Rew:ARC.UPS & STAB 31 th January’2013 To, The Vendor Dear Sir E-TENDER FOR ARC FOR SUPPLYING ONLINE UPS AND SERVO VOLTAGE STABILIZER WITH FILTER AT RETAIL OUTLETS IN GUJARAT, MP & CG STATES : 2013-14 TENDER NO.: CRFQ 1000179807 DATE: 31.01.2013 DUE DATE : 15.02.2013/ 03.00 PM Techno-commercial bid opening : 15.02.2013 / 03.30 PM We enclose herewith the tender documents pertaining to the subject work. We request you to kindly submit your most competitive bid through E-Tendering. Kindly ensure adherence of the following while submitting your bid. i. DD for 5% of the total quoted value subject to a maximum of Rs. 1,00,000/- towards EMD. (EMD is not required for registered vendor with BPCL). In case your offer is not accompanied by the requisite EMD, your offer is liable for rejection . [To be submitted separately, prior to last date of tender, at our office] ii. General conditions of the tender duly acknowledged iii. Arbitration Clause duly acknowledged iv. Special Terms & conditions / RFQ v. Technical Specifications vi. Capacity Sheet. vii. Un-priced schedule of work duly acknowledged viii. Integrity Pact Agreement , duly acknowledged Price Bids [PRICE BIDS I & IA AND II & IIA separately] shall mention only the prices. The price bid shall not incorporate any conditions. (Total of price bid I & IA, total of price bid II & IIA shall be evaluated separately for deciding the lowest quote)

Upload: others

Post on 03-Nov-2019

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Rew:ARC.UPS & STAB 31th January’2013 To, The Vendor Dear Sir E-TENDER FOR ARC FOR SUPPLYING ONLINE UPS AND SERVO VOLTAGE STABILIZER WITH FILTER AT RETAIL OUTLETS IN GUJARAT, MP & CG

STATES : 2013-14 TENDER NO.: CRFQ 1000179807 DATE: 31.01.2013 DUE DATE : 15.02.2013/ 03.00 PM Techno-commercial bid opening : 15.02.2013 / 03.30 PM We enclose herewith the tender documents pertaining to the subject work. We request you to kindly submit your most competitive bid through E-Tendering. Kindly ensure adherence of the following while submitting your bid.

i. DD for 5% of the total quoted value subject to a maximum of Rs. 1,00,000/- towards EMD. (EMD is not required for registered vendor with BPCL). In case your offer is not accompanied by the requisite EMD, your offer is liable for rejection. [To be submitted separately, prior to last date of tender, at our office]

ii. General conditions of the tender duly acknowledged iii. Arbitration Clause duly acknowledged iv. Special Terms & conditions / RFQ v. Technical Specifications vi. Capacity Sheet. vii. Un-priced schedule of work duly acknowledged viii. Integrity Pact Agreement , duly acknowledged

Price Bids [PRICE BIDS I & IA AND II & IIA separately] shall mention only the prices. The price bid shall not incorporate any conditions. (Total of price bid I & IA, total of price bid II & IIA shall be evaluated separately for deciding the lowest quote)

Page 2: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Please note that your rate should be quoted only in the price bid (I & II) and the same should not be indicated anywhere else, whi ch is liable for rejection. Your quoted rate shall be valid for the territories in Gujarat, Madhyapradesh and Chhattisgarh States. The validity of your quoted rate should be for a period from the date of LOI for territories in Gujarat, Madhya Pradesh & Chhattisgarh states (Ahmedabad, Rajkot, Surat, Bhopal, Indore, Raipur & Jabalpur). Pl. refer special terms of the tender for other details. Your offer is liable to be rejected if there is any deviation from the terms and conditions of the tender. Kindly contact us if you need any clarifications before submitting your offer. The vendor should supply both UPS & Voltage Stabilizer. Since the said specifications of said tender is same as those of our tenders in last 2-3 years, BPCL does not expect a request for technical deviation. For any technical clarification, pl. contact us prior to submission of price bid i.e. price bid should not contain any deviation. The vendors are to comply with technical specifications on the above basis. BPCL will not issue C/D forms required by Sales Tax Authorities and the tax implications to be borne by the vendor. Tender received after the specific time and date (in the e-tender platform) will not be entertained under any circumstances. We have enclosed a blank capacity statement along w ith our tender. You are advised to fill up the capacity statement without f ail. In case the same is not enclosed the tender is liable to be rejected. Minimum no of UPS / Stabilizer required per month – 30 sets (for the job allotted to successful vendor). This is an Annual Rate Contract. Price bid shall be evaluated based on Total amount and successful vendor shall be decided based on final cost to BPCL i.e. after taking of all taxes / excise duty and se rvice tax & educational cess on lowest quote basis (L1) and capacity to do. Nego tiation will be conducted with L1,if required. The Integrity Pact Agreement along with the name, a ddress of external Monitor is enclosed as Annexure – VI, which is appl icable for this tender. The vendor should enclose the Integrity Pact copy ( enclosed with tender) duly acknowledged, your tender shall be liable for rejection if the Integrity Pact signed copy is not enclosed with the tender do cuments.

Page 3: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Please note that the last date of submission of ten der should be treated as 15.02.2013 (03:00 PM) in all relevant tender docume nts attached (even if mentioned otherwise). Thanking you, Yours faithfully, For BHARAT PETROLEUM CORPN. LTD. SR. MGR. RETAIL ENGG WEST Encl : as above

Page 4: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

भारत पे�ोलयम काप�रेशन भारत सरकारका

Telephone:

Telegram:

Telex:

Our Ref:

To

Dear Sir/s.

Date

Sub. : E-TENDER FOR ARC FOR SUPPLYING ONLINE UPS AND SERVO VOLTAGE STABILIZER WITH

FILTER AT RETAIL OUTLETS IN

We shall be glad to receive your lowest quotation for the above work. Following documents are enclosed to enable you to fill your quotation:

1. General conditions of tender (in duplicate)

2. Drawing Nos.

1.

2.

3.

3. Schedule of quantities and specifications for the work involved (in duplicate).

Your quotation, together with a copy of the General

submitted in the attached envelope duly sealed. It should either be posted in the Tender Box at our premises

or sent by Registered Post so as to reach us before the closing date / time indicated on t

* Your Bank Draft for the requisite Earnest Money deposit should be forwarded along with the above

documents.

Please ensure that your name or any other identification mark does not appear on the envelope as otherwise

your Tender is liable to be disqualified.

We request you to carefully go through all Tender documents before submitting your quotations. Any

clarification regarding the work can be had from our Engineering Department on any working day during

normal working hours.

Please let us know your firm time required for the completion of all works mentioned in the attached

schedule. This should be indicated in the space provided for in the General Conditions of Tender.

We shall appreciate your returning to us the Tender Schedule, D

quoting for this Tender.

Yours faithfully,

for BHARAT PETROLEUM CORPORATION LIMITED

* Delete, if not applicable.

Encl. . as above

----------------------------------------------------------------------------

Regd. Office : BHARAT BHAVAN, 4 &6, CURR1MBHOY ROAD, BALLARD ESTATE, MUMBAI

काप�रेशन लमटेड BHARAT PETROLEUM CORPORATION LTD.

सरकारका उपम A Government of India Enterprise

From: REW, BPCL

Address: MUMBAI

Date: 31.01.2013

Tender No. : CRFQ 10001

Closing Date/time: 15.02

TENDER FOR ARC FOR SUPPLYING ONLINE UPS AND SERVO VOLTAGE STABILIZER WITH

FILTER AT RETAIL OUTLETS IN GUJARAT, MP & CG STATES

We shall be glad to receive your lowest quotation for the above work. Following documents are o fill your quotation:

1. General conditions of tender (in duplicate)

4.

5.

6.

3. Schedule of quantities and specifications for the work involved (in duplicate).

Your quotation, together with a copy of the General Conditions of Tender and Drawings duly signed, should be

submitted in the attached envelope duly sealed. It should either be posted in the Tender Box at our premises

or sent by Registered Post so as to reach us before the closing date / time indicated on t

* Your Bank Draft for the requisite Earnest Money deposit should be forwarded along with the above

Please ensure that your name or any other identification mark does not appear on the envelope as otherwise

ble to be disqualified.

We request you to carefully go through all Tender documents before submitting your quotations. Any

clarification regarding the work can be had from our Engineering Department on any working day during

let us know your firm time required for the completion of all works mentioned in the attached

schedule. This should be indicated in the space provided for in the General Conditions of Tender.

We shall appreciate your returning to us the Tender Schedule, Drawings etc. in case you are not interested in

for BHARAT PETROLEUM CORPORATION LIMITED

---------------------------------------------------------------------------------------------------------------------

Regd. Office : BHARAT BHAVAN, 4 &6, CURR1MBHOY ROAD, BALLARD ESTATE, MUMBAI

BHARAT PETROLEUM CORPORATION LTD.

A Government of India Enterprise

1000179807

2.2013 / 03.00 PM

TENDER FOR ARC FOR SUPPLYING ONLINE UPS AND SERVO VOLTAGE STABILIZER WITH

GUJARAT, MP & CG STATES : 2013-14

We shall be glad to receive your lowest quotation for the above work. Following documents are

Conditions of Tender and Drawings duly signed, should be

submitted in the attached envelope duly sealed. It should either be posted in the Tender Box at our premises

or sent by Registered Post so as to reach us before the closing date / time indicated on top of this letter.

