Page 1: Rehti CDP English

City Development Plan - Rehti i

Madhya Pradesh Urban Administration and

Development Department

Report on “City Vision, Sector Goals, Strategies, Projects and

Priorities”

City Development Plan for Rehti

January 2012

Submitted to

Commissioner

Urban Administration and Development Department, “ParishadBhawan”, Nr. 6 No. Stop, Shivaji Nagar, Bhopal

Phone: +91-755-2552356 Fax: +91-755-2552591

ICRA ManagementConsulting Services Limited

Logix Park, First Floor

Plot A4 & A5, Sector – 16

Noida – 201301

Phone: + (91 120) 4515 800

Fax: + (91 120) 4515 850

Urban Administration and Development Department

Government of Madhya Pradesh

DRAFT CITY DEVELOPMENT PLAN REHTI NAGAR PARISHAD

DISTRICT – SEHORE, MADHYA PRADESH

Project Co-ordination:

City Managers Association Madhya Pradesh

Prepared by:

ICRA Management Consulting Services Limited

2012

Page 2: Rehti CDP English

City Development Plan - Rehti ii

Abbreviations and Acronyms

AAY Antyodaya Anna Yojna

BOT Build, Operate and Transfer

BPL Below Poverty Line

BT Bitumen Top

CAGR Cumulative Average Growth Rate

CBO Community Based Organization

CC Cement Concrete

CDP City Development Plan

CIP City Investment Plan

CPHEEO Central Public Health and Environmental Engineering Organization

CSC Community Sanitary Conveniences

CUR Capital Utilization Ratio

DCB Demand Collection Balance

DSCR Debt-Service Coverage Ratio

EPC Engineering Procurement and Construction

EWS Economically Weaker Section

FOP Financial Operating Plan

FY Financial Year

GIS Geographic Information System

GoI Government of India

GoMP Government of Madhya Pradesh

RNP RehtiNagar Parishad

IHSDP Integrated Housing and Slum Development Programme

IMaCS ICRA Management Consulting Services Limited

INR Indian Rupee

ISWM Integrated Solid Waste Management

JNNURM Jawaharlal Nehru National Urban Renewal Mission

LIG Low Income Group

LPCD Liters Per Capita Daily

MC Municipal Council

MIS Management Information System

ML Million Liters

MLA Member of Legislative Assembly

MLD Million Liters per Day

MP Member of Parliament

MPHB Madhya Pradesh Housing Board

MPPCB Madhya Pradesh Pollution Control Board

MPSEB Madhya Pradesh State Electricity Board

MSW Municipal Solid Waste

NGO Non-Governmental Organization

NUIS National Urban Information System

O&M Operation & maintenance

Page 3: Rehti CDP English

City Development Plan - Rehti iii

OHT Over Head Tank

PHED Public Health Engineering Department

PHFW Department of Public Health and Family Welfare

PSC Public Sanitary Conveniences

PWD Public Works Department

ROB Road Over Bridge

SADA Special Area Development Authority

SC/ST Scheduled Caste/ Scheduled Tribe

SFC State Finance Commission

SH State Highway

SJSRY Swarnjayanti Shahri Rojgaar Yojna

STP Sewage Treatment Plant

SWDS Storm Water Drainage System

SWMS Solid Waste Management System

SWOT Strengths, Weaknesses, Opportunities and Threats

TCPD Town and Country Planning Department

TFC Twelfth Finance Commission

TFC Twelfth Finance Commission

UADD Urban Administration and Development Department

UDPFI Urban Development and Plan Formulation and Implementation

UGD Under Ground Drainage

UIDSSMT Urban Infrastructure Development Scheme for Small and Medium Towns

ULB Urban Local Body

ULCRA Urban Land Ceiling and Regulation Act

Page 4: Rehti CDP English

City Development Plan - Rehti iv

Executive Summary

The Urban Administration and Development Department (UADD) of Government of Madhya Pradesh

(GoMP) has launched an initiative to support 5 Municipal councils, 245 Nagar Parishads and 30 urban

centers in the state in preparing City Development Plans (CDPs). This initiative aims to provide a

comprehensive Medium Term Strategy (25 years) and a City Investment Plan (CIP) for each Urban

Local Body, based on which the concerned ULB will be able to access funds under schemes of

Government of India (GoI) and GoMP as well as from its own sources for implementation of priority

actions and projects, identified from this exercise. The document was also envisaged to provide a

Financial Operating Plan (FOP) to direct the ULBs for mobilizing various financial resources to

implement the identified projects, adhering to the JNNURM‟s CDP preparation toolkit and keeping in

view the Master Plan (wherever exists) provisions as prepared by Town and Country Planning

Department. In this regard, MPUADD retained ICRA Management Consulting Services Limited

(IMaCS) for assistance in preparation of City Development Plans for Rehti town.

City Profile and Growth Potential

Rehti is located in tehsil Budni in Sehore district in Indian state of Madhya Pradesh. It is located at

22.73°N and 77.43°E at an average elevation of 303 meters above mean sea level. Rehti lies on SH-

22 which is connected to NH12 from Bhopal. It is located at a distance of 72kms from Bhopal and 92

km from Sehore city. Budni Railway station is the nearest railway station which lies on Western

Central Rail track between Bhopal and Itarsi junction. Most of the passenger trains on the route stop

at Budni including a couple of express trains. Nearest airport is at Bhopal.

A SWOT analysis of the town is presented below

Strengths

Surrounding areas are rich in natural

resources due to presence of forests, this

would help to improve the economic base

and increase employment in the town

Weaknesses

Poor Infrastructure in the town

Lack of Health facilities in the town

Opportunities

Strong agricultural base would help in

engaging people/ youth in agriculture

sector by providing sufficient growth

opportunities in this field.

Region is rich in natural resources ex-

forest products can be harnessed

Nearby rivers can help in augmentation

of water in the town as well development

of recreational space for the residents of

the town

Threats

Low literacy rate shows inadequate

educational institutes/ lack of awareness

among the people

As of 2011 (Provisional Data – Census 2011), Rehti has a population of 11,616. Although the details

for 2011 are not available, but referring to Census details of 2001, the work participation rate was

Page 5: Rehti CDP English

City Development Plan - Rehti v

28.4% (2001) which was very low as compared to national rate of 39% and state rate of 42.7%.

Literacy rate is 71 % which is very high as compared to National Literacy Rate 64.84% of and state‟s

literacy rate of 63.74%. Currently, the sex ratio of the town is 919, which is far above than national

level of sex ratio of 940 and higher than state‟s sex ratio of 930.

Rehti‟s inhabitants are primarily agriculturalists. The total area of the town is 9.28 sq. km, where

agricultural land covers 30% area of the total area and 70% is the developed area including built-up

areas and roads etc.

Municipal Services - Status assessment, gaps and actions being taken

The Table shown below presents a summary of service levels and status with respect to selected

indicators in Water Supply, Sanitation, Transportation, Street lights and Solid Waste Management.

Summary of Prevailing Service Levels: Key Indicators, Issues & Gaps

SNo Name of the Indicator Value Comments

Water Supply:

1 Daily Per Capita Supply (LPCD) 43 Current supply on a per capita

basis is significantly below UDPFI

Need for significant augmentation

of water supply at source.

2 Storage Capacity / Daily Supply (%) 78

3 Distribution Network / Road Length (%) 80

Sanitation:

5 Presence of a Safe Disposal Mechanism

for Waste Water

No No Coverage of UG network

Public convenience needs

augmentation 6 Slum Population per Public convenience

(nos.)

226

Roads and Street Lights:

7 Road length (Km) 14.50 Municipal roads would require

comprehensive upgradation

following water supply and UGD

implementation.

8 Road length per Street Light (m) 45

Solid Waste Management:

9 Waste generation per capita (gms) 213 Need for a comprehensive

program for SWM

Presently, waste is thrown in open

drains and vacant plots

Composting, Source segregation

and Door-to-door collection needs

implementation in a phased

manner.

10 Landfill Area (Acres) 5

11 Average vehicle trips 1

12 Source Segregation and Composting

(Yes/No)

No

Analysis of Financial Performance

The Table shown below provides a summary of the income and expenditure of Rehti Nagar Parishad.

Income & Expenditure: Summary

Financial Status at a Glance

Items 2006-07 2007-08 2008-09 2009-10 2010-11 CAGR

Actuals in Rs. Lakh %

Rehti Nagar Parishad

Page 6: Rehti CDP English

City Development Plan - Rehti vi

Revenue Account

Income 66.2 115.6 109.4 192.1 176.7 27.8

Expenditure 80.1 68.6 62.8 102.2 110.2 8.3

Surplus/ Deficit (13.9) 47.0 46.6 89.9 66.5

Capital Account

Receipts 69.2 59.2 90.9 67.1 96.3 8.6

Payments 37.6 125.3 89.2 83.9 148.8 41.1

Surplus/ Deficit 31.6 (66.1) 1.7 (16.9) (52.5)

Overall Status incl. O.B. 16.4 (5.3) 41.8 106.0 113.5

Financial Indicators

Financial Indicators 2006-07 2007-08 2008-09 2009-10 2010-11 Average

Operating Ratio 1.21 0.59 0.57 0.53 0.62 0.71

Salaries' Expenditure to

Revenue Income 87% 45% 41% 36% 44% 0.51

Salaries' Expenditure to

Revenue Expenditure 71% 76% 71% 67% 71% 0.71

Capital Utilization Ratio 0.54 2.12 0.98 1.25 1.55 1.29

Observations on Municipal Accounts:

Average Operating Ratio:

The average operating ratio of the Rehti Nagar Parishad is 0.71 which is substantially lower than 1,

indicating surplus revenue accounts in Rehti.

Capital Utilization ratio:

Average Capital utilization ratio of Rehti Nagar Parishad is 1.29 which is more than 1, indicating that

Rehti‟s capital expenditure is more than its income .

Vision for Rehti

To take the town ahead, a vision statement for Rehti town has been finalized after consultations with

Municipality officials, elected representatives and other stakeholders:

To develop Rehti as an economically independent city with a high-quality of life in a

sustainable environment, with state-of-the-art infrastructure, service delivery, and

connectivity, supported by an efficient governance framework

In addition to the outlining of a vision for the city, discussions were also carried out on the

identification of major themes which would serve as the watchwords for initiatives and actions to

achieve the vision. Some of the major themes that came out of workshop and consultations with

stakeholders are as follows:

1. Encouraging economic status of the town, by promoting herbal manufacturing units.

2. Providing adequate services like water supply, sanitation, etc. on priority.

3. Promote education, health institutions for ensuring safe environment for the citizens.

Page 7: Rehti CDP English

City Development Plan - Rehti vii

To achieve the desired vision, Sector goals and detailed strategies have been formulated for 1)

Physical Infrastructure, 2) Social Infrastructure, 3) Economic Development, 4) Environment, 5) Urban

Poor and 6) Urban Governance and Institutional Development.

Action Plans – List of Identified Projects

Significant project level intervention would be required in Rehti to provide its citizens with the desired

services. For this, sector strategies have been formulated for the critical sectors and a list of actual

projects for each of the sector has been identified with consultations with stakeholders of the city. The

lists of the sector wise identified projects are:

Water Supply

Source Augmentation: As of now, the extraction of water is done through 8 tube wells and 1

open well at various places, but due to depleting ground water, few tube wells have stopped

working. And with increasing population and economic development there would be more

requirement of water. Thus, there is a need to encourage additional sources of water either

through installing more tube wells or open wells. This project needs to be implemented by 2015.

The additional water requirement can also be met by adopting drawing additional water from

Babar river (as given in the DPR). A detailed feasibility study would have to be conducted with

respect to exploring these potential sources. Nagar Parishad would have to co-ordinate with

irrigation department to get permissions for water use.

Water treatment facility: As there is no treatment facility available in the town, there is a need to

install treatment infrastructure with a capacity of 2.76 MLD by 2035. Thus, by 2015 treatment

infrastructure needs to be developed for 2.18 MLD water and then it needs to be augmented to

2.276 MLD by 2035.

Distribution Network: As discussed with Rehti Nagar Parishad officials, at present, Rehti has

distribution network which is 80 % of the road length. The proposed water supply scheme

includes the construction of additional 19.01 km of distribution network by 2015 and 30.39 km of

distribution network by 2035 to increase the coverage to 85% of road network by the year 2035.

Elevated Storage Capacity: At present, the water supplied through elevated storage capacity is

78%, which is more than the desired level. But, in future with the increasing demand there will be

a need to increase the capacity of elevated reservoirs up to 0.57 MLD by 2015 and 0.92 MLD by

2035, which would conform to UDPFI guidelines of storing 33% of the total water supplied in

respective years.

Metering System: 100% properties need to be assessed and water meters need to be installed

in all properties with water connection, so that the revenue income of the Nagar Parishad can be

increased. There is a need to increase capacity of officials in this sector and create awareness

among the Parishads and citizens.

Sewerage

Underground Sewerage network: The construction of the sewer network takes into

consideration the dual factors of existing and future water supply to the town and the population

size being catered to. The capacity of the system has been estimated at 2.2 MLD (80% of the

future water supply) for 2035 for which the length of the network has to be developed by 20.12km

by 2015 and additional 12.06 km by 2035.

Sewage Treatment System: As Rehti town is very small and all areas are not contiguous and

are fragmented, it would be financially beneficial for the town to implement Decentralized Waste

Water Treatment System (DEWATS) for comprehensive sewerage system, and dispose 2.21

Page 8: Rehti CDP English

City Development Plan - Rehti viii

MLD of generated sewage. This DEWAT system takes into care the demand generated in the

year 2035. The advantages of DEWAT system are that; it requires minimum space and hence

can be accommodated easily under paved pathways and parking lots etc. or small available

spaces; it requires lesser operational cost; it promotes the reuse of water for non-potable

purposes; it can be easily blended with the landscape; It cannot be switched off so it ensures

efficient working irrespective of external factors and it can treat waste water with high fat,

suspended solids and BOD. Since this system is decentralized, the zones would be defined as

per population and location and the treatment system would be developed to safely dispose-off

the sewage. The treated water can be used for agricultural use.

Sanitation

Public Convenience Systems: To provide safe and sufficient sanitation facilities to the citizens,

mainly slum dwellers, around 57 more public toilet seats need to be added to the existing

infrastructure in Rehti by 2015.

Solid Waste Management

Primary Collection: Augmentation of primary collection involves capacity addition in equipments

used in the waste collection including community bins. As per the demand assessment, on a

priority need, additional 16 handcarts would be needed for short term horizon and additional 22

handcarts would be needed for long term horizon. Also currently, the practice being followed

includes a majority of residents dumping waste outside their houses, or in drains/ vacant land or

at the designated collection point/ dustbin. This results in scattering of waste which results in poor

collection. To achieve an effective waste collection, practice of door-to-door collection should be

initiated which needs to be supported by necessary awareness generation programmes and

capacity building of the staff.

Secondary Collection: Secondary collection involves transportation of waste from collection

points to the disposal site. At present, secondary collection is carried out by tractors. These

tractors are unable to collect the waste from the internal narrow streets. On a priority, secondary

collection system should be strengthened to carry out waste transportation in an effective manner.

All the waste transportation vehicles should be covered to avoid the spilling of waste. By 2015, 3

tractors would be required if one tractor is making one trip a day and by 2035 also 3 tractors

would needed.

Development and augmentation of the landfill site: The demand-gap assessment reveals the

generation of 4.92 MT of waste in the town by 2035 against the current generation of 2.5 MT. The

current available disposal site has 5 acres area which is sufficient till 2035. The collected waste is

just dumped at the site without any treatment or segregation. The dumping site would have to be

well-equipped to ensure proper waste segregation and composting facilities. In addition, the

dumping site would need to be provided with the basic facilities of compound walls, BT/CC

approach road, electrification, which has already been done in the town. The composting and

segregation would help in some revenue generation for Nagar Parishad. It is proposed to develop

the landfill site by 2015.

Development of VermiCompost Plant: It is proposed to dispose the waste generated through

Vermi composting which involves the stabilization of organic solid waste through earthworm

consumption which converts the material into worm castings. The composting and segregation

would help in some revenue generation for Nagar Parishad and it will also reduce waste amount

to be dumped in the landfill site.

Page 9: Rehti CDP English

City Development Plan - Rehti ix

Drainage

Construction of storm water drains: The Nagar Parishad should undertake the construction of

Pucca Open and Pucca closed drains in phased manner. This construction may be done in

relation to the construction/up-gradation of roads. These construction activities would have to be

carried out on an immediate basis to address the existing and future demand-supply gap. In

short-term, 29.07 km of new drains need to be developed and addition of 17.41 km of network

needs to be done beyond 2015.

Up-gradation of existing drains: The Nagar Parishad is also required to undertake drain up-

gradation works for the existing drains in town. In the short term, 12.5 km of existing open drains

should be upgraded to Pucca open or closed drains.

Development of Root Zone Treatment System (RZTS): It is observed that the sewage flowing

through nallahs enter rivers in untreated condition and create heavy risk of river pollution. Storm

water can be treated as well with RZTS after removal of settle able substances. It is a low-cost

and maintenance free option that uses the capacity of plants (especially certain reeds – hence

also called reedbed technology) to absorb contaminants and structurally modify them for treating

water. It is based on the principle of attached growth biological reactors similar to conventional

trickling filters with combination of aerobic and anaerobic zones. The contaminants present in the

wastewater are treated as they seep through the root-zone of the plants by a combination of

plants, soil bacteria and hydraulic flow systems resulting in physical, chemical, and

microbiological processes. Oxygen present in the zone facilitates the degradation of wastewater.

A wide variety of microorganisms present in the root-zone of the plants results in efficient

removal. There is efficient reduction of pathogens also by percolation through the bed material.

Thus, it can be developed in Rehti along storm water drains.

Traffic and Transportation

Road Construction: To address the current gap of per capita road length, and the future

demand, the Nagar Parishad does not require any new road formation up to 2015, but would

need around 7.4km of additional road by 2035. The Nagar Parishad should on a priority basis,

identify the stretches and areas where roads at present do not exist and or have poor

connectivity. Also the areas where future residential growth is anticipated or planned, road

construction can be undertaken.

Signalization and Signages: The arterial road passes through the town connecting National

Highway with many villages. This may increase the flow of vehicles on the road in the future. This

endangers the pedestrians crossing the road. Thus there is need for signalization and proper

signages at few points.

Parking Spaces and Bus Stand: With the growing number of vehicles and increasing

commercial activities in the town, issue of lack of parking spaces becomes much more relevant.

The consultations with stakeholders have concluded that parking spaces can be developed near

the key commercial areas of the town.

Street Lighting & Fire Fighting

Addition of Streetlights: The Nagar Parishad needs to install a total of 559 street lights by 2015

and 186 street lights to match the demand of 2035.

Energy Saving: Rehti Nagar Parishad should replace all the tube lights with CFLs. A small

exercise was conducted to evaluate the benefits of the replacement of tube lights with CFLs in the

Page 10: Rehti CDP English

City Development Plan - Rehti x

town. It was observed that Rehti Nagar Parishad would save around Rs. 312,500/ annum in

electricity bill.

Fire Fighting: To ensure a safety against fires, Nagar Parishad should also undertake the

construction of fully equipped fire stations.

Health

Primary Health Centre: As per the UDPFI guidelines, the city needs bed capacity of 26 by year

2015 and 32 by 2025 and 41 by 2035. At present, city has 14 beds. The hygiene of the hospital is

very poor and the basic infrastructure is not good. A separate project should be undertaken to

revamp the hospital in all respect.

Nursing Home: According to the estimates, a nursing home with bed capacity of 14 is required

for the town in 2035.

Dispensary: The primary health institutions always play a key role in determining the overall

health scenario of a place. Keeping it in the mind, 1 dispensary has been proposed in the town

which should start functioning by year 2015.

Education

Primary Schools: The goal in this sector is to achieve 100% literacy rate in the city. This would

require 5 more number of schools by 2015and 8 primary schools by 2035.

Senior Secondary Schools: 2 Senior Secondary Schools will be required by 2015 and 1

additional would be required till 2035. The present Government Secondary Schools lack

infrastructure facilities and are in need of up-gradation.

Other Social Infrastructure Facilities

Community Hall: Community hall and library should be constructed in the city.

Parks: At present there is only one open ground which is used for multi-purpose functions. The

vacant land banks in the city should be identified and developed as parks to serve the dual

purpose of increasing the green cover in the city and providing citizens with open spaces for

recreation.

Urban Poor

Prepare a Slum Free City plan

Comprehensive slum mapping and need for housing

Environment

Air Quality: Periodic monitoring and review is essential to check air quality. Suitable plantations

or green cover should be provided on major routes to supplement better air quality. This would

partially be addressed by the development of Parks in the town and a massive tree plantation

drive.

Water Pollution: Efforts/schemes should be designed to check the diversion of sewage flow into

the existing drains. Decentralized sewage treatment can be considered on the basis of have low

cost and environment friendly system.

Ground Water Recharge: A critical issue that needs to be addressed on the priority basis is the

development of green spaces within the town limits to enhance the overall quality of the

environment.

Page 11: Rehti CDP English

City Development Plan - Rehti xi

Green Spaces: A critical issue that needs to be addressed on the priority basis is the

development of green spaces within the town limits to enhance the overall quality of the

environment.

Economic Development

Development of Commercial Areas: This can further be divided into development of new

commercial areas and up gradation of existing commercial areas. New commercial areas can

include dedicated markets for important commodities or general markets. In addition to the

development of new markets, existing markets can be upgraded to increase their capacity and

provide better services to the users and customers.

Development Herbal Manufacturing Units: With the objective of diversifying the economic

base of Rehti city, the existing herbal manufacturing unit should be developed. This would give

thrust to the employment generation activities which would result in the overall upliftment of the

society in the town.

Development of Hawkers Zone: Depending on the land availability and market demand,

hawker‟s zones should be developed near Salkanpur Temple. Hawkers‟ zone would provide

dedicated space to the hawkers and hence reduce congestion in the temple premises.

Organization of Trade Fairs and Other Exhibitions: With the objective of attracting private

investments, trade fairs and other exhibitions should be organized at regular intervals in the city.

This would help in showcasing Rehti‟s potential.

Urban Governance

Capacity Building: There is a need for training of the existing staff and new staff to increase the

work productivity. Workshops and awareness programmes can be conducted.

Computerization: Rehti Nagar Parishad should initiate the process of computerization in its

administration. Computerization will benefit most of functions ranging from municipal accounting

to tax management. The introduction of E-Governance will help in smoothening the processes

and thereby resulting in improvement in the efficiency.

GIS Mapping: A GIS mapping of the city properties will be very helpful in the provision of efficient

services to the citizens. This would also help in keeping a tab on tax evaders.

Capital Investment Plan (CIP) and Priority Projects

Given below is the summary of the CIP for Rehti town, The CIP has been prepared on normative

gaps in infrastructure services given existing status and norms for service delivery.

Capital Investment plan Summary: Rehti

S.No.

Rehti Nagar Parishad

Investment by ULB

Investment by 2015

Investment beyond 2015

Total Investment Need (Upto 2035)

Rs. Lakh Rs. Lakh Rs. Lakh

A Water Supply 585 232 817

B Sewerage and Sanitation 289 74 363

C Urban Roads, Transport & Traffic 832 244 1293

D Storm Water Drains 238 143 496

E Street Lighting 173 60 276

F Solid Waste Management 27 30 97

Page 12: Rehti CDP English

City Development Plan - Rehti xii

S.No.

Rehti Nagar Parishad

Investment by ULB

Investment by 2015

Investment beyond 2015

Total Investment Need (Upto 2035)

G Urban Poor/ Slums' Improvement 442 62 597

H Health Infrastructure 506 174 796

I Education Infrastructure 130 166 361

J Socio-Cultural Facilities 62 - 62

K Urban Environment 17 5 30

L Urban Governance 12 4 20

M Heritage & Tourism 5 3 10

N Economy 65 - 65

O Other Projects 60 20 100

Total Investment Identified 3443 1215 5383

Broad Actions to achieve the City Vision and Sector Goals

Rehti‟s ability to improve on its financial performance hinges primarily on its ability to sustain and

improve on the revenue growth noticeable in recent years. Some of the actions needed in this regard

are:

Conduct a zero-base assessment of skill gaps and manpower needs of ULBs to ascertain the

appropriate manpower plan in terms of skill sets and experience/seniority. This is particularly

relevant given the recent developments, specifically in urban planning and GIS, municipal

accounting and systems, e-governance and modern practices in infrastructure service delivery.

Address critical operational areas through focused training and capacity building interventions,

particularly in the areas of a) Engineering and project development, b) Accounting and Finance

and c) Use of CAD/GIS applications in Town Planning and Engineering functions.

Develop / enforce technical standards with specific applicability to development of municipal

projects.

Rehti could increase its own income by FY ending 2015 through focused interventions in the

following areas.

a. Property tax: – through revision in ARV, widening assesse base and closer scrutiny.

b. User charges – through increased penetration of water connections and new sewerage

connections could potentially triple user charges income from the current levels.

Financial Operating Plan and Investment Capacity

Given the existing financial position of Rehti Nagar Parishad, the revenue and capital accounts are

projected against the growth scenario and assumptions presented above. The City Investment Plan

(CIP) shows that the total investment required to develop Rehti town is Rs. 3443.07 Lakh at constant

prices in short term i.e. till 2015 (of the total Rs. 5382.54 lakh investment identified for funding till

2035). Rs 3443.07 Lakh include about Rs. 506 Lakh towards Health sector, Rs.130 Lakh towards

education sector and Rs. 442 lakh towards urban poor, 100% of which would be provided by the state

departments/schemes. Hence a FOP is generated from the sustainable investment point of view in

line with current growth trends against the identified investment for Nagar Parishad of Rs. 2364.82

Lakh at constant prices till 2015, which excludes investment required for Health, Education and urban

poor sectors.

Page 13: Rehti CDP English

City Development Plan - Rehti xiii

Base Investment Capacity

Base Investment Capacity is estimated considering business as usual case, where Rehti Nagar

Parishad has not taken any grant under UIDSSMT scheme and has not done any reforms to increase

their revenue income. At this scenario the Parishad will be able to sustain only 12.30 % of the total

investment identified for year 2015.

With reforms in Property Tax, Water Charges and Sewerage charges

This case assumes the reforms in property tax, Water and Sewerage have been implemented and

accordingly the investment capacity has increased by Rs. 3.52 Crore above the base investment

capacity. These reforms will increase the total sustainable capacity to 14.90%.

Reforms (without debt Funding)

This case assumes that all the reforms suggested above are being implemented and other grants are

also availed. In this scenario Nagar Parishad‟s sustainable capacity will increase to 53.20%, which is

40.90% in addition to base case. Now Nagar Parishad will be able to sustain investment of about Rs.

12.58 Crore.

Reforms along with debt Funding

This case assumes that Nagar Parishad can increase their sustainable capacity by taking debt from

any financial institution or private banks in addition to the implementation of reforms suggested above.

In this scenario Nagar Parishad can sustain up to 54.40% of the total investment identified, which is

1.20 % more than without debt funding scenario.

Page 14: Rehti CDP English

City Development Plan - Rehti xiv

Contents

1. INTRODUCTION ...................................................................................................................................... 22

1.1. BACKGROUND ........................................................................................................................................... 22 1.2. OBJECTIVES AND SCOPE OF WORK ................................................................................................................ 22 1.3. DESCRIPTION OF TASK (AS OUTLINED IN RFP) .................................................................................................. 23

1.3.1. Inception ....................................................................................................................................... 23 1.3.2. Situation assessment (opportunities, strengths, weaknesses and gaps) ...................................... 24 1.3.3. Development of city vision and sector goals and strategies ......................................................... 25 1.3.4. Development of strategies and priority actions ............................................................................ 25 1.3.5. Preparing a City Investment Plan (CIP) and a financing strategy ................................................. 25 1.3.6. Draft CDP ...................................................................................................................................... 26 1.3.7. Final CDP document ...................................................................................................................... 26

1.4. APPROACH ............................................................................................................................................... 26 1.4.1. Guiding Principle ........................................................................................................................... 26 1.4.2. Approach and Methodology ......................................................................................................... 27 1.4.3. Module I: Inception and Kick off ................................................................................................... 27 1.4.4. Module II: Consultations and Analysis .......................................................................................... 29 1.4.5. Module III: Finalisation ................................................................................................................. 32

1.5. STAKEHOLDERS INTERACTION ....................................................................................................................... 33 1.5.1. Interacting with Municipal Body ................................................................................................... 33 1.5.2. Interaction with other Stakeholders ............................................................................................. 33 1.5.3. Formation of Steering Group ........................................................................................................ 34 1.5.4. Workshops .................................................................................................................................... 34

1.6. REPORT CONTENTS ..................................................................................................................................... 35 1.7. LIMITATIONS AND CAVEATS ......................................................................................................................... 35

2. PHYSICAL FEATURES OF THE TOWN ....................................................................................................... 36

2.1. INTRODUCTION ......................................................................................................................................... 36 2.2. DISTRICT INFORMATION .............................................................................................................................. 36 2.3. LOCATION (LINKAGES AND CONNECTIVITY) ...................................................................................................... 36 2.4. PHYSIOGRAPHY AND LANDFORM ................................................................................................................... 36

2.4.1. Topography ................................................................................................................................... 36 2.4.2. Drainage ....................................................................................................................................... 37 2.4.3. Temperature ................................................................................................................................. 37 2.4.4. Climate .......................................................................................................................................... 37

2.5. MUNICIPAL AREA AND PLANNING AREA .......................................................................................................... 37 2.6. CONCLUSIONS ........................................................................................................................................... 38

3. DEMOGRAPHIC PROFILE OF THE TOWN ................................................................................................. 39

3.1. INTRODUCTION ......................................................................................................................................... 39 3.2. POPULATION GROWTH ................................................................................................................................ 39 3.3. POPULATION DENSITY ................................................................................................................................. 39 3.4. POPULATION PROJECTION ............................................................................................................................ 40 3.5. WARD-WISE DEMOGRAPHIC DETAILS ............................................................................................................. 40 3.6. ISSUES ..................................................................................................................................................... 41 3.7. CONCLUSIONS ........................................................................................................................................... 41

4. SOCIO ECONOMIC PROFILE OF THE TOWN ............................................................................................. 42

4.1. INTRODUCTION ......................................................................................................................................... 42

Page 15: Rehti CDP English

City Development Plan - Rehti xv

4.2. INDICATORS .............................................................................................................................................. 42 4.2.1. Sex Ratio ....................................................................................................................................... 42 4.2.2. Literacy Rate ................................................................................................................................. 43 4.2.3. Household Size .............................................................................................................................. 43 4.2.4. Workforce participation ................................................................................................................ 44 4.2.5. Agriculture and related activities .................................................................................................. 44 4.2.6. Industrial activities ........................................................................................................................ 44 4.2.7. Trade and Commerce .................................................................................................................... 45 4.2.8. Tourism ......................................................................................................................................... 45

4.3. ISSUES ..................................................................................................................................................... 45 4.4. CONCLUSIONS ........................................................................................................................................... 45

5. SPATIAL PLANNING AND GROWTH MANAGEMENT ............................................................................... 46

5.1. SPATIAL GROWTH TRENDS ........................................................................................................................... 46 5.2. SPATIAL DISTRIBUTION OF POPULATION .......................................................................................................... 47

5.2.1. Municipal level mapping ............................................................................................................... 47 5.3. LAND-USE ANALYSIS ................................................................................................................................... 47 5.4. HOUSING SCENARIO ................................................................................................................................... 48

5.4.1. Present and future Housing demand ............................................................................................ 48 5.4.2. Illegal colonies............................................................................................................................... 48 5.4.3. Future growth possibilities ............................................................................................................ 48

5.5. ISSUES ..................................................................................................................................................... 49 5.6. CONCLUSIONS ........................................................................................................................................... 49

6. CITY’S INFRASTRUCTURE – EXISTING STATUS, GAPS, ISSUES, SWOT, GOALS AND STRATEGIES .............. 50

6.1. WATER SUPPLY.......................................................................................................................................... 50 6.1.1. Source, Supply, Distribution Systems and Treatment facilities ..................................................... 50 6.1.2. Water Supply Connections ............................................................................................................ 51 6.1.3. Water Table Analysis .................................................................................................................... 51 6.1.4. Present and Future Demand and Supply Gaps .............................................................................. 52 6.1.5. SWOT analysis ............................................................................................................................... 53 6.1.6. Issues ............................................................................................................................................. 53

6.2. SEWERAGE ............................................................................................................................................... 54 6.2.1. Existing sewerage system ............................................................................................................. 54 6.2.2. Present and Future Demand and Supply Gaps .............................................................................. 54 6.2.3. SWOT analysis ............................................................................................................................... 54 6.2.4. Issues ............................................................................................................................................. 55

6.3. SANITATION .............................................................................................................................................. 55 6.3.1. Community toilets ......................................................................................................................... 55 6.3.2. Present and Future Demand and Supply Gaps .............................................................................. 55 6.3.3. SWOT Analysis .............................................................................................................................. 56 6.3.4. Issues ............................................................................................................................................. 56

6.4. SOLID WASTE MANAGEMENT ...................................................................................................................... 56 6.4.1. Present and Future Demand and Supply Gaps .............................................................................. 57 6.4.2. SWOT analysis ............................................................................................................................... 57 6.4.3. Issues ............................................................................................................................................. 58

6.5. DRAINAGE ................................................................................................................................................ 58 6.5.1. Existing drainage system .............................................................................................................. 58 6.5.2. Present and Future Demand and Supply Gaps .............................................................................. 58 6.5.3. SWOT analysis ............................................................................................................................... 59 6.5.4. Issues ............................................................................................................................................. 60

6.6. TRAFFIC AND TRANSPORTATION .................................................................................................................... 60 6.6.1. Existing traffic & transportation scenario ..................................................................................... 60 6.6.2. Present and Future Demand and Supply Gaps .............................................................................. 60

Page 16: Rehti CDP English

City Development Plan - Rehti xvi

6.6.3. SWOT analysis ............................................................................................................................... 61 6.6.4. Issues ............................................................................................................................................. 61

6.7. STREET LIGHTING AND FIRE FIGHTING ............................................................................................................. 61 6.7.1. Existing situation of Street lights .................................................................................................. 61 6.7.2. Present and Future Demand and Supply Gaps .............................................................................. 62 6.7.3. SWOT analysis ............................................................................................................................... 62 6.7.4. Issues ............................................................................................................................................. 62

6.8. URBAN POOR AND THEIR ACCESSIBILITY TO BASIC SERVICES ................................................................................ 63 6.8.1. SWOT analysis ............................................................................................................................... 63 6.8.2. Issues ............................................................................................................................................. 63

6.9. SOCIAL INFRASTRUCTURE ............................................................................................................................. 63 6.9.1. Overall Health facilities in the town .............................................................................................. 63 6.9.2. Overall Educational facilities in the town ..................................................................................... 64 6.9.3. Issues ............................................................................................................................................. 64 6.9.4. Recreational .................................................................................................................................. 64 6.9.5. SWOT Analysis .............................................................................................................................. 64 6.9.6. Issues ............................................................................................................................................. 65

6.10. LOCAL ECONOMY ................................................................................................................................... 65 6.10.1. Issues ............................................................................................................................................. 65

6.11. HERITAGE AND CONSERVATION ................................................................................................................ 65 6.11.1. Tourism potential of the town ...................................................................................................... 65 6.11.2. SWOT analysis ............................................................................................................................... 65 6.11.3. Issues ............................................................................................................................................. 66

6.12. EXISTING INSTITUTIONAL FRAMEWORK FOR DEVELOPMENT ............................................................................ 66 6.12.1. Rehti Nagar Parishad .................................................................................................................... 67 6.12.2. Town and Country Planning Department ..................................................................................... 67 6.12.3. Development Authority ................................................................................................................. 67 6.12.4. Department of Public Health and Family Welfare ........................................................................ 68 6.12.5. Madhya Pradesh Housing Board .................................................................................................. 68 6.12.6. Madhya Pradesh Pollution Control Board ..................................................................................... 68 6.12.7. Issues ............................................................................................................................................. 69

6.13. CONCLUSIONS ....................................................................................................................................... 69

7. MUNICIPAL FINANCIAL ASSESSMENT ..................................................................................................... 70

7.1. FINANCIAL STATUS AT A GLANCE ................................................................................................................... 70 7.2. REVENUE ACCOUNT .................................................................................................................................... 71

7.2.1. Revenue income ............................................................................................................................ 71 7.2.2. Revenue expenditure .................................................................................................................... 73

7.3. CAPITAL ACCOUNT ..................................................................................................................................... 74 7.3.1. Capital income .............................................................................................................................. 74 7.3.2. Capital expenditure ....................................................................................................................... 75

7.4. KEY FINANCIAL INDICATORS .......................................................................................................................... 75 7.5. KEY ISSUES ............................................................................................................................................... 76 7.6. CONCLUSION ............................................................................................................................................ 76

8. CITY VISION, SECTOR GOALS, STRATEGIES, ACTION PLAN, PROJECTS AND PRIORITIZATION .................. 77

8.1. FORMULATION OF CITY VISION ..................................................................................................................... 77 8.1.1. Vision for the Town ....................................................................................................................... 77 8.1.2. Mission Statements....................................................................................................................... 78

8.2. SECTOR GOALS, STRATEGIES, ACTION PLAN AND PROJECTS ................................................................................ 78 8.2.1. Water supply ................................................................................................................................. 79 8.2.2. Sewerage and Sanitation .............................................................................................................. 81 8.2.3. Sanitation ...................................................................................................................................... 83 8.2.4. Solid waste management ............................................................................................................. 84

Page 17: Rehti CDP English

City Development Plan - Rehti xvii

8.2.5. Drainage ....................................................................................................................................... 87 8.2.6. Traffic and transportation ............................................................................................................ 89 8.2.7. Street lighting, Fire fighting .......................................................................................................... 91 8.2.8. Urban poor and their accessibility to basic Services ..................................................................... 93 8.2.9. Health ........................................................................................................................................... 95 8.2.10. Education ...................................................................................................................................... 96 8.2.11. Other Social Infrastructural Facilities ............................................................................................ 98 8.2.12. Environment .................................................................................................................................. 99 8.2.13. Tourism ....................................................................................................................................... 100 8.2.14. Economic Development .............................................................................................................. 100 8.2.15. Urban Governance ...................................................................................................................... 102 8.2.16. Conclusion ................................................................................................................................... 102

9. CITY INVESTMENT PLAN AND FINANCING STRATEGIES ........................................................................ 103

9.1. CITY INVESTMENT PLAN (CIP) .................................................................................................................... 103 9.2. INSTITUTIONALISING THE CIP PROCESS ........................................................................................................ 103 9.3. CITY PRIORITIES ....................................................................................................................................... 104 9.4. SUMMARY OF INVESTMENTS ...................................................................................................................... 106 9.5. SECTOR WISE CIP DETAILS – CAPITAL NEEDS/ INVESTMENTS ............................................................................ 107

9.5.1. Water Supply .............................................................................................................................. 107 9.5.2. Sewerage & Sanitation ............................................................................................................... 108 9.5.3. Roads and traffic management .................................................................................................. 109 9.5.4. Storm Water Drainage ................................................................................................................ 110 9.5.5. Solid Waste Management .......................................................................................................... 111 9.5.6. Street Lights & Fire Fighting ........................................................................................................ 112 9.5.7. Slums and Basic Services for Urban Poor .................................................................................... 113

