    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    ACTUAL INSPECTION DATE & TIME

    EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER

    SAUDI ARAMCO USE ONLYSAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

    CONTRACTOR INSPECTION LEVELSAUDI ARAMCO INSPECTION LEVEL

    ITEM

    No.ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DA

    MH's SP ENT TRAVEL TIMQUANTITY INSP.

    WORK PERMIT REQUI

    SCHEDULED INSPECTION DATE & TIME

    LAYOUT DRAWING NUMBER

    PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.

    PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR

    Inspection of Filling & Pressurization for Hydrotesting of

    Piping SystemsSAIC-A-2013 25-May-05 MECH.

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    A4Chemical injection rates are monitored using displacement gauges.

    (NOTE: Chemicals shall not be mixed prior to injection. )

    SAES-A-007

    Para. 8.3

    A7

    After venting, valves used for venting are placed at partial open position

    and plugged or blinded.

    (NOTE: Trapped air are displaced when solid flow of stream of

    water is observed coming out of the vent. )

    SAES-A-004

    Para 8.1.3

    A11After test pressure is reached (before inspection), the isolation valvebetween manifold & the piping system under pressure test is closed &

    test pump disconnected.

    SAES-A-004,

    Para. 8.1.2

    A5Filling & pressurization is done upstream of check valves and at the

    lowest point of the system being tested.

    SAES-A-004

    Para 8.1.1

    A8In plant areas and shops the test area are marked and warning signs

    posted to alert approaching personnel.

    GI-002.102,

    Para. 5.11

    A10

    A3

    When required by the Test procedure, injection of oxygen scavenger,

    biocide and other treatment chemicals are done using proportion pump

    and feed continuously at a rate that will provide the specified

    concentration while filling the system for the hydrostatic test.

    SAES-A-007

    Para 8.1/8.2

    A. General Requirements:

    A1

    A2

    All in-line valves (if not test isolation) are in PARTIAL open position.

    (NOTE: It is a "Best Practice" that valves are in partial open

    position to ensure that all valve cavities are subjected to

    the system test pressure and to ensure that packingshave not leaks. )

    SAES-A-004

    Para 8.1.3

    Pressure Test Procedure addressed safety precautions in GI-0002.102.SAES-A-004,

    Section 5.1

    The pressure is increased in steps no greater than one-fifth of the

    strength test pressure after the preliminary check at 50 percent of the

    strength test pressure. Each step in pressurization is held at minimum of

    10 minutes.

    GI-002.102,

    Para. 5.16

    A9 Preliminary check for leaks at 50% of the strength test pressure.GI-002.102,

    Para. 5.16

    A6

    Remove air during filling by providing vents at all high points or by the

    use of scrapers when provided.

    (NOTE: Venting may be done by means of vent valves or blinded

    flanges .)

    GI-002.102,

    Para. 5.15

    Page 1 of 2

  • 7/27/2019 SAIC-A-2013 Rev 0

    2/2

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    *Person Responsible for Completion of Quality Work / Test Y =YES N =NO F =FA

    T&I Witnessed QC Record Reviewed

    Name, Sign and Date:

    Quality Record Approved:Name, Organization,

    Initials and Date:

    T&I Witnessed QC Record Reviewed

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR

    Work Verified

    Proponent and Others

    Inspection of Filling & Pressurization for Hydrotesting of

    Piping SystemsSAIC-A-2013 25-May-05 MECH.

    Work Verified

    PASS FAIL N/A RE-INSP DA

    1. SA General Instruction Manual GI-002.102, Pressure Testing Safely, (J uly 22, 2001)

    2. SAES-A-004, General Requirements for Pressure Testing, (30 J une, 2003)

    QC Superviso r

    REMARKS:

    REFERENCE DOCUMENTS:

    QC Inspector PID Representative

    Construction Representative*

    Name, Initials and Date:

    Work is Complete and Ready for Inspection:

    Name, Initials and Date:

    Performed Inspection Work / Rework May Proceed

    Name, Initials and Date:

    PMT RepresentativeT&I Witnessed QC Record Reviewed

    Name, Initials and Date:

    Work Verified

    Contractor / Third-Party

    ITEM

    No.ACCEPTANCE CRITERIA REFERENCE

    3. SAES-A-007, Hydrostatic Testing Fluids and Lay-Up Procedures, (28 J anuary, 2004)

    4. 32-SAMSS-004, Manufacture of Pressure Vessels, (29 May, 2002)

    Saudi Aramco

    Page 2 of 2