 0.667 0.0231 0.0154 8.29$ -$ -$ -$ 2,197,015$
INTERIOR WALL SYSTEMS 6 6 6 0.600 0.0260 0.0156 0.74$ -$ -$ -$ 195,250$
INTERIOR WALL FINISH SYSTEMS 8 7 8 0.767 0.0033 0.0026 1.06$ -$ -$ 281,014$ -$
INTERIOR CEILING SYSTEMS 10 9 9 0.933 0.0046 0.0043 1.46$ 386,850$ -$ -$ -$
SPECIALTIES COMPONENTS 9 8 9 0.867 0.0203 0.0176 6.46$ -$ 1,711,628$ -$ -$
EQUIPMENT COMPONENTS 6 6 6 0.600 0.0171 0.0102 5.44$ -$ -$ -$ 1,441,563$
FURNISHINGS [BUILT-IN] COMPONENTS 6 7 7 0.667 0.0335 0.0223 10.69$ -$ -$ -$ 2,832,033$
FURNISHINGS [LOOSE] COMPONENTS 8 9 8 0.833 0.0518 0.0432 16.53$ -$ 4,379,432$ -$ -$
ELEVATOR SYSTEMS 6 5 5 0.533 0.0022 0.0012 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0097 3.10$ -$ 821,144$ -$ -$
PLUMBING SYSTEMS 9 7 8 0.800 0.0350 0.0280 11.17$ -$ 2,959,766$ -$ -$
HVAC SYSTEMS 9 10 10 0.967 0.1296 0.1253 41.32$ 10,948,581$ -$ -$ -$
ELECTRICAL SYSTEMS 8 9 8 0.833 0.0648 0.0540 1/2 20.66$ 2,737,145$ 2,737,145$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 5 5 5 0.500 0.0294 0.0147 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 6 3 4 0.433 0.1296 0.0562 20.66$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 7 7 6 0.667 0.0346 0.0230 11.02$ -$ -$ -$ 2,919,622$
PRELIMINARY FACILITY CONDITION INDEX 0.6508 19,116,222$ 15,528,737$ 281,014$ 9,585,483$
Remarks: 44,511,456$
1
2
3
4
5
6
7
8
9
10
Booker T Washington High School
2001 - Athletic Track Restoration
2002 - Elevator Addition
2017 - Auditorium Seating Replacement
2002 - Electrical Upgrades
2002 - Fire Alarm Upgrades
2007 - Stage Lighting & Dimming Systems Replacement
2011 - CCTV and Media Communications Upgrade
2014 - East Parking Lot Renovation
2015 - West Parking Lot Renovation
5/22/2017
8
![Page 13: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/13.jpg)
School Site:
School Building Date: 1968 Assessment Date: 125,938 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 5 5 5 0.500 0.0580 0.0290 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 5 5 5 0.500 0.1194 0.0597 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 5 5 5 0.500 0.0614 0.0307 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 5 6 5 0.533 0.0870 0.0464 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 2 3 3 0.267 0.0534 0.0142 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 9 9 9 0.900 0.0134 0.0120 3.81$ 480,427$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 1,387,514$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 6 8 7 0.700 0.0291 0.0204 8.29$ -$ -$ 1,044,105$ -$
INTERIOR WALL SYSTEMS 6 7.5 6 0.650 0.0258 0.0168 0.74$ -$ -$ -$ 92,790$
INTERIOR WALL FINISH SYSTEMS 6 7.5 6 0.650 0.0037 0.0024 1.06$ -$ -$ -$ 133,548$
INTERIOR CEILING SYSTEMS 5 7.5 6.5 0.633 0.0051 0.0032 1.46$ -$ -$ -$ 183,846$
SPECIALTIES COMPONENTS 9 7 9 0.833 0.0130 0.0108 3.70$ -$ 466,552$ -$ -$
EQUIPMENT COMPONENTS 5 7 6 0.600 0.0094 0.0057 2.69$ -$ -$ -$ 338,207$
FURNISHINGS [BUILT-IN] COMPONENTS 7 8 7 0.733 0.0182 0.0133 5.18$ -$ -$ 652,132$ -$
FURNISHINGS [LOOSE] COMPONENTS 5 4 4.5 0.450 0.0338 0.0152 9.64$ -$ -$ -$ -$
ELEVATOR SYSTEMS 3 5 4 0.400 0.0024 0.0010 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 390,238$ -$
PLUMBING SYSTEMS 8 6 9 0.767 0.0392 0.0300 11.17$ -$ -$ 1,406,593$ -$
HVAC SYSTEMS 8 7 8 0.767 0.1449 0.1111 41.32$ -$ -$ 5,203,179$ -$
ELECTRICAL SYSTEMS 5 7 5 0.567 0.0556 0.0315 1/2 15.84$ -$ -$ 997,276$ -$
ELECTRICAL SPECIAL SYSTEMS 6 6.5 6 0.617 0.0329 0.0203 9.36$ -$ -$ -$ 1,179,387$
SITE SYSTEMS & COMPONENTS 8 7.5 8 0.783 0.1256 0.0984 17.90$ -$ -$ 2,254,711$ -$
SITE PLAYGROUNDS & ATHLETICS 6 6 6 0.600 0.0193 0.0116 5.51$ -$ -$ -$ 86,720$
PRELIMINARY FACILITY CONDITION INDEX 0.6224 1,867,941$ 466,552$ 11,948,233$ 2,014,497$
Remarks: 16,297,223$
1
2
3
4
5
6
7
8
9
10
Norfolk Technical Center
2002 - New Elevator
2007 - Lighting / Ceiling Upgrade
2007 - Chiller Replacement
2012 - Roof Replacement
8/14/2017
![Page 14: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/14.jpg)
School Site:
School Building Date: 1939 Assessment Date: 292,294 Building Area
Total Renovation & Additions: 1998
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[HS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 5 5 5 0.500 0.0518 0.0259 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 5 5 5 0.500 0.1067 0.0534 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 5 5 5 0.500 0.0549 0.0274 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 5 5 5 0.500 0.0778 0.0389 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 6.5 6.5 6 0.633 0.0477 0.0302 15.22$ -$ -$ -$ 4,448,083$
DOOR SYSTEMS 4.5 5 4 0.450 0.0120 0.0054 3.81$ -$ -$ -$ -$
WINDOW SYSTEMS 5 4.5 4 0.450 0.0346 0.0156 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 6.5 6.5 6.5 0.650 0.0231 0.0150 8.29$ -$ -$ -$ 2,423,300$
INTERIOR WALL SYSTEMS 5 7.5 5 0.583 0.0260 0.0152 0.74$ -$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 5 6.5 7 0.617 0.0033 0.0021 1.06$ -$ -$ -$ 309,957$
INTERIOR CEILING SYSTEMS 5 6.5 6 0.583 0.0046 0.0027 1.46$ -$ -$ -$ -$
SPECIALTIES COMPONENTS 5 5.5 6 0.550 0.0203 0.0111 6.46$ -$ -$ -$ -$
EQUIPMENT COMPONENTS 5 4.5 4 0.450 0.0171 0.0077 5.44$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 5 5 4 0.467 0.0335 0.0156 10.69$ -$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 5 6 5 0.533 0.0518 0.0276 16.53$ -$ -$ -$ -$
ELEVATOR SYSTEMS 5 5.5 5 0.517 0.0022 0.0011 0.69$ -$ -$ -$ -$
FIRE PROTECTION SYSTEMS 5 4.5 4 0.450 0.0097 0.0044 3.10$ -$ -$ -$ -$
PLUMBING SYSTEMS 5 4.5 6.5 0.533 0.0350 0.0187 11.17$ -$ -$ -$ -$
HVAC SYSTEMS 5.5 6 6 0.583 0.1296 0.0756 41.32$ -$ -$ -$ -$
ELECTRICAL SYSTEMS 5 4.5 5 0.483 0.0648 0.0313 20.66$ -$ -$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 6 6 7 0.633 0.0294 0.0186 9.36$ -$ -$ -$ 2,737,282$
SITE SYSTEMS & COMPONENTS 5 6 6 0.567 0.1296 0.0734 20.66$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 6 5 7 0.600 0.0346 0.0207 11.02$ -$ -$ -$ 1,610,166$
PRELIMINARY FACILITY CONDITION INDEX 0.5377 -$ -$ -$ 11,528,787$
Remarks: 11,528,787$
1
2
3
4
5
6
7
8
9
10
Granby High School
2014 - Security System Upgrades
2015 - New Chiller & Cooling Tower
8/25/2017
![Page 15: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/15.jpg)
School Site:
School Building Date: 2004 Assessment Date: 282,272 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[HS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 1.5 2 1.5 0.167 0.0518 0.0086 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 1.5 2 1.5 0.167 0.1067 0.0178 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 1.5 2 1.5 0.167 0.0549 0.0091 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 1.5 2 2.5 0.200 0.0778 0.0156 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 2 3 3 0.267 0.0477 0.0127 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 4 2.5 4 0.350 0.0120 0.0042 3.81$ -$ 107,681$ -$ -$
WINDOW SYSTEMS 3 2.5 3 0.283 0.0346 0.0098 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 3 3 4 0.333 0.0231 0.0077 8.29$ -$ -$ -$ -$
INTERIOR WALL SYSTEMS 3 3 2 0.267 0.0260 0.0069 0.74$ -$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 4 3 4 0.367 0.0033 0.0012 1.06$ -$ -$ -$ -$
INTERIOR CEILING SYSTEMS 3 3 3 0.300 0.0046 0.0014 1.46$ -$ -$ -$ -$
SPECIALTIES COMPONENTS 5 5.5 5 0.517 0.0203 0.0105 6.46$ -$ -$ -$ -$
EQUIPMENT COMPONENTS 3 3.5 2.5 0.300 0.0171 0.0051 5.44$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 3 3.5 3 0.317 0.0335 0.0106 10.69$ -$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 3 3 3 0.300 0.0518 0.0156 16.53$ -$ -$ -$ -$
ELEVATOR SYSTEMS 3 2.5 3 0.283 0.0022 0.0006 0.69$ -$ -$ -$ -$
FIRE PROTECTION SYSTEMS 3 3 3 0.300 0.0097 0.0029 3.10$ -$ -$ -$ -$
PLUMBING SYSTEMS 3 3 3 0.300 0.0350 0.0105 11.17$ -$ -$ -$ -$
HVAC SYSTEMS 3 3.5 3 0.317 0.1296 0.0410 41.32$ -$ 583,109$ -$ -$
ELECTRICAL SYSTEMS 3 3.5 3 0.317 0.0648 0.0205 20.66$ -$ -$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 3 3.5 3 0.317 0.0294 0.0093 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 3 3 3 0.300 0.1296 0.0389 20.66$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 2 3 3 0.267 0.0346 0.0092 11.02$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.2698 -$ 690,790$ -$ -$
Remarks: 690,790$
1
2
3
4
5
6
7
8
9
10
Norview High School
2 of 4 Chlllers are + 20 years old
Exterior Metal Doors are in poor condition
8/25/2017
![Page 16: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/16.jpg)
School Site:
School Building Date: 1961 Assessment Date: 120,374 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[MS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 7 6 0.667 0.0545 0.0364 1.65$ -$ -$ -$ 198,932$
STRUCTURAL WALL / FRAME SYSTEMS 8 7 6 0.700 0.1123 0.0786 3.40$ -$ -$ 409,634$ -$
STRUCTURAL ROOF SYSTEMS 5 8 5 0.600 0.0577 0.0346 1.75$ -$ -$ -$ 210,536$
EXTERIOR WALL SYSTEMS 8 7 8 0.767 0.0818 0.0627 2.48$ -$ -$ 298,398$ -$
ROOFING SYSTEMS 8 9 9 0.867 0.0502 0.0435 15.22$ -$ 1,831,832$ -$ -$
DOOR SYSTEMS 9 9 9 0.900 0.0126 0.0113 3.81$ 459,201$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0364 0.0364 11.02$ 1,326,213$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 7 9 0.800 0.0274 0.0219 8.29$ -$ 997,976$ -$ -$
INTERIOR WALL SYSTEMS 9 9 9 0.900 0.0243 0.0219 0.74$ 88,691$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 8 7 8 0.767 0.0035 0.0027 1.06$ -$ -$ 127,648$ -$
INTERIOR CEILING SYSTEMS 8 8 9 0.833 0.0048 0.0040 1.46$ -$ 175,723$ -$ -$
SPECIALTIES COMPONENTS 10 8 10 0.933 0.0168 0.0157 5.08$ 611,716$ -$ -$ -$
EQUIPMENT COMPONENTS 6 5 5 0.533 0.0134 0.0072 4.06$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 10 10 1.000 0.0262 0.0262 7.93$ 954,874$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 6 7 6 0.633 0.0455 0.0288 13.77$ -$ -$ -$ 1,657,767$
ELEVATOR SYSTEMS 10 10 10 1.000 0.0023 0.0023 0.69$ 82,888$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0102 3.10$ -$ -$ 372,997$ -$
PLUMBING SYSTEMS 8 7 8 0.767 0.0369 0.0283 11.17$ -$ -$ 1,344,449$ -$
HVAC SYSTEMS 9 9 9 0.900 0.1364 0.1227 41.32$ 3,978,640$ -$ -$ -$
ELECTRICAL SYSTEMS 9 8 9 0.867 0.0614 0.0532 1/2 18.59$ 1,118,992$ 1,118,992$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 5 6 5 0.533 0.0309 0.0165 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 3 5 4 0.400 0.1273 0.0509 19.28$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 6 7 7 0.667 0.0273 0.0182 8.26$ -$ -$ -$ 994,660$
PRELIMINARY FACILITY CONDITION INDEX 0.7239 8,621,215$ 4,124,523$ 2,553,126$ 3,061,895$
Remarks: 18,360,760$
1
2
3 2014 - New Gym Bleachers
4
5
6
7
8
9
10
Azalea Gardens Middle School
2006 - Auditorium HVAC Replacement
2011-12 - Parking Lot Replacement
2016 - Gym HVAC Replacement
No Mechanical Fresh Air ventilation in Classrooms
2 story building requires Elevator for ADA compliance
Metal Roof Retrofit +/- 26 years old and has many leaks
5/16/2017
![Page 17: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/17.jpg)
School Site:
School Building Date: 1959 Assessment Date: 126,028 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[MS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 6 6 0.633 0.0545 0.0345 1.65$ -$ -$ -$ 208,276$
STRUCTURAL WALL / FRAME SYSTEMS 6 6 6 0.600 0.1123 0.0674 3.40$ -$ -$ -$ 428,875$
STRUCTURAL ROOF SYSTEMS 6 6 6 0.600 0.0577 0.0346 1.75$ -$ -$ -$ 220,425$
EXTERIOR WALL SYSTEMS 7 6 8 0.700 0.0818 0.0573 2.48$ -$ -$ 312,414$ -$
ROOFING SYSTEMS 10 10 9.5 0.983 0.0502 0.0494 15.22$ 1,917,874$ -$ -$ -$
DOOR SYSTEMS 8 9 8 0.833 0.0126 0.0105 3.81$ -$ 1,044,851$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0364 0.0364 11.02$ 1,388,506$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 7 6 7 0.667 0.0274 0.0182 8.29$ -$ -$ -$ 1,044,851$