9.6. SOCIAL INFRASTRUCTURE .......................................................................................................................... 114 9.6.1. Health Infrastructure .................................................................................................................. 114 9.6.2. Education Infrastructure ............................................................................................................. 115

9.7. SOCIO – CULTURAL FACILITIES .................................................................................................................... 115 9.8. URBAN ENVIRONMENT & TOURISM ............................................................................................................ 116

9.8.1. Urban Environment ..................................................................................................................... 116 9.8.2. Tourism ....................................................................................................................................... 116

9.9. URBAN GOVERNANCE ............................................................................................................................... 117 9.10. OTHER INVESTMENT REQUIREMENT ......................................................................................................... 117 9.11. FINANCING OPTIONS & STRUCTURING ..................................................................................................... 118 9.12. CONCLUSION ...................................................................................................................................... 120

10. FINANCIAL OPERATING PLAN ........................................................................................................... 121

10.1. INTRODUCTION ................................................................................................................................... 121 10.2. CATEGORIES OF FOP PROJECTIONS ......................................................................................................... 121 10.3. FINANCIAL STRATEGIES FOR CIP ............................................................................................................. 121 10.4. FINANCIAL PROJECTIONS ....................................................................................................................... 122 10.5. MUNICIPAL ACCOUNT: GROWTH PROJECTIONS & ASSUMPTIONS ................................................................. 122 10.6. INVESTMENT CAPACITY/ SUSTENANCE ..................................................................................................... 124 10.7. CONCLUSION ...................................................................................................................................... 127

11. URBAN REFORMS ............................................................................................................................. 128

11.1. INTRODUCTION ................................................................................................................................... 128 11.2. MANDATORY REFORMS AT THE LEVEL OF THE STATE GOVERNMENT ............................................................... 128

11.2.1. Implementation of the 74th Constitutional Amendment Act ..................................................... 128 11.2.2. Public Disclosure Law .................................................................................................................. 129 11.2.3. Rationalization of Stamp Duty .................................................................................................... 129 11.2.4. Repeal of Urban Land Ceiling and Regulation Act ...................................................................... 129

Page 18: Rehti CDP English

City Development Plan - Rehti xviii

11.2.5. Rent Control ................................................................................................................................ 130 11.2.6. Community Participation Law ..................................................................................................... 130 11.2.7. City Planning Functions ............................................................................................................... 130

11.3. MANDATORY REFORMS AT THE LEVEL OF THE URBAN LOCAL BODY................................................................ 131 11.3.1. Municipal Accounting ................................................................................................................. 131 11.3.2. E-Governance .............................................................................................................................. 132 11.3.3. User Charges ............................................................................................................................... 133 11.3.4. Basic Services to the Urban Poor ................................................................................................ 134 11.3.5. Internal earmarking for basic services for poor .......................................................................... 135 11.3.6. Property Tax ................................................................................................................................ 135

11.4. OPTIONAL REFORMS AT LEVEL OF THE STATE GOVERNMENT/URBAN LOCAL BODY ........................................... 136 11.5. CONCLUSION ...................................................................................................................................... 137

ANNEXURE 1: WORKSHOP PROCEEDINGS ................................................................................................... 138

ANNEXURE 2: QUESTIONNAIRE ................................................................................................................... 147

ANNEXURE 3: FINANCIAL PROJECTIONS....................................................................................................... 154

ANNEXURE 4: MAPS .................................................................................................................................... 159

ANNEXURE 5: PRESENTATION OF FINAL WORKSHOP ................................................................................... 160

Page 19: Rehti CDP English

City Development Plan - Rehti xix

Exhibits

EXHIBIT 1-1: APPROACH & METHODOLOGY ................................................................................................... 29

EXHIBIT 1-2: DEVELOPING A CITY VISION (SOURCE: JNNURM TOOLKIT) ........................................................ 31

EXHIBIT 1-3: MEMBERS OF STEERING GROUP ................................................................................................ 34

EXHIBIT 2-1: DISTRICT LEVEL INFORMATION FOR BLOCKS IN SEHORE ............................................................ 36

EXHIBIT 3-1: POPULATION GROWTH TRENDS ................................................................................................ 39

EXHIBIT 3-2: POPULATION DENSITY ............................................................................................................... 39

EXHIBIT 3-3: POPULATION PROJECTION ......................................................................................................... 40

EXHIBIT 3-4: DEMOGRAPHIC DETAILS ............................................................................................................ 40

EXHIBIT 4-1: WARD WISE SOCIAL INDICATORS .............................................................................................. 42

EXHIBIT 4-2: CATEGORIZATION OF SEX RATIO ............................................................................................... 43

EXHIBIT 4-3: CATEGORIZATION OF LITERACY RATE ........................................................................................ 43

EXHIBIT 4-4: WORK FORCE DETAILS ............................................................................................................... 44

EXHIBIT 5-1: GOOGLE IMAGE OF REHTI .......................................................................................................... 46

EXHIBIT 5-2: WARD WISE POPULATION DENSITY ........................................................................................... 47

EXHIBIT 5-3: LAND USE PATTERN ................................................................................................................... 48

EXHIBIT 5-4: FUTURE HOUSING DEMAND ...................................................................................................... 48

EXHIBIT 6-1: WATER SUPPLY CONNECTIONS .................................................................................................. 51

EXHIBIT 6-2: DCB STATEMENT FOR WATER TAX COLLECTION ........................................................................ 51

EXHIBIT 6-3: WATER SUPPLY: DEMAND AND SUPPLY GAP ANALYSIS ............................................................. 52

EXHIBIT 6-4: SEWERAGE: DEMAND AND SUPPLY GAP ANALYSIS ................................................................... 54

EXHIBIT 6-5: SANITATION: DEMAND AND SUPPLY GAP ANALYSIS ................................................................. 56

EXHIBIT 6-6: SOLID WASTE MANAGEMENT: DEMAND AND SUPPLY GAP ANALYSIS ....................................... 57

EXHIBIT 6-7: DRAINAGE: DEMAND AND SUPPLY GAP ANALYSIS .................................................................... 58

EXHIBIT 6-8: TRAFFIC & TRANSPORTATION: DEMAND AND SUPPLY GAP ANALYSIS ...................................... 60

EXHIBIT 6-9: STREET LIGHTS: DEMAND AND SUPPLY GAP ANALYSIS .............................................................. 62

EXHIBIT 6-10: LIST OF NOTIFIED SLUM COLONIES .......................................................................................... 63

EXHIBIT 6-11: HEALTH INFRASTRUCTURE: DEMAND AND SUPPLY GAP ANALYSIS .......................................... 64

EXHIBIT 6-12: EDUCATIONAL FACILITIES: DEMAND AND SUPPLY GAP ANALYSIS ........................................... 64

EXHIBIT 7-1: FINANCIAL STATUS AT A GLANCE ............................................................................................... 70

EXHIBIT 7-2: SOURCE WISE REVENUE INCOME ............................................................................................... 71

EXHIBIT 7-3: TAX REVENUE ............................................................................................................................ 71

EXHIBIT 7-4: DCB STATEMENT FOR PROPERTY TAX COLLECTION ................................................................... 72

EXHIBIT 7-5: NON TAX REVENUE .................................................................................................................... 72

EXHIBIT 7-6: DCB STATEMENT FOR WATER CHARGE COLLECTION ................................................................. 72

EXHIBIT 7-7: ASSIGNED REVENUE .................................................................................................................. 73

Page 20: Rehti CDP English

City Development Plan - Rehti xx

EXHIBIT 7-8: REVENUE GRANTS, CONTRIBUTIONS AND SUBSIDIES ................................................................ 73

EXHIBIT 7-9: APPLICATION OF FUNDS BY HEAD OF ACCOUNTS ...................................................................... 74

EXHIBIT 7-10: CAPITAL INCOME ..................................................................................................................... 74

EXHIBIT 7-11: CAPITAL EXPENDITURE ............................................................................................................ 75

EXHIBIT 7-12: FINANCIAL INDICATORS ........................................................................................................... 75

EXHIBIT 8-1: WATER SUPPLY: LONG TERM AND SHORT TERM INTERVENTIONS ............................................. 80

EXHIBIT 8-2: WATER SUPPLY: PROJECTS IDENTIFIED BY THE ULB AND CONSULTANT ..................................... 80

EXHIBIT 8-3 WATER SUPPLY: PROJECT DEVELOPMENT INITIATIVES TO BE TAKEN BY NAGAR PARISHAD ....... 81

EXHIBIT 8-4: SEWERAGE: LONG TERM & SHORT TERM INTERVENTIONS ........................................................ 82

EXHIBIT 8-5: SEWERAGE: PROJECTS IDENTIFIED BY ULB AND CONSULTANT .................................................. 82

EXHIBIT 8-6: SEWERAGE: PROJECT DEVELOPMENT INITIATIVES TO BE TAKEN BY NAGAR PARISHAD ............. 83

EXHIBIT 8-7: SANITATION: LONG TERM & SHORT TERM INTERVENTIONS ...................................................... 84

EXHIBIT 8-8: SANITATION: INITIATIVES TO BE TAKEN BY NAGAR PARISHAD .................................................. 84

EXHIBIT 8-9: SOLID WASTE MANAGEMENT: LONG TERM SHORT TERM GOALS.............................................. 85

EXHIBIT 8-10: SOLID WASTE MANAGEMENT: PROJECTS IDENTIFIED BY ULB AND CONSULTANT.................... 86

EXHIBIT 8-11: SOLID WASTE MANAGEMENT: INITIATIVES TO BE TAKEN BY NAGAR PARISHAD ..................... 87

EXHIBIT 8-12: DRAINAGE: SHORT TERM & LONG TERM INTERVENTIONS ....................................................... 88

EXHIBIT 8-13: DRAINAGE: PROJECTS IDENTIFIED BY THE ULB AND CONSULTANT .......................................... 88

EXHIBIT 8-14: DRAINAGE: INITIATIVES TO BE TAKEN BY NAGAR PARISHAD ................................................... 89

EXHIBIT 8-15: TRAFFIC AND TRANSPORTATION: LONG TERM & SHORT TERM INTERVENTIONS .................... 90

EXHIBIT 8-16: TRAFFIC & TRANSPORTATION: PROJECTS IDENTIFIED BY THE ULB AND CONSULTANT ............ 90

EXHIBIT 8-17: TRAFFIC & TRANSPORTATION: INITIATIVES TO BE TAKEN BY NAGAR PARISHAD ..................... 91

EXHIBIT 8-18: STREET LIGHTS, FIRE FIGHTING & POWER: LONG TERM & SHORT TERM INTERVENTIONS ....... 92

EXHIBIT 8-19: STREET LIGHTS & FIRE FIGHTING: PROJECTS IDENTIFIED BY THE ULB AND CONSULTANT ........ 92

EXHIBIT 8-20: STREET LIGHTING, FIRE FIGHTING AND POWER: INITIATIVES TO BE TAKEN BY NAGAR PARISHAD ...................................................................................................................................................... 93

EXHIBIT 8-21: URBAN POOR AND THEIR ACCESSIBILITY TO BASIC SERVICES: LONG TERM & SHORT TERM INTERVENTIONS ............................................................................................................................................. 95

EXHIBIT 8-22: HEALTH: LONG AND SHORT TERM INTERVENTIONS ................................................................. 96

EXHIBIT 8-23: HEALTH: INITIATIVES TO BE TAKEN BY NAGAR PARISHAD ....................................................... 96

EXHIBIT 8-24: EDUCATION: LONG & SHORT TERM INTERVENTIONS ............................................................... 97

EXHIBIT 8-25: EDUCATION: INITIATIVES TO BE TAKEN BY NAGAR PARISHAD ................................................. 98

EXHIBIT 8-26: OTHER SOCIAL INFRASTRUCTURE: LONG AND SHORT TERM INTERVENTIONS ......................... 98

EXHIBIT 8-27: OTHER SOCIAL INFRASTRUCTURES: INITIATIVES TO BE TAKEN BY NAGAR PARISHAD .............. 99

EXHIBIT 8-28: ECONOMIC DEVELOPMENT: LONG AND SHORT TERM SECTOR INTERVENTIONS ................... 101

EXHIBIT 8-29: ECONOMIC DEVELOPMENT: INITIATIVES TO BE TAKEN BY NAGAR PARISHAD ....................... 101

EXHIBIT 9-1: STATUS OF INFRASTRUCTURE FACILITIES (%) ........................................................................... 104

Page 21: Rehti CDP English

City Development Plan - Rehti xxi

EXHIBIT 9-2: RANKING OF INFRASTRUCTURE FACILITIES ............................................................................. 105

EXHIBIT 9-3: CRITICAL SECTORAL ISSUES ..................................................................................................... 105

EXHIBIT 9-4: SUMMARY OF CAPITAL INVESTMENTS ................................................................................... 106

EXHIBIT 10-1: IMPORTANT ASSUMPTIONS MADE IN THE PROJECTIONS ..................................................... 122

EXHIBIT 10-2: REFORMS UNDERTAKEN ....................................................................................................... 124

EXHIBIT 10-3: CIP FUNDING PATTERN ......................................................................................................... 125

EXHIBIT 10-4: FINANCIAL OPERATING PLAN ................................................................................................ 126

EXHIBIT 11-1: MUNICIPAL ACCOUNTING: REFORM ACTION PLAN ............................................................... 131

EXHIBIT 11-2: E-GOVERNANCE: REFORM ACTION PLAN .............................................................................. 132

EXHIBIT 11-3: USER CHARGES: REFORM ACTION PLAN ............................................................................... 133

EXHIBIT 11-4: INTERNAL EARMARKING FOR POOR: REFORM ACTION PLAN ............................................... 135

EXHIBIT 11-5: PROPERTY TAX: REFORM ACTION PLAN ................................................................................ 136

EXHIBIT 11-6: OPTIONAL REFORMS ............................................................................................................. 136

LIST OF STAKEHOLDERS WHO ATTENDED FIRST WORKSHOP ....................................................................... 139

LIST OF STAKEHOLDERS PRESENT FOR SECOND WORKSHOP ....................................................................... 142

LIST OF STAKEHOLDERS PRESENT FOR THIRD WORKSHOP ........................................................................... 145

List of Maps

Map 1 - Location map with respect to country/ state/ district Map 2 - District map showing Railway and road network Map 3 - Base Map of the town Map 4 –Ward map Map 5 – Population Density Map 6 – Sex Ration Map 7 – Literacy Rate Map 8 – Existing Landuse Map 9 – Proposed Landuse Map 10 – Existing Water Supply Map 11 – Existing Solid Waste Map 12 – Existing Drainage System Map 13 – Existing Roads Map 14 – Existing Social Infrastructure Map 15 – Location of Slums Map 16 - Proposed Water Supply network Map 17 - Proposed Sewerage System Map 18- Proposed Drainage Network Map 19- Proposed Road Network

Page 22: Rehti CDP English

City Development Plan - Rehti 22

1. Introduction

1.1. Background

Madhya Pradesh is urbanizing at a fast rate and the Urban Local Bodies (ULBs) in the state are

facing the challenge of meeting the requirements of the growing population with limited technical and

financial resources. The Government of India (GoI) and Government of Madhya Pradesh (GoMP)

have initiated a number of programmes to meet the growing demands of infrastructure and service

delivery. These include both GoI schemes [including Urban Infrastructure Development Scheme for

Small and Medium Towns (UIDSSMT) and Integrated Housing and Slum Development Programme

(IHSDP)] and GoMP initiated schemes [such as the Madhya Pradesh Urban Services for the Poor

(MPUSP), a DFID assisted program, which links reform with investment in infrastructure for the poor.

After the assessment of the performance of the ULBs and their capacity for exploiting the above said

resources it was felt that such a plan is essential, not only for accessing GoI/GoMP funding but also

for providing a strategic framework for converging and co-coordinating various development inputs

towards positioning the city on a development path.

Therefore, the Urban Administration and Development Department (UADD) of Government of

Madhya Pradesh (GoMP) has launched an initiative to support 5 Municipal councils, 245 Nagar

Parishads and 30 urban centers in the state in preparing City Development Plans (CDPs). This

initiative aims to provide a comprehensive Medium Term Strategy (25 years) and a City Investment

Plan (CIP) for each Urban Local Body, based on which the concerned ULB will be able to access

funds under schemes of Government of India (GoI) and GoMP as well as from its own sources for

implementation of priority actions and projects, identified from this exercise. The document was also

envisaged to provide a Financial Operating Plan (FOP) to direct the ULBs for mobilizing various

financial resources to implement the identified projects, adhering to the JNNURM‟s CDP preparation

toolkit and keeping in view the Master Plan (wherever exists) provisions as prepared by Town and

Country Planning Department. The preparation of the CDP will take advantage of the Revised CDP

preparation toolkit/Heritage cities toolkit prepared by GoI under JNNURM and UADD/CMAMP

guidelines. It is also expected that the CDP would provide Urban Reform Action Plan for the ULBs as

envisaged under JNNURM.

In this regard, MPUADD retained ICRA Management Consulting Services Limited (IMaCS) for

assistance in preparation of City Development Plans for Rehti town.

1.2. Objectives and Scope of Work

The exercise would centre on the following broad objectives:

The CDP will scale up existing urban development and poverty alleviation schemes within a

comprehensive and coherent strategic planning framework in order to ensure optimal benefit from

available resources for the citizens of the ULBs.

The CDP should aim to catalyze new thinking and provoke debate through a consultative

stakeholder driven process. The vision and strategic thrusts of the CDP will be built around the

lessons and findings of a comprehensive and rigorous stakeholder consultation and

documentation process.

It is expected that the CDP will serve the requirements of the UIDSSMT and IHSDP programmes

as well as JNNURM and other development schemes.

Page 23: Rehti CDP English

City Development Plan - Rehti 23

The CDP will generate specific priority actions and projects that can be the basis for mobilizing

funding from diverse sources.

1.3. Description of Task (as outlined in RFP)

The tasks to be carried out for the preparation of the CDP of Rehti as outlined by MPUADD are

detailed below:

1.3.1. Inception

The purpose of this stage is to review and analyze the current status and unique features of the town

with regard to the state of its development, systems and procedures, as equally its institutional and

financial context. This stage is meant to identify the strengths and weaknesses in the city‟s

development and to provide an understanding of what impedes service delivery and management

within the existing set-up and what contributes to better service provision. This task will consist of:

Reconnaissance

The Consultant will spend their first week with reconnaissance activities, including:

Introductory meetings with the Mayor/President, Municipal Commissioner/Chief Municipal Officer,

Heads of Departments, Councillors, representatives of ongoing urban programmes, etc.

Determine feasibility and composition of a city level Steering Group (comprising of Citizen forum)

for the CDP

Citizen forum shall be formed comprising of 15 eminent persons from different walks of life.

Obtain base maps, and available secondary data on the city‟s demographics, master plan, reports

prepared under past and current urban development programmes, ULB‟s annual budget reports,

other reports giving status of service delivery, and other relevant documents on heritage listing,

data on slums and urban poor, government policy documents, etc.

Identify the line departments and key stakeholders for urban service delivery and development

such as PHED, Town and Country Planning Department, Development Authority, SADA, local

chamber of commerce, NGOs, CBOs, religious organizations, financial institutions, commerce

and industry etc.

Field reconnaissance to determine growth patterns of the city, characteristics of slums and

environmentally sensitive areas etc.

Identify economic opportunities and blocks in tapping these (eg. Tourism, industry etc.)

Mapping : Preparation of City level base maps using Auto-CAD/GIS

Workshop-I: “Kick-off workshop”

The Consultants will organize, with ULB support, a one day kick-off workshop to familiarize the

stakeholders with the purpose, process, and expected outcomes of the CDP, and build enthusiasm,

understanding and commitment to the CDP. The kick off workshop will help in deriving a consensus

along with the stakeholders firming the process and agreeing upon a structured programme to take

the CDP forward. The formation of the Steering Group will also be announced as well as the sectors

for which detailed analysis will be carried out.

Stakeholders for the kick off workshop may include:

Elected representatives, Mayor/President, Municipal Commissioner/Chief Municipal Officer etc.

Page 24: Rehti CDP English

City Development Plan - Rehti 24

City level planning and service providing agencies viz., ULB, Town and Country Planning

Department, Development Authority, SADA etc.

Line Departments of the state government such as pollution control board, health department,

tourism department, PHED, PWD, Traffic and Transportation etc

Private sector agencies such as chambers of commerce and industry,

Non-governmental and community based organizations

Representatives of the poor communities

Representatives of ongoing urban development programmes

Representatives of media, academic institutions, etc.

Inception report

At the completion of this phase the consultants will present their preliminary analysis, methodology in

an Inception report. Based on their preliminary analysis, consultations and workshop the consultants

will propose special papers (maximum 2) on specific sectors or issues and propose the names of

specialists (approved by the client) who may be commissioned to prepare the same as a part of the

sector analysis/survey. The inception report will be presented to the Steering Group, who will identify

individuals/institutions/working group who will be the local counterparts for the different sectors.

1.3.2. Situation assessment (opportunities, strengths, weaknesses and gaps)

Sector analysis

The Consultants would interact with various stakeholder groups (meetings, workshops, focus group

discussions, etc.) and review relevant publications, reports, GOs, resolutions, procedures, laws etc. to

analyze the current situation in each of the sector identified. The sector analysis will be carried out by

the consultant's team in consultation with the local counterparts and will be supported by special

papers commissioned by the Consultants team. While the team will be expected to prepare its own

methodology for the sector analysis, it is recommended that the following are included:

Study of economic opportunity and potential for Local/regional economic development, with

special reference to the poor

Physical infrastructure demand and gap assessment (considering service level benchmarking)

Transport study with emphasis on low cost public transport and livelihoods

Heritage conservation and tourism

Environmental sustainability

Access to housing, employment and social and environmental services by the poor

Health and Education services gap in the town

Sectoral Issues addressed under the Master Plan (as prepared by the TCPD)

City profile

The findings from the sector analysis would be used to prepare the City Profile consisting of the

assessment of the existing situation in all the sectors identified, emerging issues, SWOT analysis and

projection of the present gaps and future requirements. This will be done within the framework of

parameters relating to demography, economic base, finance, physical and environmental issues,

infrastructure, institutions and universalisation of services especially for the poor.

Page 25: Rehti CDP English

City Development Plan - Rehti 25

1.3.3. Development of city vision and sector goals and strategies

Discussion will be initiated on strategies, priorities and major actions that may be required in the next

five years to move towards the vision 2035. At this stage local counterparts for the different sectors

may be added.

Sector strategies

The Consultants will continue to work in consultation with the local counterparts to develop sector

strategies in consonance with the city vision and sector goals. At this stage, Consultants will need to

review the relevant cases of national and international best practices and explore if the same can be

applied in relevant sectors to bring in improved and efficient ways of working.

Vision, Goal and Strategies

The output expected in the second phase is city vision, sector goals and possible alternate strategies

and some actions and projects.

1.3.4. Development of strategies and priority actions

Evaluation of strategies

The strategies will be evaluated from the perspective of their contribution to achieving the vision and

sector goals. Criteria will be developed for prioritizing the strategies, programmes and projects in

consultation with the Steering Group.

Analyze governance framework and reform action plans

The Consultants, in consultation with the ULB officials, representatives of reform programmes and

local counterparts will examine whether the reforms which are currently being carried out and

proposed at state and local levels are sufficient to support the vision and strategic plan and to sustain

the planned interventions. If required additional reforms may be proposed.

Sector Analysis, Vision, Strategies and Projects Report

The output of this phase would be an agreed plan outlining the goals, strategies, priority actions and

projects with an estimate of preliminary funding requirements in each sector.

Workshop-II: “ULB level workshop”

At the completion of this phase the consultants will organize 2nd ULB level workshop (supported by a

presentation to the stakeholders).

1.3.5. Preparing a City Investment Plan (CIP) and a financing strategy

Project costing and determination of funding sources

The Consultants will undertake consultations with different stakeholders to determine types and

sources of financing for priority projects from internal resources, state and central governments, local

financial institutions, donors, and through public-private partnerships. The implications of each of

these will be considered.

Scheduling of priority actions and developing a City Investment Plan (CIP)

Based on the availability of resources, logical sequencing of actions and potential for immediate

implementation, the Consultants will prepare a City Investment Plan (CIP) in consultation with ULB

that lays out the cost and revenue estimates of all priority projects in the next five years. The

Page 26: Rehti CDP English

City Development Plan - Rehti 26

preparation of the CIP is a reiterative process requiring adjustments to individual projects as well as

changes in scheduling to make the whole package work financially. The City Investment plan would

be supported with a Financial Operating Plan (FOP).

1.3.6. Draft CDP

The Consultants will compile the draft CDP including the CIP and FOP and will finalize it after

feedback from stakeholders:

Workshop-III: “Workshop on Draft CDP”

The Consultants with support from ULB will organize third workshop involving all the stakeholders,

who have been part of the CDP preparation process. The workshop will seek an endorsement of the

City Development Plan from the stakeholder group present and agree on procedures for performance

monitoring.

Performance Monitoring

The Consultants, in consultation with the ULB will identify performance-monitoring/sustainability

indicators to assist ULB to review the progress and outcomes of the CDP on an annual basis and to

enable them in setting the agenda for the future.

1.3.7. Final CDP document

Following the third and final workshop, the Consultants will finalize the CDP document incorporating

the feedback from the workshop and the inputs received at the 2nd Stage State Level discussion.

This document will be submitted to ULB, along with a summary of the CDP for publication and wider

dissemination by the ULB.

1.4. Approach

The City Development Plan (CDP) is the Nagar Parishad‟s strategy that presents both a vision of a

desired future perspective for the town and the Parishad‟s organization, and mission statements on

how the Nagar Parishad, together with other stakeholders, intends to work towards achieving the

short term and long-term vision. CDP should be very comprehensive and should cover all the aspects

where town needs intervention. To achieve a comprehensive CDP, we have adopted few guiding

principles as discussed below.

1.4.1. Guiding Principle

We outline below the guiding principles underlying our approach for this exercise. These are drawn

based on our experience in working on City Development Strategies/Plans and from the expectations

outlined by MPUADD.

Sharp focus on the need and expected outcomes

We see the CDP as a critical intervention to provide a strategic framework for converging and co-

coordinating various development inputs in a holistic manner to facilitate engaging the town

administration and stakeholders towards crystallizing vision, strategy, actions for taking the town on a

development path and as a means to enable access to funds from GoI (Government of India) under

various government schemes / funding programs of GoI and Government of Madhya Pradesh

(GoMP).

JNNURM Toolkit(s) as a guiding framework

Page 27: Rehti CDP English

City Development Plan - Rehti 27

As advised by MPUADD, the preparation of the CDP will take advantage of the Revised CDP

preparation toolkit/Heritage cities toolkit prepared by GoI under JNNURM and UADD/CMAMP

guidelines in terms of the structure and process outlined in the toolkit along with integration with

current initiatives for developing a strategic framework for development agenda in the next 25 year

time horizon.

Enable Participation through a structured Multi-stakeholder Consultative Process

We shall follow a structured consultative process as suggested by MPUADD. We see participation of

key stakeholders including elected representatives, staff of Nagar Parishad, parastatal agencies and

other institutions, policy makers and the citizens to participate and plan for spatial, social and

economic development of the town as a critical requirement.

Action orientation and resource mobilization

We also see the CDP as a means to prepare the ground for identification of projects and time-bound

interventions along with evaluation of financial resources requirements, gaps and potential sources for

mobilizing funding beyond existing programmes. The scope for private sector development and

participation and access to external resources shall be explored. Further as indicated linkages of

these actions with annual plans and budget cycles of the municipal corporation will also be

incorporated.

1.4.2. Approach and Methodology

The Rehti CDP has to be developed in close consultation with all stakeholders. Aim is to develop

ownership of the plan amongst the stakeholders. We envisage conducting the exercise in 3 Modules

as shown below

1.4.3. Module I: Inception and Kick off

The expected outcomes of this module from a process stand point include the following:

To put in place institutional mechanisms including the formation of Steering Group for conduct of

the assignment in a structured consultative manner as envisaged

To engage with stakeholders and arrive at a shared understanding of the objectives and expected

outcomes of the study

Apart from this, our team would use this as a preparatory stage to

a) Review and analyze the current status and unique features of the city with regard to the state

of its development, systems and procedures, as equally its institutional and financial context.

b) Identify the strengths and weaknesses in the city‟s development and to develop an

understanding of what impedes infrastructure provision and service delivery and management

within the existing set-up and what contributes to better service provision.

c) Do a rapid assessment through interactions with stakeholders and initial data collection to

capture previous and on-going development initiatives to factor the same in the Consultations

and Analysis module.

We concur with the broad activities and tasks outlined under the Inception stage by MPUADD

including the following:

Introductory meetings with the Mayor/President, Municipal Commissioner/Chief Municipal Officer,

Heads of Departments, Councillors, representatives of ongoing urban programmes, etc.

Page 28: Rehti CDP English

City Development Plan - Rehti 28

Citizen forum shall be formed comprising of 15 eminent persons from different walks of life.

Obtain base maps, and available secondary data on the city‟s demographics, master plan, reports

prepared under past and current urban development programmes, ULB‟s annual budget reports,

other reports giving status of service delivery, and other relevant documents on heritage listing,

data on slums and urban poor, government policy documents, etc.

Identify the line departments and key stakeholders for urban service delivery and development

such as PHED, Town and Country Planning Department, Development Authority, SADA, local

chamber of commerce, NGOs, CBOs, religious organizations, financial institutions, commerce

and industry etc.

Field reconnaissance to determine growth patterns of the city, characteristics of slums and

environmentally sensitive areas etc.

Identify economic opportunities and blocks in tapping these (eg. Tourism, industry etc.)

Mapping : Preparation of City level base maps using Auto-CAD/GIS

This module will culminate in conduct of a one-day kick off workshop with stakeholders. The purpose

of the kick-off workshop would be build participative energy and commitment of stakeholders for the

study through articulation of the purpose, process, and expected outcomes of the CDP, and achieving

a shared understanding of the same. The kick off workshop will help in deriving a consensus along

with the stakeholders firming the process and agreeing upon a structured programme to take the CDP

forward. Further the institutional structures including the Steering Group for the consultative process

will also be spelt out during this workshop. Following the workshop, we would submit an Inception

Report and follow it up with a presentation to MPUADD and the ULB.

Page 29: Rehti CDP English

City Development Plan - Rehti 29

1.4.4. Module II: Consultations and Analysis

Module II will form the heart of the exercise in terms of conducting a Situation assessment followed by

a) crystallizing a Vision for the City and sector level goals and strategies and b) evaluation of

strategies and finalizing priority actions at a sector level.

This module will start with the Situation assessment covering Sector level analysis and development

of the Town profile, moving on to formulation of a Vision for the town and translating them into

Strategies, Priority Projects and Reform Actions. While there are self-contained sub-modules within

this step, we have clubbed them into Module II, given the highly consultative as well as data

collection/reconnaissance intensive nature of these steps and the iterative linkages between these

steps.

Given the multiple and heterogeneous set of stakeholders involved, we expect to use a range of

instruments to capture diverse inputs for the exercise as indicated below:

Workshops – As suggested by MPUADD

Brainstorming Sessions – For discussions with Elected Body, Residential/Trade associations.

One-on-One meetings/interviews – Town officials, Government Departments, Chief Municipal

Officer, Elected representatives, MLA/MPs, and other important opinion makers.

Limited quantitative surveys – To get a pulse of wider perceptions and priorities of the

general public.

Exhibit 1-1: Approach & Methodology

Page 30: Rehti CDP English

City Development Plan - Rehti 30

In addition, we would have a significant on-the-ground interaction effort through our research and

support staff to compile data and information from the cities. From our experience in handling such

studies, very often it is critical to spend substantial time with ULB staff/do sample based field visits

given the data and information availability related limitations. Such interactions enable us capture

qualitative insights and serve to provide surrogate inputs to validate and overcome the generally

faced limitations of data availability. For instance, we tend to collect budget documents at the

beginning at the study and do the analysis of financials in parallel. A time period wise analysis of

revenue and costs along with their drivers enable us to spot data discrepancies in the initial stages

and help us to identify areas where greater time is required for data collection/scrutiny. Similarly in the

area of service levels benchmarking, we tend to do a physical reconnaissance of municipal assets to

validate reports made available to us. For instance, we typically do visits to select water distribution

stations to assess the validity of the broader service level reports generated.

We concur with the activities and steps identified by MPUADD in the Terms of Reference in moving

from a Situation Assessment to formulate the City Vision and translating that to Sector strategies and

priority projects. Some specifics of our approach along each of these steps are described below:

Sector Analysis

We would choose the specific sectors/issues for preparing detailed sectoral papers, based on the

criticality of the sector (as viewed by the stakeholders) and the baseline status of the prevailing

service levels in that city. While the exact list of sectors would be finalized following consultations, an

indicative list of sectors that tend to come out as critical areas include the following:

a) Water Supply

b) Sanitation and Sewerage

c) Solid Waste Management

d) Urban Housing

e) Public Transportation

f) Social amenities and infrastructure including Schools, Hospitals, Markets

g) Heritage & Tourism

We expect the sector level analysis to cover the following steps.

a) Review the baseline status of the sector in terms of operational service level and financial

indicators vis-a-vis benchmarks/norms and desired levels of service to arrive at the normative

gaps.

b) Identify the possible alternatives for improving service levels, policy

changes/implications and the magnitude of investment required to improve service levels

in a time-bound manner.

c) Develop a sector strategy, targets for service level improvement and a list of potential

priority projects to be undertaken along with an expected level of improvement in service

levels through implementation of these projects.

These steps would be undertaken in consultation with local counterparts and will be supported by

special papers commissioned by the TA team. While carrying out the sector level analysis, aspects

Page 31: Rehti CDP English

City Development Plan - Rehti 31

relating to the need for provisioning for urban poor, broad review of cost-benefits including social and

environmental impacts would be factored.

City Profile

In profiling the City and crystallizing its SWOT (Strength, Weakness, Opportunity, and Threat), we

would look at slightly wider issues beyond sectoral dimensions to cover the following:

Spatial growth patterns and drivers

Economic growth drivers - intrinsic and potential

Infrastructure - Physical and Social

Issues relating to Environment sustainability

Extent of Urban Poor and their requirements

Institutional Capacity gaps and requirements.

As can be observed, the idea is to get an over-arching and a holistic idea of the town‟s future growth

directions (both economic and spatial) to understand the implications for physical infrastructure and

administrative capacity building needed to support this growth.

The city profiles would also then draw from the Sector analysis and provide an assessment of the

existing situation in all the sectors identified, emerging issues, analysis and projection of the present

gaps and future requirements. This will be done within the framework of parameters relating to

demography, economic base, finance, physical and environmental issues, infrastructure, institutions

and universalization of services especially for the poor.

City Vision

Exhibit 1-2 presents an extract from the JNNURM Toolkit on the aspects to be considered in

developing a City‟s Vision which we believe summarizes the key contours of a City level Vision

formulation quite succinctly.

The City Profile will be presented to the stakeholders and Steering Group followed with a discussion

on city perspective and city priorities as perceived by the stakeholders. With the background of city

profile, perspective and priorities, the participants will contribute to developing a collective and shared

vision for the city. Discussion will be initiated on strategies, priorities and major actions that may be

required in the next fifteen years to move towards the vision.

Exhibit 1-2: Developing a City Vision (Source: JNNURM Toolkit)

Developing a vision for the city is central to the preparation of a CDP. A vision is a statement of where

the city wishes to go, within a given timeframe, and is often expressed in terms of clear expectations.

It defines the potential of the city and reflects its unique attributes in terms of comparative and

competitive advantages, values and preferences of the city‟s residents, relationship of the city to the

state, national and global economies, and of course, the history and physical characteristics of the

city. A vision aligns stakeholders‟ energies to work cohesively for the development of the city. Cities

need to systematically consider the future, and design strategies to accordingly shape the future. All

objectives, strategies, programmes and projects must be aligned with the vision of the city.

Developing a common vision requires a significant effort of consensus building in order to balance the

competing demands arising from different economic infrastructure sectors, as also from different

interest groups within the city. In order to achieve an understanding on a common vision, it is useful to

choose “milestones” and targets such as provision of a minimum level of services to all; public

disclosure and transparency in the formulation of budget proposals; introduction of a single window in

Page 32: Rehti CDP English

City Development Plan - Rehti 32

matters of service delivery and management and the like. In developing the vision, cities must choose

a set of criteria that are directly relevant to the JNNURM components. It is important that when cities

define outcomes and milestones on the vision, they ensure that these are measurable and have a

time frame.

Sector Strategy and Goals

The formulation of key themes underlying the City Vision is thus a critical part of the exercise. At the

same time, it is important to translate this broader vision into specific sector level strategies and goals.

In formulating sector level strategies and actionable goals, it is critical to ensure a link between these

strategies and the desired service level outcomes and consistency with the overall goal. More

importantly sectoral strategies need to be inclusive.

While the Vision tends to capture a broader perspective of the citizen/stakeholder view on where the

city needs to go, strategies articulate what needs to be done.

For instance, an overall vision to provide universal coverage of water supply to all its citizens may

require strategies to a) Augment water availability, b) Reduce Distribution Losses and c) Differentiated

Tariff with subsidized lifeline supply for cost recovery.

Sector wise service level targets and reform actions

We would translate broader sector level goals into tangible service delivery targets and reform

actions. This will further enable identification of priority projects that need to be implemented to

achieve these service level targets.

1.4.5. Module III: Finalisation

This module would cover translating the consultative and analytical inputs to develop an actionable

City Investment Plan backed by an effective financing strategy leading to formulation of the City

Development Plan and its finalization through a consultative discussion on the same with the

stakeholders.

Preparing the City Investment Plan (CIP) and a Financing Strategy

The CIP and financing strategy are inseparable. An Investment Plan would be credible and actionable

only if it is backed by an analysis of financing capacity and a strategy to overcome the limitations of

the financials of the ULB. Typically we have observed that ULBs tend to have limited investment

capacity to undertake all capital investment programs. Apart from evaluating the potential financing

from schemes like JNNURM and other capital grant schemes of GoMP, it is critical to evaluate as part

of the strategic options, the ULB‟s potential to a) Improve its Revenue surplus through revenue

enhancement related reforms and rationalization of costs and b) leverage and access to external

capital through borrowings and Public Private Partnerships.

Our approach typically involves the following steps:

Estimation of unconstrained sector wise Investment requirements given normative gaps in service

levels (till 2012, 2025, and 2035), sector wise service level improvement targets and identified

priority projects up till 2015

Preparation of Financial and Operating Plan and Estimation of borrowing capacity with operating

revenue surplus improvements and revenue reforms

Developing a realistic and actionable Investment Plan and a Financial and Operating Plan within

borrowing capacity

Page 33: Rehti CDP English

City Development Plan - Rehti 33

Needless to mention the 5 year action plan would involve an iterative process and would factor

inputs from consultations with stakeholders on priority projects to be taken up in consonance with

the City Vision, Sector wise strategy and service level targets.

Submission of City Development Plan, Consultations and Finalization

Following the finalization of the CIP, we would integrate the deliverables presented in Module I and II

along with the CIP and financing strategy to prepare the Draft City Development Plan.

We would then have a workshop with stakeholders to summarize the process and the building blocks

around which the CDP has been evolved and seek an endorsement from them. We would also work

with the stakeholders to develop procedures for performance monitoring and implementation of the

actions recommended in the CDP.

