TRANSCRIPT

Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications)

September 29, 2018 Ver 3

Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered.

Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form.

Below is a link to the online help file.

https://edocs.deq.nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf

County (or Counties) where the project is located:*

Is this project a public transportation project?*

Is this a NCDOT Project?*

(NCDOT only) T.I.P. or state project number:

WBS #*

1a. Type(s) of approval sought from the Corps:*

1b. What type(s) of permit(s) do you wish to seek authorization?*

This form may be used to initiate the standard/individual permit process with the Corps. Please contact your Corps representative concerning submittals for standard permits. All required items thatare not provided in the E-PCN can be added to the miscellaneous upload area located at the bottom of this form.

1c. Has the NWP or GP number been verified by the Corps?*

Nationwide Permit (NWP) Number:

NWP Numbers (for multiple NWPS):

1d. Type(s) of approval sought from the DWR:*

1e. Is this notification solely for the record because written approval is not required?

*For the record only for DWR 401 Certification:

For the record only for Corps Permit:

1f. Is this an after-the-fact permit application?*

A. Processing Information

Yadkin

Yes NoThis is any publicly funded by municipal,state or federal funds road, rail, airport transportation project.

Yes No

B-5389

46104.1.1(for NCDOT use only)

Section 404 Permit (wetlands, streams and waters, Clean Water Act)Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)

Nationwide Permit (NWP)Regional General Permit (RGP)Standard (IP)

Yes No

14 - Linear transportation

List all NW numbers you are applying for not on the drop down list.

check all that apply

401 Water Quality Certification - Regular 401 Water Quality Certification - ExpressNon-404 Jurisdictional General Permit Riparian Buffer AuthorizationIndividual Permit

Yes No

Yes No

Yes No

1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?

Acceptance Letter Attachment

1h. Is the project located in any of NC's twenty coastal counties?*

1j. Is the project located in a designated trout watershed?*

Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx

1a. Who is the Primary Contact?*

1b. Primary Contact Email:*1c. Primary Contact Phone:*

1d. Who is applying for the permit?*

1e. Is there an Agent/Consultant for this project?*

2. Owner Information

1a. Name of project:*

1b. Subdivision name:

1c. Nearest municipality / town:*

If so, attach the acceptance letter from mitigation bank or in-lieu fee program.

Yes No

Click the upload button or drag and drop files here to attach document

B-5389 DMS Acceptance.pdf 67.76KBFILE TYPE MUST BE PDF

Yes No

Yes No

B. Applicant Information

NCDOT

[email protected](xxx)xxx-xxxx

(919)707-6108

Owner Applicant (other than owner)(Check all that apply)

Yes No

2a. Name(s) on recorded deed:*

2b. Deed book and page no.:

2c. Responsible party:

2d. Address*

2e. Telephone Number:*

2f. Fax Number:

2g. Email Address:*

NC Department of Transportation

(for Corporations)

City

RaleighState / Province / Region

NC

Postal / Zip Code

27699Country

USA

Street Address

1598 Mail Service CenterAddress Line 2

(xxx)xxx-xxxx

(919)707-6108

(xxx)xxx-xxxx

[email protected]

C. Project Information and Prior Project History

1. Project Information

Replace Bridge 105 over Yadkin River Overflow on US 421 Northbound Lane

(if appropriate)

Lewisville

2. Project Identification

2a. Property Identification Number: 2b. Property size:

2c. Project Address

2d. Site coordinates in decimal degrees

Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on how the location wasdetermined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.)

Latitude:* Longitude:*

3. Surface Waters

3a. Name of the nearest body of water to proposed project:*

3b. Water Resources Classification of nearest receiving water:*

Surface Water Lookup

3c. What river basin(s) is your project located in?*

3d. Please provide the 12-digit HUC in which the project is located.*

River Basin Lookup

4. Project Description and History

4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*

4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*

4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)

4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)

4f. List the total estimated acreage of all existing wetlands on the property:

4g. List the total estimated linear feet of all existing streams on the property:

4h. Explain the purpose of the proposed project:*

4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*

4j. Please upload project drawings for the proposed project.

5. Jurisdictional Determinations

(tax PIN or parcel ID) (in acres)

City State / Province / Region

Postal / Zip Code Country

Street Address

Address Line 2

36.105545ex: 34.208504

-80.515655-77.796371

Deep Creek

WS-IV

Yadkin-PeeDee

030401011103

Surrounding land use is primarily agricultural land, with a row of trees along the unnamed tributary.

Yes No Unknown

Click the upload button or drag and drop files here to attach document

File type must be pdf

Click the upload button or drag and drop files here to attach document

File type must be pdf

0.03

(intermittent and perennial)

209

The B-5389 project is needed to replace bridge 105 because it is functionally obsolete. Its sufficiency rating is 64.7. The project purpose is to replace the functionally obsolete bridgewith one that meets current NCDOT design standards.

The proposed project will replace the existing two-lane bridge (Bridge No. 105) with another two-lane bridge in the same location. The proposed replacement structure will be a multi-span structure that is approximately 455 feet in length, with a 38-foot wide clear deck width. The project’s total length is 1,500 feet. The existing northbound lane bridge will be replacedwith a new structure at the existing location. Traffic on the northbound lanes will be maintained during construction with an on-site detour located north of the existing bridge location.Standard road building equipment such as trucks, dozers, and cranes will be used.

Click the upload button or drag and drop files here to attach document

B-5389 Permit Drawings.pdf 2.13MB

B-5389 Roadway Plans.pdf 2.27MBFile type must be pdf

5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*

Comments:

5b. If the Corps made a jurisdictional determination, what type of determination was made?*

Corps AID Number:

5c. If 5a is yes, who delineated the jurisdictional areas?

Name (if known):

Agency/Consultant Company:

Other:

5d1. Jurisdictional determination upload

6. Future Project Plans

6a. Is this a phased project?*

Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? Thisincludes other separate and distant crossing for linear projects that require Department of the Army authorization but don’t require pre-construction notification.

1. Impacts Summary

1a. Where are the impacts associated with your project? (check all that apply):

2. Wetland ImpactsIf there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.

"W." will be used in the table below to represent the word "wetland".

2a. Site #* (?) 2a1 Reason* (?) 2b. Impact type * (?) 2c. Type of W.* 2d. W. name * 2e. Forested* 2f. Type of Jurisdicition* (?)

2g. Impact area*

2g. Total Temporary Wetland Impact

2g. Total Permanent Wetland Impact

2g. Total Wetland Impact

2h. Comments:

3. Stream ImpactsIf there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted.

"S." will be used in the table below to represent the word "stream".

