Provincial Disaster Risk Reduction and Management Council Pangasinan State Government Summary Report Republic of the Philippines Verification Survey with the Private Sector for Disseminating Japanese Technologies for Integrated Geographic Information System (Integrated GIS) for Improvement of Regional Disaster Risk Reduction and Management October 2017 Japan International Cooperation Agency Informatix Incorporated

Upload: others

Post on 21-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

Provincial Disaster Risk Reduction

and Management Council

Pangasinan State Government

Summary Report

Republic of the Philippines

Verification Survey with the Private Sector

for Disseminating Japanese Technologies

for Integrated Geographic Information System

(Integrated GIS)

for Improvement of Regional Disaster Risk Reduction

and Management

October 2017

Japan International Cooperation Agency

Informatix Incorporated

Page 2: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant
Page 3: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

i

Verification Survey with the Private Sector for Disseminating Japanese Technologies

for Integrated Geographic Information System (Integrated GIS)

for Improvement of Regional Disaster Risk Reduction and Management

Summary Report

Table of Contents……………………………………………………………………………………… i

Acronyms and Abbreviations………………………………………………………………………….. ii

1. BACKGROUND ..................................................................................................................................... 1

2. OUTLINE OF VERIFICATION AND DISSEMINATION ................................................................. 2

(1) Purpose ............................................................................................................................................ 2

(2) Activities .......................................................................................................................................... 2

(3) Information of Product/ Technology to be Provided ....................................................................... 3

(4) Counterpart Organization ................................................................................................................ 3

(5) Target Area and Beneficiaries .......................................................................................................... 3

(6) Duration ........................................................................................................................................... 3

(7) Progress Schedule ............................................................................................................................ 3

(8) Implementation System ................................................................................................................... 4

3. ACHIEVEMENT OF THE SURVEY ................................................................................................... 5

(1) Outputs and Outcomes of the Survey .............................................................................................. 5

(2) Self-reliant and Continual Activities to be Conducted by Counterpart Organization ...................... 9

4. FUTURE PROSPECTS .......................................................................................................................... 9

(1) Impact and Effect on the Concerned Development Issues through Business Development of the

Product/ Technology in the Surveyed Country ................................................................................ 9

(2) Lessons Learned and Recommendation through the Survey ......................................................... 10

ATTACHMENT: OUTLINE OF THE SURVEY

Page 4: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

ii

Acronyms and Abbreviations

APEC : Asia-Pacific Economic Cooperation

CP : Counter Part

DICT : Department of Information and Communications Technology

DILG : Department of the Interior and Local Government

DOST : The Department of Science and Technology

DRRM : Disaster Risk Reduction and Management

GDP : Gross Domestic Product

GIS : Geographic Information System

GOP: Government of the Philippines

JICA : Japan International Cooperation Agency

LGU : Local Government Unit

NAMRIA : National Mapping and Resource Information Authority

NDRRMP : National Disaster Risk Reduction and Management Plan

O&M : Operation and Maintenance

OCD : Office of Civil Defense

ODA : Official Development Assistance

PAGASA : Philippine Atmospheric Geophysical and Astronomical Services Administration

PC : Personal Computer

PDP : Philippine Development Plan

PDRRMO : Provincial Disaster Risk Reduction and Management Office

PhilNITS : The Philippine National I.T. Standards Foundation, Inc.

RA10121: Disaster Risk Reduction and Management Act

Page 5: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

1

1. BACKGROUND

Although the economic situation in the Philippines has been in a long-term slump since the 1960s to the

1990s, the growth rate of gross domestic product (GDP) has reached more than 6% in recent years, and

economic growth is becoming more sustainable. Therefore, the economic growth rate since 2012 is higher

in the ASEAN major countries. The Government of the Philippines has also developed projects for

disaster risk reduction and management (DRRM) based on the policies stated in the medium-term

development plan (PDP 2011-2016), and it has been increasing the budget for infrastructure development

to solidify further economic growth. Recently, the Government of the Philippines (GOP) has established

the Disaster Risk Reduction and Management Act (RA10121), which obliges the formulation of the

National Disaster Risk Reduction and Management Plan (NDRRMP) in 2010, that contributed to share

the information of their restoration and reconstruction experience from the Yolanda typhoon disaster or

Sendai disaster prevention framework in APEC.

