Allison I. Fultz Kaplan Kirsch & Rockwell LLP Washington, DC 2010 LEGAL AFFAIRS SEMINAR February 23, 2010. Positive Train Control. Overview. PTC Implementation – IMPORTANT DATES: January 15, 2010 – Final Rule issued March 16, 2010 – Final Rule goes into effect - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Positive Train Control

Positive Train Control

Allison I. Fultz

Kaplan Kirsch & Rockwell LLP

Washington, DC

2010 LEGAL AFFAIRS SEMINAR

February 23, 2010

Page 2: Positive Train Control

2

Overview

PTC Implementation – IMPORTANT DATES:

January 15, 2010 – Final Rule issued

March 16, 2010 – Final Rule goes into effect

April 16, 2010 – PTC Implementation Plan Deadline

December 31, 2015 – PTC Implementation Deadline

Page 3: Positive Train Control

3

Overview

Rail Safety Improvement Act of 2008 (RSIA)

• Mandates comprehensive operational and physical improvements

• Broadens power of USDOT/Federal Railroad Administration (FRA) and Surface Transportation Board (STB)

Rulemaking to implement legislation is well underway – legislation sets out strict timetables

RSIA, Sec. 104: Positive Train Control (PTC) technology (49 U.S.C. § 20157)

Page 4: Positive Train Control

4

Overview

Impetus for legislation -• Freight and passenger operations share track and

corridors• Precursors to current technology – 1920s–1960s• Recent technical advances• Recent incidents involving collision of passenger trains

with freight trains or interference with track

Page 5: Positive Train Control

5

RSIA, Sec. 104 (codified at 49 U.S.C. § 20157)• Positive Train Control (PTC) is technology designed to

prevent collisions and other incidents by automatically detecting and controlling the movement of trains

• Definition (49 U.S.C. § 20157(i)(3)): a system designed to prevent train-to-train collisions, over-speed derailments, incursions into established work zone limits, and the movement of a train through a switch left in the wrong position

• Implementing regulations at 49 C.F.R. Parts 229, 234, 235 and 236

General

Page 6: Positive Train Control

6

General

HOW IT WORKSKey components:• Equipment on locomotive cars

detects position and relation to other objects

• Equipment at control center – broadcasts authority for train movements

• Wayside interface units• Wireless data line between

train and control centerIllustration available at:www.volpe.dot.gov/safety/

crashavoid.html

Page 7: Positive Train Control

7

General

When (49 U.S.C § 20157(a)(1); C.F.R. § 236.1005(b)(1)):• Progressively, according to PTCIP submitted by April 16,

2010• Complete implementation by December 31, 2015Who (49 U.S.C § 20157(a)(1)):• Class I freight carriers• Each railroad providing or hosting regularly scheduled

• Intercity passenger service (Amtrak)• Commuter passenger service

Page 8: Positive Train Control

8

General

Where:• On each main line over which any quantity of poisonous

by inhalation (PIH) material is transported (49 U.S.C. § 20157(a)(1)(B); 49 C.F.R. § 236.1005(b)(i))

• On each main line used for regularly provided intercity or commuter passenger service, subject to limited exceptions

Main line definition: • Freight: a segment or route of railroad tracks over which

5 million or more gross tons of railroad traffic is transported annually (RSIA Sec. 104(i)(2), codified at 49 U.S.C. § 20157(i)(2))

• Passenger: all intercity and commuter passenger lines

Page 9: Positive Train Control

9

General

Main line track exceptions• Only available to passenger intercity or commuter

passenger railroads, or freight railroads conducting joint passenger and freight operation over the same segment of track (49 C.F.R. § 1019(a))

• Specific segments of track may be designated as “not main line” (49 C.F.R. § 1019(a))

Page 10: Positive Train Control

10

General

Regulatory progress:• DOT required to issue regulations governing PTC technology

(49 U.S.C. § 20157(g))• Notice of proposed rulemaking (NPRM) - July 21, 2009 (74

Fed. Reg. 35950)• FRA public hearing on proposed rule - Aug. 13, 2009• Final rule - January 15, 2010 (75 Fed. Reg. 2598) – effective

March 16, 2010• FRA seeks further comment on specific issues DOT must

report to Congress by December 31, 2012 on progress of PTC implementation

Page 11: Positive Train Control

11

General

Immediate next steps:• PTC Implementation Plan due to FRA no later than April 16,

2010• Must describe where and how railroad will install PTC

systems• Each railroad must –

• Define circumstances• Describe risks• Propose PTC elements

Page 12: Positive Train Control

12

Technical Requirements

• Interoperability (49 U.S.C. § 20157(i)(1))• Address areas of greater risk prior to areas of lesser risk (49

U.S.C. § 20157(a)(2))• Once a railroad’s plan is approved, it must be phased in

progressively (49 C.F.R. § 236.1005(b)(1)) – not all at once, as close to Dec. 31, 2015 as possible