This would be followed by a presentation to MPUADD and the ULB. Based on the inputs we would

submit the final CDP to MPUADD and the ULB along with a summary of the CDP for publication and

wider dissemination by the NP.

1.5. Stakeholders Interaction

The CDP process involved several stakeholder consultations during the course of the project to make

the process inclusive and CDP comprehensive. The team visited Rehti in the month of November and

December and had interactions and discussions with the city officials and the political representatives

to get information on the city strengths, existing scenario of infrastructure services, ongoing projects,

ULB setup, area of concerns, lacunas etc. And also the demand, gaps, vision, goals, strategies,

priorities, financial situation etc. Apart from individual consultations, three stakeholder workshops

were conducted at different stages of the study with the objectives of apprising stakeholders with the

status of the study and obtaining feedbacks on CDP process and intermediate findings. The

feedbacks from stakeholders were carefully evaluated and incorporated in the process.

1.5.1. Interacting with Municipal Body

During the visits to the town, we interacted with the officials of Rehti Nagar Parishad, wherein we

discussed the necessity of a CDP for the town and the support that we sought in order to accomplish

the task assigned by the State. We also discussed the approach and methodology for the assignment

and the support that was required from the ULB in terms of data support, city understanding and

conduction of the workshops. In the subsequent meetings the team had a detailed discussion on the

organization structure of the ULB, type & level of service provided by them, financial aspects of

respective services, existing capacity & gaps in various sectors and their perspective & suggestions

on improving the quality of services provided by municipality and data on existing on-going projects if

any. These interactions also included collection of data pertaining to services offered by ULB. During

second visit the detailed demand and gaps were discussed with local body and Nagar Parishad

supported in identifying the potential areas of development and potentials in every sector. During third

visit final investment plans were discussed with local people.

1.5.2. Interaction with other Stakeholders

Apart from meeting the ULB officials the team has also interacted with other stakeholders including

elected representatives and other eminent personalities of the town. Team has also met with revenue

department‟s representative (Patvari), sub-engineer etc.

Page 34: Rehti CDP English

City Development Plan - Rehti 34

1.5.3. Formation of Steering Group

City Level Steering Group is a group of eminent persons who can play a key role in the successful

completion of this study. This group is entrusted with the duties of reviewing all the reports and

primary consultations for all purposes. The members of the steering group are as given in Exhibit 1-3.

The meeting with City Level Steering Group was done to appraise the stakeholders on the gaps and

the visioning exercise of the city and for discussion on strategies and action plan to achieve the

decided vision.

Exhibit 1-3: Members of Steering Group

S. No. Designation / Department Name of the Official met

1 Collector, Sehore Mr.Dr. Sanjay Goel

2 SDM Mr. Ichhichit Garpale

3 CMO Mr. N.S Raghubanshi

4 Adhyaksh Mr. Raghuvir Singh Patel

5 Upadhyaksh Mr. Santosh Panchavya

1.5.4. Workshops

The objectives and outcomes of various stakeholder workshops are:

Kick-off Workshop – Inception Workshop

A workshop was organized to familiarize the stakeholders with the purpose, process, and expected

outcomes of the CDP, and build enthusiasm, understanding and commitment to the CDP. The kick off

workshop helped in deriving a consensus along with the stakeholders firming the process and

agreeing upon a structured programme to take the CDP forward. It was held on 3rd

Nov 2011.

Presentation was followed by a participative session on “discussion & suggestions.” Outcomes of this

workshop were; familiarization of stakeholders with the purpose, methodology & expected outcomes

of the study, improvisation in our understanding of city & its problems, innovative approaches to

counter existing problems and building of enthusiasm, understanding and commitment for the

successful completion of a comprehensive and ambitious but implementable, City Development Plan.

Second Workshop – City Vision, Sector Goals, Strategies and Prioritization

Second formal meeting addressing all stakeholders happened during second workshop on Dec. 21st,

2011. Presentation was followed by a participative session and questionnaire round, which helped in

finalizing the city vision, sector goals, strategies and priority actions for the development of the town.

This workshop culminated in the consolidation of strategies, priority actions and projects.

Third Workshop – Draft CDP Workshop

The third workshop was conducted on 27th August, 2012 at Rehti. In this workshop, findings and

recommendations to achieve the vision has been presented to the stakeholders. Detailed list of

proposed projects with broad cost estimates have been shared along with the sustenance capacity of

ULB. This workshop also discussed about the reform process to make ULB more efficient. This

workshop culminated in the consolidation of draft CDP and comments to improve sectoral issues

have been suggested by stakeholders.

Page 35: Rehti CDP English

City Development Plan - Rehti 35

The detailed proceedings of various stakeholder workshops are provided in Annexure 1. The second

workshop also included a questionnaire survey to elicit stakeholders‟ responses on key issues faced

by city and extent of their severity. The details pertaining to questionnaire survey, viz. objective,

methodology, questionnaire, analysis and findings, are provided in chapter 8 and questionnaire is

attached in Annexure 2.

1.6. Report contents

The City Development Plan for Rehti is prepared under following sections:

Section 1: “Introduction” (this section) provides the background to the study and outlines the

study progress till date along with proceedings of 1st and 2

nd Workshops.

Section 2: “Physical Features of the Town” covers location, geography and landform of the

town.

Section 3: “Demographic Profile of the Town” provides various demographic indicators of the

town like population growth, population projection etc.

Section 4: “Socio-Economic Profile of the Town” provides information on socio-economic

indicators of the town like workforce details etc.

Section 5:“Spatial Planning and Growth Management” gives the details about the growth

pattern of the town along with information on housing scenario present in the town.

Section 6: “City‟s Infrastructure – Existing Status, Gaps, Issues, SWOT, Goals and Strategies”

covers physical and social infrastructure sectors of the town.

Section 7: “Municipal Financial Assessment” provides the financial status of the town along

with financial strategies.

Section 8: “City Vision, Sector Goals, Strategies, Action Plan, Projects and Prioritization”

describes the vision of the town. This section also covers the strategies to be made, action to

be taken for achieving sector goals.

Section 9: City Investment Plan discusses the details of the investments required in a city to

execute various projects identified under different sectors and sub sectors.

Sector 10: Financial Operating Plan discusses the investment sustainability of Nagar Parishad

under four scenarios- base case, PT improvement & sector reforms, debt funding and reforms/

Sector 11: “Urban Reforms” outlines the reforms that should to be undertaken by ULB. It also

discusses about the reform status of mandatory and optional reforms at state and ULB level.

1.7. Limitations and Caveats

Since „To the Scale‟ Ward boundary maps are not available with the town, the digitized maps

prepared by IMaCS show the tentative ward and town boundaries which are marked by the

officials of Rehti Nagar Parishad and Revenue Department.

As the scope of CDP was limited to secondary sources, so we have limited to information

made available by Nagar Parishad.

Page 36: Rehti CDP English

City Development Plan - Rehti 36

2. Physical features of the Town

2.1. Introduction

Rehti is a small town located in tehsil Budni in the Sehore district in Indian state of Madhya Pradesh.

It is located at 22.73°N and 77.43°E at an average elevation of 303 meters above mean sea level.

Prior to the formation of Madhya Pradesh, Rehti was ruled under the nawabs of Bhopal. Due to the

nearness of forest area around Rehti, it is endowed with natural resources which are used in the

manufacturing of herbal products.

2.2. District information

Rehti is located in Sehore district which lies in the central part of Madhya Pradesh. Sehore is

surrounded by seven districts i.e. Bhopal, Raisen, Hoshangabad, Dewas, Shajapur, Raigarh and

Harda as visible in Map 1 (attached in Annexure 4).

Sehore stands in the foothills of Vidhyanchal range in the middle of Malwa Region. After formation of

Madhya Pradesh, the state capital Bhopal was once a part of the Sehore District until it was bifurcated

in 1972 and a new district Bhopal was formed. Many Big and small rivers abound the landscape of

Sehore District. Narmada, Parwati, Dudhi, Newaj, Kolar, Papnas, Kulans, Seewan, Lotia and other

rivers are found passing through the district.

The district has 5 tehsils and 5 blocks and block headquarters are located in Ashta, Nasarullahganj,

Sehore, Icchawar and Budhni (Refer Exhibit 2-1 for demographic details of blocks in Sehore district).

Sehore district forms a part of Malwa plateau with an undulating topography. It is primarily an

agricultural district occupying Narmada and Chambal basin valley. Wheat, rice, jowar, and soyabean

are the major crops grown in this area.

Exhibit 2-1: District Level Information for Blocks in Sehore

District/ Block Area (Sq. km) Population (2001) Density/ Square km

Sehore District 6578 1078912 164

Sehore 1584.25 355861 225

Ashta 1454.57 300000 204

Ichhawar 1110.85 132073 127

Budhni 1075.11 124320 114

Nasarullahganj 1353.22 166658 121

Source: Environmental Assessment Report on State Roads by Madhya Pradesh Government, 2010

2.3. Location (Linkages and connectivity)

Rehti lies on SH- 22 which is connected to NH12 from Bhopal. It is located at a distance of 72kms

from Bhopal and 92 km from Sehore city. Budni Railway station is the nearest railway station which

lies on Western Central Rail track between Bhopal and Itarsi junction. Most of the passenger trains on

the route stop at Budni including a couple of express trains. Nearest airport is at Bhopal which is at

distance of 72 Km from Rehti. Refer Map 2 in Annexure 5 for location and connectivity of Rehti.

2.4. Physiography and landform

2.4.1. Topography

Page 37: Rehti CDP English

City Development Plan - Rehti 37

Sehore stands in the foothills of Vindhyachal Range in the middle of Malwa region. The most of the

area is made of undulating plateau surface and is covered with black soils of different grades. Due to

this it has got good productive soil.

2.4.2. Drainage

Navej River is the main river passing through the town from south west direction to north-east

direction. Other nallahs also pass in the same direction which forms the municipal boundaries of the

towns. The Chambal basin valley constituents an area of about 3108 sq.km. which falls in the entire

Ashta block. The southern part of the district falls under Narmada Basin and its catchment area. The

area along the western boundary of district, along which Parbati River flows, forms a valley. The

southern boundary is also bounded by semi hilly area, the Sip River flows in the southern part of the

district.

2.4.3. Temperature

There is no meteorological observatory in Sehore district. The nearest meteorological observatory is

at Bairagarh where similar conditions prevail. The winter season starts from end of November & ends

till last week of February. January is the coldest month in the year. The average normal minimum

temperature during the month is about 10.4°C. The individual day temperature comes as low as 1 or

20

C. From March onwards, the temperature starts rising and maximum temperature is observed

during the month of May. The average normal maximum temperature is 40.70

C. The individual day

temperature is as high as 45 or 460

C. The weather becomes pleasant on the arrival of monsoons. In

October during the retreating of monsoon the temperature rises slightly during the day time and the

nights become pleasant. The average annual normal temperature of Sehore district is 31.40

C.

During the southwest monsoon the relative humidity is generally high exceeding about 88% in August.

Humidity decreases in the post monsoon season. The driest part of the year is the summer season

with the humidity going down to 26% or less. The annual normal relative humidity of the district is

57%.

2.4.4. Climate

Climate of Sehore district can be divided into four seasons. The winter season commences from end

of November lasts till end of February. The period from March to mid of June is hot season. The south

west monsoon season from middle of June to end of September, October and end of November

constitute the post monsoon and retreating monsoons.

Winds are generally light to moderate in the district with some slight strengthening in force during the

monsoon season. The wind velocity in the post monsoon or during the winter season is, in general,

low as compared to Pre-monsoon or summer season. The normal average and wind velocity of the

district is about 8.3 Km/hr.

2.5. Municipal area and planning area

Rehti Nagar Parishad spreads over an area of 9.28Sq.Km and is divided into 15 wards. The

population of the town is 11,616 as per the provisional data of census 2011. The total area consists of

developed and undeveloped land. The existing municipal area includes both built-up area and

agricultural area, which has been discussed in detail in fifth chapter.

Page 38: Rehti CDP English

City Development Plan - Rehti 38

The master plan for the town has not been prepared. It has been observed that a large component of

the existing municipal area is undeveloped, thus it creates space for the spatial development of the

town. Refer Map 1 and Map 5 in Annexure 5

2.6. Conclusion

This chapter dealt with the physical features of the town which included topography, natural drainage,

climate, and rainfall and wind direction. It also provided information on its location and connectivity.

The next chapter discusses the demographic profile of the town.

Page 39: Rehti CDP English

City Development Plan - Rehti 39

3. Demographic Profile of the Town

3.1. Introduction

Demographic characteristics of a region provide an overview of its population size, composition,

territorial distribution and changes therein. This section on demographic indicators includes indicators

that measure the population size, sex ratio, density and dependency ratio. These indicators for the

region will help in identifying areas that need policy and programmed interventions, setting near and

far-term goals, and deciding priorities, besides understanding them in an integrated structure. Data in

this section has been taken mainly from the “Census of India” and “Rehti Nagar Parishad”. The

demographic characteristics have been analyzed in terms of decadal growth and spatial distribution of

density in the town.

As of 2011 (Provisional Data census 2011), Rehti has a population of 11616 out of which males

constitute 52% of the population and females 48%. Referring to Census details of 2001, the total work

participation rate was 28.4% (2001) which was very low as compared to national rate of 39% and

state rate of 42.7%. Currently, the sex ratio of the town is 919, which is far less than national level of

sex ratio of 940 and higher than state‟s sex ratio of 930. Literacy rate is 71 % which is high as

compared to National Literacy Rate of 64.84% and state‟s literacy rate of 63.74%.

3.2. Population growth

As per the Census of 2011 (Provisional Data), the population of the town is 11606. Exhibit 3-1

provides a snapshot of the population growth over the last few decades. The population growth rate

had been very fluctuating in the town. The town has experienced firstly increase in growth rate and

then decrease in growth rate.

Exhibit 3-1: Population Growth Trends

Census

Year

Population

Total

Decadal

Change

Growth

Rate (%)

1991 7,502 7,502 -

2001 9,742 2,240 30

2011 11,616 1,874 19

Source: Rehti Nagar Parishad

3.3. Population density

Population density is an indicator which shows the space used by a person in the town. Population

density (P.D.) is calculated as population of the city divided by the municipal area of the town. It is

herein represented as Number of persons per square km (No. /sq. km).

Exhibit 3-2: Population Density

S. No Year Total Population Area (Sq. Km) Population density (Persons/ sq. Km)

1 1991 7,502 9.28 808

2 2001 9,742 9.28 1050

3 2011 11,616 9.28 1252 Source: Census of India (*Provisional population as per Census 2011) and Rehti Nagar Parishad

As visible from Exhibit 3-2: Population Density, the population density in 2001 was around 1050

persons/ sq. km, which has increased to 1252 persons/ sq. km in 2011 as the municipal area remains

the same which is equivalent to 9.28 sq. km.

Page 40: Rehti CDP English

City Development Plan - Rehti 40

3.4. Population projection

With a precedence of past and current trends of population growth in Rehti, an analysis has been

carried out with an objective of estimating population for the next three decades using various

methods which includes Arithmetic increase method, Incremental increase method, Geometric

progression method and exponential methods. Result of this analysis is presented in Exhibit 3-3.

Exhibit 3-3: Population Projection

Year

Population

Polynomial Arithmetic Increase

method Incremental

Increase method

Projected Population

Geometric Method 2nd

Order 3rd

Order Decadal

Increment Projected

Population

1991 7,502 9,742 19,484

2001 9,742 11,616 34,848 2,240

2011 11,616 13,124 52,496 1,874

2021 14,266 71,330 13,673 14,610 16,098

2031 15,042 90,252 15,730 18,541 22,309

2041 15,452 108,164 17,787 23,409 30,916 Source: IMaCS Analysis

As Rehti is a small town and has underdeveloped infrastructure facilities and insufficient employment

opportunities, the growth is a bit stagnant at the moment. However, with the proposed interventions

(suggested in this CDP), it is expected that the population growth will be a bit higher post 2015.

Hence, for the purpose of estimating future population, incremental increase method for population

projection has been found most appropriate as compared to the other methods. This has been taken

considering amongst other interventions; slum up-gradation and employment opportunity, which will

restrict people to migrate to larger cities and will result in a relatively higher population growth with

improvement in the city infrastructure which improve the quality of life of the population of the town.

3.5. Ward-wise demographic details

The town has been delineated in 15 wards. The details of the ward-wise population have been shown

in Exhibit 3-4. Ward number 15, which covers the largest area in the town, has the highest proportion

of population. The population densities for all the wards have also been presented in the Exhibit 3-4. It

is clearly visible that ward no. 6, 7, 11, 12 and 14 are very densely populated wards as compared to

other wards. Map 5 of Annexure 4 shows the location of densely populated wards in the town.

Exhibit 3-4: Demographic Details

Ward No. Population 2011 Population Density (pph)

1 530 5

2 748 11

3 1042 17

4 1027 19

5 513 18

6 533 44

7 520 25

8 566 8

9 1631 11

Page 41: Rehti CDP English

City Development Plan - Rehti 41

Ward No. Population 2011 Population Density (pph)

10 860 18

11 656 29

12 597 26

13 534 7

14 449 28

15 1410 8

Total 11616 2

Source :Census of India (*Provisional population as per Census 2011), Rehti Nagar Parishad and IMaCS

3.6. Issues

As discussed above there are 5 notified slums in the town which inhabit 3391 population of the

town, constituting about 29% of the total population of the town. Therefore it is important to

propose and develop adequate physical and social infrastructure for current and future needs of

the slum population.

A higher proportion of females among the illiterates indicate lower attention paid to female

education.

The population growth rate over the past decade of 2001-2011 has reduced, mainly because of

the less employment opportunities in the town and its surroundings.

3.7. Conclusion

This chapter discussed population growth trend and population density of the town. It was followed by

the analysis of other demographic indicators and ward-wise populations. The chapter ended with

population projections for next 25 years. The next chapter deals with the socio-economic profile of the

town.

Page 42: Rehti CDP English

City Development Plan - Rehti 42

4. Socio Economic Profile of the Town

4.1. Introduction

Socio-Economic profile of a region provides an overview of its social indicators and economy. The

section on Social Indicators includes Sex Ratio, Literacy Rate and Average Household size. This is

supported by the detailed profiling of occupations of population. The economic profile of a town

provides an understanding of its economic base and trade & commerce activities. These indicators for

the region will help in identifying areas that need policy and programmed interventions, setting near

and far-term goals, and deciding priorities.

4.2. Indicators

The social indicators including sex ratio, literacy rate and household size has been presented ward-

wise in the Exhibit 4-1 below.

Exhibit 4-1: Ward Wise Social Indicators

Ward No.

Total Household

Population HH Size

Sex Ratio

Literates Literacy rate (%)

Total Male Female Total Male Female

1 136 530 281 249 3.9 886 442 257 185 83

2 149 748 364 384 5.0 1055 595 307 288 80

3 187 1042 547 495 5.6 905 707 419 288 68

4 203 1027 538 489 5.1 909 684 393 291 67

5 84 513 251 262 6.1 1044 369 194 175 72

6 109 533 267 266 4.9 996 400 222 178 75

7 86 520 270 250 6.0 926 398 226 172 77

8 110 566 298 268 5.1 899 443 251 192 78

9 299 1631 856 775 5.5 905 1190 682 508 73

10 157 860 449 411 5.5 913 522 302 220 61

11 115 656 337 319 5.7 947 459 248 211 70

12 108 597 312 285 5.5 913 459 251 208 77

13 96 534 291 243 5.6 835 392 230 162 73

14 83 449 245 204 5.4 833 330 200 130 73

15 286 1410 747 663 4.9 888 831 484 347 59

Total 2208 11616 6053 5563 5.3 919 8221 4666 3555 71

Source: Census of India (*Provisional population as per Census 2011), Rehti Nagar Parishad and IMaCS

4.2.1. Sex Ratio

Madhya Pradesh‟s sex ratio has increased from 920 in 2001 to 930 in 2011. It is still lower than the

national levels. India‟s sex ratio was 933 in 2001 and has increased to 940 in 2011. If we look at the

sex ratio at district level in last two decades, the encouraging figures are noticeable. The sex ratio has

increased from 898 to 908 and then to 918 in 1991, 2001 and 2011 respectively in Sehore District.

Sex ratio 919 of the town is lower than national levels of 940 and the state levels of 930. Government

of Madhya Pradesh had started some effective schemes and interventions for the welfare of women

which is improving the situation in the state. The schemes that focus on sex-ratio sensitivity is „Ladli

Page 43: Rehti CDP English

City Development Plan - Rehti 43

Laxmi Scheme‟, which is handled by Department of Women and Child Development, Madhya

Pradesh for betterment of sex ratio, education and health status of girl child

Exhibit 4-2 categorizes wards into four categories based on the sex ratio. It can be observed that only

two ward number i.e. 2, 5 have more female population than male population. Sex ratio of 5 wards is

less than 900 which is less when compared to state average (930) or national average (940). A ward

wise sex ratio map is presented in Map 6 (attached in Annexure 4).

Exhibit 4-2: Categorization of Sex Ratio

Sex ratio Number of wards Ward Number

Less than 900 5 1,8,13,14,15

900-950 7 3,4,7,9,10,11,12

950-1000 1 6

More than 1000 2 2,5

Source: IMaCS Analysis

4.2.2. Literacy Rate

The total literate population is 71%. The literacy rate in females is lower than males as visible from

Exhibit 4-1. This can be attributed to low importance attached to female education. The initiation of

centrally sponsored schemes in Education such as District Primary Education Programme, Sarv

Shiksha Abhiyaan and Education Guarantee Scheme at school level had contributed in the increased

level of literacy in the state in last two decades; but the most effective scheme had been „Padhana-

Badhana‟ Movement for literacy by Government of Madhya Pradesh which was started in 1996-97. As

per 53rd round of National Sample Survey (NSS), it was established that there was nearly 11.8%

increase in the rate of literacy of the state from 1991 to 1997, which to some extent was due to

Padhana-Badhana Movement. According to provisional Figures of census 2001, the Literacy rate had

increased from 44.20% to 64.11% which reflected 19.19% increase in literacy rate within a decade.

Other schemes which attributed to increasing literacy rate in last two decades includes up-gradation

of Madarsa‟s scheme, „Free of cost Distribution scheme of text books‟, „Book – Bank Scheme‟, „ Free

of Cost School Uniform Scheme‟, etc.

It can be seen in Exhibit 4-1 that the literacy rate varies from about 59% to 83% in the 15 wards.

Exhibit 4-3 categorizes the wards into three different categories based on the literacy rate. Literacy

rate of 1 ward (15) lies below 60% range. Maximum number of wards (3, 4, 5, 6, 9, 10, 11, 13, 14)

have literacy rate in 60-75% range. Rest 5 wards have literacy rate above 75%. Overall literacy rate of

Rehti is higher as compared to the state‟s literacy rate (70.3%). A ward wise literacy map in presented

in Map 7 (attached in Annexure 4).

Exhibit 4-3: Categorization of Literacy Rate

Literacy Rate Number of wards Ward Number

Below 60% 1 15

60-75% 9 3,4,5,6,9,10,11,13,14

Above 75% 5 1,2,7,8,12

Source : IMaCS Analysis

4.2.3. Household Size

Page 44: Rehti CDP English

City Development Plan - Rehti 44

The town has 2192 households in 2011 and the average household size has lowered down from 5.3.

Ward number 7 has high household size i.e. 6 due to the presence of slum population in the ward.

4.2.4. Workforce participation

As per “Census of India,” Workers have been classified as Main workers, Marginal workers and Non

workers depending on duration of their work months. Another classification has been on the basis of

nature of work performed; Cultivators, Agricultural Laborers, Household Industry Workers and Other

Workers. The details of the workforce for 2001(since the numbers for 2011 are not available) have

been shown in Exhibit 4-4

Exhibit 4-4: Work force Details

S.No. Category Total Percentage

1 Total Population 9742

2 Total Workers 2763

3 WPR 28.4%

1 Main Workers 2362 24

2 Marginal Workers 401 4

3 Non-Workers 6979 72

1 Cultivators 792 14

2 Agricultural Labourers 1276 23

3 Household Industries

Workers 168

3

4 Other workers 3290

60 Source :Census of India, 2001

In 2001, the workforce participation rate of the town was 28.4% which was very low as compared to

national rate of 39% and state rate of 42.7%. Other than this, it is very much observable that around

37% of the workers are involved in agricultural pursuits, which includes both cultivators as well as

agricultural laborers. Workers engaged in other services also account for a large proportion (60%).

Almost 72% of the workers fall under Other Workers category. The type of workers that come under

“Other Worker” category include all government servants, municipal employees, teachers, factory

workers, plantation workers, those engaged in trade, commerce, business, transport banking, mining,

construction, political or social work, priests, entertainment artists, etc. Agriculture and related

activities

Agriculture is a strong economic base in this region. Rehti has a Krishi Upaj Mandi (category C) which

occupies an area of 5.6 hectares. The produce from region is exported to surrounding areas as well

as throughout the state.

4.2.5. Industrial activities

The small and medium forest based enterprise (Rehti SMFE) jointly initiated by Indian Institute of

Forest Management, Bhopal and Forest Development Agency, Sehore in Sehore Forest Division with

financial support from National Afforestation and Eco Development Board, MOEF, GOI was aimed at

conservation of natural resource through improvement in livelihood of collectors. The Rehti Medicinal

and Aromatic Plant unit is a small processing centre for herbal products located at Rehti Range of

Page 45: Rehti CDP English

City Development Plan - Rehti 45

Sehore Forest Division. Raw materials are collected by primary cooperative society members from

nearby forest areas, which are then, after primary processing, are converted into various type of

herbal products at the processing units. The activities identified under Rehti natural resources project

include- training and capacity building of self-help groups in resource augmentation, good collection

and harvesting practices, processing and value addition, quality packaging and production, market

linkages, network and brand building.

4.2.6. Trade and Commerce

About 100 products are manufactured and marketed at Rehti under the brand name of Vindhya

Herbals. Some of the products include Chawayanprash, Amla juice, Tulsi Syrup, Keshraj Tel, Manjan

etc. Agriculture also has a strong economic base in this region. Rehti has a Krishi Upaj Mandi which

covers an area of 5.6 hectares. The produce from region is exported to surrounding areas as well as

throughout the state.

4.2.7. Tourism

Rehti is famous for Salkanpur temple which is located at a distance of 4 kms in the east of town.This

temple is visited by pilgrims throughout the year. The temple caters to lot of tourists during yearly fairs

and festivals.

Sehore Railway Station on the Bhopal-Ujjain rail route caters to the pilgrims coming to this temple.

The nearest major railhead of Bhopal Junction Railway Station is situated to the east of Sehore.

Sehore Bus Station is the nearest bus terminal.

4.3. Issues

Rich natural resource base in the region which has given rise to the manufacturing of herbal

products in Rehti has not been explored optimally.

The average household size is 5.3. It can also be seen that household size is higher than 5 in

wards 3, 4, 9, 10 and 15. These wards are majorly inhabited by slum population in Awas Colony,

Langa Mohalla, Footi Bawri Area, Old Hospital Area and Patwa Colony.

Work participation rate is 28.4% as per census 2001 which is very low as compared with the state

data i.e. 42.7% and national data i.e. 39%.

4.4. Conclusions

This chapter dealt with various aspects of socio-economic profile of the town such as sex ratio,

literacy rate, average household size, work participation rate, socio-economic base and trade &

commerce. The discussion was then followed by an analysis of critical issues in this area. The next

chapter talks about physical planning and growth management in Rehti.

Page 46: Rehti CDP English

City Development Plan - Rehti 46

5. Spatial Planning and Growth Management

5.1. Spatial growth trends

Rehti has recently acquired the status of Nagar Parishad and currently has a population around

11616. It is located on SH 22 which connects Budni (tehsil) and Nasrullahganj, themajor towns in

Sehore district. The state highway passes through the city but 85% of the city has developed towards

the western side of the highway as shown in Exhibit 5-1 . Agriculture is the major source of income in

the town currently; therefore the town is surrounded by large tracts of farmland in its vicinity. The

current growth pattern of the town is towards Salkanpur temple which is located in the north also

connecting Budni. Salkanpur is a major tourist destination in the region forming a tourist circuit along

with Budni rural tourism.

Exhibit 5-1: Google Image of Rehti

Page 47: Rehti CDP English

City Development Plan - Rehti 47

5.2. Spatial distribution of population

There is no development plan for Rehti, therefore the information regarding the distribution of land

use as discussed below is based on our understanding of Rehti Nagar Parishad, its employees and

interviews with the local residents. The town spreads over 9.28 sq.km.. It is visible from the Map 5

(Annexure 4) that the town‟s old areas are more densely populated and congested.

Ward no. 3, 4, 9, 10, 15 are densely populated as these are slum areas.

Exhibit 5-2: Ward Wise Population Density

Ward No. Ward Population Population Density (pph)

1 530 5

2 748 11

3 1042 17

4 1027 19

5 513 18

6 533 44

7 520 25

8 566 8

9 1631 11

10 860 18

11 656 29

12 597 26

13 534 7

14 449 28

15 1410 8

Total 11616 2

Source: Census of India, 2011 (Provisional Data) and IMaCS’ analysis

Map 3 (Annexure 4) shows the municipal level map and a base map with major landmarks of Rehti.

The town has 15 wards and delineation of wards has been shown in Map 4 (Annexure 4).

5.2.1. Municipal level mapping

Figure below Map 3 Annexure 4 shows the municipal jurisdictional area limits of Rehti Nagar

Parishad, its landmarks, linkages within the town and various facilities of the town. It can be seen that

the state highway plays a major role in the city. The State Highway acts as the main artery for

connecting to different towns.

Land-use analysis

Master plan for the town is not yet prepared. The existing land use pattern of Rehti (Exhibit 5-3)

shows that 30 percent of the total area of Nagar Parishad is coming under Agricultural use. The

developed land consisting of residential, roads and institutional areas is almost equal to remaining

70%. The broad tentative existing land use of the town has been represented in Map 8 (Annexure 4).

The broad land use pattern shows that the institutional area consisting of mainly administrative

buildings are along arterial road of the town.

Page 48: Rehti CDP English

City Development Plan - Rehti 48

Exhibit 5-3: Land use Pattern

S. No Land use category Area (Ha) Percentage Overall Percentage

1 Residential 324.8 50 35

2 Commercial 97.44 15 10.5

3 Transportation 129.92 20 14

4 Institutional 64.96 10 7

5 Parks/ Playgrounds 32.48 5 3.5

Developed Area 649.6 100.0

6 Agriculture 278.4 100 30

Undeveloped 278.4 100.0

Total 928 100.0 Source: Land records and Revenue Department, 2011

5.3. Housing scenario

5.3.1. Present and future Housing demand

The average household size of the town is 5.3, therefore the future demand of houses has been

calculated after every ten years as shown below in Exhibit 5-4. It is seen that number of houses are

2192 in year 2011 would reach 3855 by the year 2035.

Exhibit 5-4: Future Housing Demand

2011 2015 2025 2035

Population 11616 12778 16182 20431

No. of Houses 2192 2411 3053 3855

Source: IMaCS Analysis

5.3.2. Illegal colonies

With increase in land values, the development of unauthorized colonies has been observed in the

town. Agricultural cultivators are sub-dividing their agricultural land and selling them for construction

of houses. Since there are no permissions from the local body to commence this construction and

change the use of the land, the basic facilities and urban services are negligible in these areas

leading to degraded condition in these areas. This phenomenon has resulted in the development of

slums in few wards of the town. 5 slums namely Awas Colony in ward 3, Langa Mohalla in ward 4,

Footi Bawari Area in ward 9, Old hospital area in ward 10 and Patwa colony in ward 15 have been

notified.

5.3.3. Future growth possibilities

The town has been expanding along the state highway and is expected to further grow at a much

higher rate towards Salkanpur. As the population grows in the town, it is expected that the process of

sub-divisions and selling plots would increase due to rising land values, and more residential

development would take place in southern part of the old town and northern part of the Mandi. This

area is good for habitation but it needs support infrastructure for sustaining good quality of life. The

Page 49: Rehti CDP English

City Development Plan - Rehti 49

broad estimated land use has been shown in Map 9 (Annexure 4), which represents the future growth

of the town spatially.

The people and officials feel that their expansion has suffered because of no major source of

employment other than agriculture. Thus, in the past few years, Rehti has missed on the opportunity

for further development and employment generation. Rehti has Salkanpur temple which is a major

tourist destination and thereby provides a great opportunity for economic development. The existing

herbal manufacturing unit has also not developed to its potential.

5.4. Issues

The population densities in the core area are substantially high and are near to the permissible

limits as prescribed in the UDPFI guidelines as compared to other wards. Initiatives should be

taken for provision of infrastructure facilities in core wards in order to cater to maximum number

of residents.

The irregular and unorganized development in the town has increased and has degraded the

quality of life. There is a need to prepare a master plan for regulated land development and

proper management and development of the town.

5.5. Conclusions

This chapter dealt with the spatial growth trend and past trend on Rehti‟s expansion in its existing

state. The ward maps and land use pattern and housing scenario have also been discussed in detail.

The chapter ended with a brief note about the growth possibilities.

Page 50: Rehti CDP English

City Development Plan - Rehti 50

6. City‟s Infrastructure – Existing Status, Gaps, Issues,

SWOT, Goals and Strategies

This chapter deals with the current status of various components of city infrastructure and services

provided by the Rehti Nagar Parishad. Various sectors/services have been analyzed in accordance

with the methodology mentioned below. Sectors / Services identified for the analysis have been

classified into following categories:

Water supply

Sewerage and Sanitation

Solid waste management

Drainage

Traffic and Transportation

Street Lighting and Fire Fighting

Urban Poor and their accessibility to basic services

Health

Education

Environment

Heritage and Conservation

Institutional Framework

6.1. Water supply

Rehti Nagar Parishad is primarily responsible for providing proper water supply in Rehti. Currently

water is being supplied in the Rehti Municipal area by tube wells. There are 8 tube wells and 1 open

well out of which 4 tube wells have a diameter of 200 mm and the remaining have a diameter of 150

mm. Babar River is the only surface water source in the vicinity of Rehti, situated at a distance of 2.3

kms

6.1.1. Source, Supply, Distribution Systems and Treatment facilities

The total installed capacity of water supply system based on the above sources is 500 KL and taking

20% transmission losses, the average water supplied is only 43 lpcd as compared to 135 lpcd as per

the standards prescribed. Given the quantity of water supplied in the town is low; the distribution

system and storage facility of water in the city is not adequate. There are no treatment plants;

therefore bleaching powder is added to the underground water for disinfection. The pressures in the

water distribution lines is also low, thereby creating problems at the consumer end.

Source

River Babar flows almost adjoining to Rehti and hence it has been adopted as a major source of

augmentation of water supply scheme. The river originates from the nearby hills and has an

approximate catchment area of 25 sq kms. It is a non-perennial river and therefore a storage structure

in the form of annicut near the causeway on Nasurallahganj road approximately at a distance of 5

kms from Rehti has been constructed.

Storage

Water is pumped to overhead reservoirs having a capacity of 300000 liters at bus stand and OHT

having a capacity of 90000 liters at Awas colony. There are five pumps of of 5HP and 7.5HP.

Page 51: Rehti CDP English

City Development Plan - Rehti 51

6.1.2. Water Supply Connections

Exhibit 6-1: Water Supply Connections

Water Supply Connections Number

Domestic Connections 500

Commercial Connections 5

Public Taps 60

Total 565

Source: Rehti Nagar Parishad

As per the discussions held with Rehti Nagar Parishad it is seen that there are total 565 water supply

connections, out of which 88% are domestic connections and 11% are public taps and 1% are under

commercial connections. Refer Exhibit 6-1 and for distribution of water supply connections. It is also

observed that there is a flat tariff of Rs. 50 for domestic connections, Rs. 75 for non-domestic

connections and Rs. 600 for a new connection. The DCB statement in Exhibit 6- indicates the

average current collection performance to be 53 %, whereas overall collection performance including

arrears is 26 %...

Exhibit 6-2: DCB Statement for Water Tax Collection

S. No Demand/ Collection 2006-07 2007-08 2008-09 2009-10 2010-11

A Demand (Rs in Lakh )

Arrears - 2.50 3.10 2.20 4.40

Current - 2.77 3.20 2.10 4.20

Total Demand - 5.27 6.30 4.30 8.60

B Collection (Rs in Lakh )

Arrears - 0.70 0.89 0.44 1.20

Current - 2.10 2.30 2.40 2.60

Total Collection - 2.80 3.19 2.84 3.80

C Balance (Rs in Lakh ) - 2.47 3.11 1.46 4.80

Collection Performance - % arrears - 28 29 20 27

Collection Performance - % Current - 76 72 114 62

D Collection Performance - % - 53 51 66 44

6.1.3. Water Table Analysis

Sehore district forms a part of Malwa plateau with an undulating topography. The geological strata of

the district comprise of three different formations namely; vindhayan formation, alluvium and Deccan

trap. About 85% of the area in the district is occupied by Deccan trap, 10% by alluviam and the

remaining 5% by vindhyan formation in Sehore district. Sehore district has 5 blocks namely Sehore,

Budni, Nasurallahganj, Ichhawar and Ashta.

As per the ground water booklet on Sehore district by Central Ground water board, a major portion of

Budni block falling under south eastern part of district is covered with Vindhayan formations which

comprise of sandstone, shale, quartzite and breccia. These formations are generally poor aquifers but

when they are subjected to weathering and jointing, they become moderately yielding aquifers. The

depth to water level in this formation varies from 4.85m to 9.50m bgl and season water level

Page 52: Rehti CDP English

City Development Plan - Rehti 52

fluctuation ranges from 0.85m to 3.0 m. The yield of wells in this formation varies from 1 to 3 lps.

Major portion of alluviam occurs along narmada river falling in Budni block and small linear patches

occur along parbati river in the western side of the district. It majorly consists of clay, sand, silt, gravel

and pebbles. The yield of wells in this formation varies from 5 to 10 lps. The remaining portion in the

district falls under Deccan trap formation which covers 85% of the total area of district. The yield of

wells in this formation varies from 1 to 5 lps.

The quality of ground water in the district has been assessed by central ground water board by

analyzing ground water samples in the district. From the samples it is observed that PH values of all

water samples vary between 7.27-8.07 which shows alkaline nature of the water in the district.

Ground water in the district is generally low to high saline as electrical conductivity varies from 465 to

2100. Highest EC values (exceeding 1000) have been found in Ashta (2100) and Bhikhileri (1830)

villages. Nitrate level in Sehore district varies from 5.6 to 358 mg/l. The concentration of nitrate

exceeding 45 mg/l has been found in Ashta (358 mg/l), Bhaya (59 mg/l) and Jattakheda (51 mg/l).

The excessive concentration of nitrate levels may be due to localized pollution or excessive use of

fertilizers in the district. The hardness of ground water in the district has been found safe except in

Ashta (705) which crosses the limit of 600 as per BIS standards. The study also analyzed that the

district has no problem with the fluoride since all wells have fluoride less than 1.5 ppm. No arsenic

content has been detected in the ground water of the district.

6.1.4. Present and Future Demand and Supply Gaps

Exhibit 6- summarizes the current status and Demand-Supply Gap analysis for Water supply service

provided by Rehti Nagar Parishad. It also provides a snapshot of comparative analysis of existing

level of service with level of service desired under the Urban Development Plans Formulation &

Implementation (UDPFI) guidelines.