* Your Bank Draft for the requisite Earnest Money deposit should be forwarded along with the above

Please ensure that your name or any other identification mark does not appear on the envelope as otherwise

We request you to carefully go through all Tender documents before submitting your quotations. Any

clarification regarding the work can be had from our Engineering Department on any working day during

let us know your firm time required for the completion of all works mentioned in the attached

schedule. This should be indicated in the space provided for in the General Conditions of Tender.

rawings etc. in case you are not interested in

-----------------------------------------

Regd. Office : BHARAT BHAVAN, 4 &6, CURR1MBHOY ROAD, BALLARD ESTATE, MUMBAI -430 001.

Page 5: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

भारत पे�ोलयम काप�रेशनभारत सरकारका

FILLING AND SUBMITTING TENDERS:

1. Quotations should be submitted only in the prescribed tender schedule forms supplied by the Company,

together with Drawings and General Conditions of Tender duly signed by the tenderer along with a Bank Draft,

it required, as per covering Rew:ARC.UPS & STA

13, on or before the due date/time of closing of the tender. Quotations received after the due date/time will

not be considered.

2. The tenderer should study all the tender documents carefully and understand the conditions, drawings,

specifications etc. before quoting. If there are any doubts, he should obtain clarifications, but this shall not be

justification for late submission or extension of

3. The tenderer should visit the site and acquaint himself with site conditions, availability of water, electricity,

approach road, construction materials as per specifications, shelter for his staff etc. since these are

provided/arranged by the tenderer (unless otherwise specified) at his cost.

4. The tenderer should quote for all items in the tender schedule. The rates should be expressed both in

figures and in words: where discrepancy exists between the two, the

Similarly, if there is any discrepancy exists between the unit rate and the amount, the unit rate will prevail.

5. The rates be quoted in the same units as mentioned in the tender schedule.

6. All entries in the Tender Documents should be in Ink/Typed. Corrections, if any, should be attested by full

signature of the Tenderer.

7. Every page of the tender documents shall be signed by the tenderer or his authorised representative.

8. The tenderer should indicate the ti

order. The time indicated in tender may have a bearing on awarding the contract.

RATES:

9. The rate quoted should be inclusive of all material, labour, water, electricity, power equipm

tools/tackles, centering, shoring, lifts, leads, scaffolding, excise/customs/octroi duties, sales tax, works contact

tax etc. levied by State/Centeral authorities. All materials are to be supplied by the tenderer unless oth

stated.

(a) Its is made clear to the parties that no excise claims on storage tanks/LPG Horton spheres/ bullets/

structurals would be entertained by the Corporation.

10.The rates quoted shall be valid for a period of six months. Once the quotation is accepted, the rates quoted

shall be firm till the entire work is completed in all respects.

ACCEPTANCE OF TENDER:

11. In complete/Conditional tender quotations or those received late and/not confirming to the terms and

conditions, the tender documents will be rejected.

काप�रेशन लमटेड BHARAT PETROLEUM CORPORATION LTD.

सरकारका उपम A Government of India Enterprise

GENERAL CONDITIONS OF TENDER

Tender No. CRFQ 10001

Due Date/Time: 15.02.201

Time for Completion:

FILLING AND SUBMITTING TENDERS:

Quotations should be submitted only in the prescribed tender schedule forms supplied by the Company,

together with Drawings and General Conditions of Tender duly signed by the tenderer along with a Bank Draft,

Rew:ARC.UPS & STAB dated 31.01.2013 for the amount mentioned in Clause

13, on or before the due date/time of closing of the tender. Quotations received after the due date/time will

should study all the tender documents carefully and understand the conditions, drawings,

specifications etc. before quoting. If there are any doubts, he should obtain clarifications, but this shall not be

justification for late submission or extension of opening date/time of the tenders.

The tenderer should visit the site and acquaint himself with site conditions, availability of water, electricity,

approach road, construction materials as per specifications, shelter for his staff etc. since these are

provided/arranged by the tenderer (unless otherwise specified) at his cost.

The tenderer should quote for all items in the tender schedule. The rates should be expressed both in

figures and in words: where discrepancy exists between the two, the rates expressed in words will prevail.

Similarly, if there is any discrepancy exists between the unit rate and the amount, the unit rate will prevail.

The rates be quoted in the same units as mentioned in the tender schedule.

der Documents should be in Ink/Typed. Corrections, if any, should be attested by full

Every page of the tender documents shall be signed by the tenderer or his authorised representative.

The tenderer should indicate the time required to complete the entire work from the date of receiving the

The time indicated in tender may have a bearing on awarding the contract.

The rate quoted should be inclusive of all material, labour, water, electricity, power equipm

tools/tackles, centering, shoring, lifts, leads, scaffolding, excise/customs/octroi duties, sales tax, works contact

tax etc. levied by State/Centeral authorities. All materials are to be supplied by the tenderer unless oth

e clear to the parties that no excise claims on storage tanks/LPG Horton spheres/ bullets/

structurals would be entertained by the Corporation.

10.The rates quoted shall be valid for a period of six months. Once the quotation is accepted, the rates quoted

shall be firm till the entire work is completed in all respects.

11. In complete/Conditional tender quotations or those received late and/not confirming to the terms and

conditions, the tender documents will be rejected.

BHARAT PETROLEUM CORPORATION LTD.

India Enterprise

1000179807

.2013 / 03.00 PM

Quotations should be submitted only in the prescribed tender schedule forms supplied by the Company,

together with Drawings and General Conditions of Tender duly signed by the tenderer along with a Bank Draft,

for the amount mentioned in Clause

13, on or before the due date/time of closing of the tender. Quotations received after the due date/time will

should study all the tender documents carefully and understand the conditions, drawings,

specifications etc. before quoting. If there are any doubts, he should obtain clarifications, but this shall not be

opening date/time of the tenders.

The tenderer should visit the site and acquaint himself with site conditions, availability of water, electricity,

approach road, construction materials as per specifications, shelter for his staff etc. since these are to be

The tenderer should quote for all items in the tender schedule. The rates should be expressed both in

rates expressed in words will prevail.

Similarly, if there is any discrepancy exists between the unit rate and the amount, the unit rate will prevail.

der Documents should be in Ink/Typed. Corrections, if any, should be attested by full

Every page of the tender documents shall be signed by the tenderer or his authorised representative.

me required to complete the entire work from the date of receiving the

The time indicated in tender may have a bearing on awarding the contract.

The rate quoted should be inclusive of all material, labour, water, electricity, power equipment

tools/tackles, centering, shoring, lifts, leads, scaffolding, excise/customs/octroi duties, sales tax, works contact

tax etc. levied by State/Centeral authorities. All materials are to be supplied by the tenderer unless otherwise

e clear to the parties that no excise claims on storage tanks/LPG Horton spheres/ bullets/

10.The rates quoted shall be valid for a period of six months. Once the quotation is accepted, the rates quoted

11. In complete/Conditional tender quotations or those received late and/not confirming to the terms and

Page 6: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

12. The Company reserves the right to reject any or every tender without assigning any reason whatsoever

and/or to negotiate with the tenderer (s) in the manner the Company considers suitable.

The Company further reserves its rights to allow to the Public enterprises 'Price Preference" (facilities as

admissible under the existing policy) as may be decided by the Company.

* EARNEST MONEY DEPOSIT : (Applicable only for work costing 50,000/- and above in value)

13. The tenderer shall be required to submit along with this quotation a Bank Draft in Favour of Bharat

Petroleum Corporation Ltd. for a sum equivalent to 5% of the total tendered value of works as earnest money

deposit, subject to a minimum of 5,000/- and a maximum of 1,00,000/-.

The earnest money deposit shall be returned to the unsuccessful tenderers within one month after due date

for opening of the tender. The earnest money deposit of the successful tenderer will be retained till the

commencement of the work. Thereafter the tenderer may opt to adjust the earnest money deposit against

security deposit as a money deposit or request return of the earnest money deposit. No interest will be

payable on earnest money deposit.

Security Deposit: (Applicable only for works costing 50,000/- and above in value)

13. (a) The successful tenderer, before commencement of the work, shall have to provided to the Company, by

way of security, a money deposit or a Bank Guarantee in the standard format provided by the Company for an

amount equivalent to 5% of the total tendered value of the works, subject to a minimum of 5,000/- and a

maximum of 1,00,000/-. The tenderer shall have the option to adjust the earnest money towards security

deposit if he so desires.

The security deposit will be retained till the successful completion of the work. In the case of security deposit

in the form of a Bank Guarantee, the same shall be kept valid by the tenderer at his cost till the completion of

the work under contract and shall be extended from time to time. No interest will be payable on security

deposit.

EXECUTION OF AGREEMENT:

14. The successful tenderer shall within 15 days of the Company's communication to him of the acceptance of

his tender, execute a formal Agreement with the Company, on the Company's format.

EXECUTION OF WORKS :

15. The successful tenderer should submit detailed construction programme adhering to the completion time

quoted in the Agreement. The programme will form part of the contract. However, the Company reserves the

right to alter the programme, if necessary, from time to time and no claim of successful tenderer on account of

such alteration will be entertained.

16. All materials required for the execution of work should conform to the standard specification and approved

by the Engineer in Charge before actually put to use. Commencement of work without prior approval shall be

entirely at the risk and cost of the contractor. No delay due to non-availability of materials, tools, equipment

etc. will be entertained by the Company. In the case of certain machinery/ equipment, the Company's site

Engineer may inspect the items for approval before they are brought to the site.