INTERIOR WALL SYSTEMS 6 7 6 0.633 0.0243 0.0154 0.74$ -$ -$ -$ 92,856$
INTERIOR WALL FINISH SYSTEMS 6 7 7 0.667 0.0035 0.0023 1.06$ -$ -$ -$ 133,644$
INTERIOR CEILING SYSTEMS 7 6 7 0.667 0.0048 0.0032 1.46$ -$ -$ -$ 183,977$
SPECIALTIES COMPONENTS 7 9 8 0.800 0.0168 0.0134 5.08$ -$ 640,448$ -$ -$
EQUIPMENT COMPONENTS 5 6 5 0.533 0.0134 0.0072 4.06$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 9 9 8 0.867 0.0262 0.0227 7.93$ -$ 999,724$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 7 6 7 0.667 0.0455 0.0303 13.77$ -$ -$ -$ 1,735,632$
NA ELEVATOR SYSTEMS 0.0023 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0102 3.10$ -$ 390,517$ -$ -$
PLUMBING SYSTEMS 5 5 4 0.467 0.0369 0.0172 11.17$ -$ -$ -$ -$
HVAC SYSTEMS 8 8 9 0.817 0.1364 0.1114 41.32$ -$ 5,206,897$ -$ -$
ELECTRICAL SYSTEMS 7 7 7 0.700 0.0614 0.0430 1/2 18.59$ -$ 1,171,552$ 1,171,552$ -$
ELECTRICAL SPECIAL SYSTEMS 5 5 5 0.500 0.0309 0.0155 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 7 7 8.5 0.750 0.1273 0.0955 19.28$ -$ -$ 2,429,885$ -$
SITE PLAYGROUNDS & ATHLETICS 7 8 8 0.767 0.0273 0.0209 8.26$ -$ -$ 1,041,379$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.7062 3,306,380$ 9,453,990$ 4,955,231$ 4,048,536$
Remarks: 21,764,136$
1
2
3
4
5
6
7
8
9
10
Rosemont Middle School
Approximately 15% of the facility contains Central Administrative Office Space
3 Classrooms dedicated to division-wide Special Education
7/27/2017
![Page 18: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/18.jpg)
School Site:
School Building Date: 1965 Assessment Date: 118,926 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[MS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 5 6 5 0.533 0.0545 0.0291 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 5 6 5 0.533 0.1123 0.0599 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 5 6 5 0.533 0.0577 0.0308 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 6 5 6 0.567 0.0818 0.0464 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 3 3 3 0.300 0.0502 0.0151 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 9 10 9 0.933 0.0126 0.0118 3.81$ 453,678$ -$ -$ -$
WINDOW SYSTEMS 10 9 10 0.967 0.0364 0.0352 11.02$ 1,310,260$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 7 6 7 0.667 0.0274 0.0182 8.29$ -$ -$ -$ 985,971$
INTERIOR WALL SYSTEMS 6 6 6 0.600 0.0243 0.0146 0.74$ -$ -$ -$ 87,624$
INTERIOR WALL FINISH SYSTEMS 7 7 7 0.700 0.0035 0.0025 1.06$ -$ -$ 126,113$ -$
INTERIOR CEILING SYSTEMS 7 8 7 0.733 0.0048 0.0035 1.46$ -$ -$ 173,609$ -$
SPECIALTIES COMPONENTS 7 8 8 0.767 0.0168 0.0129 5.08$ -$ -$ 604,357$ -$
EQUIPMENT COMPONENTS 5 5 5 0.500 0.0134 0.0067 4.06$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 7 7 7 0.700 0.0262 0.0183 7.93$ -$ -$ 943,387$ -$
FURNISHINGS [LOOSE] COMPONENTS 7 6 7 0.667 0.0455 0.0303 13.77$ -$ -$ -$ 1,637,825$
ELEVATOR SYSTEMS 10 10 10 1.000 0.0023 0.0023 0.69$ 81,891$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0102 3.10$ -$ -$ 368,511$ -$
PLUMBING SYSTEMS 7 7 7 0.700 0.0369 0.0258 11.17$ -$ -$ 1,328,276$ -$
HVAC SYSTEMS 9 9 9 0.900 0.1364 0.1227 41.32$ 4,913,475$ -$ -$ -$
ELECTRICAL SYSTEMS 9 9 9 0.900 0.0614 0.0552 18.59$ 2,211,064$ -$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 6 5 5 0.533 0.0309 0.0165 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 8 9 7 0.800 0.1273 0.1018 19.28$ -$ 2,292,955$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 8 9 8 0.833 0.0273 0.0227 8.26$ -$ 982,695$ -$ -$
-$
PRELIMINARY FACILITY CONDITION INDEX 0.6822 8,970,368$ 3,275,650$ 3,544,253$ 2,711,419$
Remarks: 18,501,691$
1
2
3
4
5
6
7
8
9
10
Lake Taylor Middle School
2004 - Chiller Replacement
2010 - Partial Roof Replacement
2012-14 - Exterior Masonry Repairs
2014 - Gym Bleacher Replacement
2 story building requires Elevator for ADA compliance
Facility is used as an Emergency Shelter
5/24/2017
![Page 19: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/19.jpg)
School Site:
School Building Date: 1956 Assessment Date: 122,675 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[MS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 7 7 0.700 0.0545 0.0382 1.65$ -$ -$ 202,735$ -$
STRUCTURAL WALL / FRAME SYSTEMS 7 7 7 0.700 0.1123 0.0786 3.40$ -$ -$ 417,464$ -$
STRUCTURAL ROOF SYSTEMS 6 7 6 0.633 0.0577 0.0366 1.75$ -$ -$ -$ 214,561$
EXTERIOR WALL SYSTEMS 7 7 7 0.700 0.0818 0.0573 2.48$ -$ -$ 304,102$ -$
ROOFING SYSTEMS 2 2 1 0.167 0.0502 0.0084 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 9 10 9 0.933 0.0126 0.0118 3.81$ 467,979$ -$ -$ -$
WINDOW SYSTEMS 9 10 10 0.967 0.0364 0.0352 11.02$ 1,351,564$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 9 8 0.833 0.0274 0.0228 8.29$ -$ 1,017,052$ -$ -$
INTERIOR WALL SYSTEMS 8 8 8 0.800 0.0243 0.0195 0.74$ -$ 90,386$ -$ -$
INTERIOR WALL FINISH SYSTEMS 8 8 9 0.833 0.0035 0.0029 1.06$ -$ 130,088$ -$ -$
INTERIOR CEILING SYSTEMS 9 7 9 0.833 0.0048 0.0040 1.46$ -$ 179,082$ -$ -$
SPECIALTIES COMPONENTS 8 7 9 0.800 0.0168 0.0134 5.08$ -$ 623,409$ -$ -$
EQUIPMENT COMPONENTS 7 6 6 0.633 0.0134 0.0085 4.06$ -$ -$ -$ 498,389$
FURNISHINGS [BUILT-IN] COMPONENTS 10 10 10 1.000 0.0262 0.0262 7.93$ 973,126$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 7 6 6 0.633 0.0455 0.0288 13.77$ -$ -$ -$ 1,689,456$
ELEVATOR SYSTEMS 10 10 10 1.000 0.0023 0.0023 0.69$ 84,473$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0102 3.10$ -$ 380,128$ -$ -$
PLUMBING SYSTEMS 8 9 9 0.867 0.0369 0.0319 11.17$ -$ 1,370,148$ -$ -$
HVAC SYSTEMS 7 8 7 0.733 0.1364 0.1000 41.32$ -$ -$ 5,068,367$ -$
ELECTRICAL SYSTEMS 6 5 6 0.567 0.0614 0.0348 1/2 18.59$ -$ -$ 1,140,383$ -$
ELECTRICAL SPECIAL SYSTEMS 6 7 7 0.667 0.0309 0.0206 9.36$ -$ -$ -$ 1,148,830$
SITE SYSTEMS & COMPONENTS 4 3 4 0.367 0.1273 0.0467 19.28$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 8 6 7 0.700 0.0273 0.0191 8.26$ -$ -$ 1,013,673$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.6474 2,877,143$ 3,790,294$ 8,146,724$ 3,551,236$
Remarks: 18,365,396$
1
2
3
4
5
6
7
8
9
10
Northside Middle School
2007 - New Parking Lot
2007 - Gym & Stage Floor Replacement
May be in NAS Flight Accident Potential Zone - Need to verify
2 story building requires Elevator for ADA compliance
2009 - Electrical Upgrade
2012 - Canopy Replacements
2012 - Exterior Masonry Repairs
Asbestos ceilings in Classrooms and 2nd floor Corridor
Moisture intrusion through exterior walls still evident
Stepped "thrones" in Boys' Restrooms?
6/13/2017
![Page 20: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/20.jpg)
School Site:
School Building Date: 1994 Assessment Date: 146,000 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[MS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 3 3 3 0.300 0.0545 0.0164 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 4 5 4 0.433 0.1123 0.0487 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 3 3 3 0.300 0.0577 0.0173 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 3 3 3 0.300 0.0818 0.0245 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 7 8 7 0.733 0.0502 0.0368 15.22$ -$ -$ 2,221,804$ -$
DOOR SYSTEMS 5 6 6 0.567 0.0126 0.0071 3.81$ -$ -$ -$ -$
WINDOW SYSTEMS 4 5 4.5 0.450 0.0364 0.0164 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 4 5 5 0.467 0.0274 0.0128 8.29$ -$ -$ -$ -$
INTERIOR WALL SYSTEMS 5 6 4 0.500 0.0243 0.0122 0.74$ -$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 5 6 6 0.567 0.0035 0.0020 1.06$ -$ -$ -$ -$
INTERIOR CEILING SYSTEMS 7 7 7 0.700 0.0048 0.0034 1.46$ -$ -$ 213,132$ -$
SPECIALTIES COMPONENTS 7 7 7 0.700 0.0168 0.0117 5.08$ -$ -$ 741,942$ -$
EQUIPMENT COMPONENTS 4 4 5 0.433 0.0134 0.0058 4.06$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 6 6 6 0.600 0.0262 0.0157 7.93$ -$ -$ -$ 1,158,153$
FURNISHINGS [LOOSE] COMPONENTS 6 7 6 0.633 0.0455 0.0288 13.77$ -$ -$ -$ 2,010,683$
ELEVATOR SYSTEMS 7 7 7 0.700 0.0023 0.0016 0.69$ -$ -$ 50,267$ -$
FIRE PROTECTION SYSTEMS 4 5 4 0.433 0.0102 0.0044 3.10$ -$ -$ 452,404$ -$
PLUMBING SYSTEMS 6 5 6 0.567 0.0369 0.0209 11.17$ -$ -$ -$ -$
HVAC SYSTEMS 7 7 7 0.700 0.1364 0.0955 41.32$ -$ -$ 6,032,048$ -$
ELECTRICAL SYSTEMS 5 5 5 0.500 0.0614 0.0307 1/2 18.59$ -$ -$ 1,357,211$ -$
ELECTRICAL SPECIAL SYSTEMS 5 5 5 0.500 0.0309 0.0155 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 5 5 6 0.533 0.1273 0.0679 19.28$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 5 5 6 0.533 0.0273 0.0145 8.26$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.5105 -$ -$ 11,068,809$ 3,168,836$
Remarks: 14,237,645$
1
2
3
4
5
6
7
8
9
10
Ruffner Middle School
2007 - Cooling Tower Replacement
2013 - Gym Floor Replacement
8/1/2017
![Page 21: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/21.jpg)
School Site:
School Building Date: 1991 Assessment Date: 140,000 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[MS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 3 3 3 0.300 0.0545 0.0164 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 3 3 3 0.300 0.1123 0.0337 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 3 3 3 0.300 0.0577 0.0173 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 3 4 3 0.333 0.0818 0.0273 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 6 8 6 0.667 0.0502 0.0335 15.22$ -$ -$ -$ 2,130,497$
DOOR SYSTEMS 5 6 6 0.567 0.0126 0.0071 3.81$ -$ -$ -$ -$
WINDOW SYSTEMS 5 7 6 0.600 0.0364 0.0218 11.02$ -$ -$ -$ 1,542,442$
INTERIOR FLOORING SYSTEMS 7 7 8 0.733 0.0274 0.0201 8.29$ -$ -$ -$ 1,160,687$
INTERIOR WALL SYSTEMS 4 5 4 0.433 0.0243 0.0105 0.74$ -$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 5 6 6 0.567 0.0035 0.0020 1.06$ -$ -$ -$ -$
INTERIOR CEILING SYSTEMS 5 8 5 0.600 0.0048 0.0029 1.46$ -$ -$ -$ 204,374$
SPECIALTIES COMPONENTS 6 7.5 7 0.683 0.0168 0.0115 5.08$ -$ -$ -$ 711,451$
EQUIPMENT COMPONENTS 5 5 5 0.500 0.0134 0.0067 4.06$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 4 4 5 0.433 0.0262 0.0113 7.93$ -$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 3 5 5 0.433 0.0455 0.0197 13.77$ -$ -$ -$ -$
ELEVATOR SYSTEMS 7 5 7 0.633 0.0023 0.0014 0.69$ -$ -$ -$ 96,403$
FIRE PROTECTION SYSTEMS 5 5 5 0.500 0.0102 0.0051 3.10$ -$ -$ -$ -$
PLUMBING SYSTEMS 7 6.5 6 0.650 0.0369 0.0240 11.17$ -$ -$ -$ 1,563,650$
HVAC SYSTEMS 6 7 8 0.700 0.1364 0.0955 41.32$ -$ -$ 5,784,156$ -$
ELECTRICAL SYSTEMS 4 5 6 0.500 0.0614 0.0307 1/2 18.59$ -$ -$ 1,301,435$ -$
ELECTRICAL SPECIAL SYSTEMS 5 5 4 0.467 0.0309 0.0144 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 6 7 6 0.633 0.1273 0.0806 19.28$ -$ -$ -$ 2,699,273$
SITE PLAYGROUNDS & ATHLETICS 3 4 4 0.367 0.0273 0.0100 8.26$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.5035 -$ -$ 7,085,591$ 10,108,777$
Remarks: 17,194,368$
1
2
3
4
5
6
7
8
9
10
Discovery at Lakewood 3-8 [Lafayette Winona] School
2003 - Electrical Upgrade
2016 - Cooling Tower Replacement
2017 - Fire Alarm Panel Replacement
2017 - New Playground
Limited Area Sprinkler at Atrium / Lobby
8/7/2017
![Page 22: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/22.jpg)
School Site:
School Building Date: 1995 Assessment Date: 152,000 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[MS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 2 3 2 0.233 0.0545 0.0127 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 2 3 2 0.233 0.1123 0.0262 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 2 3 2 0.233 0.0577 0.0135 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 3 3 3.5 0.317 0.0818 0.0259 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 5 5 5 0.500 0.0502 0.0251 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 5 6 6 0.567 0.0126 0.0071 3.81$ -$ -$ -$ -$
WINDOW SYSTEMS 5 5 5 0.500 0.0364 0.0182 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 6 6 6 0.600 0.0274 0.0164 8.29$ -$ -$ -$ 1,260,175$
