Page 1: Introduction Vanadium Recovery Project (VRP)

February 2022

Introduction

Vanadium Recovery Project (VRP)

Page 2: Introduction Vanadium Recovery Project (VRP)

PAGE 2

Zero Carbon Life cycle analysis by independent firm confirms

VRP as Zero Carbon based on Scoping Study.

Page 3: Introduction Vanadium Recovery Project (VRP)

PAGE 3

High Purity

VRP will produce battery grade vanadium pentoxide.

Page 4: Introduction Vanadium Recovery Project (VRP)

PAGE 4

Energy Storage

VRP will produce vanadium chemicals for use in vanadium redox flow batteries and Li-V cells.

Page 5: Introduction Vanadium Recovery Project (VRP)

PAGE 5

Circular Economy

The vanadium comes from steel slag and by-products planned for use in cement, paper and polymers.

Page 6: Introduction Vanadium Recovery Project (VRP)

PAGE 6

SustainableVRP is low emission, low water use, low temperature.

Page 7: Introduction Vanadium Recovery Project (VRP)

Our focus is on producing:- vanadium pentoxide; and - nickel, cobalt and lithium sulphates.

Zero Carbon High Purity

PAGE 7

Our mission is to produce Zero Carbon High Purity products in the Nordic region to create a sustainable future for all.

Mission

Page 8: Introduction Vanadium Recovery Project (VRP)

Joint Venture

PAGE 8

Zero Carbon High Purity

Vanadium

Page 9: Introduction Vanadium Recovery Project (VRP)

- Vanadium is used in many industries and applications, from automobiles, power generation, and hand tools, to ships, industrial tools and aeroplanes.

- Security of supply is a priority for the European Union (EU).

- The EU is a net importer of vanadium.

- Vanadium is sourced from mineral deposits (18%), as a by-product from the steel making process, (68%) and other sources (14%).

- Primary process for extracting vanadium is the high energy-high emission roast-leach pyrometallurgical process.

- Our process is a low energy-low emission hydrometallurgical process –a competitive advantage and point of difference.

Vanadium

PAGE 9

Zero Carbon High Purity

Vanadium

Page 10: Introduction Vanadium Recovery Project (VRP)

Summary

PAGE 10

- Vanadium recoveries approx. 75%.

- Product purity greater than 99.5% V2O5.

- Lowest quartile of operating costs for vanadium

- Supply approximately 5% of the world's vanadium.

Zero Carbon High Purity

Vanadium

Page 11: Introduction Vanadium Recovery Project (VRP)

Wagon cleaning

Outstanding Location

PAGE 11

SSAB steel mills are located in Luleå, Raahe and Oxelösund. H2 Green Steel plan for a steel mill in

Boden. The Vanadium Recovery Project will be based in Pori, Finland.

Page 12: Introduction Vanadium Recovery Project (VRP)

Simple concept

PAGE 12

Zero Carbon High Purity

Vanadium

SSAB agreement is for 2Mt of slag. This shows 200,000 tpa of slag throughput for 10 years.

Page 13: Introduction Vanadium Recovery Project (VRP)

World class counterparty

PAGE 13

Zero Carbon High Purity

Vanadium

SSAB agreement is for 2Mt of slag. This equates to 200,000 tpa of slag throughput for 10 years.

Page 14: Introduction Vanadium Recovery Project (VRP)

Future leader

PAGE 14

Zero Carbon High Purity

Vanadium

H2GS memorandum of understanding is for 4Mt of slag from commencement of

steel production.

Page 15: Introduction Vanadium Recovery Project (VRP)

PAGE 15

Vanadium Journey

Orebody to Energy Storage

Page 16: Introduction Vanadium Recovery Project (VRP)

PAGE 16

LKAB mines iron ore in Malmberget, Sweden. The ore contains vanadium.

Malmberget, Sweden

Page 17: Introduction Vanadium Recovery Project (VRP)

PAGE 17

LKAB iron pellets from Malmberget contain approximately 0.24% V2O5 (vanadium pentoxide).

Pellets are sold worldwide, including to SSAB. LKAB Pellets

Page 18: Introduction Vanadium Recovery Project (VRP)

PAGE 18

Luleå, SwedenLKAB iron ore pellets are one of the main ingredients in steel produced at the SSAB steel mill in Luleå, Oxelösund and Raahe.

Page 19: Introduction Vanadium Recovery Project (VRP)

PAGE 19SSAB produce several steel products in Luleå, Oxeösund and Raahe.

