production - reducing machine setup time - iem

22
MACHINE PERFORMANCE By Ir. Gan Chun Chet

Upload: gan-chet

Post on 13-Aug-2015

69 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCEBy Ir. Gan Chun Chet

Page 2: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE

• IMPROVING YOUR MACHINE PERFORMANCE BY KNOWING IT FIRST

• KNOWING THE CAPACITY TO PLAN AHEAD

Page 3: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : RATIOS

• UNDERSTANDING THE RATIOS• RATIO OF PRODUCT CHANGE (To/Ts)

To = OPERATING TIMETs = SETUP TIME

• INDICATES THE OPERATING TIME OVER THE SETUP TIME

Page 4: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : RATIOS

• RATIO OF NUMBER OF SETUPS AND PRODUCTS (Ts/Np)Ts = NUMBERS OF SETUPNp = NUMBER OF PRODUCTS

• INDICATES THE RATIO OF MACHINE SETUPS AND THE NUMBER OF PRODUCT PRODUCED BY THE MACHINE

Page 5: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : PERFORMANCE INDICATOR

• MACHINE PERFORMANCE = (To/Tt) * 100PERFORMANCE OF THE MACHINE IN PERCENTAGE (%)

• OPERATING HOURS ToTo = Tt – (Ti + Tm + Ts)MACHINE TOTAL PRODUCTION HOURS TtMACHINE IDLE TIME TiMACHINE MAINTENANCE TIME TmMACHINE SETUP TIME Ts

Page 6: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : PERFORMANCE VARIABLES

• MACHINE TOTAL PRODUCTION HOURS Tt (FIXED)TOTAL WORKING DAYS IN HOURS

• MACHINE IDLE TIME Ti (VARIABLE)NO PRODUCTION SCHEDULE

• MACHINE MAINTENANCE TIME Tm (VARIABLE)DEPENDING ON THE TYPE OF MAINTENANCE WORK

• MACHINE SETUP TIME Ts (REPETITIVE)MONITORING REQUIRED

Page 7: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : MONITORING SETUP TIME – STATISTIC

• STATISTICAL TECHNIQUES• MAXIMUM SETUP TIME

THE MAXIMUM TIME OF THE SETUPS• MINIMUM SETUP TIME

THE MINIMUM TIME OF THE SETUPS• AVERAGE SETUP TIME• THE AVERAGE TIME OF THE SETUPS

Page 8: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : MONITORING SETUP TIME – PREDICTION/FORECASTING

• PREDICTION TECHNIQUE• CATEGORY MODE OCCURRENCE

THE LOCATION OF THE MOST FREQUENT SETUP TIME• DEVIATION FROM ACTUAL BY MOVING AVERAGE

AVERAGE OF TWO ACTUAL PASTS CALCULATED WITH VARYING DEVIATIONDEVIATION FROM ACTUAL BY EXPONENTIAL SMOOTHINGTHE FRACTION OF ONE (1) GUESS OR PAST AND AN ACTUAL CURRENT WITH VARING DEVIATION

Page 9: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : MONITORING SETUP TIME – PREDICTION/FORECASTING

• PROBABILITY OF UP OR DOWNTHE POSSIBILITIES OF EITHER AN UP, DOWN OR UNCHANGE COUNTED TO KNOW THE PROBABILITY

• ANGLE OF INCLINATIONTHE SLOPE OF EACH POINT MOVEMENT, WHETHER IS LOCATED AT VERY HIGH ANGLE, HIGH ANGLE, LOW ANGLE (NEGATIVE) OR A MODERATE LOW ANGLE

Page 10: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : MONITORING SETUP TIME – DIAGNOSE THE REPETITIVE TASKS

• TWO TIME HIGH WITHIN THE LIMITSTWO TIMES THE SETUP TIME INCREASES WHETHER WITHIN AN UPPER LIMIT OR LOWER LIMIT WHICH IS A DEVIATION FROM A CHANGING MEAN TIME

• WARNING LEVELA PREDETERMINE SETPOINT TO WARN USER.