Also, in order to improve the disaster prevention level of the nation, the GOP has so far carried out the

important activities such as legal and institutional arrangements, formulation of disaster reduction related

plan, improvement of budget system and, capacity building of administrative agencies in the disaster

prevention field. The disaster prevention related organizations are also supported by various donors, and

the GOP’s disaster risk reduction and management (DRRM) ability is steadily improving. To achieve the

basic policy "Inclusive Growth" mentioned in the above PDP, it is considered that the GOP is adapting the

policy and the legal system in DRRM sector, in order to cover the mutually influential factors of

sustainable economic growth and improvement of the capability of DRRM.

However, it is difficult to say that the basic information sharing related to DRRM is enough between the

relevant organizations from the viewpoint of accuracy and synchronization of information. In fact, there is

still a strong sense of crisis against natural disasters from the viewpoints of damaged experience including

many past typhoon damages in the target region after the formulation of PDP. The information that

contributes to the evacuation activities in the event of disaster is stored in dissipate manner (although the

data exists abundantly) and is not integrated or processed sufficiently for decision makings to response

and command to related agencies.

In this circumstance, the Survey Team consisting of Informatix Inc., and the partners, was dispatched by

Japan International Cooperation Agency (JICA) to conduct “the verification survey in the Province of

Pangasinan, the Philippines concerning on the Informatix’s Integrated Geographic Information System

(GIS) products for Advancement of Regional Disaster Prevention (the Survey)” for about 20 months from

the day of signing the contract between Informatix Inc. and JICA. JICA supervises the overall

implementation of the Survey and own the products, equipment, and their incidental facilities, prepared

by the survey team for the purpose of implementation of the Survey during the project. The Survey is

formulated based on a new project scheme ‘Verification Survey with Private Sector for Disseminating

Japanese Technologies, which aims to demonstrate that Japanese technologies are highly effective in

improving specific development challenges in the developing countries through actual installation and

operation of products related to the technologies.

Page 6: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

2

2. OUTLINE OF VERIFICATION AND DISSEMINATION

(1) Purpose

The overall goal of the Survey is to mitigate and minimize disaster damage in the Pangasinan

Province as a result of capacity enhancement of CP LGUs on disaster management, by means of the

information sharing regarding disaster prevention through the Integrated Geographical Information

System (herein after referred to as “the GeoCloud Integrated GIS”).

The Survey purpose is listed as follows:

To study framework in which DRRM information is shared mutually and rapidly at the time of

disaster.

To craft DRRM information database using Integrated GIS in Province of Pangasinan and 3

LGUs in sustainable manners.

To evaluate Integrated GIS by implementation of workshops on DRRM in which LGU

officials (of Disaster Risk Reduction and Management Council) attend for improvement of

DRRM activities of LGUs.

To develop the plan to disseminate the technology in the Philippines.

(2) Activities

Based on the purposes of the Survey, the following activities is set and implemented:

(a) Activity-1: Discussion and examination for information sharing regarding disaster risk

reduction between CP LGUs and the Central Government

Explanation of outline of the Survey to Central Government

Arrangement and management for information sharing meetings between CP LGUs and the

Central Government

Investigation for information to disaster risk reduction and management, relevant system,

laws and policies.