INTERIOR WALL SYSTEMS 3 3 4 0.333 0.0243 0.0081 0.74$ -$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 7 7 7 0.700 0.0035 0.0025 1.06$ -$ -$ 161,185$ -$
INTERIOR CEILING SYSTEMS 7 7 7 0.700 0.0048 0.0034 1.46$ -$ -$ 221,891$ -$
SPECIALTIES COMPONENTS 6 6 6 0.600 0.0168 0.0101 5.08$ -$ -$ -$ 772,433$
EQUIPMENT COMPONENTS 5 4 5 0.467 0.0134 0.0063 4.06$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 6 6 6 0.600 0.0262 0.0157 7.93$ -$ -$ -$ 1,205,749$
FURNISHINGS [LOOSE] COMPONENTS 5 5 5 0.500 0.0455 0.0227 13.77$ -$ -$ -$ -$
ELEVATOR SYSTEMS 6 6 6 0.600 0.0023 0.0014 0.69$ -$ -$ -$ 104,666$
FIRE PROTECTION SYSTEMS 3 3 3 0.300 0.0102 0.0031 3.10$ -$ -$ -$ -$
PLUMBING SYSTEMS 6 6 6 0.600 0.0369 0.0221 11.17$ -$ -$ -$ 1,697,677$
HVAC SYSTEMS 7 7 7 0.700 0.1364 0.0955 41.32$ -$ -$ 6,279,941$ -$
ELECTRICAL SYSTEMS 5 5 5 0.500 0.0614 0.0307 1/2 18.59$ -$ -$ 1,412,987$ -$
ELECTRICAL SPECIAL SYSTEMS 8 7 8 0.767 0.0309 0.0237 9.36$ -$ -$ 1,423,453$ -$
SITE SYSTEMS & COMPONENTS 6 7 7.5 0.683 0.1273 0.0870 19.28$ -$ -$ -$ 2,930,639$
SITE PLAYGROUNDS & ATHLETICS 5 6 5 0.533 0.0273 0.0145 8.26$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.4918 -$ -$ 9,499,457$ 7,971,338$
Remarks: 17,470,795$
1
2
3
4
5
6
7
8
9
10
Norview Middle School
7/27/2017
![Page 23: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/23.jpg)
School Site:
School Building Date: 1922 Assessment Date: 241,597 Building Area
Total Renovation & Additions: 2007
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[MS]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 5 4 4 0.433 0.0545 0.0236 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 5 4 4 0.433 0.1123 0.0487 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 5 4 4 0.433 0.0577 0.0250 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 4 4 4 0.400 0.0818 0.0327 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 4 4 4 0.400 0.0502 0.0201 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 2 2 2 0.200 0.0126 0.0025 3.81$ -$ -$ -$ -$
WINDOW SYSTEMS 2 2 2 0.200 0.0364 0.0073 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 3 3 3 0.300 0.0274 0.0082 8.29$ -$ -$ -$ -$
INTERIOR WALL SYSTEMS 3 3 3 0.300 0.0243 0.0073 0.74$ -$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 3 3 4 0.333 0.0035 0.0012 1.06$ -$ -$ -$ -$
INTERIOR CEILING SYSTEMS 3 3 3 0.300 0.0048 0.0014 1.46$ -$ -$ -$ -$
SPECIALTIES COMPONENTS 3 3.5 3 0.317 0.0168 0.0053 5.08$ -$ -$ -$ -$
EQUIPMENT COMPONENTS 3 3.5 2 0.283 0.0134 0.0038 4.06$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 3 3 3 0.300 0.0262 0.0079 7.93$ -$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 3 3 3 0.300 0.0455 0.0136 13.77$ -$ -$ -$ -$
ELEVATOR SYSTEMS 3 3.5 3 0.317 0.0023 0.0007 0.69$ -$ -$ -$ -$
FIRE PROTECTION SYSTEMS 2 3 2 0.233 0.0102 0.0024 3.10$ -$ -$ -$ -$
PLUMBING SYSTEMS 3 3.5 3 0.317 0.0369 0.0117 11.17$ -$ -$ -$ -$
HVAC SYSTEMS 3.5 3.5 3.5 0.350 0.1364 0.0477 41.32$ -$ -$ -$ -$
ELECTRICAL SYSTEMS 3 3 3 0.300 0.0614 0.0184 18.59$ -$ -$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 3 3 3 0.300 0.0309 0.0093 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 3 3.5 3 0.317 0.1273 0.0403 19.28$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 4 3.5 3 0.350 0.0273 0.0095 8.26$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.3487 -$ -$ -$ -$
Remarks: -$
1
2
3
4
5
6
7
8
9
10
Blair Middle School
8/24/2017
![Page 24: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/24.jpg)
School Site:
School Building Date: 1957 Assessment Date: 77,325 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 8 7 0.733 0.0580 0.0425 1.65$ -$ -$ 127,789$ -$
STRUCTURAL WALL / FRAME SYSTEMS 8 8 8 0.800 0.1194 0.0955 3.40$ -$ 263,138$ -$ -$
STRUCTURAL ROOF SYSTEMS 8 7 7 0.733 0.0614 0.0450 1.75$ -$ -$ 135,243$ -$
EXTERIOR WALL SYSTEMS 9 9 9 0.900 0.0870 0.0783 2.48$ 191,683$ -$ -$ -$
ROOFING SYSTEMS 10 10 10 1.000 0.0534 0.0534 15.22$ 1,176,719$ -$ -$ -$
DOOR SYSTEMS 10 9 9 0.933 0.0134 0.0125 3.81$ 294,979$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 851,924$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 9 8 9 0.867 0.0258 0.0224 8.29$ -$ 641,072$ -$ -$
INTERIOR WALL SYSTEMS 9 7 8 0.800 0.0291 0.0233 0.74$ -$ 56,972$ -$ -$
INTERIOR WALL FINISH SYSTEMS 9 7 8 0.800 0.0037 0.0030 1.06$ -$ 81,998$ -$ -$
INTERIOR CEILING SYSTEMS 8 9 9 0.867 0.0051 0.0044 1.46$ -$ 112,880$ -$ -$
SPECIALTIES COMPONENTS 9 7 9 0.833 0.0130 0.0108 3.70$ -$ 286,459$ -$ -$
EQUIPMENT COMPONENTS 6 6 6 0.600 0.0094 0.0057 2.69$ -$ -$ -$ 207,656$
FURNISHINGS [BUILT-IN] COMPONENTS 10 9 10 0.967 0.0182 0.0176 5.18$ 400,404$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 8 8 8 0.800 0.0338 0.0271 9.64$ -$ 745,433$ -$ -$
ELEVATOR SYSTEMS 10 10 10 1.000 0.0024 0.0024 0.69$ 53,245$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 239,603$ -$
PLUMBING SYSTEMS 8 7 8 0.767 0.0392 0.0300 11.17$ -$ -$ 863,637$ -$
HVAC SYSTEMS 9 9 9 0.900 0.1449 0.1304 41.32$ 3,194,713$ -$ -$ -$
ELECTRICAL SYSTEMS 8 7 8 0.767 0.0556 0.0426 1/2 15.84$ 612,320$ -$ 612,320$ -$
ELECTRICAL SPECIAL SYSTEMS 6 6 6 0.600 0.0329 0.0197 9.36$ -$ -$ -$ 724,135$
SITE SYSTEMS & COMPONENTS 8 7 7 0.733 0.1256 0.0921 17.90$ -$ -$ 1,384,376$ -$
SITE PLAYGROUNDS & ATHLETICS 6 4 6 0.533 0.0193 0.0103 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.8076 6,775,987$ 2,187,953$ 3,362,968$ 931,791$
Remarks: 13,258,699$
1
2
3
4
5
6
7
8
9
10
Larrymore Elementary School
2000 - Parking Lot Renovations
2016 - Hard Surface Playground Replacement
No Mechanical Fresh Air Ventilation in Classrooms
2 story building requires Elevator for ADA compliance
5/24/2017
![Page 25: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/25.jpg)
School Site:
School Building Date: 1952 Assessment Date: 65,100 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 8 7 8 0.767 0.0580 0.0444 1.65$ -$ -$ 107,585$ -$
STRUCTURAL WALL / FRAME SYSTEMS 8 9 7 0.800 0.1194 0.0955 3.40$ -$ 221,536$ -$ -$
STRUCTURAL ROOF SYSTEMS 8 7 7 0.733 0.0614 0.0450 1.75$ -$ -$ 113,861$ -$
EXTERIOR WALL SYSTEMS 8 7 7 0.733 0.0870 0.0638 2.48$ -$ -$ 161,378$ -$
ROOFING SYSTEMS 10 10 10 1.000 0.0534 0.0534 15.22$ 990,681$ -$ -$
DOOR SYSTEMS 10 10 10 1.000 0.0134 0.0134 3.81$ 248,343$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 717,235$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 9 9 0.867 0.0291 0.0252 8.29$ -$ 539,720$ -$ -$
INTERIOR WALL SYSTEMS 8 8 8 0.800 0.0258 0.0207 0.74$ -$ 47,965$ -$ -$
INTERIOR WALL FINISH SYSTEMS 8 8 9 0.833 0.0037 0.0031 1.06$ -$ 69,034$ -$ -$
INTERIOR CEILING SYSTEMS 9 8 9 0.867 0.0051 0.0044 1.46$ -$ 95,034$ -$ -$
SPECIALTIES COMPONENTS 10 8 9 0.900 0.0130 0.0117 3.70$ 241,170$ -$ -$ -$
EQUIPMENT COMPONENTS 8 6 7 0.700 0.0094 0.0066 2.69$ -$ -$ 174,826$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 10 10 1.000 0.0182 0.0182 5.18$ 337,101$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 9 8 9 0.867 0.0338 0.0293 9.64$ -$ 627,581$ -$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ 201,722$ -$ -$
PLUMBING SYSTEMS 9 9 8 0.867 0.0392 0.0340 11.17$ -$ 727,097$ -$ -$
HVAC SYSTEMS 8 8 7.5 0.783 0.1449 0.1135 41.32$ -$ -$ 2,689,633$ -$
ELECTRICAL SYSTEMS 6 7 6 0.633 0.0556 0.0352 1/2 15.84$ -$ -$ 515,513$ 515,513$
ELECTRICAL SPECIAL SYSTEMS 8 6 7 0.700 0.0329 0.0230 9.36$ -$ -$ 609,650$ -$
SITE SYSTEMS & COMPONENTS 9 8 8.5 0.850 0.1256 0.1068 17.90$ -$ 1,165,507$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 7 7 7 0.700 0.0193 0.0135 5.51$ -$ -$ 358,618$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.7993 2,534,530$ 3,695,196$ 4,731,064$ 515,513$
Remarks: 11,476,303$
1
2
3
4
5
6
7
8
9
10
Calcott Elementary School
8/2/2017
Built-up roof appears to be original (65 years old)
~60% of Ceiling contains Asbestos
![Page 26: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/26.jpg)
School Site:
School Building Date: 1952 Assessment Date: 65,100 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 7 7 0.700 0.0580 0.0406 1.65$ -$ -$ 107,585$ -$
STRUCTURAL WALL / FRAME SYSTEMS 7 8 7 0.733 0.1194 0.0875 3.40$ -$ -$ 221,536$ -$
STRUCTURAL ROOF SYSTEMS 7 7 7 0.700 0.0614 0.0429 1.75$ -$ -$ 113,861$ -$
EXTERIOR WALL SYSTEMS 7 7 7 0.700 0.0870 0.0609 2.48$ -$ -$ 161,378$ -$
ROOFING SYSTEMS 10 10 10 1.000 0.0534 0.0534 15.22$ 990,681$ -$ -$
DOOR SYSTEMS 9 10 10 0.967 0.0134 0.0129 3.81$ 248,343$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 717,235$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 7 9 8 0.800 0.0291 0.0233 8.29$ -$ 539,720$ -$ -$
INTERIOR WALL SYSTEMS 7 8 8 0.767 0.0258 0.0198 0.74$ -$ -$ 47,965$ -$
INTERIOR WALL FINISH SYSTEMS 7 8 8 0.767 0.0037 0.0029 1.06$ -$ -$ 69,034$ -$
INTERIOR CEILING SYSTEMS 9 8 9 0.867 0.0051 0.0044 1.46$ -$ 95,034$ -$ -$
SPECIALTIES COMPONENTS 9 7 9 0.833 0.0130 0.0108 3.70$ -$ 241,170$ -$ -$
EQUIPMENT COMPONENTS 5 6 5 0.533 0.0094 0.0050 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 8 10 10 0.933 0.0182 0.0170 5.18$ 337,101$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 8 8 9 0.833 0.0338 0.0282 9.64$ -$ 627,581$ -$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ 201,722$ -$ -$
PLUMBING SYSTEMS 8 9 8 0.833 0.0392 0.0327 11.17$ -$ 727,097$ -$ -$
HVAC SYSTEMS 7 8 7.5 0.750 0.1449 0.1087 41.32$ -$ -$ 2,689,633$ -$
ELECTRICAL SYSTEMS 10 10 10 1.000 0.0556 0.0556 1/2 15.84$ 515,513$ -$ 515,513$ -$
ELECTRICAL SPECIAL SYSTEMS 8 6 7 0.700 0.0329 0.0230 9.36$ -$ -$ 609,650$ -$
SITE SYSTEMS & COMPONENTS 8 8 7 0.767 0.1256 0.0963 17.90$ -$ -$ 1,165,507$ -$
SITE PLAYGROUNDS & ATHLETICS 8 7 7 0.733 0.0193 0.0142 5.51$ -$ -$ 358,618$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.7787 2,808,873$ 2,432,324$ 6,060,280$ -$
Remarks: 11,301,477$
1
2
3
4
5
6
7
8
9
10
Willard Elementary School - 1952 Original Building
Built-up roof appears to be original (65 years old)
~60% of Ceiling contains Asbestos
8/2/2017
2003 - Parking Lot Renovation
2015 - Cooling Tower Replacement
![Page 27: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/27.jpg)
School Site:
School Building Date: 1954 Assessment Date: 55,325 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 7 7 0.700 0.0580 0.0406 1.65$ -$ -$ 91,431$ -$
STRUCTURAL WALL / FRAME SYSTEMS 7 7 7 0.700 0.1194 0.0836 3.40$ -$ -$ 188,272$ -$
STRUCTURAL ROOF SYSTEMS 7 7 7 0.700 0.0614 0.0429 1.75$ -$ -$ 96,764$ -$
EXTERIOR WALL SYSTEMS 10 10 10 1.000 0.0870 0.0870 2.48$ 1,028,599$ -$ -$ -$
ROOFING SYSTEMS 10 10 9.5 0.983 0.0534 0.0525 15.22$ 841,927$ -$ -$ -$
DOOR SYSTEMS 7 6.5 8 0.717 0.0134 0.0096 3.81$ -$ -$ 211,053$ -$
WINDOW SYSTEMS 4 5 4 0.433 0.0386 0.0167 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 8 8 0.800 0.0291 0.0233 8.29$ -$ 458,679$ -$ -$
INTERIOR WALL SYSTEMS 8 8 8 0.800 0.0258 0.0207 0.74$ -$ 40,763$ -$ -$
INTERIOR WALL FINISH SYSTEMS 8 8 9 0.833 0.0037 0.0031 1.06$ -$ 58,668$ -$ -$
INTERIOR CEILING SYSTEMS 8 9 8 0.833 0.0051 0.0043 1.46$ -$ 80,764$ -$ -$
SPECIALTIES COMPONENTS 9 10 10 0.967 0.0130 0.0126 3.70$ 204,958$ -$ -$ -$
EQUIPMENT COMPONENTS 8 6 6.5 0.683 0.0094 0.0064 2.69$ -$ -$ -$ 148,575$
FURNISHINGS [BUILT-IN] COMPONENTS 10 10 10 1.000 0.0182 0.0182 5.18$ 286,484$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 6 6 5 0.567 0.0338 0.0192 9.64$ -$ -$ -$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ 171,433$ -$ -$
PLUMBING SYSTEMS 8 8 9 0.833 0.0392 0.0327 11.17$ -$ 617,921$ -$ -$
HVAC SYSTEMS 8 8 8 0.800 0.1449 0.1159 41.32$ -$ 2,285,775$ -$ -$
ELECTRICAL SYSTEMS 7 7 6 0.667 0.0556 0.0370 1/2 15.84$ -$ 438,107$ -$ 438,107$
ELECTRICAL SPECIAL SYSTEMS 7 7 8 0.733 0.0329 0.0241 9.36$ -$ -$ 518,109$ -$