17. The responsibility for the safety, security and accounting of the materials and equipment brought or

installed by the successful tenderer or handed over to him by the Company for completion of the work will

remain with him till the acceptance of the work by the Company. Any damage caused to the

material/equipment during the execution of work will be made good by the successful tenderer at his cost. The

Company may require the successful tenderer to have guarantee/indemnity bond executed for the value of

the materials supplied to him free of cost, as per terms of the Agreement.

Page 7: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

18. Quantities shown in the Tender Schedule are approximate and payment shall be made as per actual

measurements. The successful tenderer is not entitled for any sort of compensation towards materials

procured/stored in excess of the measured quantities.

19. The Company reserves the right to increase or decrease the tendered quantity or revise specifications,

drawing, designs of any or every item or delete them at any stage of work. The successful tender's claim for

compensation or damages on account of these shall not be entertained. Such deviations will be adjusted at the

rates contained in the Agreement or at prevailing market rates, if the rates are not available in the Agreement,

by issuing variation order(s). In case it becomes necessary for the Company to temporarily suspend or

postpone the work, partly, or fully due to unforeseen circumstances, the Company shall not be liable for any

compensation on account of resultant delays.

20. The entire work will be carried out under the supervision of the authorised representative of the Company,

but this will not detract successful tenderer(s) full responsibility for quality/period of execution of work.

21. Detailed measurements of works carried out shall be taken jointly by the successful tenderer and our site

Engineer at every stage of work, before proceeding to the next stage. All works shall be measured as per the

procedure laid down. Payments will be made as per measured quantities and not as per Tender Schedule

quantities.

22. The successful tenderer shall submit to the office which has awarded the contract, periodic progress

reports of his work as stipulated by our Site Engineer.

23. The successful tenderer shall not undertake on his own any change in specifications mentioned in the

tender documents. In case of doubts he will refer the matter in writing to the Company and act as per

clarifications given by the Company. Any changes in the work involving changes in original specifications

quantities/additional items of work, should be covered by obtaining suitable variation order (s) from the

Company immediately.

24. If the performance of the successful tenderer is found to be unsatisfactory, the Company reserves the right

to cancel in part or the whole of the contract and get the work executed through alternative means at the

entire risk and cost of the successful tenderer.

25. If the successful tenderer does not complete the work in the stipulated time, the Company reserves the

right to recover liquidated damages at 0.5% of the total contract value for every week of delay or part there of

subject to a maximum of 5% of the total contract value until the work is satisfactorily completed and handed

over. However delay in completion of a specific urgent job the maximum compensation will be increased to

15% of the total contract value. Such damages may be deducted by the Company from any money due to the

tenderer and any further amount due from the tenderer shall be paid by the tenderer to the company

forthwith.

This is a specific urgent job (Yes/No) (Delete which is not applicable).

26. The successful tenderer should ensure the safety of adjoining property and shall make good any loss to

product/property resulting from his negligence.

27. Hot work be carried out only in the areas earmarked for the purpose, after required safety precautions

have been taken and only after obtaining written permission from the Site Engineer.

Any provision required to be made e.g. wind screens of G.C.I. Sheets etc, to make the area safe for hot work,

will be made the successful tenderer at his own cost.

Page 8: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

28. The work in the Company's premises should be carried out during the Companys normal working hours and

without obstructing day-to-day working the establishment. If any work is required to be carried out beyond

normal working hours, prior permission should be obtained before undertaking such work.

29. In the event of the successful tenderer failing to complete the work within the stipulated time, the

Company shall have the right to employ any other agency to complete the remaining work at the risk & cost of

the successful tenderer.

30. It will be the successful tenderer's responsibility to get the works approved and obtain all certificates for

plumbing, electrical, civil works from local, municipal, Governmental or other required authorities.

31. Tanks, Pumps, pipelines, Posts, Equipments and/or any other materials to be supplied by the Company will

be supplied anywhere within the site premises. Safekeeping, transporting and handling of the same to actual

location of installation will be the successful tendere's responsibility for which no extra payment will be made.

32. During execution of work if it is found necessary to dismantle a portion of existing bund wall, enclosure

wall, compound wall, fencing etc. to facilitate the movement of materials and equipment, the same shall be

carried out after obtaining permission in writing from Company's authorised representative and also made

good by the contractor at his own cost.

33. The successful tenderer is expected to co-operate/co-ordinate with other contractor's carrying out the

work allocated to them so as to avoid breaking up of work already done by them or causing any hindrance in

the progress of their work. In case there is any difficulty/dispute, the same should be immediately brought to

the notice of the Site Engineer.

34. If the work is required to be carried out in a working Depot, Installation, retail outlet etc. the progress of

work is likely to be interrupted on account of operations in such units. Stoppage of work under such

circumstances shall not entitle the successful tenderer to claim any compensation for idling, machinery etc.

during such interruptions.

35. The successful tenderer and his man/men shall abide by all security/safety rules regulations in force at

location and the laws, bye-laws and statutes of Government, semi-Government and other local authorities

such as requirements/liability under enactments like the Workmen's Compensation Act., Contract labour Act

etc. and the Company shall stand indemnified against any claims on these scores. The successful tenderer and

his men shall strictly abide by "no smoking' and other petroleum regulations on the premises.

36. The successful tenderer shall arrange for at least one competent supervisor to be present at site at all

times during the progress of the work, who shall be duly authorised to take instructions and execute them on

his behalf.

INTERIM PAYMENTS:

37. At the sole discretion of the Company, the contractor can receive upto 90% of the payment for the cost of

work done. Interim bills should be duly supported by the measurements of work actually done. (All payments

shall be subjected to deduction of Income Tax as may be applicable from time to time).

FINAL BILLS / RETENTION MONEY:

38. On completion of the work to the satisfaction of the Company's authorised representative and after

clearing the debris, tools, tackles, shoring, centering, materials etc. from the site and obtaining necessary

certificates as required from the local authorities, the successful tenderer shall submit his final bill based on

the jointly recorded measurements of actual work done.

Page 9: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

The final bill of the job done should be raised, unless otherwise agreed by the Corporation in writing, within

one month from the date of completion of the total job as per contract. Whether the job has been completed

or not will be decided at the sole discretion of the Corporation. Payments of the final bill will be made after

adjusting interim payments and retention amount deducted and retained.

38. (a) The Corporation will be entitled to deduct 10% value of all Interim/running bills and in final bills as

Retention Money for all jobs exceeding 1,00,000/- and no interest will be paid on money retained by the

Company.

The said retention money will be retained for a period of one year and paid to the Contractor after adjusting

any dues of the Corporation against the Contractor under the workmanship/materials pro-vided to the

Contractor and/or against any other claims for any reason whatsoever under the Agreement which may arise

within the said period of the one year. The retention period of one year will commence from the date of the

final bill or the date of completion of the job (as reckoned by BPCL) whichever is earlier.

39. The successful tenderer shall not subject or assign any part of the work to another party, without the prior

written consent of the Company. In any event the successful tenderer will be solely responsible for the work so

sublet or assigned.

40. The Contractor undertakes to ensure due and complete compliance with all laws regulations, rules etc.

whether of the Central Government or the State Government or any other competent authority applicable to

the workmen employed or whose services are otherwise availed of by the Contractor, whether in connection

with the construction work at the site or otherwise. The Employer shall have the right to inspect the records

maintained by the Contractor concerning such workman from time to time and the Contractor to produce of

the Employer's inspection in order to ascertain whether or not the requirements of all such laws regulations,

rules etc. have been complied with by the Contractor. In the event of the any contravention of such laws,

regulations rules etc. coming to light whether as a result of such inspection or otherwise, the Employer shall

have the right to require the Contractor to effect such compliance within such time as the Employer may

prescribe in that behalf and in the event of the Contractor failing to effect such compliance within the time

prescribed by the Employer then the Employer shall without prejudice to this rights to entitled to withhold

from the amount payable to the Contractor any amount payable to the workmen under any such laws,

regulations or rules and to make payment thereof to the workmen. The Employer shall also have in that event

the right to terminate the contract with immediate effect and to exercise powers reserved to the Employer

under the contract as result of termination.

41. Special conditions, if any, pertaining to the tender are shown in Tender Schedule.

Page 10: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

ANNEXURE

a) Any dispute or differences of any nature whatsoever, any claim, cross-claim, counter-claim or set off of

the Corporation against the Contractor or regarding any right, liability, act, omission or on account of

any of the parties hereto arising out of or in relation to this Agreement shall be referred to the Sole

Arbitration of the Director (HR) of the Corporation or of some officer of the Corporation who may be

nominated by the Director (HR). The Contractor will not be entitled to raise any objection to any such

Arbitrator on the ground that the Arbitrator is an Officer of the Corporation or that he has dealt with

the matters to which the contract relates or that in the course of this duties as an Officer of the

Corporation he had expressed views on all or any other matters in dispute or difference. In the event

of the Arbitrator to whom the matter is originally referred being transferred or vacating his office or

being unable to act for any reason, the Director (HR) as aforesaid at the time of such transfer, vacation

of office or inability to act may in the discretion of the Director (HR) designate another person to act as

Arbitrator in accordance with the terms of the Agreement to the end and intent that the original

Arbitrator shall be entitled to continue the Arbitration proceedings notwithstanding his transfer or

vacation of office as an Office of the Corporation if the Director (HR) does not designate another

person to act as Arbitrator on such transfer, vacation of office or inability of original Arbitrator. Such

persons shall be entitled to proceed with the reference from the point at which it was left by his

predecessor. It is also a term of this contract that no person other than the Director (HR) or a person

nominated by such Director (HR) of the Corporation as aforesaid shall act as Arbitrator hereunder. The

award of the Arbitrator so appointed shall be final conclusive and binding on all parties to the

agreement subject to the provisions of the Arbitrator Act 1940 or any statutory modification or re-

enactment thereof and the rules made there under for the time being in force shall apply to the