Examination of the information sharing mechanism and methodology

(b) Activity-2: Introduction and operation of the GeoCloud Integrated GIS in the Province of

Pangasinan

Implementation of preliminary survey

Formulation of specification of the GeoCloud Integrated GIS and procurement of materials

Modification works of the GeoCloud Integrated GIS

Trainings on operation of the GeoCloud Integrated GIS for the development partner

company(PhilNITS)

Preparation for introduction of the GeoCloud Integrated GIS

Trainings on operation of the GeoCloud Integrated GIS for CP LGUs

Installation and setting-up of hardware of the GeoCloud Integrated GIS

Setup and provisional operation of a prototype system

Introduction and operation of the GeoCloud Integrated GIS

Formulation of operational structure/system

Page 7: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

3

(c) Activity-3: Implementation of workshops in the Province of Pangasinan

Preparation of workshops

Implementation of workshops for verification of the GeoCloud Integrated GIS

Evaluation of the GeoCloud Integrated GIS based on the results of workshops

(d) Activity-4: Formulation of Business Plan for the dissemination of GeoCloud Integrated

GIS

Information collection for developing a business

Implementation of seminars and observation tours

Implementation of study tours in Japan

Examination and Proposition for the dissemination of the GeoCloud Integrated GIS as a part

of disaster risk reduction and management system in the Philippines

Establishment of a plan to develop the business

(3) Information of Product/ Technology to be Provided

The provided products and technology in the Survey are as follows:

(a) Hardware

Main servers in the Pangasinan Province with GeoCloud System

Terminal PCs in the 3 LGUs to access and operate GIS system

Surrounding Equipment (network system, Wi-Fi system, printers and scanners)

Five (5) Radio Communication System for data transmissions between the LGUs

(b) Software:

GeoCloud Integrated GIS

Manuals and Guidelines for O&M of the GeoCloud Integrated System

Training Manuals

(4) Counterpart Organization

The counterpart organization are the Pangasinan Province, one (1) city (Dagupan city) and two (2)

towns (Binmaley and Lingayen towns) in the Province of Pangasinan.

(5) Target Area and Beneficiaries

Target areas are one (1) city (Dagupan city) and two (2) towns (Binmaley and Lingayen towns) in

the Province of Pangasinan. Beneficiaries are all the residentiary of those areas.

(6) Duration

The Survey is implemented for about 22 months from March 2016 to December 2017.

(7) Progress Schedule

All of the activities are completed in the October 2017 including the donation of equipment and

Page 8: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

4

systems, and the Survey will be terminated in December 2017.

(8) Implementation System

The implementation system of the Survey as organized at the beginning of the Survey is shown in

the Figure 1.

Figure 1 Implementation System of the Survey

Meeting and

Discussion for

information

sharing

Philippines Side

C/P Organization: Province Pangasinan with 1 city and 2 towns

Relevant Department: OCD, DILG, DICT, PAGASA, NAMRIA, etc.

.

- Procurement of the System

- Introduction of the System

- Guidance for O&M of the System

- Trainings in the Philippines and Japan

- Workshops in the Philippines

- Preparing Manuals for the System

- Discussion for information sharing

- Donation of the system, etc.

Project Team

Informa tix Incorporated associated with

PhilNITS

and Advisory Company CTII

- Providing data

- Input data and information

- Participation in Trainings and

workshops

- Understanding effects of the system

on DRRM

- Learning DRRM through the system

- Operation of the system, etc.

JICA

Communication

Page 9: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

5

3. ACHIEVEMENT OF THE SURVEY

(1) Outputs and Outcomes of the Survey

(a) Activity 1: To study the method to share meteorological and disaster prevention

information between governmental organizations and Province of Pangasinan

Activity Results

1-1: To discuss with governmental organizations, such as Philippine Atmospheric, Geophysical

and Astronomical Services Administration (PAGASA) and Office of Civil Defense (OCD), to

construct the framework to support the Survey.

The outline of the Survey was explained for the line ministries of DRRM such as PAGASA,

OCD, DILG, NAMRIA, DICT in Manila on early April 2016.

