RFI FORM
RFI NO. 191
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Roger Ward
COMPANY NAME: Mather Corp.
SUBJECT: Site Scope
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE: Scope of Work
QUESTION:
BP #17-Sitework Scope Item 13: Is this contractor also responsible for snow and
ice removal for the old Police Department located at 49 Plumtrees Rd where the
contractors are allowed office trailers and storage?
ANSWER:
No. Johnson School Project Site Contractor is responsible for the old Police
Department.
RESPONSE BY: Susan M. Chipouras DATE: 12/6/18
RFI FORM
RFI NO. 192
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Roger Ward
COMPANY NAME: Mather Corp.
SUBJECT: Site Scope
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE: Scope of Work
QUESTION:
BP #17-Sitework Item 7: The following spec sections are listed but not included in
the specifications. Section 321400 Concrete Unit Pavers and Section 323223
Modular Block Retaining Walls. Please clarify if this work is part of this project
and if so where are these items proposed on site?
ANSWER:
Delete from Scope
RESPONSE BY: Susan M. Chipouras DATE: 12/6/18
RFI FORM
RFI NO. 193
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Roger Ward
COMPANY NAME: Mather Corp.
SUBJECT: Site Scope
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE: Scope of Work
QUESTION:
BP #17-Sitework Item 36e: States final topsoil and lawn seeding is by BP #17B
Landscaping. Is it the intent to have BP #17 Sitework contractor strip and stockpile
existing topsoil and BP #17B will screen, amend as necessary and place topsoil?
Or is it up to BP #17 Sitework to remove and dispose of existing topsoil and BP
#17B will furnish and install imported topsoil?
ANSWER:
Topsoil can be stockpiled on site. Coordination location with Rizzo Corp. BP#17B
– Landscaping will screen, amend as necessary and place topsoil.
RESPONSE BY: SUSAN M. CHIPOURAS DATE: 12/6/18
RFI FORM
RFI NO. 194
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Roger Ward
COMPANY NAME: Mather Corp.
SUBJECT: Site Scope
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE: Scope of Work
QUESTION:
BP #17-Sitework Item 30: References drawing SL 1.0 as a logistics plan. Please
supply a logistics plan for this site and if necessary the old Police Station.
ANSWER:
Logistics Plans are included in Addendum #4.
RESPONSE BY: Susan M. Chipouras DATE: 12/6/18
RFI FORM
RFI NO. 195
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Roger Ward
COMPANY NAME: Mather Corp.
SUBJECT: Site Scope
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE: Scope of Work
QUESTION:
BP #17-Sitework Item 35e: Refers to crane pads. Please clarify how many are
required and the size of each that should be installed.
ANSWER:
BP#17 shall provide a flat area for crane placement. Crane Pads are by the Bid
Package using the crane.
RESPONSE BY: DATE:
RFI FORM
RFI NO. 196
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Roger Ward
COMPANY NAME: Mather Corp
SUBJECT: Spec for Round Rail Fence
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE: 2/C-600.2
QUESTION:
BP #17-Sitework Item 1: Has Timber Guide Rails (spec section 329400) listed as
part of the Sitework bid package but does not list the proposed Round Rail Fence
shown on plan sheet C 200.1 and also detail 2/C 600.2. Please clarify if both of
these items should be installed by BP #17 Sitework and not BP #17A Fencing.
Please furnish a spec section for the proposed Round Rail Fence.
ANSWER:
There is no specification for the round rail fence. Bid per detail.
BP#17 shall furnish & install Timber Guide Rails. (SMC – Rizzo)
RESPONSE BY: COLLEEN FOWLER - MMI DATE: 12/6/18
RFI FORM
RFI NO. 197
PROJECT: Rockwell Elementary SchoolRenovations and Additions400 Whittlesey DriveBethel, CT 06801
OWNER: Town of BethelARCHITECT: Perkins EastmanCONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Roger WardCOMPANY NAME: Mather Corp
SUBJECT: Generator Pad
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE: C-200.1
QUESTION:1. Plan Sheet C 200.1: Has a proposed concrete utility pad for generator. Please furnish a detail for this pad.
