Implementing & Sustaining Kaizen The Polaris Way
SreeRam Mangalampalli
Lean Operations Manager
Polaris Industries
Polaris Industries
Roseau Operations
Lean Journey
Kaizen Approach Daily Management
Strategic Management
The Kaizen Process
Resources
Sustainability
Challenges
Agenda
LEAN2012.COM
Canada 14%
International
16%
United States
70%
• Manufacturer of high-performance motorized products
• Strong distribution channel – 1,500 dealers in North America
– 1,000 dealers Internationally
• Productive non-union workforce – 4,400 strong
• Stakeholder focus – Product innovation for customers
– Profit sharing for employees
– Dividends / growth for investors
Off-Road Vehicles
(ORV) 69%
On-Road
Vehicles 5%
Snowmobiles
11%
Parts Garments
& Accessories
15%
ATVs
Side-by-
Sides
Key Facts 2011 Sales by Product
Sales 2011 Sales by Geography
LEAN2012.COM
Record Financial Results
• Sales top $2B for 1st time, up 33% to record $2.66B
• Net Income up 55% to $228M; EPS up 50% to $3.20
• Gross Margins up 130 bps to 27.9%
• Net Income Margins up 120bps to 8.6%
Expanded Global Reach
• Opened a plant in Monterrey, Mexico in 2011; >22k high-quality vehicles produced
• International business grew 39%, strong, experienced leaders in place to expand growth
• European HQ established in Rolle, Switzerland
Exceptional Growth Across all Business Units
• ORV continued to gain momentum, extended market share lead
• Military business more than doubled in size, ended 2011 with record backlog
• Victory profitably increased sales and share, climbed to #2 in its segment
Acquisitions Fueling On-Road Growth
• Indian: Redemption of iconic brand
• GEM: Electric people mover leader
• Goupil: Electric light duty hauler leader
LEAN2012.COM
North America ORV Market Share
0%
5%
10%
15%
20%
25%
30%
35%
2005 2006 2007 2008 2009 2010 2011
Arctic Cat
Can Am
Deere
Honda
Kawasaki
Kubota
Polaris
Suzuki
Yamaha
LEAN2012.COM 6
Roseau Operations • Produce approximately 700 units/day
– Snowmobile - 1 Line, 1 Shift (Batch) – ATVs - 1 Line, 2 Shifts, (Mixed Model) – RZR - 1 Line, 2 Shifts, (Mixed Model) – W.I.P. Inventory Turns – 72+
• Key Processes – Assembly – Metal Paint – E-Coat, Powder – 2 shifts – Plastic Paint – Liquid w/Clear Coat – 2 shifts – Weld – Steel & Aluminum Pulse MIG Welding, 28 Robotic Cells, 3 Self
Piercing Rivet Cells – 3 shifts – Tube Fab – Laser Cutting & Tube Bending –(24/7) – Injection Molding – 11 presses Ranging from 400 Ton to 3950 Ton (24/7)
• Nearly 716,000 sq ft - 66,516 sq meters – 543,200 sq ft – mfg – 50,463 sq meters – 96,000 sq ft – engineering – 8,918 sq meters – 76,800 sq ft – plastic injection – 7,135 sq meters
• 1148 employees (mfg), 229 (temps), 225 (eng) – 1780 total
LEAN2012.COM
Lean Journey • Mid 1990s
– Partners in Continuous Improvement
– Total Quality Management
– Rapid Growth
– Avoid Exponential Hiring
– Training Employees
– Empowering Employees
– Cell Teams
– Waste and 5 Pillars
• 2008
– Toyota Production System
– Lean Operations Manager
– Consultant Visit
– University of Kentucky
– Operational Excellence
– Tracking Ideas/ Kaizens
– Value Stream Mapping
– A3 Sheet problem solving
– 3P (Production Preparation Process)
Some of the terminology stills exists in our culture
LEAN2012.COM
Polaris Kaizen Approach
8
STRATEGIC
PLAN
GOAL
DEPLOYED
POLICIES
VALUE
STREAM
MAPPING
KEEPING
OUR KAIZEN
EFFORTS
FOCUSED
DAILY
MANAGEMENT
KPI’s
With limited resources we need to keep our Kaizen activity
“Focused” on our Top Priorities
Maximum Waste
Reduction
LEAN2012.COM
2 Way approach
9
Strategic Management • GDP
• CI Plan
• Value Stream Mapping
• Kaizens and Projects
Daily Management
• Ideas
• Daily Problem
Solving/ KPI Focus
Overlap
LEAN2012.COM
DAILY MANAGEMENT
10
LEAN2012.COM
Ideas and Projects • Empowering
Employees
– Improve Key Process Indicators (KPIs)
– Ideas
• Cards
• Newspaper
• SharePoint
11
LEAN2012.COM
Statistics
LEAN2012.COM
Operational Excellence Boards
Yearly
Objectives
Plant
Safety
Key Process Indicators
Safety, Quality, Delivery and
Productivity
Status & Paretos
Ideas
Implemented
By Month
Kaizen Actions
Team Leaders
Hours off line
on projects
Group Leader’s
Version
Daily
Production
Summary
Report
LEAN2012.COM
STRATEGIC MANAGEMENT
LEAN2012.COM
Continuous Improvement Plan
• CI Plan
– Strategic projects/ GDP Goals
– Priorities of Focus
– Key Process Indicators (KPI)
• CI Roadmap
– Kaizen events in each bucket
– Aligned and prioritized
– Assigned owners
– Assigned project leaders
15
LOCATION Department Planned
12-month
Savings
Actual
Savings
(Calendar)
$ - $ - Start
Date
Compl.