Page 11: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : PERFORMANCE CHART

SIMULATION

Performance Chart

8800

9000

9200

9400

9600

9800

10000

10200

0 500 1000 1500

Setup Time (Ts)

Op

erat

ing

Ho

urs

(T

o)

Operating Hours(To=Tp-Ts)

Performance Chart

8800

9000

9200

9400

9600

9800

10000

0 20 40 60 80 100

Production Hours/ Setup Hours (Tp/Ts)O

per

atin

g H

ou

rs (

To

)

Ratio (Tp/Ts)

Page 12: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : PERFORMANCE CHART

Ratio

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0 5 10 15

Number of Product

Set

up

/Pro

du

ct

Setup/Product 1

Setup/Product 2

Ratio

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

0 2 4 6 8 10 12

Number of Product

Op

erat

ing

/Pro

du

ct

Operating/Product 1

Operating/Product 2

SIMULATION

Page 13: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : PERFORMANCE CHART

Operating Product

0

20

40

60

80

100

0 5 10 15

Number of Products

Op

erat

ing

Tim

e 10 Setups

20 Setups

30 Setups

• MORE SETUP, REDUCE OPERATING TIME

• NOTE RATIO OF PRODUCTION AND SETUP HOURS CHART

SIMULATION

Page 14: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : PERFORMANCE CHART

Warning Level

14.0

18.5

11.410.8

18.9

11.3

15.8

3.1

15.0

12.4

15 15 15 15 15 15 15 15 15 15

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

0 2 4 6 8 10 12

Number of Setups

Tim

e (H

ou

rs)

Actual Time

Warning Level

SIMULATION

Page 15: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : PERFORMANCE CHART

Distribution of Hours

87

3.4

7.62.3

0%

20%

40%

60%

80%

100%

1Machine

Pe

rce

nta

ge

(%

)

Percentage of Hours Spent OnSetups (Tsn/Ttn*100)

Percentage of Hours Spent OnMaintenance Time (Tmn/Ttn*100)

Percentage Machine Left Idle(Tin/Ttn*100)

Machine Performance (Ton/Ttn)

SIMULATION

Page 16: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE : PERFORMANCE CHART

Upper and Lower Limits

9.7

19.2

22.9

8.5

16.6

14.5 14.2

23.3

15.7

13.4

28.8

32.1

12.3

19.8

17.416.5

26.4

18.1

15.0

9.6

13.7

4.7

13.411.5 11.8

20.1

13.211.7

27.8

32.8

15.2

24.0

21.5 21.0

31.1

23.1

20.5

10.6

12.9

1.8

9.27.4 7.3

15.4

8.26.2

25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0

17.3 17.3 17.3 17.3 17.3 17.3 17.3 17.3 17.3 17.3

9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6

1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8

32.8 32.8 32.8 32.8 32.8 32.8 32.8 32.8 32.8 32.8

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

0 2 4 6 8 10 12

Number of Setup

Tim

e

Actual Machine Setup Time

Upper Limit (Moving Average)

Low er Limit (Moving Average)

Upper Limit (Exp Smoothing)

Low er Limit (Exp Smoothing)

Category 1 \/

Category 1 /\ / 2 \/

Category 2 /\ / 3 \/

Category 3 /\ / 4 \/

Category 4 /\

MODE IN CATEGORY 3 IN THIS CASE

SIMULATION

Page 17: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE

• KNOW WHAT IS ACCEPTABLE• MONITOR TO SEE WHETHER IT IS LOCATED AT

YOUR MEAN PERFORMANCE• IDENTIFY THE IMPROVEMENT EITHER

POSSIBLE OF NOT

Page 18: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE

• STRATEGY• MORE OPERATION TIME• MORE SETUPS

• KNOW YOUR MEAN

Page 19: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE

• COST OF OPERATION• LINK TO TIME (POSSIBLE?)

• EXAMPLE:• REDUCE SETUP?• INCREASE FLEXIBILTY?

Page 20: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE

• KNOW YOUR MACHINE PERFORMANCE• KNOW YOUR MEAN PERFORMANCE• KNOW THE ESTIMATED PREDICTION

Page 21: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE

• KNOW THE CAPACITY• PLAN AHEAD

Page 22: Production - Reducing Machine Setup Time - IEM

MACHINE PERFORMANCE

• EXCEL FILE – THE PURPOSE• ARTICLE – PREDICTIVE TECHNIQUE