1-2: To hold meetings with governmental organizations, the Provincial Government of

Pangasinan and 3 LGUs to share meteorological and DRRM related information.

The first steering committee was held on July 2016 for explanation of the role of the meeting and

the outline of the Survey. The second steering committee was held on November 2016 for

updating the progress of the Survey and discussion about information sharing in the Philippines.

The third steering committee was held on February 2017 for the explanation of the installation

situation of hardware and software, operation situation of GeoCloud, the progress of the Survey

and Japan visit. The forth steering committee was held on July 2017 for the explanation of the

progress, training in Japan and Philippines, workshop contents and evaluation, LGU’s activities

and discussion.

1-3: To research on existing DRRM information and systems of governmental organizations.

The Survey was conducted for the condition and activities of DRRM information in each

organization by interviewing to PAGASA, OCD, DILG, DICT, NAMRIA and urban LGUs

(Pasig city and Marikina city) after October 2016.

1-4: To study information categories to be shared and the method to share between governmental

organizations and Province of Pangasinan.

The information sharing method was surveyed considering the technical information from the

activity 1-2/1-3, and conditions such as limitation and range of utilization.

Achievement and Summary

The roles/function of the related organizations and necessary information to conduct activities of

DRRM were revealed through series of discussions and meetings, which were held with CP

organizations and the relevant central governments such as PAGASA, OCD, DILG, NAMRIA

and DICT. As a result of the discussions and meetings, the related organizations understood the

aims and the effects of the Survey from the aspect of contributions to DRRM, and the information

was shared among them, in order to establish the GeoCloud Integrated GIS for the Province of

Pangasinan.

Figure 2 Information Sharing Meetings (Left: First Meeting, Right: Forth Meeting)

Page 10: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

6

(b) Activity 2: Introduction and operation of Integrated GIS for Province of Pangasinan

Activity Results

2-1: To implement a preparatory survey.

From the beginning of the Survey, preparation was conducted in Japan and the team meeting was

held for confirmation of the role of persons in charge, and schedule of installation. Then, the

Survey contents were announced to concerned persons and the activities were started.

2-2: To design the detailed specifications of Integrated GIS and hardware.

There was not a big change of hardware configuration as planned at the beginning. At the time of

procurement, a standard high-performance type of equipment was selected.

2-3: To customize the system following the specifications in Japan.

There was not a big change of hardware configuration as planned at the beginning. At the time of

procurement, a standard high-performance type of equipment was selected, following the

specifications in Japan.

2-4: To hold a training session for engineers of the local partner.

The training for engineers of the local partner was conducted for three weeks. Although, the

training was planned for one week at the beginning. This comprised of two parts; the basic

training and the development training, which contributes to enhance the effectiveness and earlier

capacity building for development.

2-5: To implement preparatory works for system installation in the Philippines.

The basic data which LGUs need was developed by PhilNITS GC operators who have capacity to

develop GeoCloud data.

2-6: To hold training sessions for LGU officials in charge of the project.

The training for LGU officials in charge was conducted for developing capacity to operate and

utilize GeoCloud GIS System. It was subcontracted to PhilNITS.

2-7: To install and setup hardware.

The setup work such as software/hardware installation and operation confirmation was

subcontracted to PhilNITS and conducted for utilizing the procured hardware.

2-8: To install and test Integrated GIS.

The provisional operation period was set for one month using proto version for test and training

before full operation of Integrated GIS. After that, connection and operation of all terminal

equipment was confirmed.

2-9: To start full operation of Integrated GIS.

Through the activities of “2-6: To hold training sessions for LGU officials in charge of the project”

and “2-8: To install and test Integrated GIS”, the environment for starting the operation was

prepared.

2-10: To establish operation and support structures of Integrated GIS.

Through “Activity 3: Implementation of workshops in the Province of Pangasinan”, the operation

structure was clarified. For the smooth operation by LGUs and assistance of system operation

during the Survey, the support desk was established and started the support services such as

response of questions about operation and bug report.