Date
KPI Quality Roseau ORV Assembly Routings (Vent Lines and Coolant Lines) Closed Dan Tate Matt Kvien Jared Evans 5/1/2011 6/30/2011
KPI Quality Roseau ORV Assembly Throttle Cable Routing Active Dan Tate Matt Kvien Bob Moser 4/15/2011
KPI Quality Roseau ORV Assembly Missing fasteners in Hardware bags Active Dan Tate Shane Jobman Bob Moser 3/15/2011
KPI Quality Roseau Line C/ Sled Assembly Start-up Changeover verification Closed Bill Miller Keith Buley Wendy Sikorski 3/14/2011 9/30/2011
KPI Quality Roseau Line C/ Sled Assembly Handle Bar Assembly Closed Bill Miller Steve Erickson Dave Reed 3/1/2011 5/31/2011
KPIQuality
RoseauLine C/ Sled Assembly Critical Routings Process and Review
ClosedBill Miller Joel Brichacek Dave Reed
2/14/2011 7/7/2011
KPI Productivity Roseau Line C/ Sled Assembly Gluing and Chasis Area Closed Bill Miller Keith Buley Multiple 2/14/2011
Line C Rail Line Area Closed Cycle Time Bill Miller Art Moen Lynn Kostrzewski 1/25/2011 1/28/2011
Chassis Gluing Area Closed Capacity Bill Miller Keith Buley Lynn Kostrzewski 2/15/2011 6/14/2011
KPI Quality Roseau Plastics Injection Molding Purging process establishment to reduce contaminationClosed
Harley McMillin Nick Erickson1/1/2011 2/28/2011
KPI Quality Roseau Plastics Injection Molding Cleaning Barrel and Screw process to reduce contamination Closed Harley McMillin Jamie Lisell 3/1/2011 4/30/2011
KPI Safety Roseau Plastics Injection Molding Degating Process and improve knife safety Active Harley McMillin Jamie Lisell 5/1/2011 6/30/2011
KPI Safety Roseau Plastics Injection Molding Implementing Magnetics on smaller presses Brainstorming Harley McMillin Jamie Lisell 7/1/2011 8/31/2011
KPI Quality Roseau Plastics Injection Molding Changing to improved TPO to improve processes Active Harley McMillin Nick Erickson 9/1/2011 10/31/2011
GDP Mfg. Realignment Roseau Materials Tube Fab Move Planning, Testing and Shipping Closed Jane Evans MaryJo Oslon None Ongoing 8/25/2011
GDP Mfg. Realignment Roseau Materials Osceola Transition parts/ Vendors Planning Active Jane Evans MaryJo Oslon None Ongoing Ongoing
GDP Mfg. Realignment Roseau Materials Monterrey/ S.L. Outbound Transitions Closed Jane Evans Maureen Langus None Ongoing Ongoing
KPI Material Flow Roseau Materials Internal Material Flow Strategy Active Jane Evans Glen Limesand/ Paul Gummeringer 1/13/2011
Internal Material Flow Strategy Planning Closed Jane Evans Glen Limesand/ Paul GummringerSreeRam Mangalampalli 1/13/2011 3/21/2011
Internal Picking Process Active Jane Evans Darby Dokken Robert Kulig 3/21/2011 5/31/2011
Plastic Plant-More Frequent Delivery of Parts Closed Jane Evans Paul Gummeringer Robert Kulig 3/26/2011 5/31/2011
South Wall Organization Active Jane Evans Glen Limesand/ Paul GummringerLynn Kostrzewski
Driver dedicated to Dunnage Closed Jane Evans Glen Limesand/ Paul Gummringer 8/25/2011
Parts Ordering Process Active Jane Evans Glen Limesand/ Paul GummringerSreeRam Mangalampalli 1/13/2011 2/24/2011
Implementation of Kanban Queuing system Planning Jane Evans
Rear Shock Sub Assembly Hot Calls reduction Active Dan Tate Shane Jobman 8/1/2011
KPI Material Flow Roseau ORV Assembly Parts Presentation in Line A Active Dan Tate Dwight Ruud Multiple 11/20/2010 3/31/2011
Empty Carts Process and Prioritization of Areas Closed Dan Tate Dwight Ruud SreeRam Mangalampalli 11/22/2010 11/22/2010
Hubs and Shafts Area Closed Dan Tate Shane Jobman Robert Kulig 11/29/2010 12/2/2010
Radiators Area Closed Dan Tate Matt Kvein Robert Kulig 12/6/2010 12/9/2010
Brakes Area Closed Dan Tate Mike Klien Lynn Kostrzewski 12/13/2010 12/14/2010
Outer Clutch Cover Closed Dan Tate Matt Kvein Lynn Kostrzewski 1/12/2011 1/12/2011
Side Panels Closed Dan Tate Mike Klien Lynn Kostrzewski 2/9/2011 2/10/2011