3a. Reason for impact* (?) 3b.Impact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type *(?)

3f. Type of Jurisdiction*

3g. S. width* 3h. Impact length*

Yes No Unknown

Two small wetland areas and one intermittent stream were identified in the study area. No JD sitevisit was held.

Preliminary Approved Not Verified Unknown N/A

Example: SAW-2017-99999

Carolina Ecosystems, Inc.

Click the upload button or drag and drop files here to attach document

File type must be PDF

Yes No

No.

D. Proposed Impacts Inventory

Wetlands Streams-tributaries BuffersOpen Waters Pond Construction

3 Bridge replacement P Headwater Forest WA No Corps 0.020(acres)

4 Bridge replacement P Headwater Forest WB No Corps 0.010(acres)

0.000

0.030

0.030

Both wetlands are a total take.

S1

S2

S3

** All Perennial or Intermittent streams must be verified by DWR or delegated local government.

3i. Total jurisdictional ditch impact in square feet:

3i. Total permanent stream impacts:

3i. Total temporary stream impacts:

3i. Total stream and ditch impacts:

3j. Comments:

1. Avoidance and Minimization

1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*

1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:*

2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State

2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?

2c. If yes, mitigation is required by (check all that apply):

2d. If yes, which mitigation option(s) will be used for this project?

4. Complete if Making a Payment to In-lieu Fee Program

4a. Approval letter from in-lieu fee program is attached.

4b. Stream mitigation requested:4c. If using stream mitigation, what is the stream temperature:

NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website.

4d. Buffer mitigation requested (DWR only): 4e. Riparian wetland mitigation requested:

4f. Non-riparian wetland mitigation requested: 4g. Coastal (tidal) wetland mitigation requested:

4h. Comments

*** Recent changes to the stormwater rules have required updates to this section .***

Site 1 - Ditch outletprotection

Permanent Bank Stabilization SA Intermittent Both 6Average (feet)

23(linear feet)

Site 2 - Bridge Replacement Temporary Dewatering SA Intermittent Both 6Average (feet)

145(linear feet)

Site 5 - Temporary streamcrossing

Temporary Dewatering SA Intermittent Both 6Average (feet)

89(linear feet)

0

23

234

257

Temporary impacts total 0.03 acre

E. Impact Justification and Mitigation

The proposed replacement bridge will be on the same alignment as the existing bridge. Deck drains on the proposed structure will not be dischargedover open water, reducing stream pollution associated with roadway runoff. The runoff from deck drains will be discharged onto a Class B rip rapdissipator pad. Additional measures implemented to reduce impacts to the stream and surrounding properties include maintaining existing drainagepatterns and using rip rap at drainage outlets to dissipate energy and reduce erosion.

NCDOT will adhere to Best Management Practices for Construction and Maintenance Activities.

Yes No

DWR Corps

Mitigation bank Payment to in-lieu feeprogram

Permittee ResponsibleMitigation

Yes No

(linear feet)

0

(square feet)

0(acres)

0.03

(acres)

0(acres)

0

No mitigation is required for the stream bank stabilization or temporary stream impacts as these impacts do not constitute a loss of waters of the US.

F. Stormwater Management and Diffuse Flow Plan (required by DWR)

1. Diffuse Flow Plan

1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?

For a list of options to meet the diffuse flow requirements, click here.

If no, explain why:

2. Stormwater Management Plan

2a. Is this a NCDOT project subject to compliance with NCDOT’s Individual NPDES permit NCS000250?*

Comments:

1. Environmental Documentation

1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*

1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)Environmental Policy Act (NEPA/SEPA)?*

1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.)*

NEPA or SEPA Final Approval Letter

2. Violations (DWR Requirement)

2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards orRiparian Buffer Rules (15A NCAC 2B .0200)?*

3. Cumulative Impacts (DWR Requirement)

3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?*

3b. If you answered “no,” provide a short narrative description.

4. Sewage Disposal (DWR Requirement)

4a. Is sewage disposal required by DWR for this project?*

5. Endangered Species and Designated Critical Habitat (Corps Requirement)

5a. Will this project occur in or near an area with federally protected species or habitat?*

5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*

5c. If yes, indicate the USFWS Field Office you have contacted.

5d. Is another Federal agency involved?*

5e. Is this a DOT project located within Division's 1-8?*

5f. Will you cut any trees in order to conduct the work in waters of the U.S.?*

Yes No

No buffered resources within project area.

Yes No

G. Supplementary Information

Yes No

Yes No

Yes No

Click the upload button or drag and drop files here to attach document

FILE TYPE MUST BE PDF

Yes No

Yes No

Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulategrowth. Therefore, a detailed indirect or cumulative effects study will not be necessary.

Yes No N/A

Yes No

Yes No

Asheville

Yes No Unknown

Yes No

Yes No

5g. Does this project involve bridge maintenance or removal?*

5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use can be found in the NLEB SLOPES,Appendix F, pages 3-7.

Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf

If you answered "Yes" to 5g(1), did you discover any signs of bat use?*

*** If yes, please show the location of the bridge on the permit drawings/project plans.

5h. Does this project involve the construction/installation of a wind turbine(s)?**

5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?*

If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property.

5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?*

Consultation Documentation Upload

6. Essential Fish Habitat (Corps Requirement)

6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*

6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*

7. Historic or Prehistoric Cultural Resources (Corps Requirement)

Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/

7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National HistoricTrust designation or properties significant in North Carolina history and archaeology)?*

7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*

7c. Historic or Prehistoric Information Upload

8. Flood Zone Designation (Corps Requirement)

Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search

8a. Will this project occur in a FEMA-designated 100-year floodplain?*

8b. If yes, explain how project meets FEMA requirements:

8c. What source(s) did you use to make the floodplain determination?*

Comments

Miscellaneous attachments not previously requested.

Yes No

Yes No

Yes No Unknown

Yes No

Yes No

Click the upload button or drag and drop files here to attach document

File must be PDF

As of June 27, 2018, the USFWS lists one protected species for Yadkin County, the northern long-eared bat (NLEB). Please see the attachedSLOPES memo dated December 11, 2018 for NLEB. While evidence of bat use was found at Bridge 105 during a May 2018 site visit, the nearedrecorded NLEB hibernacula is 72 miles away and the closest red HUC is approximately 70 miles away.