• Subparts A through G of 49 C.F.R. Part 236 continue to apply

Page 13: Positive Train Control

13

Technical Requirements

Each PTC system must reliably and functionally prevent: (49 C.F.R. § 236.1005)• train-to-train collisions• overspeed derailments• incursions into established work zones• Movement of a train through a main line switch in the

improper position

Page 14: Positive Train Control

14

Technical Requirements

PTC system requirements, cont’d (49 C.F.R. § 236.1005) – system must:

• Include safety-critical integration of all authorities and indications of a wayside or cab signal system

• Provide an appropriate warning or enforcement in response to authority or hazard detection

• Limit the speed of passenger trains to 59 mph and freight trains to 49 mph in areas without broken rail detection or equivalent safeguards

Page 15: Positive Train Control

15

Technical Requirements

Submittals:• PTC Implementation Plan (PTCIP) (49 C.F.R. § 236.1011)• PTC Development Plan (PTCDP) and Type Approval (49

C.F.R. § 236.1013) - Components• PTC Safety Plan (PTCSP) (49 C.F.R. § 236.1015) –

Procedures• PTCDP and PTCSP need not be submitted simultaneously

with PTCIP• FRA may require independent third-party verification and

validation of product safety plan (49 C.F.R. § 236.1017; 49 C.F.R. § 236.913)

PTC applications – public docket (49 C.F.R. § 236.1011(e))

Page 16: Positive Train Control

16

Technical Requirements

Host railroad (49 C.F.R. § 236.1003(b)Safe State/fail safe (49 C.F.R. § 236.1003(b))

Page 17: Positive Train Control

17

PTC & Passenger Operations

Requirements• No new intercity or passenger rail service may commence

after Dec. 31, 2015, until a PTC system has been certified, installed and made operative (49 C.F.R. § 236.1005(b)(6))

Page 18: Positive Train Control

18

PTC & Passenger Operations

Requirements, cont’d.Joint submission of PTCIP (49 C.F.R. § 236.1009(a)(3))• If host railroad is required to install and operate a PTC

system on a segment of its track; and • If tenant railroad that shares the same track segment would

have been required to install a PTC system if the host railroad had not otherwise been required to do so

Civil penalties may apply if freight and passenger operators fail to reach agreement on joint filing (49 C.F.R. Part 236, Appendix A)

Page 19: Positive Train Control

19

PTC & Passenger Operations

Main Line Track Exceptions 49 C.F.R. § 236.1019

File main line track exclusion addendum (MTEA) to railroad’s PTCIP

• Passenger terminal exception (49 C.F.R. § 236.1019(b))• Limited operations exception (49 C.F.R. § 236.1019(c))

• FRA may grant exception where passenger and freight operations are temporally separated, among other criteria

Page 20: Positive Train Control

20

Federal Preemption

49 C.F.R. § 236.0(i)(1) – Final rule preempts any state law, regulation, or order covering the same subject matter, except an additional or more stringent law, regulation or order that is

• necessary to eliminate or reduce an essentially local safety or security hazard;

• is not incompatible with a law, regulation or order of the United States Government and

• that does not impose an unreasonable burden on interstate commerce.

49 C.F.R. § 236.0(i)(2) – Final rule establishes a federal standard of care for railroad signal and train control systems

Page 21: Positive Train Control

21

HSR & PTC

Intersection with high-speed rail (HSR) requirements (49 C.F.R. § 236.1007)):

• As of Dec. 31, 2015, the method of protecting HSR operations will be through the use of PTC. 49 CFR § 236.0(d)(2).• Defines high-speed operations as those exceeding 80

mph.• Specific requirements apply:

• Freight operation above 50 mph; passenger operation above 60 mph

• Freight or passenger operation above 90 mph• Freight or passenger operation above 125 mph• Freight or passenger operation above 150 mph

• Amtrak relief

Page 22: Positive Train Control

22

Observations

• Effects of “the pressure of the time”• Solicitation of further comments – no timetable announced• FRA discretion

Page 23: Positive Train Control

23

Implementation Costs

• FRA has estimated cost to freight railroads alone of implementing PTC at $2.3 – 5 billion

• Public policy decision (75 Fed. Reg. 2602)• No funding for PTC proposed in either House or Senate

version of transportation reauthorization.• FRA has determined - no direct compliance costs on state

and local governments (75 Fed. Reg. 2696)• Class I view - cost of PTC is weighted disproportionately

toward Class I carriers, with little impact on Class II and III railroads. (75 Fed. Reg. 2612)

Page 24: Positive Train Control

24

Policy Collisions

• Freights – leverage• Public agencies – no funding source for PTC-related

improvements• No Congressional proposal for funding• Shared use of corridors by freight and passenger providers• Implementation of HSR on shared corridors

Page 25: Positive Train Control

25

Practical Considerations

Shared use – presence of passenger service on joint use corridor will not absolutely trigger PTC

Dispute resolution• no mechanism in final rule – use STB non-binding mediation

and plug result in at FRA?

Page 26: Positive Train Control

26

QUESTIONS?