SITE SYSTEMS & COMPONENTS 10 9 9 0.933 0.1256 0.1172 17.90$ 990,502$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 5 4 4 0.433 0.0193 0.0084 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.7759 3,352,469$ 4,152,109$ 1,105,629$ 586,682$
Remarks: 9,196,890$
1
2
3
4
5
6
7
8
P. B. Young Elementary School
Maintenance replaces ~15 Insulated Glass Units per week
No Mechanical Fresh Air Ventilation in Classrooms
1994 - Electrical Systems Upgrade
~75% of Brick Veneer has failed
Severe Floodiing of North Classroom Wing
8/3/2017
2002 - Window Replacement
1954 Original Built-up Roof
![Page 28: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/28.jpg)
School Site:
School Building Date: 1954 Assessment Date: 58,500 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 7 8 0.733 0.0580 0.0425 1.65$ -$ -$ 96,678$ -$
STRUCTURAL WALL / FRAME SYSTEMS 8 8 8 0.800 0.1194 0.0955 3.40$ -$ 199,076$ -$ -$
STRUCTURAL ROOF SYSTEMS 7 7 7 0.700 0.0614 0.0429 1.75$ -$ -$ 102,318$ -$
EXTERIOR WALL SYSTEMS 8 8 7.5 0.783 0.0870 0.0681 2.48$ -$ -$ 145,017$ -$
ROOFING SYSTEMS 8 9 8.5 0.850 0.0534 0.0454 15.22$ -$ 890,244$ -$ -$
DOOR SYSTEMS 10 10 10 1.000 0.0134 0.0134 3.81$ 223,165$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 644,520$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 9 9 9 0.900 0.0291 0.0262 8.29$ 485,001$ -$ -$ -$
INTERIOR WALL SYSTEMS 8 8 9 0.833 0.0258 0.0215 0.74$ -$ 43,102$ -$ -$
INTERIOR WALL FINISH SYSTEMS 9 8 9 0.867 0.0037 0.0032 1.06$ -$ 62,035$ -$ -$
INTERIOR CEILING SYSTEMS 9 9 9 0.900 0.0051 0.0046 1.46$ 85,399$ -$ -$ -$
SPECIALTIES COMPONENTS 10 10 10 1.000 0.0130 0.0130 3.70$ 216,720$ -$ -$ -$
EQUIPMENT COMPONENTS 6 6 5.5 0.583 0.0094 0.0055 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 10 10 1.000 0.0182 0.0182 5.18$ 302,925$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 7 6.5 8 0.717 0.0338 0.0242 9.64$ -$ -$ 563,955$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ 181,271$ -$ -$
PLUMBING SYSTEMS 9 8 9 0.867 0.0392 0.0340 11.17$ -$ 653,382$ -$ -$
HVAC SYSTEMS 9 9 8 0.867 0.1449 0.1256 41.32$ -$ 2,416,951$ -$ -$
ELECTRICAL SYSTEMS 5 5 4 0.467 0.0556 0.0259 1/2 15.84$ -$ 463,249$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 7 8 7 0.733 0.0329 0.0241 9.36$ -$ -$ 547,842$ -$
SITE SYSTEMS & COMPONENTS 7 6 7 0.667 0.1256 0.0837 17.90$ -$ -$ -$ 1,047,345$
SITE PLAYGROUNDS & ATHLETICS 8 8 8 0.800 0.0193 0.0155 5.51$ -$ 322,260$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.7717 1,957,730$ 5,231,571$ 1,455,810$ 1,047,345$
Remarks: 9,692,456$
1
2
3
4
5
6
7 ~40% of Ceilings contain Asbestos Plaster
8 Site Drainage issues at SE corner of Classroom Wing
9 No Mechanical Fresh Air Ventilation to Classrooms
10
Ingleside Elementary School
Exterior CMU Structural issues in Gym
8/3/2017
1975 Classroom / Lobby Addition
2000 - Parking Lot Renovations
2011 - Partial Electrical Upgrade
2007 - Chller Replacement
2011 - Cafeteria & Kitchen Air Condiitoning
![Page 29: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/29.jpg)
School Site:
School Building Date: 1949 Assessment Date: 79,200 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 8 8 8 0.800 0.0580 0.0464 1.65$ -$ 130,887$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 7 8 7 0.733 0.1194 0.0875 3.40$ -$ -$ 269,519$ -$
STRUCTURAL ROOF SYSTEMS 7 8 7 0.733 0.0614 0.0450 1.75$ -$ -$ 138,522$ -$
EXTERIOR WALL SYSTEMS 8 7 8 0.767 0.0870 0.0667 2.48$ -$ -$ 196,331$ -$
ROOFING SYSTEMS 8 7 6 0.700 0.0534 0.0374 15.22$ -$ -$ 1,205,253$ -$
DOOR SYSTEMS 9 10 9 0.933 0.0134 0.0125 3.81$ 302,131$ -$ -$ -$
WINDOW SYSTEMS 6 6 7 0.633 0.0386 0.0245 11.02$ -$ -$ -$ 872,581$
INTERIOR FLOORING SYSTEMS 8 7 9 0.800 0.0291 0.0233 8.29$ -$ 656,617$ -$ -$
INTERIOR WALL SYSTEMS 6 6 9 0.700 0.0258 0.0181 0.74$ -$ -$ 58,354$ -$
INTERIOR WALL FINISH SYSTEMS 8 5 8 0.700 0.0037 0.0026 1.06$ -$ -$ 83,986$ -$
INTERIOR CEILING SYSTEMS 8 8 7 0.767 0.0051 0.0039 1.46$ -$ -$ 115,617$ -$
SPECIALTIES COMPONENTS 8 7 9 0.800 0.0130 0.0104 3.70$ -$ 293,405$ -$ -$
EQUIPMENT COMPONENTS 6 6 5 0.567 0.0094 0.0053 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 9 10 0.967 0.0182 0.0176 5.18$ 410,113$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 8 7 8 0.767 0.0338 0.0259 9.64$ -$ -$ 763,509$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ 54,536$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ 245,413$ -$ -$
PLUMBING SYSTEMS 8 9 8 0.833 0.0392 0.0327 11.17$ -$ 884,579$ -$ -$
HVAC SYSTEMS 9 8 9 0.867 0.1449 0.1256 41.32$ -$ 3,272,180$ -$ -$
ELECTRICAL SYSTEMS 9 10 10 0.967 0.0556 0.0537 15.84$ 1,254,336$ -$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 6 5 5 0.533 0.0329 0.0175 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 8 8 8 0.800 0.1256 0.1005 17.90$ -$ 1,417,945$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 7 8 6 0.700 0.0193 0.0135 5.51$ -$ -$ 436,291$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.7705 1,966,580$ 6,955,563$ 3,267,380$ 872,581$
Remarks: 13,062,105$
1
2
3
4
5
6
7
8
9
10
Jacox Elementary School
No Mechanical Fresh Air Ventilation in Classrooms
Major flooding in Mechanical/Electrical Basement
Originally built as a high school
5/17/2017
2012 - Gym HVAC Replacement
2014 - Gym Floor Replacement
![Page 30: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/30.jpg)
School Site:
School Building Date: 1967 Assessment Date: 58,400 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 7 7 0.700 0.0580 0.0406 1.65$ -$ -$ 96,513$ -$
STRUCTURAL WALL / FRAME SYSTEMS 7 6 7 0.667 0.1194 0.0796 3.40$ -$ -$ -$ 198,736$
STRUCTURAL ROOF SYSTEMS 6 6 6 0.600 0.0614 0.0368 1.75$ -$ -$ -$ 102,143$
EXTERIOR WALL SYSTEMS 7 7 7 0.700 0.0870 0.0609 2.48$ -$ -$ 144,769$ -$
ROOFING SYSTEMS 3 2 3 0.267 0.0534 0.0142 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 10 9 9 0.933 0.0134 0.0125 3.81$ 222,784$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 643,418$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 8 9 0.833 0.0291 0.0242 8.29$ -$ 484,172$ -$ -$
INTERIOR WALL SYSTEMS 7 8 7 0.733 0.0258 0.0190 0.74$ -$ -$ 43,029$ -$
INTERIOR WALL FINISH SYSTEMS 9 9 10 0.933 0.0037 0.0035 1.06$ 61,929$ -$ -$ -$
INTERIOR CEILING SYSTEMS 9 10 10 0.967 0.0051 0.0050 1.46$ 85,253$ -$ -$ -$
SPECIALTIES COMPONENTS 9 10 10 0.967 0.0130 0.0126 3.70$ 216,349$ -$ -$ -$
EQUIPMENT COMPONENTS 6 5 5 0.533 0.0094 0.0050 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 10 10 1.000 0.0182 0.0182 5.18$ 302,407$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 7 6 7 0.667 0.0338 0.0225 9.64$ -$ -$ -$ 562,991$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ 180,961$ -$ -$
PLUMBING SYSTEMS 8 9 9 0.867 0.0392 0.0340 11.17$ -$ 652,266$ -$ -$
HVAC SYSTEMS 10 10 10 1.000 0.1449 0.1449 41.32$ 2,412,819$ -$ -$ -$
ELECTRICAL SYSTEMS 8 8 9 0.833 0.0556 0.0463 1/2 15.84$ 462,457$ 462,457$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 9 8 9 0.867 0.0329 0.0285 9.36$ -$ 546,906$ -$ -$
SITE SYSTEMS & COMPONENTS 8 8 7 0.767 0.1256 0.0963 17.90$ -$ -$ 1,045,555$ -$
SITE PLAYGROUNDS & ATHLETICS 8 6 6 0.667 0.0193 0.0129 5.51$ -$ -$ -$ 321,709$
PRELIMINARY FACILITY CONDITION INDEX 0.7560 4,407,417$ 2,326,762$ 1,329,866$ 1,185,579$
Remarks: 9,249,623$
1
2
3
4
5
6
7
8
9
10
Willoughby Elementary School
2012 - Spray Foam Roof Replacement
Portable Chiller currently being leased at ~$12,000 per month
8/1/2017
![Page 31: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/31.jpg)
School Site:
School Building Date: 1959 Assessment Date: 37,500 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 6 6 6 0.600 0.0580 0.0348 1.65$ -$ -$ -$ 61,973$
STRUCTURAL WALL / FRAME SYSTEMS 6 6 6 0.600 0.1194 0.0716 3.40$ -$ -$ -$ 127,613$
STRUCTURAL ROOF SYSTEMS 6 6 6 0.600 0.0614 0.0368 1.75$ -$ -$ -$ 65,588$
EXTERIOR WALL SYSTEMS 6 7 7 0.667 0.0870 0.0580 2.48$ -$ -$ -$ 92,960$
ROOFING SYSTEMS 10 10 10 1.000 0.0534 0.0534 15.22$ 570,669$ -$ -$ -$
DOOR SYSTEMS 10 10 10 1.000 0.0134 0.0134 3.81$ 143,055$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 413,154$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 7 7 7 0.700 0.0291 0.0204 8.29$ -$ -$ 310,898$ -$
INTERIOR WALL SYSTEMS 7 7 7 0.700 0.0258 0.0181 0.74$ -$ -$ 27,630$ -$
INTERIOR WALL FINISH SYSTEMS 7 7 7 0.700 0.0037 0.0026 1.06$ -$ -$ 39,766$ -$
INTERIOR CEILING SYSTEMS 9 8.5 9 0.883 0.0051 0.0045 1.46$ -$ 54,743$ -$ -$
SPECIALTIES COMPONENTS 9 9.5 10 0.950 0.0130 0.0123 3.70$ 138,923$ -$ -$ -$
EQUIPMENT COMPONENTS 7 6 6 0.633 0.0094 0.0060 2.69$ -$ -$ -$ 100,706$
FURNISHINGS [BUILT-IN] COMPONENTS 8 7.5 7.5 0.767 0.0182 0.0139 5.18$ -$ -$ 194,182$ -$
FURNISHINGS [LOOSE] COMPONENTS 7 7 7 0.700 0.0338 0.0237 9.64$ -$ -$ 361,510$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ 116,200$ -$ -$ -$
PLUMBING SYSTEMS 9 10 9.5 0.933 0.0392 0.0366 11.17$ 418,835$ -$ -$ -$
HVAC SYSTEMS 8 8 8 0.800 0.1449 0.1159 41.32$ -$ 1,549,328$ -$ -$
ELECTRICAL SYSTEMS 9 9 9 0.900 0.0556 0.0500 15.84$ 593,909$ -$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 6 6 6 0.600 0.0329 0.0197 9.36$ -$ -$ -$ 351,181$
SITE SYSTEMS & COMPONENTS 8 8 8 0.800 0.1256 0.1005 17.90$ -$ 671,375$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 7 7 7 0.700 0.0193 0.0135 5.51$ -$ -$ 206,577$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.7443 2,394,744$ 2,275,446$ 1,140,563$ 800,021$
Remarks: 6,610,774$
1
2
3
4
5
6
7
8
9
10
Easton Special Needs Preschool
2001 - Parking Lot Renovations
2012 - Boiler Replacement (4 of 5)
2012 - New Cubbies in Classrooms
No Mechanical Fresh Air Ventilation in Classrooms - HW Radiator and Large Window AC Units
Original Built-up Roof
Drainage Issues and Flooding in Courtyard
8/14/2017
![Page 32: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/32.jpg)
School Site:
School Building Date: 1959 Assessment Date: 44,400 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 6 6 6 0.600 0.0580 0.0348 1.65$ -$ -$ -$ 73,376$
STRUCTURAL WALL / FRAME SYSTEMS 6 6 6 0.600 0.1194 0.0716 3.40$ -$ -$ -$ 151,094$
STRUCTURAL ROOF SYSTEMS 6 6 5 0.567 0.0614 0.0348 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 7 7 7 0.700 0.0870 0.0609 2.48$ -$ -$ 110,064$ -$
ROOFING SYSTEMS 10 10 10 1.000 0.0534 0.0534 15.22$ 675,672$ -$ -$ -$
DOOR SYSTEMS 9 9 9 0.900 0.0134 0.0120 3.81$ 169,377$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 489,174$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 10 9 9 0.933 0.0291 0.0271 8.29$ 368,104$ -$ -$ -$
INTERIOR WALL SYSTEMS 7 8 6 0.700 0.0258 0.0181 0.74$ -$ -$ 32,714$ -$
INTERIOR WALL FINISH SYSTEMS 7 8 7 0.733 0.0037 0.0027 1.06$ -$ -$ 47,083$ -$
INTERIOR CEILING SYSTEMS 6 6 6 0.600 0.0051 0.0031 1.46$ -$ -$ -$ 64,816$
SPECIALTIES COMPONENTS 6 7 6 0.633 0.0130 0.0082 3.70$ -$ -$ -$ 164,485$
EQUIPMENT COMPONENTS 6 7 6 0.633 0.0094 0.0060 2.69$ -$ -$ -$ 119,236$
FURNISHINGS [BUILT-IN] COMPONENTS 10 9 10 0.967 0.0182 0.0176 5.18$ 229,912$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 9 8 9 0.867 0.0338 0.0293 9.64$ -$ 428,028$ -$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 137,580$ -$
PLUMBING SYSTEMS 7 7 8 0.733 0.0392 0.0287 11.17$ -$ -$ 495,900$ -$
HVAC SYSTEMS 9 9 9 0.900 0.1449 0.1304 41.32$ 1,834,404$ -$ -$ -$
ELECTRICAL SYSTEMS 9 8 9 0.867 0.0556 0.0482 1/2 15.84$ 351,594$ 351,594$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 6 6 5 0.567 0.0329 0.0186 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 6 6 5 0.567 0.1256 0.0712 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 8 8 8 0.800 0.0193 0.0155 5.51$ -$ 244,587$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.7308 4,118,236$ 1,024,209$ 823,342$ 573,007$
Remarks: 6,538,793$
1
2
3
4
5
6
7
8
9
10
Poplar Halls Elementary School
2000 - New Parking Lot
5/24/2017
![Page 33: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/33.jpg)
