Rebuilding process for the Box Type Induction Furnace. The sales and engineering departments review customer requirements for rebuilding their furnace. A used furnace can also be selected from the many furnaces in our used equipment inventory for rebuilding. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Rebuilding process for the  Box Type                   Induction Furnace

Rebuilding process for the Box Type Induction

Furnace

Rebuilding process for the Box Type Induction

Furnace

Page 2: Rebuilding process for the  Box Type                   Induction Furnace

The sales and engineering departments review customer requirements for rebuilding their furnace.

A used furnace can also be selected from the many furnaces in our used equipment inventory for rebuilding.

The sales and engineering departments review customer requirements for rebuilding their furnace.

A used furnace can also be selected from the many furnaces in our used equipment inventory for rebuilding.

Page 3: Rebuilding process for the  Box Type                   Induction Furnace

The furnace is completely disassembled.

The frame is sandblasted and repaired.

The furnace is completely disassembled.

The frame is sandblasted and repaired.

Page 4: Rebuilding process for the  Box Type                   Induction Furnace

The furnace refractory top and bottom components are designed and

manufactured.

The furnace refractory top and bottom components are designed and

manufactured.

Page 5: Rebuilding process for the  Box Type                   Induction Furnace

The coil is completely rebuilt or a new coil is designed and manufactured to match the customer’s

requirements.

Rebuilt coils are acid flushed and all coils are pressure tested at 120 psi minimum. Coils are tested for proper

water flow.

The coil is completely rebuilt or a new coil is designed and manufactured to match the customer’s

requirements.

Rebuilt coils are acid flushed and all coils are pressure tested at 120 psi minimum. Coils are tested for proper

water flow.

Page 6: Rebuilding process for the  Box Type                   Induction Furnace

After the furnace is reassembled, a high

alumina refractory grout is added to the coil to

form the inside walls of the furnace.

After the furnace is reassembled, a high

alumina refractory grout is added to the coil to

form the inside walls of the furnace.

The molten metal leak detector sensors are

installed in the bottom of the furnace.

The molten metal leak detector sensors are

installed in the bottom of the furnace.

Page 7: Rebuilding process for the  Box Type                   Induction Furnace

The completed furnace is mounted onto the stanchions. The furnace is tilted by an overhead hoist to insure proper mobility.

The completed furnace is mounted onto the stanchions. The furnace is tilted by an overhead hoist to insure proper mobility.

Page 8: Rebuilding process for the  Box Type                   Induction Furnace

The stanchions can be fitted with cylinders and hand controls to tilt the furnace hydraulically. Hydraulic cylinders are rebuilt or new cylinders are installed and pre-piped to the hydraulic control valve.

The stanchions can be fitted with cylinders and hand controls to tilt the furnace hydraulically. Hydraulic cylinders are rebuilt or new cylinders are installed and pre-piped to the hydraulic control valve.

Page 9: Rebuilding process for the  Box Type                   Induction Furnace

CALL 800-828-9799 or 760-246-7333 fax:

760-246-4366

email: [email protected]

CALL 800-828-9799 or 760-246-7333 fax:

760-246-4366

email: [email protected]