Exhibit 6-3: Water Supply: Demand and Supply Gap Analysis

Existing and

Desired Level

Service Gap by Year

2015

Service Gap by

Year 2025

Service Gap by

Year 2035

Service

Head Indicator

Existing

Level

Desired

Level

Existing

(2011)

Demand

– 2015

Gap -

2015

Demand

– 2025

Gap -

2025

Demand –

2035

Gap -

2035

Source

Augmentati

on

Daily per

capita

Supply

43 135 0.5 1.72 1.22 2.18 0.46 2.76 0.57

Treatment

capacity

%

Treatment

Capacity

0 100 0 1.72 1.72 2.18 0.46 2.76 0.57

Distribution

Network

I.D as %

of Road

Length

80 85 11.6 19.01 7.41 24.07 5.06 30.39 6.32

Page 53: Rehti CDP English

City Development Plan - Rehti 53

Existing and

Desired Level

Service Gap by Year

2015

Service Gap by

Year 2025

Service Gap by

Year 2035

Service

Head Indicator

Existing

Level

Desired

Level

Existing

(2011)

Demand

– 2015

Gap -

2015

Demand

– 2025

Gap -

2025

Demand –

2035

Gap -

2035

Elevated

Storage

capacity

w.r.t.

Supply

% ESR

Capacity

to Water

Supplied

78 33% 0 327 327 444 113 581 141

Source: IMaCS Analysis

It is evident from the Exhibit above that Rehti needs a major revamping in “Water Supply” sector as

current level of service, 43 lpcd, fails to full fill the current demand of the town. The huge gap in the

water supply area by the year 2015 well underscores the above point. By the end of year 2035, Rehti

would require 2.18 MLD of water i.e. an addition of around 0.46 MLD to the capacity in year 2015.

Rehti also falls behind in meeting the standards of UDPFI guidelines in the area of storage capacity

w.r.t. supply. The town also requires a treatment plant to treat the raw water.

6.1.5. SWOT analysis

Strengths

Nearness to Babar River which is at a

distance of 2.5 kms from Rehti.

Opportunities

Metered connections could be a major

source of revenue to the municipality

Improvement in the level of service by

augmenting daily supply of water and

storage capacity.

Installation of treatment plants to improve

the quality of drinking water.

Weaknesses

Poor maintenance of water supply

infrastructure

20% of water is getting wasted on supply

and transmission

Lack of proper water treatment facilities

Lack of continuous(24X7)

supplyUnmetered water connections

Threats

Wastage of water in terms of supply and

transmission could result in economic loss

to the municipality.

Dependence on Tube-wells for water

supply leads to exploitation of underground

water.

Unwillingness of users to pay water

charges.

6.1.6. Issues

Lack of water treatment plant in the town.

Unmetered water connections in Rehti

Page 54: Rehti CDP English

City Development Plan - Rehti 54

Rehti has 15 wards with a population of 11616 in 2011, and as per the guidelines 135 lpcd of

water is required but in Rehti only 43 lpcd is available, thus creating a huge gap between the

demand and supply of potable water in the town.

The water augmentation scheme implemented is not satisfactory as the water demands of the

people are not catered adequately.

6.2. Sewerage

As envisaged in the 12th schedule of 74

th Amendment to the Constitution of India, responsibility of

providing services pertaining to sewerage and sanitation within the city limits lie with ULBs.

6.2.1. Existing sewerage system

There is no sewerage system existing in Rehti.. Hence the sewage flows along with the storm water

into the nallahs and get accumulated in the low lying areas creating unhygienic living conditions for

the local residents. As per the standards, approximately 80% of the water supplied to the town comes

out as sewage which is almost 0.4Million Litres.

6.2.2. Present and Future Demand and Supply Gaps

Exhibit 6-4: Sewerage: Demand and Supply Gap Analysis

Existing and

Desired Level Service Gap by Year 2015

Service Gap by Year 2025

Service Gap by Year 2035

Service Head

Indicator Existing

Level Desired Level

Existing (2011)

Demand - 2015

Gap - 2015

Demand – 2025

Gap -2025

Demand – 2035

Gap - 2035

Population Coverage

% Population covered by UGD

0% 100 - 12,778 12,778

16,182 3,405

20,431

4,249

UGD Network

% Sewer to Road Length

0% 90 - 20.12 20.12

25.49 5.36

32.18

6.69

Treatment Capacity

% Treatment Capacity

0% 100 - 1.38 1.38

1.75 0.37

2.21

0.46

Source: IMaCS Analysis

The above Exhibit 6- summarizes the current status and Demand-Supply Gap analysis for Sewerage

& Sanitation provided by Rehti Municipality. The Exhibit also provides a snapshot of comparative

analysis of existing level of service with level of service desired under the Urban Development Plans

Formulation & Implementation (UDPFI) guidelines.

6.2.3. SWOT analysis

Strengths Increased awareness among the

stakeholders for the improvement of

sanitation facilities.

Opportunities Provision of better services to slum and by

improving the sanitation facilities of the city.

Tertiary treatment of the sewage water and

re-using for the municipal purposes can be

explored.

Page 55: Rehti CDP English

City Development Plan - Rehti 55

Weaknesses Lack of maintenance and absence of timely

cleaning of free public conveniences

renders them unusable for significant

amount of time.

Threats Improper usage of public conveniences

would leave these facilities unusable and

would require more maintenance.

Overflow of untreated sewage from

households are mixing with storm water

drainage system resulting pollution.

6.2.4. Issues

There is no sewerage network in the town.

Sewage flows along with the storm water into the nallahs and hence causes choking of nallahs

and drains and ultimately polluting them.

As per the prescribed standards, there should be 100% population coverage with sewerage

network, but as per the existing situation there is no sewerage network in the town.

Untreated sewage flowing through the nallahs lead to unhygienic conditions in the town.

6.3. Sanitation

Like sewerage, in the 12th schedule of 74th Amendment to the Constitution of India the responsibility of

providing services pertaining to sanitation within the city limits lie with the ULBs.

6.3.1. Community toilets

After the discussions held at Rehti Nagar Parishad, it is observed that there is 1 public convenience in

Rehti with 15 seats on pay and use basis. According to city sanitation survey conducted by MPUADD,

there are 1337 individual toilets, 1285 septic tanks and only 1 community septic tank in Rehti. It is

also noticed that about 14% of the total population uses open defecation due to poor sanitation

facilities in the town.

Sanitation Number

No. of Individual toilets 1337

No. of Septic tanks 1285

Community Septic Tanks 1

% age of Open defecation in

the town 14%

Source: City Sanitation Survey, MPUADD

Rehti Nagar Parishad has developed many Public Toilets/Conveniences which are located at various

key locations in the city. The primary purpose of these Public Toilets is to serve the Floating

Population. However, these Public Toilets are also used by members of those households which lack

an in-house Sanitation facility. But a significant portion of the households which lack an in-house

sanitation facility also resorts to open defecation.

6.3.2. Present and Future Demand and Supply Gaps

Public toilets are also inadequate at an existing persons per seat , against 60 people as standard. The

exhibit also provides a snapshot of comparative analysis of existing level of service with level of

Page 56: Rehti CDP English

City Development Plan - Rehti 56

service desired under the Urban Development Plans Formulation & Implementation (UDPFI)

guidelines. By year 2035 public convenience having 57 seats would be required as shown in the

Exhibit 6- below.

Exhibit 6-5: Sanitation: Demand and Supply Gap Analysis

Service head

Existing/ desired level Service Levels, Demand and Gaps

Indicator Curre

nt level

Desired level

By Year

2015 By Year

2025 By Year

2035

Existing

(2011)

Demand

Gap

Demand

Gap

Demand

Gap

Public Conveniences

Slum Population per Seat of Pub. Convenience

226 60 15 57 42 57 - 57 -

Source: IMaCS Analysis

6.3.3. SWOT Analysis

Strengths

There is awareness amongst people regarding requirement of sanitation facilities.

Opportunities Provision of better services to slum

population by improving the sanitation

facilities of the city would improve the

overall health and the environment.

Weaknesses Slum Population per Seat of Public

Convenience is around 226 against the

UDPFI norm value of 60.

Lack of maintenance and absence of timely

cleaning of free public conveniences renders

them unusable for significant amount of time.

Threats Improper usage of public conveniences

would leave these facilities unusable and

would require more maintenance.

Overflow from septic tanks and from the

houses are mixing with storm water drainage

system resulting into surface water pollution.

6.3.4. Issues

Non-availability of municipal water supply in the vicinity has also affected the use of individual

toilets. The city does not have sufficient facilities of sanitation at the public places. There is

need to provide sanitation facilities at the market places

Public level sanitation facilities for women are grossly lacking in the city.

6.4. Solid Waste Management

As per the information available there are approximately 1710 residences, 500 commercial

establishments, 450 trade & commerce, 1 hospital and 15 public/ semi-public settlements, 200

government establishments in the city. Solid waste generated from these settlements is collected

daily and disposed of at demarcated vacant space in every ward. Garbage from here is collected in

vehicles and transferred to the compost point which is at a distance of 3 km from the city. Area under

Page 57: Rehti CDP English

City Development Plan - Rehti 57

the compost trench is approximately 5 acres. Rehti Nagar Parishad constitutes a committee for

cleanliness of the town under the councilors.

As per the data available, it is seen that 3 metric tonnes of waste is generated and collected per day.

About 1.5 tons of waste is generated from commercial markets and the remaining 1.5 tons is

generated from residential premises. There are 15 dustbins each having a capacity of 0.5 tonne. 2

tractor trolleys having a capacity of 0.5 tonne are used by the ULB for collecting and disposing

garbage. They make 4 trips per day covering a distance of 3 km (one side) in each trip. 15 pushcarts

are also used for collection of garbage at source.

6.4.1. Present and Future Demand and Supply Gaps

Exhibit 6-6: Solid Waste Management: Demand and Supply Gap Analysis

Existing and

Desired Level Service Gap by Year 2015

Service Gap by Year 2025

Service Gap by Year 2035

Service Head

Indicator

Existing Level

Desired Level

Existing (2011)

Demand - 2015

Gap - 2015

Demand –

2025

Gap -2025

Demand – 2035

Gap - 2035

Waste Generated

In grams/ person

213 250 3 3.05 3.89 4.92

Primary Collection

Push Carts/ Trolleys

15 15 16 1 18 2 22 4

Community Bins

15 15 6 8 0 10 0

Secondary Collection

Tractors

0 0 3 3 3 1 3 1

Disposal Landfill Site

5 - 5 0.22 0 0.86 1.68

Source: IMaCS Analysis

The above Exhibit 6- shows that the quantity of waste generated per capita is within the prescribed

limits. As per the standards waste generated per capita should be up to 250 grams whereas the

quantity of waste generated per capita in Rehti is 213 grams. But it is also seen that in the coming

years as the town would develop, the amount of waste generation would increase and exceed the

prescribed standards. As per the above table garbage generated per capita would be 3.89 tons by

2025, hence it is necessary to fulfill the gaps which would be created in future. It is also seen that as

per the standards, there should be adequate number of wheel barrows/ handcarts for collecting waste

from 100% of the households. But from the table above it is clear that the demand of these handcarts

would also increase and there would be a gap of 1 hand cart by 2015 which would raise to 2

handcarts by 2025 and 4 handcarts by 2035. It is also observed that a gap of 3 tractor trolleys used

for transferring garbage to compost site will be created by the year 2015. The Exhibit above also

gives an idea regarding the standards prescribed by UDPFI guidelines and CPHEEO guidelines

6.4.2. SWOT analysis

Strengths

Sufficient waste collection capacity

Potential for income generation through

processing solid waste

Opportunities

Existing infrastructure can be utilized in an

effective manner.

Private participation could be explored for

Page 58: Rehti CDP English

City Development Plan - Rehti 58

revenue generation and best usage of

waste.

Weaknesses

Lack of primary collection

Un hygienic waste disposal system

Several places of the city are not provided

collection bins leaving no options with

residents to dispose domestic waste but

throw it in open.

Threats

Failure of maintenance of extra capacity

can result in loss of capacity

Negligence from citizens can prove all

efforts of municipality futile

Drains and nallahs are getting polluted by

disposal of waste

Health hazards for the people due to

insufficient collection and open incineration.

6.4.3. Issues

Less number of garbage collection points and less number of dustbins.

Garbage generated would be 3.05 tons by 2025; hence it is necessary to fulfil the gaps which

would be created in future.

A gap of 1 tractor trolleys used for transferring garbage to compost site will be created by the

year 2015.

There are 15 dustbins in Rehti for garbage collection; the gap is expected to rise by the years

2025 and 2035.

6.5. Drainage

6.5.1. Existing drainage system

The total length of drains in Rehti is only 19 km. The town has open drains out which 12.5 km are

Pucca drains and 6.5 km are Katcha drains. There are no closed drains in the town. There is a need

to plan a proper storm water drainage system for the entire city. Talia (low lying area) in ward 7 has

been filled with mud to stop flooding of the surrounding areas.

6.5.2. Present and Future Demand and Supply Gaps

Exhibit 6-7: Drainage: Demand and Supply Gap Analysis

Existing and

Desired Level Service Gap by Year 2015

Service Gap by Year 2025

Service Gap by Year 2035

Service Head

Indicator Existing Level

Desired Level

Existing (2011)

Demand - 2015

Gap - 2015

Demand -

2025

Gap -2025

Demand -

2035

Gap - 2035

Road Length Covered with Drains

131 130 19 29.07 10.07 36.81 7.75 46.48 9.67

Network Type

% of Kutcha Open

34 0 6.50 - (6.50) - - - -

Page 59: Rehti CDP English

City Development Plan - Rehti 59

Existing and

Desired Level Service Gap by Year 2015

Service Gap by Year 2025

Service Gap by Year 2035

Service Head

Indicator Existing Level

Desired Level

Existing (2011)

Demand - 2015

Gap - 2015

Demand -

2025

Gap -2025

Demand -

2035

Gap - 2035

% of Pucca open

66 33 12.50 9.59 (2.91) 12.51 2.56 15.34 3.19

% of Pucca closed

0 67 0 19.48 19.48 24.67 5.19 31.14 6.48

Up gradation

Kutcha open to Pucca open

- - - - - - - - -

Kutcha Open to Pucca Closed

- - - - 6.50 - - - -

Pucca Open to Pucca Closed

- - - - 2.91 - - - -

New Formation

Pucca Open Drains

- - - - - - 2.56 3.19

Pucca Closed Drains

- - - - - - - - -

Source: IMaCS Analysis

The above Exhibit 6- summarizes the current status and Demand-Supply Gap analysis for Drainage

network provided by Rehti Nagar Parishad. It also provides a snapshot of comparative analysis of

existing level of service with level of service desired under the Urban Development Plans Formulation

& Implementation (UDPFI) guidelines.

6.5.3. SWOT analysis

Strengths

Presence drainage system in some parts of

the town.

Opportunities

Development of an integrated drainage

network to support the increasing

population of the city

Strengthening of existing drains to avoid

floods

Weaknesses

Encroachments of natural drains

Mix of sewage and solid waste in the drains

Low capacity of existing drains.

Lack of maintenance leading to clogging of

natural drains

Threats

Encroachments and improper maintenance

of existing drains resulting floods every

year

Mix of sewage and solid waste resulting in

polluting the environment

Page 60: Rehti CDP English

City Development Plan - Rehti 60

6.5.4. Issues

The existing drainage system needs a major revamping, as it is badly dilapidated and

encroached at many places.

Efforts should be made to develop a new drainage system.

All the existing drains should be properly cleaned at regular intervals to avoid flooding during

monsoons.

Efforts should be made to stop encroachment of the existing drains.

Awareness programs to be conducted for local citizens to prevent garbage dumping in open

drains.

6.6. Traffic and transportation

6.6.1. Existing traffic & transportation scenario

Total length of roads in the city is approximately 14.5km, out of which 8.5 km is concrete road; 1 km

water bound macadam, 2km earthen roads and the remaining 3 km under others. The roads in

general are narrow and lack in maintenance.

According to the visual survey, it is observed that the pavement conditions are not satisfactory. There

are potholes on almost all the roads and pavements which require immediate attention. The road

width is also found to be very less due to encroachment on the roads. Presently, the domestic waste

water and rainfall runoff flows over the road and in the absence of any proper slope and drainage the

water accumulates over the pavement which effects the pavement very badly. Refer Map 6 in

Annexure 5. Total number of estimated vehicles is approximately 742. (Total number of vehicles in

the urban areas in Sehore district is 2, 48,371 as per RTO, Sehore)

6.6.2. Present and Future Demand and Supply Gaps

Exhibit 6-8: Traffic & Transportation: Demand and Supply Gap Analysis

Existing and

Desired Level Service Gap by Year

2015 Service Gap by Year 2025

Service Gap by Year 2035

Service Head

Indicator Existing

Level Desired Level

Existing

(2011)

Demand - 2015

Gap - 2015

Demand - 2025

Gap -2025

Demand - 2035

Gap - 2035

Road Type

Concrete (%) 59 30 8.50 6.71 - 8.50 1.79 10.73 2.23

Black Top (%) 0 70 - 15.65 15.65 19.82 4.17 25.03 5.20

WBM (%) 7 0 1.00 - - - - - -

Cut Stone/ Earthen/Others (%)

34 0 5.00 - - - - - -

Improvements

BT to concrete - - - - - -

WBM to BT - - 1 - - - -

Earthen to BT - - 5 - - - -

Page 61: Rehti CDP English

City Development Plan - Rehti 61

Existing and

Desired Level Service Gap by Year

2015 Service Gap by Year 2025

Service Gap by Year 2035

Service Head

Indicator Existing

Level Desired Level

Existing

(2011)

Demand - 2015

Gap - 2015

Demand - 2025

Gap -2025

Demand - 2035

Gap - 2035

New Formation

Concrete - 1.19 1.49

Black Top 9.65 4.77 5.95

Source: IMaCS Analysis

Exhibit 6- summarizes the current status and Demand-Supply Gap analysis for Traffic and

Transportation provided by Rehti Nagar Parishad. Exhibit 6- also provides a snapshot of comparative

analysis of existing level of service with level of service desired under the Urban Development Plans

Formulation & Implementation (UDPFI) guidelines.

6.6.3. SWOT analysis

Strengths

Well-connected as the State Highway

passes through the city.

Lies close to the tourist circuit route of

Budni- Bhimbetka.

Opportunities

Development of alternate routes to explore

tourism opportunities in the town.

Development of Parking lots in Salkanpur

temple, can become an important source of

revenue for the Nagar Parishad

Weaknesses

Huge gap in the existing level of service.

Excessive movement of heavy vehicles on

the main artery of the city

Several incidences of encroachments have

reduced the effective width of city roads

Lack of pathways and bicycle tracks

Lack of organized parking lots at Salkanpur

temple.

Threats

Unregulated growth of encroachments

6.6.4. Issues

No rail connectivity

Lack of parking spaces at Salkanpur temple and market areas lead to reduction of road width

Excessive encroachments on road also reduce the effective road width.

Traffic congestion in the market areas.

Lot of roads within the city are unpaved and hence are not suitable for vehicular movement

6.7. Street lighting and Fire fighting

6.7.1. Existing situation of Street lights

Page 62: Rehti CDP English

City Development Plan - Rehti 62

As per the information received, there are total 305 street lights. Out of which 5 are high mast lamps,

250 mercury vapour lamps and 50 sodium vapour lamps. Rehti also has a facility of Firefighting

service which is also used to serve the surrounding areas. Though there is not a separate fire station,

the fire vehicle is parked in the police station, Rehti.

6.7.2. Present and Future Demand and Supply Gaps

Exhibit 6-9: Street Lights: Demand and Supply Gap Analysis

Existing and

Desired Level Service Gap by Year

2015 Service Gap by

Year 2025 Service Gap by

Year 2035

Service Head

Indicator Existing Level

Desired Level

Existing (2011)

Demand - 2015

Gap - 2015

Demand - 2025

Gap -2025

Demand - 2035

Gap - 2035

Additional street light poles

Average Street Light Spacing

48 30 305 745 440 944 80 1192 179

Tube Light Tube Lights (%)

0 75 - 559 559 708 149 894 186

High Power Lamps (%)

98 25 300 186 - 236 298

New Installation

Tube Lights 559 149 186

High Power

Underground Cabling (Replacement and new)

13.20 2.40 5.37

Source: IMaCS Analysis

Exhibit 6-9 summarizes the current status and Demand-Supply Gap analysis for street lights provided

by Rehti Nagar Parishad. It also provides a snapshot of comparative analysis of existing level of

service with level of service desired under the Urban Development Plans Formulation &

Implementation (UDPFI) guidelines.

6.7.3. SWOT analysis

Strengths

Existing base can be utilized to provide a

uniform coverage throughout the city.

Opportunities

Halogen lamps and tube lights can be

replaced by CFL to reduce the electricity

consumption

Weaknesses

Current level of service is 48 meters which

is not adequate as compared to the UDPFI

guidelines.

Threats

Lack of maintenance can degrade the

existing infrastructure

Illegal connections would result high

percentage of power bills.

6.7.4. Issues

Page 63: Rehti CDP English

City Development Plan - Rehti 63

As the responsibility of laying lampposts and their electrification lies with M.P. State Electricity

Board, there arises an institutional gap between the planning and implementation of installation

of new street lights.

Power saving street lights should be encouraged.

6.8. Urban poor and their accessibility to basic Services

Rehti has 5 slum notified areas which have been covered under Integrated Housing and Slum

Development Program. The selected slums include Awas colony, Langa Mohalla, FootiBawari area,

Old Hospital area and Patwa colony. Refer Exhibit 6-1 and Map 8 in Annexure 5

Exhibit 6-10: List of Notified Slum Colonies

Name of the Ward (Ward

No) Name of the Slum

Total ward Population

Slum Population (Beneficiaries)

Total Area of Slum Pocket (sq.

Km.)

3 Awas Colony 931 620 1.33

4 Langa Mohalla 912 610 0.75

9 FootiBawari Area 829 189 0.78

10 Old Hospital Area 628 265 0.65

15 Patwa Colony 913 615 1.50

Total 4213 2299 5.01

Source: Project Report on Integrated Housing and Slum Development Program for Rehti Nagar Parishad

As per the project implementation strategies, it has been proposed that the population belonging to

slums will be resettled in two rooms with tap water facilities, attached toilet and bath; electrification

etc. Kutcha houses have been identified and are being relocated near Patwa colony. The allotment of

houses will be done on lease basis of 30 years. For the families, migrated and accumulated after the

period, their genuinity should be verified by valid ration card and voter card. The intenders for

allotment of housing unit will be done only to those families who have been residing in the settlement

before the specified cut of date.

6.8.1. SWOT analysis

In the slums, the level of service for various services is similar to that in the rest of the city. SWOT

analysis of services in the slums would be similar to the individual SWOT analysis carried out under

the sections various sections of Chapter 6.

6.8.2. Issues

The existing infrastructure of the slum area is very poor

There is lack of awareness about the slum development schemes and programs announced by

the state and central government.

The slums in Rehti are located in the wards abutting the state highway.

6.9. Social infrastructure

6.9.1. Overall Health facilities in the town

There is one primary health centre with 16 beds and a separate Prasuti greh with 14 beds in the town

which caters to the needs of the people. There are private clinics also for providing health services in

the town. Refer Exhibit 6- and Map 7 in Annexure 5

Page 64: Rehti CDP English

City Development Plan - Rehti 64

Exhibit 6-11: Health Infrastructure: Demand and Supply Gap Analysis

Existing and

Desired Level Service Gap by Year

2015 Service Gap by Year

2025 Service Gap by Year

2035

Service Head

Existing Level

Desired Level

Existing (2011)

Demand - 2015

Gap -

2015

Demand -

2025

Gap -2025

Demand -

2035

Gap - 2035

Government Hospital

30 50 - 2.74 - 2.66 - 2.69 -

Nursing Home

0 3 - 9 9 11 2 14 3

Dispensary 0 1 1 1 - 1 - 1 - Source: IMaCS Analysis

6.9.2. Overall Educational facilities in the town

The town has a total of 34 educational institutions; out of which 13 are government institutions and

remaining 21 are private institutes. Out of the government institutions there are 6 primary schools, 3

middle schools and 3 higher secondary schools each and 1 Government College. Refer Exhibit 6-1

and Map 7 in Annexure 5

Exhibit 6-12: Educational Facilities: Demand and Supply Gap Analysis

Existing and

Desired Level Service Gap by Year 2015

Service Gap by Year

2025

Service Gap by Year

2035

Service

Head

Existing

(2011)

Desired

Level

Demand -

2015

Gap -

2015

Demand -

2025

Gap -

2025

Demand -

2035

Gap -

2035

Primary 6 2500 5 0 6 1 8 2

Middle 3 5000 - - - - - -

H. Sec 3 7500 - - - - - -

College 1 100000 - - - - - -

Source: IMaCS Analysis

6.9.3. Issues

The town lacks adequate health infrastructure, there is only 1 community health centre in Rehti, and

so people have to rush to Bhopal for medical treatments during emergencies.

6.9.4. Recreational

In addition to Education and Health infrastructure, there are not many socio-cultural facilities which

form an indispensable part of Social Infrastructure of a city. Some of the socio-cultural facilities in

Rehti are community hall, dusshera ground.

6.9.5. SWOT Analysis

Page 65: Rehti CDP English

City Development Plan - Rehti 65

Strengths

Initiatives towards developing socio-cultural

facilities

Opportunities

Development of new facilities supported by

an up-gradation/improvement of existing

facilities will help in an overall development

of the region.

Weaknesses

There are no playgrounds in the town for

children

Lack of vacant land for development of

recreational spaces

Threats

Lack of funds can derail the much needed

up-gradation and addition of capacity to the

existing fleet.

Lack of maintenance can degrade the

existing infrastructure.

6.9.6. Issues

Lack of sufficient parks or green spaces

Lack of sports facilities like auditoriums, grounds etc

6.10. Local Economy

Rehti‟s economy largely depends on agriculture and manufacturing of herbal products. The land is

quite fertile here and farmers have plenty of water available throughout the year in form of river Babar

and adequate monsoons .Krishi Upajmandi in Rehti supports the crop yield and imports the produce

to the nearby and surrounding regions including the state of Madhya Pradesh and Maharashtra. The

town is also surrounded by forest area from where raw material is collected for manufacturing herbal

products in Rehti and its surrounding areas.

Rehti is very close to Salkanpur temple which attracts lot of tourists throughout the year. Hence

tourism is also one of the potential sources of income in the town, though it is not exploited

completely, it can be explored to increase the revenue generation of the town.

6.10.1. Issues

Failure to tap opportunities to rejuvenate the local economy

Underdeveloped markets

Immature industrial base

Underdeveloped facilities for Pilgrims

6.11. Heritage and Conservation

6.11.1. Tourism potential of the town

Rehti is famous for Salkanpur temple which is located at a distance of 4 kms in the east of town. This

temple is visited by pilgrims throughout the year. The temple caters to lot of tourists during yearly fairs

and festivals. The temple is located near Rehti, about 70 km from Bhopal, in Madhya Pradesh. The

temple is situated on an 800-ft high hillock. It has more than 1000 stairs and road connectivity is also

available to reach the top at temple. About four and half kilometre Cement Concrete Road facilitates

the pilgrims to drive up to the top. Due to the proximity of Rehti to Budnighat which is already a part of

tourist circuit, Salkanpur temple can also be included in the tourist circuit.

6.11.2. SWOT analysis

Page 66: Rehti CDP English

City Development Plan - Rehti 66

Strengths

Presence of famous Salkanpur temple

Lies close to the tourist circuit route of

Budni- Bhimbetka.

If Rehti is promoted as a tourist destination,

it would boost the economy of the town.

Opportunities

Could be a major tourist hub, if included in

the tourist circuit due to the presence of

Salkanpur temple.

Employment generation in the town would

be boosted, once Salkanpur tourism is

promoted.

Development of Salkanpur temple, can

become an important source of revenue for

the Nagar Parishad

Weaknesses

Huge gap in the existing level of service.

Lack of organized parking lots at Salkanpur

temple, create problems for the visitors

No accommodation facilities available in

the town for tourists

Threats

Insufficient measures to conserve the

temple, may lead to eventual degradation

of the area.

The area may lose focus as the immediate

needs of the citizens are related to the

basic infrastructure facilities.

6.11.3. Issues

Lack of parking lots in Salkanpur temple

No accommodation facilities, which cause a major problem for tourists during festivals

Tourism potential of Rehti is not explored optimally.

6.12. Existing Institutional framework for Development

Urban management in India is facing new challenges in the form of large concentrations of population

in urban areas, opening of the economy and the resultant demand for quality services, growing

number of urban poor, inadequate financial resources and complexities of urban situations. As a

result, urban management has not remained an exclusive responsibility of the ULBs. There are other

organizations that are responsible for urban management like urban development authorities, special

purpose boards and corporations, and the State Government department controlling the affairs of

urban development. As a result of these agencies and the definite roles assigned to them in overall

urban management, the ULB is required to closely work with and share the responsibility of urban

management with them. But Rehti being a very small town is majorly looked after by Rehti Nagar

Parishad.

This section provides an introduction to the urban local body, which play a key role in the urban

governance by providing various urban services to the citizens and their coordination issues which

hinders the efficient service delivery to the end user. The agencies involved in urban management

and development in Madhya Pradesh and in Rehti are

Rehti Nagar Parishad

Urban Administration and Development Department (UADD);

Town and Country Planning Department (TCPD);

Page 67: Rehti CDP English

City Development Plan - Rehti 67

Madhya Pradesh Housing Board (MPHB);

Department of School Education and Department of Higher Education;

Department of Public Health and Family Welfare(PHFW);

Ministry of Railways, GoI;

Madhya Pradesh State Electricity Board (MPSEB);

Madhya Pradesh Pollution Control Board (MPPCB)

6.12.1. Rehti Nagar Parishad

Rehti Nagar Parishad is the main governing body which operates within the Nagar Parishad limits of

the town. The Nagar Parishad is responsible for the provision of basic infrastructure services to the

citizens. This includes development and operation & maintenance of infrastructure like Water Supply,

Solid Waste Management, Transportation, etc. Most of the Nagar Parishad‟s responsibilities and

duties are governed by MP Municipalities Act. Apart from the provision of basic services, under its

purview, to the citizens, Nagar Parishad also coordinates with other departments such as UADD,

TCPD, MPHB, Dept of School Education, Dept of Health Education, Railways, MPSEB, MPPCB, etc.

Nagar Parishad‟s responsibilities include coordination with other departments in formulating their

plans for Nagar Parishad area and assist them in the implementation of their plans and schemes.

The Nagar Parishad is headed by a Chief Municipal Officer, who is appointed by UADD and is

entrusted with the responsibility of all municipal affairs. The Nagar Parishad also has an elected

council headed by President. Rehti Nagar Parishad has a total of 50 employees, out of which 30

employees are on regular basis and the remaining 20 are on daily wages.

6.12.2. Town and Country Planning Department

The activities of Town and Country Planning Department (TCPD) are guided by the provisions of the

Madhya Pradesh Nagar TathaNiveshNiyam, 1973 (the Rules). The Rules provide for the appointment

of a Director to head this department. There are other officers like Additional Director, Joint Director,

Deputy Director and Assistant Director of TCPD to assist him.

The State Government, as per provisions of the Rules declares a region including major urban areas

and its surrounding settlements as a planning area, and orders the preparation of a development plan

for the region. The Director of the TCPD, with the assistance of the administrative setup provided to

him, carries out the following activities:

Survey of the entire region;

Preparation of existing land-use map; and

Preparation of a regional development plan.

6.12.3. Development Authority

The Urban Administration and Development Department (UADD) of the Government of Madhya

Pradesh is an administrative department that controls the organizations related to urban development,

including municipal corporations, councils and Nagar Parishads. This department is also responsible

for implementing the schemes related to urban poverty alleviation.

The UADD is responsible for implementation of the following Acts in the state:

Madhya Pradesh Municipal Corporation Act, 1956;

Madhya Pradesh Municipal Council Act, 1961;

Cruelty to Animals Act, 1971 (provisions applicable to urban areas);

Vidisha (Bhelsa) Ramlila Act, 1956;

Page 68: Rehti CDP English

City Development Plan - Rehti 68

Simhastha Mela Act;

Slaughter of Animals Act (provisions applicable to urban areas);

Madhya Pradesh Slum Area (Development and Irradiation) Act, 1976; and

Madhya Pradesh Cycle Rickshaw (Regulation of License) Act, 1984.

The UADD is also responsible for implementation of various public welfare schemes sponsored by the

Central and State Governments. Some such schemes include Conversion of Dry Latrine Program,

SwarnaJayanti Urban Employment Scheme, National Slum Development Program, Social Security

Group Insurance Scheme, Janashri Insurance Scheme etc. These schemes are implemented through

the District Urban Development Agency. Being the parent organization of ULBs, UADD monitors the

functioning of all ULBs in the state.

6.12.4. Department of Public Health and Family Welfare

The primary responsibility of providing health care lies with Department of Public Health and Family

Welfare. This department sets up government health institutions and coordinates with private players

in setting up private hospitals.

6.12.5. Madhya Pradesh Housing Board

Madhya Pradesh Housing Board (MPHB) falls under the administrative and functional control of the

Housing and Environment Department of GoMP. The operations of the Board are governed by the

provisions of the Madhya Pradesh Housing Board Act, 1972, and rules formulated therein, amended

from time to time.

The key functions of MPHB, as per its governing Act and rules include:

To acquire land from the Government, private parties and/or other departments for construction

of properties;

To design, plan, construct, supervise and sell residential flats and commercial complexes;

To undertake deposit works for Government departments like Education;

Welfare, Tribal Welfare Departments, etc. for construction of schools, hostels, etc.; and

To undertake repair and reconstruction work of old structures.

6.12.6. Madhya Pradesh Pollution Control Board

Implementation, supervision and monitoring activities pertaining to Central Pollution Control Acts and

Rules vests with the Central Pollution Control Board (CPCB), Government of India, and the respective

State Pollution Control Boards formed/constituted under its rules. Madhya Pradesh State Pollution

Control Board (MPPCB) headquartered in the state capital, Bhopal, carries out its operations through

seven regional offices, each located at the divisional headquarters.

The main function of the regional offices is to monitor the implementation of provisions of various Acts

governing pollution control and prevention and the Rules framed under such Acts. The pollution

prevention and control Acts include:

The Water (Prevention and Control of Pollution) Act 1974;

The Water (Prevention and Control of Pollution) Cess Act 1977;

The Air (Prevention and Control of Pollution) Act 1981;

The Environment (Protection) Act, 1986; and

The Public Liability Insurance Act 1991.

Page 69: Rehti CDP English

City Development Plan - Rehti 69

MPPCB is also responsible for implementation of the Municipal Solid Waste (Management and

Handling) Rules, 2000 of CPCB, which spell out responsibilities of the state pollution control boards

and the urban local bodies. MPPCB is the monitoring authority with respect to ground water, ambient

air, and compost quality in urban areas. The Board is also required to monitor processing and

disposal facilities for municipal waste, with the approval of the State Urban Development Department,

Town and Country Planning Department, and Ground Water Board. According to the Rules, the ULB

is responsible for implementation of the provisions and infrastructure development for collection,

storage, segregation, transport and processing of solid waste in the town.

The major areas of concern of MPPCB with regards to ULB functions are:

Management of solid and liquid waste disposal;

Waste water management;

Improvement of roads and plantation of trees;

Traffic management to control vehicular pollution; and

Proper planning of the city

6.12.7. Issues

Though roles of different organizations in the provisioning of urban services are clearly defined,

plans formulated by different organizations suffer because of lack of coordination among

various organizations.

In case of street lighting, responsibility of installation of electricity poles and their electrification

lies with MPSEB. Any failure in the coordination between Nagar Parishad and MPSEB results in

poor urban governance.

MPPCB should be regularly contacted to keep a check on urban environment and curb

pollution.

Nagar Parishad should maintain a healthy interaction for effective and comprehensive city

planning.

The Departments of Health and Education should be provided with necessary assistance in

the implementation of their plans and day-to-day activities.

MP Housing Board should consult Nagar Parishad at the planning stage to avoid any issues

later at the time of transfer of housing stocks to Nagar Parishad. Nagar Parishad should

consult MP Housing Board during the preparation of DPRs for various urban services.

Meetings at regular intervals should be organized between various governing organizations

for effective urban governance.

6.13. Conclusions

This chapter dealt with the current status of various components of city infrastructure and services

provided by the Rehti Nagar Parishad. Sectors/Services which were analyzed in the areas of existing

status, demand-supply gap, critical issues and SWOT are Physical Infrastructure (Water Supply,

Sewerage & Sanitation, Solid Waste Management, Drainage, Traffic & Transportation and Street

Lighting, Fire Fighting & Power), Social Infrastructure (Health, Education, Other Social Infrastructure –

recreational), Economic Development, Environment and Tourism (Urban Environment, Heritage and

Tourism), Urban Poor and Accessibility to Basic Services, Urban Governance and Institutional

Framework. The next chapter deals with the analysis of municipal finance.

Page 70: Rehti CDP English

City Development Plan - Rehti 70

MUNICIPAL FINANCIAL ASSESSMENT

The financial analysis for Rehti Nagar Parishad has been carried out to understand their current

status. The finances of the town have been reviewed for a period of five years, commencing from the

financial year 2006-07 to 2010-11. For the year 2006-07, 2007-08, 2008-09 actual estimates, for

2009-10 revised estimates and for 2010-11 proposed estimates have been considered. The detailed

financial analysis of the Rehti Nagar Parishad is discussed below.

7.1. Financial Status at a Glance

It is seen that revenue expenditure in the year

2006-07 is higher than the income, whereas in

years 2007-08, 2008-09, 2009-10 and 2010-11

the revenue income has always been more as

compared to the revenue expenditure. Refer

for revenue accounts of Rehti Nagar Parishad

The Revenue account comprises of revenue

income and revenue expenditure. The revenue

income of Rehti Nagar Parishad has grown in

the last four years from Rs. 66.2 Lakh in FY

2006-07 to Rs. 176.7 Lakh in FY 2010-11.

Refer Exhibit 7- for financial status of Rehti

Nagar Parishad. It can also be seen that

revenue expenditure of Rehti Nagar Parishad

has increased from Rs. 80.1 Lakh in 2006-07 to

Rs. 110.2 Lakh in 2010-11

Capital income of Rehti Nagar Parishad

comprises of own sources and from Grants and

contributions. Over the last few years, Rehti has

received many grants for special projects and

grant under Twelfth Finance Commission (T.F.C.), Road development grant and Basic services. In

the estimated Budget for 2010-11 Rs 66.1 lakh is coming from various grants. The capital income has

grown upto 98 lakh for FY 2010-11 and capital expenditure has grown upto 147 lakh in FY 2010-11.

Refer Exhibit 7-2 for Capital Accounts of Rehti Nagar Parishad.