Engines Assembly Line Closed Dan Tate Matt Kvein Lynn Kostrzewski 6/28/2011 6/30/2011
Water Spider Concept Active Dan Tate Robert Kulig Robert Kulig 9/19/2011
Line A Section 3 Active
Sequencing Tires to Line A Active Dan Tate Dwight Ruud MaryJo Olson
KPI Material Flow Roseau ORV Assembly Parts Presentation in Line B Active Dan Tate Shane Jobman 2/4/2011 5/1/2011
Prioritization of areas Closed Dan Tate Myles Hogenson SreeRam Mangalampalli 2/4/2011 2/4/2011
Supply Tech Areas 411 and 501 Closed Dan Tate Beth Abrahamson Robert Kulig 2/14/2011 2/15/2011
Shocks and Springs Area Closed Dan Tate Shane Jobman Lynn Kostrzewski 2/22/2011 2/24/2011
Gas Tank Hoses Area Closed Dan Tate Josh Broten Lynn Kostrzewski 3/1/2011 3/3/2011
Control arm Trailing arm Brakes area Closed Dan Tate Shane Jobman Lynn Kostrzewski 3/22/2011 3/24/2011
Rear Shock Sub-Assembly Consolidation Closed Dan Tate Shane Jobman Lynn Kostrzewski 4/11/2011 4/15/2011
Crating Area Active Dan Tate Dave Reed SreeRam Mangalampalli 6/10/2011 6/14/2011
s Line A moving south Closed Dan Tate Dave Reed SreeRam Mangalampalli 6/10/2011 6/14/2011
Adjusted width of conveyors for RZR crates Closed Dan Tate Dave Reed SreeRam Mangalampalli 6/10/2011 6/14/2011
Part presentation of work area Closed Dan Tate Dave Reed SreeRam Mangalampalli
Line A straight to yard Planning Dan Tate Dave Reed SreeRam Mangalampalli
Setting up rework area Planning Dan Tate Dave Reed SreeRam Mangalampalli
General Ergonomics Planning Dan Tate Dave Reed SreeRam Mangalampalli
6X6 Parts Kitting Active Dan Tate Lynn Kostrzewski
KPI Mixed Model Effectiveness Roseau ORV Assembly Mixed Model Effectiveness Active Dan Tate Dwight Ruud 12/28/2010 6/30/2011
Scheduling Communications Improvement Closed Dan Tate Dwight Ruud 12/28/2010 12/28/2010
KPI Material Flow Roseau Materials Inbound Material Strategy Active Mark Karl Jane Evans Sree Mangalampalli 4/17/2011 5/31/2011
GDP Mfg. Realignment Roseau Materials Central Planning Active Jane Evans MaryJo Oslon None 11/18/2010 6/30/2011
GDP Mfg. Realignment Roseau Welding/ Tube Fab Tube Fab Move Production start up Active Al Desrosier None 1/26/2011 12/31/2011
GDP Mfg. Realignment Roseau Engines Engines Move Cancelled Daniel Tate None TBD TBD
KPI Quality Roseau Paint Metal Paint Light Paint (25% improvement) Active Richard Lynch Dwayne Butler Renee Senechal 12/27/2010 7/31/2011
First top 3 parts Active Richard Lynch Dwayne Butler Renee Senechal 12/27/2010 7/31/2011
KPI Quality Roseau Paint Metal Paint E-Coat Bubbles Closed FTQ Richard Lynch Dwayne Butler Scott Kokal 5/1/2011 8/1/2011
KPI Safety Roseau Paint Metal Paint Loading/ Unloading area Active Richard Lynch Jim Kvidt TBD 5/1/2011 4/15/2011
KPI Safety Roseau Paint Paint Carts Analysis Active Richard Lynch Jim Kvidt Sree Mangalampalli 6/1/2011
KPI Safety Roseau Paint Metal Paint Parts Storage Standardization Active Richard Lynch Jim Kvidt TBD 3/14/2011 4/30/2011
KPIQuality
RoseauPaint Plastic Paint Dirt (especially air borne)
Active
FTQRichard Lynch Renee Senechal Lynnette Jackson
12/27/2011 7/31/2011
KPI Quality Roseau Paint Plastic Paint Runs and Sags Closed Richard Lynch Jason Keller Renee Senechal 2/22/2011 4/20/2011
KPI Environment Roseau Paint Paint Reductions of Hazardous waste material Cancelled Richard Lynch Renee Senechal David Dirks 3/15/2011 12/31/2011
KPI Environment Roseau Environmental Plastic Landfill Waste Reduction Active Jim Peterson David Dirks David Dirks 1/1/2011 6/30/2011
Delta Recycling Active Jim Peterson David Dirks David Dirks 1/1/2011 6/30/2011
Central Converting Active Jim Peterson David Dirks David Dirks 1/1/2011 6/30/2011
KPI Quality Roseau Welding/ Tube Fab Robot Repeatability Active Al Desrosier Jeremy Karnowski Scott Kokal 1/4/2011 12/31/2011
Grease zerk location team Active Al Desrosier Pat O Connell 1/26/2011 3/1/2011
