Routine Maintenance Schedule - Switchboard Page 1 of 1 Routine Maintenance Schedule - Switchboard Checklist T echnician Date of service DD/MM/YYYY Tick the adjacent box for completed items. T esting and maintenance should be carried out annually in accordance AS/NZS 3019:2007 . To be undertaken by a qualied electrician Asset detail (make, model, size, feed, etc) Check switchboard for correct operation. Check switchboard & its components for excessive heat discolouration, noise & vibration. Check temperature of board components & connections using infrared thermal gun. Test operation of indicator lamps. Repair any hot joints & or report any signicantly high temperatures found during scan. Check condition of the escutcheon cubicle. Replace faulty lamps as required. Check all switches are set to Auto. Investigate with Building Manager any switches found on manual. Check condition & operation of RCD’s. Report RCD’s that do not meet test requirement. Perform self-diagnostic test (where applicable). Report RCD’s that do not meet test requirement. Measure & record speed of operation. Update logbooks & complete service sheets. Check RCD & GPO labelling is clearly legible (where applicable). Service Residual Current Devices as per AS/NZS3190 and the following instructions. Comments (remedial/ additional work completed, faults, follow-up required etc

Upload: azman-hanafiah

Post on 22-Feb-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

7/24/2019 Routine-Maintenance-Schedule-Switchboard.pdf

http://slidepdf.com/reader/full/routine-maintenance-schedule-switchboardpdf 1/1Routine Maintenance Schedule - Switchboard Page 1 of 1

Routine Maintenance Schedule -

Switchboard

Checklist

Technician Date of service

DD/MM/YYYY

Tick the adjacent box for completed items.

Testing and maintenance should be carried out annually in accordance AS/NZS 3019:2007.

To be undertaken by a qualified electrician

Asset detail (make, model, size, feed, etc)

Check switchboard for correct operation.

Check switchboard & its components for excessive heat discolouration, noise & vibration.

Check temperature of board components & connections using infrared thermal gun.

Test operation of indicator lamps.

Repair any hot joints & or report any significantly high temperatures found during scan.

Check condition of the escutcheon cubicle.

Replace faulty lamps as required.

Check all switches are set to Auto.

Investigate with Building Manager any switches found on manual.

Check condition & operation of RCD’s.

Report RCD’s that do not meet test requirement.

Perform self-diagnostic test (where applicable).

Report RCD’s that do not meet test requirement.

Measure & record speed of operation.

Update logbooks & complete service sheets.

Check RCD & GPO labelling is clearly legible (where applicable).

Service Residual Current Devices as per AS/NZS3190 and the following instructions.

Comments (remedial/additional work completed, faults, follow-up required etc