Arbitration proceedings under this clause.

b) The award shall be made in writing and published by the Arbitrator within two years after entering

upon the reference or within such extended time not exceeding further twelve months as the Sole

Arbitrator shall by a writing under his own hands appoint. The parties hereto shall be deemed to have

irrevocably given their consent to the Arbitrator to make and publish the award within the period

referred to herein above and shall not be entitled to raise any objection or protest thereto under any

circumstances whatsoever.

c) The Arbitrator shall have power to order either of the parties to abide by observe and perform all such

directions as the Arbitrator may think fit having regard to the matters in difference i.e. dispute before

him. The Arbitrator shall have all summary powers and may take such evidence oral and/or

documentary, as the Arbitrator in his absolute discretion thinks fit and shall be entitled to exercise all

powers under the Arbitrator Act 1940 including admission of any affidavit as evidence concerning the

matter in difference i.e. dispute before him.

d) The parties against whom the Arbitration proceedings have been initiated, that is to say, the

Respondents in the proceeding, shall be entitled to prefer a cross-claim or set off before the Arbitrator

Page 11: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

in respect of any matter an issue arising out of or in relation to the Agreement without seeking a

formal reference of Arbitration to the Director (Marketing) for such counter-claim, Cross-claim or set

off and the Arbitrator shall be entitled to consider and deal with the same as if the matters arising

there from has been referred to him originally and deemed to form part of the reference made by the

Director (Marketing).

e) The Arbitrator shall be at liberty to appoint, if necessary any Accountant or Engineer or other technical

person to assist him and to act by the opinion so taken.

f) The Arbitrator shall have to make one or more awards whether interim or otherwise in respect of the

dispute and difference and in particular will be entitled to make separate awards in respect of claims

or cross-claims of the parties.

g) The Arbitrator shall be entitled to direct any one of the parties to pay the costs of the other party in

such manner and to such extent as the Arbitrator may in his discretion determine and shall also be

entitled to require one or both the parties to deposit funds in such proportion to meet the Arbitrator's

expenses whenever called upon to do so.

h) (h)The parties hereby agree that the courts in the city of Mumbai alone shall have jurisdiction to

entertain any application or other proceedings in respect of anything arising under this Agreement and

any award or awards made by Sole Arbitrator here under shall be failed in the concerned courts in the

city of Mumbai only.

Note : In case dispute relating to contract of Refinery, the words "Director (Marketing)" may be

replaced by "Director (Refinery)”.

Page 12: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Tenderer should mention estimate of time for Weeks/Months:

completing the work shown in the tender.

This is a specific urgent job Yes/No (Delete which is not applicable).

I/We have read carefully the above terms and

conditions of Tender anti agree to abide by the same.

Signature of the Contractor ........................ (or his

authorised representative)

Date :

Name/Seal of the Contractor :

Address: ----------------------------------------------

Page 13: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure-II

1

E-TENDER FOR ARC FOR SUPPLYING ONLINE UPS AND SERVO VOLTAGE STABILIZER AT RETAIL OUTLETS IN GUJARAT, MP & CG

STATES: 2013-14

SPECIAL TERMS AND CONDITIONS 1. The requirement indicated in the schedule is our consolidated

approximate requirement covering Gujarat, Madhya Pradesh & Chhattisgarh states.

2. Rate finalized against this tender will be adopted by all Territories (List is

Enclosed) in Gujarat, Madhya Pradesh & Chhattisgarh states. 3. Orders in the form of call-off letters will be issued by the Territories. 4. Power / Water and all other related requirement towards execution of work

has to be arranged by the contractor. 5. No hot work will be allowed inside the site. 6. The rates quoted shall be valid from the date of LOI and they will remain

firm till the completion of work in all respects. BPCL has the option to extend balance quantity for each area (unutilized) for next 6 months (after expiry of annual contract) and / or place a repeat order for entire contract quantity (for each area) for one more year. Both options can be exercised concurrently by mutual consent of BPCL & successful vendor. If the rates quoted for more than one area, by successful vendor is same, the unutilized quantity can be used in other area, during the currency of the contract.

7. BPCL reserves its right to award / split jobs against these rates at its

discretion among a number of bidders. 8. The rates quoted must be delivered rates inclusive of cost of material,

fabrication, erection, excise duty / sales tax, VAT, service tax & educational cess and all levies. The rate should also include loading, unloading and transportation to the RO sites. Octroi (if any) will be reimbursed at actual against documentary evidence. The rates quoted should be indicated only in price bid.

9. The award of job shall be on the basis of quoted rate and capacity of the

party to execute the order. Please note that BPCL has the right to award/ allot the quantities beyond the assessed capacity to other vendors.

10. Capacity of the vendor is to be mentioned in the capacity sheet. The

capacity statement in blank is enclosed. You are advised to fill up details

Page 14: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure-II

2

in the same failing which your tender is liable to be rejected (Min. Capacity 30 sets/ month - for each short listed vendor. for one/ multiple area for which vendor has been short listed).

11. Separate Price Bid for each area which shall be evaluated separately. 12. There are two Price Bids the tender

1) Price Bids I & IA (Supply + 2 years AMC, Gujarat ) – 150 nos. 2) Price Bids II & IIA (Supply + 2 years AMC, MP & CG) – 220 nos. All the above price bids shall be evaluated independently to decide the lowest quote for each area. BPCL shall conduct negotiation if required, at its discretion.

13. Successful vendor has to supply equipment (against single or multiple call

offs) within 4 weeks from the date on which the accumulated quantity of 10 sets is received by the vendor. However, in February & March 2013, the successful vendor is expected to have minimum 30 sets ready, for immediate supply in a week’s time from individual PO receipt. PO receipt shall be taken as receipt of scanned copy of PO (from BPCL official) on the e-mail ID provided by the vendor.

14. AMC shall begin after expiry of warranty i.e. 18 months from the date of

supply or 12 months from date of installation, whichever is earlier. 15. Successful tenderer shall have an option of submitting the bank guarantee

valid for 18 months (inclusive of 6 months lodgment period) from the date of completion of works. The value of the bank guarantee will be equivalent to the 10% of the bill value and the same should be submitted to the respective Region.

16. No mobilisation advance will be given. Similarly, part payment towards

materials supplied and price escalation will not be entertained. Vendor has the option for raising invoice from state/ states where they are registered. However, one rate has to be quoted in Price Bid.

17. Payment Terms : Payments will be released within 30 days from the date

of satisfactory completion of work and submission of the final bill ,after deducting 10% retention money, income tax, sales tax on works contract, and any other statutory levies, as applicable in the respective States.

18. Penalty terms: 0.5% of the invoice value per week subject to a maximum

of 5% will be deducted for each call off for delay in deliveries over and above the period mentioned above.

Page 15: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure-II

3

19. In case of any discrepancy between the General Conditions of Tender and Special Conditions of Tender (as mentioned above), the Special Conditions of Tender shall prevail.

20. One no UPS & one no Voltage Stabilizer to be tested for all Parameters in

the presence of BPCL official, through approved third party agency (Cost to be borne by successful vendor) at any time after the award of contract. BPCL can also ask for testing of one additional set, during supply.

21. The Bill for the completed job have to be raised immediately after

completion of the work and the payment will be made within 30 days of submission of the bill with required certificates.

22. The Vendor is fully responsible for installing & commissioning the UPS &

Voltage Stabilizer as directed. The necessary wiring will be done by BPCL in the Panel along with required switches for the installing of UPS & Voltage Stabilizer. The representative of the Vendor must be present at the RO site till the job is completed.

23. The vendor should supply both UPS & Voltage Stabilizer. BPCL will

consider the bids of only those vendors who are capable of supplying UPS & Stabilizer to our RO sites. The evaluation will be done on the above basis. The supply and billing shall be direct responsibili ty with the concerned vendor (i.e. dealer/distributor of the vendor shall not be considered for handling the BPCL account)

24. BPCL will not issue C/D forms required by sales tax authorities and the tax

implications to be borne by the vendor. 25. Please note that the warranty should be given for the equipments i.e. 12

months from the date of installation or 18 months from the date of supply whichever is earlier.

26. BPCL shall ensure minimum supply quantity for 10 sets/ month to a

particular short listed vendor (through single PO / multiple PO’s). I / We have read carefully the above terms & conditions of tender and agreed to abide by the same. Signature of the Vendor - (Or his authorised representative) Date : Address :

Page 16: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexurte-III

1

Technical Specifications for 3 kVA Ups System

S.N. P A R A M E T E R S S P E C I F I C A T I O N S A Technology True ON-LINE, IGBT based,

Microprocessor Controlled Double Conversion Technology.

B Capacity 3 kVA (Commensurate with P.F.) C I N P U T i. Voltage 160 - 280 V, Single Phase ii. Input Frequency 50 Hz. (± 6%) i.e, 47 Hz - 53 Hz (IGBT

based PFC correction) iii. Power Factor > 0.9 or Output = 2.7 KW iv. Rectifier Full Wave v. Rectifier Battery Charger Constant Voltage with Current limit. SMPS

based Battery Charger with I/P Power correction with IGBT as switching element.