Click the upload button or drag and drop files here to attach document

B-5389 NLEB SLOPES Yadkin.pdf 179.74KBFile type must be PDF

Yes No

NMFS County Index

Yes No

SEPA Documentation

Click the upload button or drag and drop files here to attach document

File must be PDF

Yes No

NCDOT Hydraulics Unit coordination with FEMA

FEMA Maps

Miscellaneous

There will be 0.97 acre of tree clearing on this project.

*

I have given true, accurate, and complete information on this form;I agree that submission of this PCN form is a “transaction” subject to Chapter 66, Article 40 of the NC General Statutes (the “Uniform Electronic Transactions Act”);I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the “Uniform Electronic Transactions Act”);I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; ANDI intend to electronically sign and submit the PCN form.

Full Name:*

Signature

Date

Click the upload button or drag and drop files here to attach document

B-5389 Signed Cover Letter.pdf 1.25MBFile must be PDF or KMZ

Signature

By checking the box and signing below, I certify that:

Mack Christopher Rivenbark III

5/17/2019

STATE OF NORTH CAROLINA

DEPARTMENT OF TRANSPORTATION

ROY COOPER JAMES H. TROGDON, III GOVERNOR SECRETARY

Mailing Address: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT & ENVIRONMENTAL ANALYSIS UNIT 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598

TELEPHONE: 919-707-6000 FAX: 919-212-5785

WEBSITE:NCDOT.GOV

Location: CENTURY CENTER, BUILDING B

1020 BIRCH RIDGE DRIVE RALEIGH NC 27610

December11,2018

TO: ErinCheely,EnvironmentalProgramConsultant EnvironmentalCoordination&PermittingGroup,EAUFROM: MelissaMiller,EnvironmentalProgramConsultant BiologicalSurveysGroup,EAUSUBJECT: Section 7 survey results for the northern long‐eared bat (Myotis

septentrionalis)associatedwiththereplacementofBridgeNo.105overtheYadkinRiveroverflowonUS421NBLinYadkinCounty,TIPNo.B‐5389.

The North Carolina Department of Transportation (NCDOT, Division 11) proposes toreplaceBridgeNo.105theYadkinRiveroverflowonUS421NBLinYadkinCounty,TIPNo.B‐5389.Theexistingbridgeisaninespanstructurewithconcretebeams,deck,guardrailsandendwalls.Theoveralllengthofthestructureis451feet.TheprojecttoreplaceBridgeNo.105hasbeenreviewedforeffectsonthenorthernlong‐earedbat (NLEB). AsofMay4,2015,NLEB is listedby theU.S.FishandWildlifeService(USFWS)as “Threatened”under theEndangeredSpeciesActof1973.AsofDecember11,2018, NLEB is listed by USFWS(http://www.fws.gov/raleigh/species/cntylist/nc_counties.html)as“probable/potential”inYadkinCounty.According to the North Carolina Natural Heritage Program (NHP) Biotics Database,mostrecently updated October 2018, the nearest NLEB hibernacula record is 72 milesnorthwestoftheproject(EOID32171)andnoknownNLEBroosttreesoccurwithin150feetoftheprojectarea.EO32171representsGrandfatherMountainsitewithmultipleobservationsfrom1986to2011.

NCDOT has also reviewed the USFWS Asheville Field office website(http://www.fws.gov/asheville/htmls/project_review/NLEB_in_WNC.html) forconsistencywithNHPrecords.Thisprojectislocatedentirelyoutsideoftheredhighlightedareas(12‐digitHUC)thattheUSFWSAshevilleFieldOfficehasdeterminedtoberepresentativeofanarea that may require consultation. The closest 12 digit (030501010502) red HUC isapproximately70milesaway(UpperWilsonCreek).OnMay30, 2018,NCDOTbiologists assessedBridgeNo. 105 forpotentialnorthern long‐earedbathabitat.Shallowvertical topsealedcrevicesanddeepverticalunsealedcrevicessuitableforroostingwerepresentonthestructure.Evidence(bats,staining,andguano)ofbatswasobserved.Atleastfivebigbrownbats(Eptesicusfuscus)wereobservedroostinginfourjoints.Almostalljointshadguanopresent.Final design, tree clearing, and percussive activities information will be provided in thepermitapplication.Ifyouneedanyadditionalinformation,pleasecontactMelissaMillerat919‐707‐6127.

(Version 2.08; Released April 2018)46104.1.1 TIP No.: B-5389 County(ies): Yadkin Page 1 of 1

TIP Number: Date:

Phone: Phone:Email: Email:

County(ies):CAMA County?

Yes

Design/Future: Year: 2040 Existing: Year:

Aquatic T&E Species? No Comments:

Yes N/ANoDeck Drains Discharge Over Water Body? (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the

General Project Narrative)(If yes, provide justification in the General Project Narrative)

Two 12' lanes with 4' inside paved shoulder and 10' outside paved shoulder; 4:1 median slopes2:1 outside slopes

30,300

[email protected]

Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer? N/ANRTR Stream ID:

Annual Avg Daily Traffic (veh/hr/day):

Existing SiteProject Length (lin. miles or feet):

ac.

Surface Water Body (1): Water Supply IV (WS-IV)NCDWR Surface Water Classification for Water Body

N/ABuffer Rules in Effect:

None

25,000

Two 12' lanes with 4' inside paved shoulder and 10' outside paved shoulder; 4:1 median slopes2:1 outside slopes

Waterbody Information

2020

NCDWR Stream Index No.:

46104.1.1

Impairments:Other Stream Classification:

Primary Classification:

Project Built-Upon Area (ac.) ac.

905 Jones Franklin Road

North Carolina Department of Transportation

Highway Stormwater Program STORMWATER MANAGEMENT PLAN

FOR NCDOT PROJECTS

Project Type:

1000 Birch Ridge Drive Address:

General Project InformationB-5389

WBS Element:

Bridge ReplacementWBS Element:Sungate Design Group, P.A.NCDOT Contact:

919-707-6488

Raleigh, NC 27606

Contractor / Designer:

[email protected]

Address:

4/24/2019

YadkinLewisville

Tierre Peterson (Structures Management Unit)

Raleigh, NC 27610

River Basin(s): City/Town:

1.7Typical Cross Section Description:

Surrounding Land Use:

General Project Narrative:(Description of Minimization of Water Quality Impacts)

No

Rural; Agricultural

Deep Creek 12-84

1.4

0.343 milesProject Description

Proposed Project

Yadkin-Pee Dee

NoneSupplemental Classification: None

Wetlands within Project Limits?