Exhibit 7-1: Financial Status at a Glance

Items 2006-07 2007-08 2008-09 2009-10 2010-11 CAGR

Actuals in Rs. Lakh %

Rehti Nagar Parishad

Revenue Account

Income 66.2 115.6 109.4 192.1 176.7 27.8

Expenditure 80.1 68.6 62.8 102.2 110.2 8.3

Surplus/ Deficit (13.9) 47.0 46.6 89.9 66.5

Capital Account

Receipts 69.2 59.2 90.9 67.1 96.3 8.6

Payments 37.6 125.3 89.2 83.9 148.8 41.1

Surplus/ Deficit 31.6 (66.1) 1.7 (16.9) (52.5)

Overall Status incl. O.B. 16.4 (5.3) 41.8 106.0 113.5

Source: Annual Accounts, Rehti Nagar Parishad

7.2. Revenue account

Page 71: Rehti CDP English

City Development Plan - Rehti 71

The following section provides an in-depth review of the revenue account, in order to assess the

municipal fiscal status. The revenue account comprises of two components - revenue income and

revenue expenditure.

7.2.1. Revenue income

The revenue sources of Rehti Nagar Parishad

can broadly be categorized as own sources,

assigned revenues, grants and contributions. It

is seen in Exhibit 7-4 that maximum income i.e.

38% is generated from revenue grants, which is

followed by income from assigned revenue

accounts (35%), followed by income from own

sources (Tax and Non-tax sources) accounts for

at 27%. The source-wise income generated

during the review period is presented below in Exhibit 7-.

Exhibit 7-2: Source Wise Revenue Income

Revenue Income

Items 2006-07 2007-08 2008-09 2009-10 2010-11 Share CAGR

Actuals in Rs. Lakh % %

Rehti Nagar Parishad

Own Sources 26.0 30.7 26.1 39.9 42.1 27 13

Tax Revenue 5.0 10.1 7.1 4.1 6.2 6 5

Non Tax Revenue 21.0 20.6 19.0 35.8 35.9 21 14

Assigned Rev 34.4 35.0 33.3 50.1 68.6 36 19

Revenue Grants 5.7 50.0 50.0 102.1 66.1 38 84

Total 66.2 115.6 109.4 192.1 176.7 100 28 Source: Annual Accounts, Rehti Nagar Parishad

Own source income includes income from Tax revenue and non-tax revenue. Own source of revenue

has increased from Rs. 26 lakh in FY 2006-07 to Rs. 42.1 lakh in FY2010-11.Tax revenue accounts

only for about 6% of the total revenue income (Refer Exhibit 7-). Non tax revenue accounts for about

21% of the total revenue income (Exhibit 7-), assigned revenue and compensation constitutes about

35% which includes taxes and duties collected by others and compensation in lieu of Taxes and

duties like Octroi compensation, stamp duty etc. Revenue from this source depends on the devolution

from GoMP. Grants and contributions constitute maximum percentage i.e. 38% of the revenue

income.

Exhibit 7-3: Tax Revenue

Actuals in Rs. Lakh

S.No Head of Accounts 2006-07 2007-08 2008-09 2009-10 2010-11

1 Property Tax 2.7 4.5 2.6 0.9 1.3

2 Integrated tax 1.2 3.2 2.2 1.3 2.0

3 Education cess - - - - -

4 Export tax 1.1 2.3 2.3 1.7 2.7

6 Advertisement Tax - - - - -

7 Other Taxes 0.0 0.0 0.1 0.1 0.1

Sub-Total (Tax Revenue)

5.0 10.1 7.1 4.1 6.2

Source: Annual Accounts, Rehti Nagar Parishad

Tax revenue comprises of property tax, integrated tax, education cess, export tax, advertisement tax

and other taxes. Tax revenue comprises of 6% share of revenue from own sources. The collection

Page 72: Rehti CDP English

City Development Plan - Rehti 72

amount for property tax in DCB varies from budget accounts. However, property tax DCB shown in

Exhibit 7- has been used for property tax projections for Nagar Parishad‟s revenue. Collection

performance of property tax has increased from 21% in FY 2006-07 to 45% in FY 2010-11.

Exhibit 7-4: DCB Statement for Property Tax Collection

Sl. No. Demand/ Collection 2006-07 2007-08 2008-09 2009-10 2010-11

A Demand (Rs in Lakh)

Arrears 2.86 2.96 1.70 1.50 1.60

Current 0.88 0.94 1.08 1.05 1.10

Total Demand 3.74 3.90 2.78 2.55 2.70

B Collection (Rs in Lakh)

Arrears 0.49 1.50 0.48 0.39 0.44

Current 0.28 0.66 0.66 0.59 0.78

Total Collection 0.77 2.16 1.14 0.98 1.22

C Balance (Rs in Lakh) 2.97 1.74 1.64 1.57 1.48

Collection Performance - % arrears 17 51 28 26 28

Collection Performance - % Current 32 70 61 56 71

D Collection Performance - % 21 55 41 38 45

Source: Rehti Nagar Parishad

Non Tax Revenue

Non Tax revenue is the major source of revenue from own sources which accounted for 21% of the

total income. Non tax revenue consists of rental income from municipal properties, water charges,

license and fees, development charges, building permission etc. It can be observed in Exhibit 7- that

rent from municipal properties accounts for the maximum share of non-tax revenue in the years 2006-

07, 2007-08, 2008-09 and 2009-10. Collection performance of water charge shows the growth in last

five years; shows the decrease in from 53% in 2007-08 FY to 44% in 2010-11 FY which is not a good

performance.

Exhibit 7-5: Non Tax Revenue

Actuals in Rs. Lakh

S No

Head of Accounts 2006-07 2007-08 2008-09 2009-10 2010-11

1 Rental Income from Municipal Properties

7.6 6.1 4.1 4.5 3.2

2 Water Charges 2.9 4.9 3.4 3.7 4.4

3 License and Fees 0.1 0.1 0.1 0.4 0.3

4 Development Charges 0.6 0.7 0.5 0.4 0.8

5 Building Permission - - - - -

6 Others 9.8 8.9 10.9 26.8 27.1

Sub Total (Non Tax) 21.0 20.6 19.0 35.8 35.9 Source: Annual Accounts, Rehti Nagar Parishad

Exhibit 7-6: DCB Statement for Water Charge Collection

S. No Demand/ Collection 2006-07 2007-08 2008-09 2009-10 2010-11

A Demand (Rs in Lakh)

Arrears - 2.50 3.10 2.20 4.40

Current - 2.77 3.20 2.10 4.20

Total Demand - 5.27 6.30 4.30 8.60

Page 73: Rehti CDP English

City Development Plan - Rehti 73

B Collection (Rs in Lakh)

Arrears - 0.70 0.89 0.44 1.20

Current - 2.10 2.30 2.40 2.60

Total Collection - 2.80 3.19 2.84 3.80

C Balance (Rs in Lakh) - 2.47 3.11 1.46 4.80

Collection Performance - % Arrears - 28 29 20 27

Collection Performance - % Current - 76 72 114 62

D Collection Performance - % - 53 51 66 44

Source: Rehti Nagar Parishad

Assigned revenues and Compensations accounts for about 36% of the total revenue income, it

includes taxes and duties collected by others and compensation in lieu of Taxes and duties like Octroi

compensation, stamp duty etc. Revenue from this source depends on the financial devolution from

GoMP. The details of the revenue from this source are shown in Exhibit 7-7 below.

Exhibit 7-7: Assigned Revenue

Actuals in Rs. Lakh

S.No Head of Accounts 2006-07 2007-08 2008-09 2009-10 2010-11

1 Octroi compensation 27.1 26.9 25.8 42.3 63.0

2 Stamp duty - - - - -

3 Passenger tax compensation 6.7 8.1 7.3 7.6 5.2

4 Income under special acts 0.6 0.0 0.1 0.2 0.3

Sub- total (Assign Revenue) 34.4 35.0 33.3 50.1 68.6

Source: Annual Accounts, Rehti Nagar Parishad

Income from grants and contributions accounts for about 38% of the total revenue income. Rehti

Nagar Parishad is getting the revenue grants from GoMP in form of Road maintenance, mid-day meal

and other state grants. The details of the grants are shown below.

Exhibit 7-8: Revenue Grants, Contributions and Subsidies

Actuals in Rs. Lakh

S.No Head of Accounts 2006-07 2007-08 2008-09 2009-10 2010-11

1 Road maintenance 5.7 50.0 50.0 5.6 53.2

2 Midday meal - - - 41.5 4.5

3 State finance commission (S.F.C) - - - 55.0 8.4

4 Other grants - - - - -

Sub- total (Grants & contribution) 5.7 50.0 50.0 102.1 66.1

Source: Annual Accounts, Rehti Nagar Parishad

7.2.2. Revenue expenditure

Revenue expenditure is classified under the

establishment mainly comprising salaries and wages,

administrative expenses, Operation and Management

Expenses and Repayment of loans.

Page 74: Rehti CDP English

City Development Plan - Rehti 74

The revenue expenditure as can be seen in Exhibit 7-9 has increased from Rs. 80.31 lakh in FY

2006-07 to Rs. 110.2 lakh in FY2010-11.

Revenue Expenditure consists of expenditure on Salaries/Wages, Administrative works, Operation &

maintenance (O&M), Programme expenses and Repayment towards the loans. In case of Rehti

Nagar Parishad, salaries and wages account for the highest share of expenditure which is 71.5% of

the total revenue expenditure and include salary of Nagar Parishad employees, Wages to the

temporary staff, pension to staff etc. The other major expenditure is towards operations &

maintenance. Expenditure on miscellaneous works accounts for only 10.9% of total revenue

expenditure. Program expenses constitute only 3% of the total revenue expenditure. Refer Exhibit 7-9

for details of application of funds by head of Accounts.

Exhibit 7-9: Application of Funds by Head of Accounts

S.No

Head of Accounts 2006-

07 2007-

08 2008-

09 2009-

10 2010-

11 Share

(%) CAGR

(%) 2010-11

1 Salaries/ Wages & Allowances

57.3 52.1 44.9 68.6 78.6 71.5 8.2

2 Administrative Expenses 0.2 0.2 0.2 0.3 0.2 0.3 (5.2)

3 Operation & Maintenance 6.4 5.7 8.5 14.2 13.0 - -

4 Programme Expenses 3.5 - 5.0 3.0 - 3.1 (5.1)

5 Repayment of Loans 3.6 2.6 0.8 2.0 5.1 3.2 9.0

6 Other Miscellaneous expenditure

9.2 8.0 3.4 14.0 13.3 10.9 9.8

Sub- total 80.1 68.6 62.8 102.2 110.2 100.0 8.3 Source: Annual Accounts, Rehti Nagar Parishad

7.3. Capital account

7.3.1. Capital income

Rehti Nagar Parishad faced capital account deficit during the last three years except for 2006-07.

In general the Capital Income of Rehti Nagar Parishad comprises of own sources in the form of sale

of property; loans, grants and contributions and transfers from revenue surplus. However during the

review period the capital revenues have been generated only through grants and contributions from

Central and State Government. Major source of income is Capital grants from GoI and GoMP which

accounts for about 94.1 lakh .

Exhibit 7-10: Capital Income

Capital Account

S.No.

Capital Income

2006-07

2007-08

2008-09

2009-10

2010-11

Share

Actuals in Rs. Lakh %

Rehti Nagar Parishad

a Sale of asset - 0.0 0.5 7.6 1.8 3

b Loans - - - - - -

c Grants & Contributions

i Special Projects 26.9 10.6 7.5 20.0 1.4 19

ii Basic services 25.4 34.4 30.8 26.5 20.8 38

iii UIDSSMT - - - - 63.0 13

iv IHSDP - - - - - -

v Flood relief & NRCP 6.0 7.2 1.4 0.3 - 5

vi State finance commission (S.F.C)

3.1 6.3 9.4 3.1 8.9 8

vii T.F.C 7.5 - 40.6 8.6 - 14

Page 75: Rehti CDP English

City Development Plan - Rehti 75

Capital Account

S.No.

Capital Income

2006-07

2007-08

2008-09

2009-10

2010-11

Share

Actuals in Rs. Lakh %

Rehti Nagar Parishad

viii Other Grants 69.0 58.6 89.8 58.5 94.1 96

Total Grants & Contributions - - - - - -

d Public Contribution 0.2 0.6 0.6 0.9 0.4 1

e Other Capital income

Total Capital Income 69 59 91 67 96 100 Source: Annual Accounts, Rehti Nagar Parishad

7.3.2. Capital expenditure

It is observed that the capital expenditure of Rehti Nagar Parishad decreased from 125.3 lakh in

2007-08 to 89.2 lakh in 2008-09. The expenditure later increased from 89.2 lakh in 2008-09 to 148.8

lakh in 2010-11. Refer Exhibit 7-11 for details of Capital Expenditure of Rehti Nagar Parishad.

Exhibit 7-11: Capital Expenditure

Capital Expenditure 2006-07 2007-08 2008-09 2009-10 2010-11 Share

Actuals in Rs. Lakh %

Capital Work in Progress 21.1 106.5 76.7 78.0 132.5 82

Purchase of fixed assets - - - - - 0

Other Capital Expenditure 16.5 18.8 12.5 5.9 16.3 0

Reserve Fund - - - - - 0

Total Capital Expenditure 37.6 125.3 89.2 83.9 148.8 100 Source: Annual Accounts, Rehti Nagar Parishad

7.4. Key financial indicators

Key financial ratios have been estimated based on the annual accounts of the Rehti Nagar Parishad

to highlight the existing position of the municipal finances. These ratios are the average ratios of last

four years and present budget year. Key financial ratios are given below.

Exhibit 7-12: Financial Indicators

Financial Indicators 2006-

07 2007-

08 2008-

09 2009-

10 2010

-11 Average

Operating Ratio 1.21 0.59 0.57 0.53 0.62 0.71

Salaries' Expenditure to Revenue Income

87% 45% 41% 36% 44% 0.51

Salaries' Expenditure to Revenue Expenditure

71% 76% 71% 67% 71% 0.71

Capital Utilization Ratio 0.54 2.12 0.98 1.25 1.55 1.29

Observations:

Operating Ratio

The average operating ratio of the Rehti Nagar Parishad is 0.71 which is substantially lower than 1,

indicating surplus revenue accounts in Rehti.

Capital Utilization ratio:

Average Capital utilization ratio of Rehti Nagar Parishad is 1.29 which is more than 1, indicating that

Rehti‟s capital expenditure is more than its income .

Salaries expenditure to revenue income:

Page 76: Rehti CDP English

City Development Plan - Rehti 76

If we look at this ratio we can observe that approximately more than 50 % of the revenue income is

utilized for paying the staff employed by Nagar Parishad. After paying off the salary not much revenue

income is left to be utilized for other productive revenue purposes.

7.5. Key issues

Rehti Nagar Parishad‟s financial health is not sustainable in long run as operating ratio is lower

than 1, indicating that Rehti‟s revenue expenditure levels are higher than the revenue income

generated.

Capital Utilization ratio is more than one, indicating that Rehti‟s capital expenditure is more than

its income

7.6. Conclusion

This chapter dealt with the analysis of municipal finance and the financial health of Rehti Nagar

Parishad. The next chapter deals with City Vision, Sector Goals, Strategies, Action Plan, Projects and

Prioritization.

Page 77: Rehti CDP English

City Development Plan - Rehti 77

8. City Vision, Sector Goals, Strategies, Action Plan,

Projects and Prioritization

The vision for Rehti was formulated by stakeholders and IMaCS through a consensus approach and

continued consultations with the community. The consultations revolved around the city‟s strengths,

current issues, concerns, problems and the areas that need to be focused on to achieve the desired

results.

8.1. Formulation of City Vision

After completing a rapid assessment of the city‟s infrastructure, physical and environmental aspects,

and institutional and financial status, a consultative process was started with Rehti Nagar Parishad

Officials.

The “City Vision and Sector Goals” workshop was held to explain the purpose of the CDP, the

ownership of the plan, and the need for establishing or strengthening partnerships to leverage Nagar

Parishad‟s role in facilitating economic growth and improving quality of life. The officials of other

government departments such as Health, Education, and Revenue etc who have a stake in the

development of the town were also involved in this workshop. This workshop focused on highlighting

the current status of all the services provided by various departments and the key issues confronting

each department.

The consultations held so far were concluded with a visioning exercise with stakeholders. Nagar

Parishad‟s officials and other stakeholders together carried out the visioning exercise at this

workshop. The workshop started with a plenary session in which the current status and gaps in

various services were presented to the stakeholders. It was followed by the mission statements and

the perceived needs of the stakeholders. The comparison also served to identify cities priorities for

various services provided by the Nagar Parishad.

8.1.1. Vision for the Town

As a result of the above-mentioned workshop and consultations with Rehti Nagar Parishad officials

and stakeholders, the vision for Rehti has emerged as follows:

To develop Rehti as an economically independent city with a high-quality of life in a

sustainable environment, with state-of-the-art infrastructure, service delivery, and

connectivity, supported by an efficient governance framework

In addition to the outlining of a vision for the city, discussions were also carried out on the

identification of major themes which would serve as the watchwords for initiatives and actions to

achieve the vision. Some of the major themes that came out of workshop and consultations with

stakeholders are as follows:

Encouraging economic status of the town, by promoting herbal manufacturing units.

Promoting wooden furniture, bamboo baskets, and earthen pots.

Promoting education and, health institutions for the citizens.

Page 78: Rehti CDP English

City Development Plan - Rehti 78

8.1.2. Mission Statements

To achieve the vision, certain Mission Statements are formulated on the basis of identified themes

which would be the various lines on which development should be concentrated. Based on

consultations with stakeholders and review of development plans of other cities, following Mission

Statements are being adopted to achieve the vision.

To provide citizens of Rehti with sustainable and basic infrastructure facilities: All basic

infrastructure facilities, viz. Water Supply, Sewerage & Sanitation, Storm Water Drainage, Solid

Waste Management, Roads & Transportation and Street Lighting & Fire Fighting, and social

infrastructure facilities, viz. Health and Education, should be developed / upgraded to support the

economic and social development of the city.

To actualize the city’s existing economic potential and generate new opportunities for the

prosperity in all sections of the community: An economic development plan should be devised

for the harnessing of city‟s economic potential. It should concentrate on the diversification of

economic base of the city so as to reduce dependence on any particular sector. Small scale

industries and herbal based industries can be developed.

To develop & promote special economic activity and training centres for women: Special

training centres should be developed for women so that all the women can get trained in various

economic activities irrespective of their literacy level. Special community based economic

activities should be designed such as handicraft activities, household food products etc so that

every women should be part of gainful economic activity.

To uplift the urban poor and bring them at par with other sections of the community: A

comprehensive up-liftment plan, comprising of employment generation, provisioning of basic

infrastructure and equal access to social infrastructure, for urban poor should be prepared to

address the existing disparity among the various sections of the community.

Institutional Strengthening and Capacity Building: Preparation of an institutional action plan

defines roles and responsibilities of various stakeholder agencies. It would also target at the

capacity of various stakeholder agencies in terms of adequacy of staff and competitiveness for an

efficient delivery. The issue of “Motivation to work” should be an integral part of this plan.

Preparation of Resource Mobilization Plan: A financial and operating plan, which addresses

the resource requirement for implementation and maintenance of the City Development Plan

proposals, shall be prepared.

These Mission Statements would serve the purpose of aligning/initiating development works with the

formulated vision, guidance during the policy formulations to achieve the goal and framework for the

coordination among the various stakeholder agencies.

8.2. Sector Goals, Strategies, Action Plan and Projects

Keeping the vision in mind, the stakeholders and IMaCS team designed goals for various

sectors/services to achieve the vision in a given timeframe. We have presented the sector goals

under the five major heads:

Physical Infrastructure

Social Infrastructure

Economic Development

Environment and Tourism

Urban Poor

Page 79: Rehti CDP English

City Development Plan - Rehti 79

Urban Governance and Institutional Development

In the subsequent sections of this chapter, we have outlined the key areas in each sector, which

would be the main focus of detailed strategies and action plan. We have also discussed the

achievement targets for short, medium and long terms. These achievement targets have been

decided according to the demand of that particular parameter in that year. The discussion on sector

goals for each sector is followed by sector strategies that should be adopted to achieve the sector

goals. Sector Strategies have been devised in accordance with the existing situation of the urban

services, demand in future years and improvement in the service levels. After strategies projects have

been identified for two phases, short-term projects which would be developed up to 2015 and long

term projects which would be developed up to 2035.

8.2.1. Water supply

Sector Goals: All households should be provided with piped water with defined service levels.

Key areas and time frame which would be addressed by detailed strategies and action plan to meet

the sectoral goal are:

Year Components 2015 2025 2035

WATER SUPPLY

Network coverage to households

100% of the properties assessed

under property tax

100% of the properties assessed

under property tax

100% of the properties assessed

under property tax

Per capita supply as per norms (135 lpcd)

135 135 135

24/7 water supply No No Yes

Quality of water Good Good Good

Non-revenue water 15% 15% 15%

Consumer metering

80% 80%

Roof water harvesting No Yes Yes

Private sector participation

No

If O&M is contracted to a

private developer

If O&M is contracted to a

private developer

Strategies to achieve the Sector Goals

Unlike the approach adopted for sectors such as roads, SWM etc, the planning for water supply

source augmentation has been done considering the demand arising in year 2035. The systems and

infrastructure would therefore have to be designed such that the long term needs are addressed and

planned for 2035. Therefore, the broad strategy would be to identify the projects addressing the future

demand and plan for the necessary. In addition to the improvements in infrastructure, the

stakeholders have also suggested that the municipal manpower dealing exclusively with the water

supply should be strengthened. The strategies are:

Augmenting water supply source

Strengthening of water supply distribution system

Treatment Capacity/ Filtration

Map 17 (Annexure 4) shows the proposed water supply network and new ESLR for the town, which

are required for the increasing population and its requirement.

Page 80: Rehti CDP English

City Development Plan - Rehti 80

Long term and Short term sector interventions required:

The Exhibit 8-1 below presents the broad strategies being proposed to address the gaps identified in

the existing levels:

Exhibit 8-1: Water Supply: Long Term and Short Term Interventions

Sector

Interventions

Required

Water supply source requires to be augmented to 2.76 MLD by 2035

The water storage capacity would also have to be increased keeping in

perspective the long-term requirements.

Elevated storage capacity has to be increased.

Refurbishment of the old dilapidated distribution network has to be planned to

reduce the loss in transmission.

Treatment plant has to be provided for water treatment.

Complete metering needs to be done in order to improve the revenue from

water charges

Expected

Outcome

Assured 135 lpcd water supply

Improvement in water quality

Improvement in the revenue from water charges, enhanced service delivery

For meeting the demand arising in 2035, the following sub projects are being recommended and

would have to be executed by the ULB by 2015.Refer Exhibit 8-2

Exhibit 8-2: Water Supply: Projects Identified by the ULB and Consultant

ULB’s Suggestion Project’s Proposed by Consultant

Scheme to increase the per capita supply of water Integrated Water supply Scheme for the

town of Rehti

Project Rationale Sub- Projects

Water Supply in the town not adequate to meet

the existing and future demand

No water treatment in the town except

chlorination.

Revenues from water charges are not adequate,

and the installation of water meters becomes

important both from the perspective raising

revenues and checking water consumption

Water Supply source augmentation to

2.76 MLD

Development of water treatment

facility of 2.76 MLD capacity

Increasing distribution network to

30.39 km by year 2035 which can be

taken up in a phased manner.

Metering of all the Water Connections

(this will also help in assessment of

NRW and supply efficiency through

various other parameters)

Projects Envisaged

This section discusses the technical details of the projects to achieve the sector goals. As a proactive

measure to address the increasing demand of water supply. The various projects envisaged for the

integrated development of water supply system are:

Source Augmentation: As of now, the extraction of water is done through 8 tube wells and 1

open well at various places, but due to depleting ground water, few tube wells have stopped

working. And with increasing population and economic development there would be more

Page 81: Rehti CDP English

City Development Plan - Rehti 81

requirement of water. Thus, there is a need to encourage additional sources of water. This project

needs to be developed completely by 2015. The additional water requirement can be met by

adopting Drawing additional water from Babar River (as given in the DPR) .This can be a

potential alternative source for the town. There is a need to have a detailed feasibility study

regarding these sources. Nagar Parishad would have to co-ordinate with irrigation department to

get permissions for water use.

Water treatment facility: As there is no treatment facility available in the town, there is a need to

install treatment infrastructure with a capacity of 2.76 MLD by 2035. Thus, by 2015 treatment

infrastructure needs to be developed for 2.18 MLD water and then it needs to be augmented to

2.276 MLD by 2035.

Distribution Network: As discussed with Rehti Nagar Parishad officials, at present, Rehti has

distribution network which is 80 % of the road length. The proposed water supply scheme

includes the construction of additional 19.01 km of distribution network by 2015 and 30.39 km of

distribution network by 2035 to increase the coverage to 85% of road network by the year 2035.

Elevated Storage Capacity: At present, the water supplied through elevated storage capacity is

78%, which is more than the desired level. But, in future with the increasing demand there would

be need to increase the capacity of elevated reservoirs up to 0.57 MLD by 2015 and 0.92 MLD by

2035, which 33% of the total water supplied in respective years (as per UDPFI Guidelines)

Metering System: 100% properties need to be assessed and water meters need to be installed

in all the properties with water connection, so that revenue income of the Nagar Parishad can be

increased. There is a need to increase capacity of officials in this sector and create awareness

among the Parishads and citizens.

Exhibit 8-3 Water Supply: Project Development Initiatives to be taken by Nagar Parishad

Immediate measures to be taken Authorities/ Agencies responsible

Finalizing the sub projects to be undertaken Rehti Nagar Parishad in consultation

with Councilors and other stakeholders

Preparation of DPRs for finalized projects Rehti Nagar Parishad

Submission of DPR to funding agency for approvals Rehti Nagar Parishad

Undertake measures for compulsory installation of

water meters

Create awareness among the Parishads and citizens

on the need for installation of water meters

Rehti Nagar Parishad

8.2.2. Sewerage and Sanitation

Sector Goals: To achieve 100 % coverage by an integrated sewerage system and safe sanitation

facilities for the town.

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are:

Year Components 2015 2025 2035

SEWERAGE &

SANITATION

Sewer network coverage to households

70% 70% 70%

Sewage Treatment and disposal arrangements

Treatment plant - capacity-1.38

MLD

Expand the capacity by 1.75

MLD

Expand the capacity by 2.21

MLD

Page 82: Rehti CDP English

City Development Plan - Rehti 82

Year Components 2015 2025 2035

Sewage Recycling and reuse

Treated water could be used for

agricultural process, not for

drinking use.

Treated water could be used for

agricultural process, not for

drinking use.

Treated water could be used for

agricultural process, not for

drinking use.

In addition to above area, a constant effort should be devoted towards “Community participation and

awareness campaign for the proper maintenance of “Sewerage system” and “Cost Recovery through

collecting the user charges.”

Strategies to achieve the Sector Goals

The lack of a sewerage network in town necessitates the development of a sewerage network which

would efficiently manage the existing and future demand. Similar to planning and designing for water

supply network, the planning for development of sewerage network would have to consider the

demand arising in 2035 and make necessary provisions for the same by 2015 and 2025. The systems

and infrastructure would therefore have to be designed such that the long term needs are addressed

and planned. The broad strategy therefore is to identify the projects addressing the future demand in

the areas of sewerage and sanitation which the Nagar Parishad would have to take up in the short run

for which necessary investments will also have to be planned for.

Map 18 (Annexure 4) shows the proposed sewerage network and new Sewerage treatment plant,

which are required for the increasing population and its requirement.

Long term and Short term Interventions

The Exhibit 8-4 below presents the broad strategies being proposed to address the gaps identified in

the existing levels:

Exhibit 8-4: Sewerage: Long Term & Short Term Interventions

Sector

Interventions

Required

Laying of underground drainage system of 20.12 km for 2015 and 32.18 Km

by 2035.

Construction of a sewerage treatment plant which can handle a capacity of

1.38 MLD for 2015 and expand it to a total capacity of 2.21 MLD by 2035

Addition of around 42 Public Sanitary Conveniences by 2015

Expected

Outcome

Synchronisation with water supply capacity, ability to meet service level targets

and disposal norms

For meeting the demand arising in 2035, the following sub projects are being recommended and

would have to be executed by the ULB by 2015. Refer Exhibit 8-5

Exhibit 8-5: Sewerage: Projects identified by ULB and Consultant

ULB’s Suggestion Project’s Proposed by Consultant

Scheme for laying of sewerage network for the town Comprehensive Sewerage Scheme

for the town of Rehti.

Project Rationale Sub- Projects

The city will consume about 3.13 MLD of water by the year

2035. About 2.50 MLD of sewerage (80 percent of water

supply as per CPHEEO norms) is estimated to be

generated in the town. There is no underground drainage

Construction of sewerage network

with a length of around 32.18 kms

Development of DEWAT system

with the capacity of 2.21 MLD of

Page 83: Rehti CDP English

City Development Plan - Rehti 83

network in the city. The waste water flowing in open drain

results in unhygienic milieu and pollution of water bodies

and the conditions are severe during monsoon when the

sewerage overflows on the road.

sewage

Projects Envisaged

This section discusses the technical details of the projects to achieve the sector goals. As a proactive

measure to address the increasing demand of water supply, the various projects envisaged for the

integrated development of sewerage system are:

Underground Sewerage network: The construction of the sewer network to be constructed

takes into consideration the factors of existing and future water supply to the town and the

population size being catered to. The capacity of the system has been estimated at 2.2 MLD

(80% of the future water supply) for 2035 for which the length of the network has to be developed

by 20.12km by 2015 and additional 12.06 km by 2035.

Sewage Treatment System: As Rehti town is very small and all areas are not contiguous and

are fragmented, it would be very beneficial for the town both financially and for operations and

maintenance to implement Decentralized Waste Water Treatment System (DEWATS) for

comprehensive sewerage system, and dispose off 2.21 MLD of generated sewage. This DEWAT

system take into care the demand generated in the year 2035. The advantages of DEWAT

system are that; it requires minimum space and hence be accommodated easily under paved

pathways and parking lots etc. or small available spaces; it requires lesser energy and operation

cost; This system promotes the reuse of water for non-potable purposes; it can be easily blended

with the landscape;it cannot be switched off so it ensures efficient working irrespective of external

factors and it can treat waste water with high fat, suspended solids and BOD. Since this system is

decentralized, the zones would be defined as per population and location for DEWATS and the

treatment system would be developed to safely dispose-off the sewage. The treated water can be

used for agricultural use.

Exhibit 8-6: Sewerage: Project Development Initiatives to be taken by Nagar Parishad

Immediate measures to be taken Authorities/Agencies responsible

Finalizing the sub projects to be undertaken Rehti Nagar Parishad in consultation with

Councilors and other stakeholders

Preparation of DPR(s) for finalized projects Rehti Nagar Parishad

Submission of DPR(s) to funding agency Rehti Nagar Parishad

8.2.3. Sanitation

Sector Goals: “To provide all the households with safe sanitation facilities”

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are

Sector Components 2015 2025 2035

Sanitation Safe sanitation facilities (with focus on Urban poor)

70% of households

85% of households

100% of households

In addition to above area, a constant effort should be devoted towards “Community participation and

awareness campaign for the proper maintenance of “Public Toilets” and “Individual Toilets.”

Page 84: Rehti CDP English

City Development Plan - Rehti 84

Strategies to achieve the Sector Goals

The lack of adequate sanitation facilities in town necessitates the development in this sector which

would efficiently manage the existing and future demand. The broad strategy therefore is to identify

the projects addressing the future demand in the areas of sanitation which the Nagar Parishad would

have to take up in the short run for which necessary investments will also have to be planned for. The

main strategy is to:

Safe Sanitation facilities to all with phased implementation and provision of adequate public

toilets

Long term and Short term Interventions

The table below presents the broad strategies being proposed to address the gaps identified in the

existing levels.

Exhibit 8-7: Sanitation: Long Term & Short Term Interventions

Sector

Interventions

Required

Addition of around 57 Public Toilet seats

Construction of Individual toilets

Expected

Outcome

Synchronization with water supply capacity, ability to meet service level

targets and disposal norms

For meeting the demand arising in 2015, the following sub projects are being recommended and

would have to be executed over coming years.

Projects Envisaged

This section discusses the technical details of the projects to achieve the sector goals. As a proactive

measure to address the increasing demand of water supply. The various projects envisaged for the

integrated development of sewerage system are:

Public Convenience Systems: To provide safe and sufficient sanitation facilities to the citizens,

mainly slum dwellers, around 57 more public toilet seats need to be added to the existing

infrastructure in Rethi by 2015.

Exhibit 8-8: Sanitation: Initiatives to be taken by Nagar Parishad

Immediate measures to be taken Authorities/Agencies responsible

Finalizing the sub projects to be undertaken Rehti Nagar Parishad in consultation with

Councilors and other stakeholders

Preparation of DPR(s) for finalized projects Rehti Nagar Parishad

Submission of DPR(s) to funding agency Rehti Nagar Parishad

8.2.4. Solid waste management

Sector Goals: To achieve 100% collection and disposal of solid waste

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are:

Year Components 2015 2025 2035

Solid Waste Door-to-door collection system door to door door to door door to door

Page 85: Rehti CDP English

City Development Plan - Rehti 85

Year Components 2015 2025 2035

Management collection collection collection

Source segregation Yes Yes Yes

Improve waste collection efficiency

100% 100% 100%

Mechanized waste handling Yes Yes Yes

Scientific waste disposal Yes Yes Yes

Landfill site adequacy 7.5 acres site is

available Yes Yes

Cost recovery of O&M No 60 % 80 %

Private sector participation To be explored Yes Yes

In addition to above area, a constant effort should be devoted towards “Community participation and

awareness campaign for the proper disposal of waste” and “Cost Recovery through collecting the

user charges.”

Strategies to achieve the Sector Goals

In order to facilitate improved solid waste management, the Nagar Parishad would have to focus on

various aspects like adoption of better practices to ensure proper collection, segregation and disposal

of waste and augmenting the existing infrastructure. The current status of the infrastructure needs to

be improved by increasing the equipments required for effectively handling the waste, and most

importantly developing the disposal site into a scientific landfill site. Apart from the focus on

augmenting the resources, the Nagar Parishad would be required to train its conservancy staff to

carry out the tasks effectively. The Strategies are:

100% House to House Collection (door to door collection)

Segregation (at source or at disposal site), composting and waste to energy

Strengthen the collection and transportation of waste

Development of land fill site

Long term and Short term sector interventions required:

The broad sector interventions to address both the short and long term requirements are listed below

in Exhibit 8-9:

Exhibit 8-9: Solid Waste Management: Long Term Short Term Goals

Sector

Interventions

Required

Promoting door-to-door collection

Up-gradation of the infrastructure required for effective collection and

disposal of waste

Adoption of new technology for disposal of waste

Improve the skills of the conservancy staff

Expected

Outcome

Hygienic conditions and a clean city

Waste segregation at source

Suitable treatment for different kinds of waste

Following are the projects proposed during the stakeholder consultation and also based on the rapid

urban assessment carried out by the Consultant. Refer Exhibit 8-10

Page 86: Rehti CDP English

City Development Plan - Rehti 86

Exhibit 8-10: Solid Waste Management: Projects Identified by ULB and Consultant

ULB’s Suggestion Project’s Proposed by Consultant

Effective collection of waste

Proper disposal of collected waste

Solid Waste Management system for Rehti

town

Vermicomposting Plant for the town

Project Rationale Sub- Projects

As per the demand assessment, in 2035, Rehti

would generate 4.92 tonnes of waste daily. To

effectively handle the generated waste, a pre-

emptive action of developing a proper Solid

Waste Management system is inevitable.

Promoting door-to-door collection

Augmenting Collection Infrastructure

Development and augmentation of landfill

site

Projects Envisaged

This section discusses the technical details of the projects to achieve the sector goals. As a proactive

measure to the address the increasing demand of water supply. The various projects envisaged for

the integrated development of Solid Waste Management System are:

Collection Infrastructure:

Primary Collection: Augmentation of primary collection involves capacity addition in the area of

equipments used in the waste collection including community bins. As per the demand

assessment, on a priority need, additional 16 handcarts would be needed for short term span

and additional 22 handcarts would be needed for long term span. Also currently, the practice

being followed includes a majority of residents dumping waste outside their houses, or in drains/

vacant land or at the designated collection point/ dustbin. This results in scattering of waste

which results in poor collection. To achieve an effective waste collection, practice of door-to-

door collection should be initiated which needs to be supported by necessary awareness

generation programmes and capacity building of the staff.

Secondary Collection: Secondary collection involves transportation of waste from collection

points to the disposal site. At present, secondary collection is carried out by tractors. These

tractors are unable to collect the waste from the internal narrow streets. On a priority, secondary

collection system should be strengthened to carry out waste transportation in an effective

manner. All the waste transportation vehicles should be covered to avoid the spilling of waste.

By 2015, 3 tractors would be required if one tractor is making one trip a day and by 2035 also 3

tractors would needed.

Development and augmentation of the landfill site: The demand-gap assessment reveals

the generation of 4.92 MT of waste in the town by 2035 against the current generation of 2.5

MT. The current available disposal site has 5 acres area which is sufficient till 2035. The

collected waste is just dumped at the site without any treatment or segregation. The dumping

site would have to be well-equipped to ensure proper waste segregation and composting

facilities. In addition, the dumping site would need to be provided with the basic facilities of

compound walls, BT/CC approach road, electrification, which has already been done in the

town. The composting and segregation would help in some revenue generation for Nagar

Parishad. It is proposed to develop the landfill site by 2015.

Development of Vermicomposting Plant: Vermicomposting involves the stabilisation of

organic solid waste through earthworm consumption which converts the material into worm

castings. Vermi technology, a tripartite system which involves biomass, microbes and

earthworms is influenced by the abiotic factors such as temperature, moisture, aeration etc.

Page 87: Rehti CDP English

City Development Plan - Rehti 87

Conditions unfavourable to aerobic decomposition result in mortality of earthworms and

subsequently no vermicomposting occurs. Hence, pre-processing of the waste as well as

providing favourable environmental condition is necessary for vermicomposting. It is relatively

more stabilised and harmonises with soil system without any ill effects. Unfavourable conditions

such as particle size of biomass and extent of its decomposition, very large temperature

increase, anaerobic condition, toxicity of decomposition products etc. influence activity of

worms. Tests in India have shown that vermin compost application can double wheat yields and

quadruple yields of fodder.

Method to prepare Vermi-Compost: The MSW is segregated i.e all the dry wastes such as

clothes, carry bags and other dry wastes are segregated from wet waste. A thatched roof shed

preferably open from all sides with unpaved (katcha) floor is erected in East West direction

length wise to protect the site from direct sunlight. A shed area of 12‟X12‟ is sufficient to

accommodate three vermin beds of 10‟X3‟ each having 1‟ space in between for treatment of 9-

12 quintals of waste in a cycle of 40-45 days. The length of shed can be increased/decreased

depending upon the quantity of waste to be treated and availability of space. The height of

thatched roof is kept at 8 feet from the centre and 6 feet from the sides. The base of the site is

raised at least 6 inches above ground to protect it from flooding during the rains. The wet waste

is pulverized and arranged in the form of vermin bed over the raised ground. The loaded waste

is finally covered with a Jute Mat to protect earthworms from birds and insects. Water is

sprinkled on the vermin beds daily according to requirement and season to keep them moist.