D O U T P U T i. Load Power Factor 0.8 lag to 0.8 lead to unity ii. Nominal Voltage 230V, single phase ± 1% iii. Regulation (IGBT based) ± 1 % iv. Frequency Constant 50 Hz. Crystal generated

frequency on mains & battery v. Waveform True Sine wave vi. Total Harmonic Distortion < 3% Max. for 100% Linear Load vii. Total Harmonic Distortion < 5% for 100% Non-Linear Load. viii. Overload Capacity 110% for 1 min.

125% for 30 sec. ix. Inverter IGBT based PWM with INSTANTANEOUS

SINEWAVE CONTROL X. Transient Response For 100% load change – Voltage remains

within + 5%, Recovery to ± 1% within 60 ms (3 cycles)

Crest Factor > 3 : 1 Duty Continuous

E E F F I C I E N C Y (AT FULL LOAD) i. Inverter efficiency Greater than 90% ii. Over all efficiency Greater than 85%

F TESTING STANDARDS

IEC 62040 - PART III

Page 17: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexurte-III

2

S.N. PARAMETERS SPECIFICATIONS G SURGE PROTECTION AND NOISE FILTERING Surge protection device should be a physically separate module in series

with load / UPS housed in the UPS cabinet Leakage current Less than 300 micro Amp Clamping Voltage (

Maximum continuous operator Voltage)

275 V

Peak Current for SPD 20KA Rated Load Current 15 A Max. transient energy for 2

ms Greater than 400 J

Response time Less than 30 Nano second For an infused open circuit voltage of 6 KV or surge current of 3 KV (8/20

micro sec.) the UPS output should not be more than 100V. RFI protection EMI protection

H B A T T E R Y P A R A M E T E R S i. Back up Time >30 Minutes at full load ii. Battery Type Sealed Maintenance Free Lead Acid iii. VAH 2400 (Minimum) iv. Battery Model/ make Sealed maintenance free batteries of

standard recognized make like Excide (Power safe) / Panasonic/ Global Yuasa/ Amco. The battery should be housed in a powder coated MS cabinet.

I OTHER P R O T E C T I O N S Load Isolation Isolation Transformer at Input. Input Ac over voltage/ under

voltage/ AUTO RECOVERY

DC Over voltage/ under voltage, Over Temperature, Over Current Rectifier

Output over voltage, under voltage

Output over load, short circuit Over current for rectifier The UPS should work trouble

free in dusty and hot conditions of Retail Outlets.

Page 18: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexurte-III

3

S.N. PARAMETERS SPECIFICATIONS J E N V I R O N M E N T A L i. Acoustic Noise Level < 55db ii. Ambient Temperature 0 to 50 Deg C (In UPS only/ Not for

Battery) ii. Storage Temperature -10 to 70 Deg C iv. Humidity Up to 95% RH, Non Condensing v. Altitude < 1000 Mtrs. Above Sea Level ( without

de-rating) K P H Y S I C A L i. Enclosure Protection Grade IP – 21 ii. Cooling Forced Air iii Cable entry From the back. No female socket or switch.

Terminal blocks for input & output. Input cable with both sides crimped lug to be provided.

L D I S P L A Y � Battery Voltage

� Battery charge / discharge

� Input Voltage / output voltage � Current (Input / Output) � Frequency (Input / Output)

M AUDIO ALARM � Rectifier Trip

� Low Battery � Over load � System trip

� Main fail

N SWITCH GEAR MCB for mains, MCB for Load 15 Amps, Havells orHager make one each

at input and output

O WARRANTY For UPS: 1 year (Onsite warranty

incl. replacement with proper working UPS at site – No Repair at site) from date of commissioning.

For Battery: 1 year

P COMMUNICATIONS

232 port. PC should be able to communicate through RS232 port (RJ-45 JACK). S/w to be provided along with UPS. This s/w should have self diagnosing feature.

SNMP compatible for future up gradation to a LAN / web based monitoring facility

Page 19: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexurte-III

4

S.N. PARAMETERS SPECIFICATIONS Q ISOLATION TRANSFORMER (INPUT SIDE)

Ration 1:1

Insulation class B

DC galvonic isolation > 100 ohm

Dielectric strength 2500 v for 60 sec

Common mode Noise 100 DB ( 100 khz to 1000 kHz) std

Differential mode noise 50 DB ( 100 khz to 1000 kHz)

Rejection 120 DB ( 100 khz to 1000 kHz) opt

Coupling capacitance. 0.005 pf

Line leakage currents < 10 mA

R CERTIFICATES & STANDARDS

ISO 9001:2000 certificate, EN 50091-1 as safety certificate, EN 50091-2 for EMC

The UPS specifications must be validated by Indian Govt. approval bodies – ERTL-ETDC-SAMEER or otherwise CE/UL approval.

Page 20: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexurte-III

5

Servo Voltage Stabilizer Typical Specifications. INPUT: Voltage : 400 VAC Line Range : 242 to 502 V line to line ie 140 to 290 V line to neutral Frequency : 50 HZ Nominal Range : 47Hz to 53 Hz Phase : Single/Three Phase & Neutral Wave Form : Sinusoidal OUTPUT:

Capacity : 30kva (30 KVA – 3 Phase implies 10 KVA load per phase)

30 KVA must have 3 nos. of variac rated at 35 amps each 3 nos. buck boost transformer rated at 4.2 KVA each

Voltage : 400VAC Nominal 3Phase Line Regulation : 230VAC ± 5% (P-N) Load Regulation : 230VAC ± 5% (P-N) Max O/P Current : 1.5 Times the rated current for 1 min at nominal conditions Frequency : Same as Input I/P power Factor : Better than 0.98 Speed of Correction : Better than 50V/sec. Load Power Factor : 0.7 lag to Unity I/P Current Harmonics : < 2% Efficiency at full Load : Better than 97% at nominal Voltage ADDITIONAL POINTS TO BE NOTED: ONLINE UPS: A) UPS topology should be true On-line double conversion. B) Technology Microprocessor based and inverter current controlled PWM

technique using IGBTs. C) Software configurable: The UPS should be software controlled & configurable

with self diagnostic facility & RS232 based communication with computer systems for monitoring. UPS must be SNMP compatible for future up gradation to a LAN / web based monitoring facility

D) Battery Isolation: The battery connection should have MCB/MCCB

Page 21: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexurte-III

6

E) Battery Start Facility should be available F) Protections against Surges as per IEEE 587 G) EMI / RFI Filtering as per EN50091-1 & EN50091-2 H) Degree of protection of enclosure: IP21 I) Standards: CE-mark J) Battery Type: SMF (Sealed Maintenance Free) Battery Rating: NOT LESS THAN 2400 (V*Ah) K) UPS shall be tested at 3 kVA (full non-linear load) L) Battery Back up shall be tested for 30 mins back up at 2.4 kW (full linear load) M) The UPS should be provided with suitable isolation transformer at Input . N) The UPS offered has to be SNMP compatible which can be upgraded for

remote monitoring at a later date i.e. the UPS will have the necessary communication ports and SNMP card slot.

O) Also battery provided with the UPS shall be Lead-Acid battery of approval

make by BPCL. P) The UPS offered should meet the EN 50091-1 & EN 500091-2 standards or equivalent IEC standards.

Q) Bye pass provision to be removed. R) Provision to be provided on the body of the UPS where Dedicated Earth Pit

to be connected. S) Effective audio/visual Alarm on failure of UPS component to be provided. T) No switch/plug/socket in input/output circuit. Supply to UPS to be directly

though BUS with 2 core cables. Similarly, output should be connected to UPS bus directly through 3 core cable.

Page 22: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexurte-III

7

SERVO VOLTAGE STABILIZER Rating 30 Kva (0.7 to Unity) Type: Unbalanced suitable for un-balanced input voltages & un-balanced loading Design: Servo Controlled using AC high torque motors (with long life characteristics) Motors should not use any carbon brushes The Servo Stabilizers must have output sensing Over Voltage / Under Voltage trip facility with electronic time delay (to avoid nuisance tripping). Similarly, Servo Stabiliser should have over voltage / under voltage trip facility at the input (supply) Auto Reset Facility with electronic time delay. Over Load / Short Circuit Protection (Incl. resistance to over voltage / incoming supply for reasonable time without burning of stabilizer components) Even if 1 phase fails other 2 phases must continue to get stabilized supply. Line Regulation : 230 VAC ± 1% (P-N) Load Regulation : 230 VAC ± 1% (P-N)

Page 23: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure - IV

SR. NO.

DESCRIPTION UNIT QTY.NOS. PER MONTH.

1 Supplying Servo Voltage Stabilizer with filter as per Technical Specification for Gujarat, Madhyapradesh & Chhattisgarh State

EA 370

2 Supplying Online UPS with filter as per Technical Specification for Gujarat, Madhyapradesh & Chhattisgarh State

EA 370

3……………..

weeks

Signature of the Vendor . Name / Seal of the Vendor(or his authorised representative)

Date : Address :

Note :- Min. capacity required is 30 sets per month for the area approved for a particular vendor.

CAPACITY

E-TENDER FOR ARC FOR SUPPLYING ONLINE UPS AND SERVO VOLTAGE STABILIZER WITH FILTER AT RETAIL OUTLETS IN GUJARAT, MP & CG STATES :

2013-14

CRFQ NO. 1000179807 DATED:31.01.2012 / DUE DATE: 15.02.2012 TIME 03:00 PM

No of weeks required for manufacturing and keeping the sets (a batch of 10-15 sets) ready and arranging for inspection by BPCL / BPCL approved third party agency.

Page 24: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure - V-1

RATE FINAL RATE AMOUNT(BASIC RATE)

BASIC RATE + VAT

(FINAL RATE x QTY.)