The proposed bridge replacement project will replace Yadkin County bridge #105, on US 421 North Bound over the Yadkin River overflow. The proposed bridge is 4 @ 115' 63" Modified Bulb Tee bridge. The existing bridge is 9 @ 50' concrete girder on concrete bents. Deck Drains on the proposed structure will not be discharged over open water, reducing stream pollution associated with roadway runoff. The runoff from deck drains will be discharged onto a class B rip rap dissipator pad. Additional measures implemented to reduce impacts to the stream and surrounding properties include, maintaining existing drainge patterns, and using rip rap pads at drainage outlets to dissipate energy and reduce erosion.

WETLAND AND SURFACE WATER IMPACTS PERMIT

SHEET 1 OF 6PERMIT DRAWING

REDLINE DRAINAGE PLANS

6-16-2018

RALEIGH, NORTH CAROLINA 27606

SUNGATE DESIGN GROUP, P.A.

NC COA No. C-0890

905 JONES FRANKLIN ROAD

VICINITY MAP

BendWest

421

YA

DKIN

RIV

ER

SR 1605

SR 1001SR

1001

SR

1570

YADKIN

COUNTY

FORSYTH COUNTY

SR 1301

SR 3317

SR

1301

421

B-5389PROJECT

CONVENTIONAL PLAN SHEET SYMBOLSSTATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS

US 421 NB

US 421 SB

US 421 NB

US 421 SB

OV

ERF

LO

W

YA

DKIN

RIV

ER

YA

DKIN

RIV

ER

OV

ER

FL

OW

-DETNB-

-LNB-

-LNB- STA. 31+00.00END TIP PROJECT B-5389

-LNB- STA. 12+88.32BEGIN TIP PROJECT B-5389

-LNB- STA. 18+39.36BEGIN BRIDGE -LNB- STA. 22+92.36

END BRIDGE

OU

TSID

E

OF FLO

OD

PLAIN

BOUNDARY (GIS)100-YR FLOODPLAIN

OUTSIDE OF FLOODPLAIN

BOUNDARY (GIS)100-YR FLOODPLAIN

OUTSIDE OF FLOODPLAIN

NA

D 83/ 2

001

NC

GRID

TOTAL LENGTH TIP PROJECT B-5389 = 0.343 MI.

LENGTH STRUCTURE TIP PROJECT B-5389 = 0.086 MI.

LENGTH ROADWAY TIP PROJECT B-5389 = 0.257 MI.

4/6 5/7

TO YADKINVILLE

TO LEWISVILLE

SR

1570 (D

IN

KIN

S

BO

TT

OM

S

RD)

-LNB- 12+65.42BEGIN CONSTRUCTION

-LNB- 31+00.00END CONSTRUCTION

CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD ___THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.THIS IS A CONTROLLED-ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES.

BRIDGE NO.105 OVER YADKIN RIVER OVERFLOW

ON US 421 NORTHBOUND LANES

DRAINAGE, GRADING, PAVING, & STRUCTURE

25 50 10050

25 50 10050

5 10 20

D

T

V

=

=

=

=

=

=

25,000

70

%

%

MPH

ADT

ADT

2020

2040

% *

FUNC CLASS =

K

YADKIN COUNTY

10

PE

B-5389

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

0

0

0

PROFILE (HORIZONTAL)

PROJECT LENGTH

RIGHT OF WAY DATE:

LETTING DATE:

STATE STATE PROJECT REFERENCE NO.

STATE PROJ. NO. F. A. PROJ. NO.

NO.TOTALSHEETS

N.C.SHEET

1

DESIGN DATA

SIGNATURE:

SIGNATURE:

P.E.

P.E.

2018 STANDARD SPECIFICATIONS

PROJECT ENGINEER

PROJECT DESIGN ENGINEER

GRAPHIC SCALES

PLANS

PROFILE (VERTICAL)

HYDRAULICS ENGINEER

ENGINEER

ROADWAY DESIGN

LOCATION:

TYPE OF WORK:

09/08/99

DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA

0

00

5/10/2019

B5389_

Hy

d_pr

m_

wet_psh_01.dgn

jharve

y

TIP P

ROJE

CT:

B-5389

AR

TM

E

N

N

A

S

O H

DE

P

TOF TRA

SPO

RT

TIO

N

TA

TE

OF N RTC

A

RO

LIN

ADESCRIPTION

of Transportation in the Office of:

Prepared for the North Carolina Department

NCBELS LICENSE # F-1049

NCDOT CONTACT

46104.1.1

6

10

65

30,300

REGIONAL TIER

JUNE 26, 2018

JACQUELYN BOWLES, PE

CO

NT

RA

CT:_

__

* (TTST =3%+ DUAL=3%)

= 55 MPHVdet

JOHN E. RICHARDS, III, PE

RURAL FREEWAY

CONSULTING ENGINEERS

ORTON HOMAS AND ASSOCIATES, INC.MA. T

6131 FALLS OF NEUSE ROAD, SUITE 106, RALEIGH, NC 27609

(919) 855-9989 FAX:(919) 855-5687

EMAIL: [email protected]

N/A

RICHARD HINTON, EI

See Sheet 1-B For Conventional Symbols

MAY 21, 2019

SHEET 2 OF 6PERMIT DRAWING

SEE SHEET 8 FOR PROFILE VIEW

-LNB- STA. 18+14.36BEGIN APP SLAB

-LNB- STA. 18+39.36BEGIN BRIDGE

-LNB- STA. 22+92.36END BRIDGE

-LNB- STA. 23+17.36END APP SLAB

NA

D 83/ 2

001

SKETCH SHOWING BRIDGE/PAVEMENT RELATIONSHIP

MA

TC

HLIN

E SEE S

HEET 5 -LN

B- 21+

00.0

0

LEGEND

PAVED SHOULDER

R/W SHEET NO.

5/10/2019

B5389_

Hyd_pr

m_

wet_psh_04.d

gn

jharvey

8/17/99

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

SHEET NO.PROJECT REFERENCE NO.

ROADWAY DESIGNENGINEER ENGINEER

4B-5389

HYDRAULICS

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

CONSULTING ENGINEERS

ORTON HOMAS AND SSOCIATES, NC.MA. T A I

6131 FALLS OF NEUSE ROAD, SUITE 106, RALEIGH, NC 27609

(919) 855-9989 FAX:(919) 855-5687

EMAIL: [email protected]

NCBELS LICENSE # F-1049

WETLANDDENOTES FILL INF F

S SSURFACE WATER

DENOTES IMPACTS IN

TS TSIMPACTS IN SURFACE WATER

DENOTES TEMPORARY

SITE 1

SITE 3

SITE 2

STS

F

SITE 4

SITE 5

TS

F

CROSSING

TEMP STREAM

JESSIE J. CLODFELTER

AND WIFE

WILLIAM STEVEN CLODFELTER

W. LOGAN JACKSON, JR.

ELLEN PARIISH JACKSON AND

BE

TTIE

D.

