GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASE NOVEMBER 16, 2015

Upload: others

Post on 09-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Page 2: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Project Elements Plot 700: Location of all future facilities

Existing BMF Location

Existing GTU Complex Location: •  GTU •  Fueling Station •  Car Wash

Permanent Structures  (THIS PROJECT)

•  GTU Facility

•  Fueling Station

•  Car Wash Facility

Permanent Structures  (NEXT PROJECT)

•  Bus Maintenance Facility

•  CNG Facility

Temporary Structures  (THIS PROJECT)

•  Temporary GTU Offices & Inspection Bays

SOUTH FIELD RELOCATION

PHASE I (THIS PROJECT)• TEMPORARY GTU OFFICES & INSPECTION BAYS• FUELING STATION• CAR WASH FACILITY

PHASE II (THIS PROJECT)• GTU FACILITY

PHASE III (FUTURE PROJECT)• BUS MAINTENANCE FACILITY• CNG FACILITY

Page 3: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Car Wash Facility

Overview – Existing Facilities Plot 700: GTU, Fuel Station, Carwash and BMF Locations

1) Ground Transportation Unit (GTU) - Offices - Inspection Bays

- Radio Shop 2) Car Wash Facility 3) Fueling Station

Fueling Station

Ground Transportation Unit

EXISTING SOUTH FIELD FACILITIES

Page 4: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Project Layout Major Scope Items: 1.  GTU Complex

•  GTU •  Radio Shop •  Car Wash •  Fueling Station

2.  Temporary Facilities 3.  Bus Maintenance Facility

N Access Rd

Plot 700

EXISTING SITE

Page 5: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

AERIAL VIEW VIEW FROM NORTHEAST CORNER OF SITE

EXISTING SITE

Page 6: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

pau

let

t t

ag

ga

rt

ar

ch

it

ec

ts

PLOT 700SITE

PREVAILINGWINDS

PACIFIC BAY

SAN BRUNO MOUNTAIN

SWEENEY RIDGE

SUM

MER

WINTER

WIND + SUN

Page 7: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

pau

let

t t

ag

ga

rt

ar

ch

it

ec

ts

TAKE OFF+ LANDING

PLOT 700SITE

PREVAILINGWINDS

PACIFIC BAY

SAN BRUNO MOUNTAIN

SWEENEY RIDGE

AIR QUALITY +ACOUSTICS

Page 8: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

11

pau

let

t t

ag

ga

rt

ar

ch

it

ec

ts

SCHEME A

KEY

1 GTU OFFICE ( 2 - STORY)2 GTU INSPECTION BAY3 RADIO SHOP BAY4 BMF OFFICE5 BMF REPAIR BAY6 CNG TANK STATION7 CNG STORAGE8 CCSF CAR WASH9 CCSF FUELING STATION10 BUS PARKING11 AIRCRAFT FUEL LINE

PROS

• Combined BMF/GTU reduces footprint• Cost-savings if single construction phase• Allows for phased construction• Separate staff parking area• Inspection bays shielded from wind• Limited perimeter for offices (light/air) • No access at N Access Road

CONS

• Fueling Station & Carwash distant from N Access Road• Parking intermingled at fueling/carwash area• Bus/car circulation intermingled• Bus parking intermixed w/ car parking• Isolated staff parking inadequate for BMF & GTU• Difficult bus maneuverability• Customer parking not consolidated/clear• Too many access points into site

PARKING

PER CEQA GTU CAR 118 BUS 11PROVIDED GTU CAR 107 BUS 11

6

7

1

3

2

5

4

8

9

10

10

10

10

1010

10

10

10

5

114

1

3

9

2

6

78

BMF CAR 45 BUS 41

BMF CAR 40 BUS 39

11

pau

let

t t

ag

ga

rt

ar

ch

it

ec

ts

SCHEME B

KEY

1 GTU OFFICE ( 1 - STORY)2 GTU INSPECTION BAY3 RADIO SHOP BAY4 BMF OFFICE5 BMF REPAIR BAY6 CNG TANK STATION7 CNG STORAGE8 CCSF CAR WASH9 CCSF FUELING STATION10 BUS PARKING11 AIRCRAFT FUEL LINE

PROS

• Clear public presence for GTU customers• Clarity of “public” parking area / access• Separation of buses & cars• One story blocks cost effective (no elevator/stairs)• Limited access from N Access Road• Radio inspection bay shielded from winds• Large areas for temporary facility & staging• Separation of staff parking

CONS

• GTU inspection bay may be vulnerable to winds• Fueling / carwash difficult to fence off if required

6

7

1 3

2

5

4

8

9

11

6

4

1 23

5

9

78

10

10

10

11

10

10

10

11

PARKING

PER CEQA GTU CAR 118 BUS 11PROVIDED GTU CAR 152 BUS 11

BMF CAR 45 BUS 41

BMF CAR 50 BUS 35

pau

let

t t

ag

ga

rt

ar

ch

it

ec

ts

SCHEME C1

KEY

1 GTU OFFICE (2 - STORY)2 GTU INSPECTION BAY3 RADIO SHOP BAY4 BMF OFFICE5 BMF REPAIR BAY6 CNG TANK STATION7 CNG STORAGE8 CCSF CAR WASH9 CCSF FUELING STATION10 BUS PARKING11 AIRCRAFT FUEL LINE

PROS

• 2 story GTU conserves site area• Larger north site reserved for buses• Public presence for CNG, CCSF & carwash• Radio Shop bay shielded from wind• Large area for temporary facility & staging