Page 11: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

7

Achievement and Summary

The main server of GeoCloud Integrated GIS was completely installed in the PDRRMO of

Pangasinan Province and terminal PCs with surrounding equipment in the target LGUs. The

specification of system was set based on results of investigations as to the present conditions of

(i) DRRM in the LGUs, (ii) existing and necessary information and (iii) existing data

transmission system.

Figure 3 Introduced System (Left: Radio Communication System, Mid: Terminal PC

with access silences, Right: Server Setup with GeoCloud GIS System)

During the Survey, the knowledge and skills to operate the system were enhanced through series

of trainings and study tours, which were conducted twice in Japan by the Survey Team. In

addition, training and operation manuals in English are provided to CP organization as a reference

to effectively operate the system in consideration of sustainability of self-system operation. As of

October 2017, the system and equipment are donated to CP organization and being well operated

by them after the donation.

Figure 4 Trainings on Operation of the GeoCloud Integrated GIS for CP

(c) Activity 3: Implementation of workshops in the Province of Pangasinan

Activity Results

3-1: To prepare design and plan of workshops together with/ based upon consultation with the

Provincial Government and 3 LGUs.

Preparation work for workshop to evaluate the effectiveness of GeoCloud Integrated GIS was

conducted considering flood situation and local DRRM structure. After the consultation with the

JICA expert, the training concept was arranged to have workshops, focusing on preparedness of

DRRM activities which is appropriate for evaluation of the effectiveness of GeoCloud Integrated

GIS.

3-2: To conduct workshops together with the Provincial Government and 3 LGUs.

The first workshop was held on October 2016 for data collection/preparation and understanding

of data utilization for the activities on DRRM. The second workshop was held on February 2017

for studying utilization for DRRM by creating disaster risk graphs to evaluate the effectiveness of

the Integrated GIS on DRRM. The third workshop was held on June 2017 for creating flood

hazard map to evaluate the effectiveness of the Integrated GIS on DRRM.

Page 12: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

8

3-3: To evaluate the effectiveness of Integrated GIS based upon the outcome of workshops

activities.

The evaluation of the effectiveness of Integrated GIS was conducted based upon the evaluation

indicators for DRRM and System which was set during workshop preparation.

Achievement and Summary

To evaluate and verify the introduced system, the workshops were systematically conducted three

times in the Philippines for the purpose of (i) data collection/preparation and understanding of

data utilization for the activities on DRRM, (ii) establishment of disaster risk graphs, (iii)

elaboration of flood hazard map in consideration of conditions of refugee. Especially, workshops

of (ii) and (iii) were conducted and outputs (see Figure 5) are made by CP through operating the

GeoCloud Integrated System.

The products in the workshops and CP’s enough operation capacity proved the contribution of the

introduced system for activities on disaster preparedness. This success has mainly been brought

by the activities of capacity enhancement during the Survey, and powerful and friendly operation

function/system of the GeoCloud Integrated GIS.

Figure 5 Outputs of Workshops (Left: Disaster Risk Graph, Right: Flood Hazard Map)

(d) Activity 4: To make a plan to disseminate Integrated GIS into all over the Philippines

Activity Results

4-1: To study for dissemination of Integrated GIS.

The study to ensure future dissemination of Integrated GIS was conducted considering the issues

for dissemination clarified in “Activity 3: Implementation of workshops in the Province of

Pangasinan”.

4-2: To hold seminars and exhibitions with the cooperation of the Province of Pangasinan.

The seminar was held on August 2017 in order to introduce the Survey contents and results to line

ministries and LGUs as a part of the dissemination activity of Integrated GIS.

4-3: To implement the study session in Japan.