WIL

ES

EXISTING R/WEXISTING R/W

EXISTING R/W

EXISTING R/W

EXISTING R/WEXISTING R/W

EXIS

TIN

G R/

W

EXIS

TIN

G

R/

WE

XIS

TIN

G

R/

W

EIP

4x4 GRANITE MON

GRASS

DIN

KIN

S

BO

TT

OM

S

RO

AD 22.5'

BS

T

DIN

KIN

S

BO

TT

OM

S

RO

AD 22.5'

BS

T

;

;

;

;

US 421 NBL 24' BST

US 421 SBL 35' BST 15"

CM

P

CONC PAVED DITCH

DI

48"

CM

P

36"

CM

P

METAL FLUME

8"

CM

P

ONLY

DIRECTION

APPROX.

METAL FLUME

8"

CM

P

ONLY

DIRECTION

APPROX.

WOODS

METAL FLUME

8"

CM

P

MT

L

MT

L

WOODS GRAVEL

BST1SFMTLBUS

CO

NC

DO

CK

BST

GRAVEL

12" RCP

ONLY

DIRECTION

APPROX.

MT

L

MT

L

48"

WW

48" W

W

48" WW

SIG

N

WOODS

48" WW

WOODS

VA

R. S

OIL R

D

48" WW

WOODS

YA

DKIN

RIV

ER

OV

ER

FL

OW

YA

DKIN

RIV

ER

OV

ERF

LO

W

BILLBOARD

MTL

MTL

MTL

MTL

WOODS

WOODS

MTL

MTL

MTL

MTL

48" WW

48" WW

SIGN

48" WW

48"

WW

MTL

MTL

MTL

MTL

WOODS

TO YADKINVILLE

LEANN M. DOUB

DARRELL DOUB AND WIFE

LEANN M. DOUB

DARRELL DOUB AND SPOUSE

MELISSA B. DOUB AND

JEFFREY W. DOUB AND SPOUSE

179.82'+9

8.65

-LNB-

138.52'+8

3.42

-LNB-

65.97'

+19.67

-LNB-

130.79'+9

2.36

-LNB-

131.27'+0

1.41

-LNB-

169.64'+6

4.25

-LNB-

F

F

FF

1

2

10

15

20

-EL-

-LNB-

CAT-1

EXIS

T.

15"

RC

P-IV

15"

TB 2GI

TB 2GI

2GI

EST. 7 SY GFEST. 2 TONS

CL 'B' RIP RAP

RETAIN

REPLACE 2GIREMOVE AND

RETAIN

RETAIN

RETAIN

RETAIN

RETAIN

15" RCP-III

FROM STA. 19+21 TO STA. 22+51 -LNB- RTFROM STA. 18+77 TO STA. 19+05 -LNB- RT

DETAIL 4

GEOTEXTILE

GROUND

PLAN VIEW

PROFILE VIEW

DECK DRAIN DISSIPATOR PAD

*NOTE: CENTER PAD DIRECTLY BELOW DECK DRAINS

Geotextile= 282 syType of Liner=90 TONS CL B Rip-RapL=358 ft.

PADDISSIPATOR

( Not to Scale)

1.0'

L

5 ft.

SEE DETAIL 3EMBANKMENTRIPRAP AT

( Not to Scale)

RIP RAP AT EMBANKMENT

STA. 19+55 -LNB- LT

DETAIL 3

Grade

Ditch1.5 ft.

GEOTEXTILE

Geotextile= 20 syType of Liner= 13 TONS,CL I Rip-Rap

10'min.

1.0'min.

( Not to Scale)LATERAL 2' BASE DITCH

2:1D

B

b

d2:1 1"/Ft.

FROM STA. 15+00 TO STA. 19+55 -LNB- LT

DETAIL 1

b=5.0 Ft.

B=2.0 Ft.

Max. d=1.5 Ft.

Min. D=1.5 Ft.

*When B is < 6.0'

Type of Liner=Class B Rip-Rap

Ground

Natural

Slope

Fill

GEOTEXTILE

SEE DETAIL 1EST. 691 SY GFD

EST. 255 TONDITCH w/ CL B RIPRAP

LATERAL 2' BASE

.02.0

2

.02.0

2

.04

.03

.02.0

2

EXIS

T.

SHEET 3 OF 6PERMIT DRAWING

SEE SHEET 8 FOR PROFILE VIEW

-LNB- STA. 18+14.36BEGIN APP SLAB

-LNB- STA. 18+39.36BEGIN BRIDGE

-LNB- STA. 22+92.36END BRIDGE

-LNB- STA. 23+17.36END APP SLAB

NA

D 83/ 2

001

SKETCH SHOWING BRIDGE/PAVEMENT RELATIONSHIP

MA

TC

HLIN

E SEE S

HEET 5 -LN

B- 21+

00.0

0

LEGEND

PAVED SHOULDER

R/W SHEET NO.

5/10/2019

B5389_

Hyd_pr

m_

wet_psh_04a_con.d

gn

jharvey

8/17/99

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

SHEET NO.PROJECT REFERENCE NO.

ROADWAY DESIGNENGINEER ENGINEER

4B-5389

HYDRAULICS

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

CONSULTING ENGINEERS

ORTON HOMAS AND SSOCIATES, NC.MA. T A I

6131 FALLS OF NEUSE ROAD, SUITE 106, RALEIGH, NC 27609

(919) 855-9989 FAX:(919) 855-5687

EMAIL: [email protected]