Raahe, Finland

Page 20: Introduction Vanadium Recovery Project (VRP)

PAGE 20

Slag from the steel making process is poured onto the surface to cool. The vanadium has been concentrated in the steel making process. The slag now contains up to

4.4% V2O5 (vanadium pentoxide).

Page 21: Introduction Vanadium Recovery Project (VRP)

PAGE 21

Slag is screened to separate lump which is returned to the blast furnace and fines which are stockpiled. Once

the slag has cooled it is loaded and transported for screening.

Page 22: Introduction Vanadium Recovery Project (VRP)

PAGE 22

Slag is stockpiled. Approximately 1.8Mt of slag is currently stockpiled across the three

SSAB steel mills.

Page 23: Introduction Vanadium Recovery Project (VRP)

PAGE 23

Slag is loaded onto vessels at Luleå, Oxelösund and Raahe for transport to Pori, Finland. This picture is for concept only. ESL is not a contracted partner. Critical Metals

responsibility starts with transporting the slag to the quay and shipping it to Pori, Finland.

Page 24: Introduction Vanadium Recovery Project (VRP)

Wagon cleaning

PAGE 24

The slag will be transported to Tahkoluoto Port in Pori, Finland. The port is ice free, open 365 days a year and provides outstanding logistical solutions.

Pori, Finland

Page 25: Introduction Vanadium Recovery Project (VRP)

Outstanding Location

PAGE 25

The Vanadium Recovery Project will be built on this site close to the unloading quay. Picture looking and north-west.

Page 26: Introduction Vanadium Recovery Project (VRP)

PAGE 26

The slag will be processed in the plant shown in this image.

Page 27: Introduction Vanadium Recovery Project (VRP)

PAGE 27

Artist impression of vanadium project and slag/SSM stockpiles on the left. Tall white and blue buildings and chimney on the right are the Peri-Pori power station. Photo by Einari Vuorinen

Page 28: Introduction Vanadium Recovery Project (VRP)

PAGE 28

Vanadium Applications

Page 29: Introduction Vanadium Recovery Project (VRP)

PAGE 29SSAB slag, ammonium metavanadate and vanadium pentoxide

Page 30: Introduction Vanadium Recovery Project (VRP)

PAGE 30

Vanadium electrolyte is used in industrial scale energy storage

applications such as these vanadium redox flow batteries.

Page 31: Introduction Vanadium Recovery Project (VRP)

PAGE 31

Lithium vanadium battery chemistries are also being trialled in electric vehicles.

Page 32: Introduction Vanadium Recovery Project (VRP)

PAGE 32

Vanadium pentoxide is used in the production of super alloys used in high tech applications such as jets and rockets.

Page 33: Introduction Vanadium Recovery Project (VRP)

PAGE 33

The largest use of vanadium is in reinforced steel bar.

Page 34: Introduction Vanadium Recovery Project (VRP)

PAGE 34

By-Product Applications

Page 35: Introduction Vanadium Recovery Project (VRP)

PAGE 35

SSM is being tested for use as a filler in CO2 free cement.

Page 36: Introduction Vanadium Recovery Project (VRP)

PAGE 36

SSM is being tested for use as a filler in paper.

Page 37: Introduction Vanadium Recovery Project (VRP)

PAGE 37

SSM is being tested for use as a filler in polymers.

Page 38: Introduction Vanadium Recovery Project (VRP)

PAGE 38

Simplified flowsheet

Zero Carbon High Purity

Vanadium

Click here to view Pilot Plant video.

Page 39: Introduction Vanadium Recovery Project (VRP)

Strong returns

PAGE 39

Preliminary Feasibility Study results released by Neometals Ltd on 4 May 2021. All numbers on 100% ownership basis.

Zero Carbon High Purity

Vanadium

Page 40: Introduction Vanadium Recovery Project (VRP)

PAGE 40

Position on cost curve

Zero Carbon High Purity

Vanadium

Page 41: Introduction Vanadium Recovery Project (VRP)

Timetable

PAGE 41

Zero Carbon High Purity

Vanadium

Page 42: Introduction Vanadium Recovery Project (VRP)

Joint venture partner

Location and logistics

management

Supportive government

agencyHost city

EIA management Finnish legal

advisers

Slag supply counterparty

Port of Pori

Permitting management

Life cycle consultant

Engineering and design

Environmental, chemical and

building permits

Contributors

PAGE 42

Page 43: Introduction Vanadium Recovery Project (VRP)

PAGE 43

Directors

• Jonathan Murray (Chairman)

• Damian Hicks (Executive Director)

• Markus Bachmann, Kris Gram, Darren Townsend and Olof Forslund (Non-Executive Directors)