School Site:
School Building Date: 1953 Assessment Date: 46,453 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 8 7.5 0.750 0.0580 0.0435 1.65$ -$ -$ 76,769$ -$
STRUCTURAL WALL / FRAME SYSTEMS 7 7 7 0.700 0.1194 0.0836 3.40$ -$ -$ 158,080$ -$
STRUCTURAL ROOF SYSTEMS 7 7 7 0.700 0.0614 0.0429 1.75$ -$ -$ 81,247$ -$
EXTERIOR WALL SYSTEMS 8 8.5 8 0.817 0.0870 0.0710 2.48$ -$ 115,153$ -$ -$
ROOFING SYSTEMS 3 3 3 0.300 0.0534 0.0160 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 9 8.5 8.5 0.867 0.0134 0.0116 3.81$ -$ 177,208$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 511,793$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 7.5 7.5 0.767 0.0291 0.0223 8.29$ -$ -$ 385,124$ -$
INTERIOR WALL SYSTEMS 8 8 7 0.767 0.0258 0.0198 0.74$ -$ -$ 34,226$ -$
INTERIOR WALL FINISH SYSTEMS 8 8 8 0.800 0.0037 0.0030 1.06$ -$ 49,260$ -$ -$
INTERIOR CEILING SYSTEMS 10 7 10 0.900 0.0051 0.0046 1.46$ 67,813$ -$ -$ -$
SPECIALTIES COMPONENTS 9 7.5 9 0.850 0.0130 0.0110 3.70$ -$ 172,090$ -$ -$
EQUIPMENT COMPONENTS 5 5 5 0.500 0.0094 0.0047 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 8 6 7 0.700 0.0182 0.0127 5.18$ -$ -$ 240,543$ -$
FURNISHINGS [LOOSE] COMPONENTS 5 5 4 0.467 0.0338 0.0158 9.64$ -$ -$ -$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 143,942$ -$
PLUMBING SYSTEMS 7 8 7 0.733 0.0392 0.0287 11.17$ -$ -$ 518,830$ -$
HVAC SYSTEMS 8 7.5 9 0.817 0.1449 0.1184 41.32$ -$ 1,919,224$ -$ -$
ELECTRICAL SYSTEMS 6 6 7 0.633 0.0556 0.0352 1/2 15.84$ -$ 367,851$ -$ 367,851$
ELECTRICAL SPECIAL SYSTEMS 6 6 7 0.633 0.0329 0.0208 9.36$ -$ -$ -$ 435,024$
SITE SYSTEMS & COMPONENTS 8 10 9 0.900 0.1256 0.1130 17.90$ 831,664$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 7 5 6 0.600 0.0193 0.0116 5.51$ -$ -$ -$ 255,897$
PRELIMINARY FACILITY CONDITION INDEX 0.7290 1,411,270$ 2,800,788$ 1,638,762$ 1,058,772$
Remarks: 6,909,591$
1
2
3
4
5
6
7
8
9
10
Berkley / Campostella Early Childhood Center
1991 - Renovations
2010 - Cafeteria HVAC Replacement
2012 - Roof Replacement
No Mechanical Fresh Air Ventilation in Classrooms
All Classroom and Corridor Ceilings contain Asbestos Plaster
8/14/2017
![Page 34: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/34.jpg)
School Site:
School Building Date: 1956 Assessment Date: 62,470 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 7 7 0.700 0.0580 0.0406 1.65$ -$ -$ 103,239$ -$
STRUCTURAL WALL / FRAME SYSTEMS 6 7 6 0.633 0.1194 0.0756 3.40$ -$ -$ -$ 212,586$
STRUCTURAL ROOF SYSTEMS 6 7 6 0.633 0.0614 0.0389 1.75$ -$ -$ -$ 109,261$
EXTERIOR WALL SYSTEMS 6 8 7 0.700 0.0870 0.0609 2.48$ -$ -$ 154,858$ -$
ROOFING SYSTEMS 8 8 8 0.800 0.0534 0.0427 15.22$ -$ 950,658$ -$ -$
DOOR SYSTEMS 10 10 10 1.000 0.0134 0.0134 3.81$ 238,310$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 688,259$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 9 10 9 0.933 0.0291 0.0271 8.29$ 517,915$ -$ -$ -$
INTERIOR WALL SYSTEMS 7 8 7 0.733 0.0258 0.0190 0.74$ -$ -$ 46,027$ -$
INTERIOR WALL FINISH SYSTEMS 7 7 8 0.733 0.0037 0.0027 1.06$ -$ -$ 66,245$ -$
INTERIOR CEILING SYSTEMS 9 9 10 0.933 0.0051 0.0048 1.46$ 91,194$ -$ -$ -$
SPECIALTIES COMPONENTS 9 8 10 0.900 0.0130 0.0117 3.70$ 231,427$ -$ -$ -$
EQUIPMENT COMPONENTS 6 5 6 0.567 0.0094 0.0053 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 9 10 0.967 0.0182 0.0176 5.18$ 323,482$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 7 7 8 0.733 0.0338 0.0248 9.64$ -$ -$ 602,227$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 193,573$ -$
PLUMBING SYSTEMS 7 8 8 0.767 0.0392 0.0300 11.17$ -$ -$ 697,723$ -$
HVAC SYSTEMS 8 7 8 0.767 0.1449 0.1111 41.32$ -$ -$ 2,580,973$ -$
ELECTRICAL SYSTEMS 6 5.5 6 0.583 0.0556 0.0324 1/2 15.84$ -$ -$ 494,686$ -$
ELECTRICAL SPECIAL SYSTEMS 6 5 6 0.567 0.0329 0.0186 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 8 7 8 0.767 0.1256 0.0963 17.90$ -$ -$ 1,118,422$ -$
SITE PLAYGROUNDS & ATHLETICS 7 6 6 0.633 0.0193 0.0122 5.51$ -$ -$ -$ 344,130$
PRELIMINARY FACILITY CONDITION INDEX 0.7244 2,090,588$ 950,658$ 6,057,974$ 665,977$
Remarks: 9,765,198$
1
2
3
4
5
6
7
8
9
10
Oceanair Elementary School
2000 - New Parking Lot
2003 - Electrical Upgrades
8/1/2017
![Page 35: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/35.jpg)
School Site:
School Building Date: 1948 Assessment Date: 82,081 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 6 7 0.667 0.0580 0.0386 1.65$ -$ -$ -$ 135,648$
STRUCTURAL WALL / FRAME SYSTEMS 7 6 7 0.667 0.1194 0.0796 3.40$ -$ -$ -$ 279,323$
STRUCTURAL ROOF SYSTEMS 7 6 6 0.633 0.0614 0.0389 1.75$ -$ -$ -$ 143,561$
EXTERIOR WALL SYSTEMS 7 8 8 0.767 0.0870 0.0667 2.48$ -$ -$ 203,473$ -$
ROOFING SYSTEMS 10 10 10 1.000 0.0534 0.0534 15.22$ 1,249,095$ -$ -$ -$
DOOR SYSTEMS 8 10 10 0.933 0.0134 0.0125 3.81$ 313,122$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 904,322$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 9 10 9 0.933 0.0258 0.0241 8.29$ 680,503$ -$ -$ -$
INTERIOR WALL SYSTEMS 8 8 8 0.800 0.0037 0.0030 0.74$ -$ 60,477$ -$ -$
INTERIOR WALL FINISH SYSTEMS 8 8 9 0.833 0.0051 0.0043 1.06$ -$ 87,041$ -$ -$
INTERIOR CEILING SYSTEMS 8 8 8 0.800 0.0130 0.0104 1.46$ -$ 119,823$ -$ -$
SPECIALTIES COMPONENTS 9 9 9 0.900 0.0094 0.0085 3.70$ 304,078$ -$ -$ -$
EQUIPMENT COMPONENTS 7 6 6 0.633 0.0182 0.0115 2.69$ -$ -$ -$ 220,429$
FURNISHINGS [BUILT-IN] COMPONENTS 9 9 10 0.933 0.0338 0.0316 5.18$ 425,032$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 7 6 8 0.700 0.0024 0.0017 9.64$ -$ -$ 791,282$ -$
ELEVATOR SYSTEMS 10 10 10 1.000 0.0109 0.0109 0.69$ 56,520$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0392 3.10$ -$ 254,341$ -$ -$
PLUMBING SYSTEMS 8 8 9 0.833 0.1449 0.1208 11.17$ -$ 916,757$ -$ -$
HVAC SYSTEMS 7 8 8 0.767 0.0556 0.0426 41.32$ -$ -$ 3,391,209$ -$
ELECTRICAL SYSTEMS 8 8 9 0.833 0.0329 0.0274 15.84$ -$ 1,299,964$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 6 6 7 0.633 0.1256 0.0796 9.36$ -$ -$ -$ 768,674$
SITE SYSTEMS & COMPONENTS 8 8 7 0.767 0.0193 0.0148 17.90$ -$ -$ 1,469,524$ -$
SITE PLAYGROUNDS & ATHLETICS 7 6 7 0.667 5.51$ -$ -$ -$ 452,161$
PRELIMINARY FACILITY CONDITION INDEX 0.7193 176.98$ 3,932,672$ 2,738,402$ 5,855,488$ 1,999,796$
Remarks: 14,526,358$
1
2
3
4
5
6
7
8
9
10
Granby Elementary School
2009 - Annex Structural Repairs
2 story building requires Elevator for ADA compliance
6/13/2017
![Page 36: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/36.jpg)
School Site:
School Building Date: 1955 Assessment Date: 61,980 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 6 6 6 0.600 0.0580 0.0348 1.65$ -$ -$ -$ 102,429$
STRUCTURAL WALL / FRAME SYSTEMS 6 6 6 0.600 0.1194 0.0716 3.40$ -$ -$ -$ 210,919$
STRUCTURAL ROOF SYSTEMS 6 6 6 0.600 0.0614 0.0368 1.75$ -$ -$ -$ 108,404$
EXTERIOR WALL SYSTEMS 10 9 8 0.900 0.0870 0.0783 2.48$ 153,644$ -$ -$ -$
ROOFING SYSTEMS 7 6 6 0.633 0.0534 0.0338 15.22$ -$ -$ -$ 943,202$
DOOR SYSTEMS 9 9 9 0.900 0.0134 0.0120 3.81$ 236,441$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 682,861$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 9 8 0.833 0.0291 0.0242 8.29$ -$ 513,853$ -$ -$
INTERIOR WALL SYSTEMS 8 7 7 0.733 0.0258 0.0190 0.74$ -$ -$ 45,666$ -$
INTERIOR WALL FINISH SYSTEMS 8 8 8 0.800 0.0037 0.0030 1.06$ -$ 65,725$ -$ -$
INTERIOR CEILING SYSTEMS 8 6 7 0.700 0.0051 0.0036 1.46$ -$ -$ 90,479$ -$
SPECIALTIES COMPONENTS 8 8 8 0.800 0.0130 0.0104 3.70$ -$ 229,612$ -$ -$
EQUIPMENT COMPONENTS 7 6 5 0.600 0.0094 0.0057 2.69$ -$ -$ -$ 166,447$
FURNISHINGS [BUILT-IN] COMPONENTS 10 9 10 0.967 0.0182 0.0176 5.18$ 320,945$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 7 6 8 0.700 0.0338 0.0237 9.64$ -$ -$ 597,503$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 192,055$ -$
PLUMBING SYSTEMS 6 7 8 0.700 0.0392 0.0274 11.17$ -$ -$ 692,250$ -$
HVAC SYSTEMS 7 8 8 0.767 0.1449 0.1111 41.32$ -$ -$ 2,560,728$ -$
ELECTRICAL SYSTEMS 8 7 8 0.767 0.0556 0.0426 15.84$ -$ -$ 981,613$ -$
ELECTRICAL SPECIAL SYSTEMS 6 6 5 0.567 0.0329 0.0186 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 7 7 7 0.700 0.1256 0.0879 17.90$ -$ -$ 1,109,649$ -$
SITE PLAYGROUNDS & ATHLETICS 6 5 6 0.567 0.0193 0.0110 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.7117 1,393,890$ 809,190$ 6,269,944$ 1,531,401$
Remarks: 10,004,425$
1
2
3
4
5
6
7
8
9
10
Suburban Park Elementary School
2000 - New Parking Lot
No Mechanical Fresh Air Ventilation in Classrooms
6/13/2017
![Page 37: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/37.jpg)
School Site:
School Building Date: 1953 Assessment Date: 58,750 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 6 7 6 0.633 0.0580 0.0367 1.65$ -$ -$ -$ 97,091$
STRUCTURAL WALL / FRAME SYSTEMS 6 7 6 0.633 0.1194 0.0756 3.40$ -$ -$ -$ 199,927$
STRUCTURAL ROOF SYSTEMS 6 7 6 0.633 0.0614 0.0389 1.75$ -$ -$ -$ 102,755$
EXTERIOR WALL SYSTEMS 8 8 8 0.800 0.0870 0.0696 2.48$ -$ 145,637$ -$ -$
ROOFING SYSTEMS 8 8 7.5 0.783 0.0534 0.0418 15.22$ -$ -$ 894,048$ -$
DOOR SYSTEMS 6 8 7 0.700 0.0134 0.0094 3.81$ -$ -$ 224,119$ -$
WINDOW SYSTEMS 4 5 4 0.433 0.0386 0.0167 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 7 6 7.5 0.683 0.0291 0.0199 8.29$ -$ -$ -$ 487,074$
INTERIOR WALL SYSTEMS 7 8 7 0.733 0.0258 0.0190 0.74$ -$ -$ 43,286$ -$
INTERIOR WALL FINISH SYSTEMS 7 8 6 0.700 0.0037 0.0026 1.06$ -$ -$ 62,300$ -$
INTERIOR CEILING SYSTEMS 9 9 9 0.900 0.0051 0.0046 1.46$ 85,764$ -$ -$ -$
SPECIALTIES COMPONENTS 9 9 10 0.933 0.0130 0.0121 3.70$ 217,646$ -$ -$ -$
EQUIPMENT COMPONENTS 6 6 5 0.567 0.0094 0.0053 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 10 10 1.000 0.0182 0.0182 5.18$ 304,219$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 9 8 8 0.833 0.0338 0.0282 9.64$ -$ 566,365$ -$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 182,046$ -$
PLUMBING SYSTEMS 8 8 7 0.767 0.0392 0.0300 11.17$ -$ -$ 656,175$ -$
HVAC SYSTEMS 9 9 9 0.900 0.1449 0.1304 41.32$ 2,427,280$ -$ -$ -$
ELECTRICAL SYSTEMS 6 6 5 0.567 0.0556 0.0315 1/2 15.84$ 465,229$ -$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 7 6 7 0.667 0.0329 0.0219 9.36$ -$ -$ -$ 550,183$
SITE SYSTEMS & COMPONENTS 7 7 7 0.700 0.1256 0.0879 17.90$ -$ -$ 1,051,821$ -$
SITE PLAYGROUNDS & ATHLETICS 5 4 4 0.433 0.0193 0.0084 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.7087 3,500,137$ 712,002$ 3,113,795$ 1,437,031$
Remarks: 8,762,965$
1
2
3
4
5
6
7
8
9
10
Chesterfield Academy School
2002 - Electrical Upgrade
Ceilings in 1953 Building contain Asbestos
No Mechancial Fresh Air Ventilation to Classrooms
8/2/2017
1971 Classroom Addition
2001 - Windows and Exterior Doors Replaced
![Page 38: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/38.jpg)
School Site:
School Building Date: 1957 Assessment Date: 66,340 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 6 6 6 0.600 0.0580 0.0348 1.65$ -$ -$ -$ 109,635$
STRUCTURAL WALL / FRAME SYSTEMS 8 6 6 0.667 0.1194 0.0796 3.40$ -$ -$ -$ 225,756$
STRUCTURAL ROOF SYSTEMS 10 7 6 0.767 0.0614 0.0470 1.75$ -$ -$ 116,030$ -$
EXTERIOR WALL SYSTEMS 7 8 8 0.767 0.0870 0.0667 2.48$ -$ -$ 164,452$ -$
ROOFING SYSTEMS 10 10 10 1.000 0.0534 0.0534 15.22$ 1,009,551$ -$ -$ -$
DOOR SYSTEMS 8 9 8 0.833 0.0134 0.0112 3.81$ -$ 253,073$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 730,897$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 7 7 9 0.767 0.0291 0.0223 8.29$ -$ -$ 550,000$ -$
INTERIOR WALL SYSTEMS 7 9 6 0.733 0.0258 0.0190 0.74$ -$ -$ 48,879$ -$
INTERIOR WALL FINISH SYSTEMS 7 10 6 0.767 0.0037 0.0029 1.06$ -$ -$ 70,349$ -$
INTERIOR CEILING SYSTEMS 8 9 5 0.733 0.0051 0.0038 1.46$ -$ -$ 96,844$ -$
SPECIALTIES COMPONENTS 10 9 10 0.967 0.0130 0.0126 3.70$ 245,764$ -$ -$ -$