NCBELS LICENSE # F-1049

WETLANDDENOTES FILL INF F

S SSURFACE WATER

DENOTES IMPACTS IN

TS TSIMPACTS IN SURFACE WATER

DENOTES TEMPORARY

SITE 1

SITE 3

SITE 2

STS

F

SITE 4

SITE 5

TS

F

CROSSING

TEMP STREAM

701

702

702

702

703

703

703

703

703

704

704

7047

04

704

704

704

705

705705705

705

705

705

705

705

705

705

705

705

705

705

705

706

706

706

706

706

706

706

706

706

706

706

706 7

06

706

706

707

707

707

707

707

707

707

707

708

708

708

708

708

708

708

708

708

709

709

709

709

710

710

710

710

710

710

710

710

710

711

711

711

711

712

712

712

712

713

713

713

713

714

714

714

714

715

715

715

715

715715

715

715

716

716

716

716

717

717

717

717

717

717

718

718

718

718

718

719

719

719

719

719

719

720

720

720

720

720

720

720720

720

720

720

720

721

721

721

721

721

721

722

722

722

722

722

722

723

723

723

723

723

723

723

723

724

724

724 724

724

724

724

725

725

725

725

725

725 725

725

725

725725

725

725

725

726

726

726

726726

726

726

727

727

727

727727

727

727

727

727

727

728

728

728

728 728

728

728

728

728

729

729

729

729 729

729729

729

729

730

730

730

730

730730 730

730

730

730730730

730

730

730

730

730

731

731

731

731 731

731

731731

731

731

732

732

732

732732

732

732

732

732

732

732

732

732

732

732

732

732

733

733

733

733 733

733

733

733733

733

733

733

733

733

733

733

733733

733

733

733

734

734

734734 734

734734734

734

734

734734

734 734

734

734

734

734

734

734

734

734

734734

734

734

734 73

4 734734

735

735

735

735

735735

735

735

735

735

735

735

735

735

735

735

735

735735 735 735 735

735

735

735

735735735

735

735735 735

735 735 735

735

735

735735735

735

735

735

735

735

735

736

736

736

736

736

736

73673

673

6 736

736

737

737

737

737

737

738

738

738

738

738

738

739

739

739

739

739

740

740

740

740

740

740

740

740

740

740

741

741

741

741

741

741

741

742

742

742

742

743

743

743

744

744

744

745

745

745

745

745

746

746

746

746

747

747

747

748

748

748

749

749

750

750

750

750

750

751

751752

752

753

753

754

755

755

755

756

757

758

759

760

761

762

JESSIE J. CLODFELTER

AND WIFE

WILLIAM STEVEN CLODFELTER

W. LOGAN JACKSON, JR.

ELLEN PARIISH JACKSON AND

BE

TTIE

D.

WIL

ES

EXISTING R/WEXISTING R/W

EXISTING R/W

EXISTING R/W

EXISTING R/WEXISTING R/W

EXIS

TIN

G R/

W

EXIS

TIN

G

R/

WE

XIS

TIN

G

R/

W

EIP

4x4 GRANITE MON

GRASS

DIN

KIN

S

BO

TT

OM

S

RO

AD 22.5'

BS

T

DIN

KIN

S

BO

TT

OM

S

RO

AD 22.5'

BS

T

;

;

;

;

US 421 NBL 24' BST

US 421 SBL 35' BST 15"

CM

P

CONC PAVED DITCH

DI

48"

CM

P

36"

CM

P

METAL FLUME

8"

CM

P

ONLY

DIRECTION

APPROX.

METAL FLUME

8"

CM

P

ONLY

DIRECTION

APPROX.

WOODS

METAL FLUME

8"

CM

P

MT

L

MT

L

WOODS GRAVEL

BST1SFMTLBUS

CO

NC

DO

CK

BST

GRAVEL

12" RCP

ONLY

DIRECTION

APPROX.

MT

L

MT

L

48"

WW

48" W

W

48" WW

SIG

N

WOODS

48" WW

WOODS

VA

R. S

OIL R

D

48" WW

WOODS

YA

DKIN

RIV

ER

OV

ER

FL

OW

YA

DKIN

RIV

ER

OV

ERF

LO

W

BILLBOARD

MTL

MTL

MTL

MTL

WOODS

WOODS

MTL

MTL

MTL

MTL

48" WW

48" WW

SIGN

48" WW

48"

WW

MTL

MTL

MTL

MTL

WOODS

TO YADKINVILLE

LEANN M. DOUB

DARRELL DOUB AND WIFE

LEANN M. DOUB

DARRELL DOUB AND SPOUSE

MELISSA B. DOUB AND

JEFFREY W. DOUB AND SPOUSE

179.82'+9

8.65

-LNB-

138.52'+8

3.42

-LNB-

65.97'

+19.67

-LNB-

130.79'+9

2.36

-LNB-

131.27'+0

1.41

-LNB-

169.64'+6

4.25

-LNB-

F

F

FF

1

2

10

15

20

-EL-

-LNB-

CAT-1

EXIS

T.

15"

RC

P-IV

15"

TB 2GI

TB 2GI

2GI

EST. 7 SY GFEST. 2 TONS

CL 'B' RIP RAP

RETAIN

REPLACE 2GIREMOVE AND

RETAIN

RETAIN

RETAIN

RETAIN

RETAIN

15" RCP-III

FROM STA. 19+21 TO STA. 22+51 -LNB- RTFROM STA. 18+77 TO STA. 19+05 -LNB- RT

DETAIL 4

GEOTEXTILE

GROUND

PLAN VIEW

PROFILE VIEW

DECK DRAIN DISSIPATOR PAD

*NOTE: CENTER PAD DIRECTLY BELOW DECK DRAINS

Geotextile= 282 syType of Liner=90 TONS CL B Rip-RapL=358 ft.

PADDISSIPATOR

( Not to Scale)

1.0'

L

5 ft.

SEE DETAIL 3EMBANKMENTRIPRAP AT

( Not to Scale)

RIP RAP AT EMBANKMENT

STA. 19+55 -LNB- LT

DETAIL 3

Grade

Ditch1.5 ft.

GEOTEXTILE

Geotextile= 20 syType of Liner= 13 TONS,CL I Rip-Rap

10'min.

1.0'min.

( Not to Scale)LATERAL 2' BASE DITCH

2:1D

B

b

d2:1 1"/Ft.

FROM STA. 15+00 TO STA. 19+55 -LNB- LT

DETAIL 1

b=5.0 Ft.

B=2.0 Ft.

Max. d=1.5 Ft.

Min. D=1.5 Ft.

*When B is < 6.0'

Type of Liner=Class B Rip-Rap

Ground

Natural

Slope

Fill

GEOTEXTILE

SEE DETAIL 1EST. 691 SY GFD

EST. 255 TONDITCH w/ CL B RIPRAP

LATERAL 2' BASE

.02.0

2

.02.0

2

.04

.03

.02.0

2

EXIS

T.

SHEET 4 OF 6PERMIT DRAWING

SEE SHEET 9 FOR PROFILE VIEW

-DETNB- STA. 20+07.45END BRIDGE

-DETNB- STA. 15+54.45BEGIN BRIDGE

NA

D 83/ 2

001

DESIGN SPEED 55 MPH

DETOUR -DETNB-

SKETCH SHOWING BRIDGE/PAVEMENT RELATIONSHIP MA

TC

HLIN

E SEE S

HEET 7 -D

ETN

B- 18

+00.0

0

LEGEND

PAVED SHOULDER

R/W SHEET NO.