CONS

• Major access onto N Access Road• Carwash intermingled w/ buses• GTU buses intermingled w/ BMF• GTU less “public” location• Western solar exposure to GTU/BMF• GTU inspection bays vulnerable to winds

6

1

3

2

5

4

89

11

10

PARKING

PER CEQA GTU CAR 118 BUS 11PROVIDED GTU CAR 114 BUS 11

BMF CAR 45 BUS 41

BMF CAR 49 BUS 41

7

11

1010 10

5

4

1

9

2

6

8

3

7

pau

let

t t

ag

ga

rt

ar

ch

it

ec

ts

SCHEME D

KEY

1 GTU OFFICE ( 2 - STORY)2 GTU INSPECTION BAY3 RADIO SHOP BAY4 BMF OFFICE5 BMF REPAIR BAY6 CNG TANK STATION7 CNG STORAGE8 CCSF CAR WASH9 CCSF FUELING STATION10 BUS PARKING11 AIRCRAFT FUEL LINE

PROS

• Clear public presence for GTU customers• Good/clear circulation for buses• Bus/car circulation generally separate• GTU overflow opportunity into bus area• 2 story BMF/GTU conserves site area• Separation of staff parking• Public presence for CNG station• CCSF Fueling & Carwash easily fenced• Large area for temp. facility & staging

CONS

• GTU inspection bay may be vulnerable to winds• GTU customer parking limited• Buses must make full loop if parking filled• CNG access onto N Access Road traffic

6 7

1 3 2

5

4

8

9

10

11

10

10

11

10

6

4

1 23

5

9

7

8

PARKING

PER CEQA GTU CAR 118 BUS 11PROVIDED GTU CAR 106 BUS 12

BMF CAR 45 BUS 41

BMF CAR 45 BUS 41

A B C D

Page 9: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

800

NORTH ACCESS RDN

ORTH FIELD

RD80' MIN

15'-0

"

10' M

IN

BMF13,700 SF(CEQA)

RADIOSHOPBAYS

3312 SF

GTU(2-STORY)10,006 SF

16,630 SFTOTAL

GTUINSPECTION

BAYS3312 SF

BUS QUEUE(4)

10

7

13

SCHEME AGTU (2-STORY)=16,630 INTERIOR SF

PARKINGBMF PROGRAM PROVIDEDCAR 41 36BUS 38 28GTUCAR 118 93/83BUS 10 0/8OVERFLOWCAR - 16/0BUS - 0/6

80' M

IN

20'-0

"

50'110'

10' MIN

25' M

IN

37' MIN

PLOT 700: SITE PLAN SCHEME A10.23.15

Page 10: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Page 11: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

NORTH ACCESS RD

NO

RTH FIELD RD

80' MIN

15'-0

"

10' M

IN

BMF13,700 SF(CEQA)

RADIOSHOPBAYS

3312 SF

GTU(2-STORY)10,006 SF

16,630 SFTOTAL

GTUINSPECTION

BAYS3312 SF

BUS QUEUE(4)

10

7

13

80' M

IN

50'110'

10' MIN

25' M

IN

37' MIN

SITE MASTER PLANSCALE: 1"=60'-0" DRAFT 11.05.15

SFO PLOT 700: 'EXHIBIT A'

CONC SPILL CONTAINMENTTRAY PER CODEREQUIREMENTS

UNDERGROUND FUELLINES TO DISPENSERS

±185'

±155'

±125'

NORTH ACCESS ROAD

COORDINATE TRAY EDGEW/ (E) UNDERGROUND FUELLINES; HAND-DIG WITHIN 7'

67'-1

0"11

3'-0

"

100'-0"

120'-8"

PROVIDE PTD GALV STLBOLLARDS AT FUEL TANKS6'-0" OC MIN

SITE PLAN: FUEL STATION & VEHICLE WASH1

KEY PLAN (NTS)

VEHICLE WASH AND FUEL STATION SCALE: 1"=20'-0" DRAFT 11.5.15

SFO PLOT 700: 'EXHIBIT B'

Page 12: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Page 13: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Page 14: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Page 15: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Page 16: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Page 17: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Page 18: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Page 19: GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT … · north access rd north field rd 80' min 15'-0" 10' min bmf 13,700 sf (ceqa) radio shop bays 3312 sf gtu(2-story) 10,006 sf 16,630

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

GTU RELOCATION PROJECT TERMINAL 1 REDEVELOPMENT PROGRAM SAN FRANCISCO INTERNATIONAL AIRPORT

CIVIC DESIGN PRESENTATION: CONCEPTUAL PHASENOVEMBER 16, 2015

Project Schedule

Q3   Q1   Q2   Q3   Q4   Q1   Q2   Q3   Q4  

Jan  15  

GTU  Programming  3  Months  

GTU  Design  

Temporary  Facility  Construc;on  

GTU  Construc;on    

Project  Closeout  

Q4  

3  Months  

2  Mo.  

3  Months   Temp  Facility  Design  

Q  2017  

Begin  U;lity  Installa;on  

April  30  Move-­‐in  Temp  Facility  

Fuel  Sta;on  Opera;onal  

Jun  1   April  1      GTU  Move-­‐in  

2016  

Sept  30  (3)  Layout  Alterna;ves  

2015  

11  Months  

Temp  Facility  Programming  

6  Months  

11  Months  

PROJECT SCHEDULE