RZR control arm tooling CLosed Al Desrosier Jeremy Karnowski 9/1/2010 2/15/2011
Arc signature tracking Active Al Desrosier Jason Ball 2/1/2011 4/1/2011
KPI Safety Roseau Welding/ Tube Fab Part Management/ Flow Active Al Desrosier Pat O Connell Robert Kulig 1/4/2011 12/31/2011
Material flow-weld,paint,asm Prioritization of areas Active Al Desrosier Pat O Connell Robert Kulig 2/21/2011 2/22/2011
Small parts area material flow Active Al Desrosier Hasso Rothenbacher Robert Kulig 2/23/2011 2/25/2011
Weld Frame Material Management Re-alignment (ATVs) Active Al Desrosier Greg Anderson Lynn Kostrzewski 3/1/2011 3/2/2011
KPI Productivity Roseau Welding/ Tube Fab Productivity in Mixed Model Environment Active Al Desrosier Todd Koenig TBD 1/4/2011 12/31/2011
Rng 400/500 robot through-put- lower frame Closed Al Desrosier Dave Thompson 11/15/2010 1/15/2011
RZR XP robot through-put/scrap/FTQ lower frame Active Al Desrosier Kurt Wojchowski 2/2/2011 4/1/2011
Rng 400/500 crew robot through-put- lower frame Planning Al Desrosier Dave Thompson
RZRXP performance team Active Al Desrosier Todd Koenig 2/1/2011 3/1/2011
Moto 18 service/production setup of tunnels Closed Al Desrosier Jason Ball 2/4/2011 4/1/2011
Small parts w/c utilization Brainstorming Al Desrosier Todd Koenig
GDP Mfg. Realignment Parts Packaging (Monterrey/ Spirit Lake/ Roseau) Active Mark Karl Andy Miller Max Gustafson 10/1/2010 3/18/2011
Plastic Parts/ Paint Active Mark Karl Andy Miller Max Gustafson 10/18/2010 3/18/2011
Weldments Active Mark Karl Andy Miller Max Gustafson 8/1/2010
Clutches Active Mark Karl Andy Miller Max Gustafson 10/1/2010
Exhaust Active Mark Karl Jeff Schwochert
Seats (Vendor involved) Active Mark Karl Jeff Schwochert
Tubes Active Mark Karl Jeff Schwochert 1/17/2011 3/18/2011
Type: GDP/
KPI &
DAILY
MGT
Type of
Savings
StatusProject TitleTTI's / Metric to Improve
Planned Dates
Team Leader FacilitatorOwner
LEAN2012.COM
Value Stream Mapping
• Once a Year
• Action Plan review
• Current State update
• Opportunities identified
• Ideal State discussed
• New Action Plan is developed with Priorities and Owners
Snowmobiles ATV
Side by Sides
LEAN2012.COM
THE KAIZEN PROCESS
LEAN2012.COM
Charter
• Assimilate and plan
– Problem Definition
– Objectives
– Scope
– Team
– Timeframe
– Key Activities
– Limitations
• Consistency of message
– Start with charter
18
LEAN2012.COM
Kaizen • Current State
– Process Flow
– Data Collection
– Root Cause Analysis
• Opportunities – Identify as we go
– Prioritize
• Future State – How different
– Short/ long term
• Action Plan – Owners and Dates
– Follow-up
19
LEAN2012.COM 20
Problem Points:
Improvement Costs:
• Snow Assembly area will face increased capacity this year. Team’s objective was to brainstorm and develop action plan on how to improve the bottleneck, gluing area.
• $78K (conservative estimate) for new layout to offset $250K increase of costs in the area due to increased capacity.
Improvement Points:
Impact:
• Improved table design to handle both front and back of chassis.
• Adding additional table to improve capacity and avoid overtime
• New layout and process will help the line increase capacity from 150 line rate to around 190 line rate with minimum increase in costs.
Before Improvement After Improvement
Example 1:
Snow Assembly Line Chassis Gluing Area
LEAN2012.COM 21
Problem Points:
Improvement Costs:
• There were opportunities around product design associated with Safety & Ergnomics, Common parts, process improvements.
• Can’t put a cost to some that are related to employee safety.
Improvement Points:
Impact:
• Developed an action list of 155 ideas. 64 will be design related. • Examples: Heat Shields, Rear racks, Motor Mounts, Seat install,
cotter pin, steering posts, handle bars, etc.