5/10/2019

B5389_

Hyd_pr

m_

wet_psh_06.d

gn

jharvey

8/17/99

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

SHEET NO.PROJECT REFERENCE NO.

ROADWAY DESIGNENGINEER ENGINEER

6B-5389

HYDRAULICS

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

CONSULTING ENGINEERS

ORTON HOMAS AND SSOCIATES, NC.MA. T A I

6131 FALLS OF NEUSE ROAD, SUITE 106, RALEIGH, NC 27609

(919) 855-9989 FAX:(919) 855-5687

EMAIL: [email protected]

NCBELS LICENSE # F-1049

WETLANDDENOTES FILL INF F

S SSURFACE WATER

DENOTES IMPACTS IN

TS TSIMPACTS IN SURFACE WATER

DENOTES TEMPORARY

SITE 1

SITE 3

SITE 2

STS

F

SITE 4

SITE 5

TS

F

CROSSING

TEMP STREAM

JESSIE J. CLODFELTER

AND WIFE

WILLIAM STEVEN CLODFELTER

W. LOGAN JACKSON, JR.

ELLEN PARIISH JACKSON AND

BE

TTIE

D.

WIL

ES

EXISTING R/WEXISTING R/W

EXISTING R/W

EXISTING R/W

EXISTING R/WEXISTING R/W

EXIS

TIN

G R/

W

EXIS

TIN

G

R/

WE

XIS

TIN

G

R/

WE

XIS

TIN

G

R/

W

EIP

4x4 GRANITE MON

GRASS

GRASS

DIN

KIN

S

BO

TT

OM

S

RO

AD 22.5'

BS

T

DIN

KIN

S

BO

TT

OM

S

RO

AD 22.5'

BS

T

;

;

;

;

US 421 NBL 24' BST

US 421 SBL 35' BST 15"

CM

P

CONC PAVED DITCH

DI

48"

CM

P

36"

CM

P

METAL FLUME

8"

CM

P

ONLY

DIRECTION

APPROX.

METAL FLUME

8"

CM

P

ONLY

DIRECTION

APPROX.

WOODS

METAL FLUME

8"

CM

P

MT

L

MT

L

WOODS GRAVEL

BST1SFMTLBUS

CO

NC

DO

CK

BST

GRAVEL

12" RCP

ONLY

DIRECTION

APPROX.

MT

L

MT

L

48"

WW

48" W

W

48" WW

SIG

N

WOODS

48" WW

WOODS

VA

R. S

OIL R

D

48" WW

WOODS

YA

DKIN

RIV

ER

OV

ER

FL

OW

YA

DKIN

RIV

ER

OV

ERF

LO

W

BILLBOARD

MTL

MTL

MTL

MTL

WOODS

WOODS

MTL

MTL

MTL

MTL

48" WW

48" WW

SIGN

48" WW

48"

WW

MTL

MTL

MTL

MTL

WOODS

TO YADKINVILLE

LEANN M. DOUB

DARRELL DOUB AND WIFE

LEANN M. DOUB

DARRELL DOUB AND SPOUSE

MELISSA B. DOUB AND

JEFFREY W. DOUB AND SPOUSE

179.82'+9

8.65

-LNB-

138.52'+8

3.42

-LNB-

65.97'

+19.67

-LNB-

130.79'+9

2.36

-LNB-

131.27'+0

1.41

-LNB-

169.64'+6

4.25

-LNB-

1

2

F

F

F

F

.00 .0

1 .02 .03 .04

.04

.02

.02 .0

1

.03

TEMP. 15" w/ ELBOWS

EST. 5 SY GFEST. 1 TONTEMP. CL 'B' RIP RAP

TEMP. CONC. FLUME

SEE DETAIL 7EMBANKMENTRIPRAP AT

( Not to Scale)

RIP RAP AT EMBANKMENT

STA. 16+96 -DETNB- LT

DETAIL 7

Grade

Ditch1.5 ft.

GEOTEXTILE

Geotextile= 20 syType of Liner= 13 TONS,CL I Rip-Rap

10'min.

1.0'min.

GRADE TO DRAIN

( Not to Scale)LATERAL 2' BASE DITCH

2:1D

B

b

d2:1 1"/Ft.

FROM STA. 12+38 TO STA. 16+96 -DETNB- LT

DETAIL 5

b=5.0 Ft.

B=2.0 Ft.

Max. d=1.5 Ft.

Min. D=1.5 Ft.

*When B is < 6.0'

Type of Liner=Class B Rip-Rap

Ground

Natural

Slope

Fill

GEOTEXTILE

SEE DETAIL 5EST 689 SY GFD

EST 254 TONSDITCH w/ CL B RIPRAP

LAT. 2' BASE

-DETNB-

-LNB-

EXIS

T.

10

15

SHEET 5 OF 6PERMIT DRAWING

SEE SHEET 9 FOR PROFILE VIEW

-DETNB- STA. 20+07.45END BRIDGE

-DETNB- STA. 15+54.45BEGIN BRIDGE

NA

D 83/ 2

001

DESIGN SPEED 55 MPH

DETOUR -DETNB-

SKETCH SHOWING BRIDGE/PAVEMENT RELATIONSHIP MA

TC

HLIN

E SEE S

HEET 7 -D

ETN

B- 18

+00.0

0

LEGEND

PAVED SHOULDER

R/W SHEET NO.

5/10/2019

B5389_

Hyd_pr

m_

wet_psh_06a_con.d

gn

jharvey

8/17/99

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

SHEET NO.PROJECT REFERENCE NO.