EQUIPMENT COMPONENTS 5 3 5 0.433 0.0094 0.0041 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 9 10 0.967 0.0182 0.0176 5.18$ 343,522$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 8 9 6 0.767 0.0338 0.0259 9.64$ -$ -$ 639,535$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 205,565$ -$
PLUMBING SYSTEMS 7 7 8 0.733 0.0392 0.0287 11.17$ -$ -$ 740,947$ -$
HVAC SYSTEMS 7 8 7 0.733 0.1449 0.1063 41.32$ -$ -$ 2,740,864$ -$
ELECTRICAL SYSTEMS 8 6 8 0.733 0.0556 0.0407 15.84$ -$ -$ 1,050,664$ -$
ELECTRICAL SPECIAL SYSTEMS 5 4 4 0.433 0.0329 0.0142 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 5 5 4 0.467 0.1256 0.0586 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 8 8 9 0.833 0.0193 0.0161 5.51$ -$ 365,448$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.7040 2,329,734$ 618,522$ 6,424,128$ 335,390$
Remarks: 9,707,774$
1
2
3
4
5
6
7
8
9
10
Sherwood Forest Elementary School
2000 - New Parking Lot
2004 - Parking Lot Renovations
5/16/2017
![Page 39: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/39.jpg)
School Site:
School Building Date: 1952 Assessment Date: 57,640 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 7 7 0.700 0.0580 0.0406 1.65$ -$ -$ 95,257$ -$
STRUCTURAL WALL / FRAME SYSTEMS 8 7 7 0.733 0.1194 0.0875 3.40$ -$ -$ 196,150$ -$
STRUCTURAL ROOF SYSTEMS 8 8 7 0.767 0.0614 0.0470 1.75$ -$ -$ 100,813$ -$
EXTERIOR WALL SYSTEMS 7 7 6 0.667 0.0870 0.0580 2.48$ -$ -$ -$ 142,885$
ROOFING SYSTEMS 9 5 8 0.733 0.0534 0.0391 15.22$ -$ -$ 877,156$ -$
DOOR SYSTEMS 9 10 9 0.933 0.0134 0.0125 3.81$ 219,884$ -$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 635,045$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 6 9 0.767 0.0291 0.0223 8.29$ -$ -$ 477,872$ -$
INTERIOR WALL SYSTEMS 6 7 6 0.633 0.0258 0.0164 0.74$ -$ -$ -$ 42,469$
INTERIOR WALL FINISH SYSTEMS 7 6 6 0.633 0.0037 0.0024 1.06$ -$ -$ -$ 61,123$
INTERIOR CEILING SYSTEMS 8 7 7 0.733 0.0051 0.0038 1.46$ -$ -$ 84,143$ -$
SPECIALTIES COMPONENTS 9 9 10 0.933 0.0130 0.0121 3.70$ 213,534$ -$ -$ -$
EQUIPMENT COMPONENTS 5 5 6 0.533 0.0094 0.0050 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 9 10 0.967 0.0182 0.0176 5.18$ 298,471$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 8 8 7 0.767 0.0338 0.0259 9.64$ -$ -$ 555,665$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 178,606$ -$
PLUMBING SYSTEMS 7 7 8 0.733 0.0392 0.0287 11.17$ -$ -$ 643,777$ -$
HVAC SYSTEMS 7 7 9 0.767 0.1449 0.1111 41.32$ -$ -$ 2,381,420$ -$
ELECTRICAL SYSTEMS 8 7 9 0.800 0.0556 0.0444 15.84$ -$ 912,878$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 3 3 3 0.300 0.0329 0.0099 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 5 6 4 0.500 0.1256 0.0628 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 6 6 6 0.600 0.0193 0.0116 5.51$ -$ -$ -$ 317,523$
PRELIMINARY FACILITY CONDITION INDEX 0.6974 1,366,935$ 912,878$ 5,590,859$ 564,000$
Remarks: 8,434,671$
1
2
3 14 Portable Classoooms; 12 in use
4
5
6
7
8
9
10
Norview Elementary School
2000 - New Parking Lot
No Mechanical Fresh Air Ventilation in Classrooms
5/16/2017
![Page 40: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/40.jpg)
School Site:
School Building Date: 1953 Assessment Date: 54,900 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 7 6 0.667 0.0580 0.0386 1.65$ -$ -$ -$ 90,729$
STRUCTURAL WALL / FRAME SYSTEMS 7 6 6 0.633 0.1194 0.0756 3.40$ -$ -$ -$ 186,825$
STRUCTURAL ROOF SYSTEMS 8 6 6 0.667 0.0614 0.0409 1.75$ -$ -$ -$ 96,021$
EXTERIOR WALL SYSTEMS 8 7 7 0.733 0.0870 0.0638 2.48$ -$ -$ 136,093$ -$
ROOFING SYSTEMS 10 10 8 0.933 0.0534 0.0498 15.22$ 835,459$ -$ -$ -$
DOOR SYSTEMS 10 10 10 1.000 0.0134 0.0134 3.81$ 209,432$ -$ -$ -$
WINDOW SYSTEMS 5 2 3 0.333 0.0386 0.0129 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 8 8 0.800 0.0291 0.0233 8.29$ -$ 455,155$ -$ -$
INTERIOR WALL SYSTEMS 8 9 8 0.833 0.0258 0.0215 0.74$ -$ 40,450$ -$ -$
INTERIOR WALL FINISH SYSTEMS 7 7 6 0.667 0.0037 0.0025 1.06$ -$ -$ -$ 58,218$
INTERIOR CEILING SYSTEMS 8 9 7 0.800 0.0051 0.0041 1.46$ -$ 80,144$ -$ -$
SPECIALTIES COMPONENTS 7 7 7 0.700 0.0130 0.0091 3.70$ -$ -$ 203,383$ -$
EQUIPMENT COMPONENTS 5 6 5 0.533 0.0094 0.0050 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 9 10 10 0.967 0.0182 0.0176 5.18$ 284,283$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 7 6 6 0.633 0.0338 0.0214 9.64$ -$ -$ -$ 529,250$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 170,116$ -$
PLUMBING SYSTEMS 8 8 6 0.733 0.0392 0.0287 11.17$ -$ -$ 613,174$ -$
HVAC SYSTEMS 8 8 7 0.767 0.1449 0.1111 41.32$ -$ -$ 2,268,215$ -$
ELECTRICAL SYSTEMS 7 6 8 0.700 0.0556 0.0389 15.84$ -$ -$ 869,483$ -$
ELECTRICAL SPECIAL SYSTEMS 7 5 5 0.567 0.0329 0.0186 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 6 7 6 0.633 0.1256 0.0796 17.90$ -$ -$ -$ 982,893$
SITE PLAYGROUNDS & ATHLETICS 7 8 6 0.700 0.0193 0.0135 5.51$ -$ -$ 302,429$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.6899 1,329,174$ 575,749$ 4,562,893$ 1,943,936$
Remarks: 8,411,753$
1
2
3
4
5
6
7
8
9
10
Lindenwood Elementary School
2000 - Parking Lot Renovation
2009 - Misc. Renovations
5/17/2017
![Page 41: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/41.jpg)
School Site:
School Building Date: 1964 Assessment Date: 39,675 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 6 6 6 0.600 0.0580 0.0348 1.65$ -$ -$ -$ 65,568$
STRUCTURAL WALL / FRAME SYSTEMS 8 8 8 0.800 0.1194 0.0955 3.40$ -$ 135,014$ -$ -$
STRUCTURAL ROOF SYSTEMS 6 6 6 0.600 0.0614 0.0368 1.75$ -$ -$ -$ 69,392$
EXTERIOR WALL SYSTEMS 8 8 8 0.800 0.0870 0.0696 2.48$ -$ 98,351$ -$ -$
ROOFING SYSTEMS 0 1 1 0.067 0.0534 0.0036 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 8 9 8 0.833 0.0134 0.0112 3.81$ -$ 151,352$ -$ -$
WINDOW SYSTEMS 10 9 10 0.967 0.0386 0.0374 11.02$ 437,117$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 7 7 9 0.767 0.0291 0.0223 8.29$ -$ -$ 328,930$ -$
INTERIOR WALL SYSTEMS 7 7 6 0.667 0.0258 0.0172 0.74$ -$ -$ -$ 29,232$
INTERIOR WALL FINISH SYSTEMS 7 7 7 0.700 0.0037 0.0026 1.06$ -$ -$ 42,073$ -$
INTERIOR CEILING SYSTEMS 8 7 8 0.767 0.0051 0.0039 1.46$ -$ -$ 57,918$ -$
SPECIALTIES COMPONENTS 8 7 6 0.700 0.0130 0.0091 3.70$ -$ -$ 146,981$ -$
EQUIPMENT COMPONENTS 7 6 6 0.633 0.0094 0.0060 2.69$ -$ -$ -$ 106,547$
FURNISHINGS [BUILT-IN] COMPONENTS 10 9 9 0.933 0.0182 0.0170 5.18$ 205,445$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 7 6 6 0.633 0.0338 0.0214 9.64$ -$ -$ -$ 382,477$
ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ -$ 122,939$
PLUMBING SYSTEMS 7 7 6 0.667 0.0392 0.0261 11.17$ -$ -$ -$ 443,127$
HVAC SYSTEMS 7 8 8 0.767 0.1449 0.1111 41.32$ -$ -$ 1,639,188$ -$
ELECTRICAL SYSTEMS 7 7 6 0.667 0.0556 0.0370 1/2 15.84$ -$ -$ 314,178$ 314,178$
ELECTRICAL SPECIAL SYSTEMS 6 6 6 0.600 0.0329 0.0197 9.36$ -$ -$ -$ 371,549$
SITE SYSTEMS & COMPONENTS 7 7 6 0.667 0.1256 0.0837 17.90$ -$ -$ -$ 710,315$
SITE PLAYGROUNDS & ATHLETICS 7 8 8 0.767 0.0193 0.0148 5.51$ -$ -$ 109,279$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.6808 642,562$ 384,718$ 2,638,547$ 2,615,325$
Remarks: 6,281,152$
1
2
3
4
5 New Exterior Doors
6
7
8
9
10
Tidewater Park Elementary School
2000 - Parking Lot Renovations
2016 - Roof Replacement
No Mechanical Fresh Air Ventilation in Classrooms
Severe Storm Drainage & Flooding issues
6/12/2017
![Page 42: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/42.jpg)
School Site:
School Building Date: 1966 Assessment Date: 36,074 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 5 6 5 0.533 0.0580 0.0309 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 5 6 5 0.533 0.1194 0.0637 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 5 6 5 0.533 0.0614 0.0327 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 7 7 6 0.667 0.0870 0.0580 2.48$ -$ -$ -$ 89,425$
ROOFING SYSTEMS 7 7 7 0.700 0.0534 0.0374 15.22$ -$ -$ 548,968$ -$
DOOR SYSTEMS 7 10 8 0.833 0.0134 0.0112 3.81$ -$ 137,615$ -$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 397,443$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 5 8 8 0.700 0.0291 0.0204 8.29$ -$ -$ 299,076$ -$
INTERIOR WALL SYSTEMS 5 8 5 0.600 0.0258 0.0155 0.74$ -$ -$ -$ 26,579$
INTERIOR WALL FINISH SYSTEMS 7 8 5 0.667 0.0037 0.0025 1.06$ -$ -$ -$ 38,254$
INTERIOR CEILING SYSTEMS 8 9 9 0.867 0.0051 0.0044 1.46$ -$ 52,661$ -$ -$
SPECIALTIES COMPONENTS 8 8 8 0.800 0.0130 0.0104 3.70$ -$ 133,640$ -$ -$
EQUIPMENT COMPONENTS 6 6 4 0.533 0.0094 0.0050 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 7 9 7 0.767 0.0182 0.0139 5.18$ -$ -$ 186,798$ -$
FURNISHINGS [LOOSE] COMPONENTS 6 9 6 0.700 0.0338 0.0237 9.64$ -$ -$ 347,763$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 111,781$ -$
PLUMBING SYSTEMS 7 7 8 0.733 0.0392 0.0287 11.17$ -$ -$ 402,908$ -$
HVAC SYSTEMS 9 9 9 0.900 0.1449 0.1304 41.32$ 1,490,412$ -$ -$ -$
ELECTRICAL SYSTEMS 7 8 8 0.767 0.0556 0.0426 1/2 15.84$ 285,662$ -$ 285,662$ -$
ELECTRICAL SPECIAL SYSTEMS 5 6 5 0.533 0.0329 0.0175 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 5 5 4 0.467 0.1256 0.0586 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 6 6 5 0.567 0.0193 0.0110 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.6571 2,173,517$ 323,916$ 2,182,956$ 154,258$
Remarks: 4,834,647$
1
2
3
4
5
6
7
8
9
10
St. Helena Elementary School
2004 - Exterior Wall Repairs
No Mechanical Fresh Air Ventilation in Classrooms
5/17/2017
![Page 43: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/43.jpg)
School Site:
School Building Date: 1957 Assessment Date: 44,500 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 6 6 7 0.633 0.0580 0.0367 1.65$ -$ -$ -$ 73,541$
STRUCTURAL WALL / FRAME SYSTEMS 6 6 7 0.633 0.1194 0.0756 3.40$ -$ -$ -$ 151,434$
STRUCTURAL ROOF SYSTEMS 6 6 7 0.633 0.0614 0.0389 1.75$ -$ -$ -$ 77,831$
EXTERIOR WALL SYSTEMS 7 7 6 0.667 0.0870 0.0580 2.48$ -$ -$ -$ 110,312$
ROOFING SYSTEMS 7 7 8 0.733 0.0534 0.0391 15.22$ -$ -$ 677,194$ -$
DOOR SYSTEMS 6 7 6 0.633 0.0134 0.0085 3.81$ -$ -$ -$ 169,758$
WINDOW SYSTEMS 1 1 0 0.067 0.0386 0.0026 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 9 9 0.867 0.0291 0.0252 8.29$ -$ 368,933$ -$ -$
INTERIOR WALL SYSTEMS 7 8 7 0.733 0.0258 0.0190 0.74$ -$ -$ 32,787$ -$
INTERIOR WALL FINISH SYSTEMS 8 8 8 0.800 0.0037 0.0030 1.06$ -$ 47,189$ -$ -$
INTERIOR CEILING SYSTEMS 9 9 9 0.900 0.0051 0.0046 1.46$ 64,962$ -$ -$ -$
SPECIALTIES COMPONENTS 9 7 10 0.867 0.0130 0.0113 3.70$ -$ 164,855$ -$ -$
EQUIPMENT COMPONENTS 6 5 5 0.533 0.0094 0.0050 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 9 10 0.967 0.0182 0.0176 5.18$ 230,430$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 8 8 9 0.833 0.0338 0.0282 9.64$ -$ 428,992$ -$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ -$ -$
PLUMBING SYSTEMS 7 7 6 0.667 0.0392 0.0261 11.17$ -$ -$ -$ 497,017$
HVAC SYSTEMS 7 8 8 0.767 0.1449 0.1111 41.32$ -$ -$ 1,838,535$ -$
ELECTRICAL SYSTEMS 7 7 7 0.700 0.0556 0.0389 15.84$ -$ -$ 704,772$ -$
ELECTRICAL SPECIAL SYSTEMS 6 6 7 0.633 0.0329 0.0208 9.36$ -$ -$ -$ 416,735$
SITE SYSTEMS & COMPONENTS 6 5 5 0.533 0.1256 0.0670 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 8 8 7.5 0.783 0.0193 0.0151 5.51$ -$ -$ 245,138$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.6522 295,391$ 1,009,969$ 3,498,426$ 1,496,629$
Remarks: 6,300,415$
1 1994 - HVAC Replacement
2
3
4
5
6
7
8
9
10
Little Creek (Nancy) Primary School
2014 - New Windows and Exterior Doors
8/2/2017
![Page 44: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/44.jpg)
School Site:
School Building Date: 1954 Assessment Date: 56,795 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 7 6 7 0.667 0.0580 0.0386 1.65$ -$ -$ -$ 93,860$
STRUCTURAL WALL / FRAME SYSTEMS 7 6 7 0.667 0.1194 0.0796 3.40$ -$ -$ -$ 193,274$