• 2011-1 recordable. 5 first aid injuries in 2012. • At least $66,000 in downtime, rework costs reduced. • Cost of mandated gloves/ employee inconvenience • Lost production capacity with downtime.
Before Improvement Action plan
# Idea Station # Payoff matrix Person Responsible Implementation Date Comment Model 1/2/3 Category
31 4011835-LH CTRL set screw fall out or are too tight for sliding on handle bar A102 1 Steve E/Mike K 5/23/2012 Sportsman 1 Process Improvement
24 paint in the EPS lower post tie rod holes-have to drill-go to plated part A111 1 Ron D/Mike K. 5/23/2012 1 process improvement
40 commonize 500 trg steering post with the sultan A111 1 Steve E/Jeremy K 5/23/2012 Touring 1 Common Parts - Ex Hardware
36 Commonize handle bars- have option for mirrors left. common handle bars SP and XP. Goal A131 1 Steve E/Mike K 5/23/2012 1 Common Parts - Ex: Hardware
45 power steering skip tooth is off-manually rotate. EPS A201 1 Dan Weber/Mike K 5/23/2012 XP 2 Safety and Ergonomics
15 Remove small cotter pin (difficult to install), need easier locking pin. brake pedal cotter pin A202 1 Bryce E,Steve E/Mike K 5/23/2012 Sportsman 1 process improvement
46 bar code XP rear gear cases hard to scan-relocate A501 1 Steve E 5/23/2012 ECO in system, 2 Safety and Ergonomics
4 put on hub caps on tractor models, move caps to strut assembly B201/202 1 Steve E/Jacob M 5/23/2012 Tractor 1 Safety and Ergonomics
22 get 1-piece boot for the winch harness on the contactor E102 1 Jeremiah J/Mike K 5/23/2012 1 process improvement
23 add 2" length to the winch wires (Mike Klien and Greg Minor) E102 1 Jeremiah J/Mike k 5/23/2012 1 process improvement
32 Xp's winch wire, ground wire too short E102 1 Jeremiah J/Mike K 5/23/2012 xp 1 Miscellaneous
37 500/800 clutch bolts and washers commonized. Clutch mounting hardware 1/4" difference. E201 1 Ron D/Jacob M 5/23/2012 Sportsman 1 Common Parts - Ex: Hardware
1 Heat shields and pipes are sharp for XP's F302 1 Ron D/Dan Weber/Jacob M 5/23/2012 Print review, Dan Tate to discuss with Rob S. XP 1 Safety and Ergonomics
16 800 exhaust pipe hit bolt head on engine causing vibration F302 1 Steve E/Jeremy K 5/23/2012 Sportsman 1 process improvement
21 Xp air box LH mount cracks through knit line G301 1 Dan Weber/Mike K 5/23/2012 1 process improvement
25
Radiator overflow bottle modified so that brake line runs underneath. Avoids clipping brake
line. G501 1 Steve E/Jeremy K 5/23/2012 All 1 Process Improvement
26 Headlight wires need to be longer on R/S on 500 forest. XPs too (pod Light) H201 1 Greg Minor/Bryce E/Jacob M 5/23/2012 Review all models Forrest 1 Process Improvement
83 XP Speedo-doesn't fit flush. Make clips smaller. H102 1 Bryce E/Mike K 5/23/2012 XP 2 Process Improvement
17 8450096-25 hose too short, need to add 1 inch F401 1 Steve E/Jeremy K 5/23/2012 Review print for angle fitting Sportsman 1 Process Improvement
27 Torx screw on pods instead of philips I152 1 Bryce E/Jacob M 5/23/2012 1 Process Improvement
11 Pods on tractors do not stay plugged in and are hard to plug in I201 1 Bryce E/Jeremy K 5/23/2012 Tractor 1 Safety and Ergonomics
5 new plug for 800's on RH foot well near exhaust pipe, getting part quoted by Jay N. I302 1 Tammy Wahl/Jeremy k 5/23/2012 Parts in testing Sportsman 1 Safety and Ergonomics
14 Torx bits break in large amounts for rear rack assembly. Torque heads small. J201 1 Ron D/Mike K. 5/23/2012 $4036 in rework last year, $4000 in labor 1 process improvement
9 Xp touring seat suspension (concern with going back to improved old design) J402 1 Ron D/Steve E/Mike K. 5/23/2012 XP 1 Safety and Ergonomics
Xp air box seal G252 1 Dan Weber/Mike K 5/23/2012 XP 2 Process Improvement