ROADWAY DESIGNENGINEER ENGINEER

6B-5389

HYDRAULICS

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

CONSULTING ENGINEERS

ORTON HOMAS AND SSOCIATES, NC.MA. T A I

6131 FALLS OF NEUSE ROAD, SUITE 106, RALEIGH, NC 27609

(919) 855-9989 FAX:(919) 855-5687

EMAIL: [email protected]

NCBELS LICENSE # F-1049

WETLANDDENOTES FILL INF F

S SSURFACE WATER

DENOTES IMPACTS IN

TS TSIMPACTS IN SURFACE WATER

DENOTES TEMPORARY

SITE 1

SITE 3

SITE 2

STS

F

SITE 4

SITE 5

TS

F

CROSSING

TEMP STREAM

701

702

702

702

703

703

703

703

703

704

704

7047

04

704

704

704

705

705705705

705

705

705

705

705

705

705

705

705

705

705

705

706

706

706

706

706

706

706

706

706

706

706

706 7

06

706

707

707

707

707

707

707

707

707

708

708

708

708

708

708

708

708

708

709

709

709

709

710

710

710

710

710

710

710

710

710

711

711

711

711

712

712

712

712

713

713

713

713

714

714

714

714

715

715

715

715

715715

715

715

716

716

716

716

717

717

717

717

717

717

718

718

718

718

718

719

719

719

719

719

719

720

720

720

720

720

720

720720

720

720

720

720

721

721

721

721

721

721

722

722

722

722

722

722

723

723

723

723

723

723

723

723

724

724

724 724

724

724

724

725

725

725

725

725

725 725

725

725

725725

725

725

725

726

726

726

726726

726

726

727

727

727

727727

727

727

727

727

727

728

728

728

728 728

728

728

728

728

729

729

729

729 729

729729

729

729

730

730

730

730

730730 730

730

730

730730730

730

730

730

730

730

731

731

731

731 731

731

731731

731

731

732

732

732

732732

732

732

732

732

732

732

732

732

732

732

732

732

733

733

733

733 733

733

733

733733

733

733

733

733

733

733

733

733733

733

733

733

734

734

734734 734

734734734

734

734

734734

734 734

734

734

734

734

734

734

734

734

734734

734

734

734 73

4 734734

735

735

735

735

735735

735

735

735

735

735

735

735

735

735

735

735

735735 735 735 735

735

735

735

735735735

735

735735 735

735 735 735

735

735

735735735

735

735

735

735

735

735

736

736

736

736

736

736

73673

673

6 736

736

737

737

737

737

737

738

738

738

738

738

738

739

739

739

739

739

740

740

740

740

740

740

740

740

740

740

741

741

741

741

741

741

741

742

742

742

742

743

743

743

744

744

744

745

745

745

745

745

746

746

746

746

747

747

747

748

748

748

749

749

750

750

750

750

750

751

751752

752

753

753

754

755

755

755

756

757

758

759

760

761

762

JESSIE J. CLODFELTER

AND WIFE

WILLIAM STEVEN CLODFELTER

W. LOGAN JACKSON, JR.

ELLEN PARIISH JACKSON AND

BE

TTIE

D.

WIL

ES

EXISTING R/WEXISTING R/W

EXISTING R/W

EXISTING R/W

EXISTING R/WEXISTING R/W

EXIS

TIN

G R/

W

EXIS

TIN

G

R/

WE

XIS

TIN

G

R/

WE

XIS

TIN

G

R/

W

EIP

4x4 GRANITE MON

GRASS

GRASS

DIN

KIN

S

BO

TT

OM

S

RO

AD 22.5'

BS

T

DIN

KIN

S

BO

TT

OM

S

RO

AD 22.5'

BS

T

;

;

;

;

US 421 NBL 24' BST

US 421 SBL 35' BST 15"

CM

P

CONC PAVED DITCH

DI

48"

CM

P

36"

CM

P

METAL FLUME

8"

CM

P

ONLY

DIRECTION

APPROX.

METAL FLUME

8"

CM

P

ONLY

DIRECTION

APPROX.

WOODS

METAL FLUME

8"

CM

P

MT

L

MT

L

WOODS GRAVEL

BST1SFMTLBUS

CO

NC

DO

CK

BST

GRAVEL

12" RCP

ONLY

DIRECTION

APPROX.

MT

L

MT

L

48"

WW

48" W

W

48" WW

SIG

N

WOODS

48" WW

WOODS

VA

R. S

OIL R

D

48" WW

WOODS

YA

DKIN

RIV

ER

OV

ER

FL

OW

YA

DKIN

RIV

ER

OV

ERF

LO

W

BILLBOARD

MTL

MTL

MTL

MTL

WOODS

WOODS

MTL

MTL

MTL

MTL

48" WW

48" WW

SIGN

48" WW

48"

WW

MTL

MTL

MTL

MTL

WOODS

TO YADKINVILLE

LEANN M. DOUB

DARRELL DOUB AND WIFE

LEANN M. DOUB

DARRELL DOUB AND SPOUSE

MELISSA B. DOUB AND

JEFFREY W. DOUB AND SPOUSE

179.82'+9

8.65

-LNB-

138.52'+8

3.42

-LNB-

65.97'

+19.67

-LNB-

130.79'+9

2.36

-LNB-

131.27'+0

1.41

-LNB-

169.64'+6

4.25

-LNB-

1

2

F

F

F

F

.00 .0

1 .02 .03 .04

.04

.02

.02 .0

1

.03

TEMP. 15" w/ ELBOWS

EST. 5 SY GFEST. 1 TONTEMP. CL 'B' RIP RAP

TEMP. CONC. FLUME

SEE DETAIL 7EMBANKMENTRIPRAP AT

( Not to Scale)

RIP RAP AT EMBANKMENT

STA. 16+96 -DETNB- LT

DETAIL 7

Grade

Ditch1.5 ft.

GEOTEXTILE

Geotextile= 20 syType of Liner= 13 TONS,CL I Rip-Rap

10'min.

1.0'min.

GRADE TO DRAIN

( Not to Scale)LATERAL 2' BASE DITCH

2:1D

B

b

d2:1 1"/Ft.

FROM STA. 12+38 TO STA. 16+96 -DETNB- LT

DETAIL 5

b=5.0 Ft.

B=2.0 Ft.

Max. d=1.5 Ft.

Min. D=1.5 Ft.

*When B is < 6.0'

Type of Liner=Class B Rip-Rap

Ground

Natural

Slope

Fill

GEOTEXTILE

SEE DETAIL 5EST 689 SY GFD

EST 254 TONSDITCH w/ CL B RIPRAP

LAT. 2' BASE

-DETNB-

-LNB-

EXIS

T.

10

15

Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural

Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design

(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 19+38 to 19+61-L-LT DITCH (BANK STABILIZATION) < 0.01 232 19+08 to 19+61-L- BRIDGE 0.02 1453 19+67 to 19+91-L- BRIDGE 0.024 19+07 to 19+24-L-RT BRIDGE 0.015 18+82 to 19+04-L-RT STREAM CROSSING 0.01 89

TOTALS*: 0.03 < 0.01 0.03 23 234 0

Revised 2018 Feb SHEET 6 OF 6

WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTS

YADKIN

B-5389

46104.1.1

NC DEPARTMENT OF TRANSPORTATION

DIVISION OF HIGHWAYS

05-10-2019

*Rounded totals are sum of actual impacts

NOTES:SITES 3 and 4 are a Total Take