ANSWER:
REFER TO DETAIL ON SHEET E-501 FOR UTILITY PAD DETAIL.
RESPONSE BY: BRIAN POELTL DATE: 12/5/18
RFI FORM
RFI NO. 198
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Roger Ward
COMPANY NAME: Mather Corp
SUBJECT: Dumpster Pad
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE: C-200.1
QUESTION:
Plan Sheet C 200.1: For the proposed dumpster pad there is a call out to use detail
6/C 600.2 but on plan sheet C 600.3 detail 9 dumpster enclosure there is also a
detail for the concrete pad. Which one should be used?
ANSWER:
Both details are applicable. Detail 9 is for the enclosure fencing and the concrete
dumpster pad detail is for the concrete pad.
RESPONSE BY: DAN KROEBER, MMI DATE: 12/4/18
RFI FORM
RFI NO. 199
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Roger Ward
COMPANY NAME: Mather Corp
SUBJECT: Existing Water Line
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE: C-301.1
QUESTION:
Plan Sheet C 301.1: Has a proposed 4” tapping valve proposed for the new 6” fire
line. What is the size of the existing waterline to be tapped?
ANSWER:
The tapping sleeve should be a 6” tapping sleeve to match the size of the 6” fire
service. The exact size of the existing water line is unknown. Please assume that
it is an 8” main that is being tapped.
RESPONSE BY: DAN KROEBER, MMI DATE: 12/4/18
RFI FORM
RFI NO. 200
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Roger Ward
COMPANY NAME: Mather Corp
SUBJECT: Exterior Grease Trap
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE: Scope
QUESTION:
BP #17-Sitework Item 35.g: Has BP #14 Plumbing furnishing and installing the
proposed exterior grease trap. Detail 9/ P-500 shows a 12” concrete pad at finished
grade and a 12’ (item F) prefabricated concrete deadmen. Which trade is
responsible for the furnishing and install of concrete pad and deadmen?
ANSWER:
BP#17 - Sitework
RESPONSE BY: Susan M. Chipouras DATE: 12/6/18
RFI FORM
RFI NO. 201
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Ryan Davis
COMPANY NAME: Schenectady Steel
SUBJECT: Equipment Screens
DISCIPLINE/TRADE: BP#4 – Structural Steel & Misc. Metals
DWG./SPEC. REFERENCE: Scope
QUESTION:
Please reconsider the roof top equipment screens and exterior sound screens to be
part of BP6 or 7.
There is no structural support steel shown on the structural drawings or on 9 / A-
324.
ANSWER:
There are no Rooftop Equipment Screens on Rockwell.
RESPONSE BY: Susan M. Chipouras DATE: 12/6/18
RFI FORM
RFI NO. 202
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Ryan Davis
COMPANY NAME: Schenectady Steel
SUBJECT: Anchor Bolt Survey
DISCIPLINE/TRADE: BP#4 – Structural Steel & Misc. Metals
DWG./SPEC. REFERENCE: Scope
QUESTION:
Does BP#4 own an anchor bolt survey?
ANSWER:
Yes
RESPONSE BY: Susan M. Chipouras DATE: 12/6/18
RFI FORM
RFI NO. 203
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Ryan Davis
COMPANY NAME: Schenectady Steel
SUBJECT: Scope of Work
DISCIPLINE/TRADE: BP#4 – Structural Steel & Misc. Metals
DWG./SPEC. REFERENCE: Scope
QUESTION:
All demolition, shoring, and abatement covered by BP#1?
ANSWER:
Demolition and Shoring by BP#1 – Demolition & Abatement. All contractors are
responsible for lead removal work and cost wherever they are attaching to existing
painted surfaces.