STRUCTURAL ROOF SYSTEMS 7 6 7 0.667 0.0614 0.0409 1.75$ -$ -$ -$ 99,336$
EXTERIOR WALL SYSTEMS 7 7 6 0.667 0.0870 0.0580 2.48$ -$ -$ -$ 140,790$
ROOFING SYSTEMS 7 7 8 0.733 0.0534 0.0391 15.22$ -$ -$ 864,297$ -$
DOOR SYSTEMS 6 7 6 0.633 0.0134 0.0085 3.81$ -$ -$ -$ 216,661$
WINDOW SYSTEMS 1 0 0 0.033 0.0386 0.0013 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 9 9 0.867 0.0291 0.0252 8.29$ -$ 470,866$ -$ -$
INTERIOR WALL SYSTEMS 7 8 7 0.733 0.0258 0.0190 0.74$ -$ -$ 41,846$ -$
INTERIOR WALL FINISH SYSTEMS 8 8 8 0.800 0.0037 0.0030 1.06$ -$ 60,227$ -$ -$
INTERIOR CEILING SYSTEMS 9 9 9 0.900 0.0051 0.0046 1.46$ 82,910$ -$ -$ -$
SPECIALTIES COMPONENTS 9 7 10 0.867 0.0130 0.0113 3.70$ -$ 210,404$ -$ -$
EQUIPMENT COMPONENTS 6 5 5 0.533 0.0094 0.0050 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 8 10 0.933 0.0182 0.0170 5.18$ 294,096$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 6 7 9 0.733 0.0338 0.0248 9.64$ -$ -$ 547,519$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ -$ 175,988$
PLUMBING SYSTEMS 6 7 6 0.633 0.0392 0.0248 11.17$ -$ -$ -$ 634,339$
HVAC SYSTEMS 7 7 8 0.733 0.1449 0.1063 41.32$ -$ -$ 2,346,508$ -$
ELECTRICAL SYSTEMS 7 7 7 0.700 0.0556 0.0389 15.84$ -$ -$ 899,495$ -$
ELECTRICAL SPECIAL SYSTEMS 6 6 7 0.633 0.0329 0.0208 9.36$ -$ -$ -$ 531,875$
SITE SYSTEMS & COMPONENTS 6 6 5 0.567 0.1256 0.0712 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 9 9 7.5 0.850 0.0193 0.0164 5.51$ -$ 312,868$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.6542 377,006$ 1,054,364$ 4,699,665$ 2,086,124$
Remarks: 8,217,159$
1
2
3
4
5
6
7
8
9
10
Little Creek (Tarpon) Elementary School
1995 - HVAC Replacement
2014 - New Windows and Exterior Doors
~30% Ceilings contain Asbestos
~50% Vinyl Asbestos Tile
8/2/2017
![Page 45: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/45.jpg)
School Site:
School Building Date: 1959 Assessment Date: 58,500 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 6 6 6 0.600 0.0580 0.0348 1.65$ -$ -$ -$ 96,678$
STRUCTURAL WALL / FRAME SYSTEMS 6 6 6 0.600 0.1194 0.0716 3.40$ -$ -$ -$ 199,076$
STRUCTURAL ROOF SYSTEMS 6 6 7 0.633 0.0614 0.0389 1.75$ -$ -$ -$ 102,318$
EXTERIOR WALL SYSTEMS 7 7 7 0.700 0.0870 0.0609 2.48$ -$ -$ 145,017$ -$
ROOFING SYSTEMS 1 1 1 0.100 0.0534 0.0053 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 9 10 9 0.933 0.0134 0.0125 3.81$ 223,165$ -$ -$ -$
WINDOW SYSTEMS 5 6 6 0.567 0.0386 0.0219 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 7 9 8 0.800 0.0291 0.0233 8.29$ -$ 485,001$ -$ -$
INTERIOR WALL SYSTEMS 7 8 7 0.733 0.0258 0.0190 0.74$ -$ -$ 43,102$ -$
INTERIOR WALL FINISH SYSTEMS 7 7 8 0.733 0.0037 0.0027 1.06$ -$ -$ 62,035$ -$
INTERIOR CEILING SYSTEMS 6 7 7 0.667 0.0051 0.0034 1.46$ -$ -$ -$ 85,399$
SPECIALTIES COMPONENTS 9 8 10 0.900 0.0130 0.0117 3.70$ 216,720$ -$ -$ -$
EQUIPMENT COMPONENTS 5 5 5 0.500 0.0094 0.0047 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 9 10 0.967 0.0182 0.0176 5.18$ 302,925$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 8 7 7 0.733 0.0338 0.0248 9.64$ -$ -$ 563,955$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 181,271$ -$
PLUMBING SYSTEMS 8 8 7 0.767 0.0392 0.0300 11.17$ -$ -$ 653,382$ -$
HVAC SYSTEMS 8 7.5 8.5 0.800 0.1449 0.1159 41.32$ -$ 2,416,951$ -$ -$
ELECTRICAL SYSTEMS 8 7 9 0.800 0.0556 0.0444 15.84$ -$ 926,498$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 7 7 7.5 0.717 0.0329 0.0235 9.36$ -$ -$ 547,842$ -$
SITE SYSTEMS & COMPONENTS 6 5 6 0.567 0.1256 0.0712 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 6 5 5 0.533 0.0193 0.0103 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.6485 742,810$ 3,828,450$ 2,196,606$ 483,471$
Remarks: 7,251,336$
1
2
3
4
5
6
7
8
9
10
Fairlawn Elementary School
2015 - Roof Replacement
No Mechanical Fresh Air Ventilation to Classrooms
Playground Equipment shared with adjacent Recreation Center
8/3/2017
1961 Classroom Addition
2001 Parking Lot Renovation
![Page 46: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/46.jpg)
School Site:
School Building Date: 1964 Assessment Date: 46,300 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 8 8 8 0.800 0.0580 0.0464 1.65$ -$ 76,516$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 6 5 5 0.533 0.1194 0.0637 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 4 4 4 0.400 0.0614 0.0245 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 5 6 4 0.500 0.0870 0.0435 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 6 5 5 0.533 0.0534 0.0285 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 8 7 7 0.733 0.0134 0.0098 3.81$ -$ -$ 176,625$ -$
WINDOW SYSTEMS 10 10 10 1.000 0.0386 0.0386 11.02$ 510,107$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 7 7 7 0.700 0.0291 0.0204 8.29$ -$ -$ 383,856$ -$
INTERIOR WALL SYSTEMS 8 8 8 0.800 0.0258 0.0207 0.74$ -$ 34,113$ -$ -$
INTERIOR WALL FINISH SYSTEMS 6 7 6 0.633 0.0037 0.0024 1.06$ -$ -$ -$ 49,098$
INTERIOR CEILING SYSTEMS 5 7 6 0.600 0.0051 0.0031 1.46$ -$ -$ -$ 67,589$
SPECIALTIES COMPONENTS 7 6 6 0.633 0.0130 0.0082 3.70$ -$ -$ -$ 171,524$
EQUIPMENT COMPONENTS 5 5 5 0.500 0.0094 0.0047 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 7 6 6 0.633 0.0182 0.0115 5.18$ -$ -$ -$ 239,751$
FURNISHINGS [LOOSE] COMPONENTS 6 5 6 0.567 0.0338 0.0192 9.64$ -$ -$ -$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ 143,468$ -$
PLUMBING SYSTEMS 8 6 7 0.700 0.0392 0.0274 11.17$ -$ -$ 517,121$ -$
HVAC SYSTEMS 9 7 9 0.833 0.1449 0.1208 41.32$ -$ 1,912,903$ -$ -$
ELECTRICAL SYSTEMS 7 6 8 0.700 0.0556 0.0389 1/2 15.84$ -$ 366,640$ 366,640$ -$
ELECTRICAL SPECIAL SYSTEMS 6 5 5 0.533 0.0329 0.0175 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 5 6 6 0.567 0.1256 0.0712 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 5 5 5 0.500 0.0193 0.0097 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.6305 510,107$ 2,390,172$ 1,587,710$ 527,961$
Remarks: 5,015,951$
1
2
3
4
5
6
7
8
9
10
Tarrallton Elementary School
2004 - Cooling Tower Replacement
2007 - Parking Lot Renovation
2009 - Structural Floor Repairs
No Mechanical Fresh Air Ventilation in Classrooms
Major Floor Slab failures
6/12/2017
![Page 47: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/47.jpg)
School Site:
School Building Date: 1966 Assessment Date: 60,900 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 6 6 6 0.600 0.0580 0.0348 1.65$ -$ -$ -$ 100,644$
STRUCTURAL WALL / FRAME SYSTEMS 6 6 6 0.600 0.1194 0.0716 3.40$ -$ -$ -$ 207,243$
STRUCTURAL ROOF SYSTEMS 6 6 6 0.600 0.0614 0.0368 1.75$ -$ -$ -$ 106,515$
EXTERIOR WALL SYSTEMS 6 7 6 0.633 0.0870 0.0551 2.48$ -$ -$ -$ 150,966$
ROOFING SYSTEMS 9 6 8 0.767 0.0534 0.0409 15.22$ -$ -$ 926,766$ -$
DOOR SYSTEMS 10 9 9 0.933 0.0134 0.0125 3.81$ 232,321$ -$ -$ -$
WINDOW SYSTEMS 9 9 10 0.933 0.0386 0.0361 11.02$ 670,962$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 6 7 7 0.667 0.0291 0.0194 8.29$ -$ -$ -$ 504,899$
INTERIOR WALL SYSTEMS 8 7 8 0.767 0.0258 0.0198 0.74$ -$ -$ 44,871$ -$
INTERIOR WALL FINISH SYSTEMS 8 8 7.5 0.783 0.0037 0.0029 1.06$ -$ -$ 64,580$ -$
INTERIOR CEILING SYSTEMS 5 5 4 0.467 0.0051 0.0024 1.46$ -$ -$ -$ -$
SPECIALTIES COMPONENTS 8 9 9 0.867 0.0130 0.0113 3.70$ -$ 225,611$ -$ -$
EQUIPMENT COMPONENTS 6 6 4.5 0.550 0.0094 0.0052 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 10 10 10 1.000 0.0182 0.0182 5.18$ 315,352$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 8 8.5 8 0.817 0.0338 0.0276 9.64$ -$ 587,092$ -$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ -$ 94,354$
PLUMBING SYSTEMS 6 7.5 6 0.650 0.0392 0.0255 11.17$ -$ -$ -$ 340,094$
HVAC SYSTEMS 3 2 3 0.267 0.1449 0.0386 41.32$ -$ -$ -$ -$
ELECTRICAL SYSTEMS 6 6 7 0.633 0.0556 0.0352 15.84$ -$ -$ -$ 482,254$
ELECTRICAL SPECIAL SYSTEMS 7 7 7 0.700 0.0329 0.0230 9.36$ -$ -$ 570,318$ -$
SITE SYSTEMS & COMPONENTS 7 8 8 0.767 0.1256 0.0963 17.90$ -$ -$ 1,090,313$ -$
SITE PLAYGROUNDS & ATHLETICS 4 3.5 2.5 0.333 0.0193 0.0064 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.6196 1,218,635$ 812,703$ 2,696,848$ 1,986,970$
Remarks: 6,715,156$
1
2
3
4
5
6
7
8
9
10
Sewells Point Elementary School
8/3/2017
1984 Addition / Renovation
2008 - Geothermal Wells + HVAC Power installed
![Page 48: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/48.jpg)
School Site:
School Building Date: 1990 Assessment Date: 83,000 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 4 3 4 0.367 0.0580 0.0213 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 3 3 3 0.300 0.1194 0.0358 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 3 3 3 0.300 0.0614 0.0184 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 4 5 4 0.433 0.0870 0.0377 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 9 10 9 0.933 0.0534 0.0498 15.22$ 631,540$ -$ -$ -$
DOOR SYSTEMS 8 8 8 0.800 0.0134 0.0107 3.81$ -$ 316,627$ -$ -$
WINDOW SYSTEMS 5 6.5 5 0.550 0.0386 0.0213 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 8 8 8 0.800 0.0291 0.0233 8.29$ -$ 688,122$ -$ -$
INTERIOR WALL SYSTEMS 5 5 4 0.467 0.0258 0.0121 0.74$ -$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 7 7 8 0.733 0.0037 0.0027 1.06$ -$ -$ 88,016$ -$
INTERIOR CEILING SYSTEMS 5 9 6 0.667 0.0051 0.0034 1.46$ -$ -$ -$ 121,164$
SPECIALTIES COMPONENTS 8 8 8 0.800 0.0130 0.0104 3.70$ -$ 307,483$ -$ -$
EQUIPMENT COMPONENTS 4 5 4 0.433 0.0094 0.0041 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 7 7 6 0.667 0.0182 0.0121 5.18$ -$ -$ -$ 429,790$
FURNISHINGS [LOOSE] COMPONENTS 7 7 7 0.700 0.0338 0.0237 9.64$ -$ -$ 800,142$ -$
ELEVATOR SYSTEMS 4 6 5 0.500 0.0024 0.0012 0.69$ -$ -$ -$ -$
FIRE PROTECTION SYSTEMS 5 5 5 0.500 0.0109 0.0054 3.10$ -$ -$ -$ -$
PLUMBING SYSTEMS 7 6.5 6 0.650 0.0392 0.0255 11.17$ -$ -$ -$ 927,021$
HVAC SYSTEMS 8 8 8 0.800 0.1449 0.1159 41.32$ -$ 3,429,178$ -$ -$
ELECTRICAL SYSTEMS 6 6.5 6 0.617 0.0556 0.0343 1/2 15.84$ -$ 657,259$ -$ 657,259$
ELECTRICAL SPECIAL SYSTEMS 6 6.5 7 0.650 0.0329 0.0214 9.36$ -$ -$ -$ 777,280$
SITE SYSTEMS & COMPONENTS 7 7 7.5 0.717 0.1256 0.0900 17.90$ -$ -$ 1,485,977$ -$
SITE PLAYGROUNDS & ATHLETICS 7 7.5 7 0.717 0.0193 0.0138 5.51$ -$ -$ 457,224$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.5942 631,540$ 5,398,670$ 2,831,358$ 2,912,515$
Remarks: 11,774,083$
1
2
3
4
5
6
7
8
9
10
Tanners Creek Elementary School
8/7/2017
Limited Area Sprinkler System in Lobby / Atrium
Air-Cooled Chiller needs replacement
~85% Asphalt Shingle Roof
![Page 49: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/49.jpg)
School Site:
School Building Date: 1990 Assessment Date: 15,825 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 3 3 3 0.300 0.0580 0.0174 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 3 3 3 0.300 0.1194 0.0358 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 3 3 3 0.300 0.0614 0.0184 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 3 2 3 0.267 0.0870 0.0232 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 10 10 10 1.000 0.0534 0.0534 15.22$ 240,822$ -$ -$ -$
DOOR SYSTEMS 6 6 6 0.600 0.0134 0.0080 3.81$ -$ -$ -$ 60,369$
WINDOW SYSTEMS 5 5 5 0.500 0.0386 0.0193 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 4 5 5 0.467 0.0291 0.0136 8.29$ -$ -$ -$ -$
INTERIOR WALL SYSTEMS 4 5 5 0.467 0.0258 0.0121 0.74$ -$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 4 6 5 0.500 0.0037 0.0019 1.06$ -$ -$ -$ -$
INTERIOR CEILING SYSTEMS 6 6 5 0.567 0.0051 0.0029 1.46$ -$ -$ -$ -$
SPECIALTIES COMPONENTS 6 6 6 0.600 0.0130 0.0078 3.70$ -$ -$ -$ 58,626$
EQUIPMENT COMPONENTS 5 5 5 0.500 0.0094 0.0047 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 6 6 6 0.600 0.0182 0.0109 5.18$ -$ -$ -$ 81,945$
FURNISHINGS [LOOSE] COMPONENTS 6 5 5 0.533 0.0338 0.0180 9.64$ -$ -$ -$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ -$ -$