Sultan RH side panel foil needs eco change J201 1 Steve E 5/23/2012 just eco foil for Sportsman 2 Process Improvement
41 Trailboss tie rods commonized with sultans A111 2 Steve E/Jeremy K need to review with prints and at next build Trail Boss 1 Common Parts - Ex Hardware
35
Commonize motor mounts and get rid of 076 motor mount(and isolators). engine mounts
have studs .06 shorter on one side. engine brackets-plate different colors to aid
differentiation C022 2 Bryce E/Jacob M All 1 Common Parts - Ex: Hardware
55 One Battery for 550/ 850 XP (3 to 2) C101 2 Ron D/Mike K. XP 2 Common Parts - Ex: Hardware
62 Can we reduce our battery cables? D201 2 Bryce E/Greg Minor/Jacob M All 2 Common Parts - Ex Hardware
75
400 front radiator hose, currently 2 panduits, can it replace with one clamp, Tractor Upper LH
Rad hose common with 500 D501 2 Steve E/Bryce E/Jeremy K need to review at next build, get routing photo Sportsman 3 Miscellaneous
10 make SP contactor nut/bolt asm vs selftaper E102 2 Ron D/Steve E/Mike K. Sportsman 1 Safety and Ergonomics
33 XP 550 pipe angle to engine, (exhaust leaks) Generates lot of rework. F302 2 Ron D/Bryce E/Mike K. xp 1 Miscellaneous
78
XP tool box seal glued in, sportsman is not. Can glue be removed, can seal be put in at
vendor F401 2 Dan Weber/Mike K xp 3 Common Parts - Ex: Hardware
81 Need pry bar to close the rear tool box on XP J201 2 Dan Weber/Mike K XP 3 Process Improvement
6 front cab on forest INTL models need to have holes drilled and plugged. I152 2 Steve E/Jacob M Forest 1 Safety and Ergonomics
28 Fit up on painted cabs have to add panduit- sultan I152 2 Steve E/Bryce E/Jeremy K Sportsman 1 Process Improvement
52 Side panels on XP's tabs not going in I301 2 Bryce E/Mike K XP 2 Process Improvement
18 touring passenger foot pad, difficult to install bolts, I301/I302 2 Bryce E/Jeremy K Review next build Touring 1 Process Improvement
29 Bad fit up in all rear racks J201 2 Ron D/Mike K. All 1 Process Improvement
66 Side panels on sultans come out of grommets. Rubber grommets fit issue? I401 2 Steve E/Jeremy K Review with Clint on the line Sportsman 1 process improvement
7 SP 500 touring and sportsman seats too hard to go on J402 2 Steve E/Jacob M Sportsman 1 Safety and Ergonomics
8 Tractor seats are impossible to put on. J402 2 Steve E/Jacob M Tractor 1 Safety and Ergonomics
51 Glue is not good on the hand warmers 9not sticky enough) A131 3 Bryce E/Mike K 2 Process Improvement
54 Handwarmer needs longer convolute tubing A131 3 Bryce E/Mike K 2 Miscellaneous
42 Commonization throttle cable for tractor 500 trg C032 3 Bryce E/Jeremy K Tractor 1 Common Parts - Ex Hardware
34 Tractor air solenoids, plastic fittings cracking D451 3 Ron D/Jeremy K add torque and angle spec to print? New fitting? Tractor 1 Miscellaneous
19 Oil Cooler install on trail boss, hard to put on nuts, can stamping be coined and use self- D501 3 Steve E/Jeremy K need to review at next build Concentrics 1 process improvement
69
Air intake boot to engine seems too large in diameter and moves when tightening hose
clamp (trail boss, picture available) D501 3 Steve E/Jeremy K need to review at next build Concentrics 3 Process Improvement
43 Headlight Springs in 550/ 850 forrest bumper hard to install H201 3 Ron D/Mike K. XP 2 Safety and Ergonomics
48
800 military, slots in bumper plate need to be shorter in length, allow box to open
completely H201 3 Steve E/Jeremy K Review at next build with Steve Military 2 Process Improvement
68 XP touring rear skid plate, dosen't stay on before screws can be put on. A102 4 Ron D/Jeremy K Working on moving the steel skid plate xp 3 Process Improvement
74
Fuji Engines loose hardware: We get loose parts in packet. Why cant we buy in bulk?