RESPONSE BY: Susan M. Chipouras DATE: 12/6/18
RFI FORM
RFI NO. 204
PROJECT: Rockwell Elementary SchoolRenovations and Additions400 Whittlesey DriveBethel, CT 06801
OWNER: Town of BethelARCHITECT: Perkins EastmanCONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Richard MeloCOMPANY NAME: MJ Daly
SUBJECT: Piping Insulation
DISCIPLINE/TRADE: BP#15 – HVAC
DWG./SPEC. REFERENCE: 23 07 19
QUESTION:HVAC Piping Insulation Spec (23 07 19, page 26 #G), states to insulate the Engine Exhaust Piping and Silencer with Calcium Silicate: 4 inches thick? There is no engine exhaust piping, silencer or generator shown on the HVAC drawings? Please verify this spec section can be ignored for this project?
ANSWER:Engine exhaust / silencer insulation does not apply to this project.
RESPONSE BY: Jesse Vose, PE DATE: 12-05-2018
RFI FORM
RFI NO. 205
PROJECT: Rockwell Elementary SchoolRenovations and Additions400 Whittlesey DriveBethel, CT 06801
OWNER: Town of BethelARCHITECT: Perkins EastmanCONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Richard MeloCOMPANY NAME: MJ Daly
SUBJECT: Equipment Insulation
DISCIPLINE/TRADE: BP#15 – HVAC
DWG./SPEC. REFERENCE: 23 07 19
QUESTION:"HVAC Equipment Insulation Spec (23 07 16, page 24 #J) states that the Piping system filter-housing insulation shall be one of the following:1. Cellular Glass: 3 inches thick.2. Mineral-Fiber Board: 2 inches thick and 3-lb/cu. ft. nominal density.3. Mineral-Fiber Pipe and Tank: 2 inches thick.Please provide a detail on the filter housings needed so the HVAC Insulation Contractors can account for this, if necessary?"
ANSWER:Piping system filter-housing insulation does not apply to this project.
RESPONSE BY: Jesse Vose, PE DATE: 12-05-2018
RFI FORM
RFI NO. 206
PROJECT: Rockwell Elementary SchoolRenovations and Additions400 Whittlesey DriveBethel, CT 06801
OWNER: Town of BethelARCHITECT: Perkins EastmanCONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Richard MeloCOMPANY NAME: MJ Daly
SUBJECT: Heat Trace
DISCIPLINE/TRADE: BP#14 – Plumbing
DWG./SPEC. REFERENCE: P-300
QUESTION:Please verify that the Plumbing Contractor would only own furnishing and installing the heat tracing found on drawing P-300. The Heat Trace spec has extensive requirements including Gutters & Downspouts, Snow & Ice Melting on Roofs, etc., but none of these items are shown on the Plumbing drawings? Please advise on the scope of work to carry for Heat Tracing, if additional items are required, other than what is shown on the P-300 Plumbing drawing.
ANSWER:
The Construction Manager is responsible to advise you on your scope of the project.
RESPONSE BY: JIM STENQVIST DATE: 12/5/18
RFI FORM
RFI NO. 207
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Michelle Shuler
COMPANY NAME: Tull Brothers
SUBJECT: Hardware
DISCIPLINE/TRADE: BP#6 – General Trades
DWG./SPEC. REFERENCE: P-300
QUESTION:
Opening #120 is a single opening asking for hardware set #14 which is for a paired
opening. Please confirm correct hardware set.
ANSWER:
Provide HW set #01.
RESPONSE BY: JC@PE DATE: 12/5/18
RFI FORM
RFI NO. 208
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Michelle Shuler
COMPANY NAME: Tull Brothers
SUBJECT: Door Schedule
DISCIPLINE/TRADE: BP#6 – General Trades
DWG./SPEC. REFERENCE: P-300
QUESTION:
Opening # ST-102B is an exterior opening that is calling out for a wood door and
an aluminum frame. Head and jamb detail shows a hollow metal frame. Should this
opening be an aluminum door and frame seeing it is exterior? Please confirm?