PLUMBING SYSTEMS 6 5 6 0.567 0.0392 0.0222 11.17$ -$ -$ -$ -$
HVAC SYSTEMS 9 9 9 0.900 0.1449 0.1304 41.32$ 653,816$ -$ -$ -$
ELECTRICAL SYSTEMS 7 5 7 0.633 0.0556 0.0352 1/2 15.84$ 125,315$ -$ -$ 125,315$
ELECTRICAL SPECIAL SYSTEMS 5 6 5 0.533 0.0329 0.0175 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 8 8 7 0.767 0.1256 0.0963 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 8 7 7 0.733 0.0193 0.0142 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.5632 1,019,953$ -$ -$ 326,254$
Remarks: 1,346,208$
1
2
3
4
5
6
7
8
9
10
Willard Elementary School - 1990 Classroom Addition
8/2/2017
![Page 50: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/50.jpg)
School Site:
School Building Date: 1922 Assessment Date: 83,095 Building Area
Total Renovation & Additions: 1999
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 5 5 5 0.500 0.0580 0.0290 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 5 5 5 0.500 0.1194 0.0597 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 5 5 5 0.500 0.0614 0.0307 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 5 5 5 0.500 0.0870 0.0435 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 4 4 4 0.400 0.0534 0.0214 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 5 4 4 0.433 0.0134 0.0058 3.81$ -$ -$ -$ -$
WINDOW SYSTEMS 4 3.5 4 0.383 0.0386 0.0148 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 7 7 7 0.700 0.0291 0.0204 8.29$ -$ -$ 688,909$ -$
INTERIOR WALL SYSTEMS 6 6.5 6 0.617 0.0258 0.0159 0.74$ -$ -$ -$ 61,224$
INTERIOR WALL FINISH SYSTEMS 6 6.5 7 0.650 0.0037 0.0024 1.06$ -$ -$ -$ 88,116$
INTERIOR CEILING SYSTEMS 7 6.5 7 0.683 0.0051 0.0035 1.46$ -$ -$ -$ 121,303$
SPECIALTIES COMPONENTS 6 6 7 0.633 0.0130 0.0082 3.70$ -$ -$ -$ 307,835$
EQUIPMENT COMPONENTS 6 4 5 0.500 0.0094 0.0047 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 5 4.5 4 0.450 0.0182 0.0082 5.18$ -$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 5 5.5 5 0.517 0.0338 0.0175 9.64$ -$ -$ -$ -$
ELEVATOR SYSTEMS 6 6 6 0.600 0.0024 0.0014 0.69$ -$ -$ -$ 57,218$
FIRE PROTECTION SYSTEMS 5 5 4 0.467 0.0109 0.0051 3.10$ -$ -$ -$ -$
PLUMBING SYSTEMS 7 5.5 7 0.650 0.0392 0.0255 11.17$ -$ -$ -$ 928,082$
HVAC SYSTEMS 6 5 7 0.583 0.1449 0.0845 41.32$ -$ -$ -$ -$
ELECTRICAL SYSTEMS 6 5 5 0.533 0.0556 0.0296 15.84$ -$ -$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 7 5 7 0.633 0.0329 0.0208 9.36$ -$ -$ -$ 778,170$
SITE SYSTEMS & COMPONENTS 6 7.5 6 0.650 0.1256 0.0816 17.90$ -$ -$ -$ 1,487,678$
SITE PLAYGROUNDS & ATHLETICS 6 7 7 0.667 0.0193 0.0129 5.51$ -$ -$ -$ 457,747$
PRELIMINARY FACILITY CONDITION INDEX 0.5471 -$ -$ 688,909$ 4,287,374$
Remarks: 4,976,283$
1
2
3
4
5
6
7
8
9
10
Bayview Elementary School
8/25/2017
Connection to Community Recreation Center for Gymnasium
![Page 51: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/51.jpg)
School Site:
School Building Date: 1978 Assessment Date: 60,800 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 4 4 4 0.400 0.0580 0.0232 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 4 4 4 0.400 0.1194 0.0478 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 4 4 4 0.400 0.0614 0.0245 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 4 4 5 0.433 0.0870 0.0377 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 6 5 6 0.567 0.0534 0.0303 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 8 6 7 0.700 0.0134 0.0094 3.81$ -$ -$ 231,939$ -$
WINDOW SYSTEMS 8 8 8 0.800 0.0386 0.0309 11.02$ -$ 133,972$ -$ -$
INTERIOR FLOORING SYSTEMS 7 5 7 0.633 0.0291 0.0184 8.29$ -$ -$ -$ 504,070$
INTERIOR WALL SYSTEMS 6 5 6 0.567 0.0258 0.0146 0.74$ -$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 6 5 7 0.600 0.0037 0.0022 1.06$ -$ -$ -$ 64,474$
INTERIOR CEILING SYSTEMS 6 5 6 0.567 0.0051 0.0029 1.46$ -$ -$ -$ -$
SPECIALTIES COMPONENTS 8 8 8 0.800 0.0130 0.0104 3.70$ -$ 225,241$ -$ -$
EQUIPMENT COMPONENTS 5 5 5 0.500 0.0094 0.0047 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 8 8 8 0.800 0.0182 0.0145 5.18$ -$ 314,834$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 6 5 6 0.567 0.0338 0.0192 9.64$ -$ -$ -$ -$
NA ELEVATOR SYSTEMS 0.0024 0.69$ -$ -$ -$ -$
NA FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ -$ 188,398$
PLUMBING SYSTEMS 7 6 7 0.667 0.0392 0.0261 11.17$ -$ -$ -$ 679,071$
HVAC SYSTEMS 7 7 7.5 0.717 0.1449 0.1039 41.32$ -$ -$ 2,511,976$ -$
ELECTRICAL SYSTEMS 6 6 7 0.633 0.0556 0.0352 1/2 15.84$ -$ -$ 481,462$ 481,462$
ELECTRICAL SPECIAL SYSTEMS 6 5 6 0.567 0.0329 0.0186 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 4 4 4 0.400 0.1256 0.0502 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 5 5 5 0.500 0.0193 0.0097 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.5344 -$ 674,047$ 3,225,378$ 1,917,475$
Remarks: 5,816,900$
1
2
3 2017 - New Playground
4
5
6
7
8
9
10
Ghent K-8 [Magnet] School
8/3/2017
2007 - New Chiller
2016 - New Primary Parking Lot
![Page 52: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/52.jpg)
School Site:
School Building Date: 1990 Assessment Date: 64,000 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 3 3 3 0.300 0.0580 0.0174 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 3 3 3 0.300 0.1194 0.0358 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 3 3 3 0.300 0.0614 0.0184 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 3 3 3 0.300 0.0870 0.0261 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 0 1 0 0.033 0.0534 0.0018 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 6 5 7 0.600 0.0134 0.0080 3.81$ -$ -$ -$ 244,146$
WINDOW SYSTEMS 6 6.5 5 0.583 0.0386 0.0225 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 5 4.5 4 0.450 0.0291 0.0131 8.29$ -$ -$ -$ -$
INTERIOR WALL SYSTEMS 6 6 6 0.600 0.0258 0.0155 0.74$ -$ -$ -$ 47,155$
INTERIOR WALL FINISH SYSTEMS 6 6 6 0.600 0.0037 0.0022 1.06$ -$ -$ -$ 67,867$
INTERIOR CEILING SYSTEMS 5 6 5 0.533 0.0051 0.0027 1.46$ -$ -$ -$ -$
SPECIALTIES COMPONENTS 7 7.5 7 0.717 0.0130 0.0093 3.70$ -$ -$ 237,095$ -$
EQUIPMENT COMPONENTS 5 5 5 0.500 0.0094 0.0047 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 7 7 6 0.667 0.0182 0.0121 5.18$ -$ -$ -$ 331,405$
FURNISHINGS [LOOSE] COMPONENTS 6 7 6 0.633 0.0338 0.0214 9.64$ -$ -$ -$ 616,977$
ELEVATOR SYSTEMS 6 5 6 0.567 0.0024 0.0014 0.69$ -$ -$ -$ -$
FIRE PROTECTION SYSTEMS 0.0109 3.10$ -$ -$ -$ 198,314$
PLUMBING SYSTEMS 7 6.5 6 0.650 0.0392 0.0255 11.17$ -$ -$ -$ 714,812$
HVAC SYSTEMS 7 8 8 0.767 0.1449 0.1111 41.32$ -$ -$ 2,644,186$ -$
ELECTRICAL SYSTEMS 6 5 5 0.533 0.0556 0.0296 1/2 15.84$ -$ -$ 506,802$ -$
ELECTRICAL SPECIAL SYSTEMS 6 6 6 0.600 0.0329 0.0197 9.36$ -$ -$ -$ 599,349$
SITE SYSTEMS & COMPONENTS 7 6 6 0.633 0.1256 0.0796 17.90$ -$ -$ -$ 1,145,814$
SITE PLAYGROUNDS & ATHLETICS 5 4.5 4 0.450 0.0193 0.0087 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.4867 -$ -$ 3,388,083$ 3,965,838$
Remarks: 7,353,921$
1
2
3
4
5
6
7
8
9
10
Monroe Elementary School
8/7/2017
2016 - New Asphalt Shingle Roof
Air-Cooled Chiller needs replacement
2007 - Interior Lighting Replacement
![Page 53: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/53.jpg)
School Site:
School Building Date: 1998 Assessment Date: 54,786 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 3 3 2 0.267 0.0580 0.0155 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 3 3 2 0.267 0.1194 0.0318 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 3 3 2 0.267 0.0614 0.0164 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 5 4.5 5 0.483 0.0870 0.0420 2.48$ -$ -$ 135,810$ -$
ROOFING SYSTEMS 5 6.5 5 0.550 0.0534 0.0294 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 5 5.5 4 0.483 0.0134 0.0065 3.81$ -$ -$ -$ -$
WINDOW SYSTEMS 5 5 5 0.500 0.0386 0.0193 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 5 6.5 5 0.550 0.0291 0.0160 8.29$ -$ -$ -$ -$
INTERIOR WALL SYSTEMS 5 6.5 4 0.517 0.0258 0.0134 0.74$ -$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 4 6.5 5 0.517 0.0037 0.0019 1.06$ -$ -$ -$ -$
INTERIOR CEILING SYSTEMS 6.5 7 7.5 0.700 0.0051 0.0036 1.46$ -$ -$ 79,977$ -$
SPECIALTIES COMPONENTS 6 6 6 0.600 0.0130 0.0078 3.70$ -$ -$ -$ 202,961$
EQUIPMENT COMPONENTS 4 4.5 4 0.417 0.0094 0.0039 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 5 5 4 0.467 0.0182 0.0085 5.18$ -$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 5 5 5 0.500 0.0338 0.0169 9.64$ -$ -$ -$ -$
ELEVATOR SYSTEMS 4 5 6 0.500 0.0024 0.0012 0.69$ -$ -$ -$ -$
FIRE PROTECTION SYSTEMS 5 4 4 0.433 0.0109 0.0047 3.10$ -$ -$ -$ -$
PLUMBING SYSTEMS 4 4 6 0.467 0.0392 0.0183 11.17$ -$ -$ -$ -$
HVAC SYSTEMS 7 6 7 0.667 0.1449 0.0966 41.32$ -$ -$ -$ -$
ELECTRICAL SYSTEMS 4 5 4 0.433 0.0556 0.0241 15.84$ -$ -$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 4 5 5 0.467 0.0329 0.0153 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 5 5.5 6 0.550 0.1256 0.0691 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 5 5 4 0.467 0.0193 0.0090 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.4711 -$ -$ 215,788$ 202,961$
Remarks: 418,749$
1
2
3
4
5
6
7
8
9
10
Taylor Elementary School
8/24/2017
![Page 54: FACILITIES CONDITIONS ASSESSMENTS...FCI - Facility Condition Index: A numeric score between 0 and 1 which quantifies the condition of a site/ building facility or group of building](https://reader033.vdocument.in/reader033/viewer/2022052613/60534d13d3995f53d51f7803/html5/thumbnails/54.jpg)
School Site:
School Building Date: 2007 Assessment Date: 96,818 Building Area
BUILDING SYSTEMS & COMPONENTS
System
Condition
Index [SCI]
John
System
Condition
Index [SCI]
Jack
System
Condition
Index [SCI]
Mike
Average
SCI
Importance
Factor
Weight
[ES]
Weighted
SCI
Systems
Replacement
Cost in 2018
Dollars / SF
Priority 1
Estimated Cost of
Capital Renewals
[SCI > .9]
2018 $$$
Priority 2
Estimated Cost of
Capital Renewals
[.9 > SCI > .8]
2018 $$$
Priority 3
Estimated Cost of
Capital Renewals
[.8 > SCI > .7]
2018 $$$
Priority 4
Estimated Cost of
Capital Renewals
[.7 > SCI > .6]
2018 $$$
STRUCTURAL FLOOR SYSTEMS 1 1 2 0.133 0.0580 0.0077 1.65$ -$ -$ -$ -$
STRUCTURAL WALL / FRAME SYSTEMS 1 1 1 0.100 0.1194 0.0119 3.40$ -$ -$ -$ -$
STRUCTURAL ROOF SYSTEMS 1 1 1 0.100 0.0614 0.0061 1.75$ -$ -$ -$ -$
EXTERIOR WALL SYSTEMS 2 1 1 0.133 0.0870 0.0116 2.48$ -$ -$ -$ -$
ROOFING SYSTEMS 2.5 3 3 0.283 0.0534 0.0151 15.22$ -$ -$ -$ -$
DOOR SYSTEMS 2.5 3 2 0.250 0.0134 0.0033 3.81$ -$ -$ -$ -$
WINDOW SYSTEMS 2.5 3 2 0.250 0.0386 0.0097 11.02$ -$ -$ -$ -$
INTERIOR FLOORING SYSTEMS 3 4 3 0.333 0.0291 0.0097 8.29$ -$ -$ -$ -$
INTERIOR WALL SYSTEMS 3 5.5 3 0.383 0.0258 0.0099 0.74$ -$ -$ -$ -$
INTERIOR WALL FINISH SYSTEMS 6 5.5 7 0.617 0.0037 0.0023 1.06$ -$ -$ -$ 102,669$
INTERIOR CEILING SYSTEMS 3 4.5 3 0.350 0.0051 0.0018 1.46$ -$ -$ -$ -$
SPECIALTIES COMPONENTS 3 6 3 0.400 0.0130 0.0052 3.70$ -$ -$ -$ -$
EQUIPMENT COMPONENTS 3 3 2 0.267 0.0094 0.0025 2.69$ -$ -$ -$ -$
FURNISHINGS [BUILT-IN] COMPONENTS 2.5 5.5 3 0.367 0.0182 0.0067 5.18$ -$ -$ -$ -$
FURNISHINGS [LOOSE] COMPONENTS 3 3.5 3 0.317 0.0338 0.0107 9.64$ -$ -$ -$ -$
ELEVATOR SYSTEMS 2.5 3.5 3 0.300 0.0024 0.0007 0.69$ -$ -$ -$ -$
FIRE PROTECTION SYSTEMS 2 3 2 0.233 0.0109 0.0025 3.10$ -$ -$ -$ -$
PLUMBING SYSTEMS 2.5 2.5 3 0.267 0.0392 0.0104 11.17$ -$ -$ -$ -$
HVAC SYSTEMS 3 3 3 0.300 0.1449 0.0435 41.32$ -$ -$ -$ -$
ELECTRICAL SYSTEMS 2 3 3 0.267 0.0556 0.0148 15.84$ -$ -$ -$ -$
ELECTRICAL SPECIAL SYSTEMS 2 3 3 0.267 0.0329 0.0088 9.36$ -$ -$ -$ -$
SITE SYSTEMS & COMPONENTS 2 4 3 0.300 0.1256 0.0377 17.90$ -$ -$ -$ -$
SITE PLAYGROUNDS & ATHLETICS 2 3.5 3 0.283 0.0193 0.0055 5.51$ -$ -$ -$ -$
PRELIMINARY FACILITY CONDITION INDEX 0.2382 -$ -$ -$ 102,669$
Remarks: 102,669$
1
2
3
4
5
6
7
8
9
10
Coleman Place Elementary School
8/24/2017