(Rs.) (Rs.) (Rs.) (Rs.)1 Supplying Servo Voltage Stabilizer

with filter as per Technical Specification for Gujarat State

EA 150

2 Supplying Online UPS with filter as per Technical Specification for Gujarat State

EA 150

TOTAL

NOTE: 123456

Signature of the Vendor . Name / Seal of the Vendor(or his authorised representative)

Address :

Date :

The scope of the work includes testing, commissioning of UPS / Voltage Stabilizers.

NO. DESCRIPTION

In words:

AMC FOR 2 YEARS

TOTAL (SUPPLY & COMMI.) + TOTAL- A (AMC FOR 2 YEARS)

In words:

TOTAL - A

GRAND TOTAL

QTY.VAT

(_______%)

Octroi if any will be reimbursed against production of original receipt.

Basic Rate includes transportation, loading, uloading, etc. but excluding taxes.Final rate is basic rate plus applicable taxes (Excise / custom duty, VAT, WCT etc.)

Any other tax applicable other than the above may also be indicated separately.Please include Annexure giving details of each tax (% basis) loaded on basic rate to arrive at final rate.

UNPRICE BID I

E-TENDER FOR ARC FOR SUPPLYING ONLINE UPS AND SERVO VOLTAGE STABILIZER WITH FILTER AT RETAIL OUTLETS IN GUJARAT, MP & CG STATES : 2013-14

UNIT

GUJARAT STATE

(SUPPLY & COMMISSIONING OF EQUIPMENT)

CRFQ NO. 1000179807 DATED:31.01.2012 / DUE DATE: 15.02.2012 TIME 03:00 PM

Page 25: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure - V - 2

RATE FINAL RATE AMOUNT(BASIC RATE)

BASIC RATE + VAT

(FINAL RATE x QTY.)

(Rs.) (Rs.) (Rs.) (Rs.)1 Supplying Servo Voltage Stabilizer

with filter as per Technical Specification for Madhya Pradesh & Chhattisgarh States

EA 220

2 Supplying Online UPS with filter as per Technical Specification for Madhya Pradesh & Chhattisgarh States

EA 220

TOTAL

NOTE: 123456

Signature of the Vendor . Name / Seal of the Vendor(or his authorised representative)

Address :

Date :

Final rate is basic rate plus applicable taxes (Excise / custom duty, VAT, WCT etc.)

UNPRICE BID II

E-TENDER FOR ARC FOR SUPPLYING ONLINE UPS AND SERVO VOLTAGE STABILIZER WITH FILTER AT RETAIL OUTLETS IN GUJARAT, MP & CG STATES : 2013-14

UNIT

MADHYAPRADESH & CHHATTISGARH STATES

(SUPPLY & COMMISSIONING OF EQUIPMENT)

Any other tax applicable other than the above may also be indicated separately.Please include Annexure giving details of each tax (% basis) loaded on basic rate to arrive at final rate.

TOTAL - A

GRAND TOTAL

CRFQ NO. 1000179807 DATED:31.01.2012 / DUE DATE: 15.02.2012 TIME 03:00 PM

QTY.

The scope of the work includes testing, commissioning of UPS / Voltage Stabilizers.

NO. DESCRIPTION

In words:

AMC FOR 2 YEARS

TOTAL (SUPPLY & COMMI.) + TOTAL- A (AMC FOR 2 YEARS)

In words:

VAT (_______%)

Octroi if any will be reimbursed against production of original receipt.

Basic Rate includes transportation, loading, uloading, etc. but excluding taxes.

Page 26: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure – V - 3

UNPRICE BID IA (AMC)

E-TENDER FOR ARC FOR SUPPLYING ONLINE UPS AND SERVO VOLTAGE STABILIZER WITH FILTER AT RETAIL OUTLETS IN

GUJARAT, MP & CG STATES : 2013-14

GUJARAT STATE TENDER NO.: CRFQ 1000179807 DATE : 31.01.2013 DATE OF OPENNING: 15.02.2012 TIME: 03.00 PM

SR NO. DESCRIPTION QTY UNIT

RATE (Rs./set/annum)

Service Tax

+ Educational cess

Final Rate (A+B) AMOUNT( for two

years i.e, rate column to be

multiplied by 2)

1 AMC charges for 30 KVA Stabiliser & 3 KVA UPS for 2 years (post completion of contract period/ warranty period) in a separate envelope marked “AMC charges with scope”. The AMC charges should be comprehensive (excluding batteries).

150 nos

Per number per annum.

TOTAL:

In Words Rs,…………………………………………………………………………………… Notes:

1. SERVICE TAX: Your rate should be inclusive of all taxes excluding service tax & education cess. Kindly mention service tax separately.

2. PERIOD: The period is for two years after completion of warranty period. However quote shall be given per annum basis.

3. EQUIPMENTS UNDER WARRANTY: All components of 30 KVA stabilizer & 3 KVA UPS for excluding battery.

4. TYPE: Comprehensive. i.e, the quote should include cost of all spares/ components required during preventive and breakdown maintenance.

5. VISITS: The quote should include four PREVENTIVE visits in year on every three months. Breakdown to be attended within 48 hours and shall not be charged extra.

6. PREVENTIVE MAINTENANCE: This includes following activities:

Page 27: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure – V - 3

• Checking of provision of dedicated earthing. • Checking of segregation of earthings in the UPS. • Health of battery. • Cleaning of UPS from inside. • Checking all displays. • E-N voltage at farthest end. • Checking all the electrical joints. • Checking quality of output voltage/current/frequency. • Checking setting of all alarms/protection.

NOTE: During maintenance, no raw or stabilized power should be given to MPD/Automation equipments. Service engineer should visit the site every three months. The report shall be signed by BPCLs officer only.

7. BRAEKDOWN MAINTENANCE: This includes following activities: • The visit should be free of cost. • Breakdown call to be attended within 48 hours.

8. PENALTY CLAUSE: Following penalty clauses are applicable for the said AMC.

• 0.5% per week subjected to maximum 5% of the total value of the contract ( AMC contract only) in case of failure to attend Preventive maintenance schedule, i.e, once in a quarter.

• Rs. 250 per day in case of failure to attend breakdown calls within 48 hours.

9. GENERAL:

• Provision of all tools & tackles shall be in vendor’s scope. • The quote shall include all logistics, to-fro & hotel charges of service

engineer. • Safety precautions shall be taken during maintenance activities. • Any damage to our equipment during preventive & breakdown maintenance

shall be charged from the vendor. • Please note, no extra cost will be given under any circumstances. • The complaint shall be lodged by BPCL/ BPCL dealers through BPCL

complaint Module (BROMA+), applicable to all vendors. Vendor has to integrate their service centre with BPCL complaint module for effective redressal of complaints (BROMA+ training shall be given by BPCL to successful vendor’s representative)

Contract will remain valid for the period of two years after completion of the warranty with the provision of extension for two more years. I have read the terms and the conditions and those are acceptable to me. Signature of the Vendor Name / Seal of the Vendor (or his authorised representative) Date : Address :

Page 28: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure – V- 4

PRICE BID II A (AMC)

E-TENDER FOR ARC FOR SUPPLYING ONLINE UPS AND SERVO VOLTAGE STABILIZER WITH FILTER AT RETAIL OUTLETS IN

GUJARAT, MP & CG STATES : 2012-13

MADHYAPRADESH & CHHATTISGARH STATES TENDER NO.: CRFQ 1000179807 DATE : 31.01.2013 DATE OF OPENNING: 15.02.2012 TIME: 03.00 PM

SR NO.

DESCRIPTION QTY UNIT RATE

(Rs./set/annum)

Service Tax

+ Educational cess

Final Rate (A+B) AMOUNT( for two

years i.e, rate column to be

multiplied by 2)

1 AMC charges for 30 KVA Stabiliser & 3 KVA UPS for 2 years (post completion of contract period/ warranty period) in a separate envelope marked “AMC charges with scope”. The AMC charges should be comprehensive (excluding batteries).

220 nos

Per number per annum.

TOTAL:

In Words Rs,…………………………………………………………………………………… Notes:

1. SERVICE TAX: Your rate should be inclusive of all taxes excluding service tax & education cess. Kindly mention service tax separately.

2. PERIOD: The period is for two years after completion of warranty period. However quote shall be given per annum basis.

3. EQUIPMENTS UNDER WARRANTY: All components of 30 KVA stabilizer & 3 KVA UPS for excluding battery.

4. TYPE: Comprehensive. i.e, the quote should include cost of all spares/ components required during preventive and breakdown maintenance.

5. VISITS: The quote should include four PREVENTIVE visits in year on every three months. Breakdown to be attended within 48 hours and shall not be charged extra.

6. PREVENTIVE MAINTENANCE: This includes following activities:

Page 29: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure – V- 4

• Checking of provision of dedicated earthing. • Checking of segregation of earthings in the UPS. • Health of battery. • Cleaning of UPS from inside. • Checking all displays. • E-N voltage at farthest end. • Checking all the electrical joints. • Checking quality of output voltage/current/frequency. • Checking setting of all alarms/protection.

NOTE: During maintenance, no raw or stabilized power should be given to MPD/Automation equipments. Service engineer should visit the site every three months. The report shall be signed by BPCLs officer only.

7. BRAEKDOWN MAINTENANCE: This includes following activities: • The visit should be free of cost. • Breakdown call to be attended within 48 hours.

8. PENALTY CLAUSE: Following penalty clauses are applicable for the said AMC.

• 0.5% per week subjected to maximum 5% of the total value of the contract ( AMC contract only) in case of failure to attend Preventive maintenance schedule, i.e, once in a quarter.