The waste is turned upside down fortnightly without disturbing the basal layer (vermin bed).The

appearance of black granular crumbly powder on top of vermin beds indicate harvest stage of

the compost. The earthworms go down and the compost is collected from the top without

disturbing the lower layers (vermin bed). The first lot of Vermi compost is ready for harvesting

after 22 ½ months and the subsequent lots can be harvested after every 6 weeks of loading.

The vermin bed is loaded for the next treatment cycle.

Exhibit 8-11: Solid Waste Management: Initiatives to be taken by Nagar Parishad

Immediate measures to be taken Authorities/Agencies responsible

Augmenting the size of the conservancy

staff

Rehti Nagar Parishad in consultation with Councillors

and other stakeholders

Purchase of additional equipment Rehti Nagar Parishad

Identification of areas for construction of

public conveniences

Rehti Nagar Parishad

8.2.5. Drainage

Sector Goals: To develop an efficient drainage system to ensure cleanliness of city

Key areas and time frame which would be addressed by detailed strategies and action plan to meet

the sectoral goal are:

Year Components 2015 2025 2035

DRAINAGE

Drainage network Total of 29.07 Km Total of 36.81

Km Total of 46.48

Km

Pucca Drains 9.59 Km Pukka open and 19.48 Km Pukka closed

12.15 Km pukka open and 24.67

Km pukka closed

15.34 Km pukka open

and 31.14 Km pukka closed

Page 88: Rehti CDP English

City Development Plan - Rehti 88

Year Components 2015 2025 2035

Rehabilitation of existing primary

nallahs and water bodies

De silting of drains to increase their capacity

100% 100%

Flood prone areas No more flooding due to better coverage of drains

none none

Strategies to achieve the Sector Goals

In the case of storm water drainage, the broad strategy followed would be similar to that proposed in

the case of road sector, wherein the existing gaps in this sector and the future requirements would be

addressed in terms of two categories of priority or short term needs and long term needs. The existing

gaps and the demand arising for the year 2015 may be taken up as priority projects. The suggestions

which had been put forth in the stakeholder consultation would have been clubbed under the category

of short term requirements and the long term requirements (2035) should be addressed by the Nagar

Parishad in the second phase. The broad strategies are

Comprehensive and Integrated Drainage Network

Awareness about the management of drainage network

Map 19 (Annexure 4) shows the proposed drainage network and final disposal points, which are

required for the increasing population and its requirement.

Long term and Short term sector interventions required:

The broad sector interventions to address both the short and long term requirements have been

enlisted below in Exhibit 8-12:

Exhibit 8-12: Drainage: Short Term & Long Term Interventions

Sector

Interventions

Required

Cleaning/ desilting of the existing drains, this will also include the removal of

encroachments.

Construction of storm water drains running into a length of 29.07 km by

2015, of which 19.48 km should be Pucca closed and 9.59 km will be Pucca

open.

Public Campaigns to generate awareness about the distinction between

storm water and waste water

Expected

Outcome Universal coverage and disposal capacity

Following are the projects proposed during the stakeholder consultation and also based on the rapid

urban assessment carried out by the Consultant. Refer Exhibit 8-13.

Exhibit 8-13: Drainage: Projects Identified by the ULB and Consultant

ULB’s Suggestion Project’s Proposed by

Consultant

Scheme for laying of storm water drainage network for the town Storm Water Drainage

network for the town of

Rehti

Project Rationale Sub- Projects

According to normative standards, the length of the drains are

assumed at 130% of road length considering all divided roads to have

drains on either side and undivided roads on at least one side.

Cleaning/desilting of

existing drains flowing

in the city.

Page 89: Rehti CDP English

City Development Plan - Rehti 89

Likewise the total drain length in the town shall be of about 46.48 km

by 2035. Further the drains in the initial phase shall be open and

subsequently be made closed; hence the investment is towards up-

gradation annually and for construction of new closed drains. All

existing open drains shall be first upgraded to closed drains and

subsequently new drains shall be constructed.

Prominently, all the road and storm water projects are to be taken up

simultaneously to match the levels of the roads with the drains and

allow draining of rain water from the city.

Up gradation of Pucca

open to Pucca closed

by 2015

Construction of new

31.14 km of Pucca

closed drains and

15.34 km Pucca open

drains by 2035

Projects Envisaged

This section discusses the technical details of the projects to achieve the sector goals. As a proactive

measure to the address the increasing demand of water supply. The various projects envisaged for

the integrated development of Drainage System are:

Cleaning / De-silting of existing drains: As an immediate measure, Nagar Parishad should aim

at timely cleaning and maintenance of existing drainage network. Under this project, major natural

drains should be given proper attention as they are flowing in the Nagar Parishad area.

Construction of storm water drains: The Nagar Parishad should undertake the construction of

Pucca Open and Pucca closed drains in phased manner. This construction may be done in

relation to the construction/up-gradation of roads. These construction activities would have to be

carried out on an immediate basis to address the existing and future demand-supply gap. In

short-term, 29.07 km of new drains need to be developed and addition of 17.41 km of network

needs to be done beyond 2015.

Up-gradation of existing drains: The Nagar Parishad is also required to undertake drain up-

gradation works for the existing drains in town. In the short term, 12.5 km of existing open drains

should be upgraded to Pucca open or closed drains.

Development of Root Zone Treatment System (RZTS): It is observed that the sewage flowing

through nallahs joins rivers in untreated condition and creates heavy risk of river pollution. Storm

water can be treated as well with RZTS after removal of settle able substances. It is a low-cost

and maintenance free option that uses the capacity of plants (especially certain reeds – hence

also called reedbed technology) to absorb contaminants and structurally modify them for treating

water. It is based on the principle of attached growth biological reactors similar to conventional

trickling filters with combination of aerobic and anaerobic zones. The contaminants present in the

wastewater are treated as they seep through the root-zone of the plants by a combination of

plants, soil bacteria and hydraulic flow systems resulting in physical, chemical, and

microbiological processes. Oxygen present in the zone facilitates the degradation of wastewater.

A wide variety of microorganisms present in the root-zone of the plants results in efficient

removal. There is efficient reduction of pathogens also by percolation through the bed material.

Thus, it can be developed in Rehti along storm water drains.

Exhibit 8-14: Drainage: Initiatives to be taken by Nagar Parishad

Immediate measures to be taken Authorities/Agencies responsible

Finalising the sub projects to be undertaken Rehti Nagar Parishad in consultation with

Councillors and other stakeholders

Preparation of DPR for finalised projects Rehti Nagar Parishad

Submission of DPR to funding agency Rehti Nagar Parishad

8.2.6. Traffic and transportation

Page 90: Rehti CDP English

City Development Plan - Rehti 90

Sector Goals: To link each and every part of the city with efficient transportation system.

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are:

Year Components 2015 2025 2035

ROADS & TRAFFIC

MANAGEMENT

New road formations

- 5.96 7.44

Road Widening

0.76 km 0.78 km 0.50 km

Junctions and traffic signal

improvements

Regulating traffic through better management

Regulating traffic through

better management

Regulating traffic through better management

Strategies to achieve the Sector Goals

In the case of the road sector, the broad strategy which the Nagar Parishad should follow is one

wherein the existing gaps in this sector and the future requirements would be addressed in terms of

two categories of priority or short term needs and long term needs. The overall plan should be based

on broad strategies such as:

Improving the internal road network

Awareness and Regulations enforcement

Improvement of transport infrastructure: Public Transport , Street lighting , Junctions

improvement , Parking areas and Pedestrian pathways and crossings

Map 20 (Annexure 4) shows the proposed transport network, which is required for the increasing

population and its requirement.

Long term and Short term sector interventions required:

The broad sector interventions to address both the short and long term requirements have been

enlisted below in Exhibit 8-15

Exhibit 8-15: Traffic and Transportation: Long Term & Short Term Interventions

Sector

Interventions

Required

Construction of new roads in areas which are at present earthen.

New roads to cater to missing links and developing areas: total road length

reaching 28.32 km in 2025 and 35.75 km by 2035

Improving pedestrian security by developing signals at town limits on arterial

roads.

Development of Parking Spaces

Improved bus stand and related amenities

Expected

Outcome Improved connectivity, Hassle-free travel on roads, safe driving during nights

Following are the projects proposed during the stakeholder consultation and also based on the rapid

urban assessment carried out by the Consultant. Refer Exhibit 8-16

Exhibit 8-16: Traffic & Transportation: Projects Identified by the ULB and Consultant

ULB’s Suggestion

Project Rationale

Project’s Proposed by

Consultant

Page 91: Rehti CDP English

City Development Plan - Rehti 91

Up gradation of roads to

CC

Pedestrian Security

through road signage and

signalization as short

term project.

The current road length per

capita is much lesser than the

norms; Keeping in view the

growth of the town, the total

road length needs to be

extended and the quality of

roads needs to be improved.

Construction of 5.96 Km by

2025 and further 7.4 km by

2035

Projects Envisaged

This section discusses the technical details of the projects to achieve the sector goals. As a proactive

measure to the address the increasing demand of water supply. The various projects envisaged for

the integrated development of Roads and Transportation is:

Road Construction: To address the current gap of per capita road length, and the future

demand, the Nagar Parishad does not need any new road formation up-to 2015, but would need

to construct around 7.4km of additional road by 2035. The Nagar Parishad should on a priority

basis identify the stretches and areas where roads at present do not exist and or have poor

connectivity. Also the areas where future residential growth is anticipated or planned, road

construction can be undertaken.

Signalization and Signages: The arterial road passes through the town connecting National

Highway with multiple villages. This may increase the flow of vehicles on the road in the future.

This endangers the pedestrians crossing the road. Thus there is need for signalization and proper

signages at few points.

Parking Spaces and Bus Stand: With the growing number of vehicles and increasing

commercial activities in the town, issue of lack of parking spaces becomes much more relevant.

The consultations with stakeholders have concluded that parking spaces can be developed near

the key commercial area of the town.

Exhibit 8-17: Traffic & Transportation: Initiatives to be taken by Nagar Parishad

Immediate measures to be taken Authorities/Agencies responsible

Finalising the sub projects to be undertaken Rehti Nagar Parishad in consultation with

Councillors and other stakeholders

Preparation of DPR for finalised projects Rehti Nagar Parishad

Submission of DPR to funding agency Rehti Nagar Parishad

8.2.7. Street lighting, Fire fighting

Sector Goals: To provide adequate coverage of street lights and fire fighting instruments.

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are:

Year Components 2015 2025 2035

Street Lights

New Installation 559 149 186

Energy savings Installation of

street lights with CFL Fixtures

Installation of street lights with

CFL Fixtures

Installation of street lights with

CFL Fixtures

Fire Fighting

100% fire safety coverage

Yes Yes Yes

Fully equipped power station

Yes Yes Yes

Page 92: Rehti CDP English

City Development Plan - Rehti 92

Strategies to achieve the Sector Goals

Street Lighting: To achieve the goal of 100 % coverage of road network by street light, a massive

augmentation will have to be undertaken in this sector. A survey of existing roads and street lights

should be carried out to obtain information pertaining to uncovered with street lights. The findings of

this survey should then be integrated with the plan related to the road network. All new roads should

be provided with the street lightings with proper arrangement for the underground cables.

Fire Fighting: To ensure 100% safety against fire, capacity addition in terms of equipment and

workforce should be carried out. The safety of staff should also be of paramount interest and hence,

necessary safety equipment and accessories should be procured. A rapid information system and a

fire-station should be developed to minimize the reaching time to the affected site. Since internal

streets are very narrow, small vehicles or tankers should be taken by Nagar Parishad for fire tending.

Long term and Short term sector interventions required:

The Exhibit 8-18 below presents the broad strategies being proposed to address the gaps identified in

the existing levels

Exhibit 8-18: Street Lights, Fire Fighting & Power: Long Term & Short Term Interventions

Sector

Interventions

Required

Increase in the number of CFLs as streetlights on roads

Increasing the number of street lights by 559 & 186 by year 2015 &2035

respectively.

Feasibility studies for alternate power sources

Need for tankers for fire services

Expected

Outcome

City wide coverage of road network with energy efficient street lights.

100 % coverage and safety against the fires.

Following are the projects proposed during the stakeholder consultation and also based on the rapid

urban assessment carried out by the Consultant.

Exhibit 8-19: Street Lights & Fire Fighting: Projects identified by the ULB and Consultant

ULB’s Suggestion Project’s Proposed

An overall coverage of city roads with street lights

and safety against fires

Augmentation of street light coverage

and laying of underground cable

Procurement of water tender and

capacity building of staff

Project Rationale Sub- Projects

With the growth expected in future, town‟s road

network would grow from 22.36 kms in 2015 to

35.75 kms in year 2035. Hence, to ensure a

town-wide coverage of street lights, a major

capacity addition would have to be undertaken in

this area to achieve the sector goal.

Augmentation of street lights

Augmentation of fire tankers

Projects Envisaged

Page 93: Rehti CDP English

City Development Plan - Rehti 93

This section discusses the technical details of the projects to achieve the sector goals. As a proactive

measure to the address the increasing demand of water supply. The various projects envisaged for

the integrated development of Street lights and fire services are:

Additionn of Streetlights: The Nagar Parishad needs to install a total of 559 street lights by

2015 and 186 street lights to match the demand of 2035.

Energy Saving: Rehti Nagar Parishad should replace all the tube lights with CFLs. A small

exercise was conducted to evaluate the benefits of the replacement of tube lights with CFLs in the

town. It was observed that Rehti Nagar Parishad would save around Rs. 312500/ annum in

electricity bill.

Fire Fighting: To ensure a safety against the fire, Nagar Parishad should also undertake the

construction of fully equipped fire stations.

Exhibit 8-20: Street Lighting, Fire Fighting and Power: Initiatives to be taken by Nagar Parishad

Street Lighting and Fire Fighting

Immediate measures to be taken Authorities/Agencies responsible

Finalising the sub projects to be undertaken Rehti Nagar Parishad in consultation with

Councillors and other stakeholders

Preparation of DPR for finalised projects Rehti Nagar Parishad

Submission of DPR to funding agency Rehti Nagar Parishad

8.2.8. Urban poor and their accessibility to basic Services

Sector Goals: To achieve hygienic environment in slums, access to basic services and quality

housing for all slum households with the ultimate aim of a slum-free city.

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are:

Sector Components 2015 2025 2035

Urban Poor

Access to water connection

100% of the properties assessed under property tax

100% of the properties assessed under property tax

100% of the properties assessed under property tax

Access to public toilets and urinal facilities for all slum households

100% of households (with 1 public toilet per 35 users)

100% of households (with 1 public toilet per 35 users)

100% of households (with 1 public toilet per 35 users)

Access to dustbins and secondary storage points

Door to door Collection (estimated in the overall projections for the town)

Door to door Collection (estimated in the overall projections for the town)

Door to door Collection (estimated in the overall projections for the town)

Up gradation of kutcha roads to CC roads in slums

CC Road network in slums

CC Road network in slums

CC Road network in slums

Improved drainage systems

Construction of Pucca open and Pucca closed drains in slums

Construction of Pucca open and Pucca closed drains in slums

Construction of Pucca open and Pucca closed drains in slums

Adequate street lighting facilities

Provision of street lights in the slums

Provision of street lights in the slums

Provision of street lights in the slums

Education facilities Yes (Special focus Yes (Special focus Yes (Special focus

Page 94: Rehti CDP English

City Development Plan - Rehti 94

Sector Components 2015 2025 2035

on slum areas while planning new facilities)

on slum areas while planning new facilities)

on slum areas while planning new facilities)

Adequate health facilities

Urban poor having access to same facilities as other patients in the town

Yes (Special focus on slum areas while planning new facilities)

Yes (Special focus on slum areas while planning new facilities)

Community Facilities

Urban Poor having access to same facilities as other citizens in the town

Urban Poor having access to same facilities as other citizens in the town

Urban Poor having access to same facilities as other citizens in the town

Strategies to achieve the Sector Goals

The following strategies are proposed to address the issues of urban poor and slum development in

Rehti. The broad strategies are:

Provision of basic services in slum areas

Slum improvement and rehabilitation programme to cover the whole cross-section of the urban

poor

Community empowerment for establishing linkages between community and bankers so as to

facilitate assistance to beneficiaries.

Identify institutions for imparting specialized training to the community for improving their skills

and talents

Improvement of housing conditions

Making land available to the poor at affordable prices and ensuring the provision of housing, urban

infrastructure, and other services on the government land, can provide alternatives that would restrict

the formation of new slums. Simple strategies like reservation of land for EWS housing can ensure

the creation of sufficient and affordable housing stock in the town.

Perhaps the most important change needed in managing Rehti‟s slums is fostering a collaborative

partnership between local authorities and communities, with strong support from the government.

Local authorities are the city planners, financiers, and providers of infrastructure services. Their

performance depends on good governance at the city level involving communities living in informal

settlements. This implies working with the urban poor as partners in the city development process,

and not seeing them as obstacles, as is too often the case today. Community organizations can

provide a voice for the urban poor and ensure that their interests are met in slum up gradation

programmes and urban planning.

While planning for redevelopment of slums, Nagar Parishad should focus on infrastructure such as

sewers, piped water, and electricity grids. Investments in improved sanitation should receive high

priority to improve the quality of life and reduce the high burden of oral-fecal diseases in informal

settlements caused by widespread open defecation.

Effective hygiene education and awareness-building programs are essential to create demand for

sanitation and to ensure its adequate use by all household members. Other investments required as

part of slum up gradation include investment in storm water drainage, community facilities, local

markets, and street lighting. Health services require investments as well. As mentioned earlier,

nutrition interventions for both the general population and vulnerable groups will reduce morbidity and

mortality among the urban poor. Clinics/ health posts need to be more accessible, located where the

Page 95: Rehti CDP English

City Development Plan - Rehti 95

needs are the strongest, and open during hours that can accommodate the schedules of the working

poor.

Access to credit mechanisms is of particular importance; the poor can incrementally invest in housing,

if they have adequate security of tenure, and this can become an important means of asset

accumulation.

Long term and Short term sector interventions required:

The broad sector interventions to address both the short and long term requirements are listed below

in Exhibit 8-21:

Exhibit 8-21: Urban Poor and their Accessibility to Basic Services: Long Term & Short Term Interventions

Sector

Interventions

Required

Survey to collect the exact data pertaining to existing status of slums

Making land and houses available at affordable prices

Equipping existing slums and developed areas with necessary infrastructure

Create awareness for better hygiene and education

Employment generation initiatives

Expected

Outcome

Equitable society

Better infrastructure

Projects Envisaged

The projects identified to meet the Gaps (Demand-Supply) in this sector are listed below. These

projects need to be developed by 2015.

Prepare a Slum Free City plan

Comprehensive slum mapping and need for housing

8.2.9. Health

Sector Goals: To equip Rehti with state-of-art health infrastructure so as to reduce the dependence

on other cities

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are:

Sector Components 2015 2025 2035

Health

Doctors per 1000 population 1.5 2 2

Beds per 1000 population 1 2 2.6

Effective implementation of health programmes and

related services in the slum areas of the city

To be carried in coordination of Dept. of Health,

GoMP

To be carried in coordination of Dept. of Health,

GoMP

To be carried in coordination of Dept. of Health,

GoMP

Regular checks for water contamination in all water

bodies of the city

Yes (Provision to be made for necessary

infrastructure)

Yes Yes

Strategies to achieve the Sector Goals

For the provision of medical infrastructure, Rehti Nagar Parishad‟s role is limited to primary level

services and in even the Government Hospital lacks good facilities. To promote medical facilities,

Rehti Nagar Parishad must provide a conducive environment for other government agencies and

private developers in the form of support infrastructure, incentives, etc.

Page 96: Rehti CDP English

City Development Plan - Rehti 96

Future steps towards improvement in health care facilities should be based on certain principles.

These are:

Control on Preventable diseases by safe drinking water , quality control on food items and safe

sanitation facilities

Strengthening of Health Infrastructure of the town

Awareness among the citizens

Long term and Short term sector interventions required:

The broad sector interventions to address both the short and long term requirements are listed below

Exhibit 8-22: Health: Long and Short Term Interventions

Sector

Interventions

Required

Increase in number of doctors and bed capacity of town

Development of necessary infrastructure

Primary focus on primary healthcare and control on the preventable

diseases

Expected

Outcome

Health infrastructure to ensure the 100 % coverage of patients

Provision of health facilities so as to reduce the dependence on the other

cities and towns

Projects Envisaged

This section discusses the technical details of the projects to achieve the sector goals. As a proactive

measure to the address the increasing demand of water supply. The various projects envisaged for

the Health Sector are:

Primary Health Centre: As per the UDPFI guidelines, the city need bed capacity of 26 by year

2015 and 32 by 2025 and 41 by 2035. At present, city has 14 beds. The hygiene of the hospital is

very poor and the basic infrastructure is not good. A separate project should be undertaken to

revamp the hospital in all respect.

Nursing Home: According to the estimates, a nursing home with bed capacity of 14 is required

for the town in 2035.

Dispensary: The primary health institutions always play a key role in determining the overall

health scenario of a place. Keeping it in the mind, 1 dispensary has been proposed in the town

which should start functioning by year 2015.

Exhibit 8-23: Health: Initiatives to be taken by Nagar Parishad

Immediate measures to be taken Authorities/Agencies responsible

Finalizing the sub projects to be undertaken Rehti Nagar Parishad and Dept of Health, GoMP

Preparation of DPR for finalized projects Rehti Nagar Parishad and Dept of Health, GoMP

Submission of DPR to funding agency Rehti Nagar Parishad and Dept of Health, GoMP

8.2.10. Education

Sector Goals: To achieve a 100% literacy rate with student-friendly educational institutions

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are:

Page 97: Rehti CDP English

City Development Plan - Rehti 97

Sector Components 2015 2025 2035

Education

Literacy Rate 85% 95% 100%

Enrollment in primary schools

90% 100% 100%

Teacher Student Ratio

60% of prescribed Teacher Student

ratio

80% of prescribed Teacher Student

ratio

100% of prescribed Teacher Student

ratio

Institutions for Higher Education

It has a graduation college

Yes No

Strategies to achieve the Sector Goals

For the provision of educational infrastructure, Rehti Nagar Parishad‟s role is limited to primary level

services. To promote higher-level education, Nagar Parishad must provide a conducive environment

for other government agencies and private developers in the form of support infrastructure, incentives,

etc.

Nagar Parishad should take strong steps to ensure the quality of education in schools through

standardization and performance incentives. To achieve the goals by finalized strategies, we have

estimated the number of schools and other educational institutions that would be required to achieve

a 100% literacy rate. These estimations have been done in accordance to the UDPFI guidelines. The

various Strategies are:

Awareness among the citizens

Adequate Educational institutions

Provision of support infrastructure at educational institutions

Employment generation to incentivize education

Long Term and Short Term Interventions

Exhibit 8-24 presents the broad strategies being proposed to address the gaps identified in the

existing levels.

Exhibit 8-24: Education: Long & Short Term Interventions

Sector

Interventions

Required

Development of necessary infrastructure

Awareness generation

Enforcement of regulations on private schools

Expected

Outcome

100% enrolment in primary schools

Achievement of prescribed teacher-student ratio

100 % literacy rate

Projects Envisaged

This section discusses the technical details of the projects to achieve the sector goals. As a proactive

measure to the address the increasing demand of water supply. The various projects envisaged for

the Education Sector are:

Primary Schools: The overarching goal in this sector is to achieve 100% literacy rate in the city.

Rehti requires 5 more number of schools by 2015; and 8 primary schools by 2035.

Senior Secondary Schools: 2 Senior Secondary Schools will be required by 2015 and 1 in

addition till 2035. The present Government Secondary Schools lack infrastructure facilities and

are in need of up-gradation.

Page 98: Rehti CDP English

City Development Plan - Rehti 98

As discussed earlier, Nagar Parishad‟s role in this sector is limited to the provision of providing basic

services and catalyzing involvement of other departments.

Exhibit 8-25: Education: Initiatives to be taken by Nagar Parishad

Immediate measures to be taken Authorities/Agencies responsible

Finalising the sub projects to be undertaken Rehti Nagar Parishad and Dept of Education, GoMP

Preparation of DPR for finalised projects Rehti Nagar Parishad and Dept of Education, GoMP

Submission of DPR to funding agency Rehti Nagar Parishad and Dept of Education, GoMP

8.2.11. Other Social Infrastructural Facilities

Sector Goal

“To provide a universal access to quality social infrastructural amenities to improve the

overall quality of life”

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are provided below

Sector Components 2015 2025 2035

Other Social

Infrastructure

Develop parks Yes Yes Yes

Area coverage under

recreational facilities

15% of town area

(as per UDPFI)

15% of town area

(as per UDPFI)

15% of town area

(as per UDPFI)

Playing facilities/

Sports Facilities Play grounds Play grounds Play grounds

Sufficient

infrastructure at mela

/exhibition ground

Yes Yes Yes

Strategies to achieve the Sector Goals

The core strategy adopted in this sector focuses on the development of socio-cultural facilities which

help in elevating overall quality of life in Rehti. Some of the key facilities considered under this

approach are community rooms, community hall, library, recreational club, parks, sport complex.

Nagar Parishad may also encourage public private partnership in this area for maintenance of

buildings and infrastructure.

Long term and Short term sector interventions required:

Exhibit 8-25 presents the broad strategies being proposed to address the gaps identified in the

existing levels.

Exhibit 8-26: Other Social Infrastructure: Long and Short Term Interventions

Sector

Interventions

Required

Allocation and Identification of land

Land acquisition

Up-gradation of existing facilities

Page 99: Rehti CDP English

City Development Plan - Rehti 99

Expected

Outcome

Improved quality of life

Improved access to the recreational facilities

Projects Envisaged

This section discusses the technical details of the projects to achieve the sector goals. As a proactive

measure to the address the increasing demand of water supply. The various projects envisaged for

other social infrastructural facilities are:

Considering the stakeholders view and standard guidelines, following projects have been proposed in

the town:

Community Hall: Community hall and library should be constructed in the city.

Parks: At present there is only one dushhera ground which is used for multi-purpose functions.

There vacant land in the city should be identified and developed as parks to serve the dual

purpose of increasing the green cover in the city and providing citizens with open spaces for

recreation.

Exhibit 8-27: Other Social Infrastructures: Initiatives to be taken by Nagar Parishad

Immediate measures to be taken Authorities/Agencies responsible

Finalising the sub projects to be undertaken Rehti Nagar Parishad and the stakeholders

Preparation of DPR for finalised projects Rehti Nagar Parishad

Submission of DPR to funding agency Rehti Nagar Parishad

8.2.12. Environment

Sector Goals: To accomplish clean, green and safe living environment for all citizens

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are:

Pollution Sources; Air, Water, Soil and Noise

Demand / Supply side control

Strategies to achieve the Sector Goals

For retaining the healthy status of Rehti‟s urban environment, several planning and conservation

initiatives need to be taken. This could be achieved through the proper zoning of activities, provision

for sufficient breathing space in new development and adoption of proper landscape design practices

at the town level. There should be a clear-cut strategy to conserve and protect the physical

environment, including rivers and natural drains and pond in and around Rehti Nagar Parishad. It is

important to weigh the environmental impact of the new programs or development schemes. Lately, a

large number of unauthorized layouts have come up in the town, in south eastern part of the town. It

is important to devise a plan, which can check the growth of these unauthorized developments. Pond

conservation should also be explored with the possibilities of reviving ponds for water sources or

points of interest in the town by pond front development.

Projects Envisaged

Page 100: Rehti CDP English

City Development Plan - Rehti 100

This section discusses various aspects of urban environment and their addressing by the projects

proposed in other urban services. In addition to this, some projects are also proposed with specific

focus on improving the quality of environment.

Air Quality: Periodic monitoring and review is essential to check air quality. Suitable plantations

or green cover should be provided on major routes to supplement better air quality. This would

partially be addressed by the development of Parks in the town and a massive tree plantation

drive.

Water Pollution: Efforts/schemes should be designed to check the diversion of sewage flow into

the existing drains. Decentralized sewage treatment can be considered to have low cost and

environment friendly system.

Ground Water Recharge: A critical issue that needs to be addressed on the priority basis is the

development of green spaces within the town limits to enhance the overall quality of the

environment.

Green Spaces: A critical issue that needs to be addressed on the priority basis is the

development of green spaces within the town limits to enhance the overall quality of the

environment.

8.2.13. Tourism

Sector Goals: To improve tourism infrastructure in Rehti in order to cater to Salkanpur tourists

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are:

Hospitality Institutions

Regional Connectivity

Strategies to achieve the Sector Goals

As a measure to effectively utilize the city‟s potential, a comprehensive survey should be carried out

for the tourist coming to Rehti. The survey should try to elicit details like frequency of visit, willingness

to stay in Rehti, services they expect, willingness to pay for better infrastructure, etc. This survey

would provide us with an extensive database and would be critical for public and private sector in

setting up necessary infrastructure like hospitality institutions, transportation, recreational /

entertainment infrastructure, etc. There lies enormous tourism potential in Rehti in the form of

religious tourism.

8.2.14. Economic Development

Sector Goals: Sustainable economic development on the basis of inherent strengths of the city

through promotion of health, education, tourism and industrial sectors – focus on local employment

opportunities.

Strategies to achieve the Sector Goals

The town economy is predominantly agrarian in nature with majority of the workers engaged in

primary sector activities and educated youths migrate out of town for employment opportunity. The

town lacks a sound economic activity base. The weak town economy has also resulted in the brain-

drain which in turn affects the town‟s economy. Resources should be mobilised to provide support to

boost the local economy. Measures should be taken to establish small and medium scale industries.

Page 101: Rehti CDP English

City Development Plan - Rehti 101

Special care needs to be taken for women employment and education. In a nutshell, following

strategies need to be adopted for sustainable economic development:

1. Incentivizing agriculture

2. Promoting small & medium scale industries

3. Strengthening the markets

4. Improving transportation infrastructure

Long term and Short term sector interventions required:

Exhibit 8-28 presents the broad strategies being proposed to address the gaps identified in the

existing levels

Exhibit 8-28: Economic Development: Long and Short Term Sector Interventions

Sector

Interventions

Required

Development of small scale industrial area (herbal-based)

Rejuvenation of trade and commerce

Development of agro based industries

Expected

Outcome

New employment opportunities

Improved average income and access to better facilities

Projects Envisaged

This section discusses the technical details of the projects to achieve the sector goals. As a proactive

measure to the address the increasing demand of water supply. The various projects envisaged for

economic development of the town are:

Development of Commercial Areas: This can further be divided into development of new

commercial areas and up gradation of existing commercial areas. New commercial areas can

include dedicated markets for important commodities or general markets. In addition to the

development of new markets, existing markets can be upgraded to increase their capacity and

provide better services to the users and customers.

Development Herbal Manufacturing Units: With the objective of diversifying the economic

base of Rehti city, the existing herbal manufacturing unit should be developed. This would

thrust to the employment generation activities result into the overall upliftment of the society in

the town.

Development of Hawkers Zone: Depending on the land availability and market demand,

hawker‟s zones should be developed in near Salkanpur Temple. The Hawkers zone would

dedicate space to the hawkers and hence reducing congestion in the temple premises.

Organization of Trade Fairs and Other Exhibitions: With the objective of attracting private

investments, trade fairs and other exhibitions should be organized at regular intervals in the city.

This would serve the multiple purposes of showcasing Rehti‟s potential.

Exhibit 8-29: Economic Development: Initiatives to be taken by Nagar Parishad

Immediate measures to be taken Authorities/Agencies responsible

Finalising the sub projects to be undertaken Rehti Nagar Parishad

Preparation of DPR for finalised projects Rehti Nagar Parishad

Submission of DPR to funding agency Rehti Nagar Parishad

Page 102: Rehti CDP English

City Development Plan - Rehti 102

8.2.15. Urban Governance

Sector Goals: Sector Goal: Well managed city with proactive and proficient staff

Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal

are:

No. Achievement Target 2015 2025 2035

1 Decentralization of urban functions to local bodies 100% 100% 100%

2 Establish clarity of roles and responsibilities. 100% 100% 100%

3 Training to enhance capacity building. 100% 100% 100%

4 People‟s Participation in Governance 50% 80% 100%

Strategies to achieve the Sector Goals

The decentralization of urban functions to local bodies has increased their responsibilities manifold.

For the prescribed level of service delivery, Rehti Nagar Parishad should take concerted actions to

augment the capacity, wherever necessary, and enable existing staff to perform efficiently by

providing them with necessary training. E-governance will be very helpful in smoothening various

process & procedures. It will also lead to an expeditious service delivery.

Projects Envisaged

Capacity Building: There is a need for training of the existing staff and new staff to increase the

productivity of the work. Workshops and awareness programmes can be conducted.

Computerization: Rehti Nagar Parishad should initiate the process of computerization in its

administration. Computerization will benefit most of its functions ranging from municipal

accounting to tax management. The introduction of E-Governance will help in smoothening the

processes and improvement in the efficiency.

GIS Mapping: A GIS mapping of the city properties will be very helpful in the provision of efficient

services to the citizens. This would also help in keeping a tab on tax evaders.

8.2.16. Conclusion

This chapter dealt with the city vision, sector goals and sector strategies to achieve sector goals. It

also presents the identified interventions required in every sector which is followed with identification

of projects and project implementation agencies in all of its sub sections.

Page 103: Rehti CDP English

City Development Plan - Rehti 103

9. City Investment plan and Financing Strategies

To achieve the formulated vision of Rehti, a City Investment Plan (CIP) has been prepared through a

comprehensive process of assessment of gaps in physical and social infrastructure sectors. This

assessment has also led to the identification of sector specific strategies, implementation actions and

associated reforms with specific inputs from stakeholders.

The strategies adopted primarily have three dimensions; improving the service delivery by efficiency

measures, improving service delivery by creating infrastructure assets and improving the governance

aspects of Rehti Nagar Parishad. This section summarizes the capital investments required for

creating infrastructure assets and various strategic interventions required in the implementation of

such projects; these strategies are both investment and administrative oriented.

9.1. City Investment Plan (CIP)

The City Investment Plan is a multi-year scheduling of identified and prioritized investments. The

scheduling or phasing of the plan is based on the assessment of fiscal resources‟ availability (for new

investments and O&M), technical capacity for construction and O&M, and the choice of specific

improvements to be carried out by 2015-16.

The need for the CIP is on account of:

City growth and infrastructure needs (to be carried out once every five years)

Scheduling of investments of ongoing projects due to cost and/ or time overruns

Assigning of priorities within the constraints of available financial resources

9.2. Institutionalising the CIP Process

The City Investment Plan is an important element and is significant in terms of the city‟s management

process and sustainability with regard to the delivery of basic services. The CIP will also provide a

framework for the annual budget cycle of Rehti Nagar Parishad for the next five years. As a part of

Rehti CDP, CIP includes the following:

The desired service levels/ standards for infrastructure provision;

Identified the roles and responsibilities of various stakeholders in the implementation of

identified projects.

Project phasing and strategies for implementation.

Rehti Nagar Parishad has the primary responsibility of delivering municipal services. So the CDP

proposals will be implemented by the Nagar Parishad. The projects, prioritization, investment phasing,

strategies and action plan are framed accordingly.

The CIP involves the identification of public facilities to cater demand of the city populace in the years

2015 and 2035. The projects have been identified through a demand-gap analysis for various urban

services. Identification of projects was followed by their prioritization based on the stakeholder‟s

consultation. The projects identified are aimed at ensuring the optimal and efficient utilization of

existing infrastructure systems and enhancing the capacity of the systems/services to cater to the

demands of future population. In addition to the projects which are related to major urban services,

Page 104: Rehti CDP English

City Development Plan - Rehti 104

CIP also includes developmental projects like greenery development, parking spaces, system

modernization etc.

The CIP and forecasted future needs for provision of capital facilities under each identified sector is

presented below. These assets will help Rehti in improving the quality and coverage of service for the

current population as well as accommodate the expected increase in population. In some of the

sectors like source augmentation for water supply, development of landfill site etc, a planning horizon

of 25 years has been considered. Rehti Nagar Parishad expects that these infrastructure assets

would not only guarantee services to its citizens, but also signal a proactive commitment to potential

investors.

9.3. City Priorities

A questionnaire survey to elicit stakeholders‟ responses on key issues faced by city and extent of their

severity was done. A questionnaire, provided in Annexure 2 was designed by IMaCS team to gain a

comprehensive understanding of city-level and ward-specific issues encountered by citizens of Rehti.

The questionnaire survey tried to obtain stakeholders‟ vision of city, prioritization of various urban and

infrastructural services.

The questionnaire was divided into two parts; one corresponding to the entire city and the second part

corresponding to the ward specific issues.

In the first part of the questionnaire, questions pertaining to the whole city were included such as

important aspects of the city, economic drivers, physical & social infrastructure, etc. The respondents

were asked to rank the criticality of the issues on a scale of 1 to 9 with 1 being most critical and 9

being the least. The guidelines to decide the criticality included importance of a particular sector in

city‟s development and existing status of the sector. These sectors were further divided into various

components and respondents were again asked to rank the criticality of these components. This

provided the information corresponding to the adequacy of the supporting infrastructure and facilities

related to these sectors. The sectors included in the questionnaire were: Road network, Road surface

condition, Water Supply, Sewerage facility, Storm water drainage, Solid waste management, Health

facilities, Education facilities, and Greenery and adequacy of open space e.g. adequacy of parks,

lawns in the city etc.

In the second part of the questionnaire, a detailed survey of ward-wise infrastructure facilities was

carried out. The approach and methodology adopted in this part was same as that followed in the first

part of the questionnaire. Each respondent was asked to respond with respect to the ward he/she

belongs to.

The data collected through the questionnaire survey was analyzed to prioritize various

sectors/services of the city according to their criticality. In addition to this, various components of each

sector were also prioritized in order to identify the critical areas of all urban sectors/services. The data

set included 30 responses for each question of the questionnaire.

Questionnaire analysis:

A basic analysis which includes percentage of respondents who have ranked various infrastructure

sectors on a scale of 1 to 9 is given in Exhibit 9-1. A brief study of the Exhibit suggests that

Sewerage, Water System, Roads and Health Infrastructure are among the most critical problems

faced by the residents in Rehti.

Exhibit 9-1: Status of Infrastructure Facilities (%)

Problems/ Ranks 1 2 3 4 5 6 7 8 9

Page 105: Rehti CDP English

City Development Plan - Rehti 105

Problems/ Ranks 1 2 3 4 5 6 7 8 9

Road Network 5.88 - - 17.65 - 11.76 11.76 11.76 5.88

Road surface

Condition - 11.76 - 5.88 5.88 17.65 5.88 - 17.65

Availability of water 5.88 5.88 - 5.88 17.65 5.88 17.65 5.88 -

Sewerage facility 5.88 5.88 23.5

3 17.65 - - 11.76 - -

Storm Water

Drainage facility - 17.65

17.6

5 5.88 29.41 5.88 - - 5.88

Solid Waste - 11.76 11.7

6 5.88 17.65 - 5.88 5.88 5.88

Health Facility 35.29 - 5.88 - - 11.76 - - -

Education Facility - - 5.88 - 5.88 11.76 11.76 17.65 11.76

Parks - 17.65 5.88 5.88 - - - 23.53 11.76

Source: IMaCS Analysis

In addition to a preliminary analysis, an overall rank for each sector was derived out of cumulative

perception in terms of its criticality. A decreasing rank order of various infrastructure facilities is given

in Exhibit 9-2. The ranking thus obtained lays down a path for prioritization of development works in

the city. It would try to synchronize the usage of developmental funds with the needs of the city. It

should be kept in mind that the Exhibit below is only an indicator of relative criticality of various

sectors/services.