The first Japan visit was conducted on November 2016 for LGU and line ministry officials in

charge. Main objective was to learn the situation of Integrated GIS, data sharing among DRRM

departments and data management of other departments, by visiting the local government which

has Integrated GIS for contribution to a smooth operation start of Integrated GIS. The second

Japan visit was conducted on May 2017 for decision makers such as the provincial governor and

mayors, because it contributes to dissemination of Integrated GIS by understanding the situation

of introduction of Integrated GIS in Japan and exchange of opinions.

Population in

Inundated Area

Population in Inundated Area

without Evacuation Center

Population

0

100

200

300

400

500

600

700

0 20 40 60 80 100 120

Po

ten

tial

Ev

acu

ee P

op

ula

tio

n t

o b

e

ad

dre

ssed

(P

ers

on

s)

Return Period (year)

Disaster Risk Graph

frequentsmall magnitude

rarehigh magnitudeHazard

Effect of the System

Effect of evacuation center

To be addressed

• wide area evacuation• other place for evacuation• construction of evacuation center• , etc.

Disaster risk graph of sample area

Page 13: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

9

4-4: To make a brief proposal for dissemination of the system for disaster prevention and its

measures in the Philippines.

The dissemination concept of the system was studied with analysis about relevance and

effectiveness of the dissemination of the system after workshops and interview to line ministries.

4-5: To make a future plan for dissemination of the Integrated GIS in the Philippines.

Based on the activity 4-4, the future activities and plan in the Philippines were formulated.

Achievement and Summary

Based on (i) the verification results of the introduced system as mentioned item (c), (ii) a research

of market environment by 3C analysis and (iii) the level of potential capacity of local government

staff to adapt to the System, a business plan was formulated to disseminate the GeoCloud

Integrated GIS in governmental organizations in the Philippines in order to improve the condition

of DRRM. In the Survey, the verification of the System was carried out from the viewpoint of

disaster preparedness; however, the System was applied by Informatix Incorporated for the

activities on other stages of DRRM such as response and rehabilitation in Japan.

Moreover, the System has a possibility to be applied for other business field such as asset

management, land use management and traffic management etc. in accordance with the concept

of i-government in the Philippines.

(2) Self-reliant and Continual Activities to be Conducted by Counterpart Organization

To keep sustainability on the O&M of the GeoCloud Integrated GIS by CP themselves, the Survey

Team prepared tools and a scheme to support CP (particularly, LGUs) in order to smoothly conduct

O&M of the System as follows:

Training and operation manuals and guidelines in English were ready for users

Technical transfer to the business partner (PhilNITS in the Philippines) from Informatix

Incorporated successfully finished. After the contract between them, the business partner will

support for not only operation but also maintenance and expansion of the System.

According to the result of the interviews with the participating staff of LGUs, it was

recognized that the System has friendly and visually arranged function to input, modify and

analyze the information for the staffs of LGUs.

The installation fee and cost of maintenance are kept in reasonable conditions compared with

the DRRM budget of Provinces and LGUs.

4. FUTURE PROSPECTS

(1) Impact and Effect on the Concerned Development Issues through Business Development of

the Product/ Technology in the Surveyed Country

The target country has suffered from natural disasters such as typhoon, severe storm, floods,

landslide, etc. Normally, the risk of those disasters is analyzed based on the hazard degree, the

vulnerability of people/assets and DRRM system, and the exposure condition in the target area. In

this context, the products and technology transferred to CP organizations in this Survey will

contribute to future reduction of vulnerability of the whole LGUs in their implementation capacity of

DRRM, if the product will spread to other LGUs.

Page 14: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

10

Figure 5 Impact and Effect on the Risk of Disasters in the Philippines

For example, during the Survey, quick impacts were happened in CP LGUs. The CP conducted

making wide-areas road maps to clarify the vulnerable area to flood inundation and pasted the

modified flood hazard maps on the news boards in the city and towns. As just described, the

reduction of vulnerability by LGUs was immediately started after the completion of installation of

the product and technical transfer for the operation of the System in the Survey.