• Rs. 250 per day in case of failure to attend breakdown calls within 48 hours.

9. GENERAL:

• Provision of all tools & tackles shall be in vendor’s scope. • The quote shall include all logistics, to-fro & hotel charges of service

engineer. • Safety precautions shall be taken during maintenance activities. • Any damage to our equipment during preventive & breakdown maintenance

shall be charged from the vendor. • Please note, no extra cost will be given under any circumstances. • The complaint shall be lodged by BPCL/ BPCL dealers through BPCL

complaint Module (BROMA+), applicable to all vendors. Vendor has to integrate their service centre with BPCL complaint module for effective redressal of complaints (BROMA+ training shall be given by BPCL to successful vendor’s representative)

Contract will remain valid for the period of two years after completion of the warranty with the provision of extension for two more years. I have read the terms and the conditions and those are acceptable to me. Signature of the Vendor Name / Seal of the Vendor (or his authorised representative) Date : Address :

Page 30: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure-VI

SR NO CHECK POINTS UPS STAB

1 Checking of provision of dedicated earthing for UPS. YES/NO YES/NO

2Checking of segregation of earthings in the UPS (only two core from

stabilizer to UPS).YES/NO YES/NO

3 Stabiliser is earthed at two different points. YES/NO YES/NO

4 Health of battery. YES/NO YES/NO

5Cleaning of UPS & STAB from inside & outside. Clean carbon brushes.

YES/NO YES/NO

6 Checking all displays of UPS & STAB. YES/NO YES/NO

7 E-N voltage at farthest end of the UPS distribution ckt at load end.

YES/NO YES/NO

8Checking quality of output voltage/current/frequency of UPS & STAB.

YES/NO YES/NO

9 Checking setting of all alarms/protection of UPS & STAB. YES/NO YES/NO

10 Status of all switches of UPS & STAB. YES/NO YES/NO

11 Checking all the electrical joints of UPS & STAB. YES/NO YES/NO

12Visually inspect equipment for loose connections, burned insulation or any

other signs of wear of UPS & STAB.YES/NO YES/NO

13

During the inspection, check all power cabling for abrasions and burn spots.

Visually check components for signs of overheating, swelling, leaking, etc.. YES/NO YES/NO

14 Visually check for any liquid contamination. YES/NO YES/NO

15Perform visual checks and operational tests of all UPS & STAB equipment.

YES/NO YES/NO

16 Review maintenance logs and log all alarm operations and output.

YES/NO YES/NO

17Complete a functional checkout and test of the UPS & STAB diagnostic

systems.YES/NO YES/NO

18 Check environment, temperature, dust, moisture, room vents, etc. YES/NO YES/NO

19 Clean and tighten all power connections at the input and output terminals.

YES/NO YES/NO

20Off-line load test the UPS system to ensure that the system is completely

functional ( once in a year).YES/NO YES/NO

21 Ensure UPS is placed at sales room only and not at Electrical Room. YES/NO YES/NO

22 Battery bank is well ventilated. YES/NO YES/NO

23 Visually check printed circuit board alignments in UPS & STAB YES/NO YES/NO

24 Run the Stab & UPS on DG sets and check i/o voltage, frequency. YES/NO YES/NO

25 Calibrate or replace meters ( once in a year) if not calibrated. YES/NO YES/NO

26 Ensure enclosure is maintetaining required IP standard. YES/NO YES/NO

PREVENTIVE CHECKLIST FOR UPS & STABILISER IN WR (in addition to vebndor's checklist)

Page 31: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and
Page 32: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and
Page 33: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and
Page 34: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and
Page 35: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and
Page 36: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and
Page 37: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Annexure - VIII

TERRITORY REVENUE DIST.

COVEREDSTATE TERRITORY

REVENUE DIST. COVERED

STATE

MUMBAI MUMBAI MAH'TRA RAJKOT AMRELI GUJARATMUMBAI RAIGAD MAH'TRA RAJKOT JAMNAGAR GUJARATTHANE THANE MAH'TRA RAJKOT JUNAGARH GUJARATTHANE NASHIK MAH'TRA RAJKOT KUTCH GUJARAT

AHMEDNAGAR AHMEDNAGAR MAH'TRA RAJKOT PORBUNDAR GUJARATAHMEDNAGAR AURANGABAD MAH'TRA RAJKOT RAJKOT GUJARATAHMEDNAGAR JALNA MAH'TRA RAJKOT SURENDRA GUJARAT

MANMAD DHULE MAH'TRA RAJKOT DIU U/TMANMAD JALGAON MAH'TRA BHOPAL BETUL M.P.MANMAD NANDURBAR MAH'TRA BHOPAL BHIND M.P.MANMAD AKOLA MAH'TRA BHOPAL BHOPAL M.P.MANMAD BULDHANA MAH'TRA BHOPAL CHHATARPUR M.P.MANMAD HINGOLI MAH'TRA BHOPAL CHHINDWARA M.P.MANMAD WASHIM MAH'TRA BHOPAL GUNA M.P.NAGPUR AMRAVATI MAH'TRA BHOPAL GWALIOR M.P.NAGPUR BHANDARA MAH'TRA BHOPAL HOSHANGABAD M.P.NAGPUR CHANDRAPUR MAH'TRA BHOPAL MORENA M.P.NAGPUR GADHCHIROLI MAH'TRA BHOPAL RAISEN M.P.NAGPUR GONDIA MAH'TRA BHOPAL RAJGARH M.P.NAGPUR NAGPUR MAH'TRA BHOPAL SAGAR M.P.NAGPUR WARDHA MAH'TRA BHOPAL SEHORE M.P.NAGPUR YEOTMAL MAH'TRA BHOPAL SHIVPURI M.P.

PUNE PUNE MAH'TRA BHOPAL TIKAMGARH M.P.PUNE SATARA MAH'TRA BHOPAL VIDISHA M.P.

SOLAPUR NANDED MAH'TRA INDORE DEWAS M.P.SOLAPUR LATUR MAH'TRA INDORE DHAR M.P.SOLAPUR OSMANABAD MAH'TRA INDORE EAST NIMAR M.P.SOLAPUR SOLAPUR MAH'TRA INDORE INDORE M.P.SOLAPUR BEED MAH'TRA INDORE JHABUA M.P.SOLAPUR PARBHANI MAH'TRA INDORE MANDSAUR M.P.

GOA GOA GOA INDORE RATLAM M.P.GOA KOLHAPUR MAH'TRA INDORE SHAJAPUR M.P.GOA RATNAGIRI MAH'TRA INDORE UJJAIN M.P.GOA SANGLI MAH'TRA INDORE WEST NIMAR M.P.GOA SINDHUDURG MAH'TRA JABALPUR DAMOH M.P.

AHMEDABAD AHMEDABAD GUJARAT JABALPUR JABALPUR M.P.AHMEDABAD BANAS KANTHA GUJARAT JABALPUR MANDLA M.P.AHMEDABAD BHAWNAGAR GUJARAT JABALPUR NARSIMHAPUR M.P.AHMEDABAD GANDHINAGAR GUJARAT JABALPUR PANNA M.P.AHMEDABAD MEHSANA GUJARAT JABALPUR REWA M.P.AHMEDABAD PATAN GUJARAT JABALPUR SATNA M.P.AHMEDABAD SABAR KANTHA GUJARAT JABALPUR SEONI M.P.

SURAT ANAND GUJARAT JABALPUR SHAHDOL M.P.SURAT BHARUCH GUJARAT JABALPUR SIDHI M.P.SURAT DAHOD GUJARAT RAIPUR BALAGHAT CGSURAT KHED GUJARAT RAIPUR BASTAR CGSURAT NARMADA GUJARAT RAIPUR BILASPUR CGSURAT NAVSARI GUJARAT RAIPUR DURG CGSURAT PUNCH MAHAL GUJARAT RAIPUR RAIGARH CGSURAT SURAT GUJARAT RAIPUR RAIPUR CGSURAT THE DANGS GUJARAT RAIPUR RAJNANDGAON CGSURAT VADODRA GUJARAT RAIPUR SURGUJA CGSURAT VALSAD GUJARAT

SURATDADRA & NAGAR HAVELI U/T

SURAT DAMAN U/T

TERRITORY REVENUE DISTRICT LIST OF WESTERN REGION

Page 38: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Ann

exur

e- I

X

TE

RR

ITO

RY

TM

CG

E

NG

G O

FF

EN

GG

OF

FS

ALE

S O

FF

SA

LES

S

ALE

S

MA

NE

ES

H P

AT

NE

Y, M

C

(982

0326

566)

Pan

kaj K

umar

Sin

gh, A

ME

(993

0315

772

)S

hrip

ad J

ogip

eth,

D

y.M

E(9

9874

4695

8)A

rpit

Tiw

ari,D

MS

)(N

asik

) (9

9233

8800

2)A

nant

a S

awal

e, A

M

Aut

o(94

2398

4202

)(T

h,

Mum

,Nag

&

Man

)982

0001

566

Mili

nd W

aghm

are,

DM

S

(982

01 9

6477

)A

mbi

ka B

adha

ni,

DM

S(9

9300

5222

9)

SA

ND

IP D

ES

HP

AN

DE

, MC

(9

9875

2453

5)A

nura

g K

umar

, AM

E

(916

7385

787)

Vai

bhav

Gar

gate

,DM

S

(976

9355

518)

Sur

aj P

rata

p,E

X.S

ales

(9

8819

0829

2)A

hmed

nag

ar

Rav

indr

apal

Sin

gh,

AM

S(9

8208

6008

7)

Ran

e N

itin

Ash

ok,A

ME

(8

8888

8358

8)(A

hmed

naga

r)

(982

2232

101)

Phi

roz

Kam

irkar

, (9

8900

2452

0)

DH

AR

MIK

, M

C

(988

1717

216)

Gan

esh

Jagd

ale,

AM

E

(888

8887

236)

Mon

ika

Aza

ad, M

T

(888

8897

124)

Vai

bhav

Waz

alw

ar,A

MS

(

7350

1201

20)

Raj

endr

asin

gh

(997

5393

342)

Tar

un P

raka

sh

Gho

gale

, AM

S

(735

0000

996)

Sus

hant

Guj

ar, M

T

(888

8845

082)

Meg

ha D

eshm

ukh,

Dy.