ANSWER:
Provide Aluminum door and frame.
RESPONSE BY: JC@PE DATE: 12/5/18
RFI FORM
RFI NO. 209
PROJECT: Rockwell Elementary SchoolRenovations and Additions400 Whittlesey DriveBethel, CT 06801
OWNER: Town of BethelARCHITECT: Perkins EastmanCONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Ken HuntCOMPANY NAME: Rizzo Corp.
SUBJECT: Kitchen FCU power
DISCIPLINE/TRADE: BP#16 – Electrical
DWG./SPEC. REFERENCE: EP-101B, 1/E-202, M-101B
QUESTION:EP-101B Kitchen send you to detail 1/E-202. I do not see power for FCUs (refer to M-101B)
ANSWER:
ELECTRICAL DRAWING EP-101B SHOWS POWER TO FCU-1 IN KITCHEN OFFICE 122A. (CIRCUIT 18,20,SB-1). FCU NOT LOCATED IN KITCHEN CALL OUT AREA SHOWN ON E-202.
RESPONSE BY: BRIAN POELTL DATE: 12/6/18
RFI FORM
RFI NO. 210
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: David Lukesky
COMPANY NAME: Barrett Roofing
SUBJECT: Roof Color
DISCIPLINE/TRADE: BP#7 – Roofing
DWG./SPEC. REFERENCE:
QUESTION:
There are details that call out White EPDM Membrane. The color of the membrane
in Spec Section 075323 is called out as black. What shall be the color of the
furnished EPDM membrane?
ANSWER:
EPDM shall be Black as Specified.
RESPONSE BY: A.DOBBERTIN@PE DATE: 12/05/2018
RFI FORM
RFI NO. 211
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: David Lukesky
COMPANY NAME: Barrett Roofing
SUBJECT: Phenolic Shelf Box
DISCIPLINE/TRADE: BP#7 – Roofing
DWG./SPEC. REFERENCE:
QUESTION:
Reference detail 3&6/A-322. Is top of the phenolic shelf/box covered with EPDM,
or is that a flashing for the phenolic panel assembly? Who is responsible for this
condition?
ANSWER:
BP#7 – Roofing is responsible for flashing on details 3 & 6/A-322.
RESPONSE BY: Ken Hunt DATE: 12/6/18
RFI FORM
RFI NO. 212
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: David Lukesky
COMPANY NAME: Barrett Roofing
SUBJECT: Wood Blocking Scope
DISCIPLINE/TRADE: BP#7 – Roofing
DWG./SPEC. REFERENCE:
QUESTION:
Please clarify which contractor(s) are to furnish and install the wood blocking,
plywood, sheathing and insulation materials at the roof edge conditions. Reference
details 3, 6, 9 & 12 on A-321 and 3, 6, 7 & 9 on A-322.
ANSWER:
BP#6 – General Trades owns details 3,6,9 & 12 on A-321 and details 3,6,7 & 9 on
A-322.
RESPONSE BY: Ken Hunt DATE: 12/6/18
RFI FORM
RFI NO. 213
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: David Lukesky
COMPANY NAME: Barrett Roofing
SUBJECT: Roofing
DISCIPLINE/TRADE: BP#7 – Roofing
DWG./SPEC. REFERENCE:
QUESTION:
Specification section 076200 references a 3-coat fluoropolymer finish which is an
expensive finish. Is a 2-coat finish acceptable?
ANSWER:
Provide 3-coat finish as specified.
RESPONSE BY: J. CULOTTA @ PE DATE: 12/06/2018
RFI FORM
RFI NO. 214
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: David Lukesky
COMPANY NAME: Barrett Roofing
SUBJECT: Canopy Plywood
DISCIPLINE/TRADE: BP#7 – Roofing
DWG./SPEC. REFERENCE:
QUESTION:
Please identify which contractor is to furnish and install the plywood sheathing for
the roof deck on the Canopy at the Bus Loop.