Unnecessary parts movement across line. C022 4 Mike K/Dan Tate Materials/purchasing group needs to review All 2 Process Improvement
20 SP 500 trg air box 1 clip typically falls off G252 4 Steve E/Jeremy K Touring 1 Process Improvement
70
Trail boss 330, hard to put screws in to hold turn lights to front rack. Looks like tabs should
have been bent down for more access for the tool. H201 4 Steve E/Jeremy K Review at next build with Steve Concentrics 3 Process Improvement
82 Delete VIC spray in crating-Put in bag? L100 4 Bryce E/Mike K XP 3 Process Improvement
63 Commonize choke/ ignition nuts on sultan I201 4 Bryce E/Jeremy K Sportsman 2 Common Parts - Ex Hardware
12 2 different screws and nuts for XP & sultan footwells- 1 metric and 1 standard- mixed I301 4 Bryce E/Mike K
Engineering will not mix chassis fasteners between
metric and standard, review with operators for real
problem XP 1 process improvement
49 have stamp for tractors on lower front l/s frame tube A101 International regulation to have VIN # on L/S of vehicle Tractor 2 Process Improvement
50 take stars off tractor vin # A101 International regulation 2 Process Improvement
73 Change from screws to push rivets on rock guard. Skid plate-frame and load for XP? A102 cannot risk skid plate falling off during use XP 3 Process Improvement
72 add 2 skip teeth in EPS steering post to error-proof assembly A201
Getting EPS unit aligned will eliminate the need for this
item 3 process improvement
64
Either standard or metric but just one for arden fasteners. Legacy is standard. New product is
metric. All
New product is Metric, Review areas where thru
fasteners can be accepted All 3 process improvement
56 Commonize 500/800 front struts B201
too much weight difference between the vehicles, have
to be different, Ride and handling suffers Sportsman 2 Common Parts - Ex: Hardware
67 550 coupler to come on engine like 850 does. Fuji engine vs. Osceola/ Mexico. C022 Logistics issue, couplers in Ohio, Engines in Japan XP 3 process improvement
53 wire routing, XP's seem cleaner than sportsmans D201 Review on new models, All 2 Miscellaneous
13 Fan and fan shroud to come assembled together. (800 sportsman only) D452 Work with Purchasing Sportsman 1 process improvement
30
Hoses for radiators have different quantites in big boxes, some does just 3 hoses? Same box
size for end of runs etc. (Work with Purchasing) D452 Sportsman 1 Miscellaneous
38 Commonize radiators for 500 & 800??? D452 Engine size and heat output Sportsman 1 Common Parts - Ex: Hardware
59
Commonize fuel pumps & hoses 400, 500, trg. Do they use the same pumps with different
routings???? Can't commonize touring. D452
pumps are common, hoses cannot be, engine and carb
location differences Sportsman 2 Common Parts - Ex: Hardware
44 113 belt very tough to intall (Process review) E101 Jeremy K/Mike K
Move to manufacturing list, find tool that was built to
open clutch. Sportsman 2 Safety and Ergonomics
60
Commonize clutch cover seal retainers?? Inner retainer. 800 has different shape than 500.
They mess it up. Error-proofing item. E102 Engine case will not allow items to be common Sportsman 2 Common Parts - Ex: Hardware
58 Commonize rear springs for 550/ 850 XP E201 Steve E/Jacob M 800 is heavier, need indicator for spring idenification XP 2 Common Parts - Ex: Hardware
57 Commonize grease zerks at E212 & E251- on a-arms and hubs ??? E212
longer ones cannot be used in A-arms (hit bolt), short
ones cannot use in casting (not enough thread
engagement) 2 Common Parts - Ex: Hardware
2 Halfshafts hard to fit into tranny due to cotter ring- force them in E302 Mike K Move to manufacturing list for QA investigation Sportsman 1 Safety and Ergonomics
3 A-arm does not fit top of bearing carrier- have to hammer it on #1017748-067 E302 Jeremy K Move to manufacturing list for QA investigation All 1 Safety and Ergonomics
39 Commonize 550/ 850 silencers (4 to 2) F302 Tested by engineering and 550 will not survive on 850 XP 1 Common Parts - Ex: Hardware
47 exhaust pipe shield, why three fasteners to hold(1262282) F302 Need three to keep part from breaking Sportsman 2 process improvement
79 Oil tank, different dip stick on scrambler, why? F401
Oil tank is mounted at different angle, requires unique
dip stick Concentrics 3 Common Parts - Ex: Hardware
80 Foil on bottom of XP tool box has screws. Can we eliminate screws and use adhesive? F401 Exhaust too hot and it effects the adhesives XP 3 Common Parts - Ex Hardware
76 Commonize gas tanks??? TRG tank is bigger. Sportsman: can't fit that in.??? G101 Touring too big for 500 and 500 too small for TRG Sportsman 3 Common Parts - Ex: Hardware
71 XP air box plug wire holder needs to be filed G252 Complete, using up old inventory 3 process improvement
77
Commonize fuel lines- clamps vs snap ins. All fuel injected are snap ons. All carborator
models are snap on. G301 Cost to implement too high vs labor savings 3 Common Parts - Ex: Hardware
65 Have XP front bumper access cover molded in like sultans instead of asm I101
tool cost to change is too high, customers would like to
see sultans removable XP 3 process improvement
61
All rear rack screws commonized across models. Metric/ standard threads on fastener.
Always have problem with right hand top corner. J201
Requires corporate directive to change all vehicles to
metric All 2 Common Parts - Ex: Hardware
Example 2:
ATV Process Improvements Kaizen
LEAN2012.COM
Kaizen Video
22
LEAN2012.COM
Resources
• People
– Director for Lean Operations
– Lean Operations Manager
– 2 Facilitators
– Team Leaders
• Infrastructure
– Creform Room
– Resource Room
– Kaizen Room
23
ROSEAU MANUFACTURING
October 2011
Holly Palm
Adm Assistant
Robert Miller
Snow M.E.
Open
Snow M.E.