(2) Lessons Learned and Recommendation through the Survey

(a) Lessons and Learnings

(i) Importance of Local Business Partner

The local business partner has covered and supported the activities of the Survey during the

absence of Informatix Incorporated in the Philippines, particularly, in case of necessity of

urgent negotiations and discussions, which often happen with sub-contractors to change

design or spec-conditions, in order to procure and install the equipment and system on time

as well as conduct inventory management for spare parts in the Philippines. Based on this

experience, the Survey Team realized the importance of the local business partner to realize

the formulated business plan.

(ii) Significance of Supports by In-house Staff

To promote and conduct a number of activities in the Survey on schedule, supports and

assists by in-house engineer and administrative staff were essential and very effective. As a

result of this experience, it can be said that the supportive structure should be established

when the dissemination of the System starts in the Philippines based on the formulated

business plan.

(iii) Effectiveness of Assistance by Consultant

Through the Survey, it is realized that the development consultant are conversant with the

technical and administrative terminology, schemes of ODA project, mechanism and

procedure of ODA projects very well, so that Informatix Incorporated can attain the goal and

outputs of the Survey on schedule. In addition, it can be said that the consultants will

effectively collaborate to promote the implementation of the formulated business plan

(b) Recommendation

The DRRM projects are largely divided into two portion such as structural measures (hard

components) and non-structural measures (soft components). The introduced system is categorized

into the non-structural measures and its cost and installation time are less than the structural

measures. In the Sendai disaster prevention framework, the disaster risk reduction and mitigation

by the non-structural measures are also recognized as an important method, with quick impact on

the mitigation of disaster damage. In this context, it is recommended to incorporate the introduced

Page 15: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

11

system (the GeoCloud Integrated GIS) with technical transfer into the ODA and DRRM projects as

one of non-structural measures to reduce and mitigate the future risk and damage by disasters.

Page 16: Provincial Disaster Risk Reduction and Management Council Pangasinan State Government ... · 2017. 12. 7. · C/P Organization: Province Pangasinan with 1 city and 2 towns Relevant

12

Attachment

Outputs and Outcomes of the Survey

GC Integrated GIS is used in lots of

public institutions, but only in Japan.

Practical use of the Integrated GIS

other than DRRM matters, such as city

planning and assets valuation.

Pangasinan will be known as a model

of practical use of Integrated GIS for

DRRM, and it helps to disseminate the

framework all over the Philippines.

Establishment of the framework in

which DRRM information is shared

mutually and rapidly, complying

related policies of central

governmental organizations.

LGUs‘ communication and response

ability for disaster risk reduction and

management is strengthened.

Upgrade of bases for disaster

risk reduction and management

(DRRM) in participating LGUs.

Upgrade of response capability

in sharing DRRM information

among LGUs, evacuation and

the instructions.

Concerned Development Issues

in the Philippines

Verification Survey with the Private Sector for Disseminating Japanese technologies for Integrated Geographic

Information System (Integrated GIS) for Improvement of Regional Disaster Risk Reduction and Management

Informatix Inc., Kanagawa, Japan

Impact on the Concerned

Development Issues in the Philippines

Implemented Activities in the

Survey

To construct DRRM information

database on Integrated GIS, and

to train officials for updating

data and the maintenance.

To study the method and

contents of information for

sharing with related

governmental organizations.

Implementation of Disaster

Imagination Games for officials.

Proposed

Products/Technologies

Products/ Technologies

GeoCloud Integrated GIS

(Geographic Information System)

- The technology to collect and link

map information owned at

multiple sections and organizations.

- Realization of information

sharing and its maintenance easily

with low cost exploiting the

technology of cloud computing.

The Philippines

Survey Overview

Name of Counterpart:

The provincial government of

Pangasinan

Survey duration: Mar/2015 – Dec/2017

Survey Area: Province of Pangasinan,

1 city and 2 municipalities.

Current

Under & Post Project