ANSWER:
BP#6 - General Trades
RESPONSE BY: Ken Hunt DATE: 12/6/18
RFI FORM
RFI NO. 215
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Peter Maddox
COMPANY NAME: Richards Corp.
SUBJECT: Topsoil
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE:
QUESTION:
Which bid package is responsible for screening and placing topsoil?
ANSWER:
BP#17B - Landscaping
RESPONSE BY: Susan M. Chipouras DATE: 12/6/18
RFI FORM
RFI NO. 216
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Peter Maddox
COMPANY NAME: Richards Corp.
SUBJECT: Timber Rails
DISCIPLINE/TRADE: BP#17 – Site Work
DWG./SPEC. REFERENCE:
QUESTION:
Please confirm Site Contractor shall furnish the timber rails.
ANSWER:
BP#17 - Site Work shall furnish and install timber rails.
RESPONSE BY: Susan M. Chipouras DATE: 12/6/18
RFI FORM
RFI NO. 217
PROJECT: Rockwell Elementary SchoolRenovations and Additions400 Whittlesey DriveBethel, CT 06801
OWNER: Town of BethelARCHITECT: Perkins EastmanCONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Mark HaberCOMPANY NAME: Rizzo Corp.
SUBJECT: Feeders for LS Panels
DISCIPLINE/TRADE: BP#16 – Electrical
DWG./SPEC. REFERENCE:
QUESTION:Per E-401 it shows that the Feeders for the LS panels are to be run at a 2 Hour Fire rating. The rest of the cabling that runs out of this panel is not 2 hour rated. Because of this can Normal Conduit/Conductors be run in lieu of having the 2 hour fire rating on the main feeder only?If the 2 hour fire rating is to be maintain can 2 hour fire rated cable be used in lieu of conduit/conductors?
ANSWER:
ALL FEEDER CIRCUITS SHALL BE 2 HOUR RATED (HORIZONTAL AND VERTICAL), LISTED/LABELED, AND INSTALLED IN ACCORDANCE WITH UL 2196 (E.G. MINERAL INSULATED CABLES) AS INDICATED ON E-401. BRANCH WIRING DOES NOT HAVE TO BE 2 HOUR RATED.
RESPONSE BY: BRIAN POELTL DATE: 12/6/18
RFI FORM
RFI NO. 218
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Michael Walton
COMPANY NAME: Northeast Interior Systems
SUBJECT: Addendum #4, RFI-040
DISCIPLINE/TRADE: BP#5 – Architectural Woodwork
DWG./SPEC. REFERENCE:
QUESTION:
RFI 040 was asked specifically about the doors and drawer fronts. My RFI applies
to all of the core material. We request FSC ULEF M2 particleboard be included as
an acceptable core material for the case body and doors of the plastic-laminate
cabinets on this project. (NU GREEN 2 Product Data attached).
ANSWER:
FSC ULEF M2 particle board is acceptable for use for the core material.
RESPONSE BY: JC@PE DATE: 12/6/18
RFI FORM
RFI NO. 219
PROJECT: Rockwell Elementary School
Renovations and Additions
400 Whittlesey Drive
Bethel, CT 06801
OWNER: Town of Bethel
ARCHITECT: Perkins Eastman
CONSTRUCTION MANAGER: Rizzo Corporation
DATE: 11/30/18
FROM: Tom Rodrigue
COMPANY NAME: Imperial Roofing
SUBJECT: Existing Roof Insulation
DISCIPLINE/TRADE: BP#7 – Roofing
DWG./SPEC. REFERENCE:
QUESTION:
Is the Existing Roof insulation to remain in place? See Demo Note “F” on AD-
102A. Indicates Existing Roof Insulation to remain…..
ANSWER:
No. See updated note in Addendum #5.
RESPONSE BY: A. DOBBERTIN@PE DATE: 12/05/2018