Exhibit 9-2: Ranking of Infrastructure Facilities

Rank Infrastructure Facility

1 Storm Water Drainage

2 Road Surface Condition

3 Sewerage facility

4 Health Facility

5 Solid Waste Management

6 Road Network

7 Education facility

8 Availability of water

9 Parks, Lawns

Source: IMaCS Questionnaire Survey Analysis

A detailed analysis was carried out for each sector in order to identify the most critical problem within

each sector. The findings of this analysis will be useful while devising City Investment Plan, Annual

Action Plan and Prioritization of projects within each sector. Exhibit 9-3 lists most critical problems in

the various sectors/services of the city.

Exhibit 9-3: Critical Sectoral Issues

Sector Most critical problem

Water Supply Supply Hours

Storm Water Drainage Blocked Drains

Transportation Encroachments

Solid Waste Management Shortage of collection site

Source: IMaCS Analysis

Page 106: Rehti CDP English

City Development Plan - Rehti 106

As for the social infrastructure, stakeholders were asked to rank their perception on a scale of 1 to 4

with 1 being Good, 2 being Satisfactory, 3 being Poor and 4 being Very Poor. From the responses it

has been observed that the city in-general suffers from poor social infrastructure which includes

parks, proper markets & parking space, recreational activities, and good education and health care.

9.4. Summary of Investments

The total estimated capital investment required for providing efficient services to the present

population and future population of Rehti by the year 2035 is Rs. 5383 Lakh at constant prices. Of the

total identified investment need a total of Rs. 3443 Lakh is proposed for investment for Rehti Nagar

Parishad by 2015.

Investment Head (Agency/ Period) Rs. Lakh

Total investment Need of Rehti by 2035 5383

Investment by Rehti Nagar Parishad by 2015 3443

Source: Computed Values

The planning horizon for the projects identified in sectors of urban poor/ slums, system modernization,

city beautification etc which can be taken up immediately by 2015 therefore the entire identified

investment is proposed for funding by 2015 itself. In case of core service sectors of water supply,

sewerage, drainage, solid waste management 2035 is considered as the planning horizon and hence

only part of the identified investment is proposed for funding by 2015. Rehti will need to plan for the

remaining identified investment to be funded beyond 2015. Also, the projects already under

preparation by the ULB as indicated in the strategy section will form a part of the total investment

need identified in the CIP. Exhibit 9-4 presents the summary of sector-wise total investment need and

investments up to 2015.

Exhibit 9-4: Summary of Capital Investments

S.No.

Rehti Nagar Parishad

Investment by ULB

Investment by 2015

Investment beyond 2015

Total Investment Need (Upto 2035)

Rs. Lakh Rs. Lakh Rs. Lakh

A Water Supply 585 232 817

B Sewerage and Sanitation 289 74 363

C Urban Roads, Transport & Traffic 832 244 1293

D Storm Water Drains 238 143 496

E Street Lighting 173 60 276

F Solid Waste Management 27 30 97

G Urban Poor/ Slums' Improvement 442 62 597

H Health Infrastructure 506 174 796

I Education Infrastructure 130 166 361

J Socio-Cultural Facilities 62 - 62

K Urban Environment 17 5 30

L Urban Governance 12 4 20

M Heritage & Tourism 5 3 10

N Economy 65 - 65

O Other Projects 60 20 100

Total Investment Identified 3443 1215 5383 Source: IMaCS Analysis

Page 107: Rehti CDP English

City Development Plan - Rehti 107

Investment need for the Rehti Nagar Parishad

As can be observed from the table above, a significant amount i.e. 59% of the total investment is

needed by the year 2015. From the perspective of sector priorities, about 47% of the investment

required for water supply will be proposed by year 2015 and 64% would be proposed for Sewerage

and Sanitation. Drains and road sectors envisage around 48% and 64% respectively of the identified

investment by 2015 while street lighting sector envisage about 63% of the identified investment.

Within the total investment proposed for Rehti Nagar Parishad, apart from other investments which

include, health, education, community development etc maximum share is taken by the Roads sector

at 24 % followed by drain and health sector at 15.2% and 14.8% respectively. Sewerage accounts for

7% and solid waste management accounts for 2 % of the investment. Slum rehabilitation accounts for

about 3 % of the total investment by 2015.

Sector wise details of the City Investment Plan, capital facilities costs, supportive actions and

implementation aspects are discussed in the following sections in detail. Demand-gap assessment

leading to various projects‟ identification has already been done in chapter 6.

9.5. Sector wise CIP details – Capital needs/ Investments

9.5.1. Water Supply

The total investment need for water sector by year 2035 is estimated at Rs. 816.52 Lakh . However

the gaps in the system are to be filled in phases in line with the quantum of population addition.

Accordingly, part of the identified investment proposed to be funded by 2015 will cater to the current

gaps and meet the immediate requirements.

A DPR has been prepared to enhance the water capacity by withdrawing water from river Babar. This

project should be taken up on immediate level as the current supply is way below desired levels as

already discussed in sector analysis.

Priority needs (2015) / Long term needs (2035)

Sector/ Component

Investment up to 2015

Investment beyond 2015

Total Investment till 2035

(Rs. Lakh ) (Rs. Lakh ) (Rs. Lakh )

Water Supply 584.83 231.69 816.52

1 Source Augmentation 58.96 20.08 79.04

2 Treatment capacity 170.40 44.74 215.14

3 Distribution Network 249.42 126.40 375.82

4 Elevated Storage

capacity w.r.t. Supply 23.67 13.38 37.06

5 Refurbishment of Old Distribution Network

69.17 22.87 92.04

6 Metering System 13.20 4.23 17.43

7 Public Stand Posts - - - Source: IMaCS Analysis

Action Plan for Implementation (2015)

Water Supply 2012 2013 2014 2015

Investment

up to

2015(Rs.

584.83 82.33 185.94 108.59 207.97

Page 108: Rehti CDP English

City Development Plan - Rehti 108

Water Supply 2012 2013 2014 2015

Lakh )

Capital

Facilities

Water supply Augmentation

Treatment Plant

Distribution network

augmentation

Elevated storage reservoirs

of 3.04 ML capacity

System refurbishment &

replacements

Support &

System

Sustenance

Measures

Metering System

Regularise unauthorised

connections, Check

distribution leaks and reduce

UFW

Improve collections to reach

85% collection efficiency by

2015

Action

Measures

The Nagar Parishad will have to develop a comprehensive water management

plan for the city including details of groundwater availability, use, potential for

increasing the water drawn from the available ground water source of the town.

Identify the areas hitherto not covered by water distribution network and develop

a comprehensive plan for providing water supply to these areas.

Increase the number of domestic connections

Reserve land for zones that are good for water recharge and water conservation

Sector

Notes

Capital investments on system refurbishment and replacement shall happen only

after conducting water audit and identification of UFW sources

Improvement of collection efficiency is applicable to both arrears and current

demand

Performance

Monitoring

Indicators

Daily per capita water supply (min of 135 lpcd)

Elevated storage capacity w.r.t. supply (33%)

Distribution network reach as % of road length (min 85%)

System coverage – water HSCs as % of PT assessments (min 85%)

Cost recovery through user charges (100% O&M expenses)

Source: IMaCS Analysis

9.5.2. Sewerage & Sanitation

The total investment need for sewerage sector by 2035 is estimated at Rs. 363.19 Lakh . However

the gaps in the system are proposed to be filled in phases in line with the quantum of population

addition and augmentation of water supplies to the town. Accordingly part of the identified investment

is proposed to be funded by 2015 to cater to the current gaps and meet the immediate requirements.

Priority needs (2015) / Long term needs (2035)

Sector/ Component

Investment up to 2015

Investment beyond 2015 Total Investment till 2035

(Rs. Lakh ) (Rs. Lakh ) (Rs. Lakh )

Sewerage & Sanitation

289.39 73.80 363.19

1 UGD Network 254.87 66.92 321.79

Page 109: Rehti CDP English

City Development Plan - Rehti 109

2 Treatment Capacity 26.22 6.88 33.10

3 Public Convenience Seats

8.30 - 8.30

Source: IMaCS Analysis

Action Plan for Implementation (2015)

Sewerage System/ UGD 2012 2013 2014 2015

Investment

up to

2015(Rs.

Lakh )

289.39 30.18 101.29 101.70 56.22

Capacity

Facilities

Collection network augmentation

Sewerage Treatment Plants

(decentralized waste water

treatment method to be adopted)

Pumping Machinery

Support &

System

Sustenance

Measures

Ensure every house tax

assessment & water connection is

also connected to the UGD

Improve collections to reach 85%

collection efficiency by 2015

Action

Measures

Eradicate the conditions which give rise to conditions of malaria and other water

borne diseases.

Ensure access of sanitary facilities to the slum dwellers

Isolate sewerage system from storm water and drinking water channels

Source: IMaCS Analysis

9.5.3. Roads and traffic management

The total investment need for roads, street lighting and traffic management sectors by 2035 is

estimated at Rs. 1293 Lakh . However the gaps in the system are proposed to be filled in phases in

line with the area being developed and quantum of population addition. Accordingly part of the

identified investment is proposed to be funded by 2015 to cater to the current gaps and meet the

immediate requirements.

Priority needs (2015) / Long term needs (2035)

Sector/ Component

Investment up to 2015 Investment beyond 2015

Total Investment till 2035

(Rs. Lakh ) (Rs. Lakh ) (Rs. Lakh )

Roads & Urban Transport 831.55 461.45 1293

1 Roads Up gradation 85 40.18 125.18

2 Roads New Formation 193.05 348.23 541.28

3 Roads Widening & Strengthening

43.50 73.04 116.54

4 Bridges/Flyovers/subways

500 - 500

5 Development of Bus stop

10 - 10

Source: IMaCS Analysis

Action Plan for Implementation (2015)

Page 110: Rehti CDP English

City Development Plan - Rehti 110

Roads, Street lighting and

Traffic Management 2012 2013 2014 2015

Investment

up to 2015

(Rs. Lakh )

Rs. 831.55

Lakh 52.00 175.73 240.54 363.28

Capital

Facilities

Roads Up-

gradation

New road

formation

Widening &

Strengthening

(Improvement

of traffic

system and

Junction

improvements

)

Development

of Bus Stop

Action

Measures

Identification of earthen roads which need to be upgraded to BT/CC

Improve connectivity within the Municipal area

Provide parking lots and introduce parking fee

Provide for footpaths on the existing and yet to be developed roads

Sector Notes

The design of the new roads should have provision for shoulder, foot paths, utility

ducts and storm water drains under the foot paths.

New roads development shall be integrated with the drain construction (i.e. for

any new road drainage facility to be planned and constructed alongside)

Performance

Monitoring

Indicators

Road network – Degree of connectivity in terms of per-capita road length (min

1.75 m)

Road condition - % municipal roads surfaced (100% - CC/ BT surfacing)

Source: IMaCS Analysis

9.5.4. Storm Water Drainage

The total investment need for drains sectors by 2035 is estimated at Rs. 496.25 Lakh . However the

gaps in the system are proposed to be filled in phases in line with the road network being developed

and quantum of population addition. Accordingly part of the identified investment is to be funded by

2015 to cater to the current gaps and meet the immediate requirements.

Priority needs (2015) / Long term needs (2035)

Sector/ Component

Investment up to 2015 Investment beyond 2015 Total Investment till

2035

(Rs. Lakh ) (Rs. Lakh ) (Rs. Lakh )

Drains 237.98 258.28 496.25

1 Drains Up gradation

78.06 - 78.06

2 Drains New Formation

159.92 258.28 418.20

Source: IMaCS Analysis

Page 111: Rehti CDP English

City Development Plan - Rehti 111

Action Plan for Implementation (2015)

Storm Water Drainage 2012 2013 2014 2015

Investment

up to 2015

(Rs. Lakh )

237.98 Lakh 59.49 35.70 83.29 59.49

Capital

Facilities

New formation of

closed drains

Up gradation

Support &

System

Sustenance

Measures

Ensure that every

divided road to have

closed drains on either

side and undivided

roads have drains on

at least one side

Action

Measures

Isolate sewerage system from drinking water and storm water lines

Identify, delineate, sanitize and protect the natural drainage system of the city

Adopt Root Zone treatment system for cleaning water in storm water drains before

final disposal

Sector

Notes

Improve drainage network on a priority basis in flood prone areas

All new roads to be designed shall have adequate provision for storm water

drains.

Constructing new drains shall be integrated with the new roads development

Performance

Monitoring

Indicators

Drainage network should 130% of road length

All divided roads to have drains on either side and undivided roads on at least one

side

Drains to be cleaned before and after monsoon for better functioning

Source: IMaCS Analysis

9.5.5. Solid Waste Management

The total investment need for conservancy and sanitation sectors by 2035 is estimated at Rs. 96.97

Lakh . However the gaps in the system are proposed to be filled in phases in line with the road

network being developed and quantum of population addition. Accordingly part of the identified

investment is to be funded by 2015 to cater to the current gaps and meet the immediate

requirements.

Action Plan for Implementation (2015)

Solid Waste Management 2012 2013 2014 2015

Investment

up to 2015

(Rs. Lakh )

Rs. 96.97 Lakh 6.52 9.59 11.30 -

Capital

Facilities

Acquisition of new vehicles

for primary and secondary

collection

Land fill infrastructure and

composting facility

development at disposal site

Page 112: Rehti CDP English

City Development Plan - Rehti 112

Solid Waste Management 2012 2013 2014 2015

Container Bins & dumper

placers

Construction of pay & use

public convenience systems

in slums

Support &

System

Sustenance

Measures

Implementation of complete

door -to-door collection

Part-privatisation of house-to-

house collection at 80%

households (Rehti Nagar

Parishad to cover only 20%

households)

Awareness campaign on

source segregation

Other

actions/

Measures

Increase the ambit of Solid Waste Management to include “recycling” and to

facilitate and regulate the sector accordingly.

Ensure optimum utilization of existing fleet

I-E-C campaigns to be initiated for awareness among the urban poor and slum

dwellers towards better SWM practices

Initiate steps towards sharing the responsibility of primary collection of

segregated garbage with citizens

Develop transfer stations in a scientific, eco-friendly manner – processing waste

at these sites, for different types of material

Develop decentralized waste processing sites at each zone- appropriate

technologies

Improve and ensure access to sanitary facilities for the urban poor and slum

dwellers.

Encourage pay & use category of public conveniences with community

involvement in the maintenance of the same.

Sector

Notes

Rehti Nagar Parishad shall be the prime implementing agency for the sector

For establishment of Intermediate Transfer Stations to reduce cost of

transportation, identify sites which are cost effective

Identify localized/ decentralized locations for processing/ disposal/ reuse of bio-

degradable and plastic waste

Performance

Monitoring

Indicators

Source segregation – reduction of waste to be collected (min 70 % of waste

generated)

Door-to-door collection as % of households covered (min 80%)

Optimum fleet utilization (No. of trips/ vehicle/ day - average minimum of 2.5)

Vehicle capacity as % of rated capacity to waste generated (minimum 100%)

Source: IMaCS Analysis

9.5.6. Street Lights & Fire Fighting

The total investment need for street lighting by 2035 is estimated at Rs.275.93 lakh . However the

gaps in the system are proposed to be filled in phases in line with the area being developed and

Page 113: Rehti CDP English

City Development Plan - Rehti 113

quantum of population addition. Accordingly part of the identified investment is proposed to be funded

by 2015 to cater to the current gaps and meet the immediate requirements. Funds for fire services

have already been sanctioned for the town by Madhya Pradesh Government, thus it has not been

taken into account.

Priority needs (2015) / Long term needs (2035)

Sector/ Component

Investment up to

2015

Investment

beyond 2015

Total Investment

till 2035

(Rs. Lakh ) (Rs. Lakh ) (Rs. Lakh )

Street Lighting 172.75 103.8 275.93

1 New Installation 139.75 83.75 223.50

2 Underground Cabling 33 19.43 52.45

Action Plan for Implementation (2015)

Street Lighting 2012-13 2013-14 2014-15 2015-16

Investment Up to

2015 (Rs. Lakh ) 172.75 43.19 43.19 51.83 34.55

Capital Facilities New Installation

Underground Cabling

Action Measures Replacement of existing tube lights and high power lamps with appropriate

CFLs to reduce energy consumption and electricity bills.

New Installation should include CFLs

9.5.7. Slums and Basic Services for Urban Poor

The requirements in the sector are of immediate priority and hence, the planning horizon for the

sector is 2015 and accordingly projects and investments identified are to be funded by 2015. A sum of

Rs. 442.15 Lakh is the investment identified for various improvement projects and for providing basic

services to urban poor.

Action Plan for Implementation

Slums and Urban Poor 2012 2013 2014 2015

Investment

up to 2015

(Rs. Lakh )

Rs. 442.15 Lakh 90.61 164.67 86.25 100.63

Capital

Facilities

In situ rehabilitation of slums-

housing

Infrastructure development for

Slum rehabilitation

Other

actions/

Measures

Providing for reservation of lands for EWS

Facilitating access to credit for urban poor. Rehti Nagar Parishad can explore the

option of acting as a guarantor.

Frequent meetings with slum dwellers towards encouraging participation in slum

development programmes, awareness creation on beneficiary contribution to

project development and also assuming the responsibility of implementing the

Page 114: Rehti CDP English

City Development Plan - Rehti 114

Slums and Urban Poor 2012 2013 2014 2015

projects.

Facilitate and encourage the neighborhood concept in slums to carry out towards

recreational activities such as reading, sports and drama.

Sector

Notes

Infrastructure and basic services‟ provision in slums shall not be in isolation but in

conjunction and in line with overall infrastructure development in the city.

Awareness on health and hygiene shall be created among slum dwellers in line

with the long-term goal of moving towards individual toilets and doing away with

public convenience systems.

Performance

Monitoring

Indicators

Water Supply –Individual house service connections to all

Sewerage - Individual house service connections to all

Sanitation – Community toilets in short run and individual toilets in long run

Solid Waste Management- Coverage of all slum households under door-to-door

collection and awareness campaigns on source segregation

Source: IMaCS Analysis

9.6. Social Infrastructure

9.6.1. Health Infrastructure

To meet the formulated sector goal with satisfactory level of service indicators, the sector would

require an investment of Rs 796.00 Lakh by 2035. However, the gaps in the system are proposed to

be filled in phases in line with the area being developed and quantum of population addition.

Priority needs (2015) / Long term needs (2035)

Sector/ Component

Investment up to

2015

Investment

beyond 2015

Total Investment

till 2035

(Rs. Lakh ) (Rs. Lakh ) (Rs. Lakh )

Health Infrastructure 506 290 796

1 General Hospital 416 240 656

2 Nursing Home 90 50 140

Action Plan for Implementation (2015)

Health Infrastructure 2012 2013 2014 2015

Investment Up to

2015 (Rs. Lakh ) 506 149.00 190.60 83.20 83.20

Capital Facilities General Hospital

Nursing Home

Action Measures Augmentation of Bed Capacity of the city by either developing new facilities

or upgrading the existing ones

Development of Nursing home and Dispensaries

Generating awareness about safe sanitation

Page 115: Rehti CDP English

City Development Plan - Rehti 115

Health Infrastructure 2012 2013 2014 2015

Sector Notes Provisions should be made for the optimal utilization of health infrastructure

by tackling obstacles like shortage of power, medical staff, etc

Primary care should be given due importance

Hospital waste should be properly disposed

Source: IMaCS Analysis

9.6.2. Education Infrastructure

To meet the formulated sector goal with satisfactory level of service indicators, the sector would

require an investment of Rs 360.86 Lakh by 2035. As per the population projection the need of any

new educational facility is not required by 2015, therefore complete investment would be required

beyond 2015-16. The Education Sector needs to be strengthened by developing new schools at

required levels, equipping schools with basic infrastructure, complementing education with

employment opportunities and generating awareness about education. There is also a need to

consider that, provisions should be made for the optimal utilization of education infrastructure by

tackling obstacles like shortage of power, staff, etc and primary education should be given its due

importance.

Social Infrastructure Projects

Education

Name of the Project Construction of 8 primary, 3 secondary schools

Need of the Project

Current educational infrastructure is supporting the

current demand, but additional requirement stated above

would be needed to support the future demand

Source: IMaCS Analysis

9.7. Socio – Cultural Facilities

To meet the formulated sector goal with satisfactory level of service indicators, the sector would

require an investment of Rs 62 Lakh by 2035.

Priority needs (2015) / Long term needs (2035)

Sector/ Component

Investment up to

2015

Investment

beyond 2015

Total Investment

till 2035

(Rs. Lakh ) (Rs. Lakh ) (Rs. Lakh )

Socio-Cultural Infrastructure 62.02 - 62.02

1 Play grounds 50 - 50

2 Community Hall 0.02 - 0.02

3 Development of Mela Ground 12 - 12

Action Plan for Implementation (2015)

Socio-Cultural Infrastructure 2012 2013 2014 2015

Investment Up to

2015 (Rs. Lakh ) 62.02 4.80 29.81 27.41 -

Page 116: Rehti CDP English

City Development Plan - Rehti 116

Socio-Cultural Infrastructure 2012 2013 2014 2015

Capital Facilities Play Grounds

Community Hall

Development of Mela Ground

Action Measures Development of Community Rooms, Community hall and a Public Library

Development of Green Spaces

Development of a Recreational Club, a Sports Complex and a Swimming

Pool

Sector Notes Maintenance of these public facilities plays a crucial role in preserving the

assets

A healthy socio-cultural atmosphere fosters a healthy environment for growth

Land for these facilities can be acquired under the Public Purpose

9.8. Urban Environment & Tourism

9.8.1. Urban Environment

To meet the formulated sector goal, an investment is made of about Rs 30 Lakh by 2035. An

investment plan was devised for the improvement of urban environment considering the future threats

in the short and long terms.

Priority needs (2015) / Long term needs (2035)

Sector/ Component

Investment up to

2015

Investment

beyond 2015

Total Investment

till 2035

(Rs. Lakh ) (Rs. Lakh ) (Rs. Lakh )

Urban Environment 17 13 30

1 Tree plantation 5 5 10

2 Preservation of Water Bodies 12 8 20

Action Plan for Implementation (2015)

Socio-Cultural Infrastructure 2012-13 2013-14 2014-15 2015-16

Investment Up to

2015 (Rs. Lakh ) 17 3 3 3 1

Tasks Identified Tree plantation including Root

Zoning treatment system

Action Measures Strengthening of Waste Collection and Disposal Mechanism and Waste

Water Conveyance System

Development of green spaces and tree plantation

Initiatives for ground water recharge & preservation of water bodies

9.8.2. Tourism

Page 117: Rehti CDP English

City Development Plan - Rehti 117

To meet the formulated sector goal, an investment is made of only about Rs 10 Lakh by 2035. An

investment plan was devised for the improvement of urban environment considering the future threats

in the short and long terms.

Priority needs (2015) / Long term needs (2035)

Sector/ Component

Investment up to

2015

Investment

beyond 2015

Total Investment

till 2035

(Rs. Lakh ) (Rs. Lakh ) (Rs. Lakh )

Tourism 17 13 30

1 Infrastructure 5 5 10

Action Plan for Implementation (2015)

Socio-Cultural Infrastructure 2012-13 2013-14 2014-15 2015-16

Investment Up to

2015 (Rs. Lakh ) 5 0.50 0.50 1.50 2.50

Tasks Identified Developing Infrastructure

Action Measures Provision of rest houses/ hotels

Sufficient parking Infrastructure

9.9. Urban Governance

To meet the formulated sector goal with satisfactory level of service indicators, the sector would

require an investment of Rs 20 Lakh till 2035, whose investment snapshot is given below.

Sector/ Component

Investment up to

2015

Investment

beyond 2015

Total Investment

till 2035

(Rs. Lakh ) (Rs. Lakh ) (Rs. Lakh )

Urban Governance 12 8 20

1 Computerization 3 2 5

2 Training Modules 3 2 5

3 GIS Mapping 6 4 10

Action Plan for Implementation (2015)

Urban Infrastructure 2012 2013 2014 2015

Consolidated Yearly Investment (Rs Lakh ) 7.80 1.80 1.80 0.60

Tasks Identified

Electronic Items for Computerization

Training Modules

GIS Mapping

Action Measures

Computerization for improving accountability in the system

GIS mapping for having a wide database which can be used for improving the

revenue, better planning and implementation

9.10. Other Investment requirement

Page 118: Rehti CDP English

City Development Plan - Rehti 118

During discussions it was identified that town requires improvement of crematorium/ burial grounds.

The investment requirement identified for the town is Rs. 100 lakh up to 2035 and Rs. 60 Lakh up to

2015-16.

9.11. Financing Options & Structuring

Project structuring and risk assessment

Infrastructure projects are typically capital intensive in nature. During the process of Rapid Urban

Assessment and Stakeholder Workshop, the projects identified for ULBs to be incorporated in the City

Development Plan varies across all conventional urban infrastructure sectors coming under the

purview of ULB such as water supply, sewerage and Under Ground Drainage, sanitation, roads,

transportation network, street lighting, storm water drains, solid waste management, community

facilities etc. While on one hand, all the identified and demand driven projects, need to be financed in

a sustainable manner, the ULBs in general do not have the financial strength to take up these projects

on their own. Historically, ULBs have been dependent on conventional sources i.e., state and central

support for funding infrastructure projects. While these sources still account for a considerable portion

of the total fund flow in urban infrastructure sector, not 100% of these come as unconditional grant

and ULBs are gradually made liable for funding their own projects by means of loan, beneficiary

contribution etc. At the same time, other unconventional options for raising infrastructure finance such

as pooled finance, Private Sector Participation (PSP) are also emerging. In this context, need for

structuring infrastructure projects based on suitable financing options available in the sector becomes

imperative. However, each of these options might have some risks associated with it and assessment

of the same is also important. Detailed in the section below are the options for project structuring

available in the present framework for financing ULB infrastructure with risk assessment for the same.

ULB’s revenue source

The revenue sources of ULB comprise of own revenue and State transfers (combination of assigned

revenue and grants & contributions). State devolution to ULBs is a source of meeting the debt service

requirements under various borrowings. An Urban Local Body is capable of financing its own projects

if it has a revenue surplus position and capable of sustaining it consistently over future tenure of the

project envisaged. However, the financial status analysis of Rehti Nagar Parishad shows that the

Revenue account of the Nagar Parishad is not capable of taking huge investment entirely on its own

balance sheet; hence it is not a valid option for this ULB.

Risk assessment:

Even if the ULB has a revenue surplus position at present, there could be inconsistencies in future

thus making the project subject to risk of running out of fund.

Ongoing sector development schemes/ programmes

Typically these are state and central sources of financing through which ULBs get fund in the form of

loan and grants. Apart from traditional programmes, this option also includes multilateral sources of

funding which is routed through state level nodal agency.

State schemes

Projects taken up under regular state schemes are generally funded entirely by the state. The funds

are allocated in the state budget and made available to the implementing agency through the state

Page 119: Rehti CDP English

City Development Plan - Rehti 119

Urban Development Department (UDD). The ULB can structure its identified projects best suited to

any such ongoing state scheme applicable for a specific sector.

Risk assessment:

Less risk but not likely to get fund for large capital intensive projects

Central schemes

For central schemes, the total funding is generally shared between centre and state or centre, state

and ULB itself. The funding pattern is different for different schemes and could be of any combination

of loan, grant and own contribution.

Risk assessment: Low risk as Govt. supported programme. However, ULBs has to make arrangement

for own contribution as well as repay loan over specified period. Thus has to assure a source for that.

Risk assessment:

Low risk as these Government supported programme. However, ULBs have to make arrangement for

own contribution as well as repay loan over specified period.

Borrowing

Pooled finance

Pooled finance is a form of market borrowing. It is a financial instrument for tapping capital market to

finance small city infrastructure projects. Like an independent financial entity, the Nagar Parishad can

issue bond to raise money from market. The municipal bond has to be rated by a credit rating agency

and then issued in the market. However, ULBs has to have a strong financial position to raise money

by this instrument.

Risk assessment:

This instrument is prone to market risk

ULB has to maintain consistently good financial position and credibility

Financial institution borrowing

For ULBs, borrowing from financial institutions has been generally from government supported

financial institutions like HUDCO, LIC etc. The Rehti Nagar Parishad can borrow money from these

financial institutions.

Risk assessment:

Low risk as supported by Government

The fund is focused towards urban development

Disbursement could be conditional

Public Private Partnership

This instrument seeks to have contribution from a private party in developing a facility and/or

operating a facility. There are various standard forms of contract that could be entered into between

the public body (ULB) and the private party depending on the conditions best suited for a particular

project. Typically, the private party would operate the facility over a certain period of time after

developing in with some user charges and then hand it over to the public body

Risk assessment:

Page 120: Rehti CDP English

City Development Plan - Rehti 120

Risk of opposition to user charges for basic public amenities

ULB has to have thorough monitoring over project development as well as operation

period by private party

Other capital sources

These are some Government. capital sources, which are not dedicated to urban development but

could be tapped for this purpose. For example funds from Member of Parliament Local Area

Development (MPLAD), MLALAD, and Central Finance Commission Grants etc. These cannot be

considered as regular sources of funds but can be tapped for one time investment by ULBs

depending on availability and local situation.

Risk assessment:

Highly uncertain as long as not committed

Most likely to be one time contribution, not a consistent source

9.12. Conclusion

In this chapter the investment requirement in various sectors and sub-sectors has been detailed out.

Along with investments the action measures needed to implement the projects, performance

indicators to identify the effective execution has also been detailed out. The next chapter puts forward

the financial operating plan (FOP) for Rehti town.

Page 121: Rehti CDP English

City Development Plan - Rehti 121

10. Financial Operating Plan

10.1. Introduction

The sustainable investment capacity of Rehti Nagar Parishad has been assessed through a Financial

Operating Plan (FOP), which gives a yearly forecast of finances for the years 2012-13 to year 2015-

16. A salient feature of the FOP is that all outstanding dues, including debt and non-debt liabilities if

any, have been taken into account.

The accounts data of Rehti Nagar Parishad between the years 2006-07and 2010-11 are used as the

basis for determining past trends in revenue and expenditure and arriving at appropriate growth

assumptions for each of the income and expense items. After forecasting the revenue account, the

capital investments proposed under the CIP are added to the forecast. The FOP is generated to

assess the investment-sustaining capacity of Rehti Nagar Parishad.

The project funding structure comprises of grants under the State scheme (accounting for 30 per cent

of the funding); internal resources and loans accounting for the rest. 75% of the loan repayment would

be the responsibility of the state and rest 25% to be managed by ULB. The level of investment that

Rehti Nagar Parishad can sustain is determined by studying the overall surpluses/ year-to-year

opening balance and debt service coverage ratio. If the debt service coverage ratio - DSCR (amount

of surplus available to pay interest and to repay principal that is due) falls below 1, then the

investments are reduced gradually till the DSCR exceeds 1 in all the years in the forecast period.

The main items of income and expenditure, classified into the revenue account and the capital

account, are projected in the FOP under the following categories.

10.2. Categories of FOP Projections

The main items of income and expenditure, classified into the revenue account and the capital

account, are projected in the FOP under the following categories.

Revenue Account Receipts:

Taxes, Non Tax Sources, Assigned Revenue and

Grants, Contribution and Subsidies

Revenue Account Expenditure:

Establishment

Operation and Maintenance

Debt Servicing- Existing and New Loans

Phasing of non debt liabilities, and

Additional O&M

Capital Income and

Capital Expenditure

10.3. Financial Strategies for CIP

In determining a long-term financial strategy, Rehti Nagar Parishad plans to raise resources and

funds for the CIP through:

Grants available under the State scheme Framework (as 30 percent State Govt. Grants).

Available internal resources and improving upon the same through

Page 122: Rehti CDP English

City Development Plan - Rehti 122

i. Increase the property tax coverage by bringing 100% properties under tax

assessment. The property tax per assessment is found to be very low in Rehti and

an hence initial revision of the annual rated value per assessment is proposed with

subsequent revisions every five year

ii. Revision of Water charges at specific intervals. Though the revision in water tariff

should be done on annual basis to recover 100% of the O&M cost. However, annual

revision is not a general practice in all the ULBs across the state, so revision after

every five years is envisaged for projections.

iii. Introduction of Sewerage Charges in 2014-15, after implementing the Sewerage

Project

iv. Maintenance of the collection performance of taxes and charges at certain minimum

levels for current and for arrears

Grants available under the Framework (as percent of investment proposed for funding by

2015 in infrastructure sectors – 30 percent would be given by state government as grant,

state government will take loan on rest of the 70 percent investment, on which repayment

would be done in such a manner that govt. will have to repay for 75 percent of the 70

percent of the investment and ULB will have to pay on 25 percent of the 70 percent of the

total investment. Thus, on calculations it was found that state would be providing for 82.5

percent grants of the total investment).

Borrowings from market or financial institutions

10.4. Financial Projections

Current revenue sources are projected under built-in growth assumptions for income and expenditure

items, to assess the impact of each such revenue enhancement measure being suggested. The

projections also aim at estimating the surplus that will be available for servicing new debt. Part of the

surplus, after meeting the additional O&M expenses on newly created assets and infrastructure, is

translated into debt size and project size (grant component plus debt component) based on certain

assumptions regarding interest rate, repayment method and loan-grant mix.

A spread sheet FOP model has been customized to depict the financial position of Rehti Nagar

Parishad; the investment sustaining capacity of Nagar Parishad is assessed based on the FOP

assumptions. The model was used to calculate future surpluses under various scenarios involving

combinations of internal revenue improvement, state support, financing terms, etc.

10.5. Municipal Account: Growth Projections & Assumptions

The standard assumptions under which the projections are carried out and certain expenditure control

and revenue augmentation measures proposed in line with the mandatory and optional reforms under

the UIDSSMT framework are presented below in Exhibit 10-1

Exhibit 10-1: Important Assumptions made in the projections

Head Assumptions

Guiding Factor for Assessing the Sustaining Capacity

Surplus Positive surplus - year on year basis

DSCR Greater than 1

Project Financing – for admissible Components under JNNURM

Page 123: Rehti CDP English

City Development Plan - Rehti 123

Head Assumptions

Project Costing Unit Cost, with 5 % Cost escalation factor and 5% Physical contingency

New/Additional O & M and from second year of investment 5% growth is considered for the additional O & M

5% of Capital cost

Grant from GoMP 82.5% of the proposed projects

Grant from GoMP for Health, Education and Slums

100% of the proposed projects

If Loan for Balance funding Repayment in 12 years, with 3 year principal moratorium 8% interest rate

Old Outstanding loans As per existing terms and conditions

Revenue Expenditure

Growth in Expenditure Actual average growth with a minimum 8% and maximum of 12% (based on last five years trend)

Pay Commission Revision Pay Commission revision- additional 10% from 2013-14 every five years

Assumption for assessment of Rehti Nagar Parishad’s sustainability

Income Items

Growth in revenue income Actual average growth with a minimum 8% and maximum of 12% (based on last five years trend)

Property Tax: Propose to introduce from FY 2012-13

Annual growth in Assessment 2 % per annum

Increase in Assessments due to Survey/ PT Reforms

524 properties

Initial Revision in 2012-13 150% of the existing

Revision of Tax 50% every five years

Collection Performance 85% or current average whichever is higher by 2015

Income Items- Water Supply

Annual growth in Water Connection 1.7% per annum

Regularisation of unaccounted connections

536 connections

Coverage 85% of Assessed properties by 2015

Initial revision in water tariffs by 150% in FY 20011

Next Revisions in water tariffs by 50 % every five years

Initial revision – new Connection fee by 150% in FY 20011

Future revision – new Connection fee by 25% every five years

Collection Performance 85% by 2015-16

Income Items- Sewerage

Coverage 100% of water connections by 2015-16

Sewerage Charge 50% of water charges from year 2014-15

Initial revision - new Connection fee Rs. 1000 per connections

Page 124: Rehti CDP English

City Development Plan - Rehti 124

Head Assumptions

Future revision - new Connection fee by 10% every five years

Collection Performance 85% by 2015

Source: IMaCS Analysis

10.6. Investment Capacity/ Sustenance

Given the existing financial position of Rehti Nagar Parishad, the revenue and capital accounts are

projected against the growth scenario and assumptions presented above. The City Investment Plan

(CIP) shows that the total investment required to develop Rehti town is Rs. 3443.07 Lakh at constant

prices in short term i.e. till 2015 (of the total Rs. 5382.54 lakh investment identified for funding till

2035). Rs 3443.07 Lakh include about Rs. 506 Lakh towards Health sector, Rs.130 Lakh towards

education sector and Rs. 442 lakh towards urban poor, 100% of which would be provided by the state

departments/schemes. Hence a FOP is generated from the sustainable investment point of view in

line with current growth trends against the identified investment for Nagar Parishad of Rs. 2364.82

Lakh at constant prices till 2015, which excludes investment required for Health, Education and urban

poor sectors.

Base Investment Capacity

Base Investment Capacity is estimated considering business as usual case, where Rehti Nagar

Parishad has not taken any grant under UIDSSMT scheme and has not done any reforms to increase

their revenue income. At this scenario the Parishad will be able to sustain only 12.30 % of the total

investment identified for year 2015.

Impact of Reforms on Investment Capacity of Rehti Nagar Parishad

Following are the four cases considered as shown in Exhibit 10-2 and sustainability was checked.

Exhibit 10-2: Reforms Undertaken

Assumptions (Revenue Improvement Measures)

Base Case

Impact of Reforms on Investment Capacity

Scenario 1 Scenario 2 Scenario 3

Property Tax

PT Survey No Yes Yes Yes

Property Growth No Yes Yes Yes

Collection Efficiency No Yes Yes Yes

Rate Change No Yes Yes Yes

Water Supply

Water Audit/ Regularization No Yes Yes Yes

System Refurbishment No Yes Yes Yes

Collection Efficiency No Yes Yes Yes

Revision of Charges No Yes Yes Yes

UGD

Introduction of Sewerage Charges No Yes Yes Yes

Collection Efficiency No Yes Yes Yes

Revision of Charges No Yes Yes Yes

Institutional Reforms No Yes Yes Yes

Page 125: Rehti CDP English

City Development Plan - Rehti 125

Assumptions (Revenue Improvement Measures)

UIDSSMT Funding (GoI) No No Yes Yes

UIDSSMT Funding (GoMP) No No Yes Yes

Contribution to Revolving Fund No No Yes Yes

ULB's Share in CIP Yes Yes Yes Yes

Debt Funding No No No Yes

With reforms in Property Tax, Water Charges and Sewerage charges

This case assumes the reforms in property tax, Water and Sewerage have been implemented and

accordingly the investment capacity has increased by Rs. 3.52 Crore above the base investment

capacity. These reforms will increase the total sustainable capacity to 14.90%.

Reforms (without debt Funding)

This case assumes that all the reforms suggested above are being implemented and UIDSSMT

grants are also availed. In this scenario Nagar Parishad‟s sustainable capacity will increase to

53.20%, which is 40.90% in addition to base case. Now Nagar Parishad will be able to sustain

investment of about Rs. 12.58 Crore.

Reforms along with debt Funding

This case assumes that Nagar Parishad can increase their sustainable capacity by taking debt from

any financial institution or private banks in addition to the implementation of reforms suggested above.