Mgr

. A

uto

(988

1130

605)

(P

u &

G

oa)

San

deep

Jai

n, D

MS

(8

9757

5089

5)Z

aidu

SO

LAP

UR

(Sol

apur

, O

sman

abad

,Lat

ur,

Pak

ni, N

ande

d)

MO

TIR

AM

AN

I PA

NK

AJ

D

(955

2777

300)

AM

OL

K S

UP

LE, D

MC

Ank

it K

haita

n,

AM

E(9

0110

2256

4)vi

jayk

umar

Cha

krap

ani,

DM

E

(888

8710

160)

Pal

labh

Sah

u (9

5454

2088

8)L.

V.S

. Nag

araj

u,

EX

.sal

es

DA

ULA

T K

UN

GA

RE

, DM

C

(989

0196

954)

Ani

rudd

ha V

ansh

iv, M

T

(898

3634

894)

Nira

jkum

ar J

ha, A

ME

, C

hand

rapu

r (9

9603

4446

4)D

alvi

Mah

endr

a S

ashi

kant

,DM

S (

9503

3997

36)

Naz

im S

haik

h , M

T

(904

9344

433)

Vip

ul V

yas

Rav

i K. G

horp

ade

MT

(9

5035

2590

9)R

ajka

tti Y

.S, A

ME

Rav

unni

Kut

ty

UP

,AM

S,A

mra

vati

Giri

sh A

thaw

ale,

AM

E

(942

2300

227)

GU

PT

A S

AN

JEE

V

(941

4118

271)

RA

JA. M

, DM

C

(942

3105

288)

Raj

kum

ar Y

adu,

AM

E

(888

8895

504)

)B

hanu

Pra

tap,

DM

S

(Aur

anga

bad)

(94

2068

9335

)S

uyog

Mar

kand

e (9

0220

3915

9)D

orje

y (9

5615

0198

4)

Rav

i M

ahes

hwar

i,MT

(992

2672

846)

S. G

edam

(8

0878

9006

0)

AH

ME

DA

NA

GA

R(B

eed,

Jal

na, P

arbh

ani,

Nan

ded)

AM

IT G

UN

JAN

(7

8989

1860

4)R

AN

E N

ITIN

AS

HO

K, D

MC

(8

8888

8358

8)S

hakt

i Bot

hra

(880

6199

699)

Kap

il P

otad

ar,M

T

(992

2956

630)

Sac

hin

Sak

hark

ar,A

MS

(880

6099

933

)Nan

ded

RA

JKU

MA

R S

ALU

NK

HE

, D

MC

.(89

7576

5203

)D

evda

tta B

halc

hand

ra K

otul

kar,

E

x.E

ngg

(996

0113

166)

Sur

esh

B. A

late

, AM

EZ

anva

r N

ikhi

l, D

MS

(988

1472

905)

Din

esh

Dhe

kne,

A

MS

(901

1097

888)

Pan

kaj S

harm

a,

AM

E(9

6236

7019

9)S

uhas

Des

hmus

h,D

MS

(9

6230

6049

9)V

iraj K

elus

kar

(986

9055

754)

MU

MB

AI

(s

ewre

e, V

ashi

,Rai

gad)

)P

UR

I RA

JIV

(9

8204

8969

4)

PA

ND

IYA

N T

.V.

(993

0341

928)

SH

RA

VA

N K

UM

AR

BO

DA

(9

4224

4312

9)

TH

AN

E (

Ahm

edna

gar,

N

asik

)

NA

GP

UR

(B

ulda

na, A

kola

, Y

eotm

al, W

ashi

m,

Hin

goli,

Gad

chiro

li,

Gon

dia,

Cha

ndra

pur,

M

AN

MA

D

(Nan

durb

ar,D

hule

, Ja

lgao

n,A

uran

gaba

d)

GO

A

(M

iraj,

Kol

hapu

r,R

atna

giri,

Sin

dhu

durg

, San

gli)

SIN

GH

IN

DE

RJI

T(9

8810

7302

6)

D.L

. TO

NS

E

(9

4239

6205

8)

PU

NE

(Sat

ara,

)

Page 39: Rew:ARC.UPS & STAB 31 th January’2013 ... - Bharat Petroleum€¦ · rew:arc.ups & stab 31 th january’2013 to, the vendor dear sir e-tender for arc for supplying online ups and

Ann

exur

e- I

X

TE

RR

ITO

RY

TM

CG

E

NG

G O

FF

EN

GG

OF

FS

ALE

S O

FF

SA

LES

S

ALE

S

SIA

BA

L M

UK

HE

RJI

(9

9099

5111

6)S

HIV

AP

RA

SA

D. G

, M

C(0

9737

2987

78)

A.K

. Big

hane

, MT

(99

2501

4474

)P

rana

v M

ishr

a,

Ass

t.Mgr

.Eng

g (9

9090

4477

6)

Sha

shan

k S

harm

a,

DM

S(9

8244

5277

8)G

adgi

l R D

ines

h,

DM

S(B

havn

agar

) (9

9245

9410

0)

Nila

bh N

ishc

hhal

, A

MS

(997

9895

554)

Shu

bang

Pan

dey,

A

MS

(982

4503

099)

Meh

sana

AM

OL

BH

OS

ALE

, DM

C

(982

4108

822)

Aja

y D

ewas

i,AM

E (

9429

4087

85)

Mah

esh

B K

ulgu

de, D

MS

(9

7277

5145

3)V

ikra

nt H

ate

(972

7751

166)

Ram

esh

G. M

eena

, AM

E

(992

4259

9600

Am

it B

ilolik

ar,D

MS

(9

9250

2853

7)N

S S

ELU

KA

R,

Dy.

Mgr

.Con

st.(

9638

7542

48)

Sud

hans

hu K

umar

(9

9988

0855

5)A

poor

va S

war

oop

(998

1798

407)

Viv

ek P

ant,

AM

E (

9909

0010

80)

Ank

it K

umar

Shu

kla

(909

9090

374)

Mul

chan

dani

Nirm

al G

, (D

MS

)R

OS

HA

N Y

. SA

KH

AR

E,

DM

C

(9

7550

1103

5)

Yog

esh

S L

ole,

AM

E

(998

1509

608)

Anu

rag

Sha

rma

(7

4058

2965

1)S

iddh

arth

Kuh

uwah

aS

anto

sh S

ahan

i

Har

shit

Gou

r, A

ME

(9

4256

0689

9A

. Ram

sank

ar,A

M A

uto

(989

3295

626)

(MP

)Ja

vid

Des

ai, A

MS

(9

8939

0515

4)R

AM

AN

MA

LIK

(

78

9890

0373

)S

HR

IVA

ST

AV

A V

IKA

S,M

C

(786

9910

955)

Avi

nash

Kum

ar,A

ME

( 78

9890

0376

) R

ajde

ep B

aniy

a A

njai

Yad

av

(789

8900

379)

Gan

esha

Nad

ar,

AM

S,(

7869

9111

39)

Div

yans

h R

aghu

vans

hi,

EX

.Eng

g (7

8283

3836

6)R

AV

I R.

SA

HA

Y

(9

4254

1201

8)A

DH

IKA

RI J

EE

TE

ND

RA

(9

4251

5299

3) (

Mgr

.Con

stn.

)T

anay

Kum

ar, M

T (

9406

7134

94)

Am

ar D

eep,

AM

E

(942

5152

218)

Abh

ijit P

aul (

9425

8029

88)

Aja

y R

uge,

DM

S

(942

5116

544)

R

AJE

EV

BH

AG

DIK

AR

, S

r.M

gr.C

onst

n (9

9815

1693

5)S

achi

n S

Tal

han,

D

MS

,(94

2523

5930

)G

aura

v S

ingh

(786

9192

886)

Sou

vik

Gho

sh, M

T

(888

9900

263)

Jayd

eep

S P

otda

r, A

MS

(7

3899

0991

9)

RA

JNIK

AN

T P

AT

EL

(990

9063

838)

RA

JKO

T

(Kan

dla,

Jam

naga

r)

SU

RA

T

(H

azira

, K

oyal

i,Vad

odar

a,V

api )

GO

RA

V

(971

4730

055)

AH

ME

DA

BA

D

(Sab

arm

ati,

Sid

hpur

,Bha

vnag

ar,

Meh

sana

)

AJA

Y P

HIR

KE

(9

4253

0103

7)

RA

IPU

R

(Bhi

lai,B

ilasp

ur)

(CH

AT

TIS

GA

RH

)

IND

OR

E (

Man

glia

)

JAB

ALP

UR

(B

hito

ni,S

atna

)

VE

RM

A A

NU

P K

UM

AR

(7

3899

0020

2)

BH

OP

AL

(R

airu

, Bak

ania

, Bhi

lai)