Brenda Brandt
Brake/Clutch Supervisor
Kieth Buley - Temp
Snow Pre Supervisor
Steve Erickson
Snow Final Supervisor
Bill Miller
Operations Mgr
Robert Novak
Weld M.E. - ATV
Jason Ball
Weld Process Engineer
Jeremy Karnowksi
Weld M.E. Snow/Sport ATV
Todd Koenig
Welding Supervisor-1st
Pat O'Connell
Welding Supervisor-2nd
Mike Jordet
Welding Supervisor-3rd
Troy Weiland
Tube Fab Supervisor
Glen Buckta
Tube Fab Supervisor
Wally Borah
Tube Fab Supervisor
Shannon Ostby
Tube Fab Supervisor
Joel Brichacek
Enginser, Associate
Todd Hagen
Mfg Technologist
Al Desrosier
Unit Mgr Components
Open
ATV M.E.
Mike Klein
Adv. M.E. ATV
Dave Reed
Adv. M.E. SxS
Open
SxS M.E.
Shane Jobman
SxS M.E.
Dwight Ruud
Line A Supervisor
Myles Hogenson
Line B Supervisor
Lisa Thompson
Line A 2nd
Nicole McDonald
Line B 2nd
Daniel Tate
Mgr Assembly Production
Maureen Langaas
Materials Proj Lead
Paul Gumeringer Temp
Logistics Supervisor
Cindy Butler
Shipping Supervisor
Mary Jo Olson
Inventory Ctl Supervisor
Jane Evans
Materials Manager
Howard Orgon
Tool Engineer
Jamie Lisell
Mfg Engineer
Nick Ericksen
Process Engineer
Pat Novacek
Supervisor
Tim Doneth
Supervisor
Tim Nelson
Supervisor
Dean Johnson
Supervisor
Spencer Johnston
Inv. Control Supervisor
Harley McMillin
Mfg Mgr Plastic Inj.
Guy Strandberg
Maint Systems Coord
Mike Bodell
Plant Services Supervisor
Dwayne Mast
Tool & Die Sup/Buyer
Deland Broten
Technologist, Assoc.
Rick Enger
Controls Engineer
Scott Laznicka
Controls Engineer
Nate Olafson
Project Coord.
Open
Controls Engineer
Rodney Borowicz
Project Engineer
Kurt Bickler
Facilities Eng./Systems Mgr
Sree Mangalampalli
Lean Manufacturing Mgr
Bruce Stone
QA Technologist
Bob Moser
SxS QE Supervisor
Jared Evans
ATV Technologist/Sup
Scott Kokal
Weld/QESup.
Rebecca Bowes
QA Audit/Sup.
Dennis Sabourin
Technologist, Quality
Andrew Hoard
Technologist Tube Fab
Steve Pavek
Quality Assurance Mgr
Jim Kvidt
1st Shift Paint Sup.
Renee Senechal
Finishing Engineer
Richard Lynch
Unit Mgr - Metal/Plastic Paint
Mark Karl
Director Operations
LEAN2012.COM
Team Leaders • 1 every 5-8 emp.
• Approximately 65
• 50% off the line
• Work on
– Implementing ideas
– Training
– Andon
– Line balancing
– Standard work documentation
LEAN2012.COM
Creform Room
• Custom built racks
– Parts presentation
– Flexibility
– Creativity
– Maintenance requests
• Team Leaders/ Group Leaders
– Training provided
– Easy to learn
– Reuse/ Recycle
LEAN2012.COM
Resource Room • Facilitators’ office
– Assist & Support
– Mentor & Coach
• Computers – Standard work sheets
– Other lean tools
• Label Maker – Improved 5S
– Ease of use
– Training
• Sign Maker
• Library – Lean/ Business books
LEAN2012.COM
Kaizen Room
• Amenities:
– Standard work sheets
– Supplies • Post its
• Brown paper
• Markers
• Tape etc.
– Wall Space to map processes
– Dry Erase board
– Flip Charts
– Dedicated room to schedule
LEAN2012.COM
Sustainability
• Action Plan Follow-up
– Running list
– Stored in SharePoint site
– Follow-up meetings
– Champion’s call
– Color coded
28
LEAN2012.COM
Gemba Walk • Overview
– 3 Teams of Managers
– 1-2 Walks per day
– 15 min scheduled walk
– 15 min review meeting
• Process
– Rotate areas
– Review Improvements
• Purpose
– Gather Feedback
– Strategic orientation
29
LEAN2012.COM
Challenges
“It is not that we implement systems and they just happen”
Flexibility
• Mission Critical Direction Changes
• Business Need Changes
Sustainability • Hiring surge • Vigilant • Momentum • Re-energize
Standardization • Cross-site • Within the plant • Level of Standardization • Balance of priority
Lean Maturity • Started in 1995. • Buy-in and Embrace
LEAN2012.COM
Questions & Answers
Maximum: 10 minutes
LEAN2012.COM
SreeRam Mangalampalli
Implementing & Sustaining Kaizen The Polaris Way
Please remain in the room to do the session evaluation