In this scenario Nagar Parishad can sustain up to 54.40% of the total investment identified, which is

1.20 % more than without debt funding scenario.

The impact of the different scenario on the investment sustainability of Rehti Nagar Parishad is shown

below.

Fund Requirement

For the identified investment for Nagar Parishad of Rs. 23.65 Crore at constant prices only Rs. 12.87

Crore is sustainable. Exhibit 10-3 shows the funding pattern for sustainable investment.

Exhibit 10-3: CIP Funding Pattern

S. No Mode of Funding Source Amount (Rs. Crore)

Rehti Nagar Parishad

Total Identified Investment till 2015 (current price) 10.81

Investment by Nagar Parishad (current price) 15.62

Page 126: Rehti CDP English

City Development Plan - Rehti 126

S. No Mode of Funding Source Amount (Rs. Crore)

Investment by Nagar Parishad (constant price) 23.64

Sustainable Investment till 2015 (constant price) 12.86

Sustainable Investment (current) 15.62

1 Grants UIDSSMT 12.57

2 Loans Open Market/ FIs

3 Own sources Nagar Parishad Source: IMaCS Analysis

From the above analysis (Exhibit 10-3), it is very clear that ULB alone even with the grant support

under UIDSSMT scheme and reforms will not be able to implement 100% of the projects identified

under the City Investment Plan (CIP). But they can substantially increase their sustainable capacity

with these reforms. So, it is recommended that ULB along the support from UADD, GoMP should try

to develop few projects at PPP model and additional grant support from GoMP. It is also

recommended that on the same lines of the National Urban Information System (NUIS) programme

for strengthening of information system at Municipal Corporation level, GoMP should also provide

support to all the local bodies in Madhya Pradesh, which are not covered in the mentioned

programme.

Financial Operating plan

Based on all the assumption for projections and the implementation of the strategies to improve

sustainability of Rehti Nagar Parishad, the FOP has been prepared. (Refer Annexure). However, the

summary of final revenue model is presented in below in Exhibit 10-4

Exhibit 10-4: Financial Operating Plan

1 2 3 4 5 6 7 8 9 10

Financial Year ------> 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

Figures in Rs. Lakh Projection

Rehti Nagar Parishad

SUMMARY

i Opening balance 88 149 196 226 246 290 335 399 482 588

ii Revenue Receipts 165 184 205 229 260 298 329 362 399 440

iii Revenue Expenditure 112 147 190 227 240 253 266 279 293 309

iv Municipal receipts 359 616 752 646 308 319 346 381 420 463

v Municipal expenditure 299 569 722 626 264 274 282 298 314 331

New Debt Servicing

Exp. 4 10 18 24 24 24 23 21 20 18

New O&M Exp. 9 31 59 82 87 92 96 101 106 111

vi Revenue Surplus/ 53 37 15 2 20 46 63 83 106 132

Page 127: Rehti CDP English

City Development Plan - Rehti 127

Deficit for the year

vii Municipal Surplus/

Deficit for the year 60 47 30 20 44 46 63 83 106 132

viii Closing balance 149 196 226 246 290 335 399 482 588 720

ix Performance Indicators

DSCR 15.83 4.55 1.82 1.10 1.82 2.93 3.79 4.92 6.38 8.32

DSR 2% 6% 9% 11% 9% 8% 7% 6% 5% 4%

PT Collection

Performance 62% 68% 73% 79% 85% 86% 86% 87% 87% 88%

Source: IMaCS Analysis

10.7. Conclusion

This chapter discussed the Investment sustainability of Rehti Nagar Parishad. The discussion on

assumptions for various financial projections was followed by detailing of investment capacity of ULB.

The investment capacity was analyzed for four scenarios; Base case, PT improvements & Sector

Reforms and Debt Funding & Reforms. The investment capacity analysis was followed by a

discussion on the funding requirement of the city. The next chapter deals with the urban reforms.

Page 128: Rehti CDP English

City Development Plan - Rehti 128

11. Urban Reforms

11.1. Introduction

In recent times, several initiatives have been taken by GoI and GoMP to a) improve infrastructural

facilities and help create durable public assets and quality oriented services in cities &towns b)

enhance public-private-partnership in infrastructural development and, c) promote planned integrated

development of towns and cities. A key aspect in achieving the fore mentioned goals is improvement

in Urban Governance and Service Delivery. The underlying objective of most of the recent initiatives

is to make ULBs financially sound and enable them to undertake new projects.

The main thrust of the revised strategy of urban renewal is to ensure improvement in urban

governance so that Urban Local Bodies (ULBs) and parastatal agencies become financially sound

with enhanced credit rating and ability to access market capital for undertaking new programmes and

expansion of services. In this improved environment, public-private participation models for

provisioning of various services would also become feasible.

Among various schemes aimed at the urban renewal, the most important schemes are Jawaharlal

Nehru National Urban Renewal Mission (JNNURM) and urban infrastructure Development Scheme for

Small & Medium Towns (UIDSSMT). Whereas JNNURM has its own selection criteria for the cities

which can receive funding under it, UIDSSMT expands the ambit of beneficiaries to cover all

cities/towns as per 2001 census excepting cities/towns covered under JNNURM.

UIDSSMT aims at improvement in urban infrastructure in towns and cities in a planned manner. To

achieve this objective, State Governments, Urban Local Bodies and para-statal agencies are required

to accept implementation of an agenda of reforms as funding under UIDSSMT has been linked with

the ULBs performance towards the implementation of anticipated reforms.

The proposed reforms at various level of governance have been categorized into:

Mandatory Reforms at the level of the State Government,

Mandatory Reforms at the level of the Urban Local Body

Optional Reforms at level of the State Government/Urban Local Body

11.2. Mandatory Reforms at the level of the State Government

11.2.1. Implementation of the 74th Constitutional Amendment Act

Desired Objective

UIDSSMT requires certain reforms to be undertaken by states/cities in implementing the 74th

Amendment of the Constitution, with the objective of implementing decentralization measures. The

State should ensure meaningful association and engagement of Urban Local Bodies in planning the

function of para-statal agencies as well as the delivery of services to the citizens.

Current Status

All the provisions of 74th CAA incorporated in Municipal Acts.

Powers and functions of 12th Schedule transferred to ULBs.

Powers of preparation of Zoning Plans vested in Municipalities

DPCs constituted and are functional from the year 2005

Process for constitution of MPCs in Million Plus cities is in progress.

Page 129: Rehti CDP English

City Development Plan - Rehti 129

Timeline for Reforms

All the reforms which were applicable under this section have been carried out.

11.2.2. Public Disclosure Law

Desired Objective

UIDSSMT requires certain reforms to be undertaken by states/ cities in Public Disclosure, with the

objective that municipalities and parastatal agencies will have to publish various information about the

municipality and it‟s functioning on a periodic basis. Such information includes but is not limited to

statutorily audit statements of annual performance covering operating and financial parameters, and

service levels for various services being rendered by the municipality.

Current Status

Implemented in 2008-09.

Provision has been made in Acts and Rules have been framed

Timeline for Action on Reforms

The state government agrees to make provision for public disclosure and ULBs to pass such a

resolution in a stipulated time.

The state government has agreed to undertake all required reforms related to financial

statements in a stipulated time frame.

11.2.3. Rationalization of Stamp Duty

Desired Objective

UIDSSMT requires certain reforms to be undertaken by states/cities to rationalize Stamp Duty, with

the objective of establishing an efficient real estate market with minimum barriers on transfer of

property so as to be put into more productive use.

Current Status

Reduction in rates by 0.5%

Implemented in year 2008-09, that continued for FY 09-10 and 10-11.

Rate reduced to 5% w.e.f. 1st April, 2011

Timeline for Reforms

GoI has been insisting on the gradual reduction of stamp duty to 5% and hence, GoMP has

committed to the same in a stipulated time frame. Though the process has been initiated, it has

recently been completed.

11.2.4. Repeal of Urban Land Ceiling and Regulation Act

Desired Objective

UIDSSMT requires certain reforms to be undertaken by states/ cities in the Repeal of ULCRA with the

objective of increasing the supply of land in the market, removing the inefficiencies and in the

establishment of an efficient land market.

Current Status

The ULCRA has been repealed in the year 2000.

Page 130: Rehti CDP English

City Development Plan - Rehti 130

Timeline for Reforms

All the reforms under this section have been carried out.

11.2.5. Rent Control

Desired Objective

UIDSSMT requires certain reforms to be undertaken by states/ cities in Rent Control, with the

objective of having a system that balances the rights and obligations of landlords and tenants to

encourage construction and development of more housing stock, as well as promoting an efficient

and robust rental/tenancy market, so as to improve the availability of housing across all income

categories.

Current Status

The MP Parisar Kirayedari Vidheyak, 2010 passed by the State Assembly in March, 2010.

Bill sent to GoI for Presidential Assent.

Timeline for Reforms

A timeframe for the remaining aspects of this reform has been decided to fulfill the requirements in a

stipulated time. In addition to this, process has been initiated to pass a resolution to establish a new

rent control system

11.2.6. Community Participation Law

Desired Objective

UIDSSMT requires certain reforms to be undertaken by states/ cities in Community Participation, with

the objective of institutionalizing citizen participation as well as introducing the concept of the Area

Sabah in urban areas. The larger objective is to involve citizens in municipal functions, e.g. setting

priorities, budgeting provisions, etc. The Community Participation Law refers to the appropriate

provisions that need to be made in the state-level municipal statute(s) for the establishment of such a

3- or 4-tiered structure precisely as described above. These enactments will also need to ensure clear

definition of functions, duties and powers of each of these tiers, and provide for the appropriate

devolution of funds, functions and functionaries as may be decided by the State Government to these

levels.

Current Status

Completed – Mohallasamiti are formed as the third tier.

Timeline for Reforms

Community Participation Law is proposed to be enacted on the basis of Model Community

Participation Law.

Constitution of Mohalla Committees to further decentralize the system

11.2.7. City Planning Functions

Desired Objective

UIDSSMT requires certain reforms to be undertaken by states/ cities in the area of city planning, with

an objective to assign or associate elected ULBs with “city planning functions”.

Current Status

Page 131: Rehti CDP English

City Development Plan - Rehti 131

In this area, all reforms have been achieved with the transfer of powers related to the provisioning of

water supply & sewerage, public transport and solid waste management. This has been supported by

the association of ULB with city planning functions. This has been achieved by the active participation

of ULB in the preparation of city development plans.

Timeline for Reforms

All objectives of this reform except related to those of traffic and transport, have been achieved by

various measures taken by state government.

11.3. Mandatory Reforms at the level of the Urban Local Body

11.3.1. Municipal Accounting

Desired Objective

UIDSSMT requires certain reforms to be undertaken by states/ cities in Municipal Accounting, with the

objective of having a modern accounting system based on double-entry accrual principles, leading to

better financial management, transparency and self-reliance.

Current Status

Madhya Pradesh Municipal Accounts Manual prepared and circulated in July 2007

Under implementation in all the 14 Municipal Corporations and 96 Municipal Councils

All the 4 JNNURM cities have switched over to DEAS

Timeline for Reforms

With the growing thrust on adoption of double entry accrual base system of accounting in state and its

several advantages over the existing system, Rehti Nagar Parishad should strive to shift to the new

system on the immediate basis. Rehti Nagar Parishad should carry out all the requisites and migrate

to the new system by year 2014-15. It is also recommended that Rehti Nagar Parishad should adhere

to following timelines to achieve the objectives of this reform by year 2015-16. Refer Exhibit 11-1 for

reform action plan

Exhibit 11-1: Municipal Accounting: Reform Action Plan

S.No Reform 2011-12 2012-13 2013-14 2014-15 2015-16

1

Completion and

Adoption of

Manual

Yes

2 Training of

Personnel 40% 80% 100%

3

Migration to

Double entry

accrual based

Accounting

30% 70% 100%

Page 132: Rehti CDP English

City Development Plan - Rehti 132

11.3.2. E-Governance

Desired Objective

UIDSSMT requires certain reforms to be undertaken by states/ cities in E-Governance, with the

objective of having a transparent administration, quick service delivery, effective MIS, and general

improvement in the service delivery link.

Current Status

The e-governance action plan is under implementation in JNNURM cities with the support of

DFID funded MPUSP

DPR under preparation for NMMP on e-governance for Indore, Bhopal &Jabalpur.

Timeline for Reforms

To achieve the objectives of this reform, city would be required to bring many of its services and

procedures under the ambit of e-governance. As the first step, Rehti should procure equipment‟s

required for various applications by year 2011-12, which should be followed by the capacity building

exercises aimed at enabling existing staff and recruitment of new staff competent to carry out the

required duties. The city should aim to carry out registration of births & deaths, public grievance

redressal, payment of property tax and bills of other utilities, municipal accounting, and works

management system through computerization by year 2015-16. It is also recommended that Rehti

Nagar Parishad should adhere to following timelines to achieve the objectives of this reform. Refer

Exhibit 11-2 for reform action plan.

Exhibit 11-2: E-Governance: Reform Action Plan

S.No Reform 2011-12 2012-13 2013-14 2014-15 2015-16

1

Appointment of

state-level

technology

consultant as

state technology

advisor

Yes

2

Finalization of

implantation of

action plan

Work in Progress

3

Appointment of

software

consultants/

agency for

training

Yes

Implementation of e governance against the following modules

Property Tax 20% 50% 80% 100%

Page 133: Rehti CDP English

City Development Plan - Rehti 133

S.No Reform 2011-12 2012-13 2013-14 2014-15 2015-16

Accounting 25% 50% 75% 100%

Water Supply &

Other utilities 25% 50% 75% 100%

Birth and Death

registration 40% 100%

Citizens

grievance

monitoring

30% 30% 100%

Personnel

Management

System

30% 70% 100%

11.3.3. User Charges

Desired Objective

UIDSSMT requires certain reforms to be undertaken by states/ cities in the levy of User Charges on

different municipal services, with an objective of securing effective linkages between asset creation

and asset maintenance and ultimately leading to self-sustaining delivery of urban services.

Current Status

User Charges have been defined in the Municipal Acts

Separate Provision for User Charges has been introduced in Municipal Acts

Amendment as above have been notified in official gazette dated 19-4-2010

Timeline for Reforms

Firstly, Municipality should establish a proper accounting system for Water Supply and should

subsequently expand this system to other services such as solid waste management, sewerage, etc.

The accounting system for water supply should be established together with the reforms related to

municipal accounting. A proper accounting system should be in place for all the municipal services by

year 2014-15. During this period, ULB should work in coordination of state government to define a

user charge structure and service standards for each of the services. These initiatives should result in

full recovery of O&M costs by year 2015-16. It is also recommended that Rehti Nagar Parishad should

adhere to following timelines to achieve the objectives of this reform by year 2015-16. Refer Exhibit

11-3 for reform action plan

Exhibit 11-3: User Charges: Reform Action Plan

S.No Reform 2011-12 2012-13 2013-14 2014-15 2015-16

1

Formulation &

Adoption of a policy

on user charges by

state/ ULB

Yes

Page 134: Rehti CDP English

City Development Plan - Rehti 134

S.No Reform 2011-12 2012-13 2013-14 2014-15 2015-16

2

The state should set

up a body for

recommending a user

charge structure

To be sorted out by state and ULB

3 Recovery of O&M

cost 70% 80% 90% 100%

4 Establishment of proper accounting system for each service so as to determine the O&M cost separately

A Water Supply 20% 50% 80% 100%

B Sewerage NA 100%

C Solid Waste

Management 25% 50% 75% 100%

5 Achievement of targeted service standards for the service

A Water Supply (LPCD) 75 75 75 100 135

B Sewerage NA

C Solid Waste

Management 70% 70% 80% 85% 90%

6 Defining user charge structure for the services

A Water Supply Yes

B Sewerage Yes

C Solid Waste

Management Yes

11.3.4. Basic Services to the Urban Poor

Desired Objective

Provision of basic services to the poor including security of tenure at affordable prices, improved

housing, water supply, sanitation and ensuring delivery of other existing universal services of the

Government for education, health and social security.

Current Status

It is ensured that all the projects pertaining to housing for urban poor necessarily have provision

for basic amenities listed in the 7 point charter.

Timeline for Reforms

The Nagar Parishad should attempt to increase the coverage of all services so that all urban poor

have access to a minimum level of service. This can be achieved by means of various sub projects in

a phased manner. Schemes like IHSDP should address the issue of housing and rehabilitation

whereas all new projects should consider delivery of services to the poor as a part of their primary

objective. All projects identified under CIP should give a due importance to coverage of city‟s poor

Page 135: Rehti CDP English

City Development Plan - Rehti 135

population. In addition to the new developmental works, works related to up gradation or

strengthening of service delivery mechanism should also focus on the city‟s poor population. Rehti

should target a period 5 years to cover all urban poor with basic services.

11.3.5. Internal earmarking for basic services for poor

Desired Objective

UIDSSMT requires certain reforms to be undertaken by states/ cities in the provision of basic services

to the Urban Poor, with an objective of providing security of tenure at affordable prices, improved

housing, water supply and sanitation. In addition, delivery of other existing universal services of the

government for education, health and social security is to be ensured.

Current Status

State Government has taken policy decision to have such an internal earmarking done in all the

ULBs in the State.

The Government order to this effect has been issued on dated 13.04.07.

This fund has now been made Non-lapsable. Executive instructions in this regard have been

issued on 29th July, 2010.

Timeline for Reforms

A detailed survey to identify the needs of urban poor in the areas of infrastructure and socio-economic

upliftment should be carried out. Based on the findings of this survey and an institutional support from

the state government, municipality should allocate certain percentage, ranging from 20 to 25 %, of

their expenditure for the urban poor. It is also recommended that Rehti Nagar Parishad should adhere

to timelines to achieve the objectives of this reform. Refer Exhibit 11-4 for reform action plan

Exhibit 11-4: Internal Earmarking for Poor: Reform Action Plan

S.No Reform 2011-12 2012-13 2013-14 2014-15 2015-16

1

A resolution between

state government and

ULB on

comprehensive policy

on providing basic

services to all urban

poor

Yes

2

Defining criteria for

identification of the

urban poor

Yes

3 Fresh enumeration

based on the above Yes

4 Decision on the funds

allocation percentage Yes

5

Achievement of

actual fund allocation

budget

50% 75% 100%

11.3.6. Property Tax

Page 136: Rehti CDP English

City Development Plan - Rehti 136

Desired Objective

JNNURM requires certain reforms to be undertaken by states/ cities in Property Taxes, with the broad

objective of establishing a simple, transparent, non-discretionary and equitable property tax regime

that encourages voluntary compliance. States/cities need to ensure that their desirable objectives for

reforms include these reforms, but need not restrict themselves to these items.

Current Status

Unit area based,

Non-discretionary, self-assessment system in existence from year 1996

Timeline for Reforms

Considering the low collection efficiency and gap between properties liable to pay property tax and

properties that actually pay, property tax reforms should carried out on the immediate basis to

improve the municipal revenues. It is recommended that Rehti Nagar Parishad should adhere to

timelines to achieve the objectives of this reform. Refer Exhibit 11-5 for reform action plan

Exhibit 11-5: Property Tax: Reform Action Plan

S.No Reform 2011-12 2012-13 2013-14 2014-15 2015-16

1

Migration to self-

Assessment of

Property taxation

Yes

2 Extension to

uncovered properties 50% 100%

3 Migration to the GIS

based tax system 20% 40% 75% 100%

4

Review and Revision

of Property Tax

guidelines

Yes

5 Collection Efficiency 40% 50% 60% 72% 85%

6

Coverage Ratio

(Registered

Properties/ Actual No.

of Properties)

60% 70% 75% 80% 85%

7 Establish Tax payer

education programme Yes

11.4. Optional Reforms at level of the State Government/Urban Local

Body

This category consists of reforms which are not mandatory and should be taken up by state/ULB on

their own convenience. Refer Exhibit 11-6

Exhibit 11-6: Optional Reforms

SNo Reform Status

1 Revision of bye-laws to streamline the approval process for construction of

Completed

Page 137: Rehti CDP English

City Development Plan - Rehti 137

SNo Reform Status

buildings, development of sites etc.

2 Simplification of legal and procedural frameworks for conversion of agricultural land for non-agricultural purposes.

Completed

3 Introduction of Property Title Certification System in ULBs.

Responsibility of implementing this

reform has been assigned to Revenue

Department of the State Government.

Govt. of India has been requested to give

technical and financial support to State

for implementing this reform.

4

Earmarking at least 20-25% of developed land in all housing projects (both Public and Private Agencies) for EWS/LIG category with a system of cross subsidization.

Provision for earmarking15% Land for

EWS already exists.

Additional 10% reservation for LIG has

been made in Municipal acts In March,

2010.

5 Introduction of computerized process of registration of land and property.

Responsibility of implementing this

reform has been assigned to Revenue

Department of the State Government.

Govt. of India has been requested to give

technical and financial support to State

for implementing this reform.

6 Revision of bye-laws to make rain water harvesting mandatory in all buildings and adoption of water conservation measures.

completed

7 Bye-laws for reuse of recycled water. completed

8

Administrative reforms i.e. reduction in establishment by bringing out voluntary retirement schemes, non-filling up of posts falling vacant due to retirement etc., and achieving specified milestones in this regard.

New set up has been approved for all

the JnNURM cities. Provision for

contractual appointment.

Service condition rules for Municipal

Corporation being revamped

9 Structural reforms Completed

10 Encouraging Public Private Partnership State Policy for PPP notified by the

Finance Department.

11.5. Conclusion

This chapter provided the objective and status of various reforms mandated under UIDSSMT. The

reforms were discussed under the headings of Mandatory Reforms at State level, Mandatory Reforms

at ULB level and Optional Reforms at State and ULB level.

Page 138: Rehti CDP English

City Development Plan - Rehti 138

Annexure 1: Workshop Proceedings

Page 139: Rehti CDP English

City Development Plan - Rehti 139

First Workshop - Inception Workshop

Inception workshop was conducted on 3rd

Nov 2011 in the meeting hall in Rehti Municipal council‟s

office. The objective of this workshop was to introduce the stake holders of the city (Municipal council

members, municipal officials, representatives from other departments and other eminent citizens) to

the concept of City Development plan as strategy document which would focus on the vision of the

city for coming 25 years and to involve the

citizens in the City Development Plan (CDP)

process and take their feedback on the identified

infrastructure constraints that the city was facing,

understand their concerns and also involve them

in the prioritization of projects.

Minutes of Meeting

The meeting was organized with the help of

Nagar Parishad and was attended by the people

listed below.

List of Stakeholders who attended First Workshop

S. No. Designation / Department Name

1 Adhyaksh Raghuvir Singh Patel

2 Upadhyaksh Santosh Panchavya

3 CMO N. S Raghubanshi

4 ARI Abhay Kumar Chaturvedi

5 ARI Dilip Kr. Gupta

6 Nagar Panchayat Employee Sher Singh Rajput

7 Nagar Panchayat Employee J.P Chauhan

8 Councilor Kailash Nath Chandrabanshi

9 Councilor Sutish Verma

10 Councilor Sanmshad Begam

11 Sub-Engineer Kevalram Kushwaha

12 Computer Operator Abhishek Verma

A brief summary of proceedings of “Kick-off” Stakeholder Consultation Workshop is as follows:

IMaCS explained the need for a long-term plan for Rehti and role of IMaCS, with support from

Stakeholders, in preparing the City Development Plan.

Adhyaksh, Mr.Patel and other Parishads discussed the strengths and weaknesses‟ of the town and

also its growth prospects.

The presentation by IMaCS familiarized the stakeholders with the purpose, process, and expected

outcomes of the CDP study. Members were then requested for their views and suggestions in

formulating the City Development Plan with key stress on following areas:

Identity of the city and development prospects

Page 140: Rehti CDP English

City Development Plan - Rehti 140

Needs and necessary Projects to be undertaken

Ward specific issues that need immediate attention

A few suggestions that came out of the discussion are as under

Rehti is the nearest town (about 4 km away) to the Temple at Salkanpur, which is a place of

religious importance and attracts a lot of tourists. It is therefore necessary in Rehti to have

facilities to cater the needs of the tourists and hence promote tourism.

Source of Water for the city is ground water (i.e. hand pumps, tube wells). The ground water

is connected to the ESR (elevated service reservoirs) and is supplied to the town. There is no

treatment plant at present. With the growing populations other options need to be explored.

There is no sewerage system in the town at present. The sewerage is carried by the storm

water drains or nallahs that flow along the natural ground topography and finally flow into

Narmada River or accumulate in the low lying area causing unhygienic conditions.

The city roads have potholes, and most of them are kutcha roads. Due to lot of encroachment

on roads by the shopkeepers as well as parking on the streets, the road width gets reduced

and the roads become narrow.

Employment opportunities in the town should be boosted by taking appropriate measures

because the current work force participation in the town is very low.

Page 141: Rehti CDP English

City Development Plan - Rehti 141

Page 142: Rehti CDP English

City Development Plan - Rehti 142

Second Workshop- Sector Analysis, City Vision & Strategy Formulation

Second workshop was conducted on 21stDecember 2011 in the meeting hall in Rehti Nagar

Parishad‟s office. The objective of this workshop was to interact with various stakeholders to finalize

City Profile; to finalize sector strategies in consonance with the city vision and sector goals; and to

evaluate the strategies from the perspective of their contribution to achieving the vision and sector

goals.

In this workshop, city profile was presented

to the stakeholders followed by a

discussion on city perspectives and city

priorities as perceived by the stakeholders.

With the background of city profile,

perspective and priorities, a collective and

shared vision was developed for the city.

In addition to the formulation of the vision

and sector goals, the preliminary

discussions were carried out on strategies,

priorities and major actions that would be

required in the next five years to move

towards the vision 2035. This workshop

also involved selection of strategies based

on their contribution towards achieving the city vision and sector goals. The selection of strategies

was followed by prioritization of identified projects and immediate actions required to achieve the

sector goals. This workshop culminated in the consolidation of city vision, sector goals, strategies,

priority actions and projects.

Minutes of Meeting

The meeting was organized with the help of Nagar Parishad and was attended by the people listed

below.

List of Stakeholders Present for Second Workshop

S. No. Designation / Department Name

1 President, Rehti Nagar Parishad Sh. Raghuveer Patel

2 Tahsildar, Rehti Sh. SR Kanasha

3 CMO, Nagar Parishad, Rehti Sh. RD Sharma

4 Accountant, Nagar Parishad, Rehti Sh. SS Rajput

5 Parshad, Nagar Parishad, Rehti Smt. Shamshad Bi

6 Parshad, Nagar Parishad, Rehti Sh. Tej Singh

7 Patwari Sh. VinayRawat

8 Parshad, Nagar Parishad, Rehti Smt. Rajamani

9 ARI, Nagar Parishad, Rehti Sh. Dilip Kumar Gupta

10 Sub Engineer Sh. KR Kushwaha

11 Parshad, Nagar Parishad, Rehti Sh. Nepal Singh

12 Nagar Parishad, Rehti Sh. JP Choudary

13 Nagar Parishad, Rehti Sh. Ramdas

14 Nagar Parishad, Rehti Sh. Rajendra

Page 143: Rehti CDP English

City Development Plan - Rehti 143

S. No. Designation / Department Name

15 ARI, Nagar Parishad, Rehti Sh. RP Pandey

16 Nagar Parishad, Rehti Sh. RN Vyas

Presentation started off with a brief introduction of the study i.e. Preparation of City Development Plan

for Rehti, so as to bring all the stakeholders on the same platform (Refer Annexure Ia). Based on the

information collected by various sources, the representative from IMaCS presented city profile which

included demographic and socio-economic profile of the town with spatial component. Demographic

profile dealt with population growth trend and its probable reasons, it also showed the population

projections and the methods used for these projections. The stakeholders agreed on the projected

population. Socio-economic profile comprised of key socio-economic parameters, major economic

base and major potentials and main issues faced by the residents of the town. During this,

stakeholders stated that few steps are needed to increase employment opportunities and improve

quality of life in the town to discourage migration to urban areas/cities. City profiling was followed by

the findings of Sector Analysis which includes Water Supply, Sewerage and Sanitation, Storm Water

Drainage, Solid Waste Management, Transportation, Health, Education and other socio-cultural

facilities for short, medium and long term, i.e. 5 years, 10 years and 25 years respectively. Analysis

comprised of existing status of service level indicators, Demand-Supply Gaps for and key

observations & major issues.

After covering these sections, we turned our focus on “formulation of a vision for Rehti.” This part of

the presentation included definition of vision, major concerns that need to be addressed while

developing a vision and important aspects that define Rehti. It was then followed by stating the vision

for the town based on our understanding. Formulation of City vision and Sectoral goals were

supplemented by a Questionnaire survey in the local dialect (Hindi Annexure II) with the aim of

obtaining stakeholders’ vision of the city. . Questionnaire survey included stakeholders’ view of

problems in the various sectors, evaluation of city‟s growth and infrastructure and ranking of major

issues and problems of the town, as perceived by stakeholders.

Further the stakeholders discussed sectoral strategies and vision and suggested few things such as

insufficient water supply and how to improve the same. They also suggested getting water from river

Narmada as source. Further, they highlighted the lack of employment opportunities, in this town which

is a cause for youth migrating to other cities. The stakeholders suggested that since, Rehti has a

strong agricultural base and it has a regional crop market (Mandi), few small scale agro based

industries can be promoted in the town. Small scale industry of herbal medicine can be further

supported and grown. They also suggested of generating employment by developing Rehti as tourist

hub. Other than this, the condition of slums was also discussed. There was a suggestion to improve

the quality of life of all the slum dwellers by providing basic infrastructure to all of them. They also

talked about acute shortage of doctors and of other healthcare facilities. The stakeholders showed

concern about non-availability of parks, playgrounds, community halls and ill maintained ponds. Other

than this, they agreed on various strategies and sector goals and the actions required for the

development of the town which was presented by our team.

Page 144: Rehti CDP English

City Development Plan - Rehti 144

Page 145: Rehti CDP English

City Development Plan - Rehti 145

Third Workshop- Draft Report Finalization

The final workshop for City Development Plan for Rehti was

held on 27th August 2012 at Rehti Nagar Parishad office.

The workshop was attended by approximately 15

stakeholders including, Adhyaksh, Upadhayaksh, CMO,

Sub-engineer, other staff and citizens.

List of Stakeholders present for Third Workshop

S. No. Designation / Department Name

1 CMO R D Sharma

2 Adyaksh Raghuvir Singh patel

3 Upadhayaksh Santosh Singh

4 Parshad Kewal Ram Kushwaha

5 CA Nitiadhyaksh Dilip Kumar Gupta

6 Parishad Pratinidhi Rajendra Prashar

7 Parishad Pratinidhi Hari Prasad

8 Citizen Sher Singh Rajput

9 Parishad Pratinidhi Swakalp Singh

10 Parishad Sejja Singh

11 Parishad Nepal Singh

12 Parishad Pratinidhi Uttam Singh

Broad theme for this workshop was to appraise the stakeholders with the outcome of the plan and

share with them the Projects which has come out from the detailed consultations in the preceding

workshops and corresponding investments to implement those projects on ground. Municipal

interventions which are needed in order to cope up with the projected investments and the amount of

revenue which the Nagar Parishad can generate upon doing the proposed reforms were also

discussed. CIP and FOP were explained to the stakeholders with a road map on how to achieve it.

The Exercise was well appreciated by the stakeholders and with that note; the final workshop for the

CDP exercise for Rehti was completed.

Page 146: Rehti CDP English

City Development Plan - Rehti 146

Page 147: Rehti CDP English

City Development Plan - Rehti 147

Annexure 2: Questionnaire

Page 148: Rehti CDP English

City Development Plan - Rehti 148

Page 149: Rehti CDP English

City Development Plan - Rehti 149

Page 150: Rehti CDP English

City Development Plan - Rehti 150

Page 151: Rehti CDP English

City Development Plan - Rehti 151

Page 152: Rehti CDP English

City Development Plan - Rehti 152

Page 153: Rehti CDP English

City Development Plan - Rehti 153

Page 154: Rehti CDP English

City Development Plan - Rehti 154

Annexure 3: Financial Projections

Page 155: Rehti CDP English

City Development Plan - Rehti 155

Financial Year ------> 2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2019-20

2020-21

2021-22

Figures in Rs.

Lakh Actuals

Estimate

Projection

Rehti Nagar Panchayat

SUMMARY

i Opening balance

- 16

(5)

42

106

114

88

149

196

226

246

290

335

399

482

588

ii Revenue Receipts

66 116

109

192

177

145

165

184

205

229

260

298

329

362

399

440

iii

Revenue Expenditure

686 69

63

102

110

101

112

147

190

227

240

253

266

279

293

309

iv

Municipal receipts

135

175

200

259

273 224

359

616

752

646

308

319

346

381

420

463

v Municipal expenditure

119

197

153

195

265 250

299

569

722

626

264

274

282

298

314

331

New Debt Servicing Exp. -

4

10

18

24

24

24

23

21

20

18

New O&M Exp.

-

9

31

59

82

87

92

96

101

106

111

vi

Revenue Surplus/ Deficit for the year (620)

47

47

90

67

44

53

37

15

2

20

46

63

83

106

132

vii

Municipal Surplus/ Deficit for the year 16

(22)

47

64

8

(25)

60

47

30

20

44

46

63

83

106

132

viii

Closing balance 16

(5)

42

106

114

88

149

196

226

246

290

335

399

482

588

720

ix

Performance Indicators

DSCR - 15.8

3 4.55 1.82 1.10 1.82 2.93 3.79 4.92 6.38 8.32

DSR 0% 2% 6% 9% 11% 9% 8% 7% 6% 5% 4%

PT Collection Performance

56% 62% 68% 73% 79% 85% 86% 86% 87% 87% 88%

REVENUE ACCOUNT

0

RECEIPTS

I Own Sources

Tax Revenue

1 Property Tax 3 5 3 1 1 1 3 4 4 4 4 5 5 5 5 5

Page 156: Rehti CDP English

City Development Plan - Rehti 156

2 Integrated tax 1 3 2 1 2 2 3 3 3 4 4 4 5 6 6 7

3 Other Taxes 1 2 2 2 3 2 3 3 3 4 4 5 5 6 6 7

Non Tax

1

Rental Income from Municipal Properties

8 6 4 4 3 5 6 6 7 7 8 9 9 10 11 12

2 Water Charges 3 5 3 4 4 4 8 8 9 10 14 22 23 23 24 24

3

Sewerage Charges

0 0 1 3 7 10 11 12 12 12

4 License and Fees 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1

5 Others 10 10 11 27 28 19 22 24 27 31 34 38 43 48 54 60

Sub Total Own Revenue

26 31 26 40 42 35 43 49 56 63 76 94 102 110 119 129

II

Assigned Revenue and Compensations

1

Octroi compensation

27 27 26 42 63 41 46 52 58 65 73 82 92 103 115 129

2 Stamp duty 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3

Passenger tax compensation

7 8 7 8 5 8 8 9 10 10 11 12 13 14 15 16

4

Income under special acts

1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1

Sub Total assign revenue

34 35 33 50 69 49 55 61 68 76 85 94 105 117 131 146

III

Revenue Grants, Contributions and Subsidies

1 Road maintenance

6 50 50 6 53 37 41 46 52 58 65 73 81 91 102 114

2 Mid day meal 0 0 0 41 4 10 11 12 12 13 15 16 17 18 20 21

3 State finance commission (S.F.C)

0 0 0 55 8 14 15 16 17 19 20 22 23 25 27 30

4 Other grants 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Sub total Revenue Grants

6 50 50 102 66 60 67 74 82 90 100 110 122 135 149 165

Total Revenue Receipts 66 116 109 192 177 145 165 184 205 229 260 298 329 362 399 440

EXPENDITURE

I Salaries/ Wages & Allowances 57 52 45 69 79 77 74 79 84 89 94 100 106 113 120 128

Page 157: Rehti CDP English

City Development Plan - Rehti 157

II

Administrative Expenses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

III

Operation & Maintenance

1 Existing O&M 6 6 9 14 13 10 11 12 13 14 15 16 18 19 21 22

2 New O&M 0 9 31 59 82 87 92 96 101 106 111

IV

Programme Expenses 4 0 5 3 0 2 2 2 2 2 2 2 2 2 2 2

V Repayment of Loans

1 Existing Loans 4 3 1 2 5 0 0 0 0 0 0 0 0 0 0 0

2

New Loans (Interest Payment)

0 4 10 18 24 24 24 23 21 20 18

VI

Other Miscellaneous expenditure 9 8 3 14 13 11 12 13 14 15 17 18 20 22 24 27

Total Revenue Expenses 80 69 63 102 110 101 112 147 190 227 240 253 266 279 293 309

CAPITAL ACCOUNT

RECEIPTS

I Sale of asset 0 0 1 8 2 0 0 0 0 0 0 0 0 0 0 0

II

Loans 0 0 0 0 0 0 44 84 100 74 2 0 0 0 0 0

III

Public Contribution 0 0 0 0 0 0

IV

Income from Connection Fee (Water & Sewerage)

0 2 6 7 12 7 1 1 1 1

V Grants & Contributions

1 Special Projects 27 11 8 20 1 14 0 0 0 0 0 0 0 0 0 0

2 Basic services 25 34 31 27 21 30 0 0 0 0 0 0 0 0 0 0

3 UIDSSMT 0 0 0 0 63 13

4 IHSDP 0 0 0 0 0 0

5

Flood relief & NRCP

6 7 1 0 0 3 0 0 0 0 0 0 0 0 0 0

6 T.F.C 3 6 9 3 9 7 8 9 10 11 12 14 15 17 19 22

7 Other Grants 7 0 41 9 0 12 0 0 0 0 0 0 0 0 0 0

8 New Grants 142 338 432 325 21 0 0 0 0 0

Page 158: Rehti CDP English

City Development Plan - Rehti 158

Sub Total Grants 69 59 90 59 94 79 150 347 441 335 33 14 15 17 19 22

VI

Other Capital income 0 1 1 1 0 1

Total Capital Receipts 69 59 91 67 96 80 194 433 547 417 47 21 17 18 21 23

EXPENDITURE

1 Investment 38 125 89 84 149 149 187 422 531 399 47 21 17 18 21 23

2

New Loans (Principal Repayment)

0 0 0 2 7 13 18 19 21 22

IV

CAPEX 38 125 89 84 149 149 187 422 531 399 24 21 17 18 21 23

Page 159: Rehti CDP English

City Development Plan - Rehti 159

Annexure 4: Maps

Page 160: Rehti CDP English

City Development Plan - Rehti 160

Annexure 5: Presentation of Final Workshop

Page 161: Rehti CDP English

City Development Plan - Rehti 161

ICRA Management Consulting Service Limited (IMaCS)

Logix Park, 1st Floor, Tower A4&A5

Sector 16, Noida – 201 301, Uttar Pradesh, India

Tel: 91 120 4515800 Fax: 91 120 4515850

Website: www.imacs.in

Disclaimer: The report is based on information collected by IMaCS from sources believed to be

reliable. While all reasonable care has been taken to ensure that the information contained herein is

not untrue or misleading, IMaCS is not responsible for any losses that the client may incur from the

use of this report or its contents. The assessment is based on information that is currently available

and is liable to change. The analysis that follows should not be construed to be a credit rating

assigned by ICRA’s Rating Division for any of the company’s debt instruments. IMaCS is not a legal

firm and our advice/recommendations should not be construed as legal advice on any issue.